e-mail: [email protected] Web: www.rexquote.co.uk TEL:01823 433398 Machine fitted with permanently attached Quick Hitch Standard Quick Hitch Charts Machine Type: Komatsu PW160 Serial Number: H60267 Rail Axle Number: 2410 Network Rail Number: 99709 910054-4 Equipment: Boom 2.00m Artic 3.475 Arm 2.1m Date: 19th November 2015 Issue: 1 Software Versions: Safety Controller V1.25.5.8 I/O Controller 1 V1.25.5.8 I/O Controller 2 V1.25.5.8 MMI V1.25.5.7 This machine is equipped with a PME Rated Capacity Indicator. This system is designed to comply with RAILWAY SAFETY STANDARD RIS-1530-PLT Issue 5 Radius / Height are given in METRES. Loads are given in TONNES, and assume that the load is suspended vertically below the lifting point with no other equipment attached. This machine is fitted with an hydraulically adjustable boom. This allows the machine to reach the same point in space with a variety of different equipment angles, each combination has a different safe working load. The charts on the following pages show both the upper & lower limits of the loads achievable. Loads marked 'b' boom, 'r' articulation, and 'a' arm are limited by hydraulic capacity. All rail duties listed are valid for use on and up to a 1:25 gradient, and with a maximum track twist of 27mm.

Upload: others

Post on 27-Jun-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Standard Quick Hitch Charts - L & W Contractors

e-mail: [email protected]: www.rexquote.co.uk

TEL:01823 433398

Machine fitted with permanently attached Quick Hitch

Standard Quick Hitch Charts

Machine Type: Komatsu PW160

Serial Number: H60267

Rail Axle Number: 2410

Network Rail Number: 99709 910054-4

Equipment: Boom 2.00m Artic 3.475 Arm 2.1m

Date: 19th November 2015

Issue: 1

Software Versions: Safety Controller V1.25.5.8

I/O Controller 1 V1.25.5.8

I/O Controller 2 V1.25.5.8

MMI V1.25.5.7

This machine is equipped with a PME Rated Capacity Indicator. This system is designed to comply with RAILWAYSAFETY STANDARD RIS-1530-PLT Issue 5

Radius / Height are given in METRES. Loads are given in TONNES, and assume that the load is suspended vertically belowthe lifting point with no other equipment attached. This machine is fitted with an hydraulically adjustable boom. This allows the machine to reach the same point in space with a variety of different equipment angles, each combination hasa different safe working load. The charts on the following pages show both the upper & lower limits of the loads achievable.Loads marked 'b' boom, 'r' articulation, and 'a' arm are limited by hydraulic capacity.

All rail duties listed are valid for use on and up to a 1:25 gradient, and with a maximum track twist of 27mm.

Page 2: Standard Quick Hitch Charts - L & W Contractors

Machine Type Komatsu PW160 Equipment 2.00m + 3.48m + 2.10m

Issue Date 17/11/2015 Serial No. 11022

System Type PME RAIL Additional Info. Triple

Duty

AU Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10°

Over Osc End

Osc Axle Safety

71%

Duty

AU Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10°

Over Osc End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.01 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 6.96 5.55 4.58 3.83 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 6.69 5.41 4.52 3.56k 3.11k 2.73a 2.60a 2.42 2.20 2.09 -

-2.00 - - - 11.36 8.44 6.57 5.33 4.44 3.13k 3.11k 2.98 2.65 2.40 2.24 - -

-3.00 - 12.00 11.50k 11.17k 8.38 6.72 5.45 4.52 3.89 3.37 2.99 2.68 2.61 - - -

-4.00 - - - 11.61 8.56 6.74 5.46 4.68 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.40 3.01 2.66a 2.30a -

4.00 - - - - - 7.18b 7.05 5.91 4.98 4.37 3.82 3.42 3.03 2.67 2.36 1.75a

3.00 - - - - - 7.68 7.08 5.87 5.01 4.28 3.83 3.41 3.02 2.66 2.36 2.08

2.00 - - - - - 7.52 6.94 5.82b 4.98 4.26k 3.80 3.39 2.98 2.62 2.33 2.07

1.00 - - - - - 7.92 7.02 5.83 4.94 4.29 3.82 3.38 2.92 2.58 2.30 2.05

0.00 - - - - - 7.33 6.82 5.74 4.78 4.19 3.71 3.28 2.87 2.52 2.26 2.01

-1.00 - - - - - 7.92 6.71 5.59 4.77 4.10 3.65 3.17 2.78 2.47 2.20 -

-2.00 - - - 12.00 11.20 8.39 6.74 5.59 4.69 4.03 3.54 3.08 2.73 2.43 - -

-3.00 - 12.00 12.00 12.00 11.04 8.22 6.70 5.49 4.64 3.94 3.42 3.04 2.68 - - -

-4.00 - - - 11.61 11.30 8.30 6.60 5.42 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

1 of 64 17/11/2015 11:57

Page 3: Standard Quick Hitch Charts - L & W Contractors

Duty

BU Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10° - +/- 45°

Over Osc End

Osc Axle Safety

71%

Duty

BU Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10° - +/- 45°

Over Osc End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.86 - - - -

6.00 - - - - - - - 3.01a 2.74 2.32 1.82a 1.74 1.50 1.44 - -

5.00 - - - - - 2.74a 2.86a 2.96a 2.64 2.26 1.94a 1.70a 1.49 1.31 1.25 -

4.00 - - - - - 2.95a 3.12k 2.91 2.45 2.14 1.87 1.66 1.46 1.28 1.14 1.11

3.00 - - - - - 3.98 3.18 2.58 2.28 1.98 1.77 1.57 1.40 1.25 1.10 1.04

2.00 - - - - - 4.00 3.19 2.57 2.12 1.87 1.67 1.48 1.33 1.20 1.06 1.01

1.00 - - - - - 3.92 3.12 2.53 2.09 1.80 1.60 1.43 1.30 1.16 1.03 1.00

0.00 - - - - - 3.86 3.06 2.50 2.05 1.78 1.57 1.39 1.25 1.13 1.03 1.00

-1.00 - - - - - 3.66 2.94 2.44 2.00 1.75 1.57 1.39 1.26 1.13 1.07 -

-2.00 - - - 5.96 4.54 3.56 2.88 2.38 2.02 1.77 1.57 1.38 1.25 1.16 - -

-3.00 - 12.00 9.26 6.06 4.49 3.66 2.97 2.42 2.07 1.79 1.58 1.42 1.37 - - -

-4.00 - - - 6.09 4.61 3.68 3.00 2.57 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.10a 2.73 2.35 2.00 - - - -

6.00 - - - - - - - 3.03a 3.08a 2.72 2.36 2.05 1.76 1.49 - -

5.00 - - - - - 2.97a 3.28a 3.38a 3.11 2.71 2.35 2.06 1.78 1.51 1.30 -

4.00 - - - - - 4.78 4.23 3.61 3.06 2.64 2.33 2.04 1.78 1.53 1.31 1.11

3.00 - - - - - 5.07 4.21 3.52 3.01 2.60 2.28 2.03 1.78 1.52 1.30 1.11

2.00 - - - - - 4.95 4.11 3.44 2.96 2.56 2.26 2.02 1.76 1.49 1.28 1.09

1.00 - - - - - 4.71 4.09 3.36 2.92 2.56 2.24 1.97 1.70 1.44 1.23 1.06

0.00 - - - - - 4.12 3.83 3.27 2.75 2.43 2.13 1.88 1.61 1.38 1.20 1.03

-1.00 - - - - - 4.33 3.70 3.15 2.69 2.35 2.06 1.76 1.51 1.31 1.14 -

-2.00 - - - 6.53 5.89 4.55 3.72 3.12 2.63 2.24 1.96 1.68 1.46 1.27 - -

-3.00 - 12.00 10.55 7.31 5.84 4.46 3.68 3.04 2.57 2.19 1.85 1.63 1.42 - - -

-4.00 - - - 6.09 5.96 4.49 3.61 2.98 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

2 of 64 17/11/2015 11:57

Page 4: Standard Quick Hitch Charts - L & W Contractors

Duty

CU Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 45° - +/- 135°

Osc Axle Safety

71%

Duty

CU Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 45° - +/- 135°

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.86 - - - -

6.00 - - - - - - - 3.01a 2.74 2.32 1.82a 1.74 1.50 1.44 - -

5.00 - - - - - 2.74a 2.86a 2.96a 2.64 2.26 1.94a 1.70a 1.49 1.31 1.25 -

4.00 - - - - - 2.95a 3.12k 2.91 2.45 2.14 1.87 1.66 1.46 1.28 1.14 1.11

3.00 - - - - - 3.98 3.18 2.58 2.28 1.98 1.77 1.57 1.40 1.25 1.10 1.04

2.00 - - - - - 4.00 3.19 2.57 2.12 1.87 1.67 1.48 1.33 1.20 1.06 1.01

1.00 - - - - - 3.92 3.12 2.53 2.09 1.80 1.60 1.43 1.30 1.16 1.03 1.00

0.00 - - - - - 3.86 3.06 2.50 2.05 1.78 1.57 1.39 1.25 1.13 1.03 1.00

-1.00 - - - - - 3.66 2.94 2.44 2.00 1.75 1.57 1.39 1.26 1.13 1.07 -

-2.00 - - - 5.96 4.54 3.56 2.88 2.38 2.02 1.77 1.57 1.39 1.25 1.16 - -

-3.00 - 12.00 9.26 6.06 4.49 3.66 2.97 2.42 2.07 1.79 1.58 1.42 1.37 - - -

-4.00 - - - 6.09 4.61 3.68 3.00 2.57 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.10a 2.73 2.35 2.00 - - - -

6.00 - - - - - - - 3.03a 3.08a 2.72 2.36 2.05 1.76 1.49 - -

5.00 - - - - - 2.97a 3.28a 3.38a 3.11 2.71 2.35 2.06 1.78 1.51 1.30 -

4.00 - - - - - 4.78 4.23 3.61 3.06 2.64 2.33 2.04 1.78 1.53 1.31 1.11

3.00 - - - - - 5.07 4.21 3.52 3.01 2.60 2.28 2.03 1.78 1.52 1.30 1.11

2.00 - - - - - 4.95 4.11 3.44 2.96 2.56 2.26 2.02 1.76 1.49 1.28 1.09

1.00 - - - - - 4.71 4.09 3.36 2.92 2.56 2.24 1.97 1.70 1.44 1.23 1.06

0.00 - - - - - 4.12 3.83 3.27 2.75 2.43 2.13 1.88 1.61 1.38 1.20 1.03

-1.00 - - - - - 4.33 3.70 3.15 2.69 2.35 2.06 1.76 1.51 1.31 1.14 -

-2.00 - - - 6.53 5.89 4.55 3.72 3.12 2.63 2.24 1.96 1.68 1.46 1.27 - -

-3.00 - 12.00 10.55 7.31 5.84 4.46 3.68 3.04 2.57 2.19 1.85 1.63 1.42 - - -

-4.00 - - - 6.09 5.96 4.49 3.61 2.98 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

3 of 64 17/11/2015 11:57

Page 5: Standard Quick Hitch Charts - L & W Contractors

Duty

DU Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 135° - +/- 150°

Over Fixed End

Osc Axle Safety

71%

Duty

DU Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 135° - +/- 150°

Over Fixed End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 8.86 7.07 5.72b 4.91 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 8.54 6.90 5.78 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 10.86 8.42 6.57a 5.13a 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 10.79 8.58 6.96 5.79 4.34k 3.59k 3.11k 3.19k 3.06a - - -

-4.00 - - - 12.00 11.00 8.61 6.96 5.81a - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.42a 3.05a 2.30a -

4.00 - - - - - 7.18b 7.54b 7.28 6.15 4.58a 4.54 4.15 3.69 3.33 2.95 1.75a

3.00 - - - - - 7.79b 8.02b 7.28b 6.12 5.31b 4.61k 4.17 3.74 3.32 2.95 2.40a

2.00 - - - - - 7.61b 7.86b 7.19b 6.04 5.24 4.60 4.16 3.71 3.28 2.95 2.65

1.00 - - - - - 8.85 8.49 7.23 6.15 5.30 4.67 4.14 3.65 3.27 2.92 2.62

0.00 - - - - - 9.10 8.66 7.09 5.98 5.26 4.65 4.10 3.63 3.21 2.87 2.31a

-1.00 - - - - - 10.14 8.54 7.09 6.02 5.18 4.50 3.98 3.52 3.16 2.83 -

-2.00 - - - 12.00 12.00 10.77 8.59 7.02 5.93 5.10 4.37 3.86 3.45 3.10 - -

-3.00 - 12.00 12.00 12.00 12.00 10.56 8.55 6.98 5.85 5.01 4.36 3.80 3.43 - - -

-4.00 - - - 12.00 12.00 10.66 8.43 6.90 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

4 of 64 17/11/2015 11:57

Page 6: Standard Quick Hitch Charts - L & W Contractors

Duty

EU Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 150° - +/- 160°

Over Fixed End

Osc Axle Safety

71%

Duty

EU Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 150° - +/- 160°

Over Fixed End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 8.97b 7.10b 5.72b 5.24b 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 11.00k 9.02b 7.40b 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 10.90k 10.98k 6.57a 5.13a 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 10.89k 9.54a 7.25a 5.82a 4.34k 3.59k 3.11k 3.19k 3.06a - - -

-4.00 - - - 12.00 11.74b 9.59b 7.96b 5.81a - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.42a 3.05a 2.30a -

4.00 - - - - - 7.18b 7.60b 7.65b 6.29a 4.58a 4.58a 4.32a 4.03a 3.70a 3.07a 1.75a

3.00 - - - - - 7.79b 8.09b 8.16b 8.02b 6.82b 6.03b 4.94b 4.89k 4.40a 3.71a 2.40a

2.00 - - - - - 7.61b 7.96b 8.05b 7.95b 7.46b 6.58b 5.86b 4.94b 4.93b 4.13a 2.72a

1.00 - - - - - 8.87b 8.76b 8.71b 8.26b 7.57b 6.79b 6.10b 5.56b 4.98k 4.43a 2.94a

0.00 - - - - - 10.86b 10.47b 9.56b 8.75b 7.67b 6.88b 6.18b 5.59b 4.91a 4.45a 2.31a

-1.00 - - - - - 12.00 11.94b 10.27b 8.85b 7.79b 6.96b 6.17b 5.53b 4.80a 3.78a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.44b 8.91b 7.82b 6.91b 6.14b 5.16k 4.39a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.26a 8.82b 7.40b 6.39b 4.96b 3.98a - - -

-4.00 - - - 12.00 12.00 11.43b 9.39b 7.64a - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

5 of 64 17/11/2015 11:57

Page 7: Standard Quick Hitch Charts - L & W Contractors

Duty

FU Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

71%

Duty

FU Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 8.97b 7.10b 5.72b 5.24b 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 11.00k 9.02b 7.40b 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 10.90k 10.98k 6.57a 5.13a 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 10.89k 9.54a 7.25a 5.82a 4.34k 3.59k 3.11k 3.19k 3.06a - - -

-4.00 - - - 12.00 11.74b 9.59b 7.96b 5.81a - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.42a 3.05a 2.30a -

4.00 - - - - - 7.18b 7.60b 7.65b 6.29a 4.58a 4.58a 4.32a 4.03a 3.70a 3.07a 1.75a

3.00 - - - - - 7.79b 8.09b 8.16b 8.02b 6.82b 6.03b 4.94b 4.89k 4.40a 3.71a 2.40a

2.00 - - - - - 7.61b 7.96b 8.05b 7.95b 7.46b 6.58b 5.86b 4.94b 4.93b 4.13a 2.72a

1.00 - - - - - 8.87b 8.76b 8.71b 8.26b 7.57b 6.79b 6.10b 5.56b 4.98k 4.43a 2.94a

0.00 - - - - - 10.86b 10.47b 9.56b 8.75b 7.67b 6.88b 6.18b 5.59b 4.91a 4.45a 2.31a

-1.00 - - - - - 12.00 11.94b 10.27b 8.85b 7.79b 6.96b 6.17b 5.53b 4.80a 3.78a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.44b 8.91b 7.82b 6.91b 6.14b 5.16k 4.39a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.26a 8.82b 7.40b 6.39b 4.96b 3.98a - - -

-4.00 - - - 12.00 12.00 11.43b 9.39b 7.64a - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

6 of 64 17/11/2015 11:57

Page 8: Standard Quick Hitch Charts - L & W Contractors

Duty

AL Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10°

Over Osc End

Osc Axle Safety

71%

Duty

AL Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10°

Over Osc End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 8.97b 7.10b 5.72b 5.24b 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 11.00k 9.02b 7.36 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 10.90k 10.98k 6.57a 5.13a 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 10.89k 9.54a 7.25a 5.82a 4.34k 3.59k 3.11k 3.19k 3.06a - - -

-4.00 - - - 12.00 11.74b 9.59b 7.96b 5.81a - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.42a 3.05a 2.30a -

4.00 - - - - - 7.18b 7.60b 7.65b 6.29a 4.58a 4.58a 4.32a 4.01 3.57 3.07a 1.75a

3.00 - - - - - 7.79b 8.09b 8.16b 7.50 6.22 5.32 4.64 4.08 3.57 3.13 2.40a

2.00 - - - - - 7.61b 7.96b 8.04b 7.44 6.30 5.33 4.59 4.09 3.54 3.14 2.72a

1.00 - - - - - 8.87b 8.76b 8.71b 7.50 6.25 5.32 4.61 4.03 3.54a 3.07 2.74

0.00 - - - - - 10.86b 10.47b 9.43b 7.62 6.31 5.29 4.58 3.99 3.45 3.04 2.31a

-1.00 - - - - - 12.00 11.94b 9.71 7.68 6.27 5.19 4.40 3.89 3.38 2.99 -

-2.00 - - - 12.00 12.00 12.00 12.00 9.57 7.54 6.14 5.07 4.36 3.80 3.34 - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 9.53 7.45 6.05 5.07 4.27 3.77 - - -

-4.00 - - - 12.00 12.00 11.43b 9.39b 7.64a - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

7 of 64 17/11/2015 11:57

Page 9: Standard Quick Hitch Charts - L & W Contractors

Duty

BL Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10° - +/- 45°

Over Osc End

Osc Axle Safety

71%

Duty

BL Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 10° - +/- 45°

Over Osc End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.02 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 6.96 5.55 4.58 3.83 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 6.69 5.41 4.52 3.56k 3.11k 2.73a 2.60a 2.42 2.20 2.09 -

-2.00 - - - 11.36 8.44 6.57 5.33 4.44 3.13k 3.11k 2.98 2.65 2.40 2.24 - -

-3.00 - 12.00 11.50k 11.17k 8.38 6.72 5.45 4.52 3.89 3.37 2.99 2.68 2.61 - - -

-4.00 - - - 11.61 8.56 6.74 5.46 4.68 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.40 3.01 2.66a 2.30a -

4.00 - - - - - 7.18b 7.05 5.91 4.98 4.37 3.82 3.42 3.03 2.67 2.36 1.75a

3.00 - - - - - 7.68 7.08 5.87 5.01 4.28 3.83 3.41 3.02 2.66 2.36 2.08

2.00 - - - - - 7.52 6.94 5.82b 4.98 4.26k 3.80 3.39 2.98 2.62 2.33 2.07

1.00 - - - - - 7.92 7.03 5.83 4.94 4.29 3.82 3.38 2.92 2.58 2.30 2.05

0.00 - - - - - 7.33 6.82 5.74 4.78 4.19 3.72 3.28 2.87 2.52 2.26 2.01

-1.00 - - - - - 7.92 6.71 5.59 4.77 4.10 3.65 3.17 2.78 2.47 2.20 -

-2.00 - - - 12.00 11.20 8.39 6.74 5.59 4.69 4.03 3.54 3.08 2.73 2.43 - -

-3.00 - 12.00 12.00 12.00 11.04 8.22 6.70 5.49 4.64 3.94 3.42 3.04 2.68 - - -

-4.00 - - - 11.61 11.30 8.30 6.60 5.42 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

8 of 64 17/11/2015 11:57

Page 10: Standard Quick Hitch Charts - L & W Contractors

Duty

CL Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 45° - +/- 135°

Osc Axle Safety

71%

Duty

CL Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 45° - +/- 135°

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.02 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 6.96 5.55 4.58 3.83 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 6.69 5.41 4.52 3.56k 3.11k 2.73a 2.60a 2.42 2.20 2.09 -

-2.00 - - - 11.36 8.44 6.57 5.33 4.44 3.13k 3.11k 2.98 2.65 2.40 2.24 - -

-3.00 - 12.00 11.50k 11.17k 8.38 6.72 5.45 4.52 3.89 3.37 2.99 2.68 2.61 - - -

-4.00 - - - 11.61 8.56 6.74 5.46 4.68 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.40 3.01 2.66a 2.30a -

4.00 - - - - - 7.18b 7.05 5.91 4.98 4.37 3.82 3.42 3.03 2.67 2.36 1.75a

3.00 - - - - - 7.68 7.08 5.87 5.01 4.28 3.83 3.41 3.02 2.66 2.36 2.08

2.00 - - - - - 7.52 6.94 5.82b 4.98 4.26k 3.80 3.39 2.98 2.62 2.33 2.07

1.00 - - - - - 7.92 7.03 5.83 4.94 4.29 3.82 3.38 2.92 2.58 2.30 2.05

0.00 - - - - - 7.33 6.82 5.74 4.78 4.19 3.72 3.28 2.87 2.52 2.26 2.01

-1.00 - - - - - 7.92 6.71 5.59 4.77 4.10 3.65 3.17 2.78 2.47 2.20 -

-2.00 - - - 12.00 11.20 8.39 6.74 5.59 4.69 4.03 3.54 3.08 2.73 2.43 - -

-3.00 - 12.00 12.00 12.00 11.04 8.22 6.70 5.49 4.64 3.94 3.42 3.04 2.68 - - -

-4.00 - - - 11.61 11.30 8.30 6.60 5.42 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

9 of 64 17/11/2015 11:57

Page 11: Standard Quick Hitch Charts - L & W Contractors

Duty

DL Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 135° - +/- 150°

Over Fixed End

Osc Axle Safety

71%

Duty

DL Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 135° - +/- 150°

Over Fixed End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 7.54 6.13 5.12 4.35 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 7.28 5.99 5.07 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 9.00 7.17 5.92 5.00 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 8.95 7.31 6.03 5.08 4.34k 3.59k 3.11k 3.11 3.02 - - -

-4.00 - - - 11.98 9.12 7.33 6.04 5.22 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.37a 3.01a 2.30a -

4.00 - - - - - 7.18b 7.22b 6.42b 5.46 4.49k 4.25 3.80 3.39 3.05 2.70 1.75a

3.00 - - - - - 7.75b 7.40b 6.34 5.49b 4.75 4.26 3.81 3.40 3.03 2.70 2.40a

2.00 - - - - - 7.61b 7.51 6.31b 5.38 4.74 4.22b 3.81b 3.38 3.01 2.68 2.42

1.00 - - - - - 8.18 7.59 6.38 5.41 4.77b 4.23 3.78a 3.31 2.97 2.65 2.39

0.00 - - - - - 7.90 7.39 6.29 5.30 4.68 4.17 3.70 3.28 2.91 2.61 2.31a

-1.00 - - - - - 8.50 7.29 6.16 5.30 4.61 4.12 3.61 3.19 2.86 2.57 -

-2.00 - - - 12.00 11.61 8.95 7.33 6.10 5.22 4.53 3.90 3.53 3.15 2.80 - -

-3.00 - 12.00 12.00 12.00 11.46 8.79 7.29 6.06 5.18 4.45 3.90 3.48a 3.10 - - -

-4.00 - - - 11.98 11.70 8.87 7.19 5.99 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

10 of 64 17/11/2015 11:57

Page 12: Standard Quick Hitch Charts - L & W Contractors

Duty

EL Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 150° - +/- 160°

Over Fixed End

Osc Axle Safety

71%

Duty

EL Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 150° - +/- 160°

Over Fixed End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 8.08 6.58 5.51 4.69 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 7.81 6.43 5.46 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 9.65 7.70 6.36 5.13a 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 9.59 7.84 6.48 5.47 4.34k 3.59k 3.11k 3.19k 3.06a - - -

-4.00 - - - 12.00 9.77 7.86 6.48 5.61 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.42a 3.05a 2.30a -

4.00 - - - - - 7.18b 7.35b 6.82 5.81 4.58a 4.47 4.03 3.63 3.26 2.90 1.75a

3.00 - - - - - 7.79b 7.84b 6.79 5.82 5.09 4.49 4.06 3.64 3.26 2.91 2.40a

2.00 - - - - - 7.61b 7.85b 6.71 5.77 5.05 4.43 4.05 3.61 3.23a 2.90 2.62

1.00 - - - - - 8.66b 8.07b 6.73 5.80 5.07 4.53 4.05 3.56a 3.20 2.87 2.59

0.00 - - - - - 8.45 7.92 6.73 5.68 5.02 4.48 3.97 3.54 3.14 2.82 2.31a

-1.00 - - - - - 9.10 7.81 6.60 5.69 4.94 4.33k 3.89a 3.44 3.09 2.78 -

-2.00 - - - 12.00 12.00 9.59 7.85 6.55 5.60 4.87 4.21 3.75 3.37 3.04 - -

-3.00 - 12.00 12.00 12.00 12.00 9.42 7.82 6.51 5.56 4.79 4.20 3.68 3.35 - - -

-4.00 - - - 12.00 12.00 9.50 7.72 6.43 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

11 of 64 17/11/2015 11:57

Page 13: Standard Quick Hitch Charts - L & W Contractors

Duty

FL Road

(Minimum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

71%

Duty

FL Road

(Maximum Loads)

Lift Point

Hitch

Config

ROAD

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

71%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30a 2.20a 2.17a - - - - - -

7.00 - - - - - - - - 2.18a 1.96a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.01a 3.05a 2.39a 1.82a 1.76a 1.78a 1.81a - -

5.00 - - - - - 2.74a 2.86a 2.96a 3.06a 3.18a 1.94a 1.70a 1.70a 1.71a 1.72a -

4.00 - - - - - 2.95a 3.12k 3.13k 3.13k 3.24k 2.88b 1.73a 1.70a 1.70a 1.69a 1.75a

3.00 - - - - - 6.10b 4.95b 3.56k 3.13k 3.12k 2.88b 1.72a 1.73a 1.71a 1.71a 1.71a

2.00 - - - - - 5.79b 4.85b 4.15b 3.23k 3.12k 2.79a 1.84a 1.79a 1.78a 1.80a 1.78a

1.00 - - - - - 5.97b 4.82b 4.16b 3.11k 3.11k 3.11k 2.00a 1.91a 1.91a 1.90a 1.83a

0.00 - - - - - 8.86 7.07 5.72b 4.91 3.12k 2.63a 2.22a 2.17a 2.06a 1.95a 1.92a

-1.00 - - - - - 8.54 6.90 5.78 3.56k 3.11k 2.73a 2.60a 2.46a 2.23a 2.19a -

-2.00 - - - 11.47k 10.86 8.42 6.57a 5.13a 3.13k 3.11k 3.15k 3.00a 2.71a 2.48a - -

-3.00 - 12.00 11.50k 11.17k 10.79 8.58 6.96 5.79 4.34k 3.59k 3.11k 3.19k 3.06a - - -

-4.00 - - - 12.00 11.00 8.61 6.96 5.81a - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.97a 2.29a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.54a - - - -

6.00 - - - - - - - 3.03a 3.21a 3.25a 3.24a 3.18a 2.91a 2.06a - -

5.00 - - - - - 2.97a 3.28a 3.47a 3.58a 3.61a 3.62a 3.57a 3.42a 3.05a 2.30a -

4.00 - - - - - 7.18b 7.54b 7.28 6.15 4.58a 4.54 4.15 3.69 3.33 2.95 1.75a

3.00 - - - - - 7.79b 8.02b 7.28b 6.12 5.31b 4.61k 4.17 3.74 3.32 2.95 2.40a

2.00 - - - - - 7.61b 7.86b 7.19b 6.04 5.24 4.60 4.16 3.71 3.28 2.95 2.65

1.00 - - - - - 8.85 8.49 7.23 6.15 5.30 4.67 4.14 3.65 3.27 2.92 2.62

0.00 - - - - - 9.10 8.66 7.09 5.98 5.26 4.65 4.10 3.63 3.21 2.87 2.31a

-1.00 - - - - - 10.14 8.54 7.09 6.02 5.18 4.50 3.98 3.52 3.16 2.83 -

-2.00 - - - 12.00 12.00 10.77 8.59 7.02 5.93 5.10 4.37 3.86 3.45 3.10 - -

-3.00 - 12.00 12.00 12.00 12.00 10.56 8.55 6.98 5.85 5.01 4.36 3.80 3.43 - - -

-4.00 - - - 12.00 12.00 10.66 8.43 6.90 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

12 of 64 17/11/2015 11:57

Page 14: Standard Quick Hitch Charts - L & W Contractors

Duty

2AU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10°

Over Osc End

Osc Axle Safety

67%

Duty

2AU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 2.89 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 6.37 5.14 4.27 3.59 3.11k 2.57a 2.25a 2.19a 2.07a 1.93 1.90

-1.00 - - - - - 6.08 4.97 4.22 3.54 3.12k 2.71a 2.53 2.29 2.10 1.97 -

-2.00 - - - 10.28 7.50 6.03 4.95 4.19 3.32k 3.13 2.80 2.53 2.30 2.15 - -

-3.00 - 11.58k 10.99k 9.84 7.49 5.96 4.93 4.16 3.62 3.17 2.84 2.56 2.54 - - -

-4.00 - - - 11.05 8.08 6.39 5.29 4.52 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.82 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.59a 3.22 2.85 2.52 2.25 -

4.00 - - - - - 6.81b 6.42 5.41 4.38b 4.04a 3.64 3.24 2.88 2.54 2.26 1.78a

3.00 - - - - - 7.32 6.47 5.42 4.66 4.09 3.61 3.22 2.87 2.53 2.25 1.99

2.00 - - - - - 7.24b 6.43 5.38 4.64 4.01 3.59 3.22 2.83 2.51 2.23 1.98

1.00 - - - - - 7.36 6.44 5.37 4.61 3.98 3.58 3.17 2.77 2.47 2.19 1.96

0.00 - - - - - 6.60 6.30 5.30 4.48 3.96 3.50 3.10 2.71 2.42 2.14 1.93

-1.00 - - - - - 7.15 6.20 5.20 4.42 3.89 3.42 2.99 2.64 2.35 2.10 -

-2.00 - - - 11.34 9.78 7.54 6.11 5.11 4.38 3.78 3.29 2.89 2.57 2.32 - -

-3.00 - 12.00 12.00 12.00 9.85 7.50 6.15 5.05 4.30 3.70 3.22 2.86 2.56 - - -

-4.00 - - - 11.12 8.29 6.53 5.36 4.52 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

13 of 64 17/11/2015 11:57

Page 15: Standard Quick Hitch Charts - L & W Contractors

Duty

2BU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

67%

Duty

2BU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.17 - - - - - -

7.00 - - - - - - - - 2.21a 1.94 1.70 1.53 - - - -

6.00 - - - - - - - 2.73 2.27 1.95 1.70 1.45 1.26 1.21 - -

5.00 - - - - - 2.75a 2.89a 2.58 2.21 1.92 1.66 1.44 1.25 1.09 1.05 -

4.00 - - - - - 3.16a 2.91 2.48 2.13 1.80 1.55 1.38 1.20 1.07 0.94 0.92

3.00 - - - - - 3.36 2.68 2.15 1.93 1.71 1.51 1.33 1.15 1.03 0.91 0.86

2.00 - - - - - 3.31 2.63 2.12 1.78 1.55 1.43 1.27 1.12 0.98 0.88 0.82

1.00 - - - - - 3.21 2.61 2.13 1.71 1.51 1.34 1.21 1.07 0.96 0.85 0.82

0.00 - - - - - 3.22 2.55 2.07 1.69 1.47 1.31 1.17 1.05 0.93 0.85 0.83

-1.00 - - - - - 2.98 2.41 2.01 1.64 1.45 1.28 1.15 1.02 0.93 0.87 -

-2.00 - - - 4.91 3.64 2.93 2.37 1.99 1.66 1.44 1.28 1.14 1.03 0.96 - -

-3.00 - 11.58k 6.48 4.69 3.61 2.88 2.35 1.97 1.70 1.48 1.31 1.17 1.17 - - -

-4.00 - - - 5.26 3.94 3.14 2.60 2.20 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.84a 2.65 2.20a - - - - - -

7.00 - - - - - - - - 2.65 2.29 1.99 1.68 - - - -

6.00 - - - - - - - 2.73 2.61 2.30 1.99 1.73 1.47 1.24 - -

5.00 - - - - - 2.96a 3.24 2.98 2.64 2.28 1.99 1.74 1.50 1.27 1.09 -

4.00 - - - - - 3.96 3.54 2.98 2.57 2.22 1.95 1.72 1.50 1.28 1.09 0.92

3.00 - - - - - 4.05 3.46 2.90 2.45 2.19 1.92 1.71 1.50 1.28 1.09 0.92

2.00 - - - - - 4.11 3.40 2.85 2.45 2.15 1.91 1.70 1.48 1.24 1.07 0.90

1.00 - - - - - 4.00 3.38 2.84 2.46 2.13 1.89 1.64 1.40 1.21 1.02 0.88

0.00 - - - - - 3.35 3.21 2.73 2.31 2.06 1.80 1.58 1.35 1.15 0.99 0.85

-1.00 - - - - - 3.51 3.11 2.63 2.23 1.97 1.72 1.47 1.26 1.09 0.94 -

-2.00 - - - 5.36 4.68 3.70 3.03 2.56 2.20 1.87 1.60 1.37 1.19 1.05 - -

-3.00 - 12.00 7.89 6.15 4.73 3.69 3.06 2.50 2.10 1.79 1.53 1.34 1.18 - - -

-4.00 - - - 5.27 4.02 3.19 2.63 2.20 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

14 of 64 17/11/2015 11:57

Page 16: Standard Quick Hitch Charts - L & W Contractors

Duty

2CU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

67%

Duty

2CU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.02 1.94 - - - - - -

7.00 - - - - - - - - 2.05 1.72 1.49 1.33 - - - -

6.00 - - - - - - - 2.46 2.03 1.73 1.49 1.26 1.08 1.03 - -

5.00 - - - - - 2.75a 2.75 2.32 1.96 1.69 1.45 1.25 1.07 0.92 0.88 -

4.00 - - - - - 3.15 2.60 2.20 1.88 1.57 1.34 1.18 1.01 0.90 0.78 0.76

3.00 - - - - - 3.02 2.38 1.87 1.67 1.48 1.30 1.13 0.97 0.85 0.75 0.70

2.00 - - - - - 2.98 2.33 1.84 1.52 1.32 1.21 1.07 0.93 0.81 0.72 0.67

1.00 - - - - - 2.87 2.30 1.85 1.46 1.27 1.12 1.01 0.88 0.78 0.69 0.66

0.00 - - - - - 2.89 2.24 1.79 1.43 1.24 1.09 0.97 0.86 0.76 0.68 0.67

-1.00 - - - - - 2.64 2.10 1.73 1.38 1.22 1.06 0.95 0.84 0.75 0.70 -

-2.00 - - - 4.48 3.26 2.59 2.06 1.70 1.40 1.21 1.06 0.94 0.84 0.78 - -

-3.00 - 11.58k 6.03 4.27 3.22 2.54 2.04 1.69 1.44 1.25 1.09 0.97 0.97 - - -

-4.00 - - - 4.82 3.55 2.79 2.28 1.91 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.69 2.39 1.99 - - - - - -

7.00 - - - - - - - - 2.39 2.05 1.77 1.47 - - - -

6.00 - - - - - - - 2.46 2.35 2.06 1.77 1.53 1.28 1.06 - -

5.00 - - - - - 2.96a 3.11 2.71 2.38 2.04 1.76 1.53 1.31 1.09 0.92 -

4.00 - - - - - 3.71 3.23 2.69 2.30 1.97 1.72 1.52 1.31 1.10 0.92 0.76

3.00 - - - - - 3.69 3.13 2.61 2.19 1.95 1.70 1.50 1.31 1.10 0.92 0.76

2.00 - - - - - 3.75 3.07 2.56 2.18 1.91 1.68 1.50 1.28 1.06 0.90 0.74

1.00 - - - - - 3.65 3.06 2.54 2.19 1.89 1.66 1.43 1.21 1.03 0.85 0.71

0.00 - - - - - 3.01 2.88 2.43 2.05 1.82 1.57 1.37 1.15 0.97 0.82 0.69

-1.00 - - - - - 3.15 2.77 2.33 1.96 1.72 1.49 1.26 1.06 0.90 0.77 -

-2.00 - - - 4.92 4.25 3.32 2.69 2.26 1.92 1.62 1.37 1.16 0.99 0.87 - -

-3.00 - 12.00 7.47 5.70 4.30 3.31 2.72 2.20 1.83 1.54 1.30 1.13 0.98 - - -

-4.00 - - - 4.84 3.63 2.84 2.32 1.92 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

15 of 64 17/11/2015 11:57

Page 17: Standard Quick Hitch Charts - L & W Contractors

Duty

2DU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 60° - +/- 120°

Osc Axle Safety

67%

Duty

2DU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 60° - +/- 120°

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.02 1.94 - - - - - -

7.00 - - - - - - - - 2.05 1.72 1.49 1.33 - - - -

6.00 - - - - - - - 2.46 2.03 1.73 1.49 1.26 1.08 1.03 - -

5.00 - - - - - 2.75a 2.75 2.32 1.96 1.69 1.45 1.25 1.07 0.92 0.88 -

4.00 - - - - - 3.15 2.60 2.20 1.88 1.57 1.34 1.18 1.01 0.90 0.78 0.76

3.00 - - - - - 3.02 2.38 1.87 1.67 1.48 1.30 1.13 0.97 0.85 0.75 0.70

2.00 - - - - - 2.98 2.33 1.84 1.52 1.32 1.21 1.07 0.93 0.81 0.72 0.67

1.00 - - - - - 2.87 2.30 1.85 1.46 1.27 1.12 1.01 0.88 0.78 0.69 0.66

0.00 - - - - - 2.89 2.24 1.79 1.43 1.24 1.09 0.97 0.86 0.76 0.68 0.67

-1.00 - - - - - 2.64 2.10 1.73 1.38 1.22 1.06 0.95 0.84 0.75 0.70 -

-2.00 - - - 4.48 3.26 2.59 2.06 1.70 1.40 1.21 1.06 0.94 0.84 0.78 - -

-3.00 - 11.58k 6.03 4.27 3.22 2.54 2.04 1.69 1.44 1.25 1.09 0.97 0.97 - - -

-4.00 - - - 4.82 3.55 2.79 2.28 1.91 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.69 2.39 1.99 - - - - - -

7.00 - - - - - - - - 2.39 2.05 1.77 1.47 - - - -

6.00 - - - - - - - 2.46 2.35 2.06 1.77 1.53 1.28 1.06 - -

5.00 - - - - - 2.96a 3.11 2.71 2.38 2.04 1.76 1.53 1.31 1.09 0.92 -

4.00 - - - - - 3.71 3.23 2.69 2.30 1.97 1.72 1.52 1.31 1.10 0.92 0.76

3.00 - - - - - 3.69 3.13 2.61 2.19 1.95 1.70 1.50 1.31 1.10 0.92 0.76

2.00 - - - - - 3.75 3.07 2.56 2.18 1.91 1.68 1.50 1.28 1.06 0.90 0.74

1.00 - - - - - 3.65 3.06 2.54 2.19 1.89 1.66 1.43 1.21 1.03 0.85 0.71

0.00 - - - - - 3.01 2.88 2.43 2.05 1.82 1.57 1.37 1.15 0.97 0.82 0.69

-1.00 - - - - - 3.15 2.77 2.33 1.96 1.72 1.49 1.26 1.06 0.90 0.77 -

-2.00 - - - 4.92 4.25 3.32 2.69 2.26 1.92 1.62 1.37 1.16 0.99 0.87 - -

-3.00 - 12.00 7.47 5.70 4.30 3.31 2.72 2.20 1.83 1.54 1.30 1.13 0.98 - - -

-4.00 - - - 4.84 3.63 2.84 2.32 1.92 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

16 of 64 17/11/2015 11:57

Page 18: Standard Quick Hitch Charts - L & W Contractors

Duty

2EU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

67%

Duty

2EU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.17 - - - - - -

7.00 - - - - - - - - 2.21a 1.94 1.70 1.53 - - - -

6.00 - - - - - - - 2.73 2.27 1.95 1.70 1.45 1.26 1.21 - -

5.00 - - - - - 2.75a 2.89a 2.58 2.21 1.92 1.66 1.44 1.25 1.09 1.05 -

4.00 - - - - - 3.16a 2.91 2.48 2.13 1.80 1.55 1.38 1.20 1.07 0.94 0.92

3.00 - - - - - 3.36 2.68 2.15 1.93 1.71 1.51 1.33 1.15 1.03 0.91 0.86

2.00 - - - - - 3.31 2.63 2.12 1.78 1.55 1.43 1.27 1.12 0.98 0.88 0.82

1.00 - - - - - 3.21 2.61 2.13 1.71 1.51 1.34 1.21 1.07 0.96 0.85 0.82

0.00 - - - - - 3.22 2.55 2.07 1.69 1.47 1.30 1.17 1.05 0.93 0.85 0.83

-1.00 - - - - - 2.98 2.41 2.01 1.64 1.45 1.28 1.15 1.02 0.93 0.87 -

-2.00 - - - 4.91 3.64 2.93 2.37 1.99 1.66 1.44 1.28 1.14 1.03 0.96 - -

-3.00 - 11.58k 6.48 4.69 3.61 2.88 2.35 1.97 1.70 1.48 1.31 1.17 1.17 - - -

-4.00 - - - 5.26 3.94 3.14 2.60 2.20 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.84a 2.65 2.20a - - - - - -

7.00 - - - - - - - - 2.65 2.29 1.99 1.68 - - - -

6.00 - - - - - - - 2.73 2.61 2.30 1.99 1.73 1.47 1.24 - -

5.00 - - - - - 2.96a 3.24 2.98 2.64 2.28 1.99 1.74 1.50 1.27 1.09 -

4.00 - - - - - 3.96 3.53 2.98 2.57 2.22 1.95 1.72 1.50 1.28 1.09 0.92

3.00 - - - - - 4.05 3.46 2.90 2.45 2.19 1.92 1.71 1.50 1.28 1.09 0.92

2.00 - - - - - 4.11 3.40 2.85 2.45 2.15 1.91 1.70 1.48 1.24 1.07 0.90

1.00 - - - - - 4.00 3.38 2.84 2.46 2.13 1.89 1.64 1.40 1.21 1.02 0.88

0.00 - - - - - 3.35 3.21 2.73 2.31 2.06 1.80 1.58 1.35 1.15 0.99 0.85

-1.00 - - - - - 3.51 3.11 2.63 2.23 1.97 1.72 1.47 1.26 1.09 0.94 -

-2.00 - - - 5.36 4.68 3.70 3.03 2.56 2.20 1.87 1.60 1.37 1.19 1.05 - -

-3.00 - 12.00 7.89 6.15 4.73 3.69 3.06 2.50 2.10 1.79 1.53 1.34 1.18 - - -

-4.00 - - - 5.27 4.02 3.19 2.63 2.20 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

17 of 64 17/11/2015 11:57

Page 19: Standard Quick Hitch Charts - L & W Contractors

Duty

2FU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

67%

Duty

2FU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.73 - - - -

6.00 - - - - - - - 3.02a 2.53 2.19 1.77a 1.66 1.45 1.39 - -

5.00 - - - - - 2.75a 2.89a 2.88 2.48 2.16 1.88 1.64 1.44 1.27 1.22 -

4.00 - - - - - 3.16a 3.11k 2.79 2.39 2.04 1.77 1.58 1.38 1.24 1.10 1.08

3.00 - - - - - 3.76 3.02 2.45 2.21 1.95 1.73 1.53 1.34 1.20 1.07 1.02

2.00 - - - - - 3.71 2.98 2.42 2.06 1.79 1.66 1.48 1.30 1.16 1.04 0.98

1.00 - - - - - 3.61 2.95 2.44 1.98 1.75 1.56 1.41 1.26 1.13 1.01 0.98

0.00 - - - - - 3.62 2.90 2.37 1.95 1.71 1.52 1.37 1.24 1.10 1.01 0.99

-1.00 - - - - - 3.38 2.75 2.31 1.90 1.69 1.50 1.35 1.21 1.10 1.03 -

-2.00 - - - 5.52 4.12 3.33 2.72 2.29 1.93 1.68 1.50 1.34 1.22 1.14 - -

-3.00 - 11.58k 7.26 5.28 4.09 3.28 2.70 2.27 1.97 1.72 1.53 1.37 1.37 - - -

-4.00 - - - 5.90 4.44 3.55 2.95 2.51 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.01 2.94a 2.23a - - - - - -

7.00 - - - - - - - - 2.94 2.55 2.23 1.90 - - - -

6.00 - - - - - - - 3.02a 2.90 2.56 2.23 1.94 1.67 1.43 - -

5.00 - - - - - 2.96a 3.27a 3.26a 2.94 2.55 2.23 1.96 1.70 1.45 1.26 -

4.00 - - - - - 4.33 3.90 3.31 2.87 2.48 2.18 1.94 1.70 1.47 1.26 1.08

3.00 - - - - - 4.52 3.85 3.24 2.74 2.46 2.16 1.92 1.70 1.46 1.26 1.08

2.00 - - - - - 4.58 3.79 3.19 2.75 2.42 2.15 1.92 1.68 1.43 1.24 1.06

1.00 - - - - - 4.46 3.78 3.18 2.76 2.40 2.13 1.85 1.60 1.40 1.20 1.04

0.00 - - - - - 3.76 3.61 3.07 2.61 2.33 2.04 1.80 1.55 1.33 1.16 1.01

-1.00 - - - - - 3.97 3.50 2.97 2.53 2.23 1.96 1.68 1.46 1.27 1.11 -

-2.00 - - - 6.02 5.26 4.17 3.43 2.90 2.49 2.13 1.84 1.59 1.39 1.24 - -

-3.00 - 12.00 8.82 6.90 5.32 4.16 3.46 2.84 2.40 2.06 1.77 1.56 1.38 - - -

-4.00 - - - 5.92 4.54 3.62 2.99 2.52 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

18 of 64 17/11/2015 11:57

Page 20: Standard Quick Hitch Charts - L & W Contractors

Duty

2GU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

67%

Duty

2GU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 2.95 2.43a 1.77a 1.78a 1.74 1.67 - -

5.00 - - - - - 2.75a 2.89a 2.95a 2.90 2.54 1.99a 1.72a 1.72a 1.54 1.49 -

4.00 - - - - - 3.16a 3.11k 3.11k 2.82 2.42 2.12 1.70a 1.68 1.52 1.36 1.33

3.00 - - - - - 4.40 3.56 2.92 2.65 2.33 2.08 1.73a 1.63 1.47 1.33 1.27

2.00 - - - - - 4.34 3.52 2.89 2.49 2.18 2.00 1.79 1.60 1.43 1.30 1.22

1.00 - - - - - 4.23 3.49 2.91 2.40 2.14 1.91 1.73 1.55 1.40 1.27 1.22

0.00 - - - - - 4.26 3.44 2.84 2.37 2.09 1.87 1.69 1.53 1.37 1.26 1.24

-1.00 - - - - - 4.01 3.29 2.79 2.32 2.07 1.84 1.66 1.50 1.37 1.29 -

-2.00 - - - 6.48 4.87 3.96 3.26 2.77 2.35 2.06 1.84 1.66 1.51 1.41 - -

-3.00 - 11.58k 8.49 6.22 4.84 3.91 3.24 2.74 2.39 2.10 1.88 1.69 1.68 - - -

-4.00 - - - 6.92 5.23 4.21 3.51 3.01 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 2.97 2.60 2.24 - - - -

6.00 - - - - - - - 3.02a 3.14a 2.98 2.61 2.28 1.98 1.72 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.33 2.96 2.60 2.30 2.01 1.74 1.53 -

4.00 - - - - - 4.97 4.36 3.77 3.34 2.90 2.56 2.29 2.01 1.76 1.53 1.33

3.00 - - - - - 5.25 4.48 3.78 3.21 2.88 2.54 2.27 2.01 1.75 1.53 1.33

2.00 - - - - - 5.32 4.42 3.72 3.21 2.83 2.52 2.26 1.98 1.72 1.51 1.31

1.00 - - - - - 5.19 4.40 3.71 3.23 2.81 2.50 2.20 1.92 1.69 1.47 1.29

0.00 - - - - - 4.41 4.23 3.60 3.07 2.75 2.41 2.14 1.86 1.63 1.43 1.26

-1.00 - - - - - 4.68 4.13 3.50 3.00 2.65 2.34 2.03 1.77 1.56 1.38 -

-2.00 - - - 7.06 6.19 4.91 4.05 3.43 2.96 2.55 2.21 1.93 1.71 1.53 - -

-3.00 - 12.00 10.28 8.08 6.24 4.90 4.08 3.37 2.88 2.48 2.15 1.90 1.69 - - -

-4.00 - - - 6.94 5.35 4.28 3.56 3.01 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

19 of 64 17/11/2015 11:57

Page 21: Standard Quick Hitch Charts - L & W Contractors

Duty

2HU Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

67%

Duty

2HU Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 10.89k 9.03b 7.48b 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 10.93k 7.15a 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.43k 9.42a 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.97b 7.98a 7.21b - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 7.11b 5.53a 4.57a 4.52a 4.27a 4.04a 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 8.06b 8.16b 7.97b 6.42b 5.77b 4.88a 4.91k 4.30a 3.56a 2.44a

2.00 - - - - - 7.71b 7.93b 8.06b 8.00b 7.36b 6.49b 5.71b 4.93b 4.89b 4.11a 2.72a

1.00 - - - - - 8.87b 8.93b 8.71b 8.21b 7.57b 6.80b 6.02b 5.53b 4.94b 4.40a 2.94a

0.00 - - - - - 10.93b 10.34b 9.46b 8.71b 7.67b 6.83b 6.16b 5.59b 4.94a 4.45a 2.35a

-1.00 - - - - - 12.00 12.00b 10.17b 8.88b 7.73b 6.90k 6.20b 5.57b 4.76k 3.74a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.33b 8.93b 7.90b 6.95b 6.09b 4.68k 4.47a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.32b 8.66b 7.44b 6.25b 4.98b 3.96a - - -

-4.00 - - - 12.00 12.00 10.54b 8.79b 7.21b - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

20 of 64 17/11/2015 11:57

Page 22: Standard Quick Hitch Charts - L & W Contractors

Duty

2AL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10°

Over Osc End

Osc Axle Safety

90%

Duty

2AL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 10.74 8.71 7.38 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 10.66 7.15a 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.43k 9.42a 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.97b 7.98a 7.21b - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 7.11b 5.53a 4.57a 4.52a 4.27a 4.04a 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 8.06b 8.07 7.50 6.19b 5.64b 4.87 4.62 4.14 3.56a 2.44a

2.00 - - - - - 7.71b 7.93b 8.06b 7.47 6.51 5.77 5.07 4.66 4.17 3.75a 2.72a

1.00 - - - - - 8.87b 8.93b 8.68 7.49b 6.51 5.76b 5.08 4.63 4.13 3.71 2.94a

0.00 - - - - - 10.93b 10.16 8.67 7.52 6.58 5.80b 5.03 4.59 4.09 3.66 2.35a

-1.00 - - - - - 12.00 10.80b 8.94 7.65 6.64 5.74 4.99 4.48 4.04 3.61a -

-2.00 - - - 12.00 12.00 12.00 10.76 8.90 7.58 6.54 5.62 4.96 4.38 3.98 - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 10.71 8.81 7.43 6.39 5.57 4.90 3.96a - - -

-4.00 - - - 12.00 12.00 10.54b 8.79b 7.21b - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

21 of 64 17/11/2015 11:57

Page 23: Standard Quick Hitch Charts - L & W Contractors

Duty

2BL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

90%

Duty

2BL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.69 1.65

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.63 1.53

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.11 2.78a 1.82a 1.81a 1.80 1.58 1.46

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.04 2.65 1.92a 1.92a 1.76 1.53 1.46

0.00 - - - - - 7.26 5.48 4.32 3.46 2.97 2.57a 2.25a 1.97 1.71 1.53 1.48

-1.00 - - - - - 6.77 5.20 4.22 3.38 2.93 2.54 2.21 1.92 1.71 1.57 -

-2.00 - - - 12.00 8.95 6.68 5.16 4.18 3.32k 2.92 2.53 2.21 1.94 1.78 - -

-3.00 - 11.58k 10.99k 11.36k 8.92 6.57 5.13 4.14 3.49 2.98 2.60 2.26 2.25 - - -

-4.00 - - - 12.00 9.95 7.23 5.66 4.64 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.72 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.59a 3.20 2.76 2.34 1.97 -

4.00 - - - - - 6.81b 6.67 5.89b 4.44 4.13 3.70 3.22 2.78 2.36 1.98 1.65

3.00 - - - - - 7.62b 7.25 5.95 4.94 4.22k 3.65 3.21b 2.77 2.34 1.96 1.65

2.00 - - - - - 7.59 7.30 5.84 4.82b 4.11 3.62 3.19b 2.74 2.30 1.93 1.61

1.00 - - - - - 8.11b 7.19 5.81 4.87 4.08 3.61 3.12 2.66 2.22 1.87 1.57

0.00 - - - - - 7.61 7.17 5.76 4.69 4.04 3.49 3.00 2.56 2.14 1.81 1.53

-1.00 - - - - - 8.41 6.99 5.59 4.58 3.92 3.36 2.84 2.40 2.03 1.72 -

-2.00 - - - 12.00 12.00 9.04 6.83 5.46 4.51 3.76 3.16 2.69 2.28 1.98 - -

-3.00 - 12.00 12.00 12.00 12.00 8.97 6.89 5.35 4.37 3.64 3.06 2.64 2.26 - - -

-4.00 - - - 12.00 10.31 7.43 5.76 4.64 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

22 of 64 17/11/2015 11:57

Page 24: Standard Quick Hitch Charts - L & W Contractors

Duty

2CL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

90%

Duty

2CL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.75 1.70a 1.69a 1.70a 1.55 1.52

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.06 2.69 1.73a 1.75a 1.73a 1.50 1.41

2.00 - - - - - 5.86b 4.92b 3.94 3.13k 2.83 2.57 1.82a 1.81a 1.66 1.46 1.35

1.00 - - - - - 5.79b 4.88b 3.97 3.17 2.77 2.41 1.92a 1.84 1.62 1.41 1.34

0.00 - - - - - 6.24 4.82 3.86 3.12 2.70 2.34 2.06 1.80 1.57 1.40 1.36

-1.00 - - - - - 5.82 4.58 3.77 3.05 2.66 2.30 2.02 1.76 1.56 1.44 -

-2.00 - - - 10.91 7.43 5.74 4.54 3.73 3.08 2.65 2.29 2.01 1.77 1.63 - -

-3.00 - 11.58k 10.99k 10.31 7.40 5.65 4.51 3.69 3.16 2.71 2.35 2.06 2.05 - - -

-4.00 - - - 11.94 8.15 6.17 4.96 4.12 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.24a 2.93 2.52 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.60a 3.44 3.01 2.56 2.15 1.81 -

4.00 - - - - - 6.81b 6.39 5.26 4.21 3.89b 3.42 2.99 2.58 2.17 1.83 1.52

3.00 - - - - - 7.40 6.46b 5.25 4.43 3.88b 3.36 2.98 2.58 2.15 1.82a 1.52

2.00 - - - - - 7.24b 6.38 5.26 4.42 3.78 3.36 2.97 2.53 2.12 1.79 1.49

1.00 - - - - - 7.45 6.38 5.27 4.37 3.79b 3.33 2.87 2.44 2.04 1.72 1.44

0.00 - - - - - 6.51 6.18 5.09 4.21 3.66 3.19 2.76 2.35 1.97 1.66 1.40

-1.00 - - - - - 7.06 6.02 4.93 4.10 3.55 3.08 2.61 2.20 1.86 1.58 -

-2.00 - - - 12.00 10.24 7.51 5.89 4.81 4.04 3.40 2.89 2.45 2.09 1.81 - -

-3.00 - 12.00 12.00 12.00 10.35 7.47 5.94 4.72 3.91 3.29 2.79 2.40 2.06 - - -

-4.00 - - - 12.00 8.40 6.32 5.03 4.12 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

23 of 64 17/11/2015 11:57

Page 25: Standard Quick Hitch Charts - L & W Contractors

Duty

2DL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 60° - +/- 120°

Osc Axle Safety

90%

Duty

2DL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 60° - +/- 120°

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.64 1.56 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.01 2.54 1.70a 1.69a 1.60 1.36 1.33

3.00 - - - - - 5.95b 4.86 3.39k 3.12k 2.86 2.47 1.73a 1.75a 1.53 1.31 1.22

2.00 - - - - - 5.86b 4.78 3.72 3.07 2.60 2.34 1.82a 1.71 1.46 1.26 1.16

1.00 - - - - - 5.79b 4.73 3.75 2.94 2.53 2.17 1.90 1.63 1.41 1.21 1.16

0.00 - - - - - 6.14 4.64 3.64 2.90 2.46 2.11 1.83 1.59 1.36 1.21 1.17

-1.00 - - - - - 5.68 4.37 3.54 2.82 2.42 2.06 1.79 1.54 1.36 1.24 -

-2.00 - - - 11.50 7.44 5.59 4.32 3.51 2.85 2.40 2.06 1.78 1.56 1.42 - -

-3.00 - 11.58k 10.99k 10.78 7.40 5.49 4.29 3.47 2.93 2.47 2.12 1.83 1.83 - - -

-4.00 - - - 12.00 8.25 6.06 4.77 3.91 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.22 2.77a 2.34 1.92 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.56a 3.28 2.83 2.36 1.95a 1.63 -

4.00 - - - - - 6.81b 6.31 5.10 4.06 3.72 3.23 2.82 2.39 1.99 1.64 1.33

3.00 - - - - - 7.40 6.46b 5.17b 4.25 3.70 3.20 2.79 2.37 1.98 1.63 1.33

2.00 - - - - - 7.24b 6.29 5.11 4.26 3.64 3.17 2.79 2.32 1.92 1.60 1.30

1.00 - - - - - 7.46 6.33 5.11 4.19 3.60 3.14 2.68 2.23 1.87 1.52 1.25

0.00 - - - - - 6.43 6.08 4.92 4.02 3.51 3.00 2.55 2.13 1.76 1.46 1.21

-1.00 - - - - - 7.02 5.89 4.75 3.90 3.35 2.87 2.38 1.98 1.65 1.38 -

-2.00 - - - 12.00 10.69 7.53 5.75 4.62 3.84 3.19 2.67 2.22 1.86 1.60 - -

-3.00 - 12.00 12.00 12.00 10.83 7.48 5.81 4.52 3.69 3.07 2.56 2.17 1.84 - - -

-4.00 - - - 12.00 8.53 6.22 4.85 3.91 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

24 of 64 17/11/2015 11:57

Page 26: Standard Quick Hitch Charts - L & W Contractors

Duty

2EL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

75%

Duty

2EL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

75%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 2.96 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 7.07 5.56 4.53 3.75 3.11k 2.57a 2.25a 2.19a 2.07a 1.93 1.89

-1.00 - - - - - 6.70 5.35 4.46 3.57k 3.12k 2.71a 2.57 2.30 2.10 1.97 -

-2.00 - - - 12.00 8.51 6.64 5.33 4.43 3.32k 3.17k 2.86 2.56 2.32 2.16 - -

-3.00 - 11.58k 10.99k 11.36k 8.50 6.55 5.30 4.39 3.78 3.28 2.91 2.60 2.59 - - -

-4.00 - - - 12.00 9.28 7.09 5.73 4.82 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.91 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.59a 3.34 2.95 2.58 2.28 -

4.00 - - - - - 6.81b 6.64b 5.89 4.56 4.18k 3.77 3.38 2.96a 2.60 2.29 1.78a

3.00 - - - - - 7.62b 7.05 5.91 5.00 4.26 3.77 3.36b 2.95 2.59 2.28 1.99

2.00 - - - - - 7.53 7.12 5.84b 4.89 4.25 3.75 3.36b 2.93 2.55 2.25 1.99

1.00 - - - - - 7.89b 7.06 5.79 4.94 4.22 3.77 3.30a 2.85 2.51 2.21 1.96

0.00 - - - - - 7.36 6.98 5.76 4.79 4.19 3.67 3.21 2.78 2.46 2.15 1.93

-1.00 - - - - - 8.06 6.85 5.63 4.72 4.10 3.57 3.09 2.70 2.38 2.11 -

-2.00 - - - 12.00 11.62 8.56 6.74 5.53 4.67 3.98 3.41 2.97 2.62 2.34 - -

-3.00 - 12.00 12.00 12.00 11.73 8.51 6.79 5.45 4.56 3.88 3.33 2.93 2.60 - - -

-4.00 - - - 12.00 9.56 7.26 5.83 4.82 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

25 of 64 17/11/2015 11:57

Page 27: Standard Quick Hitch Charts - L & W Contractors

Duty

2FL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

75%

Duty

2FL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

75%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 8.34 6.49 5.25 4.33 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 7.94 6.26 5.18 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.29 7.87 6.24 5.14 3.32k 3.17k 3.07a 2.93a 2.62a 2.47 - -

-3.00 - 11.58k 10.99k 11.36k 10.30 7.77 6.22 5.10 4.26k 3.65k 3.13k 2.97 2.96 - - -

-4.00 - - - 12.00 11.31 8.43 6.72 5.60 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.31 2.89 2.32a -

4.00 - - - - - 6.81b 7.50b 6.15 5.16 4.52a 4.26 3.76 3.32 2.92 2.58 1.78a

3.00 - - - - - 7.68b 7.80b 6.76 5.68 4.80 4.22 3.76 3.31 2.91 2.57 2.26

2.00 - - - - - 7.71b 7.73 6.70 5.63 4.82 4.22 3.75 3.29 2.88 2.55 2.25

1.00 - - - - - 8.73b 8.02 6.67 5.61 4.79 4.22 3.71 3.22a 2.85 2.49 2.23

0.00 - - - - - 8.71 8.23 6.69 5.51 4.77 4.18 3.65 3.16 2.77 2.45 2.19

-1.00 - - - - - 9.68 8.10 6.56 5.45 4.66 4.07 3.50 3.07 2.70a 2.40 -

-2.00 - - - 12.00 12.00 10.35 7.97 6.44 5.39 4.57 3.88 3.39 2.99 2.67 - -

-3.00 - 12.00 12.00 12.00 12.00 10.29 8.02 6.35 5.29 4.47 3.82 3.36 2.97 - - -

-4.00 - - - 12.00 11.70 8.66 6.84 5.60 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

26 of 64 17/11/2015 11:57

Page 28: Standard Quick Hitch Charts - L & W Contractors

Duty

2GL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

75%

Duty

2GL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

75%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.01 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 8.75 7.05 5.93 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 8.69 7.04 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.08 8.59 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.24 7.51 6.35 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 6.80 5.53a 4.57a 4.48 4.21 3.79 3.35 3.01 1.78a

3.00 - - - - - 7.68b 8.06b 7.40 6.27 5.42 4.68 4.25 3.80 3.37 3.02 2.44a

2.00 - - - - - 7.71b 7.89b 7.34 6.21 5.41 4.68 4.24 3.79 3.35 2.99 2.69a

1.00 - - - - - 8.87b 8.81 7.37 6.18 5.41 4.68 4.25 3.73 3.30 2.97 2.66

0.00 - - - - - 9.46 8.78 7.39 6.13b 5.43 4.78 4.15 3.68 3.28 2.92 2.35a

-1.00 - - - - - 10.47 8.89 7.32 6.16 5.33 4.58 4.08 3.60 3.20 2.88 -

-2.00 - - - 12.00 12.00 11.12 8.78 7.21 6.11 5.24 4.49 3.94 3.53 3.16 - -

-3.00 - 12.00 12.00 12.00 12.00 11.06 8.73 7.13 6.01 5.13 4.44 3.89 3.51 - - -

-4.00 - - - 12.00 12.00 9.47 7.64 6.36 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

27 of 64 17/11/2015 11:57

Page 29: Standard Quick Hitch Charts - L & W Contractors

Duty

2HL Level-50

(Minimum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

90%

Duty

2HL Level-50

(Maximum Loads)

Lift Point

Hitch

Config

RAIL

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 10.89k 9.03b 7.48b 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 10.93k 7.15a 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.43k 9.42a 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.97b 7.98a 7.21b - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 7.11b 5.53a 4.57a 4.52a 4.27a 4.04a 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 8.06b 8.16b 7.97b 6.42b 5.77b 4.88a 4.91k 4.30a 3.56a 2.44a

2.00 - - - - - 7.71b 7.93b 8.06b 8.00b 7.36b 6.49b 5.71b 4.93b 4.89b 4.11a 2.72a

1.00 - - - - - 8.87b 8.93b 8.71b 8.21b 7.57b 6.80b 6.02b 5.53b 4.94b 4.40a 2.94a

0.00 - - - - - 10.93b 10.34b 9.46b 8.71b 7.67b 6.83b 6.16b 5.59b 4.94a 4.45a 2.35a

-1.00 - - - - - 12.00 12.00b 10.17b 8.88b 7.73b 6.90k 6.20b 5.57b 4.76k 3.74a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.33b 8.93b 7.90b 6.95b 6.09b 4.68k 4.47a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.32b 8.66b 7.44b 6.25b 4.98b 3.96a - - -

-4.00 - - - 12.00 12.00 10.54b 8.79b 7.21b - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

28 of 64 17/11/2015 11:57

Page 30: Standard Quick Hitch Charts - L & W Contractors

Duty

3AU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

67%

Duty

3AU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.04 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 2.93 2.58 1.70a 1.69a 1.70a 1.70a 1.69

3.00 - - - - - 5.17 4.24 3.39k 3.12k 2.84 2.54 1.73a 1.75a 1.73a 1.68 1.61

2.00 - - - - - 5.11 4.20 3.50 3.05 2.69 2.47 1.82a 1.81a 1.80 1.65 1.57

1.00 - - - - - 5.00 4.17 3.53 2.96 2.65 2.38 1.92a 1.92a 1.78 1.62 1.57

0.00 - - - - - 5.02 4.12 3.46 2.93 2.60 2.34 2.12 1.93 1.75 1.62 1.58

-1.00 - - - - - 4.78 3.97 3.40 2.88 2.58 2.31 2.10 1.90 1.75 1.65 -

-2.00 - - - 7.52 5.75 4.73 3.95 3.38 2.91 2.57 2.31 2.09 1.91 1.80 - -

-3.00 - 11.58k 9.69 7.24 5.73 4.68 3.93 3.36 2.95 2.61 2.35 2.12 2.11 - - -

-4.00 - - - 7.99 6.14 5.00 4.22 3.65 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.09 2.71 2.41 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.44 3.10 2.75a 2.42 2.13 1.90 -

4.00 - - - - - 5.77 5.10 4.37 3.87 3.45 3.06 2.74 2.44 2.15 1.90 1.69

3.00 - - - - - 6.10 5.23 4.45 3.81 3.42 3.04 2.73 2.43 2.14 1.89 1.69

2.00 - - - - - 6.18 5.17 4.39 3.81 3.38 3.02 2.72 2.40 2.12 1.88a 1.67

1.00 - - - - - 6.03 5.16 4.38 3.83 3.35 3.00 2.66 2.35 2.07 1.84 1.64

0.00 - - - - - 5.19 4.99 4.27 3.67 3.30 2.91 2.58 2.29 2.02 1.80 1.62

-1.00 - - - - - 5.53 4.89 4.18 3.60 3.20 2.84 2.49 2.20 1.96 1.76 -

-2.00 - - - 8.15 7.21 5.79 4.81 4.10 3.57 3.10 2.71 2.39 2.14 1.93 - -

-3.00 - 12.00 11.56 9.25 7.26 5.76 4.84 4.05 3.49 3.03 2.65 2.37 2.12 - - -

-4.00 - - - 8.02 6.27 5.09 4.27 3.65 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

29 of 64 17/11/2015 11:57

Page 31: Standard Quick Hitch Charts - L & W Contractors

Duty

3BU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

67%

Duty

3BU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.08 2.00 - - - - - -

7.00 - - - - - - - - 2.11 1.79 1.56 1.40 - - - -

6.00 - - - - - - - 2.51 2.09 1.80 1.56 1.33 1.15 1.10 - -

5.00 - - - - - 2.75a 2.79 2.37 2.03 1.76 1.52 1.32 1.14 0.99 0.95 -

4.00 - - - - - 3.16a 2.65 2.26 1.95 1.65 1.42 1.26 1.09 0.97 0.85 0.83

3.00 - - - - - 3.05 2.44 1.95 1.75 1.56 1.38 1.20 1.04 0.93 0.82 0.77

2.00 - - - - - 3.01 2.40 1.92 1.61 1.40 1.29 1.15 1.01 0.89 0.79 0.74

1.00 - - - - - 2.91 2.37 1.93 1.55 1.36 1.21 1.09 0.96 0.86 0.76 0.73

0.00 - - - - - 2.93 2.31 1.88 1.52 1.33 1.17 1.05 0.94 0.83 0.76 0.74

-1.00 - - - - - 2.69 2.17 1.81 1.47 1.30 1.15 1.03 0.92 0.83 0.77 -

-2.00 - - - 4.39 3.28 2.65 2.14 1.79 1.49 1.30 1.15 1.03 0.92 0.86 - -

-3.00 - 10.60 5.72 4.19 3.24 2.60 2.12 1.77 1.53 1.33 1.18 1.05 1.05 - - -

-4.00 - - - 4.69 3.54 2.83 2.35 1.99 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.70a 2.44 2.06 - - - - - -

7.00 - - - - - - - - 2.44 2.11 1.83 1.54 - - - -

6.00 - - - - - - - 2.51 2.40 2.12 1.84 1.60 1.35 1.13 - -

5.00 - - - - - 2.96a 3.13a 2.75 2.43 2.10 1.83 1.60 1.38 1.16 0.99 -

4.00 - - - - - 3.70 3.24 2.73 2.36 2.04 1.79 1.59 1.38 1.17 0.99 0.83

3.00 - - - - - 3.68 3.16 2.66 2.25 2.01 1.77 1.57 1.38 1.17 0.99 0.83

2.00 - - - - - 3.73 3.10 2.61 2.25 1.97 1.75 1.57 1.35 1.14 0.97 0.81

1.00 - - - - - 3.64 3.09 2.59 2.26 1.96 1.73 1.50 1.28 1.10 0.93 0.79

0.00 - - - - - 3.04 2.92 2.49 2.12 1.89 1.65 1.45 1.23 1.04 0.89 0.76

-1.00 - - - - - 3.17 2.82 2.39 2.03 1.80 1.57 1.33 1.14 0.98 0.84 -

-2.00 - - - 4.77 4.18 3.33 2.74 2.32 2.00 1.70 1.45 1.24 1.07 0.95 - -

-3.00 - 10.97 6.90 5.44 4.23 3.32 2.77 2.27 1.91 1.63 1.39 1.21 1.06 - - -

-4.00 - - - 4.70 3.62 2.88 2.38 2.00 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

30 of 64 17/11/2015 11:57

Page 32: Standard Quick Hitch Charts - L & W Contractors

Duty

3CU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

67%

Duty

3CU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30 1.89 1.81 - - - - - -

7.00 - - - - - - - - 1.91 1.59 1.37 1.21 - - - -

6.00 - - - - - - - 2.32 1.89 1.61 1.37 1.15 0.97 0.92 - -

5.00 - - - - - 2.75a 2.60 2.17 1.83 1.57 1.33 1.13 0.96 0.82 0.78 -

4.00 - - - - - 2.98 2.44 2.05 1.74 1.44 1.22 1.07 0.91 0.80 0.68 0.66

3.00 - - - - - 2.85 2.22 1.72 1.53 1.35 1.18 1.01 0.86 0.75 0.65 0.61

2.00 - - - - - 2.81 2.17 1.69 1.38 1.18 1.08 0.95 0.82 0.71 0.62 0.55

1.00 - - - - - 2.70 2.14 1.70 1.31 1.14 1.00 0.89 0.77 0.68 0.58 0.55

0.00 - - - - - 2.72 2.07 1.64 1.28 1.10 0.96 0.85 0.76 0.65 0.58 0.55

-1.00 - - - - - 2.46 1.93 1.57 1.24 1.08 0.94 0.83 0.73 0.65 0.60 -

-2.00 - - - 4.30 3.07 2.41 1.89 1.54 1.26 1.07 0.93 0.83 0.73 0.68 - -

-3.00 - 11.58k 5.90 4.08 3.03 2.36 1.87 1.53 1.30 1.11 0.97 0.85 0.85 - - -

-4.00 - - - 4.65 3.36 2.60 2.11 1.75 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.55 2.25 1.86 - - - - - -

7.00 - - - - - - - - 2.25 1.91 1.64 1.35 - - - -

6.00 - - - - - - - 2.32 2.21 1.92 1.65 1.41 1.17 0.96 - -

5.00 - - - - - 2.96a 2.96 2.56 2.24 1.91 1.64 1.41 1.19 0.98 0.82 -

4.00 - - - - - 3.55 3.07 2.54 2.16 1.84 1.60 1.40 1.20 1.00 0.82 0.66

3.00 - - - - - 3.53 2.97 2.46 2.05 1.81 1.57 1.38 1.20 0.99 0.82 0.66

2.00 - - - - - 3.58 2.91 2.40 2.04 1.77 1.56 1.38 1.17 0.96 0.80 0.64

1.00 - - - - - 3.48 2.89 2.39 2.05 1.76 1.54 1.31 1.10 0.92 0.75 0.62

0.00 - - - - - 2.83 2.71 2.27 1.90 1.68 1.44 1.25 1.04 0.86 0.71 0.58

-1.00 - - - - - 2.96 2.59 2.16 1.81 1.58 1.37 1.14 0.95 0.80 0.66 -

-2.00 - - - 4.74 4.06 3.13 2.52 2.09 1.77 1.48 1.24 1.04 0.88 0.76 - -

-3.00 - 12.00 7.44 5.56 4.12 3.12 2.55 2.03 1.67 1.40 1.17 1.00 0.86 - - -

-4.00 - - - 4.66 3.44 2.65 2.15 1.76 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

31 of 64 17/11/2015 11:57

Page 33: Standard Quick Hitch Charts - L & W Contractors

Duty

3DU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

67%

Duty

3DU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30 1.89 1.81 - - - - - -

7.00 - - - - - - - - 1.91 1.59 1.37 1.21 - - - -

6.00 - - - - - - - 2.32 1.89 1.61 1.37 1.15 0.97 0.92 - -

5.00 - - - - - 2.75a 2.60 2.17 1.83 1.57 1.33 1.13 0.96 0.82 0.78 -

4.00 - - - - - 2.98 2.44 2.05 1.74 1.44 1.22 1.07 0.91 0.80 0.68 0.66

3.00 - - - - - 2.85 2.22 1.72 1.53 1.35 1.18 1.01 0.86 0.75 0.65 0.61

2.00 - - - - - 2.81 2.17 1.69 1.38 1.18 1.08 0.95 0.82 0.71 0.62 0.55

1.00 - - - - - 2.70 2.14 1.70 1.31 1.14 1.00 0.89 0.77 0.68 0.58 0.55

0.00 - - - - - 2.72 2.07 1.64 1.28 1.10 0.96 0.85 0.76 0.65 0.58 0.55

-1.00 - - - - - 2.46 1.93 1.57 1.24 1.08 0.94 0.83 0.73 0.65 0.60 -

-2.00 - - - 4.30 3.07 2.41 1.89 1.54 1.26 1.07 0.93 0.83 0.73 0.68 - -

-3.00 - 11.58k 5.90 4.08 3.03 2.36 1.87 1.53 1.30 1.11 0.97 0.85 0.85 - - -

-4.00 - - - 4.65 3.36 2.60 2.11 1.75 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.55 2.25 1.86 - - - - - -

7.00 - - - - - - - - 2.25 1.91 1.64 1.35 - - - -

6.00 - - - - - - - 2.32 2.21 1.92 1.65 1.41 1.17 0.96 - -

5.00 - - - - - 2.96a 2.96 2.56 2.24 1.91 1.64 1.41 1.19 0.98 0.82 -

4.00 - - - - - 3.55 3.07 2.54 2.16 1.84 1.60 1.40 1.20 1.00 0.82 0.66

3.00 - - - - - 3.53 2.97 2.46 2.05 1.81 1.57 1.38 1.20 0.99 0.82 0.66

2.00 - - - - - 3.58 2.91 2.40 2.04 1.77 1.56 1.38 1.17 0.96 0.80 0.64

1.00 - - - - - 3.48 2.89 2.39 2.05 1.76 1.54 1.31 1.10 0.92 0.75 0.62

0.00 - - - - - 2.83 2.71 2.27 1.90 1.68 1.44 1.25 1.04 0.86 0.71 0.58

-1.00 - - - - - 2.96 2.59 2.16 1.81 1.58 1.37 1.14 0.95 0.80 0.66 -

-2.00 - - - 4.74 4.06 3.13 2.52 2.09 1.77 1.48 1.24 1.04 0.88 0.76 - -

-3.00 - 12.00 7.44 5.56 4.12 3.12 2.55 2.03 1.67 1.40 1.17 1.00 0.86 - - -

-4.00 - - - 4.66 3.43 2.65 2.15 1.76 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

32 of 64 17/11/2015 11:57

Page 34: Standard Quick Hitch Charts - L & W Contractors

Duty

3EU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

67%

Duty

3EU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.08 2.00 - - - - - -

7.00 - - - - - - - - 2.11 1.79 1.56 1.40 - - - -

6.00 - - - - - - - 2.51 2.09 1.80 1.56 1.33 1.15 1.10 - -

5.00 - - - - - 2.75a 2.79 2.37 2.03 1.76 1.52 1.32 1.14 0.99 0.95 -

4.00 - - - - - 3.16a 2.66 2.26 1.95 1.65 1.42 1.26 1.09 0.97 0.85 0.83

3.00 - - - - - 3.05 2.44 1.95 1.75 1.56 1.38 1.20 1.04 0.93 0.82 0.77

2.00 - - - - - 3.01 2.40 1.92 1.61 1.40 1.29 1.15 1.01 0.89 0.79 0.74

1.00 - - - - - 2.91 2.37 1.93 1.55 1.36 1.21 1.09 0.96 0.86 0.76 0.73

0.00 - - - - - 2.93 2.31 1.88 1.52 1.33 1.17 1.05 0.94 0.83 0.76 0.74

-1.00 - - - - - 2.69 2.17 1.81 1.47 1.30 1.15 1.03 0.92 0.83 0.77 -

-2.00 - - - 4.39 3.28 2.65 2.14 1.79 1.49 1.30 1.15 1.03 0.92 0.86 - -

-3.00 - 10.60 5.72 4.19 3.24 2.60 2.12 1.77 1.53 1.33 1.18 1.05 1.05 - - -

-4.00 - - - 4.69 3.54 2.83 2.35 1.99 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.70a 2.44 2.06 - - - - - -

7.00 - - - - - - - - 2.44 2.11 1.83 1.54 - - - -

6.00 - - - - - - - 2.51 2.40 2.12 1.84 1.60 1.35 1.13 - -

5.00 - - - - - 2.96a 3.13a 2.75 2.43 2.10 1.83 1.60 1.38 1.16 0.99 -

4.00 - - - - - 3.70 3.24 2.73 2.36 2.04 1.79 1.59 1.38 1.17 0.99 0.83

3.00 - - - - - 3.68 3.16 2.66 2.25 2.01 1.77 1.57 1.38 1.17 0.99 0.83

2.00 - - - - - 3.73 3.10 2.61 2.25 1.97 1.75 1.57 1.35 1.14 0.97 0.81

1.00 - - - - - 3.64 3.09 2.59 2.26 1.96 1.73 1.50 1.28 1.10 0.93 0.79

0.00 - - - - - 3.04 2.92 2.49 2.12 1.89 1.65 1.45 1.23 1.04 0.89 0.76

-1.00 - - - - - 3.17 2.82 2.39 2.03 1.80 1.57 1.33 1.14 0.98 0.84 -

-2.00 - - - 4.77 4.18 3.33 2.74 2.32 2.00 1.70 1.45 1.24 1.07 0.95 - -

-3.00 - 10.97 6.90 5.44 4.23 3.32 2.77 2.27 1.91 1.63 1.39 1.21 1.06 - - -

-4.00 - - - 4.70 3.62 2.88 2.38 2.00 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

33 of 64 17/11/2015 11:57

Page 35: Standard Quick Hitch Charts - L & W Contractors

Duty

3FU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

67%

Duty

3FU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.77 1.59 - - - -

6.00 - - - - - - - 2.89 2.38 2.05 1.77a 1.51 1.31 1.25 - -

5.00 - - - - - 2.75a 2.89a 2.73 2.32 2.01 1.73 1.50 1.30 1.13 1.09 -

4.00 - - - - - 3.16a 3.11 2.63 2.24 1.89 1.62 1.44 1.24 1.11 0.97 0.95

3.00 - - - - - 3.62 2.86 2.27 2.04 1.79 1.58 1.38 1.19 1.06 0.94 0.89

2.00 - - - - - 3.56 2.81 2.25 1.88 1.63 1.50 1.33 1.16 1.02 0.91 0.85

1.00 - - - - - 3.45 2.78 2.26 1.80 1.58 1.40 1.26 1.11 0.99 0.88 0.85

0.00 - - - - - 3.47 2.72 2.19 1.78 1.54 1.36 1.22 1.09 0.96 0.88 0.86

-1.00 - - - - - 3.21 2.56 2.13 1.73 1.52 1.34 1.19 1.06 0.96 0.90 -

-2.00 - - - 5.49 3.97 3.16 2.53 2.11 1.75 1.51 1.33 1.19 1.07 1.00 - -

-3.00 - 11.58k 7.48 5.23 3.94 3.10 2.51 2.08 1.79 1.55 1.37 1.22 1.22 - - -

-4.00 - - - 5.91 4.32 3.39 2.78 2.33 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.86 2.80 2.23a - - - - - -

7.00 - - - - - - - - 2.80 2.40 2.08 1.75 - - - -

6.00 - - - - - - - 2.89 2.76 2.41 2.09 1.80 1.53 1.29 - -

5.00 - - - - - 2.96a 3.27a 3.17 2.79 2.40 2.08 1.81 1.56 1.32 1.13 -

4.00 - - - - - 4.22 3.80 3.17 2.71 2.33 2.04 1.80 1.56 1.33 1.13 0.95

3.00 - - - - - 4.41 3.72 3.09 2.59 2.30 2.01 1.78 1.56 1.33 1.13 0.95

2.00 - - - - - 4.48 3.65 3.03 2.59 2.26 1.99 1.78 1.53 1.29 1.11 0.93

1.00 - - - - - 4.35 3.64 3.02 2.60 2.24 1.98 1.71 1.46 1.26 1.06 0.91

0.00 - - - - - 3.61 3.45 2.91 2.44 2.17 1.88 1.65 1.40 1.19 1.02 0.88

-1.00 - - - - - 3.82 3.34 2.80 2.36 2.07 1.80 1.53 1.31 1.13 0.97 -

-2.00 - - - 6.04 5.21 4.03 3.26 2.72 2.32 1.96 1.67 1.43 1.24 1.09 - -

-3.00 - 12.00 9.37 7.05 5.26 4.02 3.29 2.66 2.23 1.89 1.61 1.40 1.23 - - -

-4.00 - - - 5.94 4.42 3.45 2.82 2.34 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

34 of 64 17/11/2015 11:57

Page 36: Standard Quick Hitch Charts - L & W Contractors

Duty

3GU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

67%

Duty

3GU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.87 - - - -

6.00 - - - - - - - 3.02a 2.68 2.34 1.77a 1.78a 1.58 1.52 - -

5.00 - - - - - 2.75a 2.89a 2.95a 2.62 2.30 1.99a 1.72a 1.57 1.40 1.35 -

4.00 - - - - - 3.16a 3.11k 2.94 2.54 2.19 1.91 1.70a 1.52 1.37 1.23 1.21

3.00 - - - - - 3.90 3.18 2.61 2.37 2.10 1.88 1.67 1.47 1.33 1.20 1.14

2.00 - - - - - 3.85 3.14 2.59 2.22 1.95 1.81 1.62 1.44 1.29 1.17 1.10

1.00 - - - - - 3.75 3.11 2.60 2.14 1.91 1.71 1.56 1.39 1.26 1.14 1.10

0.00 - - - - - 3.77 3.06 2.54 2.12 1.87 1.68 1.52 1.37 1.23 1.14 1.11

-1.00 - - - - - 3.54 2.92 2.48 2.07 1.85 1.65 1.49 1.35 1.23 1.16 -

-2.00 - - - 5.56 4.25 3.49 2.89 2.46 2.09 1.84 1.65 1.49 1.36 1.27 - -

-3.00 - 11.58k 7.11 5.34 4.22 3.44 2.87 2.44 2.14 1.88 1.68 1.52 1.51 - - -

-4.00 - - - 5.90 4.55 3.70 3.12 2.68 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.08 2.69 2.36 2.03 - - - -

6.00 - - - - - - - 3.02a 3.04 2.70 2.37 2.08 1.81 1.56 - -

5.00 - - - - - 2.96a 3.27a 3.35 3.06a 2.69 2.37 2.09 1.83 1.58 1.39 -

4.00 - - - - - 4.43 4.01 3.45 3.01 2.63 2.32 2.08 1.84 1.60 1.39 1.21

3.00 - - - - - 4.62 3.98 3.38 2.89 2.60 2.30 2.06 1.83 1.59 1.39 1.21

2.00 - - - - - 4.67 3.92 3.33 2.89 2.56 2.29 2.06 1.81 1.56 1.37 1.19

1.00 - - - - - 4.57 3.91 3.32 2.91 2.54 2.27 1.99 1.74 1.53 1.33 1.16

0.00 - - - - - 3.89 3.75 3.22 2.76 2.48 2.18 1.94 1.69 1.47 1.29 1.14

-1.00 - - - - - 4.10 3.65 3.12 2.69 2.39 2.11 1.83 1.60 1.41 1.24 -

-2.00 - - - 6.01 5.32 4.29 3.58 3.06 2.65 2.29 1.99 1.74 1.53 1.38 - -

-3.00 - 12.00 8.43 6.79 5.37 4.28 3.61 3.00 2.57 2.22 1.93 1.71 1.52 - - -

-4.00 - - - 5.92 4.64 3.76 3.16 2.68 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

35 of 64 17/11/2015 11:57

Page 37: Standard Quick Hitch Charts - L & W Contractors

Duty

3HU 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

67%

Duty

3HU 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 10.89k 9.03b 7.48b 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 10.93k 7.15a 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.43k 9.42a 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.97b 7.98a 7.21b - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 7.11b 5.53a 4.57a 4.52a 4.27a 4.04a 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 8.06b 8.16b 7.97b 6.42b 5.77b 4.88a 4.91k 4.30a 3.56a 2.44a

2.00 - - - - - 7.71b 7.93b 8.06b 8.00b 7.36b 6.49b 5.71b 4.93b 4.89b 4.11a 2.72a

1.00 - - - - - 8.87b 8.93b 8.71b 8.21b 7.57b 6.80b 6.02b 5.53b 4.94b 4.40a 2.94a

0.00 - - - - - 10.93b 10.34b 9.46b 8.71b 7.67b 6.83b 6.16b 5.59b 4.94a 4.45a 2.35a

-1.00 - - - - - 12.00 12.00b 10.17b 8.88b 7.73b 6.90k 6.20b 5.57b 4.76k 3.74a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.33b 8.93b 7.90b 6.95b 6.09b 4.68k 4.47a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.32b 8.66b 7.44b 6.25b 4.98b 3.96a - - -

-4.00 - - - 12.00 12.00 10.54b 8.79b 7.21b - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

36 of 64 17/11/2015 11:57

Page 38: Standard Quick Hitch Charts - L & W Contractors

Duty

3AL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

90%

Duty

3AL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 8.51 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 8.18 6.88 5.97 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 9.75 8.12 6.87 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 9.73 8.04 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 10.36 8.53 7.26 6.34 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 6.75 5.53a 4.57a 4.52a 4.27a 4.03 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 7.80b 7.22 6.32 5.60 4.89 4.50 4.07 3.68 3.33 2.44a

2.00 - - - - - 7.71b 7.87b 7.17 6.26 5.58 4.93 4.49b 4.07 3.67 3.30 2.72a

1.00 - - - - - 8.73b 8.28 7.20 6.24 5.55 4.93 4.51 4.05 3.62 3.28 2.94a

0.00 - - - - - 8.77 8.44 7.22 6.20 5.61 4.91 4.44 3.97 3.58 3.22 2.35a

-1.00 - - - - - 9.38 8.32 7.15 6.22 5.50 4.83 4.27 3.91 3.51 3.19 -

-2.00 - - - 12.00 12.00 9.79 8.22 7.05 6.16 5.42 4.73 4.22 3.84 3.47 - -

-3.00 - 12.00 12.00 12.00 12.00 9.75 8.26 6.98 6.07 5.31 4.68 4.17 3.81 - - -

-4.00 - - - 12.00 10.58 8.69 7.36 6.34 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

37 of 64 17/11/2015 11:57

Page 39: Standard Quick Hitch Charts - L & W Contractors

Duty

3BL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

90%

Duty

3BL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.09 1.99a 1.72a 1.72a 1.70 1.62 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 2.93 2.51 1.70a 1.69a 1.66 1.44 1.41

3.00 - - - - - 5.53 4.40 3.39k 3.12k 2.79 2.45 1.73a 1.75a 1.60 1.39 1.31

2.00 - - - - - 5.45 4.34 3.51 2.97 2.56 2.34 1.82a 1.76 1.53 1.35 1.25

1.00 - - - - - 5.30 4.30 3.53 2.86 2.50 2.19 1.92a 1.69 1.49 1.30 1.25

0.00 - - - - - 5.33 4.22 3.44 2.82 2.44 2.13 1.88 1.66 1.44 1.30 1.26

-1.00 - - - - - 4.98 4.01 3.35 2.75 2.40 2.09 1.84 1.62 1.44 1.33 -

-2.00 - - - 8.43 6.14 4.91 3.97 3.32 2.78 2.39 2.08 1.84 1.63 1.50 - -

-3.00 - 11.58k 10.99k 8.04 6.10 4.83 3.94 3.29 2.85 2.45 2.14 1.88 1.88 - - -

-4.00 - - - 9.06 6.65 5.24 4.32 3.65 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.16 2.72 2.34 1.95 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.54a 3.18 2.77 2.36 1.98 1.69 -

4.00 - - - - - 6.30 5.49 4.62 3.97a 3.56 3.12 2.77 2.38 2.01 1.69 1.41

3.00 - - - - - 6.71 5.65 4.71 3.95 3.53 3.09 2.74 2.37 2.01a 1.69 1.41

2.00 - - - - - 6.81 5.57 4.63 3.96 3.47 3.07 2.74 2.32 1.96 1.66 1.38

1.00 - - - - - 6.62 5.55 4.62 3.98 3.44 3.04 2.64 2.24 1.91 1.59 1.34

0.00 - - - - - 5.54 5.29 4.46 3.76 3.35 2.92 2.54a 2.15 1.81 1.53 1.30

-1.00 - - - - - 5.89 5.15 4.32 3.65 3.21 2.81 2.37 2.01 1.72 1.46 -

-2.00 - - - 9.27 8.00 6.21 5.04 4.22 3.61 3.07 2.63 2.23 1.91 1.66 - -

-3.00 - 12.00 12.00 10.80 8.09 6.19 5.08 4.14 3.48 2.97 2.53 2.18 1.89 - - -

-4.00 - - - 9.10 6.81 5.34 4.38 3.66 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

38 of 64 17/11/2015 11:57

Page 40: Standard Quick Hitch Charts - L & W Contractors

Duty

3CL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

90%

Duty

3CL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.71 1.62 - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 2.85 1.99a 1.72a 1.70 1.43 1.35 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 2.67 2.22 1.70a 1.61 1.39 1.17 1.14

3.00 - - - - - 5.51 4.23 3.29 2.92 2.51 2.16 1.73a 1.53 1.32 1.12 1.04

2.00 - - - - - 5.41 4.15 3.25 2.68 2.25 2.03 1.75 1.47 1.25 1.08 0.98

1.00 - - - - - 5.24 4.11 3.28 2.55 2.18 1.87 1.64 1.40 1.21 1.03 0.98

0.00 - - - - - 5.27 4.02 3.17 2.51 2.11 1.81 1.57 1.36 1.16 1.02 0.99

-1.00 - - - - - 4.86 3.78 3.08 2.43 2.07 1.77 1.53 1.32 1.16 1.05 -

-2.00 - - - 9.22 6.23 4.78 3.73 3.05 2.46 2.06 1.76 1.53 1.33 1.21 - -

-3.00 - 11.58k 10.99k 8.69 6.18 4.69 3.70 3.01 2.54 2.13 1.82 1.58 1.57 - - -

-4.00 - - - 10.11 6.86 5.16 4.12 3.40 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 2.93 2.41 - - - -

6.00 - - - - - - - 3.02a 3.21a 3.23a 2.94 2.48 2.07 1.68 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.36 2.96 2.53 2.12 1.72 1.42 -

4.00 - - - - - 6.41 5.46 4.47 3.85 3.35 2.89 2.51 2.11 1.75 1.43 1.14

3.00 - - - - - 6.88b 5.64 4.58 3.75 3.31 2.86 2.48 2.10 1.74a 1.42 1.14

2.00 - - - - - 6.98b 5.55 4.49 3.76 3.24 2.83 2.48 2.06 1.68 1.39 1.11

1.00 - - - - - 6.81 5.52 4.47 3.78 3.21 2.80 2.36 1.96 1.63 1.31 1.07

0.00 - - - - - 5.51 5.23 4.29 3.54 3.11 2.66 2.27 1.87 1.53 1.26 1.03

-1.00 - - - - - 5.93 5.06 4.13 3.42 2.96 2.53 2.08 1.72 1.43 1.18 -

-2.00 - - - 10.42 8.63 6.32 4.93 4.02 3.37 2.81 2.32 1.92 1.61 1.37 - -

-3.00 - 12.00 12.00 11.82k 8.74 6.29 4.98 3.93 3.23 2.69 2.21 1.87 1.59 - - -

-4.00 - - - 10.18 7.06 5.28 4.19 3.41 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

39 of 64 17/11/2015 11:57

Page 41: Standard Quick Hitch Charts - L & W Contractors

Duty

3DL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

90%

Duty

3DL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.71 1.62 - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 2.85 1.99a 1.72a 1.70 1.43 1.35 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 2.67 2.22 1.70a 1.61 1.39 1.17 1.14

3.00 - - - - - 5.51 4.23 3.29 2.92 2.51 2.16 1.73a 1.53 1.32 1.12 1.04

2.00 - - - - - 5.41 4.15 3.25 2.68 2.25 2.03 1.75 1.47 1.25 1.08 0.98

1.00 - - - - - 5.24 4.11 3.28 2.55 2.18 1.87 1.64 1.40 1.21 1.03 0.98

0.00 - - - - - 5.27 4.02 3.17 2.51 2.11 1.81 1.57 1.36 1.16 1.02 0.99

-1.00 - - - - - 4.86 3.78 3.08 2.43 2.07 1.77 1.53 1.32 1.16 1.05 -

-2.00 - - - 9.22 6.23 4.78 3.73 3.05 2.46 2.06 1.76 1.53 1.33 1.21 - -

-3.00 - 11.58k 10.99k 8.69 6.18 4.69 3.70 3.01 2.54 2.13 1.82 1.58 1.57 - - -

-4.00 - - - 10.11 6.86 5.16 4.12 3.40 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 2.93 2.41 - - - -

6.00 - - - - - - - 3.02a 3.21a 3.23a 2.94 2.48 2.07 1.68 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.36a 2.96 2.53 2.12 1.72 1.42 -

4.00 - - - - - 6.41 5.46 4.47 3.85 3.35 2.89 2.51 2.11 1.75 1.43 1.14

3.00 - - - - - 6.88b 5.64 4.58 3.75 3.31 2.86 2.48 2.10 1.74a 1.42 1.14

2.00 - - - - - 6.98b 5.55 4.49 3.76 3.24 2.83 2.48 2.06 1.68 1.39 1.11

1.00 - - - - - 6.81 5.52 4.47 3.78 3.21 2.80 2.36 1.96 1.63 1.31 1.07

0.00 - - - - - 5.51 5.23 4.29 3.54 3.11 2.66 2.27 1.87 1.53 1.26 1.03

-1.00 - - - - - 5.93 5.06 4.13 3.42 2.96 2.53 2.08 1.72 1.43 1.18 -

-2.00 - - - 10.42 8.63 6.32 4.93 4.02 3.37 2.81 2.32 1.92 1.61 1.37 - -

-3.00 - 12.00 12.00 11.82k 8.74 6.29 4.98 3.93 3.23 2.69 2.21 1.87 1.59 - - -

-4.00 - - - 10.18 7.06 5.28 4.19 3.41 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

40 of 64 17/11/2015 11:57

Page 42: Standard Quick Hitch Charts - L & W Contractors

Duty

3EL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

90%

Duty

3EL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.69

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.74 1.62

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.08 2.74 1.92a 1.92a 1.91 1.69 1.62

0.00 - - - - - 6.40 5.09 4.16 3.45 3.02 2.57a 2.25a 2.11 1.86 1.68 1.64

-1.00 - - - - - 6.02 4.86 4.08 3.38 2.98 2.64 2.34 2.07 1.86 1.73 -

-2.00 - - - 10.34 7.47 5.95 4.83 4.05 3.32k 2.97 2.63 2.33 2.09 1.93 - -

-3.00 - 11.58k 10.99k 9.86 7.43 5.87 4.80 4.01 3.48 3.03 2.69 2.38 2.37 - - -

-4.00 - - - 11.14 8.09 6.35 5.22 4.42 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.79 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.59 3.22 2.82a 2.44 2.10 -

4.00 - - - - - 6.81b 6.53 5.48 4.38b 4.04a 3.66 3.24 2.84 2.46 2.10 1.78a

3.00 - - - - - 7.43 6.58 5.48 4.69 4.11 3.61 3.21 2.83 2.43 2.09 1.80

2.00 - - - - - 7.26 6.52 5.43 4.67 4.00 3.59 3.21 2.79 2.41 2.06 1.76

1.00 - - - - - 7.48 6.52 5.42 4.63 3.98 3.58 3.15 2.73a 2.34 2.01 1.72

0.00 - - - - - 6.65 6.35 5.32 4.48 3.95 3.48 3.04 2.63a 2.27 1.95 1.69

-1.00 - - - - - 7.14 6.20 5.18 4.38 3.84 3.37 2.90 2.51 2.17 1.87 -

-2.00 - - - 11.42 9.81 7.53 6.08 5.07 4.33 3.70 3.19 2.77 2.41 2.12 - -

-3.00 - 12.00 12.00 12.00 9.90 7.50 6.13 4.99 4.21 3.60 3.10 2.73 2.39 - - -

-4.00 - - - 11.20 8.29 6.48 5.29 4.42 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

41 of 64 17/11/2015 11:57

Page 43: Standard Quick Hitch Charts - L & W Contractors

Duty

3FL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

90%

Duty

3FL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.69

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 2.92 1.92a 1.92a 1.94a 1.77 1.69

0.00 - - - - - 7.40 5.73 4.59 3.74 3.11k 2.57a 2.25a 2.19a 1.96 1.76 1.72

-1.00 - - - - - 6.96 5.47 4.50 3.57k 3.12k 2.71a 2.49 2.19 1.96 1.81 -

-2.00 - - - 12.00 8.95 6.87 5.43 4.47 3.32k 3.17k 2.81 2.48 2.20 2.03 - -

-3.00 - 11.58k 10.99k 11.36k 8.93 6.77 5.40 4.43 3.78 3.25 2.87 2.53 2.52 - - -

-4.00 - - - 12.00 9.83 7.38 5.90 4.91 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.60a 3.41 2.97 2.56 2.21 -

4.00 - - - - - 6.81b 6.84 5.89b 4.69 4.26 3.85a 3.42 2.99 2.59 2.21 1.78a

3.00 - - - - - 7.68 7.39 6.16b 5.18 4.38 3.86 3.41 2.99 2.57 2.20 1.85

2.00 - - - - - 7.71b 7.44 6.06 5.05 4.36 3.84 3.40 2.95 2.54a 2.17 1.85

1.00 - - - - - 8.17 7.33 6.03 5.07 4.33 3.85 3.33 2.87 2.47 2.11 1.80

0.00 - - - - - 7.73 7.32 5.98 4.94 4.29 3.74 3.24 2.77 2.40 2.05 1.76

-1.00 - - - - - 8.46 7.15 5.82 4.84 4.13 3.61 3.09 2.67 2.29 1.97 -

-2.00 - - - 12.00 12.00 9.03 7.01 5.70 4.78 4.03 3.42 2.95 2.56 2.24 - -

-3.00 - 12.00 12.00 12.00 12.00 8.97 7.07 5.60 4.64 3.91 3.33 2.90 2.54 - - -

-4.00 - - - 12.00 10.15 7.57 6.00 4.91 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

42 of 64 17/11/2015 11:57

Page 44: Standard Quick Hitch Charts - L & W Contractors

Duty

3GL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

90%

Duty

3GL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 8.30 6.64 5.47 4.57 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 7.90 6.40 5.40 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 9.83 7.82 6.38 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 9.81 7.73 6.29a 5.32 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 10.64 8.32 6.83 5.80 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 6.34 5.42a 4.57a 4.43 3.96 3.57 3.17 2.80 1.78a

3.00 - - - - - 7.68b 7.80b 6.85b 5.89b 5.04 4.51 4.01 3.58 3.17 2.81 2.44a

2.00 - - - - - 7.71b 7.78 6.78 5.84b 5.07 4.35 3.99 3.57 3.14 2.79 2.45

1.00 - - - - - 8.70 8.02 6.77 5.76b 5.06 4.42 4.02 3.50 3.08 2.74 2.40

0.00 - - - - - 8.61 8.21 6.79 5.77 5.05 4.48 3.90a 3.41 3.03 2.69 2.35a

-1.00 - - - - - 9.36 8.07 6.72 5.69 4.93 4.26k 3.78 3.34 2.95 2.63 -

-2.00 - - - 12.00 12.00 9.89 7.94 6.60 5.63 4.84 4.13 3.65k 3.24 2.89 - -

-3.00 - 12.00 12.00 12.00 12.00 9.84 7.99 6.51 5.51 4.73 4.09 3.62 3.23 - - -

-4.00 - - - 12.00 10.93 8.50 6.93 5.80 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

43 of 64 17/11/2015 11:57

Page 45: Standard Quick Hitch Charts - L & W Contractors

Duty

3HL 50-100

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

90%

Duty

3HL 50-100

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 10.89k 9.03b 7.48b 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 10.93k 7.15a 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.43k 9.42a 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.97b 7.98a 7.21b - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 7.11b 5.53a 4.57a 4.52a 4.27a 4.04a 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 8.06b 8.16b 7.97b 6.42b 5.77b 4.88a 4.91k 4.30a 3.56a 2.44a

2.00 - - - - - 7.71b 7.93b 8.06b 8.00b 7.36b 6.49b 5.71b 4.93b 4.89b 4.11a 2.72a

1.00 - - - - - 8.87b 8.93b 8.71b 8.21b 7.57b 6.80b 6.02b 5.53b 4.94b 4.40a 2.94a

0.00 - - - - - 10.93b 10.34b 9.46b 8.71b 7.67b 6.83b 6.16b 5.59b 4.94a 4.45a 2.35a

-1.00 - - - - - 12.00 12.00b 10.17b 8.88b 7.73b 6.90k 6.20b 5.57b 4.76k 3.74a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.33b 8.93b 7.90b 6.95b 6.09b 4.68k 4.47a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.32b 8.66b 7.44b 6.25b 4.98b 3.96a - - -

-4.00 - - - 12.00 12.00 10.54b 8.79b 7.21b - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

44 of 64 17/11/2015 11:57

Page 46: Standard Quick Hitch Charts - L & W Contractors

Duty

3AU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

67%

Duty

3AU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.07 2.43a 1.77a 1.78a 1.81a 1.79 - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.01 2.66 1.99a 1.72a 1.72a 1.65 1.60 -

4.00 - - - - - 3.16a 3.11k 3.11k 2.94 2.55 2.24 1.70a 1.69a 1.63 1.47 1.45

3.00 - - - - - 4.48 3.68 3.05 2.78 2.46 2.20 1.73a 1.75a 1.59 1.44 1.38

2.00 - - - - - 4.42 3.63 3.02 2.62 2.31 2.13 1.82a 1.72 1.55 1.41 1.33

1.00 - - - - - 4.32 3.61 3.04 2.54 2.27 2.04 1.86 1.67 1.52 1.38 1.34

0.00 - - - - - 4.34 3.56 2.98 2.51 2.23 2.00 1.82 1.65 1.49 1.38 1.35

-1.00 - - - - - 4.11 3.41 2.92 2.46 2.21 1.98 1.79 1.62 1.49 1.40 -

-2.00 - - - 6.41 4.92 4.07 3.39 2.90 2.49 2.20 1.97 1.79 1.63 1.53 - -

-3.00 - 11.58k 8.17 6.17 4.90 4.01 3.37 2.88 2.53 2.23 2.01 1.82 1.81 - - -

-4.00 - - - 6.79 5.26 4.30 3.63 3.14 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.08 2.72 2.36 - - - -

6.00 - - - - - - - 3.02a 3.18a 3.09 2.73 2.38 2.10 1.83 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.44 3.08 2.72 2.41 2.13 1.86 1.64 -

4.00 - - - - - 5.02 4.44 3.84 3.45 3.02 2.68 2.40 2.13 1.87 1.65 1.45

3.00 - - - - - 5.28 4.55 3.88 3.32 2.99 2.66 2.38 2.12 1.87 1.64 1.45

2.00 - - - - - 5.35 4.50 3.83 3.33 2.95 2.64 2.38 2.10 1.84 1.63 1.43

1.00 - - - - - 5.22 4.48 3.82 3.34 2.93 2.62 2.32 2.04 1.80 1.58 1.40

0.00 - - - - - 4.49 4.32 3.71 3.19 2.87 2.54 2.26 1.98 1.74 1.55 1.38

-1.00 - - - - - 4.75 4.22 3.62 3.12 2.78 2.46 2.15 1.90 1.68 1.50 -

-2.00 - - - 6.92 6.14 4.97 4.15 3.55 3.09 2.68 2.34 2.06 1.83 1.65 - -

-3.00 - 12.00 9.67 7.81 6.19 4.95 4.18 3.49 3.01 2.61 2.28 2.03 1.82 - - -

-4.00 - - - 6.82 5.37 4.37 3.68 3.14 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

45 of 64 17/11/2015 11:57

Page 47: Standard Quick Hitch Charts - L & W Contractors

Duty

3BU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

67%

Duty

3BU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30 1.90 1.82 - - - - - -

7.00 - - - - - - - - 1.93 1.62 1.40 1.25 - - - -

6.00 - - - - - - - 2.31 1.91 1.63 1.40 1.18 1.01 0.96 - -

5.00 - - - - - 2.75a 2.57 2.17 1.84 1.59 1.36 1.17 1.00 0.86 0.82 -

4.00 - - - - - 2.93 2.43 2.05 1.76 1.47 1.25 1.11 0.95 0.84 0.72 0.70

3.00 - - - - - 2.81 2.21 1.74 1.56 1.38 1.22 1.05 0.90 0.79 0.69 0.65

2.00 - - - - - 2.76 2.17 1.71 1.41 1.22 1.12 0.99 0.86 0.75 0.66 0.61

1.00 - - - - - 2.67 2.14 1.72 1.35 1.18 1.04 0.93 0.82 0.72 0.63 0.61

0.00 - - - - - 2.68 2.08 1.66 1.32 1.14 1.01 0.90 0.80 0.70 0.63 0.61

-1.00 - - - - - 2.44 1.94 1.60 1.28 1.12 0.98 0.87 0.77 0.69 0.64 -

-2.00 - - - 4.09 3.00 2.39 1.90 1.57 1.30 1.12 0.98 0.87 0.78 0.72 - -

-3.00 - 10.62 5.42 3.89 2.96 2.34 1.88 1.56 1.34 1.15 1.01 0.90 0.90 - - -

-4.00 - - - 4.38 3.26 2.57 2.11 1.77 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.53 2.24 1.88 - - - - - -

7.00 - - - - - - - - 2.25 1.93 1.66 1.38 - - - -

6.00 - - - - - - - 2.31 2.21 1.93 1.67 1.44 1.20 0.99 - -

5.00 - - - - - 2.96a 2.91 2.54 2.23 1.92 1.66 1.44 1.23 1.02 0.85 -

4.00 - - - - - 3.45 3.01 2.52 2.16 1.85 1.62 1.43 1.23 1.03 0.86 0.70

3.00 - - - - - 3.42 2.92 2.44 2.05 1.83 1.60 1.41 1.23 1.03 0.86 0.70

2.00 - - - - - 3.47 2.86 2.39 2.04 1.79 1.58 1.41 1.20 0.99 0.84 0.68

1.00 - - - - - 3.38 2.85 2.37 2.05 1.77 1.56 1.34 1.13 0.96 0.79 0.66

0.00 - - - - - 2.79 2.67 2.27 1.91 1.70 1.47 1.28 1.08 0.90 0.76 0.63

-1.00 - - - - - 2.90 2.57 2.16 1.82 1.61 1.40 1.17 0.99 0.84 0.71 -

-2.00 - - - 4.46 3.88 3.06 2.49 2.10 1.79 1.51 1.28 1.08 0.92 0.80 - -

-3.00 - 11.04 6.63 5.14 3.93 3.05 2.52 2.04 1.70 1.43 1.21 1.05 0.91 - - -

-4.00 - - - 4.39 3.33 2.62 2.15 1.78 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

46 of 64 17/11/2015 11:57

Page 48: Standard Quick Hitch Charts - L & W Contractors

Duty

3CU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

67%

Duty

3CU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.15 1.76 1.68 - - - - - -

7.00 - - - - - - - - 1.78 1.48 1.28 1.12 - - - -

6.00 - - - - - - - 2.16 1.76 1.49 1.28 1.06 0.90 0.85 - -

5.00 - - - - - 2.75a 2.41 2.02 1.70 1.45 1.23 1.05 0.89 0.75 0.71 -

4.00 - - - - - 2.75 2.25 1.89 1.61 1.33 1.12 0.99 0.83 0.73 0.62 0.60

3.00 - - - - - 2.62 2.04 1.58 1.40 1.24 1.09 0.93 0.78 0.68 0.58 0.52

2.00 - - - - - 2.58 1.99 1.55 1.25 1.08 0.99 0.87 0.75 0.64 0.53 0.47

1.00 - - - - - 2.48 1.96 1.55 1.19 1.03 0.90 0.81 0.70 0.61 0.49 0.46

0.00 - - - - - 2.49 1.89 1.50 1.17 1.00 0.87 0.77 0.68 0.58 0.49 0.46

-1.00 - - - - - 2.24 1.76 1.43 1.12 0.98 0.85 0.75 0.65 0.57 0.50 -

-2.00 - - - 3.87 2.78 2.19 1.72 1.40 1.14 0.97 0.84 0.75 0.66 0.61 - -

-3.00 - 10.94 5.23 3.67 2.74 2.14 1.70 1.39 1.18 1.01 0.88 0.77 0.77 - - -

-4.00 - - - 4.17 3.05 2.37 1.92 1.60 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.46a 2.09 1.73 - - - - - -

7.00 - - - - - - - - 2.10 1.78 1.53 1.26 - - - -

6.00 - - - - - - - 2.16 2.06 1.79 1.53 1.31 1.08 0.88 - -

5.00 - - - - - 2.96a 2.73 2.38 2.08 1.78 1.53 1.32 1.11 0.91 0.75 -

4.00 - - - - - 3.27 2.83 2.35 2.01 1.71 1.49 1.30 1.11 0.92 0.75 0.60

3.00 - - - - - 3.23 2.74 2.27 1.90 1.68 1.46 1.28 1.11 0.91 0.75 0.60

2.00 - - - - - 3.27 2.68 2.22 1.89 1.64 1.44 1.28 1.09 0.88 0.73 0.57

1.00 - - - - - 3.18 2.66 2.21 1.90 1.63 1.43 1.22 1.01 0.85 0.68 0.53

0.00 - - - - - 2.59 2.49 2.10 1.76 1.55 1.34 1.16 0.95 0.78 0.65 0.49

-1.00 - - - - - 2.70 2.37 1.99 1.66 1.46 1.26 1.04 0.87 0.72 0.59 -

-2.00 - - - 4.25 3.66 2.85 2.30 1.92 1.63 1.35 1.14 0.95 0.80 0.69 - -

-3.00 - 11.43 6.50 4.93 3.71 2.84 2.33 1.86 1.53 1.28 1.07 0.91 0.78 - - -

-4.00 - - - 4.18 3.11 2.42 1.96 1.61 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

47 of 64 17/11/2015 11:57

Page 49: Standard Quick Hitch Charts - L & W Contractors

Duty

3DU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

67%

Duty

3DU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.14 1.76 1.68 - - - - - -

7.00 - - - - - - - - 1.78 1.48 1.28 1.12 - - - -

6.00 - - - - - - - 2.16 1.76 1.49 1.28 1.06 0.90 0.85 - -

5.00 - - - - - 2.75a 2.41 2.02 1.70 1.45 1.23 1.05 0.89 0.75 0.71 -

4.00 - - - - - 2.75 2.25 1.89 1.61 1.33 1.12 0.99 0.83 0.73 0.62 0.60

3.00 - - - - - 2.62 2.04 1.58 1.40 1.24 1.09 0.93 0.78 0.68 0.58 0.52

2.00 - - - - - 2.58 1.99 1.55 1.25 1.08 0.99 0.87 0.75 0.64 0.53 0.47

1.00 - - - - - 2.48 1.96 1.55 1.19 1.03 0.90 0.81 0.70 0.61 0.49 0.46

0.00 - - - - - 2.49 1.89 1.50 1.17 1.00 0.87 0.77 0.68 0.58 0.49 0.46

-1.00 - - - - - 2.24 1.76 1.43 1.12 0.98 0.85 0.75 0.65 0.57 0.50 -

-2.00 - - - 3.86 2.78 2.19 1.72 1.40 1.14 0.97 0.84 0.75 0.66 0.61 - -

-3.00 - 10.94 5.23 3.67 2.74 2.14 1.70 1.39 1.18 1.01 0.88 0.77 0.77 - - -

-4.00 - - - 4.17 3.05 2.37 1.92 1.60 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.46a 2.09 1.73 - - - - - -

7.00 - - - - - - - - 2.10 1.78 1.53 1.26 - - - -

6.00 - - - - - - - 2.16 2.06 1.79 1.53 1.31 1.08 0.88 - -

5.00 - - - - - 2.96a 2.73 2.38 2.08 1.78 1.53 1.32 1.11 0.91 0.75 -

4.00 - - - - - 3.27 2.83 2.35 2.01 1.71 1.49 1.30 1.11 0.92 0.75 0.60

3.00 - - - - - 3.23 2.74 2.27 1.90 1.68 1.46 1.28 1.11 0.91 0.75 0.60

2.00 - - - - - 3.27 2.68 2.22 1.89 1.64 1.44 1.28 1.09 0.88 0.73 0.57

1.00 - - - - - 3.18 2.66 2.21 1.90 1.63 1.43 1.22 1.01 0.85 0.68 0.53

0.00 - - - - - 2.59 2.49 2.09 1.76 1.55 1.34 1.16 0.95 0.78 0.65 0.49

-1.00 - - - - - 2.70 2.37 1.99 1.66 1.46 1.26 1.04 0.87 0.72 0.59 -

-2.00 - - - 4.24 3.66 2.85 2.30 1.92 1.63 1.35 1.14 0.95 0.80 0.69 - -

-3.00 - 11.43 6.50 4.93 3.71 2.84 2.33 1.86 1.53 1.28 1.07 0.91 0.78 - - -

-4.00 - - - 4.17 3.11 2.42 1.96 1.61 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

48 of 64 17/11/2015 11:57

Page 50: Standard Quick Hitch Charts - L & W Contractors

Duty

3EU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

67%

Duty

3EU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.30 1.90 1.82 - - - - - -

7.00 - - - - - - - - 1.93 1.62 1.40 1.25 - - - -

6.00 - - - - - - - 2.31 1.91 1.63 1.40 1.18 1.01 0.96 - -

5.00 - - - - - 2.75a 2.57 2.17 1.84 1.59 1.36 1.17 1.00 0.86 0.82 -

4.00 - - - - - 2.93 2.43 2.05 1.76 1.47 1.25 1.11 0.95 0.84 0.72 0.70

3.00 - - - - - 2.81 2.21 1.74 1.56 1.38 1.22 1.05 0.90 0.79 0.69 0.65

2.00 - - - - - 2.76 2.17 1.71 1.41 1.22 1.12 0.99 0.86 0.75 0.66 0.61

1.00 - - - - - 2.67 2.14 1.72 1.35 1.18 1.04 0.93 0.82 0.72 0.63 0.61

0.00 - - - - - 2.68 2.08 1.66 1.32 1.14 1.01 0.90 0.80 0.70 0.63 0.61

-1.00 - - - - - 2.44 1.94 1.60 1.28 1.12 0.98 0.87 0.77 0.69 0.64 -

-2.00 - - - 4.09 3.00 2.39 1.90 1.57 1.30 1.12 0.98 0.87 0.78 0.72 - -

-3.00 - 10.62 5.42 3.89 2.96 2.34 1.88 1.56 1.33 1.15 1.01 0.90 0.90 - - -

-4.00 - - - 4.38 3.26 2.57 2.11 1.77 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.53 2.24 1.88 - - - - - -

7.00 - - - - - - - - 2.25 1.93 1.66 1.38 - - - -

6.00 - - - - - - - 2.31 2.21 1.93 1.67 1.44 1.20 0.99 - -

5.00 - - - - - 2.96a 2.91 2.54 2.23 1.92 1.66 1.44 1.23 1.02 0.85 -

4.00 - - - - - 3.45 3.01 2.52 2.16 1.85 1.62 1.43 1.23 1.03 0.86 0.70

3.00 - - - - - 3.42 2.92 2.44 2.05 1.83 1.60 1.41 1.23 1.03 0.85 0.70

2.00 - - - - - 3.47 2.86 2.39 2.04 1.79 1.58 1.41 1.20 0.99 0.84 0.68

1.00 - - - - - 3.38 2.85 2.37 2.05 1.77 1.56 1.34 1.13 0.96 0.79 0.66

0.00 - - - - - 2.79 2.67 2.27 1.91 1.70 1.47 1.28 1.07 0.90 0.76 0.63

-1.00 - - - - - 2.90 2.57 2.16 1.82 1.61 1.40 1.17 0.99 0.84 0.71 -

-2.00 - - - 4.46 3.88 3.06 2.49 2.10 1.79 1.51 1.28 1.08 0.92 0.80 - -

-3.00 - 11.04 6.63 5.14 3.93 3.05 2.52 2.04 1.70 1.43 1.21 1.05 0.91 - - -

-4.00 - - - 4.39 3.33 2.62 2.15 1.78 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

49 of 64 17/11/2015 11:57

Page 51: Standard Quick Hitch Charts - L & W Contractors

Duty

3FU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

67%

Duty

3FU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.09 2.01 - - - - - -

7.00 - - - - - - - - 2.12 1.79 1.56 1.40 - - - -

6.00 - - - - - - - 2.53 2.10 1.80 1.56 1.33 1.14 1.09 - -

5.00 - - - - - 2.75a 2.82 2.39 2.04 1.76 1.51 1.31 1.13 0.98 0.94 -

4.00 - - - - - 3.16a 2.68 2.28 1.95 1.65 1.41 1.25 1.08 0.96 0.84 0.82

3.00 - - - - - 3.10 2.46 1.96 1.75 1.55 1.37 1.20 1.03 0.92 0.81 0.76

2.00 - - - - - 3.05 2.42 1.93 1.61 1.40 1.29 1.14 1.00 0.87 0.78 0.73

1.00 - - - - - 2.95 2.39 1.94 1.54 1.35 1.20 1.08 0.95 0.85 0.75 0.72

0.00 - - - - - 2.97 2.33 1.88 1.52 1.32 1.16 1.04 0.93 0.82 0.75 0.73

-1.00 - - - - - 2.73 2.19 1.81 1.47 1.30 1.14 1.02 0.90 0.82 0.76 -

-2.00 - - - 4.52 3.34 2.68 2.15 1.79 1.49 1.29 1.14 1.02 0.91 0.85 - -

-3.00 - 11.58k 5.98 4.31 3.30 2.63 2.13 1.77 1.53 1.33 1.17 1.04 1.04 - - -

-4.00 - - - 4.85 3.62 2.87 2.37 2.00 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.70a 2.46 2.07 - - - - - -

7.00 - - - - - - - - 2.46 2.12 1.83 1.54 - - - -

6.00 - - - - - - - 2.53 2.42 2.13 1.84 1.59 1.35 1.13 - -

5.00 - - - - - 2.96a 3.13a 2.78 2.45 2.11 1.83 1.60 1.37 1.15 0.98 -

4.00 - - - - - 3.73a 3.29 2.76 2.38 2.05 1.79 1.58 1.37 1.16 0.98 0.82

3.00 - - - - - 3.76 3.20 2.68 2.26 2.02 1.77 1.57 1.37 1.16 0.98 0.82

2.00 - - - - - 3.81 3.14 2.63 2.26 1.98 1.75 1.56 1.35 1.13 0.96 0.80

1.00 - - - - - 3.71 3.13 2.62 2.27 1.96 1.73 1.50 1.28 1.09 0.91 0.77

0.00 - - - - - 3.08 2.96 2.51 2.13 1.89 1.64 1.44 1.22 1.03 0.88 0.75

-1.00 - - - - - 3.23 2.85 2.41 2.04 1.80 1.57 1.33 1.13 0.97 0.83 -

-2.00 - - - 4.94 4.30 3.40 2.78 2.34 2.01 1.70 1.45 1.23 1.06 0.93 - -

-3.00 - 12.00 7.30 5.67 4.35 3.39 2.81 2.28 1.91 1.62 1.38 1.20 1.05 - - -

-4.00 - - - 4.86 3.70 2.92 2.40 2.00 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

50 of 64 17/11/2015 11:57

Page 52: Standard Quick Hitch Charts - L & W Contractors

Duty

3GU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

67%

Duty

3GU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.77 1.60 - - - -

6.00 - - - - - - - 2.78 2.33 2.02 1.77a 1.53 1.34 1.28 - -

5.00 - - - - - 2.75a 2.89a 2.64 2.27 1.99 1.73 1.52 1.33 1.17 1.12 -

4.00 - - - - - 3.16a 2.96 2.55 2.20 1.88 1.63 1.46 1.28 1.15 1.01 1.00

3.00 - - - - - 3.38 2.74 2.23 2.01 1.79 1.59 1.41 1.23 1.10 0.98 0.93

2.00 - - - - - 3.34 2.70 2.20 1.87 1.64 1.52 1.36 1.20 1.06 0.96 0.90

1.00 - - - - - 3.24 2.67 2.21 1.80 1.60 1.43 1.29 1.15 1.04 0.93 0.90

0.00 - - - - - 3.26 2.62 2.15 1.78 1.56 1.39 1.25 1.13 1.01 0.92 0.90

-1.00 - - - - - 3.03 2.48 2.09 1.73 1.54 1.37 1.23 1.10 1.01 0.94 -

-2.00 - - - 4.81 3.65 2.99 2.45 2.07 1.75 1.53 1.36 1.23 1.11 1.04 - -

-3.00 - 10.89 6.17 4.61 3.62 2.94 2.43 2.05 1.79 1.57 1.40 1.26 1.25 - - -

-4.00 - - - 5.12 3.93 3.18 2.66 2.28 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.84a 2.70 2.23a - - - - - -

7.00 - - - - - - - - 2.70 2.35 2.06 1.75 - - - -

6.00 - - - - - - - 2.78 2.66 2.36 2.06 1.80a 1.55 1.32 - -

5.00 - - - - - 2.96a 3.26a 3.02 2.69 2.34 2.06 1.81 1.57 1.34 1.16 -

4.00 - - - - - 3.95 3.55 3.02 2.62 2.28 2.02 1.80 1.58 1.36 1.17 1.00

3.00 - - - - - 4.03 3.48 2.95 2.51 2.26 1.99 1.78 1.57 1.35 1.16 1.00

2.00 - - - - - 4.08 3.42 2.90 2.51 2.22 1.98 1.78 1.55 1.32 1.14 0.98

1.00 - - - - - 3.99 3.41 2.89 2.52 2.20 1.96 1.71 1.48 1.29 1.10 0.95

0.00 - - - - - 3.37 3.25 2.78 2.38 2.14 1.87 1.66 1.43 1.23 1.07 0.93

-1.00 - - - - - 3.53 3.15 2.69 2.30 2.04 1.80 1.55 1.34 1.17 1.02 -

-2.00 - - - 5.21 4.60 3.70 3.08 2.62 2.27 1.95 1.68 1.45 1.27 1.13 - -

-3.00 - 11.23 7.35 5.89 4.64 3.69 3.10 2.57 2.18 1.88 1.62 1.43 1.26 - - -

-4.00 - - - 5.13 4.01 3.23 2.70 2.28 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

51 of 64 17/11/2015 11:57

Page 53: Standard Quick Hitch Charts - L & W Contractors

Duty

3HU 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

67%

Duty

3HU 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 6.77 5.66 4.82 4.16 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 6.53 5.50 4.78 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 9.98 7.77 6.48 5.49 4.75 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 9.65 7.76 6.42 5.48 4.72 4.19 3.65k 3.13k 3.08 3.06 - - -

-4.00 - - - 10.55 8.25 6.80 5.80 5.06 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.32a 2.97 2.32a -

4.00 - - - - - 6.81b 6.64b 5.88 4.80 4.37 4.08 3.69 3.33 3.00 2.70 1.78a

3.00 - - - - - 7.48b 6.77 5.89 5.16 4.49 4.07 3.69 3.32 2.99 2.70 2.44

2.00 - - - - - 7.32b 6.80 5.84b 5.09 4.53 4.05 3.68 3.31 2.96 2.68 2.43

1.00 - - - - - 7.53b 6.83 5.81 5.09 4.51 4.07 3.66 3.25 2.92 2.65 2.40

0.00 - - - - - 6.98 6.71 5.78 5.00 4.49 4.02 3.61 3.20a 2.89 2.61 2.35a

-1.00 - - - - - 7.47 6.63 5.70 4.96 4.39 3.95 3.50 3.15 2.83 2.58 -

-2.00 - - - 10.76 9.60 7.80 6.55 5.62 4.92 4.33 3.81 3.42 3.08 2.80 - -

-3.00 - 12.00 12.00 11.64 9.66 7.77 6.58 5.57 4.85 4.26 3.77 3.39 3.07 - - -

-4.00 - - - 10.60 8.43 6.93 5.87 5.07 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

52 of 64 17/11/2015 11:57

Page 54: Standard Quick Hitch Charts - L & W Contractors

Duty

3AL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

90%

Duty

3AL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 7.52 6.12 5.11 4.31 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 7.16 5.90 5.04 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 11.65 8.71 7.10 5.88 5.00 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.18 8.69 7.01 5.85 4.97 4.26k 3.65k 3.13k 3.10 3.08 - - -

-4.00 - - - 12.00 9.35 7.51 6.28 5.39 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.01a 5.92 5.10 4.55 4.27b 3.82b 3.44 3.07 2.71 1.78a

3.00 - - - - - 7.68b 7.51 6.39 5.54 4.79 4.29 3.84 3.45 3.07 2.73 2.39

2.00 - - - - - 7.71b 7.49b 6.33 5.49 4.81 4.23b 3.84 3.43 3.02 2.70 2.38

1.00 - - - - - 8.12 7.46 6.33 5.47 4.79 4.24 3.83 3.36 2.97 2.65 2.33

0.00 - - - - - 7.78 7.45 6.33 5.39 4.76 4.25 3.74 3.28 2.92 2.59 2.31

-1.00 - - - - - 8.35 7.32 6.20 5.31 4.65 4.10 3.61 3.21 2.84 2.54 -

-2.00 - - - 12.00 11.12 8.77 7.21 6.09 5.26 4.56 3.94 3.50 3.12 2.79 - -

-3.00 - 12.00 12.00 12.00 11.21 8.73 7.25 6.01 5.15 4.46 3.89 3.46 3.10 - - -

-4.00 - - - 12.00 9.57 7.66 6.36 5.40 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

53 of 64 17/11/2015 11:57

Page 55: Standard Quick Hitch Charts - L & W Contractors

Duty

3BL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

90%

Duty

3BL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 10° - +/- 40°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.74 1.66 - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 2.78 1.99a 1.72a 1.72a 1.48 1.41 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.09 2.62 2.21 1.70a 1.65 1.44 1.24 1.21

3.00 - - - - - 4.93 3.93 3.15 2.84 2.47 2.16 1.73a 1.58 1.38 1.19 1.11

2.00 - - - - - 4.86 3.87 3.12 2.62 2.24 2.04 1.78 1.52 1.31 1.15 1.06

1.00 - - - - - 4.72 3.83 3.14 2.51 2.17 1.89 1.68 1.45 1.27 1.10 1.05

0.00 - - - - - 4.74 3.75 3.05 2.47 2.11 1.84 1.62 1.42 1.23 1.10 1.07

-1.00 - - - - - 4.40 3.55 2.96 2.39 2.08 1.80 1.58 1.38 1.23 1.13 -

-2.00 - - - 7.36 5.40 4.34 3.50 2.93 2.43 2.07 1.80 1.58 1.39 1.28 - -

-3.00 - 11.58k 9.83 7.02 5.36 4.26 3.48 2.90 2.49 2.13 1.85 1.62 1.62 - - -

-4.00 - - - 7.89 5.85 4.63 3.83 3.24 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 2.86 2.38 - - - -

6.00 - - - - - - - 3.02a 3.21a 3.22a 2.89 2.45 2.07 1.72 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.51a 3.27 2.88 2.49 2.12 1.75 1.47 -

4.00 - - - - - 5.66 4.91 4.14 3.73 3.22 2.82 2.48 2.11 1.78 1.48 1.21

3.00 - - - - - 5.97 5.06 4.23 3.56 3.18 2.79 2.45 2.10 1.77 1.47 1.21

2.00 - - - - - 6.05 4.98 4.16 3.56 3.12 2.77 2.44 2.07 1.72 1.44 1.18

1.00 - - - - - 5.89 4.96 4.14 3.58 3.10 2.74 2.34 1.97 1.67 1.37 1.14

0.00 - - - - - 4.92 4.72 3.99 3.38 3.01 2.61 2.26 1.89 1.57 1.32 1.10

-1.00 - - - - - 5.20 4.57 3.85 3.26 2.87 2.49 2.09 1.75 1.48 1.24 -

-2.00 - - - 8.05 6.99 5.48 4.46 3.75 3.22 2.74 2.30 1.94 1.65 1.43 - -

-3.00 - 12.00 12.00 9.31 7.07 5.46 4.51 3.68 3.09 2.63 2.20 1.89 1.63 - - -

-4.00 - - - 7.92 5.98 4.72 3.88 3.24 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

54 of 64 17/11/2015 11:57

Page 56: Standard Quick Hitch Charts - L & W Contractors

Duty

3CL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

90%

Duty

3CL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 40° - +/- 60°

Over Osc End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.86 - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.74 1.42 1.34 - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.02 2.53 1.99a 1.72 1.41 1.15 1.08 -

4.00 - - - - - 3.16a 3.11k 3.11k 2.88 2.32 1.89 1.61 1.32 1.11 0.91 0.88

3.00 - - - - - 5.16 3.86 2.93 2.55 2.16 1.83 1.52 1.23 1.04 0.86 0.78

2.00 - - - - - 5.07 3.78 2.88 2.28 1.88 1.68 1.42 1.18 0.97 0.81 0.73

1.00 - - - - - 4.88 3.73 2.90 2.16 1.80 1.52 1.32 1.10 0.92 0.76 0.72

0.00 - - - - - 4.91 3.64 2.80 2.11 1.74 1.47 1.25 1.06 0.88 0.76 0.73

-1.00 - - - - - 4.46 3.38 2.69 2.02 1.70 1.42 1.21 1.02 0.88 0.78 -

-2.00 - - - 9.21 5.88 4.38 3.32 2.65 2.06 1.69 1.41 1.21 1.03 0.92 - -

-3.00 - 11.58k 10.99k 8.60 5.83 4.28 3.29 2.61 2.13 1.76 1.47 1.25 1.25 - - -

-4.00 - - - 10.27 6.56 4.78 3.72 3.02 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 2.64 2.12 - - - -

6.00 - - - - - - - 3.02a 3.21a 3.15 2.66 2.20 1.78 1.39 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.48a 3.13 2.65 2.22 1.82 1.44 1.14 -

4.00 - - - - - 6.16 5.13 4.13 3.62 3.03 2.58 2.20 1.82 1.46 1.15 0.88

3.00 - - - - - 6.65 5.32 4.24 3.43 2.99 2.54 2.17 1.82 1.45 1.15 0.88

2.00 - - - - - 6.78 5.22 4.15 3.43 2.92 2.51 2.16 1.78 1.40 1.11 0.85

1.00 - - - - - 6.54 5.19 4.12 3.45 2.89 2.48 2.05 1.66 1.34 1.04 0.80

0.00 - - - - - 5.16 4.87 3.94 3.20 2.78 2.32 1.95 1.56 1.23 0.98 0.76

-1.00 - - - - - 5.57 4.69 3.76 3.06 2.62 2.19 1.75 1.40 1.13 0.90 -

-2.00 - - - 10.65 8.53 5.98 4.54 3.64 3.01 2.44 1.97 1.58 1.29 1.07 - -

-3.00 - 12.00 12.00 12.00 8.66 5.95 4.60 3.54 2.85 2.30 1.85 1.53 1.27 - - -

-4.00 - - - 10.35 6.78 4.89 3.79 3.02 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

55 of 64 17/11/2015 11:57

Page 57: Standard Quick Hitch Charts - L & W Contractors

Duty

3DL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

90%

Duty

3DL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 60° - +/- 120°

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.86 - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.74 1.42 1.34 - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.02 2.53 1.99a 1.72 1.41 1.15 1.08 -

4.00 - - - - - 3.16a 3.11k 3.11k 2.88 2.32 1.89 1.61 1.32 1.11 0.91 0.88

3.00 - - - - - 5.16 3.86 2.93 2.55 2.16 1.83 1.52 1.23 1.04 0.86 0.78

2.00 - - - - - 5.07 3.78 2.88 2.28 1.88 1.68 1.42 1.18 0.97 0.81 0.73

1.00 - - - - - 4.88 3.73 2.90 2.16 1.80 1.52 1.32 1.10 0.92 0.76 0.72

0.00 - - - - - 4.91 3.64 2.80 2.11 1.74 1.47 1.25 1.06 0.88 0.76 0.73

-1.00 - - - - - 4.46 3.38 2.69 2.02 1.70 1.42 1.21 1.02 0.88 0.78 -

-2.00 - - - 9.21 5.88 4.38 3.32 2.65 2.06 1.69 1.41 1.21 1.03 0.92 - -

-3.00 - 11.58k 10.99k 8.60 5.83 4.28 3.29 2.61 2.13 1.76 1.47 1.25 1.25 - - -

-4.00 - - - 10.27 6.56 4.78 3.72 3.02 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 2.64 2.12 - - - -

6.00 - - - - - - - 3.02a 3.21a 3.15 2.66 2.20 1.77 1.39 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.48a 3.13 2.65 2.22 1.82 1.44 1.14 -

4.00 - - - - - 6.16 5.13 4.13 3.62 3.03 2.58 2.20 1.82 1.46 1.15 0.88

3.00 - - - - - 6.65 5.32 4.24 3.43 2.99 2.54 2.17 1.82 1.45 1.15 0.88

2.00 - - - - - 6.78 5.22 4.15 3.43 2.92 2.51 2.16 1.78 1.40 1.11 0.85

1.00 - - - - - 6.54 5.19 4.12 3.45 2.89 2.48 2.05 1.66 1.34 1.04 0.80

0.00 - - - - - 5.16 4.87 3.94 3.20 2.78 2.32 1.95 1.56 1.23 0.98 0.76

-1.00 - - - - - 5.57 4.69 3.76 3.06 2.62 2.18 1.75 1.40 1.13 0.90 -

-2.00 - - - 10.65 8.53 5.98 4.54 3.64 3.00 2.44 1.97 1.58 1.29 1.07 - -

-3.00 - 12.00 12.00 12.00 8.66 5.95 4.60 3.54 2.85 2.30 1.85 1.53 1.27 - - -

-4.00 - - - 10.35 6.78 4.89 3.79 3.02 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

56 of 64 17/11/2015 11:57

Page 58: Standard Quick Hitch Charts - L & W Contractors

Duty

3EL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

90%

Duty

3EL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 120° - +/- 130°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.05 1.99a 1.72a 1.72a 1.60 1.53 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 2.88 2.43 1.70a 1.69a 1.57 1.34 1.31

3.00 - - - - - 5.76 4.47 3.39k 3.12k 2.74 2.37 1.73a 1.72 1.50 1.29 1.21

2.00 - - - - - 5.67 4.41 3.49 2.92 2.48 2.25 1.82a 1.66 1.43 1.24 1.14

1.00 - - - - - 5.49 4.36 3.52 2.80 2.42 2.09 1.85 1.59 1.39 1.20 1.14

0.00 - - - - - 5.53 4.28 3.42 2.76 2.35 2.03 1.78 1.55 1.34 1.19 1.16

-1.00 - - - - - 5.13 4.04 3.32 2.68 2.31 1.99 1.74 1.51 1.34 1.22 -

-2.00 - - - 9.39 6.50 5.05 4.00 3.29 2.72 2.30 1.98 1.73 1.52 1.39 - -

-3.00 - 11.58k 10.99k 8.89 6.46 4.97 3.97 3.26 2.78 2.36 2.04 1.78 1.77 - - -

-4.00 - - - 10.23 7.12 5.44 4.38 3.65 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.13 2.66 2.26 1.86 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.54a 3.15 2.73 2.28 1.91 1.59 -

4.00 - - - - - 6.60 5.70 4.71 3.97 3.55 3.09 2.71 2.30 1.93 1.60 1.31

3.00 - - - - - 6.88b 5.85 4.81 3.98 3.52 3.05 2.69 2.29 1.92 1.59 1.31

2.00 - - - - - 6.98b 5.79 4.73 3.99 3.45 3.03 2.68 2.25a 1.87 1.56 1.28

1.00 - - - - - 7.04 5.77 4.71 4.01 3.42 3.00 2.57 2.16 1.81 1.49 1.23

0.00 - - - - - 5.77 5.49 4.54 3.77 3.33 2.87 2.48 2.06 1.71 1.43 1.19

-1.00 - - - - - 6.20 5.32 4.38 3.65 3.18 2.75 2.29 1.92 1.61 1.35 -

-2.00 - - - 10.53 8.84 6.58 5.20 4.27 3.60 3.03 2.55 2.14 1.81 1.56 - -

-3.00 - 12.00 12.00 11.82k 8.94 6.55 5.25 4.18 3.47 2.92 2.44 2.09 1.79 - - -

-4.00 - - - 10.30 7.32 5.56 4.45 3.65 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

57 of 64 17/11/2015 11:57

Page 59: Standard Quick Hitch Charts - L & W Contractors

Duty

3FL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

90%

Duty

3FL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 130° - +/- 140°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.72 -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.13 2.68 1.70a 1.69a 1.70a 1.52 1.49

3.00 - - - - - 5.95b 4.85 3.39k 3.12k 2.99 2.63 1.73a 1.75a 1.69 1.47 1.38

2.00 - - - - - 5.86b 4.78 3.81 3.13k 2.76 2.50 1.82a 1.81a 1.62 1.42 1.32

1.00 - - - - - 5.79b 4.74 3.84 3.08 2.70 2.35 1.92a 1.80 1.58 1.38 1.32

0.00 - - - - - 5.98 4.65 3.74 3.04 2.63 2.28 2.01 1.76 1.53 1.37 1.33

-1.00 - - - - - 5.58 4.42 3.65 2.96 2.59 2.24 1.97 1.72 1.53 1.41 -

-2.00 - - - 10.15 7.06 5.50 4.37 3.62 3.00 2.58 2.23 1.96 1.73 1.59 - -

-3.00 - 11.58k 10.99k 9.62 7.02 5.41 4.35 3.58 3.07 2.64 2.29 2.01 2.00 - - -

-4.00 - - - 11.05 7.71 5.91 4.77 3.99 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.24a 2.88 2.46 2.07 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.58 3.36 2.94 2.50a 2.10 1.77 -

4.00 - - - - - 6.81b 6.13 5.08 4.12 3.80 3.33 2.92 2.53 2.13 1.79 1.49

3.00 - - - - - 7.05 6.29 5.17b 4.30 3.78 3.28 2.91 2.52 2.10 1.79 1.49

2.00 - - - - - 7.19 6.11 5.08 4.31 3.68k 3.28 2.91 2.47 2.08 1.75 1.45

1.00 - - - - - 7.19b 6.15 5.08 4.24 3.69 3.25 2.81 2.38 2.02 1.68 1.41

0.00 - - - - - 6.23 5.93 4.91 4.09 3.58k 3.12 2.70 2.29 1.92 1.63 1.37

-1.00 - - - - - 6.72 5.77 4.76 3.97 3.46 3.00 2.54 2.14 1.82 1.54 -

-2.00 - - - 11.38 9.56 7.13 5.64 4.64 3.92 3.31 2.81 2.38 2.04 1.77 - -

-3.00 - 12.00 12.00 12.00 9.67 7.10 5.69 4.55 3.79 3.20 2.72 2.34 2.01 - - -

-4.00 - - - 11.13 7.93 6.04 4.85 3.99 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

58 of 64 17/11/2015 11:57

Page 60: Standard Quick Hitch Charts - L & W Contractors

Duty

3GL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

90%

Duty

3GL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 140° - +/- 160°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.70

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 2.91 1.92a 1.92a 1.94a 1.77 1.70

0.00 - - - - - 7.19 5.61 4.52 3.71 3.11k 2.57a 2.25a 2.19a 1.96 1.77 1.72

-1.00 - - - - - 6.76 5.36 4.44 3.57k 3.12k 2.71a 2.49 2.19 1.96 1.81 -

-2.00 - - - 12.00 8.61 6.68 5.32 4.40 3.32k 3.17k 2.80 2.48 2.21 2.03 - -

-3.00 - 11.58k 10.99k 11.36k 8.58 6.59 5.29 4.36 3.74 3.23 2.86 2.53 2.52 - - -

-4.00 - - - 12.00 9.42 7.16 5.77 4.83 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.60a 3.38 2.96a 2.55 2.21 -

4.00 - - - - - 6.81b 6.68 5.89b 4.63 4.21 3.83 3.40 2.98 2.58 2.21 1.78a

3.00 - - - - - 7.62b 7.19 6.03 5.10 4.33 3.83 3.39 2.97 2.57 2.20 1.86

2.00 - - - - - 7.56b 7.23 5.93 4.97 4.30 3.80 3.37 2.94 2.54a 2.17 1.85

1.00 - - - - - 7.96 7.17b 5.90 5.02b 4.28 3.82 3.31 2.85 2.47 2.11 1.81

0.00 - - - - - 7.49 7.11 5.86 4.86 4.24 3.71 3.22 2.76 2.40 2.06 1.77

-1.00 - - - - - 8.17 6.95 5.70 4.76 4.13k 3.58 3.08 2.66 2.29 1.97 -

-2.00 - - - 12.00 11.81 8.68 6.82 5.58 4.70 3.98 3.40 2.93 2.55 2.24 - -

-3.00 - 12.00 12.00 12.00 11.93 8.63 6.87 5.49 4.57 3.87 3.30 2.89 2.53 - - -

-4.00 - - - 12.00 9.70 7.33 5.86 4.83 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

59 of 64 17/11/2015 11:57

Page 61: Standard Quick Hitch Charts - L & W Contractors

Duty

3HL 100-150

(Minimum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

90%

Duty

3HL 100-150

(Maximum Loads)

Lift Point

Hitch

Config

CANT

Sector

+/- 160° - +/- 180°

Over Fixed End

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.88a - - - -

6.00 - - - - - - - 3.02a 3.08a 2.43a 1.77a 1.78a 1.81a 1.80a - -

5.00 - - - - - 2.75a 2.89a 2.95a 3.06a 3.19a 1.99a 1.72a 1.72a 1.72a 1.73a -

4.00 - - - - - 3.16a 3.11k 3.11k 3.16k 3.14k 2.88b 1.70a 1.69a 1.70a 1.70a 1.78a

3.00 - - - - - 5.95b 4.94b 3.39k 3.12k 3.14k 2.86b 1.73a 1.75a 1.73a 1.72a 1.73a

2.00 - - - - - 5.86b 4.92b 4.16b 3.13k 3.13k 2.78a 1.82a 1.81a 1.81a 1.75a 1.75a

1.00 - - - - - 5.79b 4.88b 4.19b 3.19k 3.13k 3.07a 1.92a 1.92a 1.94a 1.86a 1.84a

0.00 - - - - - 9.03b 7.07b 5.79b 5.04k 3.11k 2.57a 2.25a 2.19a 2.07a 1.98a 1.98a

-1.00 - - - - - 10.89k 9.03b 7.48b 3.57k 3.12k 2.71a 2.59a 2.46a 2.29a 2.20a -

-2.00 - - - 12.00 10.93k 10.93k 7.15a 5.17a 3.32k 3.17k 3.07a 2.93a 2.62a 2.51a - -

-3.00 - 11.58k 10.99k 11.36k 11.43k 9.42a 6.29a 5.47a 4.26k 3.65k 3.13k 3.17k 3.14a - - -

-4.00 - - - 12.00 12.00 9.97b 7.98a 7.21b - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.14a 3.03a 2.57a - - - -

6.00 - - - - - - - 3.02a 3.21a 3.24a 3.25a 3.18a 2.92a 2.11a - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.56a 3.62a 3.61a 3.56a 3.40a 3.02a 2.32a -

4.00 - - - - - 6.81b 7.50b 7.11b 5.53a 4.57a 4.52a 4.27a 4.04a 3.60a 3.09a 1.78a

3.00 - - - - - 7.68b 8.06b 8.16b 7.97b 6.42b 5.77b 4.88a 4.91k 4.30a 3.56a 2.44a

2.00 - - - - - 7.71b 7.93b 8.06b 8.00b 7.36b 6.49b 5.71b 4.93b 4.89b 4.11a 2.72a

1.00 - - - - - 8.87b 8.93b 8.71b 8.21b 7.57b 6.80b 6.02b 5.53b 4.94b 4.40a 2.94a

0.00 - - - - - 10.93b 10.34b 9.46b 8.71b 7.67b 6.83b 6.16b 5.59b 4.94a 4.45a 2.35a

-1.00 - - - - - 12.00 12.00b 10.17b 8.88b 7.73b 6.90k 6.20b 5.57b 4.76k 3.74a -

-2.00 - - - 12.00 12.00 12.00 12.00 10.33b 8.93b 7.90b 6.95b 6.09b 4.68k 4.47a - -

-3.00 - 12.00 12.00 12.00 12.00 12.00 12.00 10.32b 8.66b 7.44b 6.25b 4.98b 3.96a - - -

-4.00 - - - 12.00 12.00 10.54b 8.79b 7.21b - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

60 of 64 17/11/2015 11:57

Page 62: Standard Quick Hitch Charts - L & W Contractors

Duty

4AU 150+

(Minimum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

67%

Duty

4AU 150+

(Maximum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

67%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.02 1.66 1.59 - - - - - -

7.00 - - - - - - - - 1.68 1.40 1.20 1.06 - - - -

6.00 - - - - - - - 2.04 1.66 1.41 1.20 1.00 0.84 0.80 - -

5.00 - - - - - 2.75a 2.26 1.90 1.60 1.37 1.16 0.99 0.83 0.70 0.67 -

4.00 - - - - - 2.57 2.10 1.76 1.51 1.25 1.05 0.92 0.78 0.68 0.56 0.53

3.00 - - - - - 2.44 1.90 1.47 1.30 1.16 1.02 0.87 0.73 0.63 0.51 0.45

2.00 - - - - - 2.40 1.86 1.44 1.16 1.00 0.92 0.80 0.69 0.59 0.47 0.41

1.00 - - - - - 2.31 1.83 1.45 1.11 0.96 0.84 0.75 0.65 0.54 0.43 0.40

0.00 - - - - - 2.32 1.76 1.39 1.08 0.92 0.81 0.71 0.63 0.51 0.42 0.40

-1.00 - - - - - 2.08 1.63 1.32 1.03 0.90 0.79 0.69 0.60 0.50 0.44 -

-2.00 - - - 3.53 2.57 2.03 1.59 1.30 1.05 0.90 0.78 0.69 0.61 0.54 - -

-3.00 - 9.31 4.71 3.35 2.53 1.98 1.57 1.29 1.09 0.94 0.81 0.72 0.72 - - -

-4.00 - - - 3.80 2.81 2.20 1.79 1.49 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.34 1.98 1.64 - - - - - -

7.00 - - - - - - - - 1.98 1.69 1.45 1.19 - - - -

6.00 - - - - - - - 2.04 1.94 1.69 1.45 1.24 1.02 0.83 - -

5.00 - - - - - 2.96a 2.56 2.24 1.96 1.68 1.44 1.24 1.05 0.85 0.70 -

4.00 - - - - - 3.05 2.65 2.21 1.89 1.61 1.40 1.23 1.05 0.86 0.70 0.53

3.00 - - - - - 3.00 2.56 2.13 1.79 1.59 1.38 1.21 1.05 0.86 0.70 0.53

2.00 - - - - - 3.04 2.50 2.08 1.78 1.55 1.36 1.21 1.02 0.83 0.68 0.50

1.00 - - - - - 2.96 2.49 2.07 1.78 1.53 1.35 1.14 0.95 0.79 0.64 0.47

0.00 - - - - - 2.41 2.32 1.96 1.65 1.46 1.26 1.09 0.89 0.73 0.60 0.43

-1.00 - - - - - 2.49 2.21 1.86 1.55 1.37 1.18 0.98 0.81 0.67 0.52 -

-2.00 - - - 3.87 3.35 2.63 2.14 1.79 1.52 1.26 1.06 0.88 0.74 0.63 - -

-3.00 - 9.68 5.79 4.46 3.39 2.63 2.16 1.73 1.43 1.19 0.99 0.85 0.72 - - -

-4.00 - - - 3.81 2.86 2.24 1.82 1.50 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

61 of 64 17/11/2015 11:57

Page 63: Standard Quick Hitch Charts - L & W Contractors

Duty

4AL 150+

(Minimum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

90%

Duty

4AL 150+

(Maximum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

90%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 2.40a 2.18a 2.20a - - - - - -

7.00 - - - - - - - - 2.21a 1.98a 1.88a 1.85 - - - -

6.00 - - - - - - - 3.02a 3.02 2.43a 1.77a 1.74 1.43 1.35 - -

5.00 - - - - - 2.75a 2.89a 2.95a 2.93 2.48 1.99a 1.72 1.42 1.18 1.11 -

4.00 - - - - - 3.16a 3.11k 3.11k 2.80 2.28 1.88 1.62 1.33 1.14 0.94 0.92

3.00 - - - - - 4.76 3.65 2.83 2.48 2.13 1.82 1.53 1.26 1.07 0.89 0.82

2.00 - - - - - 4.68 3.58 2.79 2.24 1.87 1.68 1.44 1.20 1.00 0.85 0.77

1.00 - - - - - 4.51 3.54 2.81 2.12 1.80 1.53 1.34 1.13 0.96 0.80 0.76

0.00 - - - - - 4.54 3.45 2.71 2.08 1.74 1.48 1.27 1.10 0.91 0.80 0.77

-1.00 - - - - - 4.15 3.22 2.60 2.00 1.70 1.44 1.24 1.05 0.91 0.82 -

-2.00 - - - 7.71 5.29 4.07 3.17 2.57 2.03 1.69 1.43 1.23 1.06 0.96 - -

-3.00 - 11.58k 10.99k 7.28 5.23 3.99 3.14 2.53 2.10 1.75 1.49 1.28 1.27 - - -

-4.00 - - - 8.43 5.82 4.41 3.52 2.91 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 3.05a 2.95a 2.23a - - - - - -

7.00 - - - - - - - - 3.15a 3.04 2.58 2.09 - - - -

6.00 - - - - - - - 3.02a 3.18a 3.06 2.60 2.17 1.77 1.41 - -

5.00 - - - - - 2.96a 3.27a 3.46a 3.47a 3.03 2.59 2.19 1.81 1.45 1.17 -

4.00 - - - - - 5.59 4.74 3.95 3.47 2.94 2.52 2.17 1.82 1.47 1.18 0.92

3.00 - - - - - 5.96 4.91 4.00 3.29 2.90 2.48 2.14 1.81 1.46 1.17 0.91

2.00 - - - - - 6.06 4.81 3.92 3.29 2.84 2.46 2.13 1.77 1.41 1.14 0.88

1.00 - - - - - 5.87 4.79 3.90 3.31 2.81 2.43 2.02 1.66 1.36 1.07 0.84

0.00 - - - - - 4.74 4.51 3.73 3.08 2.71 2.28 1.93 1.56 1.26 1.01 0.80

-1.00 - - - - - 5.05 4.35 3.57 2.95 2.55 2.15 1.75 1.42 1.16 0.93 -

-2.00 - - - 8.66 7.24 5.37 4.22 3.46 2.90 2.38 1.95 1.59 1.31 1.10 - -

-3.00 - 12.00 12.00 10.48 7.34 5.35 4.27 3.37 2.76 2.26 1.84 1.54 1.29 - - -

-4.00 - - - 8.47 5.98 4.50 3.58 2.91 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

62 of 64 17/11/2015 11:57

Page 64: Standard Quick Hitch Charts - L & W Contractors

Duty

4Max Travel AU

(Minimum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

25%

Duty

4Max Travel AU

(Maximum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

25%

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 0.76 0.62 0.59 - - - - - -

7.00 - - - - - - - - 0.63 0.52 0.45 0.40 - - - -

6.00 - - - - - - - 0.76 0.62 0.53 0.45 0.37 0.31 0.30 - -

5.00 - - - - - 1.10 0.84 0.71 0.60 0.51 0.43 0.37 0.31 0.26 0.25 -

4.00 - - - - - 0.96 0.78 0.66 0.57 0.47 0.39 0.34 0.29 0.25 0.21 0.21

3.00 - - - - - 0.91 0.71 0.55 0.49 0.43 0.38 0.32 0.27 0.24 0.20 0.19

2.00 - - - - - 0.90 0.69 0.54 0.43 0.37 0.34 0.30 0.26 0.22 0.19 0.18

1.00 - - - - - 0.86 0.68 0.54 0.41 0.36 0.31 0.28 0.24 0.21 0.18 0.17

0.00 - - - - - 0.86 0.66 0.52 0.40 0.35 0.30 0.27 0.24 0.20 0.18 0.18

-1.00 - - - - - 0.78 0.61 0.49 0.39 0.34 0.29 0.26 0.22 0.20 0.18 -

-2.00 - - - 1.32 0.96 0.76 0.59 0.48 0.39 0.33 0.29 0.26 0.23 0.21 - -

-3.00 - 3.48 1.76 1.25 0.94 0.74 0.59 0.48 0.41 0.35 0.30 0.27 0.27 - - -

-4.00 - - - 1.42 1.05 0.82 0.67 0.56 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 0.87 0.74 0.61 - - - - - -

7.00 - - - - - - - - 0.74 0.63 0.54 0.44 - - - -

6.00 - - - - - - - 0.76 0.72 0.63 0.54 0.46 0.38 0.31 - -

5.00 - - - - - 1.21 0.96 0.84 0.73 0.63 0.54 0.46 0.39 0.32 0.26 -

4.00 - - - - - 1.14 0.99 0.83 0.71 0.60 0.52 0.46 0.39 0.32 0.26 0.21

3.00 - - - - - 1.12 0.96 0.80 0.67 0.59 0.51 0.45 0.39 0.32 0.26 0.21

2.00 - - - - - 1.13 0.93 0.78 0.66 0.58 0.51 0.45 0.38 0.31 0.25 0.20

1.00 - - - - - 1.10 0.93 0.77 0.67 0.57 0.50 0.43 0.36 0.30 0.24 0.19

0.00 - - - - - 0.90 0.86 0.73 0.62 0.55 0.47 0.41 0.33 0.27 0.22 0.18

-1.00 - - - - - 0.93 0.82 0.69 0.58 0.51 0.44 0.36 0.30 0.25 0.21 -

-2.00 - - - 1.44 1.25 0.98 0.80 0.67 0.57 0.47 0.40 0.33 0.28 0.24 - -

-3.00 - 3.61 2.16 1.66 1.27 0.98 0.81 0.65 0.53 0.44 0.37 0.32 0.27 - - -

-4.00 - - - 1.42 1.07 0.84 0.68 0.56 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/

63 of 64 17/11/2015 11:57

Page 65: Standard Quick Hitch Charts - L & W Contractors

Duty

4Max Cant AL

(Minimum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

25%

Duty

4Max Cant AL

(Maximum Loads)

Lift Point

Hitch

Config

SUPER CANT

Sector

+/- 180°

Osc Axle Safety

25%

NOTES SWL = 75% of Tip Load or 87% of Max System Hydraulic Pressure (whichever is the lower).

Radius/Height are given in metres. Loads are given in tonnes, and assume that the load is suspended

vertically below the bucket pin with no other equipment attached.

Loads marked 'b' boom, 'a' arm and 'r' artic are limited by hydraulic capacity (87% of system maximum hydraulic pressure).

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 1.02 0.84 0.80 - - - - - -

7.00 - - - - - - - - 0.85 0.70 0.61 0.54 - - - -

6.00 - - - - - - - 1.03 0.84 0.71 0.61 0.51 0.43 0.41 - -

5.00 - - - - - 1.58 1.17 0.97 0.81 0.69 0.59 0.50 0.43 0.37 0.35 -

4.00 - - - - - 1.37 1.12 0.93 0.78 0.65 0.55 0.48 0.41 0.36 0.31 0.30

3.00 - - - - - 1.32 1.01 0.79 0.70 0.61 0.53 0.46 0.39 0.34 0.30 0.28

2.00 - - - - - 1.30 0.99 0.78 0.63 0.54 0.50 0.43 0.38 0.33 0.29 0.27

1.00 - - - - - 1.25 0.98 0.78 0.61 0.52 0.46 0.41 0.36 0.31 0.28 0.27

0.00 - - - - - 1.26 0.96 0.75 0.59 0.51 0.44 0.39 0.35 0.30 0.27 0.27

-1.00 - - - - - 1.15 0.90 0.73 0.57 0.50 0.43 0.38 0.34 0.30 0.28 -

-2.00 - - - 2.14 1.47 1.13 0.88 0.72 0.58 0.50 0.43 0.38 0.34 0.32 - -

-3.00 - 10.28 3.13 2.02 1.45 1.11 0.87 0.71 0.60 0.51 0.45 0.39 0.39 - - -

-4.00 - - - 2.34 1.62 1.22 0.98 0.81 - - - - - - - -

0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9.00 - - - - - - - - - - - - - - - -

8.00 - - - - - - - 1.20 1.00 0.82 - - - - - -

7.00 - - - - - - - - 1.00 0.85 0.72 0.60 - - - -

6.00 - - - - - - - 1.03 0.98 0.85 0.73 0.62 0.52 0.43 - -

5.00 - - - - - 1.77 1.34 1.15 1.00 0.84 0.72 0.62 0.53 0.44 0.37 -

4.00 - - - - - 1.65 1.40 1.14 0.96 0.82 0.71 0.62 0.53 0.44 0.37 0.30

3.00 - - - - - 1.65 1.36 1.11 0.91 0.81 0.70 0.61 0.53 0.44 0.37 0.30

2.00 - - - - - 1.68 1.34 1.09 0.91 0.79 0.69 0.61 0.52 0.43 0.36 0.30

1.00 - - - - - 1.63 1.33 1.08 0.92 0.78 0.68 0.58 0.49 0.41 0.34 0.29

0.00 - - - - - 1.32 1.25 1.04 0.86 0.75 0.64 0.56 0.47 0.39 0.33 0.28

-1.00 - - - - - 1.40 1.21 0.99 0.82 0.71 0.61 0.51 0.43 0.36 0.31 -

-2.00 - - - 2.41 2.01 1.49 1.17 0.96 0.81 0.67 0.56 0.47 0.40 0.35 - -

-3.00 - 11.25 4.21 2.91 2.04 1.49 1.19 0.94 0.77 0.64 0.53 0.46 0.40 - - -

-4.00 - - - 2.35 1.66 1.25 1.00 0.81 - - - - - - - -

Prolec Machine Engine Load Chart Builder http://prolectools.co.uk/User/PMEChartBuilder/