To analyze & improve discharging time of Aqueous FG Products using SPC Tool
2016
Target (Discharging Time)
2
Target >>>> 30 min. from 35 min./ batch
List of FG Products analyzed for discharging time using SPC tool
3
List of FG- Aqueous Plant
S.NO SAP CODE OLD CODE DESCRIPTION BATCH SIZE (Kg)
1 10-603778-1.1350 11006393LW/B OP INK HIGH GLOSS
ANTIBLOCKING 3000
2 10-603780-7.2660 11006391L WB OP INK NEUTRAL FINISH 3000
3 10-603785-6.2660 11006374Y WATER BASED PRIMER INK - TA 2800
4 10-603787-2.2660 11006386L WB OP INK- HIGH GLOSS HIGH SLIP 3120
5 10-603788-0.2660 11006385L WATER BASED OP INK - HIGH GLOSS 3120
6 10-603789-8.2660 11006378LWATER BASED OP INK - INLINE
PRIMER 3000
7 10-603868-0.2660 894275L WATER BASED OP INK - HIGH SCUFF 3120
8 10-603871-4.2660 894390Y PRIME FIX OP INK - PRIMER 3120
9 10-006541-6.2660 W987502 UNI PAPER TRANS WHITE HV 3120
10 10-615417-2.2660 10-615417-2/1 WB TOB ST OPL 3000
11 10-007024-2.1350 21271268B WB TOB HR CLEAR 3000
12 10-604870-5.1350 BEW00033 AQUAKOTE GLOSS 18 3120
13 10-603870-6.2660 894201Y Heat sealable WB blister coating 3000
14 10-603867-2.2660 894371X WATER BASED OP INK MATT 3000
15 10-007296-6.2660 BEW00018 WB TECH MEDIUM LCB 1653 3000
4
Data Collection from 16.03.2016 to 02.04.2016 – Daily monitoring
Sr. No. Total Discharging Time in min. Mean Product Mean USL LSL
1 39 34.9 11006385L #DIV/0! 30 0
2 37 34.9 894390Y #DIV/0! 30 0
3 33 34.9 894371X #DIV/0! 30 0
4 35 34.9 11006385L #DIV/0! 30 0
5 35 34.9 11006378L #DIV/0! 30 0
6 35 34.9 W987502 #DIV/0! 30 0
7 34 34.9 BEW00033 #DIV/0! 30 0
8 37 34.9 11006386L #DIV/0! 30 0
9 34 34.9 894390Y #DIV/0! 30 0
10 35 34.9 11006385L #DIV/0! 30 0
11 34 34.9 BEW00033 #DIV/0! 30 0
12 37 34.9 11006385L #DIV/0! 30 0
13 33 34.9 10-615417-2/1 #DIV/0! 30 0
14 32 34.9 11006374Y #DIV/0! 30 0
15 34 34.9 BEW00033 #DIV/0! 30 0
Run Chart of the data from 16.03.2016 to 02.04.2016
5
6
Key Factors for Analysis
• Power Tripping Problem
• Discharge line
• Pump Capacity
• Batch Viscosity
• Air Pressure
• Batch Size
Action Plan Identification
7
1. We have taken Power tripping Problem with maintenance team .
2. We identified that pump is having long suction, which slow down the
discharge process.
Product/Shade
Power Tripping
No. of times Total time loss due to power tripping
Action Identified to reduce power tripping Problem
W987502 Yes 3 12 min 01 Person must be available at electric sub station to reset.
894390Y Yes 2 08 min
Action Plan Implemented
8
1. Shifting of discharge pump from mezzanine floor to ground floor.Before After
2. Power Tripping was arrested by deploying one person/shift at electric sub station to reset the tripping issue at the earliest.
Power tripping time reduced from 04 min. to 02 min.
Pump Location(Earlier)
Pump Present
9
Data Collection after Action implementation from 30.05.2016 to 10.06.2016
Sr. No. Total Discharging Time in min. Mean Product Mean USL LSL
1 28 24.4 11006385L #DIV/0! 30 0
2 28 24.4 894390Y #DIV/0! 30 0
3 24 24.4 894371X #DIV/0! 30 0
4 24 24.4 11006385L #DIV/0! 30 0
5 24 24.4 11006378L #DIV/0! 30 0
6 24 24.4 W987502 #DIV/0! 30 0
7 24 24.4 BEW00033 #DIV/0! 30 0
8 23 24.4 11006386L #DIV/0! 30 0
9 21 24.4 894390Y #DIV/0! 30 0
10 25 24.4 11006385L #DIV/0! 30 0
11 24 24.4 BEW00033 #DIV/0! 30 0
12 24 24.4 11006385L #DIV/0! 30 0
13 26 24.4 10-615417-2/1 #DIV/0! 30 0
14 25 24.4 11006374Y #DIV/0! 30 0
15 25 24.4 BEW00033 #DIV/0! 30 0
10
Run Chart after action implementation (30.05.2016 to 10.06.2016 )
Benefits
11
• Discharging time reduced from 35 min. to 27 min. average resulting in saving of 08 min. per batch.
• Total saving per day = 30 min.
• Due to this saving we are able to manage our daily Production effectively & can utilize this half an hour in other Production related activities.