VI-A1
Page 1 of 4
State College Area School District Office of Physical Plant
Ed Poprik, Director
To: Robert O’Donnell From: Ed Poprik RE: High School Update Date: July 24, 2017 In addition to reviewing the construction progress report from Massaro Construction Management, this update includes 2 specific items for discussion: -Furniture, Fixtures, and Equipment (FFE) update
-High School Signage
Furniture, Fixtures and Equipment (FFE) update: The FFE planning effort for this project has been actively underway for nearly a year. The FFE budget, which has been approved as part of the soft costs at $2.6 million, will fund the purchase of new items, which are not part of the building construction. These items include, but are not limited to: -Furniture -Appliances -Select instructional equipment Crabtree Rohrbaugh and Associates (CRA) has been working with administration to prepare for purchases, while balancing cost estimates against the available budget. Concurrently, district-owned materials are being evaluated for re-use in the finished building. In preparation for the December completion of Phase 1, the first round of furniture purchases will need to be approved in August. An additional round of purchasing is planned for 2019. In order to protect the integrity of the approved budget total and lock in pricing now, an accounting of all potential
State College Area School District, High School, July 24, 2017
Page 2 of 4
purchases for both phases is being compiled. As part of the initial award, the selected vendor(s) will guarantee pricing for the purchases and deliveries scheduled for 2019. The Board action slated for August will be to approve the current purchases for Phase 1 and establish a not to exceed cost for the remainder of the Phase 2 purchases. A primary focus of Phase 1 purchases will be for areas that are not currently in existence in the current building. Examples include: flexible furniture for the large group, small group, and gathering areas. In order to obtain the best balance of quality and price for the furniture portion of the purchases, quotes from 3 vendors who hold state contract pricing were obtained. Awards will be made to the low vendor(s). A completed accounting of the items and quotes will be presented at the time of the award. For the appliances and equipment portion of the purchases, some pieces may be purchased outright, while a formal bid may be forth coming for certain pieces of equipment. Based on current pricing, if all furniture planned were purchased as new, the budget would be exceeded. In addition to looking for savings opportunities where appropriate, and select use of existing furniture, some furniture may be planned as a future purchase outside of the project budget. Several renderings and a sample floor plan are attached. Signage: Site signage, wayfinding, was not included as part of the bid package for this project. Therefore, administration is beginning the review and planning process for routine site signage, wayfinding signage, and main entry signage. CRA, who have completed wayfinding signage for numerous High School and campus projects, has offered to provide their services without additional charge. It is anticipated that in the coming months, CRA will work with administration to develop a draft plan. When complete, this plan will be reviewed with the Board at a future Facilities and Grounds Committee meeting.
State College Area School District, High School, July 24, 2017
Page 3 of 4
Regarding the main entry signage, due to the campus nature of our project, several potential locations exist. The obvious choices would include the main entry drive to the South building, the main entry drive to the North building, and the intersection of O’Bryan Lane and Westerly Parkway. A review of all possible options will be completed with the final selection checked against the State College Borough sign ordinance. If necessary, variances will be requested. During discussions about potential main entry signs, the local stone mason, Mr. Phil Hawk was raised as a potential resource. Examples of Mr. Hawk’s work, which includes signs for Penn State University and College Township, can be found at www.PhilHawk.com. A preliminary, non-binding, meeting has been held with Mr. Hawk and he is enthusiastic about the potential project. As part of the discussion, the potential of reclaiming stone from a wall in an existing wing of the North auditorium was also discussed. Mr. Hawk is interested in pursuing this possibility for a number of reasons including but not limited to: -Sustainability -Quality of the Stone -Source of “free” materials -Integration of the old High School with the new High School Administration is seeking permission to engage in a limited time and materials contract with Mr. Hawk to engage in a site sign planning process. As with the other signage, draft plans would be reviewed with the Board prior to execution. Following a successful design process, another contract could be sought for the actual construction. Due to the status of furniture purchase estimates, funding for this portion of the project would be from contingency and supplemented by a commitment from the HS PTO. As part of this process, administration plans to present a credit change order on August 14 to eliminate a 6-foot fence from the project. The design team included the fence as a way to prevent pedestrian traffic from using the parking lot as a short cut. However; this fence, if installed, would be in a prime location for main entry signage. If this area is not chosen as a final sign location, administration believes a better pedestrian traffic flow solution is warranted. (see red line on attached site plan)
State College Area School District, High School, July 24, 2017
Page 4 of 4
Attachments: Construction Progress PowerPoint High School Site Plan FFE graphics
CONFERENCE
C040
OFFICE
C036
OFFICE
C035
OFFICE
C034
BUILDINGADMINISTRATION
C037
TABLE &CHAIRS-NIC
TABLE &CHAIRS-NIC
COPIER-NIC
UCREFRIG-NIC
CHAIR &COMPUTER-NIC
CHAIRS-NIC
WORKSTATION,CHAIR, &SHELVING-NIC
FILES &SHELVING-NIC
FILES-NIC
WORKSTATION,CHAIR, &SHELVING-NIC
1I4.4D
A
B
C
WORKSTATION,CHAIR, &SHELVING-NIC
60" TV-NIC
FILES-NIC
TABLE &CHAIRS-NIC
FILES-NIC
705
708
436
314
314
104
305
325
315
315
339331322
339
290
305 290
248
329
245
322
234
305289
305289
707710 710
ALIGN3' - 0"
8' - 6"
5' - 5 1/2"
316
203
734
OFFICE
C027
WORKSTATION& CHAIR-NICSHELVING
-NIC
728 710
FILE-NIC
CLASSROOM
D014
CORRIDOR
D008
CORRIDOR
D008
CORRIDOR
D019
MICROWAVE-NIC
MOBILELECTERN-NIC
TABLE &CHAIRS-NIC
MOBILELECTERN-NIC
DESK &STOOL-NIC
SMALLGROUP
INSTRUCTION
D013
LCDPROJ-NIC
1I4.4
H
50" TV-NIC
50" TV-NIC
705705
305
220305
220
329
239
308
201
321
232
728 703 728
UCREFRIG-NIC
203
322 322 316 329 331
248 234 245
339339
COPIER-NIC
305 305 315 315
289 289
COMPUTER-NIC
OPEN
FRAMELESSTACKBOARD(WIDTH TO FIT xHEIGHT TO FIT)
436
OPEN
0' -
8"
4' - 0"
8' -
0"
1' -
0" FINISHED
END PANELFRAMELESSTACKBOARD(WIDTH TO FIT xHEIGHT TO FIT)
734
436
325 314 314 104 305 305
290290
MICROWAVE-NIC
201
321 308 329 305 305
220220239232
CUST
D031
SGI
D032
CONFERENCE
D030
FACULTYPLANNING
D027
STORAGE
D029
SMALLGROUP
INSTRUCTION
D036
SMALLGROUP
BREAKOUT
D026
HEATPUMP
CLOSET
D034
STORAGE
D035
HEATPUMP
CLOSET
D028
ELECT
D033
COPIER-NIC
WORKSTATION& CHAIR-NIC
UCREFRIG-NIC
TABLE &CHAIRS-NIC
60" TV-NIC
SHELVING-NIC
CART-NIC
MOP BUCKET-NIC
SHELVING-NIC
TABLE &STOOLS-NIC
CHAIRS &OTTOMAN-NIC
50" TV-NIC
MOPSINK-BY PC
LOW MOBILESTORAGE-NIC
TABLE &CHAIRS-NIC
TEACHER'SSTATION-NIC
LOW MOBILESTORAGE-NIC
TEACHER'SSTATION-NIC
SHELVING-NIC
LCDPROJ-NIC
LOUNGECHAIR-NIC
1I4.4E
F
G
60" TV-NIC
704
719
704
705
330
321
305 219
305 219
305 219
305 219
104 105 105 105 105 105 107 107 107 107 107 107
320232
329
308201
305219
305219
305219
707
TABLE &CHAIRS-NIC
MOP RACK-SEE SPEC
COPIER-NIC
330321305305305305
219 219 219 219
TY
P
4' -
0"
104 105 105 105 105 105 107 107 107 107 107 107
UC REFRIG-NIC
320 308 329 305 305 305
219219219201232
PROJECT
PLOT SCALE:
FILENAME:
DATE:
01 MM-DD-YR DESCRIPTION OF CHANGESNAME
R E V I S I O N S
ww
w.c
ra-a
rch
ite
cts
.com
ALL REPORTS, PLANS SPECIFICATIONS AND COMPUTER FILES RELATING TO THIS
PROJECT ARE THE PROPERTY OF CRABTREE, ROHRBAUGH & ASSOCIATES.
CRABTREE ROHRBAUGH & ASSOCIATES RETAINS ALL COMMON LAW, STATUTE AND
OTHER RESERVED RIGHTS INCLUDING THE COPYRIGHT THERETO. REPRODUCTION
OF THE MATERIAL HERIN OR SUBSTANTIAL USE WITHOUT WRITTEN PERMISSION OF
CRABTREE, ROHRBAUGH & ASSOCIATES VIOLATES THE COPYRIGHT LAWS OF THE
UNITED STATES AND WILL BE SUBJECT TO LEGAL PROSECUTION.
© CRABTREE, ROHRBAUGH & ASSOCIATES, INC 2014, 2015
CR
AB
TR
EE
RO
HR
BA
UG
H &
AS
SO
CIA
TE
S -
AR
CH
ITE
CTS
250
WE
ST
MA
IN S
TR
EE
T, S
UIT
E 2
00
CH
AR
LO
TTE
SV
ILLE
V
A 2
29
02
434
-97
5-7
26
2 F
AX
434-9
75
-72
63
401 E
AS
T W
IND
ING
HIL
L R
OA
D
ME
CH
AN
ICS
BU
RG
P
A 1
7055
717-4
58-0
272 FA
X 7
17-4
58-0
047
1/4" = 1'-0"
LARGE SCALE LAYOUTS 9THGRADE LEARNING COMMUNITY,
FACULTY PLANNING, & OPENCLASSROOM
JANUARY 29, 2016
2787
1I4.4
ST
AT
E C
OLLE
GE
AR
EA
SC
HO
OL D
IST
RIC
T
ST
AT
E C
OLLE
GE
AR
EA
HIG
H S
CH
OO
L −
SO
UT
H B
UIL
DIN
G
653 W
ES
TE
RLY
PA
RK
WA
YS
TA
TE
CO
LLE
GE
, P
A 1
6801
AD
DIT
ION
S &
RE
NO
VA
TIO
NS
TO
TH
E
4 11-04-2015 MER ADDENDUM NO. 4
A 12-09-2015 MER CODE COMMENTS PHASE 1
8 11-16-2015 MER ADDENDUM NO. 8
GRADES 9 - 12 MOUNTING HEIGHT SCHEDULE
MARKER BOARD 3'-0" AFF TO BOTTOM EDGE
TACK BOARD 3'-0" AFF TO BOTTOM EDGE
BASE CABINETS 3'-0" AFF TO TOP OF COUNTER
WALL CABINETS 7'-0" AFF TO TOP OF CABINET
PROJECTION SCREEN MOUNTED DIRECTLY BELOW CEILING
TV/DVD
LCD BRACKET-CEILINGMOUNTED
CENTERED ON PROJECTION SCREEN, MARKERBOARD AND/OR COMBINATION MARKER/TACKBOARD UNIT PER MANUFACTURER'S WRITTENRECOMMENDATIONS.(OWNER PROVIDED/GC INSTALLED)
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- GROUND FLOOR AREA 'D': D026, D027, D029, D030, D031, D032 & D036.
1/4" = 1'-0"1I4.4
1 9TH GRADE LEARNING COMMUNITY
1/4" = 1'-0"1I4.4
2 COORDINATOR OFFICE
1/4" = 1'-0"1I4.4
4 SMALL GROUP INSTRUCTION & CLASSROOM*
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS: C015, C016, D013, D014, B115, B116, C114, C115, D113, D114, A213, B215, B216, C211, C212, D213, D214 & A317.
1/4" = 1'-0"1I4.4
A INTERIOR ELEVATION A
1/4" = 1'-0"1I4.4
B INTERIOR ELEVATION B
1/4" = 1'-0"1I4.4
C INTERIOR ELEVATION C
1/4" = 1'-0"1I4.4
D INTERIOR ELEVATION D
1/4" = 1'-0"1I4.4
H INTERIOR ELEVATION H
GENERAL NOTE IN REFERENCE TO 1I4.4
1. ALL CASEWORK IN ADMINSTRATION AREA & FACULTY PLANNING SHALL RECEIVE LOCKS.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- FIRST FLOOR AREA 'B': B131, B132, B134, B135, B140 & B141.
1/4" = 1'-0"1I4.4
3 FACULTY PLANNING*
1/4" = 1'-0"1I4.4
E INTERIOR ELEVATION E
1/4" = 1'-0"1I4.4
F INTERIOR ELEVATION F
1/4" = 1'-0"1I4.4
G INTERIOR ELEVATION G
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- FIRST FLOOR AREA 'C': C132, C133, C135, C136, C141, & C142.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- FIRST FLOOR AREA 'D': D125, D126, D128, D129, D134 & D135.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- SECOND FLOOR AREA 'B': B235, B236, B238, B239, B241, B244 & B245.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- SECOND FLOOR AREA 'C': C228, C229, C231, C232, C234, C237 & C238.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- SECOND FLOOR AREA 'D': D226, D227, D229, D230, D232, D235 & D236.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- THIRD FLOOR AREA 'A': A334, A335, A337, A340, A342, A345 & A346.
1I4.4 - GENERAL CASEWORK AND EQUIPMENT SCHEDULE
NO DESCRIPTION MANUFACTURER MODEL DIMENSIONS104 1-DOOR ADA TALL WARDROBE MODIFIED TO INCLUDE
CLOTHING ROD @ 48" AFF & PROVIDE ADA STICKER ONDOOR - LEFT HINGED
LSI 5232M 15"W x 24"D x 84"H
105 1-DOOR TALL WARDROBE - LEFT HINGED LSI 5232 15"W x 24"D x 84"H
107 1-DOOR TALL WARDROBE - RIGHT HINGED LSI 5222 15"W x 24"D x 84"H
201 ADA VANITY SNK BASE CABINET LSI 1137 36"W x 24"D x 34"H
203 ADA VANITY SINK BASE CABINET LSI 1137 30"W x 24"D x 34"H
219 2-DOOR/2-DRAWER BASE CABINET LSI 1102 36"W x 24"D x 36"H
220 2-DOOR/2-DRAWER BASE CABINET LSI 1102 36"W x 24"D x 34"H
232 1-DOOR/1-DRAWER BASE CABINET - LEFT HINGED LSI 1072 24"W x 24"D x 34"H
234 1-DOOR/1-DRAWER BASE CABINET - LEFT HINGED LSI 1072 21"W x 24"D x 34"H
239 1-DOOR/1-DRAWER BASE CABINET - RIGHT HINGED LSI 1062 24"W x 24"D x 34"H
245 1-DOOR/1-DRAWER BLIND BASE CABINET - LEFT SIDEEXPOSED
LSI 1082 45"W x 24"D x 36"H
248 1-DOOR/1-DRAWER BLIND BASE CABINET - RIGHT SIDEEXPOSED
LSI 1092 45"W x 24"D x 34"H
289 2-DRAWER LATERAL FILE CABINET LSI 1351 36"W x 24"D x 36"H
290 2-DRAWER LATERAL FILE CABINET LSI 1351 36"W x 24"D x 34"H
305 2-DOOR WALL CABINET LSI 3052 36"W x 14"D x 30"H
308 2-DOOR WALL CABINET LSI 3002 36"W x 14"D x 18"H
314 2-DOOR WALL CABINET LSI 3052 30"W x 14"D x 30"H
315 2-DOOR WALL CABINET LSI 3052 30"W x 14"D x 24"H
316 2-DOOR WALL CABINET LSI 3002 30"W x 14"D x 18"H
320 1-DOOR WALL CABINET - LEFT HINGED LSI 3072 24"W x 14"D x 30"H
321 1-DOOR WALL CABINET - LEFT HINGED LSI 3072 24"W x 14"D x 24"H
322 1-DOOR WALL CABINET - LEFT HINGED LSI 3072 21"W x 14"D x 30"H
325 1-DOOR WALL CABINET - LEFT HINGED LSI 3072 18"W x 14"D x 30"H
329 1-DOOR WALL CABINET - RIGHT HINGED LSI 3062 24"W x 14"D x 30"H
330 1-DOOR WALL CABINET - RIGHT HINGED LSI 3062 24"W x 14"D x 24"H
331 1-DOOR WALL CABINET - RIGHT HINGED LSI 3062 21"W x 14"D x 30"H
339 1-DOOR CORNER WALL CABINET - LEFT HINGED LSI 3332 24"W x 24"D x 30"H
436 BUILT-IN DESK MOFIDIED TO INCLUDE 42"HTRANSACTION LEDGE, (1) BOX/BOX/FILE, (1) FILE/FILE,TACK SURFACE & (2) GROMMETS. PROVIDE SOLIDPOLYMER MATERIAL FOR TRANSACTION LEDGE
LSI 0491, 1330, 1350, 9931, 9902 SEE DRAWING x 24"/30"D x30"H/42"H
703 MARKERBOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 16'-0"W x 4'-0"H
704 MARKERBOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 14'-0"W x 4'-0"H
705 MARKERBOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 12'-0"W x 4'-0"H
707 MARKERBOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 8'-0"W x 4'-0"H
708 MARKERBOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 6'-0"W x 4'-0"H
710 MARKERBOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 4'-0"W x 4'-0"H
719 TACK BOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 14'-0"W x 4'-0"H
728 TACK BOARD SEE SPECIFICATIONS SEE SPECIFICATIONS 4'-0"W x 4'-0"H
734 SUSPENDED FABRIC DIVIDER PANEL SEE SPECIFICATIONS SEE SPECIFICATIONS SEE DRAWINGS
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS: C027, D003, A104, A140, B126, D103, D203, A224 & A328.
*LAYOUT SHALL BE APPLIED TO THE FOLLOWING ROOMS- SECOND FLOOR AREA 'A': A229, A231 & A236.4
8