spt_5
DESCRIPTION
freeTRANSCRIPT
NOTAHUNXi (mm)Xrata-rata Xi (mm)(Xrata-rata - Xi)2 (mm)
12001106,1220,695428,283025
2200287,0221,5972,550409
3200355,51-29,915894,907225
4200447,639-37,7861427,781796
5200535,482-49,9432494,303249
62006110,9625,535652,036225
72007109,24923,824567,582976
82008116,53831,113968,018769
9200965,914-19,511380,679121
102010119,81634,3911182,740881
Jumlah (mm)854,258998,883676
Rata-rata (mm)85,425
Standar Dev31,62082
Tugas ke 5 Sistem Penyaliran Tambang Nama:NIM:Kelas : 03
R24 = Xrata-rata +
R24 = 85,425 +
R24 = 118,88 mm
I = 2/3
I = 2/3
I = 4,95 mm/jam
Luasan bottom pit= 1.153.106,4072 m2 = 1,1531 km2Luasan disposal atas= 595.607,6343 m2= 0,5956 km2Luasan disposal bawah= 465.653,1746 m2= 0,4656 km2
Curah hujan rencana 10 tahun
XT = Xrata-rata + (Sx x ) X10 = 85,425 + (31,62 x )X10 = 143,87 mm
1. debit air limpasan ke bottom pitQ = 0,278 . C . I . A Q = 0,278 x 0,9 x 4,95 mm/jam x 1,15 km2Q = 1,428 m3/detik2. debit air limpasan ke area disposala. Disposal atasQ = 0,278 . C . I . A Q = 0,278 x 0,75 x 4,95 mm/jam x 0,595 km2Q = 0,614 m3/detikb. Disposal bawahQ = 0,278 . C . I . A Q = 0,278 x 0,75 x 4,95 mm/jam x 0,465 km2Q = 0,480 m3/detik3. total debit air limpasanQtotal = debit air limpasan ke bottom pit + debit air ke disposalQtotal = 1,428 m3/detik + 0,614 m3/detik + 0,480 m3/detikQtotal = 2,52 m3/detik4. debit air hujanQ = curah hujan rencana x DTHQ = 143,87 mm/jam x 2,21 km2Q = 3,68 m3/detik5. debit air tambangQ = debit air hujan + total debit air limpasanQ = 3,68 m3/detik + 2,52 m3/detikQ = 6,20 m3/detik