TOPICS

1. SPLS Overview

2. SPLS Liaison Responsibilities

3. Policy & Procedures

4. PC Maintenance – Some Details

5. The Forms – Things to Know

6. Meeting Procedures

7. Development Process – Basic Steps

8. Best Practices

9. Standards Staff 2

Page 3: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

3

SPLS OVERVIEW

•Responsibilities & Authority•Project Committees•Cognizant TC

Page 4: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

4

SPLS Responsibilities

• The Standards Project Liaison Subcommittee (SPLS) is responsible for • Coordinating, • Monitoring and • Guiding the development of standards and guidelines.

• The SPLS is the first line approval body for PC activities

• Responsibility for the technical content of ASHRAE standards or guidelines and the consensus process rests with the Project Committee, not with SPLS

Page 5: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

5

SPLS Authority

Approves:• PC membership & related

PC MOP waivers• TPS changes• PC work plans and unit

waivers• Publication public review of

standards, guidelines and addenda (SCDs – standards committee documents)

• Development of user manuals

Recommends Approval: • PC Chair appointments• Policy-level PC

membership• Policy-level TPS changes• Funding requests for PC

interim meetings• Continuous maintenance

for standard /guidelines • Standard Achievement

Award recipient

Page 6: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

PCs Assigned to SPLS

• Policy level PCs – project committees that receive a higher level of oversight due to the nature and scope of their activities:

SSPC 34 SSPC 161

SSPC 62.1 SSPC 189.1

SSPC 62.2 SPC 191

SSPC 90.1 GPC 24

SSPC 90.2 GPC 29

• Non-policy level PCs & standing PCs – all others

6

Page 7: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Cognizant TC

• The ASHRAE Technical Committee or Task Group within whose scope a particular standard’s technical content most logically falls

• The Cognizant TC normally recommends the chair and at least four other members for a new project committee

7

Page 8: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

8

SPLS LIAISON RESPONSIBILITIES

•Read & Understand the PC MOP•Coordinate•Monitor & Report•Guide

Page 9: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

9

Project Committee Manual of Procedures

• Read and understand the Project Committee Manual of Procedures (PC MOP), which:• Defines the formation, structure, and activities of Project

Committees (PCs)• Establishes criteria and procedures for each step in writing

and processing ASHRAE Standards Committee Documents (SCDs)

• Includes oversight procedures intended to ensure that due process is followed and consensus achieved in developing and maintaining SCDs

• Major revisions to the PC MOP were approved by the Board in June 2010

Page 10: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

10

As a liaison, coordinate with your PCs

• Work closely with your PC Chairs to: • Develop and maintain balanced PC membership

• Review PC membership package & ensure balance

• Prepare a PC work plan• Review and submit a PC work plan for SPLS approval

• Review Publication Public Review Drafts • Review publication public review packages to ensure

procedures were followed and submit to MOS for processing and SPLS approval

Page 11: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

As a liaison, you will monitor & report

• Monitor:• Attend PC meetings & stay in close contact w/PC Chairs• Ensure PC submits meeting minutes in a timely manner• Communicate meeting materials deadlines and other relevant information to your PC and PC Chairs

• Report: • Keep SPLS Chair and MOS informed by email of PC activities

• Submit a status report to the SPLS Staff Liaison before each regular SPLS meeting

• Transfer files to a new SPLS Liaison (or the MOS) when PC responsibility is re-assigned

11

Page 12: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

12

As a liaison, you are expected to

• Educate PCs on matters of policies and procedures• Advise PCs when due dates are approaching• Encourage PCs to develop their SCDs in a timely fashion• Chairs to generate regular committee activity between in

person meetings through e-mail and telephone contact

• Be visible to PCs by attending their meetings

Page 13: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

13

POLICY AND PROCEDURE

•The Rules•Due Process•Openness•Balance

Page 14: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

What Are the Rules?

• ASHRAE Rules and Procedures:• ROB – Rules of the Board of Directors

• StdC MOP, StdC Reference Manual (new) & PC MOP

• PASA – Procedures for ASHRAE Standards Actions (PASA is now also used for guidelines procedures)

• ANSI Essential Requirements: Due process requirements for American National Standards (known as the ANSI Procedures)

14

Page 15: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

ANSI’s Rules are like three legs of a stool

Balance

15

Openness

Due Process

Page 16: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Due Process

• Any person (organization, company, government agency, individual, etc.) with a direct and material interest has a right to participate by:

a) Expressing a position and its basis,

b) Having that position considered, and

c) Appealing if adversely affected

• Due process allows for equity and fair play

16

Page 17: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Openness

• Participation shall be open to all persons who are directly and materially affected by the activity in question• Participation in a process is not necessarily the same as membership or vote on a committee

• Participation can be as simple as submitting a public review comment

• There shall be no undue financial barriers to participation

17

Page 18: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

18

Balance• Balance means at the time a standards action vote is taken:• No single interest category equals more than half of a

committee membership dealing with product standards• No single interest category equals more than one third of

the membership of a committee dealing with safety

• To ensure PC balance, no interest category shall have a majority except with the recorded assent of the members in the other categories and approved by SPLS (for a non-policy level PC)

• A balance within SPC subcommittees and GPCs is desirable but not required

Page 19: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

19

PC MAINTENANCE – THE DETAILS

•Membership •Work Plans•Liaison Reports

Page 20: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

20

Types of PC Members

• Individual members: appointed as “personal members,” not representing any organization, corporation, partnership, or employer

• Organizational members (OM): are voting representatives on the PC that represents their organizations’ interests• The OM representative and alternate may not serve as a

Chair or Vice Chair of a committee or subcommittee

• Consultants: experts in a specific section of the SCD to be developed and are appointed by the PC Chair

Page 21: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

21

Types of PC Members• International Organizational Liaison (IOL): A liaison from international trade or professional organizations, international standards committees, and other groups to facilitate the development and promote the acceptance of its standard

• The IOL does not have a vote at PC meetings, but:• Receives all documents and communications that are distributed

to PC members;• Reports status of PC activities to the constituency of the

organization;• Provides input from the constituency of the organization.

• The establishment or removal of an IOL is done at the request of the PC Chair in consultation with the SPLS Liaison

Page 22: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

22

Project Committee Size and Composition

• A PC must have at least 5 voting members including the Chair, with no upper limit

• The PC must have voting members from at least the following interest categories: Producer, User, and General

• There can not be more than one voting member from any one company, association, agency, etc.

• If alternate interest categories would ensure broader consensus, or are better suited to a particular TPS, a PC Chair can submit a recommendation to the SPLS for approval

Page 23: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

23

Tenure

• SPC Members serve until the project has been completed and the PC discharged

• SSPC members serve no more than four consecutive full years except where membership is rotated in a manner that assures continuity and balance

• SSPC initial terms staggered over four years• An SSPC Chair’s request for additional term/s may be considered by SPLS

Page 24: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

24

Membership Approval

• SPLS is the first-line approver of all PC members• Standards Committee approves all PC Chairs and policy-level PC members

• PC Chairs appoint a Secretary, Webmaster, and consultants and notifies the Manager of Standards

• The Chair and any Vice Chairs or Subcommittee Chairs must be ASHRAE members - others do not

Page 25: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

26

PC Requirements• A new PC must have an approved roster within 12 months of

project approval • If not, a waiver of PC MOP 4.14.4.1 must be requested (by the PC

Chair or SPLS Liaison), or the project will be automatically be discontinued

• A PC may be discharged by SPLS if the PC reports that it cannot prepare an acceptable SCD or addendum within a reasonable period of time

• If the PC has not officially met for 12 months, or is not advancing the development of the SCD in a timely manner, then the SPLS Liaison should determine if another Chair should be sought or if the matter should be sent back to PPIS to re-evaluate the need for the project committee

Page 26: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

27

THE FORMS – THINGS TO KNOW…

•PC Application •Bias/Conflict of Interest Statement•Chair’s Recommendation Form•IOL Form•PC Work Plan•SPLS Liaison Report

Page 27: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

28

Membership Package• PC Member applications are submitted to and processed by ASHRAE staff

• Applicant information is forwarded to the PC Chair for consideration

• The PC Chair recommends or declines applicants and submits a Chair’s Recommendation Form

• SPLS Liaisons review membership packages for new PC Chairs and submit a Chair’s Recommendation Form for SPLS and StdC approval

• The 3 forms on the following pages must be received by the published application deadline or the package will be held for the next SPLS meeting

Page 28: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Application for Individual Project Committee Membership – this form can be found on the ASHRAE website under Membership Forms.

IMPORTANT: the application must be completed in full and signed by hand and faxed or a PDF document may be emailed to ASHRAE at the number/email address noted on the form.

29

1. I am applying for Individual Membership on the following ASHRAE Project Committee: (Please use a separate form for each committee.)

SSPC 34 Designation and Safety Classification of Refrigerants

SSPC 62.1 Ventilation for Acceptable Indoor Air Quality

SSPC 62.2 Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings

SSPC 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings

SSPC 90.2 Energy Efficient Design of Low-Rise Residential Buildings

SSPC 161 Air Quality Within Commercial Aircraft

SSPC 189.1 Standard for the Design of High-Performance, Green Buildings Except Low-Rise Residential Buildings

SPC 201 Facility Smart Grid Information Model

If you are applying for a committee other than those listed above, please enter committee information below and use the Default Interest Categories listed in Section 4:

2. Name of Applicant Print or Type Name (Last, First, Middle Initial) below Today’s Date

ASHRAE Member/ Non Member ID (ASHRAE Membership is not a requirement unless applying for Chair or Vice-Chair position)

*Committee Position for Which You Are Applying: (see below)

*VM-Project Committee Voting Member; SVM-Project Subcommittee Voting Member; NVM-Non-Voting Member; CON-Consultant, or Primary/Alternate Organizational Rep

3. Bio Report (in the “Member Central” section of the ASHRAE website) and the Potential Sources of Bias/ Conflict of Interest form:

Bio information current within a year from the application due date. Date Bio information on ASHRAE’s website completed/updated: __________

I have completed and signed the Potential Sources of Bias/Conflict of Interest form. Date form was completed/updated: ______________

4. If elected as a member of the Project Committee, I would qualify in the following Interest Category (check one): (Descriptions of Interest Categories are on Page 2)

DEFAULT SSPC 34 SSPC 62.1 SSPC 62.2 SSPC 90.1 SSPC 90.2 SSPC 161

General Interest Consulting Engineer/ Contractor/Architect

Design/Builders Design/Builders Compliance Compliance Flight Personnel

Producer General Interest General Interest General Interest Designer General Interest General Interest

User Producer/Vendor Manufacturer Manufacturer General Interest Industry Manufacturer

Supplier (category may

not be available-check with PC

Chair)

User Owner/Operator/Occupant

Owner/Operator/Occupant

Industry Producer Owner/Operator

User User Utility Passenger

Utility

SSPC 189.1 SPC 201

Compliance General

Designer Utility

General Interest Consumers - Residential, Commercial, and Industrial

Industry

Appliance, Residential Automation, and Consumer Electronics Producer

User Commercial/Institutional/Industrial Producer

Utility ~PLEASE DO NOT ADD INTEREST CATEGORIES~

5. By signing below, I certify that: If elected as a member of any ASHRAE Standard or Guideline Committee or appointed as a consultant to such committee, I state that I intend to make and will make contributions with others members of such committee that will be merged into inseparable or interdependent parts of a unitary work or works. To facilitate the creation of such work or works, I acknowledge and agree that my contributions and any resulting work or works constitute and are to be considered works made for hire. To any extent that my contributions or the resulting work or works are not considered a work made for hire, I hereby assign to ASHRAE all right, title and interest to all said contributions and all said resulting works. I understand and agree that I acquire no rights in the resulting work or works, whether published or unpublished. I attest that I have the authority and am empowered to grant the foregoing and within rights to ASHRAE.

SIGNATURE Note: This form is not valid unless signed by Applicant Submit Completed Form to: ([email protected]); Tel. (678) 539-1143; Fax (678) 539-2143

ASHRAE Standard/Guideline Project Committee Application for Individual Membership

Look for:

1.PC #

2.Dates for bio and Bias form updates

3.Interest Category

4.Signa-ture

Page 29: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

30

Membership Interest

Categories

DEFINITIONS

Interest: the perspective of a member of a project committee, as judged by his or her present and past sources of income, fees, or reimbursements of related expenses, in the context of the purpose and scope of the project committee. The perspective may also be judged by the recorded views of the individual, or of any organization he/she is employed by or of which he/she is a member.

Interest categories: the principal (top) tier of interest classifications. For some standards projects, it may be appropriate to designate subcategories of one or more interest category. INTEREST CATEGORIES

Appliance, Residential Automation, and Consumer Electronics Producer: Those directly concerned with the production or distribution of products or services involved with residential appliances, or energy control applications in residences, including industry associations representing producers or distributors, or those receiving substantial support from a producer directly concerned.

Compliance: Persons primarily interested in compliance with the standard. A person in this category would make their living from developing regulations, enforcing the requirements of the standard, developing programs tied to the standard, or advocating the standard. Example members of this category would be building code officials, building code organizations, state energy offices, and other local, state, and federal officials.

Commercial/Institutional/Industrial Producer: Those directly concerned with the production or distribution of the products or services used in commercial, institutional, or industrial facilities, including industry associations representing producers or distributors, or those receiving substantial support from a producer directly concerned.

Consumers – Residential, Commercial, and Industrial: those who use the product or service involved, or those who receive substantial support from a user directly concerned, but are not involved with its production or distribution. This reference is not to users of the standard, but to users of the product or service covered by the standard.

Designer: A designer of buildings, building systems or subsystems (including envelope, HVAC, lighting). A person in this category would make their living from designing buildings and systems that are impacted by the standard. Example members of this category would be architects, design firms, consulting engineers, lighting designers and employees of energy consulting firms.

Designers/Builders: Those who provide building design and construction services, including consulting engineers, HVAC and general contractors, design /build contractors, or representatives of associations of these types of professionals.

Flight Personnel: Individuals who are employed by the airlines as part of the aircraft crew (pilots and flight attendants) or individuals employed by the airlines to maintain the aircraft, and the organizations that represent these individuals.

General (SPC 201): Those who have interests other than those described elsewhere, and may include consulting engineers or employees of appropriate government agencies, nationally recognized testing laboratories or educational institutions, and codes-oriented individuals.

General Interest: Building regulatory officials or their representatives, researchers, educators, IAQ specialists, and others with expertise in the fields of ventilation and indoor air quality, as well as medical doctors, public health experts, industrial hygienists or representatives of associations of these types of professionals. In addition, this category is intended for those who have interests other than those described in the other categories. Example members of this category would be employees of research institutions, universities, nationally recognized testing laboratories, employees of energy advocacy groups, and others with a general interest in energy utilization in buildings.

Industry: Construction firms or manufacturers, producers, or distributors of products or systems that would be installed in buildings. A person in this category would make their living from constructing buildings or producing or distributing products impacted by this standard or representing groups of manufacturers impacted by this standard. Example members of this category would be contractors, manufacturing firms, assembly firms, distributors and wholesalers, and industry trade associations that represent these groups.

Manufacturers: Employees or representatives of manufacturers, distributors or trade associations of HVAC equipment, HVAC controls, and equipment designed to enhance indoor air quality (e.g. air cleaners). Also, individuals associated with products used in the construction of buildings (e.g., finishes, wall and floor coverings, wood products) and used within buildings by occupants (e.g., furniture and furnishings, tobacco products, appliances, office equipment).

Owners/Operators/Occupants: Employees or representatives of building owners/managers, building engineers, facility managers, and consultants who specialize in working in existing buildings (as opposed to those who design and construct new buildings), as well as representatives of building occupants.

Passenger (As used by SPC 161): Individuals who pay to ride on aircraft, and the organizations that represent these individuals.

Producer: Those directly concerned with the production or distribution of the product or service involved, including industry associations representing producers or distributors, or those receiving substantial support from a producer directly concerned.

Supplier: Employees of firms that provide maintenance services for HVAC systems owned by others. This would include engineers and consultants with a primary job scope of specifying or supervising maintenance of HVAC systems owned by others. It would especially include contractors and technicians who actually perform HVAC system services for hire. This group may also include representatives of associations the membership of which falls in this category.

User: Users of buildings and building systems and subsystems. A person in this category would make their living from owning or operating buildings. Example members of this category would be building owners and operators (private and governmental), tenants, and trade associations or organizations representing these groups.

Utility: Those who provide energy services to buildings impacted by this standard. A person in this category would make their living from providing energy services to a building impacted by this standard. Example members of this category would be electric, gas, steam, or other utility and trade associations or organizations representing these groups.

ASHRAE Standard/Guideline Project Committee Application for Individual Membership

Page 30: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

31

ASHRAE Potential Sources of Bias / Conflict of Interest

Statement of Inclinations, Interests and Affiliations This form must accompany all applications for membership on a Standard or Guideline Project Committee

ASHRAE Committee: SSPC 62.1, Ventilation for Acceptable Indoor Air Quality (Number and Title)

Name: Stephanie Reiniche Title: Manager of Standards

Employer: ASHRAE Telephone: (678) 539-1143

Address incl.1791 Tullie Circle, NE City, State, Zip: Atlanta, GA 30329

Email: [email protected]

Product or Service: Standards Developer Today’s Date: 8/3/2009

This form will not be accepted unless all Sections are completed, and the form is signed and dated. The use of “None”, N/A, or no response to answer these inquiries will render this form unacceptable.

1. ORGANIZATIONAL AFFILIATIONS. Enter information as requested below.

A. Report relevant business relationships (as an employee, owner, officer, director, consultant, etc.) within the last five years. ASHRAE, Inc.

B. Report any relevant remunerated or volunteer non-business relationships (e.g., professional organizations, trade

associations, public interest or civic groups, etc. within the last five years. ASHRAE, Girl Scouts, ASME, NFPA C. Disclose any direct sources of funding for your time and/or expenses to participate in project committee activities, as

well as the primary sources of your income for professional activities within the last five years which are related to the subject matter of the standard(s). If you currently pay for your own expenses, please enter ‘self funded’. ASHRAE pays for me to attend the ASHRAE meetings.

2. PUBLIC STATEMENTS AND POSITIONS. List relevant articles, testimony, speeches, etc., by date, title and publication (if any) in which they appeared. Provide a brief description of relevant positions of any organizations or groups with which you are or have been closely identified or associated. Attach additional sheets if necessary. Please mark the box below only if applicable.

I have no relevant public statements or positions (double-click box to mark).

August 3, 2009 _______________________________________ _______________________________________ SIGNATURE DATE Note: Copies of the completed form are not to be distributed beyond ASHRAE staff and members of the affected project committee and Standards Committee without the written consent of the applicant.

Fax completed form to 678 539-2143 or send a .pdf or image to [email protected] Form must be signed to be valid.

Bias/Conflict of Interest Statement - this form can be found on the ASHRAE website under Membership Forms.

IMPORTANT: the Bias/Conflict of Interest form will not be accepted unless all sections are filled in. The use of “None,” “N/A,” or a no response to any question will render this form unacceptable.

Must be signed by hand!

This form is to be updated annually!

Page 31: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

32

ASHRAE Biographical Report (Bio)– this report is generated by ASHRAE staff from the information provided in the “My Profile” section on the ASHRAE website.

IMPORTANT: The bio “Review Date “must be within the last 12 months from the membership application deadline to be accepted.

Page 32: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

33

Standing PC Chair’s Recommendation

FormThings to look for:

1. Voting Status

2. Interest Categories

3. Term (if SSPC)

4. Reason for declined applicants

5. Reason for change of status

6. Reason for Removal for Cause *

7. Proposed membership balance

8. Additional notes

*see notes

SSPC/SGPC Chair’s Membership Recommendation Form

Committee Number: SGPC-0 Committee Name: The Commissioning Process Committee Chair: Tim Corbett Today’s Date: 08/18/2011 Deadline: August 24, 2011

Meeting: October 2011 Tech Weekend

This form is to be used by the PC Chair in conjunction with completed Applications for Membership, the Bias/Conflict of Interest forms, and the Biographical Reports for person(s) being considered for new membership, change of status or removal from the committee. It is mandatory for all applicants to submit Current Bias/Conflict of Interest form. Please review to ensure no conflicts exist. Please review each applicant’s information and assign Interest Category, Voting Status and, if applicable, Subcommittee. If the applicant will be representing an organization, please indicate whether it will be as a Primary or Alternate representative. You may add more rows to any section as needed. For membership procedures, please refer to the PC MOP. This form must be completed and returned to [email protected] by the deadline for consideration at the upcoming ASHRAE Standards Committee meeting. A delay may cause any membership items to be removed from consideration.

NEW APPLICANTS

Applicant’s Name Recommended

Position1:

Voting Status

Interest Category

Term in

Years

Subcommittee Assignment

Org Rep PRI/ALT

Organization Represented

Larry Ross PCVM User 4

Thomas Cappellin PCVM Gen Int. 2 Chair Gdl. 1.1

Subc.

Michael Lathrop PCVM Gen Int. 4 Gdl. 1.1 Primary

OR ABC

DECLINATION OF APPLICANT Applicant’s Name Indicate Reason for Declination of Applicant (mandatory information)

Mark Jones At this time the PC already has a voting member from the same organization.

CURRENT MEMBER CHANGES

Member’s Name Positions:

(If applicable)

Voting Status

Interest Category

Term in

Years

Subcommittee Assignment

Org Rep PRI/ALT

Organization Represented

Walter Horn*

Current PCVM Gen Int 4

Recommended Chair Gdl 0 Subcmte

PCVM Gen Int 4 Gdl. 0

Thomas R. Meyer*

Current NVM Gen Int 4

Recommended Vice Chair PCVM User 2 Gdl. 1.1

REMOVAL OF MEMBER - Required field if removing established members Member’s Name Removal for Cause: Attach documents and indicate reason for removal here

John Smith Failure to attend last 3 meetings and unresponsive to letter ballots.

RESIGNATION OF MEMBER - Required field Member’s Name Attach member’s written resignation – Enter date

PRESENT/ PROPOSED BALANCE - MANDATORY field to be completed by PC Chair Is the Chair recommending that the number of interest categories be changed? (y/n) NO

List of Interest Categories Present Number of Voting Members for

each Interest Category Proposed Number of Voting Members for

each Interest Category General Interest 0 3 Producer 4 4 User 1 3 Total 5 10

ADDITIONAL NOTES: SGPC 0 is structured into 2 subcommittees, one to oversee continuous maintenance of Gdl 0 and one to revise Gdl 1.1. Walter Horn’s term ended 6/30/2011 and is being recommended for reappointment for a second 4 year term Thomas Meyer changed employers resulting in a change of interest categories. He is being recommended to serve the remainder of his current term ending 6/30/2013

1Recommended Position would include titles such as Chair, Vice Chair, Secretary, SubC Chair or Webmaster. PC Chair is voted in by SPLS and StdC. Vice-Chairs are voted in for SSPC/SGPCs. Subcommittee Chairs are voted in for all PCs. Vice-Chairs and Secretaries are appointed by the SPC/GPC Chair, who must notify Staff of the new appointment.

Page 33: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Membership Ballot ExampleFinal Ballot for SPLS Voting

34

PPrroojjeecctt CCoommmmiitttteeee MMeemmbbeerrsshhiipp RRoosstteerr CChhaannggeess ffoorr

AASSHHRRAAEE SSuummmmeerr CCoonnffeerreennccee,, LLoouuiissvviillllee,, KKeennttuucckkyy –– JJuunnee 22000099 UUnnlleessss ootthheerrwwiissee nnootteedd,, tteerrmmss ffoorr aallll aapppplliiccaannttss wwiillll bbeeggiinn JJuullyy 11,, 22000099

GPC 1.2 (GPC30): The Commissioning Process for Existing HVAC&R Systems Roster; Recommendation

Present Balance: Total of 26 Voting Members 8 General Interest 10 Producer 1 Supplier 6 User 1 Utility

Proposed Balance: Total of 26 Voting Members 9 General Interest 9 Producer 1 Supplier 6 User 1 Utility

1. Change of Status for Anthony G. Buschur from NVM-Producer to NVM-General Interest Notes: Anthony Buschur was voted in Chicago as an NVM-Producer in error.

GPC 8: Energy Cost Allocation for Multiple-Occupancy Residential Buildings Roster; Recommendation

Present Balance: Total of 0 Voting Members 0 General Interest 0 Producer

Proposed Balance: Total of 7 Voting Members 2 General Interest 5 Producer

1. Appointment of Roger Freischlag as Chair and PCVM-Producer 2. Appointment of Scott Deshone as PCVM-Producer 3. Appointment of Martha Hewett as PCVM-General Interest 4. Appointment of Kenneth Hobermann as PCVM-Producer 5. Appointment of Thomas McHugh as PCVM-Producer 6. Appointment of Alex Sleiman as PCVM-General Interest 7. Appointment of Wade Smith as PCVM-Producer Notes: This committee is not balanced.

GPC 20: XML Definitions for HVAC&R Roster; Recommendation

Present Balance: Total of 12 Voting Members 6 General Interest 6 Producer

Proposed Balance: Total of 13 Voting Members 6 General Interest 7 Producer

1. Appointment of Andrew Stadheim as PCVM-Producer Notes:

GPC 23: Guideline for the Design and Application of HVAC Equipment for Rail Passenger Vehicles Roster; Recommendation

Present Balance: Total of 8 Voting Members 3 General Interest 2 Supplier 1 User 2 Vehicle Buyer

Proposed Balance: Total of 10 Voting Members 3 General Interest 3 Supplier 2 User 2 Vehicle Buyer

1. Appointment of Don Guan as NVM-General Interest 2. Appointment of Jenny Marsala as NVM-User 3. Appointment of Richard Mikla as NVM-Vehicle Buyer 4. Change of Status for Rene Beaulieu from NVM-User to PCVM-User 5. Change of Status for Hugh Ferdows from NVM-Supplier to PCVM-Supplier 6. Removal of Robert Cummings as NVM-General Interest for Cause Notes: See Chair’s Recommendation for reason for Removal for Cause.

Present Balance

Proposed Balance

Page 34: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

35

IOL Form

Committee No: ___________

Committee Name: ______________________________________________________________________

IOL Name / Title

Organization

Address

City State Zip

Country

Phone Fax

Email

By signing below, I certify that:

If appointed as an International Organizational Liaison Member of any ASHRAE Standard or Guideline Project Committee, I state that I intend to make, and will make, contributions with other members of such committee that will be merged into inseparable or interdependent parts of a unitary work or works. To facilitate the creation of such work or works, I acknowledge and agree that my contributions and any resulting work or works constitute, and are to be considered, works made for hire. To any extent that my contributions or the resulting work or works are not considered a work made for hire, I hereby assign to ASHRAE all right, title and interest to all said contributions and all said resulting works. I understand and agree that I acquire no rights in the resulting work or works, whether published or unpublished. I attest that I have the authority and am empowered to grant the foregoing and within rights to ASHRAE.

SIGNATURE

INVITATION FOR PROJ ECT COMMITTEE MEMBERSHIP AS AN

INTERNATIONAL ORGANIZATIONAL LIAISON

The Invitation is is the only form needed to appoint an IOL• No PC Member application…• No ASHRAE bio …• No Bias/Conflict of Interest Stmt…

The intent is to make this easy for the IOL

Page 35: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

36

PC Work Plan

• New PCs’ draft WPs are to be submitted for approval no later than one year from the date the full PC roster is approved

• SSPCs’ and SGPCs’ updated draft work plans are to be submitted for approval no later than six months from the publication of a new edition

• WPs submitted by SSPCs and SGPCs must also be approved by the StdC

• PCs and SSPCs can vote to approve the WP either before or after being submitted to SPLS for approval

Page 36: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

37

Sample PC Work Plan

Things to look for:1. Both boxes checked in units

format – or a waiver must be requested

2. Interest categories3. Project milestones and dates4. Plans for interim meetings

and any support needed5. A communication plan6. For SSPC’s - key objectives

with specific, changes, updates, or revisions noted with dates.

Note: there is an SSPC/SGPC WP template available on the ASHRAE website

Standards Project Committee Work Plan ASHRAE Technology for a Better Environment

This Work Plan is to be filled out by the PC chair as an anticipated schedule for completion of the PC documents according to PC MOP 4.5.1. A copy of this Work Plan along with the approved Title, Purpose and Scope for the PC should be forwarded to the SPLS Liaison and to the Manager of Standards at the initiation of the project. This Work Plan includes the information mandated by the PC MOP. Additional information may be provided at the option of the PC Chair. The Work Plan should be updated by the PC Chair as necessary.

PC Number Project Name

SPC 198 “Method of Testing for Rating DX-Dedicated Outside Air Systems (DX-DOAS) for Moisture Removal Capacity and Moisture Removal Efficiency”

PC Chair PC Chair Address

Craig Burg N120 W18485 Freistadt Rd., Germantown, WI 53022

Date Submitted: Five-Year ANSI cycle date (Revision projects only. Obtain from the MOS)

Units format to be used. Both boxes must be checked or a waiver must be requested. January 15, 2011

Date SPLS Approved:

Added by staff SI I-P

Type of document to be produced/revised.

Design Practice Standard Method of Test and Classification Standard Rating Protocol Guideline User Manual Check if you expect this document to be utilized in building codes:

Interest Category Plan. Identify interest categories to be used. Provide definitions and additional supporting information if interest categories vary from those indicated below.

Producers Users General Interest Other (Describe below)

See attached PC Chairs Membership Recommendation Form

Major Project Milestones. Provide the anticipated completion dates for the project milestones listed. Other milestones may be described as needed. For revision projects, publication date should occur prior to five-year ANSI cycle date.

Project Milestone Estimated Completion Date (mm/yyyy)

Completion and submission of initial membership roster June 2011

First PC meeting June 2011

Completion of first draft of document December 2012

PC approval for public review December 2012

PC vote for publication May 2012

Describe the communication plan that will be employed to develop consensus prior to public review among materially affected interests who are members of the project committee. Also include the need for and frequency of any meetings outside the Winter and Annual Society Meetings including justification.

PC meetings at ASHRAE meetings, Tele/web conferences, and e-mail correspondence

Page 37: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

38

Liaison Reports

• Liaison reports are used to ensure project committees are making progress according to their work plans as well as to highlight issues of concern

• Liaison reports are due to the SPLS Staff Liaison prior to each regular meeting – January Winter Meeting, June Annual Meeting and October Tech Weekend

• Reports are to be given to the new SPLS Liaison when PC responsibility is reassigned

Page 38: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

40

MEETING PROCEDURES

•Quorum•Consensus•Voting Rules•Consent Agenda•Letter Ballots

Page 39: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

41

PC Meetings and Correspondence

• All PC meetings are open to observation by directly and materially interested persons

• PC working meetings are to be held at least once per year. Normally these are held in conjunction with the Annual and Winter Society Meetings.

• PC Chairs must advise their SPLS Liaison and the Manager of Standards (MOS) of all meetings or teleconferences between Society Meetings in time to announce the interim meeting in Standards Actions – 30 days before in-person meetings and 14 days for conference calls.

Page 40: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Quorum

• Quorum is required to conduct business at a meeting of the Standards Committee, its Subcommittees, or PCs

• Quorum Requirements: More than 50% of the voting membership of the committee present

42

Page 41: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Consensus

• Consensus defined: Substantial agreement, in the judgment of a duly appointed authority, reached by directly and materially affected interest categories

• Substantial agreement means much more than a simple majority – but not necessarily unanimity

• Consensus requires that all views and objections be considered, and that an effort be made toward their resolution 43

Page 42: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Voting Rules• Unless otherwise specified, actions of the SPLS and PCs require approval by a majority of those voting at a meeting

• Recommendations or approvals for standards actions require affirmative votes of a “supermajority” of SPLS and the PC: this is a majority of the membership and at least two-thirds of those voting, excluding abstentions and unreturned ballots (for letter ballots)

44

Page 43: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

45

Majority Vote Examples

• Examples of non-standards action votes for SPLS:• PC membership and related PC MOP waivers• TPS changes• PC classification (change to CM, PM, discontinuance) • Standard or guideline number changes• Requests for User Manuals and funding

• Examples of non-standards action votes for PCs • TPS, Work Plan and meeting minutes approval• Sections of the draft standard• Advisory Public Review• Responses to public review commenters

Page 44: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

46

Standards Action Votes

• For SPLS:• Approving publication public review (PPR) of a new or revised standard, guideline or addendum

• For PCs: • Recommendation for PPR and publication of a draft standard, guideline or addendum (SCD)

• Recommendation for discontinuance of a new SCD following public review

• Issuance or revision of an official interpretation

Page 45: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

47

PC Standards Actions Vote Requirements

• All PCVMs must be given the opportunity to vote, either before (via letter ballot), during, or after the meeting (via continuation letter ballot)• Negative votes & abstentions explained in writing• When negative votes with reasons given via letter or

continuation ballot, a recirculation ballot must be conducted with reasons for the negative votes provided

• If no reasons are given for negative votes in a letter or continuation ballot, a recirculation ballot is not necessary and the results are final

• When a standards action vote is taken at a meeting, a continuation ballot must be sent to absent members

Page 46: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

48

Letter Ballots• The Chair may authorize a letter ballot to be issued on any matter

• Please do not use “Reply to All” when voting• Persons who cast a negative vote on a letter ballot are requested to comment on reasons for negative vote

• If the vote passes with one or more negative votes, the results shall be held in abeyance until the comments are transmitted to all eligible voters and they are given an opportunity to change their vote through a recirculation ballot

• The Chair may offer a rebuttal to the comments from negative voters

Page 47: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Abstentions

• Common reasons for abstentions: An individual -• has not adequately reviewed the material and there is not

enough information in the discussion to enable them to vote• was not in the room during the discussion of the motion• would prefer to abstain with a reason rather than cast a

negative vote on the motion

• The motion involves a PC in which the person is a current or recent past member of, e.g., membership, PPR approvals

• Other potential conflicts of interest49

Page 48: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Consent Agenda

• When several related items are likely to pass without question, debate, negative votes or abstentions, a consent agenda may be used

• A consent agenda allows for the approval of a group of items with one motion and one vote – without discussion

• Items may be pulled from the consent agenda for any reason at the request of a voting member

• Removed items may be taken up immediately after the consent agenda or placed later on the agenda

50

Page 49: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

51

DEVELOPMENT PROCESS THE BASIC STEPS

•Advisory Public Review•Publication Public Review•Substantive Changes•Approval

Page 50: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Public Reviews

• PCs vote to recommend a draft SCD for one of two types of public review: • "Advisory Public Review" (APR) or• "Publication Public Review" (PPR)

52

Page 51: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

53

APR• Allows a PC to put out all or portions of an SCD for

comment• PC recommends an APR for approval by its SPLS Liaison

and the SPLS Chair with a majority vote• Length of PR period determined by the PC in consultation

with SPLS Liaison and manager of standards (MOS)• Receipt of each comment is acknowledged but

communication with the commenters is optional• Communication may be undertaken to clarify a

commenter's intent or to invite further participation in the standard development process

• A subsequent full public review is required

Page 52: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Publication Public Review

• When the draft SCD is complete, the PC votes to recommend publication public review

• The document must be approved by SPLS before it can be issued for public review through the Fast Track or Normal Track Process

• Non-policy level PPR packages can be submitted at any time and a public review will be issued once approved

• Code-intended standards can be processed at any time but will be issued for public review 2 times per year to coordinate with the code change cycles of the ICC

54

Page 53: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

55

Fast Track

• Drafts that meet the following criteria are considered to be on Fast Track:• There are no negative votes within the PC• No credible threat of legal action (in writing) against ASHRAE related to the draft

• Not a Policy Level Standard (PCs may request an exception from the SPLS Chair for this criterion for non-contentious issues)

• The public review package will then be sent to the SPLS Liaison for review, who has ten calendar days to notify the MOS that due process has not been violated

Page 54: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

56

Normal Track

• For all other cases, known as the Normal Track, SPLS must review the submittal package for due process and approve the draft before it can be issued for public review

Page 55: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

57

PPR Review - What to Look For• Membership on the committee was accurately maintained and balanced

• Meetings and conference calls of the committee were open to all materially affected individuals

• The vote for publication public review was correctly taken (all PC members had the opportunity to vote) and recorded (letter ballot or meeting)

• If the PPR vote was taken at a meeting, a quorum was present and the minutes are on record

• There were NO negative PC votes (if on fast track).

• Comments were dealt with fairly and the PC made an attempt at resolution (if the submittal is an ISC)

Page 56: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

59

Public Review Comments

The PC has four choices when considering public review comments:

1. No changes are needed, reject the comments

2. Only editorial changes are needed

3. Substantive changes are needed

4. Draft should be discontinued

Page 57: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

64

Substantive Changes

Revision of Publication Draft• After consideration of comments or because of new information received, the PC may decide to make changes to the draft.

• Substantive changes require an additional public review and another PC vote for publication, either:• A complete revision (another full public review), or• Independent Substantive Changes (ISC is a substantive change

that is independent of any other substantive change and does not significantly affect any other requirement in the document)

• PC again considers public review comments and attempts to reach resolution with any unresolved commenter

Page 58: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Development Process Approval • If no substantive changes are made, the PC Chair submits the publication package for approval by Standards Committee and the Board

• If there are unresolved commenters or negative PC voters (with reason), they are informed of their right to appeal after Board approves the Standard for publication

• If they appeal, an appeals panel is formed to hear and decide on the appeals received.

• Once appeals are closed, staff requests ANSI approval of the standard

• The standard is published and the PC is dissolved or approved for continuous maintenance at the request of the PC

67

Page 59: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

68

Maintenance of Standards• Periodic Maintenance (PM) - maintained under a 5-year

cycle whereby the entire standard is either revised, reaffirmed, or withdrawn

• Continuous Maintenance (CM) – Standing PCs (SSPCs/ SGPCs) designated as operating under CM revise the standard or guideline more frequently than the normal five-year cycle

• A PC may recommend that an SSPC or SGPC be established

• The method of maintenance of a standard or guideline may be changed at any time from periodic to continuous maintenance or from continuous to periodic maintenance by recommendation of SPLS and approval by StdC

Page 60: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

69

BEST PRACTICES

Page 61: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Best PracticesTo be a successful SPLS Liaison:

1. Build a relationship with your PC Chairs – make frequent contact with them

2. Go to their meetings!

3. Educate PC members about the standards development process

4. Give the Meeting Deadlines sheet to your PC Chairs and remind them of key dates before every ASHRAE meeting

5. Thank committee members for the work they do for ASHRAE!

6. Come prepared to SPLS meetings – review your Action Items and know your motions

70

Page 62: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

71

STANDARDS STAFF

Page 63: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Standards StaffDirect line 678.539.xxxx

Standards CommitteeStephanie Reiniche, Manager of Standards........................ext. [email protected]

Status of Standards & Guidelines, SPLS and Std. 201Susan LeBlanc, Standards Administrator………….............ext. [email protected]

Procedures, PPIS, and AppealsTanisha Meyers-Lisle, Procedures Administrator.................ext. [email protected]

Staff Review of DraftsCarmen Manning, Standards Analyst ........…….................ext. [email protected]

72 PC Chairs Training: Getting Started

Page 64: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Standards StaffAmerican Standards, including Standards 62.1 and 62.2

Mark Weber, Asst. Mgr. of Standards - American………….....ext. [email protected]

Codes, CIS, Standards 90.1 , 90.2 and 189

Steve Ferguson, Asst. Mgr. of Standards - Codes………….…[email protected]

International Standards and Standard 34

Doug Tucker, Asst. Mgr. of Standards - Int’l…………………..ext. [email protected]

Standard 189.1

Bert Etheridge, Asst. Mgr. Special Projects…………….....…..ext. [email protected]

Project Committee Membership

Beverly Fulks, Standards Coordinator....................................ext. [email protected] PC Chairs Training: Getting Started

Page 65: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

Standards StaffProject Committee Membership SSPC 34

Angela McFarlin, Admin. Asst. ....................................................ext. [email protected]

Project Committee Membership SPCs 90.1, 90.2 and 189.1

Katrina Shingles, Admin Asst. ….................................................ext. [email protected]

74 PC Chairs Training: Getting Started

Page 66: SPLS TRAINING Presented by: Doug Reindl, SPLS Chair 1

75

QUESTIONS?