Page 1: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Stakeholder Meeting: FMVSS Considerations for Automated

Driving Systems

WiFi Login Information

Network: MediaCntr_Net

Password: OpenHouse2018

Stakeholder Meeting - Draft Project Status Update 36

Page 2: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Opening Remarks

Myra Blanco, DirectorCenter for Public Policy, Partnerships, and Outreach

VTTI

Stakeholder Meeting - Draft Project Status Update 37

Page 3: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Crash Avoidance Breakout Debrief

Michelle ChakaProgram Director, VTTI

Stakeholder Meeting - Draft Project Status Update 38

Page 4: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Crashworthiness and Occupant Protection Breakout Debrief

Clay GablerSamuel Herrick Professor of Engineering

Chair, Biomedical Engineering Graduate ProgramVTTI

Stakeholder Meeting - Draft Project Status Update 39

Page 5: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Test Procedures

Loren StoweSenior Research Associate, VTTI

Stakeholder Meeting - Draft Project Status Update 40

Page 6: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Testing of FMVSS with Automated Vehicles

•Research Question

• performance requirements for motor vehicles or items of motor vehicle

§571) that may lack key components?

•Research Scope • Develop and demonstrate methods to show how the

technical translations could be implemented with and ADS-DV

•Stakeholder Meeting - Draft Project Status Update 41

Page 7: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

• Instrument to execute testing procedures

•Cybersecurity should be part of the design criteria

•OEM participation and/or adaptability

• Safety and repeatability

Testing Considerations

Stakeholder Meeting - Draft Project Status Update 42

Page 8: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

• Human Control

• Control interface for inside the vehicle

• Remote control of vehicle to run tests

• Programmed

• Preprogrammed routine for each test

• OEM programs capability and tester creates scripts to run tests

Possible Solutions

Stakeholder Meeting - Draft Project Status Update 43

Page 9: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

• Simulation• Hardware-in-the-loop (HIL)

•Design documentation

Possible Solutions (cont.)

Stakeholder Meeting - Draft Project Status Update 44

Page 10: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

General Approach

•Classification of standards

• Select subset of standards

• Implement and execute test methods

• Evaluate

• Iterate

•Validate

Stakeholder Meeting - Draft Project Status Update 45

Page 11: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Classification of Standards

•Classification of standards based on:•Applicability modes of conformance• Test procedure complexity

• FMVSS 126 Electronic Stability Control• FMVSS 141 Quiet Car

• Test procedure translation requirements • FMVSS 126 (ESC): specific steering wheel inputs • FMVSS 138 (TPMS): drive 20-22 min at 31-62 mph

•Opportunities to include normal ADS functionalityStakeholder Meeting - Draft Project Status Update 46

Page 12: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Classification: General Themes

• Vehicle state monitoring• Telltales• Warnings• Door open/closed• Transmission gear/state

• Vehicle control• Steering inputs• Speed control• Brake activation• Gear selection

• Key actions• Insertion/removal• Start/stop of power plant• Accessory mode

Stakeholder Meeting - Draft Project Status Update 47

Page 13: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Phase 1.1 Standards Selection

Standard Select General Comments Mode*

102: ShiftSequence

No No test procedures n/a

108: Lamps No Primarily lab tests and/or visual inspection

n/a

114: Theft and Rollaway

Yes Start/stop with precise positioning requirements

HC, P, DD

HC = Human control; P = Programmed; ADS = ADS normal operation; S = Simulation; DD = Design documentation

*

Stakeholder Meeting - Draft Project Status Update 48

Page 14: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Phase 1.1 Standards Selection (cont.)

Standard Select General Comments Mode*

118: Power Windows

No Controls for windows and panels with ignition lock system engaged/disengaged

DD

138: TPMS Yes Ignition lock system (for telltale); “simple” driving task at normal speeds for given duration

HC, P, ADS, DD

141: Quiet Car

Opt. Simple driving task (drive along straight line at precise speed)

HC, P,ADS, DD

HC = Human control; P = Programmed; ADS = ADS normal operation; S = Simulation; DD = Design documentation

*

Stakeholder Meeting - Draft Project Status Update 49

Page 15: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Other Standards for Consideration

Standard Select General Comments Mode*

126: ESC Yes Very involved procedure requiring iterative action and precise, repeatable control at human interface

HC(?), P, ADS(?), S

135: Brakes Yes Lengthy procedure; input defined at brake pedal

HC, P, ADS(?), S

HC = Human control; P = Programmed; ADS = ADS normal operation; S = Simulation; DD = Design documentation

*

Stakeholder Meeting - Draft Project Status Update 50

Page 16: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Implementation: Vehicle Based Modes

•VTTI test platform is conventional vehicle with:• Integrated ADS functionality•Human control console•Ability to script ADS functions

•Allows baseline testing (current test procedures) and ADS testing with different test modes

Stakeholder Meeting - Draft Project Status Update 51

Page 17: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Implementation: Non-vehicle Based Modes

• Simulation•Provides the opportunity to test functionality with

vehicles that do not meet current standards •Validation critical• Implementation challenges

• Software platform• Access to hardware for HIL

•Design Documentation•Demonstrate design conforms to standard

Stakeholder Meeting - Draft Project Status Update 52

Page 18: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

S6.2

.2

(a) Drive the vehicle forward up a 10% grade and stop it with the service brakes.(b) Apply the parking brake (if present).(c) Move the gear selection control to “park.”(d) Note the vehicle position.(e) Release the parking brake. Release the service brakes.(f) Remove the key.(g) Verify that the gear selection control or transmission is locked in “park.”(h) Verify that the vehicle, at rest, has moved no more than 150 mm from the position noted prior to release of the brakes.

Implementation: Example – 114 (Rollaway)

Stakeholder Meeting - Draft Project Status Update 53

Page 19: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Option 1: Human Control Option 2: Programmed

S6.2

.2

Use interface to vehicle to provide human control of vehicle function --> test procedures as written apply.

Initiate test procedure for 6.2.2:1. Activate engine/motor.2. Drive forward fixed distance to

position vehicle on 10% slope (up).3. Change transmission state to “park.”4. Deactivate engine/motor (key action).5. Display/record transmission state.6. Measure vehicle displacement.

Implementation: Example – 114 (Rollaway)

Stakeholder Meeting - Draft Project Status Update 54

Page 20: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Evaluation

•Comparison to baseline• Results • Time to set up• Time to execute• Repeatability

• Ease of execution• Vehicle preparation• Execution of test• Cycle time• Data access

•General considerations• Safety•Cost• Sensitivity•Cybersecurity

Stakeholder Meeting - Draft Project Status Update 55

Page 21: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Validation

• Test with other platforms

• Test at other locations

•DOT and partner engagement• NHTSA VRTC (Vehicle Research and Test Center)

• GM

• Nissan

• DRI (Dynamic Research, Inc.)

Stakeholder Meeting - Draft Project Status Update 56

Page 22: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Next Steps for Testing

•Phased approach follows translation of standards

•Apply methodology to subsequent sample of standards

• Iterative process

Stakeholder Meeting - Draft Project Status Update 57

Page 23: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Thank You!

Stakeholder Meeting - Draft Project Status Update 58

Page 24: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Next Steps

Myra Blanco, DirectorCenter for Public Policy, Partnerships, and Outreach

VTTI

Stakeholder Meeting - Draft Project Status Update 59

Page 25: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Closing Remarks

Cem Hatipoglu, DirectorOffice of Vehicle Crash Avoidance and Electronic Control Research, NHTSA

Stakeholder Meeting - Draft Project Status Update 60

Page 26: Stakeholder Meeting: FMVSS Considerations for Automated … Plenary... · 2018. 5. 15. · Display/record transmission state. 6. Measure vehicle displacement. Implementation: Example

Thank You!

• Ellen Lee, COR (TO)

• E-mail: [email protected]

• Phone: 202-366-1435

• Myra Blanco

PI/Project Manager

• E-mail: [email protected]

• Phone: 540-231-1551

Stakeholder Meeting - Draft Project Status Update 61