This document is prepared for MM Training. If interested for MM training in Pune, Please write to [email protected] with your contact details. Special Procurement Cycles: Special Procurement cycles, means the procurement cycle with some variation from the normal. In MM, we have following special procurement cycles. Based on Account Assignment Category in PO Procurement for Stock Procurement for consumption Based on Item Categories Subcontracting Consignment Service Procurement Pipeline Stock transfer Procurement for Stock: This is the most standard form of procurement type without any deviation from the standard procurement process. Specialty of this cycle Procurement for stock in simple terms means the material procured goes into stock Material Master is must as the stock is to be updated for a particular material No account assignment mentioned in the PO i.e. Account Assignment is Blank i.e. Standard (Account assignment category Standard is denoted by blank in SAP) After GR, Material Stock and value is updated. This can be seen in the Material Master Accounting View or stock overview transaction (MMBE) Step 1 – Crate PO Create PO with account assignment category blank. (Transaction Code – ME21N) Note: in PO, before the material code there are two columns Account Assignment Category and Item Category. For the procurement for stock, account assignment category is taken as blank i.e. standard Give the details and save the PO. Step 2 – Goods Receipt for Purchase Order To check the qty and value update in Material master, we can record the initial status in Material Master Material Master accounting view has the details of material stock quantity and value (Transaction Code MM03) Also the stock status can be seen in MMBE Transaction Post the Goods receipt (Transaction Code- MIGO) and compare the sock and value status in Material

Upload: anton-richard

Post on 08-Nov-2015

23 views

Category:

Documents


1 download

DESCRIPTION

Special Procurement Cycle

TRANSCRIPT

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Special Procurement Cycles: Special Procurement cycles, means the procurement cycle with some variation from the normal.

    In MM, we have following special procurement cycles.

    Based on Account Assignment Category in PO

    Procurement for Stock

    Procurement for consumption

    Based on Item Categories

    Subcontracting

    Consignment

    Service Procurement

    Pipeline

    Stock transfer

    Procurement for Stock: This is the most standard form of procurement type without any deviation from the standard procurement process.

    Specialty of this cycle

    Procurement for stock in simple terms means the material procured goes into stock

    Material Master is must as the stock is to be updated for a particular material

    No account assignment mentioned in the PO i.e. Account Assignment is Blank i.e. Standard (Account

    assignment category Standard is denoted by blank in SAP)

    After GR, Material Stock and value is updated. This can be seen in the Material Master Accounting View or

    stock overview transaction (MMBE)

    Step 1 Crate PO

    Create PO with account assignment category blank. (Transaction Code ME21N)

    Note: in PO, before the material code there are two columns Account Assignment Category and Item

    Category. For the procurement for stock, account assignment category is taken as blank i.e. standard

    Give the details and save the PO.

    Step 2 Goods Receipt for Purchase Order

    To check the qty and value update in Material master, we can record the initial status in Material Master

    Material Master accounting view has the details of material stock quantity and value (Transaction Code

    MM03)

    Also the stock status can be seen in MMBE Transaction

    Post the Goods receipt (Transaction Code- MIGO) and compare the sock and value status in Material

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Material Master Display (MM03) Accounting View

    Stock Overview Transaction MMBE

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Goods Receipt for Purchase Order Transaction MIGO

    Stock Value and Quantity is updated in the material master record.

    Stock is updated in Stock Overview transaction MMBE

    Thus through Procurement for stock, stock quantity and value is updated.

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Procurement for Consumption: Material Master is optional

    Account assignment is mandatory

    Stock is not updated in material master or stock overview transaction

    Step 1 Create PO

    Create PO with account assignment category

    In the account assignment column we mention account assignment category and in account assignment tab, we

    mention the details of account assignment like cost center no. etc

    These are the account assignment categories available

    Step 2 Goods Receipt against Purchase Order

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Goods receipt is done against Purchase Order in Transaction code MIGO.

    Post the Goods Receipt

    Check the stock status in Material Master and MMBE transaction. After this GR, stock and value is not updated and

    thus posted direct to consumption

    Material Master accounting view

    Procurement cycles based on Item Categories

    Subcontracting Cycle: Subcontracting is a process where we provide raw material to vendor for processing on labor charges and

    vendor will give the finished goods after processing

    Raw material supplied to vendor is a special stock type O.

    This is a material owned by us lying in vendors premises

    This material is still valuated in our inventory and can be seen in the plant stock

    For the subcontracting finished goods must have BOM (Bill of Material) in system

    If some other material is generated along with finished good, then it called as Byproduct ex. scrap

    By products are entered as negative items in BOM.

    BOM is mainly in PP module and transaction codes for BOM are CS01 Create, CS02 Change, CS03

    Display

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Material BOM

    In the above example, Material 100-114 is a by product and entered as negative qty

    Info record with category subcontracting will be used in the PO Subcontracting cycle.

    Step 1: PO Creation:

    In the PO Item category is taken as L i.e. Subcontracting

    PO is created for the Finished goods that vendor will supply

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    In Material Details Tab of item details section, we can see the button components & explode BOM

    Click on the components list to see the list of raw materials required to be given to vendor

    It is also possible to procure a raw material from another vendor and ship it directly to the subcontracting

    vendor instead of taking it in our company and then sending it to subcontracting vendor

    For this create a normal PO (Item Category Blank) to the supplier vendor and in delivery address tab of item

    details section of PO, give the vendor code to which the material is to be sent. If the material is to be sent as

    raw material as subcontracting, then check the SC Vendor as shown below

    After the Goods Receipt of this PO, material will be added to the subcontracting stock provided to vendor

    Step 2: Issue Raw Material to Vendor

    After the PO is crated, we will issue raw material to the sub contractor

    This is done by transaction ME2O

    In this transaction we can give either raw material list or finished goods list for selection

    We can provide material in excess quantity than the BOM quantity

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    In the above example, for component 100-112, actual requirement as per PO qty and BOM Calculation is 20

    Pcs. But 90 quantity is already issued to vendor and hence system is showing as 70 quantity in excess in green

    color. This is possible when we have issued excess raw material to vendor earlier

    For the second item, there is no sub contracting stock with vendor i.e. 0 Qty. Actual BOM requirement is 30

    PCs and hence system is showing 30 qty as red

    Select the items and click on post goods issue button in the application toolbar

    Following dialog box will appear for raw material issue

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Material is issued to the vendor by movement type 541.

    Enter the quantity to be issued and click on continue

    After goods issue, system will display a message as below

    System will generate a material document in the background for the goods issue

    Stock of components supplied to vendors is a special stock referred by type O

    This stock can be seen in stock overview transaction MMBE as shown below

    To see the details of the vendor to whom the material is supplied, double click on the line

    System will display a vendor wise stock of subcontracting stock

    Step 3: Receive Finished Goods

    After processing, vendor will supply the finished goods against the PO

    Do the Goods Receipt against PO in MIGO transaction

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    In the above screen we can see that the finished goods are inwarded by movement type 101. Raw material is

    consumed by movement type 543. By products, which were mentioned as negative qty in PO are generated by

    movement type 545

    Post the goods receipt.

    There is no difference in invoice processing is same as normal cycle in MIRO

    This will complete the subcontracting procurement cycle

    Consignment Cycle: Consignment is a stock owned by vendor but lying in our premises.

    This stock is not valuated in our inventory. Only when we transfer the material from consignment to own

    stock for use, then only it is valuated in our inventory and payment liability is generated

    Consignment stock is a special stock in SAP indicated by K

    Step 1: Info Record

    For the consignment process, Info record of the category must exist for standard purchasing organization

    assigned to plant

    All the rate and tax information (tax code) must be available in info record purchasing dat

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Step 2: Create PO

    Create a PO with Item category as K Consignment

    In the consignment PO, net price is zero and there will not be any conditions tab. Because, the material is not

    valuated in our stock after GR for the PO

    Step 3: Goods Receipt against PO

    Do the goods receipt against this PO in transaction MIGO

    In the GR, special stock indicator K is updated. This will post the quantity to consignment stock

    This special stock can be seen in MMBE transaction

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    To see the details of consignment stock, double click on the line. It will display the vendor wise stock of the

    consignment material

    At the time of goods receipt, material is not valuated in our inventory i.e. stock value does not increases. No

    payment liability generated and no accounting document generated

    Step 4: Transfer posting consignment to own

    When we require the material, we do transfer posting from consignment to own stock in MIGO transaction by

    material movement type 411 as shown below

    In the MIGO transaction Select transfer posting Others as shown in above figure

    Movement type is 411 and special stock is K

    We also enter the vendor whose material we are transferring

    Post the documents

    This time the material transferred is valuated in our inventory and liability is generated. Accounting document

    is generated and stock value increases

    Step 5: Consignment Settlement

    In the consignment, vendor does not send individual invoice for each transfer posting, but we post an

    accounting document for transfer postings

    This is done by transaction MRKO

    Both consignment & pipeline deliveries are settled by this transaction. We select the appropriate option i.e.

    consignment or pipeline or both

    There are two modes to run the transaction display and settle. Display will just display if any error is there or

    not. Settle will actually post the accounting document

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Display Mode

    Run the transaction again in settle mode and check the accounting document posted.

    Accounting document generated for vendor payment.

    This will complete the consignment cycle

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Pipeline Cycle Pipeline is a material which directly flows into process

    Materials of this type has material type PIPE

    There is no PO, No Goods Receipt, No stock for these materials

    Example for understanding can be taken of electricity or Corporation water line. In this we need not create a

    PO or keep the material in stock. We only record the consumption and pay accordingly.

    We only record the consumption. In MIGO transaction, special stock type is P

    All the rate and tax info is stored in info records. Info record category for this is Pipeline

    Step 1: Info Record

    Info record category Pipeline must be created

    All rate and tax information must exist in info record or else it will give error in settlement

    Purchasing organization for this is standard Purchasing organization assigned to plant in enterprise structure

    Tax information is recorded in info record

    Step 2: Record consumption in MIGO

    There is no PO or stock for the pipeline material

    We can issue / consume material even when it is not there in stock. This is the characteristic of pipeline

    material

    Consumption of pipeline material is recorded in MIGO. Special stock type is P

    For the example given in the below screen, it is issue to cost center and special stock type is P

    Enter the material, quantity, plant, vendor, cost center etc and post the document

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Post the goods issue

    Step 3: Pipeline settlement

    Pipeline deliveries are settled with the transaction MRKO. Same as consignment material

    In this transaction select pipeline and give other selection criteria and post the document

    This will complete the pipeline procurement cycle

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Service Procurement: Service procurement is the procurement of services.

    Service procurement in SAP happens in following steps

    Step 1: Create PO

    In PO there will always be account assignment category because service can not be stored physically and it is

    always consumption. Hence account assignment category in PO is always present.

    Item category used in PO is D i.e. services

    For the example given below, we have taken account assignment category as K i.e. cost center and item

    category as D i.e. services

    At the item level we mention only one item.

    Detailed services are mentioned in Services tab in the item details section of the PO

    After maintaining the service lines, pop up window will appear to maintain the account assignment details for

    each service lines

    Maintain the account assignment

    There is auto repeat account assignment button, which can copy the same account assignment to all items

    Enter the details and save the PO

    Step 2: Create Service Entry Sheet

    Transaction code to create the service entry sheet is ML81N

    After entering in the transaction, it will show the last PO or SES (Service Entry Sheet) created.

    Click on Other Purchase Order button in application toolbar and enter the PO no. as

    shown in screen below.

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Click on continue from this window.

    To create a new SES for this PO, click on the New Button in application toolbar

    This will create a new entry sheet for the PO.

    Enter the other details required in the SES as shown below

    After entering the header level details, we need to select services from PO. For this click on the service

    selection button at the bottom of the screen.

    A pop up will appear selecting the PO no. Click on continue.

    Next screen will show the services available in PO. Select the services and click on copy services

    button in the application toolbar.

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    After copying the required services in SES, we can change the quantity of the individual services and then

    save the SES

    Step 3: Release SES (Service Entry Sheet)

    SES created needs the approval or release. Then only the account posting happens and the liability is

    generated.

    For releasing / approving the SES, click on change button . The status of the PO now is

    which can be seen the SES after SES number

    Click on release flag. . Status of the PO will become, i.e. it will be released after

    saving. Save the SES.

    Now the SES is approved and the status becomes i.e. released.

    Invoice Verification is same as normal Goods receipts i.e. through transaction MIRO. It can be done with

    reference to PO or SES

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    SES Created is also updated in Purchased Order History Tab in PO

    Invoice posting will complete the Service procurement cycle.

    Stock Transfer Order (STO Process) STO (Stock Transport Order) is a process of material transfer from one plant to another of same or different

    company codes

    Stock transfer can be done, purely in inventory management in transaction MIGO. For single step, the

    movement type is 301 and for two step transfer the movement type is 311 & 313

    Stock transfer can also be done with PO process called as STO

    Step 1: Create STO

    SAP Standard PO document type for STO is UB

    Instead of vendor, in the PO, we mention supplying plant.

    STO is raised by receiving plant on sending plant

    Item category in this PO is U i.e. stock transfer

  • This document is prepared for MM Training. If interested for MM training in Pune, Please write to

    [email protected] with your contact details.

    Other fields in PO are as normal PO. Create and Save the PO

    Step 2: Goods Issue against the STO

    There are two methods to do the goods issue

    One is through MIGO and another is by creating delivery

    For MIGO goods issue, select Goods Issue Purchase Order as shown below

    Movement type for this is 351.

    Post the goods issue.

    This goods issue will remove the stock from the sending plant and update it in the in transit stock of the

    receiving plant.

    Accounting happens at the time of goods issue only and accounting document is generated.

    This in transit stock of the receiving plant can be seen in transaction MB5T

    Other method of goods issue is by creating delivery.

    This is by shipping and has some Sales Distribution module involvement also.

    Outbound Delivery is created against PO in transaction VL10B and then Goods Issue posted against this

    delivery. This movement type is 641

    With this movement also goods are removed from sending plant and posted in the in transit location of

    receiving plant. Accounting document generated while material issue.

    Ste 3: Receive Goods against STO

    This is a normal goods receipt against PO in transaction MIGO. Movement type is 101

    No accounting document generated at this step.

    This will remove the stock from in transit location to storage

    Advantages of STO:

    Delivery costs can be accommodated by applying pricing procedure and appropriate conditions

    For the in transit damages either reverse the goods issue, scrap the damaged good in sending plant and then

    send the OK material or receive complete qty in receiving plant and then scrap the damaged qty

    Excise invoice can be generated