MSCS July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of Establishment A. LONG RANGE PLANNING COMMITTEE RECOMMENDATION i) THAT a notice be given to schools in this cluster, namely St. Brendan School, Dalkeith School and Nesbitt School for a consolidation of elementary enrolments offering the Core Program and to General Vanier School, and ii) THAT two (2) scenarios will be considered on the consolidation of the enrolments at either the Dalkeith or at the Nesbitt facility, and iii) THAT consequently, St. Brendan School may have its Deed of Establishment revoked on June 30, 2012, and iv) THAT the Core Program boundary of St. Brendan be consolidated and annexed to the school(s) that would house the enrolment, and v) THAT the distinct boundary of St. Brendan School be consolidated and annexed to either General Vanier School or Nesbitt School. Scenario 1 St. Brendan School’s enrolment will be consolidated with the enrolment at the Dalkeith facility, the Program boundary for St. Brendan be annexed to Dalkeith, and the St. Brendan distinct boundary be annexed to General Vanier School. Scenario 2 St. Brendan School’s enrolment will be consolidated with the Core Program enrolment at the Nesbitt facility, the program boundary for St. Brendan be annexed to the Nesbitt Core Program boundary, and the St Brendan distinct boundary be annexed to Nesbitt School. B. INFORMATION ENROLMENT HISTORY: 2006-07 TO 2010-11 PROJECTIONS: The Baragar projections are based on the September 2010 enrolment and 2010 data assumptions on migration, participation rate, and the historical net impact of people moving in and out of existing housing and moving into new housing in the school’s catchment area. The Principal’s March 2011 forecast was not available to be included within the projections at the time this document was prepared.

Upload: vuongtram

Post on 25-Aug-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 1

ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of Establishment A. LONG RANGE PLANNING COMMITTEE RECOMMENDATION i) THAT a notice be given to schools in this cluster, namely St. Brendan School, Dalkeith

School and Nesbitt School for a consolidation of elementary enrolments offering the Core Program and to General Vanier School, and

ii) THAT two (2) scenarios will be considered on the consolidation of the enrolments at either

the Dalkeith or at the Nesbitt facility, and iii) THAT consequently, St. Brendan School may have its Deed of Establishment revoked on

June 30, 2012, and iv) THAT the Core Program boundary of St. Brendan be consolidated and annexed to the

school(s) that would house the enrolment, and v) THAT the distinct boundary of St. Brendan School be consolidated and annexed to either

General Vanier School or Nesbitt School. Scenario 1 St. Brendan School’s enrolment will be consolidated with the enrolment at the Dalkeith

facility, the Program boundary for St. Brendan be annexed to Dalkeith, and the St. Brendan distinct boundary be annexed to General Vanier School.

Scenario 2 St. Brendan School’s enrolment will be consolidated with the Core Program enrolment at the

Nesbitt facility, the program boundary for St. Brendan be annexed to the Nesbitt Core Program boundary, and the St Brendan distinct boundary be annexed to Nesbitt School.

B. INFORMATION ENROLMENT HISTORY: 2006-07 TO 2010-11

PROJECTIONS: The Baragar projections are based on the September 2010 enrolment and 2010 data assumptions on migration, participation rate, and the historical net impact of people moving in and out of existing housing and moving into new housing in the school’s catchment area. The Principal’s March 2011 forecast was not available to be included within the projections at the time this document was prepared.

Page 2: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 2

ST. BRENDAN

CYCLE I CYCLE 2 CYCLE 3

PM/PK M/K A(1) B(2) C D(3) E(4) F G(5) H(6) I SP. ED. TOTAL

2006-07 CORE ENG 10 15 16 35 34 34 42 26 2122007-08 CORE ENG 13 10 18 1 14 26 36 34 24 1762008-09 CORE ENG 8 17 12 1 13 17 27 35 22 1522009-10 CORE ENG 8 9 24 10 16 20 26 15 1282010-11 CORE ENG 13 12 16 21 13 9 20 16 120

PROJECTIONS2011-12 BARAGAR 11 17 12 14 21 9 13 15 1122012-13 BARAGAR 12 15 17 8 14 21 9 15 1112013-14 BARAGAR 12 16 15 14 8 14 21 15 1152014-15 BARAGAR 12 17 16 11 14 8 14 15 1072015-16 BARAGAR 12 16 17 12 11 14 8 15 105 NOTE: Only special education students in self-contained classrooms are specified in the projections, otherwise they are included in grade totals

The data show that since 2006-07, the enrolment at St. Brendan School has declined from 212 to 120 students. This represents a drop of 92 students. Furthermore, there has been less than 200 students at St. Brendan since 2007-08.

DALKEITH

CYCLE I CYCLE 2 CYCLE 3

PM/PK M/K A(1) B(2) C D(3) E(4) F G(5) H(6) I SP. ED. TOTAL

2006-07 CORE ENG 21 18 38 25 42 55 51 2502007-08 CORE ENG 17 26 25 44 32 43 58 2452008-09 CORE ENG 14 20 24 30 45 36 47 2162009-10 CORE ENG 21 13 18 23 32 44 37 1882010-11 CORE ENG 14 15 13 21 24 1 28 43 159

PROJECTIONS2011-12 BARAGAR 17 10 14 13 23 24 26 1272012-13 BARAGAR 18 12 8 15 16 22 22 1132013-14 BARAGAR 17 13 11 10 17 14 20 1022014-15 BARAGAR 19 12 12 12 12 16 13 962015-16 BARAGAR 18 14 11 13 14 10 14 94

NOTE: Only special education students in self-contained classrooms are specified in the projections, otherwise they are included in grade totals

The data show that since 2006-07, the enrolment at Dalkeith School has declined from 250 students to 159 students in 2010-11. This represents a drop of 91 students.

Page 3: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 3

NESBITT

CYCLE I CYCLE 2 CYCLE 3

PM/PK M/K A(1) B(2) C D(3) E(4) F G(5) H(6) I SP. ED. TOTAL

2006-07 CORE ENG 16 24 25 26 34 39 57 221BIL/IMM 31 31 39 36 41 43 49 270TOTAL 47 55 64 62 75 82 106 491

2007-08 CORE ENG 16 16 29 25 32 34 40 1 193BIL/IMM 48 30 29 3 40 31 37 42 1 261TOTAL 64 46 58 3 65 63 71 82 2 454

2008-09 CORE ENG 59 18 20 30 28 42 39 236BIL/IMM 44 32 41 41 40 34 232TOTAL 59 62 52 71 69 82 73 468

2009-10 CORE ENG 38 12 17 22 25 29 43 186BIL/IMM 45 42 35 41 45 38 246TOTAL 38 57 59 57 66 74 81 432

2010-11 CORE ENG 7 11 15 26 27 1 42 29 158BIL/IMM 28 34 45 42 38 37 40 264TOTAL 35 45 60 68 65 1 79 69 422

PROJECTIONS2011-12 BARAGAR 41 46 47 58 71 66 79 4082012-13 BARAGAR 42 52 48 49 59 70 66 3862013-14 BARAGAR 44 53 54 49 50 58 70 3782014-15 BARAGAR 44 54 55 55 50 49 58 3652015-16 BARAGAR 45 55 57 56 56 49 49 367

NOTE: Only special education students in self-contained classrooms are specified in the projections, otherwise they are included in grade totals

The data show that since 2006-07, the enrolment at Nesbitt School for the Core Program has declined from 221 students to 158 students in 2010-11. This represents a drop of 63 students.

In the graphs that follow, the population data provide historic counts by age (including births and preschoolers) of all children that have lived in the St. Brendan’s, Dalkeith’s and Nesbitt’s Core Program catchment area for each year. From Census data, Baragar noted that there is a positive assumption in births supported by the fact that there were considerably more women aged 20 to 34 living in all of these catchment areas in 2009 than there were in 2001. However, in four years time, it is not known how many of these children will be eligible to attend English school because of Laws 101, 105 and 115. The 2010 birth registry data for Quebec will not be available to Baragar until the summer of 2011.

Page 4: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 4

Population History English Montreal School Board

St Brendan Elementary - core

A History of the Number of Children in this CatchmentAge 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Births 1737 1806 1849 1804 1908 1802 1915 2081 2165 2268 2237 n/a1 1645 1562 1664 1641 1616 1686 1645 1839 1973 1993 2150 20722 1741 1664 1602 1657 1636 1622 1706 1724 1850 1937 2088 21343 1739 1711 1659 1564 1653 1581 1575 1674 1692 1762 1921 21254 1802 1698 1731 1655 1573 1615 1594 1560 1634 1642 1763 19685 1776 1821 1713 1704 1602 1545 1604 1628 1548 1585 1666 17976 1716 1806 1841 1713 1686 1598 1550 1596 1573 1509 1585 16677 1611 1705 1791 1814 1665 1689 1603 1519 1564 1531 1525 16108 1595 1636 1709 1777 1844 1651 1639 1585 1518 1535 1515 14989 1604 1637 1666 1699 1742 1779 1648 1615 1571 1484 1519 153610 1461 1623 1624 1655 1679 1727 1752 1619 1560 1544 1474 151311 1431 1497 1620 1615 1628 1698 1684 1709 1570 1535 1524 146112 1351 1502 1531 1597 1630 1587 1658 1673 1656 1542 1526 152013 1262 1378 1504 1517 1579 1628 1561 1604 1622 1638 1513 153514 1407 1301 1419 1500 1514 1590 1601 1551 1579 1584 1613 152815 1348 1438 1327 1423 1488 1495 1594 1597 1518 1564 1570 160616 1302 1389 1457 1331 1429 1495 1478 1574 1594 1512 1558 155517 1432 1366 1409 1465 1349 1449 1489 1447 1551 1561 1537 1542

Total 27960 28540 29116 29131 29221 29237 29296 29595 29738 29726 30284 286671 to 4 6927 6635 6656 6517 6478 6504 6520 6797 7149 7334 7922 82995 to 8 6698 6968 7054 7008 6797 6483 6396 6328 6203 6160 6291 6572

9 to 12 5847 6259 6441 6566 6679 6791 6742 6616 6357 6105 6043 603013 to 16 5319 5506 5707 5771 6010 6208 6234 6326 6313 6298 6254 62241 to 16 24791 25368 25858 25862 25964 25986 25892 26067 26022 25897 26510 27125

A "Catchment" is that geographic area w hich represents the formal attendance boundary of a school. School Year: 2010/2011

Page 5: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 5

Population History English Montreal School Board

Dalkeith Elementary - core

A History of the Number of Children in this CatchmentAge 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Births 1493 1363 1499 1415 1434 1423 1433 1580 1549 1448 1568 n/a1 1531 1472 1339 1470 1371 1391 1378 1393 1525 1456 1413 15452 1494 1534 1462 1349 1447 1351 1395 1412 1379 1529 1482 15103 1715 1534 1535 1469 1375 1498 1431 1425 1411 1405 1529 15264 1689 1748 1548 1563 1468 1410 1525 1446 1422 1436 1460 15615 1742 1702 1734 1590 1575 1485 1439 1518 1442 1409 1420 14726 1735 1749 1688 1754 1591 1562 1518 1475 1487 1458 1471 14047 1798 1760 1752 1674 1765 1599 1561 1575 1448 1463 1448 14818 1715 1810 1757 1753 1626 1771 1592 1576 1522 1463 1497 14769 1785 1735 1791 1755 1759 1635 1754 1583 1531 1509 1440 151310 1630 1819 1735 1837 1740 1746 1646 1738 1563 1486 1509 146811 1584 1632 1801 1732 1807 1728 1722 1638 1732 1546 1484 151112 1450 1550 1687 1827 1740 1810 1724 1702 1597 1685 1528 148113 1548 1453 1583 1693 1821 1725 1802 1759 1673 1591 1690 151114 1539 1557 1482 1607 1656 1803 1696 1786 1756 1635 1580 167115 1510 1539 1587 1520 1606 1661 1787 1674 1777 1693 1636 158916 1469 1515 1569 1581 1515 1614 1669 1796 1663 1753 1654 163317 1540 1494 1567 1571 1583 1534 1587 1666 1771 1640 1741 1680

Total 28967 28966 29116 29160 28879 28746 28659 28742 28248 27605 27550 260321 to 4 6429 6288 5884 5851 5661 5650 5729 5676 5737 5826 5884 61425 to 8 6990 7021 6931 6771 6557 6417 6110 6144 5899 5793 5836 5833

9 to 12 6449 6736 7014 7151 7046 6919 6846 6661 6423 6226 5961 597313 to 16 6066 6064 6221 6401 6598 6803 6954 7015 6869 6672 6560 64041 to 16 25934 26109 26050 26174 25862 25789 25639 25496 24928 24517 24241 24352

A "Catchment" is that geographic area w hich represents the formal attendance boundary of a school. School Year: 2010/2011

Page 6: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 6

Population History English Montreal School Board

Nesbitt Elementary

A History of the Number of Children in this Catchment(Nesbitt Elementary - core (gr k-6))

Age 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010Births 3458 3509 3650 3645 3644 3617 3683 3949 4060 4233 4307 n/a

1 3269 3010 3079 3041 3075 2993 3145 3279 3537 3556 3625 36802 3234 3114 2943 2980 2978 2960 2966 3018 3093 3274 3366 35043 3281 3106 2988 2818 2878 2904 2904 2885 2900 2916 3193 32934 3341 3177 3020 2877 2774 2830 2825 2793 2761 2763 2814 31565 3154 3245 3108 2914 2815 2703 2776 2731 2683 2646 2662 27706 3227 3060 3101 3011 2829 2709 2627 2663 2668 2561 2561 26137 3183 3107 3017 3039 2963 2718 2633 2540 2564 2543 2515 24968 3089 3098 3050 2933 2947 2847 2708 2581 2469 2465 2483 24509 3080 2995 2997 2975 2901 2882 2800 2591 2486 2388 2405 244510 2991 2996 2921 2933 2882 2844 2787 2739 2543 2377 2319 237811 2602 2963 2976 2840 2899 2780 2807 2673 2654 2467 2311 230312 2589 2567 2910 2894 2773 2819 2748 2704 2604 2593 2394 225813 2531 2553 2532 2831 2867 2703 2785 2645 2618 2510 2543 231214 2465 2477 2498 2489 2779 2803 2672 2723 2576 2551 2463 249615 2634 2467 2466 2451 2461 2735 2745 2636 2650 2506 2521 243516 2566 2588 2436 2455 2441 2389 2677 2747 2589 2564 2479 246817 2602 2546 2619 2415 2457 2413 2391 2647 2709 2567 2525 2478

Total 53296 52578 52311 51541 51363 50649 50679 50544 50164 49480 49486 455351 to 4 13125 12407 12030 11716 11705 11687 11840 11975 12291 12509 12998 136335 to 8 12653 12510 12276 11897 11554 10977 10744 10515 10384 10215 10221 10329

9 to 12 11262 11521 11804 11642 11455 11325 11142 10707 10287 9825 9429 938413 to 16 10196 10085 9932 10226 10548 10630 10879 10751 10433 10131 10006 97111 to 16 47236 46523 46042 45481 45262 44619 44605 43948 43395 42680 42654 43057

A "Catchment" is that geographic area w hich represents the formal attendance boundary of a school. School Year: 2010/2011

Page 7: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 7

EDUCATIONAL PROGRAM In 2010-11, St. Brendan School offered the Core Program in Kindergarten to Cycle 3. St. Brendan School is classified as an Inner City Category III school.

Dalkeith School also offers a Core Program from Kindergarten to Cycle 3. A PELO Program (Programme d’enseignment de la langue d’origine) for Italian is offered there.

Nesbitt School offers both Core and French Immersion programs from Kindergarten to Cycle 3. It is classified as an Inner City Category III school. A PELO Program for Italian, Portuguese and Tamil are offered there.

FACILITY PROFILE The St. Brendan facility houses St. Brendan Elementary School. The capacity of the St. Brendan facility is 315 pupil places. In 2010-2011, St. Brendan Elementary School used 38.1% of the capacity. Theoretically, St. Brendan School uses 15 classrooms. It also has a gymnasium, a polyvalent area and a library. The operating costs include caretaking and contracted services, utilities, security, supplies/materials, building maintenance and repairs.

St. Brendan School

Year Built 1957 Capacity 315 Enrolment Sept. 30, 2010 120 Operating Costs 2009/10 (maintenance and utilities included)

$132,024

Total Rental Income 2009/10 $0

Total number of rooms for classroom instruction 11 Daycare 1 Kindergarten for 5 year olds 2 Computer 1 Total rooms available* 15 Gymnasium 1 Polyvalent 1 Library 1

*This chart outlines a theoretical description of classroom space available and not the actual use of classrooms in the facility (assessed as of June 2001).

The Dalkeith facility houses only the enrolment for Dalkeith School. The capacity for Dalkeith School is 485 pupil places. In 2010-2011, Dalkeith School used 32.8% of the capacity. Theoretically, Dalkeith School uses 22 classrooms. It has a gymnasium, a cafeteria and a library. The operating costs include caretaking and contracted services, utilities, security, supplies/materials, building maintenance and repairs.

Page 8: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 8

Dalkeith School Year Built 1961 : 1965 Capacity 485 Enrolment Sept. 30, 2010 159 Operating Costs 2009/10 (maintenance and utilities included)

$175,857

Total Rental Income 2009/10 $488

Total number of rooms for classroom instruction 17 Daycare 1 Kindergarten for 5 year olds 3 Computer 1 Total rooms available* 22 Gymnasium 1 Cafeteria 1 Library 1

*This chart outlines a theoretical description of classroom space available and not the actual use of classrooms in the facility (assessed as of June 2001).

The Nesbitt facility houses only the enrolment for Nesbitt School. The capacity for Nesbitt School is 880 pupil places. In 2010-2011, Nesbitt School used 48% of the capacity. Theoretically, Nesbitt School uses 40 classrooms. It has a gymnasium, a cafeteria, a polyvalent area and a library. The operating costs include caretaking and contracted services, utilities, security, supplies/materials, building maintenance and repairs.

Nesbitt School

Year Built 1911 : 1923 : 1926 Capacity 880 Enrolment Sept. 30, 2010 (Core and French Immersion)

422

Operating Costs 2009/10 (maintenance and utilities included)

$364,536

Total Rental Income 2009/10 $0

Total number of rooms for classroom instruction 32 Daycare 1 Kindergarten for 5 year olds 4 Music 1 Art 1 Computer 1 Total rooms available* 40 Gymnasium 1 Polyvalent 1 Cafeteria 1 Library 1

*This chart outlines a theoretical description of classroom space available and not the actual use of classrooms in the facility (assessed as of June 2001).

Page 9: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 9

DISTRIBUTION OF SAINT BRENDAN SCHOOL'S STUDENT POPULATION The Baragar statistical data that follow indicate by Core Program boundaries where pupils attending St. Brendan School live and are based on September 30, 2010 enrolment data. The September 30, 2010 enrolment is 120 students.

St. Brendan School Population Distribution – September 30, 2010

L'EAU

Nesbitt*

*Dalkeith

*

25 HM

SH

ER

BR

OO

KE

ES

T

BE

AU

BIE

N

CHAMP D'EAU 40 H

M

PIE IX BD

LACORD

AIRE

PIE IX

DE CHARLEROI

DE L'ASSOMPTION

LACORDAIRE

RO

SE

MO

NT

DES

GRA

ND

ES-P

RAI

RIE

S

MASSE

St. Brendan*

Core K – Cycle 1

St. Brendan 102 Dalkeith 7 Nesbitt (Core Program) 6 Edward Murphy 5

TOTAL 120

Page 10: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 10

DISTINCT BOUNDARY FOR SAINT BRENDAN – WHERE STUDENTS GO TO The Baragar statistical data that follow indicate where pupils living in the St. Brendan Distinct Boundary go to, regardless of the program (Core, Bilingual and French Immersion) and are based on September 30, 2010 enrolment data. The September 30, 2010 population for students living in this boundary and attending EMSB elementary schools is 81 students.

St. Brendan Distinct Boundary – September 30, 2010

General Vanier*

*Nesbitt

Dante *

*Edwa

RO

SE

MO

NT

BE

LAN

GE

R

*St. Brendan DE L'ASSOMPTION

SH

ER

BR

OO

KE

RU

E

PIE IX BD

LACORDAIRE

Nesbitt 23 St. Brendan 21 General Vanier 16 Dante 13 Leonardo da Vinci 2 Mackay Centre 2 Pierre Elliot Trudeau 2 Edward Murphy 1 St Raphael 1

TOTAL 81

Page 11: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 11

DISTRIBUTION OF DALKEITH SCHOOL'S STUDENT POPULATION The Baragar statistical data that follow indicate by Core Program boundaries where pupils attending Dalkeith School live and are based on September 30, 2010 enrolment data. The September 30, 2010 enrolment is 159 students.

Dalkeith School Population Distribution – September 30, 2010

DE CHARLEROI

*Dalkeith

40 H

M

25 HM

25 HM

L'EAU

40 H

M

DES

GR

AND

ES-P

RAIR

IES

M

ASSE

BE

AU

BIE

N

DE

S C

LOS

ER

IES

CH

AU

VIN

CHAMP D'EAU

LANGELIER

SH

ER

BR

OO

KE

RU

E E

GEORGES V

BOURGET BV

LACO

RD

AIRE

Core K – Cycle 1

Dalkeith 136 Edward Murphy 16 St. Brendan 6 Out of Board – Le Gardeur 1

TOTAL 159

Page 12: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 12

DISTRIBUTION OF NESBITT SCHOOL'S CORE PROGRAM STUDENT POPULATION The Baragar statistical data that follow indicate by Core Program boundaries where pupils attending Nesbitt School Core Program live and are based on September 30, 2010 enrolment data. The September 30, 2010 enrolment for the Core Program at Nesbitt School is 158 students.

Nesbitt School Core Program Population Distribution – September 30, 2010

RAILWAYPAPINEAU D

ES

CA

RR

IER

ES

40 HM

CHRISTOPHE-COLOMB

VAN HORNE

JAR

RY

ST DENIS

PARC AV

L'E

AU

PIE IX

L'E

AU

* Nes

bitt

Core K – Cycle 1

Nesbitt 130 St. Brendan 24 Coronation 2 Dalkeith 2

TOTAL 158

Page 13: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 13

C. RATIONALE

In the annual review of the Three-Year Plan, the Long Range Planning Committee compared the enrolment in this area of the territory with the number of student places available in the Core Program. Enrolment

School

Sept. 30, 2010 enrolment

St. Brendan 120 Dalkeith 159 Nesbitt – Core Program 158

Total 437 Student Places Available

School Capacity St. Brendan 315 Dalkeith 485 Nesbitt 880

Total 1680

Based on September 30, 2010 enrolment figures, the difference between the number of student places available and that required for St. Brendan School, Dalkeith School and Nesbitt School Core Program is 1243. The consolidation of the population of elementary schools offering the Core Program in this area of the network would ensure a more efficient use of the space at either the Dalkeith or at the Nesbitt facilities and offers greater educational resources for the population. As St. Brendan and Nesbitt are designated as Inner City Schools Category III, relocated students would continue to benefit from the Inner City grants and subsidies.

Page 14: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 14

D. PROPOSED NEW CORE PROGRAM BOUNDARY FOR THE CONSOLIDATION OF ENROLMENT OF ST. BRENDAN WITH DALKEITH AND/OR NESBITT CORE PROGRAM AND NEW DISTINCT BOUNDARY

A distinct boundary is annexed in its entirety to another distinct boundary, whereas a program boundary can be subject to division. The distinct boundary determines a program boundary for a school as it is “the foundation” for the transportation boundary. Therefore, annexing the distinct boundary of St. Brendan considers only schools whose distinct boundaries are adjacent to St. Brendan’s distinct territory. Using September 30, 2010 enrolment data, consideration of the school that most of the students who live in St. Brendan’s distinct boundary (page 10) go to, is taken into account regardless of the program the schools offer (Nesbitt - 23 students). Obviously, St. Brendan’s enrolment cannot be considered. Consequently, a proposed new Core Program boundary must “totally overlap” the new proposed distinct boundary. Adhering to the previously stated conditions, the proposed annex of St. Brendan’s distinct boundary has to be considered first before determining any proposed program boundary. In Scenario 1, consideration is given that St. Brendan’s enrolment will be consolidated with Dalkeith. Consequently, the proposed Core Program boundary for Dalkeith must “totally overlap” St. Brendan’s distinct boundary. No other Core Program boundary can overlap the St. Brendan distinct boundary. Ignoring that most students in St. Brendan’s distinct boundary go to Nesbitt, St. Brendan’s distinct boundary is annexed to General Vanier because it offers the Bilingual Program. However, in Scenario 2, the distinct boundary of St. Brendan is annexed to Nesbitt’s distinct boundary and the new proposed Core Program boundary for Nesbitt for those scenarios recognizes all conditions previously stated.

Page 15: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 15

Scenario 1 St. Brendan School’s enrolment will be consolidated with the enrolment at the Dalkeith facility, the Core Program boundary for St. Brendan be annexed to Dalkeith, and the St. Brendan distinct boundary be annexed to General Vanier School. The proposed new Core Program boundary for Dalkeith School (Scenario 1) would be as follows:

North – Waterfront South – Hwy. 40 to Bourget Blvd. to Sherbrooke (Edward Murphy) to Hwy 25 to Des

Closeries to Chauvin (both sides) to Langelier to Beaubien to Lacordaire to Rosemont (Edward Murphy) to De l’Assomption (both sides) to Sherbrooke (Edward Murphy)

East – End of Island West – Pie IX Blvd. (both sides)

Nes bi tt*

St. B rendan *

LANGELIER

RO

SE

MO

NT

BE

AU

BIE

N

LACORDAIRE

CH

AU

VIN

D

ES

CLO

SER

IES

SH

ER

BR

OO

KE

DE L'ASS OM PTION

Dalkeith*

BOURGET BV

SH

ER

BR

OO

KE

RU

E

40 H

M

L'EA

U

PIE IX BD

25 HM

Therefore, the Dalkeith facility would be able to house both enrolments (total 279 students, capacity 485). The combined enrolment of St. Brendan and Dalkeith is plotted in the preceding map.

Page 16: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 16

The proposed new distinct boundary for General Vanier (Scenario 1) would be as follows: North – Jean Rivard to Viau to Jean Nicolet to Des Galets (both sides) South – Sherbrooke (Edward Murphy) to de l’Assomption (both sides) to Rosemont

(Edward Murphy) East – Lacordaire (H Mercier) to Dollier to Belanger (both sides) to Lacordaire

(Dante/Edward Murphy) West – 25th Ave. (St. Dorothy) to Hwy. 40 to Pie IX (both sides)

J- N IC O LET

40 H

M

*G eneral Vanier

PIE IX BD

*St Brendan

RO

SE

MO

NT

BD

BE

LAN

GE

R R

U E

DES GALETS

LACORDAIRE BD

DOLLIER RUJEAN RIV

ARD

25E AV

DE L'ASSOMPTION BD

40 H

M

VIA

U

SH

ER

BR

OO

KE

RU

E

LACORDAIRE RU

Using the September 30, 2010 enrolment data, the students living in the new General Vanier distinct boundary is as follows: General Vanier 172 Edward Murphy 4 Nesbitt 57 Pierre Elliott Trudeau 3 St. Brendan 36 Leonardo da Vinci 2 Dante 29 Mackay Centre 2 Pierre de Coubertin 21 St. Raphael (elem.) 1 Honoré Mercier 11 St. Dorothy 1

TOTAL - 339

Page 17: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 17

Scenario 2 St. Brendan School’s enrolment will be consolidated with the Core Program enrolment at the

Nesbitt facility, the Core Program boundary for St. Brendan be annexed to the Nesbitt Core Program boundary, and the St Brendan distinct boundary be annexed to Nesbitt School.

The proposed new Core Program boundary for Nesbitt School Core Program (Scenario 2) would be as follows:

North – Waterfront South – Waterfront East – Lacordaire (Dalkeith) to Charleroi to Masse (both sides) to Des Grandes

Prairies (railway) to Champ d’Eau (both sides) to Hwy. 40 to Hwy. 25 to Beaubien (Dalkeith/Edward Murphy) to Lacordaire to Rosemont (Edward Murphy) to de l’Assomption (both sides) to Sherbrooke (Edward Murphy)

West – C-Colomb (Parkdale) to Hwy. 40 to St Denis to Jarry (both sides) to railway/Parc to Van Horne to des Carrier to Papineau (both sides)

DE CHARLEROI

DES

GR

AND

ES P

RAI

RIE

S

MASSE

LACO

RDA

IRE

L'E

AU

SH

ER

BR

OO

KE

PIE IX DE L'ASSOMPTION

St. Brendan* R

OS

EM

ON

T

BE

AU

BIE

N

LACORDAIRE

25 HM

25 HM

*Dalkeith

SH

ER

BR

OO

KE

RU

E

40 H

M

CHAMP D'EAU

PAPINEAU

*Nes

bitt

DE

S C

AR

RIE

RE

S

CHRISTOPHE-COLOMB

JAR

RY

PARC

L'E

AU

SAINT DENIS

40 HM

Therefore, the Nesbitt facility would be able to house both Core Program enrolments (total 278 students, capacity 880). The combined enrolment of St. Brendan and Nesbitt Core Program is plotted in the map above.

Page 18: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 18

The proposed new distinct boundary for Nesbitt (Scenario 2) would be as follows: North – Des Carriers (P.E. Trudeau) to d’Iberville (both sides) to St. Zotique (P.E.

Trudeau) to St. Michel to Jean Talon (both sides) to Pie IX (General Vanier) to Belanger (both sides)

South – Waterfront East – Lacordaire (Dante/Edward Murphy) to Rosemont (Edward Murphy) to de

l’Assomption (both sides) to Sherbrooke to Pie IX (Edward Murphy) West – Papineau (both sides)

PIE IX BD

LACORDAIRE

BE

LAN

GE

R

*S t. Bre nda n

RO

SE

MO

NT

DE L'ASSO MPTIO N BD

SH

ER

BR

OO

KE

RU

E

P IE IX BD

JEA

N T

ALO

N

IBERVILLE

DES CAR

RIE

RES

ST MICHEL

*Nesbitt

L'E

AUPAPINEAU AV

ST

ZOT

IQU

E

Using the September 30, 2010 enrolment data, the students living in the new Nesbitt distinct boundary is as follows:

Nesbitt 128 Edward Murphy 2 Pierre Elliott Trudeau 76 Honoré Mercier 2 General Vanier 24 Leonardo da Vinci 2 St. Brendan 22 Mackay Centre 2 Dante 13 Sinclair Laird 1 FACE (elem.) 9 St. Dorothy 1 Parkdale 4 St. Raphael (elem.) 1 Bancroft 3 Westmount Park 1 Dunrae Gardens 2

TOTAL - 293

Page 19: ST. BRENDAN SCHOOL: Consolidation of … July 2012 – St. Brendan 557 Page 1 ST. BRENDAN SCHOOL: Consolidation of elementary enrolments and the subsequent revocation of a Deed of

MSCS July 2012 – St. Brendan 557 Page 19

E. CRITERIA

• St. Brendan School has a low enrolment. • A decline in enrolment at St. Brendan School is projected for subsequent years. • Dalkeith has a low enrolment. • A decline in enrolment at Dalkeith School is projected for subsequent years. • Nesbitt School’s Core Program has a low enrolment. • A decline in enrolment at Nesbitt for the Core Program is projected for subsequent years. • St. Brendan, Dalkeith and Nesbitt offer the Core Program. • In reviewing the inventory of elementary school facilities within the EMBS network and

recognizing that the elementary enrolment will continue to decline, the St. Brendan facility may be better suited to house an older clientele instead of continuing to house an elementary one.

• Regardless the scenario, all schools offering the Core Program will have large program boundaries.

• The consolidation of the Core Program enrolment in this area would ensure a more efficient use of the space at either facility and offer greater resources for the population.

• Facility location and transportation distances of where Core Program students live has been considered for each scenario.

• The enrolment at St. Brendan is small and the students can be accommodated in either school facility easily.

• Dalkeith School is the only school offering the Core Program located east of Hwy. 25. • To consider Scenario 1, the fact that most students who live in St. Brendan’s distinct

boundary go to Nesbitt must be ignored. • In keeping with the preceding statement and noting which school most students go to,

the distinct boundary of St. Brendan is annexed in its entirety to either General Vanier’s (Scenario 1) or Nesbitt’s (Scenario 2) distinct boundary.

• On determining proposed Core Program boundaries, all scenarios have a new proposed Core Program Boundary that totally overlaps their respective new proposed distinct boundary.

• Financial considerations: Based on the salary scale as of April 2010*, there would be savings in the order of

$207,490 which include the following: secretary (1), caretaking staff (1.5), principal (1), library technician (0.2).

*An agreement in principal on salaries, pension plans and parental rights was reached in June 2010. The 5-year collective agreement provides for fixed salary increases of 6.0% and variable increases based on economic growth (up to 3.5%) and inflation (1%) for a potential total of 10.5%. At the time of writing this document, it is unknown when these increases will be in effect.