southern power distribution company of a.p · pdf filei am competent and duly authorised by...

415
SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED 19-13-65/A, VidyutNilayam, Srinivasapuram, Tirupati (www.apspdcl.in) Aggregate Revenue Requirement and Tariff Proposal for the Retail Supply Business for FY 2018-19 30 th November 2017

Upload: duongkhanh

Post on 01-Feb-2018

278 views

Category:

Documents


21 download

TRANSCRIPT

Page 1: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

SOUTHERN POWER DISTRIBUTION COMPANY

OF A.P LIMITED

19-13-65/A, VidyutNilayam, Srinivasapuram, Tirupati (www.apspdcl.in)

Aggregate Revenue Requirement and Tariff Proposal for

the Retail Supply Business for FY 2018-19

30th November 2017

Page 2: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

BEFORE THE HONOURABLE ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

AT ITS OFFICE AT 4th FLOOR, SINGARENI BHAVAN, RED HILLS, HYDERABAD

FILING NO.______/2017

CASE NO. _______/2017

In the matter of: Filing of the ARR application in respect of Retail Supply Business and proposed Tariffsfor the FY 2018-19 under multi-year tariff principles in accordance with the “Andhra Pradesh Electricity Regulatory Commission (Terms And Conditions For Determination Of Tariff For Wheeling And Retail Sale Of Electricity) Regulation, 2005” by the Southern Power Distribution Company of Andhra Pradesh Limited (‘APSPDCL’ or ‘the Company’ or ‘the Licensee’) as the Distribution and Retail Supply Licensee.

In the matter of:

SOUTHERN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED

… Applicant

AFFIDAVIT OF APPLICANT VERIFYING THE APPLICATION ACCOMPANYING FILING AS PER TERMS AND CONDITIONS OF TARIFF FOR WHEELING AND RETAIL SALE OF ELECTRICITY

I,Dinesh Paruchuri son of Sri P.V.B. Kutumba Rao,working for gain at the Southern Power Distribution Company of Andhra Pradesh Limited do solemnly affirm and say as follows:

1 I am the Chairman & Managing Director (Full Additional Charge) of APSPDCL, the Licensee that has, vide the Honourable Commission’s approval in proceedings no. APERC/Secy/Engg/No.6 dt.31.3.2000, been granted the distribution and retail supply functions that APTransco was authorised to conduct or carry out under the Act and the license, with respect to the business of distribution and retail supply of electricity in the Southern distribution zone in Andhra Pradesh. On December 27, 2000, the Honourable Commission has awarded a Distribution and Retail Supply License to APSPDCL, to be effective from April 1, 2001. I am competent and duly authorised by APSPDCL to affirm, swear, execute and file this affidavit in the present proceedings.

2 As such, I submit that I have been duly authorised by the Board of Directors of APSPDCL to submit the application, as per Terms and Conditions of Tariff for Wheeling and Retail Sale of Electricity (Regulation 4 of 2005) of APSPDCL for the FY 2018-19 to the Honourable Commission.

3 I submit that I have read and understood the contents of the appended application of APSPDCL. The facts stated in the application are true to the best of my knowledge, which are derived from the official records made available and certain facts stated are based on information and advice which, I believe to be true and correct.

Page 3: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)
Page 4: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

BEFORE THE HONOURABLE ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION

AT ITS OFFICE AT 4th FLOOR, SINGARENI BHAVAN, RED HILLS, HYDERABAD 500 004

FILING NO.______/2017

CASE NO. _______/2017

In the matter of:

Filing of the ARRapplication in respect of Retail Supply Business and proposed Tariffs for the FY 2018-19 under multi-year tariff principles in accordance with the “Andhra Pradesh Electricity Regulatory Commission (Terms And Conditions For Determination Of Tariff For Wheeling And Retail Sale Of Electricity) Regulation, 2005 and First Amendment Regulation, 2014” by the Southern Power Distribution Company of Andhra Pradesh Limited (‘APSPDCL’ or ‘the Company’ or ‘the Licensee’) as the Distribution and Retail Supply Licensee.

In the matter of:

SOUTHERN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED

… Applicant

The Applicant respectfully submits as under:

1 This filing is made by the SOUTHERN POWER DISTRIBUTION COMPANY OF ANDHRA PRADESH LIMITED (APSPDCL) under Section 61 of the Electricity Act 2003 for determination of the Aggregate Revenue Requirement and Tariff for the Retail Supply Business for the year FY 2018-19.

2 The licensee has adopted the following methodology to arrive at the ARR for retail supply business. Distribution Cost:The licensee has adopted the distribution cost for FY 2017-18 &

FY 2018-19 as approved in the Wheeling Tariff Order (Distribution Business Tariff Order) for 3rd MYT control period (FY 2014-15 to 2018-19). The Distribution cost approved for FY 2017-18 is Rs.2,541.10 Cr. and for FY 2018-19 is Rs. 2,919.66 Cr.

Transmission Cost:The licensee has considered the Transmission cost for FY 2017-18 as approved in the Tariff Order FY 2017-18. For FY 2018-19 the Licensee considered the Transmission cost as approved in the Transmission Tariff Order for 3rd MYT control period (FY 2014-15 to 2018-19) and has projected transmission cost as a proportion of contracted demand of Licensee from the combined state for FY 2018-19 (including 17.45% of CPDCL demand corresponding to the Ananthapur and Kurnool

Page 5: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

districts which were assigned to APSPDCL w.e.f 02-06-2014). Therefore the projected transmission cost estimated for FY 2018-19 is Rs. 931.18 Cr.

SLDC Cost:The SLDC Charges have been adopted as per Tariff orders of AP Transco dated 9th May 2014.Licensee has projected SLDC cost as a proportion of contracted demand of Licensee from the combined state for FY 2017-18 and FY 2018-19.Therefore the projected transmission cost estimated for FY 2018-19 is Rs. 26.56 Cr.

PGCIL and ULDC Costs: The licensee has considered PGCIL and ULDC Charges as per the CERC Regulations. The projected PGCIL and ULDC Costs for FY 2018-19 is Rs. 682.28 Cr. and 12.93 Cr. respectively

Distribution losses: The licensee has considered losses for H2 FY 2017-18 as per APERC approved values and 2% reduction is considered for FY 2018-19. The following table provides the voltage level losses considered by the APSPDCL for projecting the energy requirement for H2 FY 2017-18 and FY 2018-19 :

Transmission losses:The Licensee has considered theactual lossesfor H1 FY 17-18and approved losses of 3.03% in the Tariff Order FY 2017-18 for H2FY 2017-18and FY 2018-19.

PGCIL Losses:TheLicensee has consideredthe external (PGCIL) losses as approved by the Hon’ble Commission at 3.57% in the Tariff Order for FY17-18 for FY 2017-18 and FY 2018-19.

3 Filing of Retail Supply ARR for FY 18-19

As per Regulation No. 4 of 2005, the licensee is required to file the Aggregate Revenue Requirement (ARR) for Retail Supply Business and Tariff proposal for the entire control period i.e., for the period from FY 2014-15 to FY 2018-19. However, the licensee requested the Honourable Commission to allow for submission of the ARR and Tariff filing for Retail Supply Business for FY 2018-19 on yearly basis.

The Honourable Commission has been kind enough in granting permission to submit the ARR & Proposed tariff filings in respect of the Retail Supply Business for FY 2018-19 instead of total control period of FY 2014-15 to FY 2018-19 vide APERC proceeding number T-70/2017/23, Dated:23-11-2017.

Page 6: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

4 Performance Analysis of APSPDCL for the previous year FY 2016-17 and current year FY 2017-18

Performance Analysis: A brief analysis of the licensee business for FY 2016-17and FY 2017-18 is as follows:

Sale of Energy and Distribution Loss for FY 2016-17 & FY 2017-18

Revenue

The table below shows a comparison of the revenue from various consumer categories as approved in the Tariff Order and as billed (FY 2016-17) and expected to be billed (FY 2017-18) by APSPDCL.

Category Wise Revenue: (Figures shown in Rs Crores)

Page 7: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

5 Retail Supply Business True-up for FY 2016-17 and Provisional True-up for FY 2017-18

The licensee has not considered the True up for FY 2016-17 and provisional True up for FY 2017-18 in the ARR projections for FY 2018-19. Therefore, the Licensee seeks liberty to take permission from the Hon’ble Commission for filing it as a separate petition.

6 ARR Projections for FY 2018-19

Sales Estimates for FY 2018-19

The licensee has adopted a modified trend approach for projecting the category-wise sales for the ensuing year. As the name suggests, the licensee has considered the historical growth trend observed in the sales of categories for the last 5 years from FY 2011-12 to FY 2016-17 and the same has been applied to compute the sales for H2 FY 2017-18 also for FY 2018-19. The sales so computed are moderated based on the other relevant inputs such as underlying economic growth drivers, number of pending applications etc.The historical sales growth of 8 districts are used to project the sales of 8 districts for H2 FY 2017-18 & FY 2018-19. The total sales forecast for key categories is as follows:

Due to optimum energy availability in the state, the licensee is not considering any load relief in H2 of FY 2017-18 and FY 2018-19.

Yearly Growth Rate:

Page 8: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Number of hours of Supply to LT Agricultural Consumers in FY 2018-19:

The licensee would like to continue with existing7 hours of power supply to agricultural consumers inFY 2018-19. However, the licensee maysubmit a supplementary filingfor increase in the number of hours of supply to agricultural consumers based on the orders from the Government of Andhra Pradesh.

Revenue estimate at Current Tariffs for APSPDCL in FY 2018-19

Revenue projected at current tariff incl. NTI is Rs.14,816.47Crs. Revenue from key categories at current tariff for FY 2018-19 is shown below :

Power Purchase Requirement and Cost Estimate for the state of Andhra Pradesh for FY 2018-19

As per the Twelfth Schedule of the Andhra Pradesh Reorganization Act, 2014 for bifurcation of united Andhra Pradesh (Central Act No. 6 of 2014, dated 01.03.2014), the districts of Anantapur and Kurnool which were under the jurisdiction of the erstwhile Andhra Pradesh Central Power Distribution Company Ltd. (APCPDCL), now Southern Power Distribution Company of Telangana Limited (TSSPDCL) were reassigned to the Andhra Pradesh Southern Power Distribution Company Ltd. (APSPDCL). The proportionate share of power was transferred from the allocated share of the erstwhile APCPDCL to APSPDCL.

According to G.O.Ms. No. 20 (dated 08.05.2014), based on the last 5 years’ average consumption of Anantapur and Kurnool districts, 17.45% of power earlier allocated to the erstwhile APCPDCL has to be transferred to APSPDCL. Accordingly, power allocation percentages for Andhra Pradesh Discoms and Telangana Discoms have been modified. Andhra Pradesh has been allocated a percentage of 46.11% of the erstwhile united Andhra Pradesh share.

Page 9: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

The revised power allocation percentages for the two Discoms of Andhra Pradesh (APEPDCL and APSPDCL)are mentioned below.

S. No. Name of the Distribution

Company Allocation Percentage

1 APEPDCL 34.27 %

2 APSPDCL 65.73 %

The following are the key assumptions considered by the licensee with regard to power purchase availability by the licensee –

APGENCO / TSGENCO Stations

- Energy allocation for existing APGENCO thermal stations, DamodaramSanjeevaiah TPP I & II and RTPP IV has been considered at 100% to APDiscoms. For APGENCO Hydel stations allocation is as per geographical location (100%) including Machkund and TB Dam. Allocation for interstate hydel projects have been taken as 100%. The energy from TSGENCO has not been considered due to Regulation of Power to the Distribution Licensees from 11th June, 2017.

- RTPP-IV (600 MW) has been assumed to be commissioned from 1st April’18

- Energy availability for FY 2018-19 has been projected based on the projected performance estimated by APGENCO and maintenance schedules of the plants.

- Energy allocation for hydel stations is based on geographical location. It has been observed over the past few years that the actual availability from hydel stations has been consistently lower than the value approved in the Tariff Orders issued by APERC as the reservoirs are being used more and more for irrigation than for power generation. In this regard, the hydel projections have been considered to be similar to the 10 year average availability from FY 2002-03 to FY 2017-18. The same has been factored in projecting the availability for FY 2018-19.

CGS Stations – Existing

- Energy availability FY 2018-19 has been projected based on the projected performance estimated by CGS, maintenance schedules of the plants and details of energy availabilities received from respective generators.

Page 10: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

CGS Station – Upcoming

- 2400 MW (3x800 MW) Thermal Power Project is being setting up by M/s. NTPC Ltd at Kudigi, Karnataka. NTPC had commissioned the Kudgi Unit 1 on 31.7.2017 and AP had been allocated 145 MWs from this unit with the inclusion of unallocated power also. NTPC had submitted the availability projections from Kudgi entire complex along with tentative COD of Unit 2 & Unit 3. Accordingly, 100% of availability of AP share is considered from NTPC Kudigi for FY 2018-19.

APGPCL

- The projections for APGPCL – I and APGPCL – II are for FY 2018-19 projections, the gas supply is considered at 0.45 MMSCMD.

IPPs Gas

- The availability of power from the generating stations of GGPP, Spectrum, LancoKondapalli have been projected based on the current gas supply levels. Actual energy availability till September- 2017, has been factored while estimating energy availability with 40%-45% PLF assumed.

- Godavari Gas Power Plant – M/s GVK was bought out by APDISCOMs on 22nd April, 2016 and renamed as Godavari Gas Power Plant. For this plant, entire energy availability has been considered to be scheduled for Andhra Pradesh. Energy availability for FY 2018-19 were given based on the projection that the gas is available to run two gas turbines in part load @ 30 MW each in combined cycle mode. Thus, 100MW generation per month is considered for projections. A PLF of 45% was considered for 2017-18 H2 and a PLF of 43% was considered for 2018-19 considering the scheduled outages for the respective years.

- Spectrum – The PPA subsisting was expired on 18.04.16. As per the instructions of GoAP, the plant is allowed dispatches from 27.09.2017 onwards. As per the directions of APDISCOMs, M/s. SPGL has submitted their revised proposal on fixed charges computation for renewing the expired PPA for a further period of 15 years. The revised proposal submitted by M/s. SPGL was submitted to GoAP requesting to accord permission to APDISCOMs to go for renewal of the M/s. SPGL and to file the draft PPA before the Hon’ble Commission. Accordingly, 100% Share of Spectrum is considered. For FY 2018-19 the energy availability has been projected at a PLF of 40% as per the present gas availability.

- LancoKondapalli: M/s LANCO PPA had expired on 1st January 2016, but the projections have been furnished expecting that the PPA would get renewed. The proposals for renewal of PPA have been submitted to Hon’ble APERC. The entire capacity of LANCO is being scheduled to AP DISCOMs with effect from 01.01.2016.

Page 11: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

- M/s. Reliance: For FY 2018-19, M/s. Reliance Project has not been considered, as the PPA is going to be expired on 23.12.2017.

- Energy availability from the New IPPs viz; GVK Extn, GMR Vemagiri, Gautami&Konaseema is considered to be zero based on the Natural gas supplies from RIL KG D-6 fields. The Natural gas supplies from RIL KG D-6 fields to the aforesaid IPPs became zero from 01.03.2013 onwards. Hence there is no generation under long term PPA with gas from RIL KG D-6 fields. The aforesaid IPPs have requested for approval of APDISCOMs to supply power with available natural gas from Deep Water fields of ONGC. APDISCOMs have decided not to permit the aforesaid IPPs to generate power and supply with Natural Gas sourced from Deep water, ultra deep water and high pressure and high temperature as the said gas price is much higher than the domestic gas. Moreover any Natural Gas for KG basin shall be allocated by MoP&NG to the aforesaid IPPs. Therefore, Energy availability from these projects is considered to be zero based on the Natural gas supplies from RIL KG D-6 fields.

Non-Conventional Energy Sources

- Non-conventional energy sources have been allocated to the APDiscoms based on their PPA.

- The two mini-power plants Srivathsa and LVS have been allocated to APEPDCL. The PPA of Srivathsa is going to be expired on 31.03.2018 and the GSA between M/s. Srivathsa and GAIL is valid upto 2021. APEPDCL is proposing power supply for FY 2018-19 with the PLF 45%, with the same terms and conditions of existing PPA. In respect of LVS, a petition has been filed before the Hon’ble High court to declare the PPA as inadmissible and hence no availability has been considered for H2 FY 201 7-1 8 and FY 2018-19.

- Wind: The installed capacity of Wind by end of H1 FY 2017-18 is 3,517.85 MW and addition of around 1,292.70 MW is considered for FY 2018-19 resulting in installed capacity is 4,810.55 MW.

- Solar: The installed capacity of solar by end of H1 FY 2017-18 is 1,851.19 MW, an addition of around 800 MW is considered for FY 2018-19 based on the target time lines envisaged in the Power Purchase agreements entered by the solar developers with DISCOMs. The installed capacity projected in FY 2018-19 is 2,651.19 MW.

Energy from Renewables have been allocated to the APDiscoms in the ratio of 65.73:34.27as per revised allocation.

Page 12: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

IPP - Others

- Thermal Powertech Corporation India Limited (TPCIL) - APDISCOMs and Telangana DISCOMs have signed a Power Purchase Agreement with M/s. TPCIL for a contracted capacity of 500 MW under Long term basis through case-I bidding for a period of 25 years w.e.f. 20.04.2015. APDISCOMs have been allocated a share of 46.11% (as per GoMS No.20) i.e., 230.55 MW out of the said total contracted capacity of 500 MW. For the FY 2018-19 based on the projections received from generator duly taking into consideration of annual maintenance /Unit overhaul.

- KSK Mahanadi Power Company Limited: Erstwhile four APDISCOMs have entered into Power Purchase Agreement Dated 31.07.2012 with M/s. KSK Mahanadi Power Company Limited for supply of aggregate capacity of 400 MW power to APDISCOMs under Medium Term Open Access under Case-I Bidding for a period of 3 years and availed power from 14.08.2013 to 15.06.2016. APDISCOMs have been allocated a share of 46.11% (as GO Ms. No. 20) i.e., 184.44 MW out of the total contracted capacity of 400 MW. Subsequently, the APDISCOMs viz., APEPDCL & APSPDCL have separately entered into Agreement Dated 19.12.2014 with M/s. KSK Mahanadi Power Company Limited for supply of 400 MW power to exclusively to APDISCOMs for the period from 16.06.2016 to 31.03.2021 by extending the initially entered agreement. The Hon’ble APERC vide order dated 19.08.2015 in O.P.No. 3 of 2015 has approved the said plan under the said Agreement Dated 19.12.2014 and stated that the same may be considered as a Long Term Power Purchase Agreement. The energy availability projections in respect of M/s. KSK Mahanadi is considered for the FY 18-19 based on the projections received from Generator duly taking into consideration of annual maintenance / Unit overhaul.

Short Term/Bilateral Purchase

As per the load forecast of APSLDC, there is a RTC power requirement of around 500 MW in the months of January, February, March, April and May. Accordingly, APDiscoms have projected around 6 MU per day of power purchase from power exchanges to meet the deficit through short term purchases and bilateral purchases of 12 MU per day in FY 2018-19.

The estimated surplus energy at the state level during FY 2018-19 is 4,630 MUs shown in the table below.

S.No. Particulars FY 2018-19 A Energy Requirement (MU) 61,543 B Energy Availability (MU) 66,173 C = B – A Surplus (+) 4,630 D Surplus Energy sold to market (MU) 3,100 E = C - D Energy Back down (MU) 1,530

Page 13: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

a) Power Purchase Cost Estimate for FY 2018-19:

APGENCO / TSGENCO Stations

Fixed Costs

Fixed costs for existing APGENCO Stations have been considered as approved by APERC in its order dated 26.03.2016 in OP No.3/2006 filed by APGENCO for determination of tariff for FY 2014-19

As the tariffs for SDSTPS and RTPP-IV have not yet been approved by the Honourable APERC, the licensee has estimated the single part tariff of 3.63/ unit. This includes fixed cost of Rs. 1.02/ unit and variable cost of Rs.2.61/unit. Based on the despatch, fixed cost projected is around Rs. 940.77 Crs.

Variable costs

Variable Costs for APGENCO stations has been computed considering the entire coal procurement is from All Rail Route (ARR) mode, and that complete fuel requirement is met through domestic coal and marginal quantum of imported coal ( extent upto 10% ). Effective variable cost escalation considered is 3% over current year approved values.

CGS Stations

Fixed Cost and Variable Cost for CGS Stations have been considered as per generator projections. Variable cost escalation is limited to 3% over current year approved values.

IPP Gas

Fixed Cost and Variable Cost have been considered as per generator projections for old Gas IPP’s

As no energy availability is considered from New Gas IPP’s, no fixed and variable cost has been considered.

Non-Conventional Energy Sources

Power purchase price for Biomass/Industrial Waste, Bagasse & Mini Hydel have been considered based on applicable APERC Orders

Power purchase cost for Wind plants has been considered at weighted average cost of Rs. 4.73/kWh based on applicable APERC Orders

Page 14: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Power purchase cost for Solar Plants has been considered at weighted average cost of Rs. 5.41/kWh from all sources (as per corresponding bid price revealed in the respective tenders).

IPP Others

Fixed costs of HNPCL has been considered based on the capital expenditure and IDC only up to the normative construction period as specified in CERC norms. Moreover, since availability of only one unit has been considered for FY 2017-18, the fixed charge associated with only one unit has been considered.

Long Term and Medium Term Purchase

Fixed cost of TPCIL and KSK Mahanadi is considered as per generator projections. Variable cost escalation is limited to 3% over current year approved values.

Average Revenue Realized vs Average CoS break up for APSPDCL in FY 2018-19

Average Revenue Realisation (ARR) for FY 2018-19 is Rs.4.21/kWh

Average Cost of Supply (CoS) for APSPDCL - Rs. 6.16/kWh

Average CoS break-up (per unit of Sales) for APSPDCL is as follows:-

Cost Components FY 17-18 Approved (Rs./Unit)

FY 17-18 Projected (Rs./Unit)

FY 18-19 Projected (Rs./Unit)

Power purchase cost 3.84 4.02 4.19 T&D Loss Cost 0.52 0.53 0.54 Network 1.13 1.19 1.31 Other Cost 0.09 0.77 0.08 Cost of Service 5.58 5.82 6.16

The estimated revenue gap for the licensee for FY 2018-19 is as follows:

S.No. Particulars FY 2018-19

A Total Revenue 15,211

B Aggregate Revenue Requirement (Rs. Cr.) 21,429

C = A – B Revenue (Deficit) / Surplus (Rs. Cr.) (6,219)

Page 15: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

7 Tariff Proposal

Licensees have not proposed any tariff increase for FY 2018-19 and proposed to continue with current tariffs as approved by Hon’ble Commission during FY 2017-18. This has benefited all consumers (1.71 Cr.) of the state of Andhra Pradesh. Total number of consumers in the APSPDCL are 1.13 Cr.

Whereas, Licensee proposed tariff reduction as per the directions of the government and introduced new categories in the tariff proposal

a. Tariff Reduction:

Rural Horticulture with Connected Load upto 5HP

On the directions of GoAP, the licensee is filing for the separate sub-category within the LT-V(C): Others category with sub category name as Rural Horticulture with Connected Load upto 5 HP with proposed energy charge of Rs. 1.50/kWh.

ToD Discount for Domestic Consumers with Smart Meters

The licensee is planning to roll out the installation of smart meters in the upcoming months. For the consumers with smart meters, the licensee would like to propose a discount of Rs.1.00/Unit during 10 AM-12 PM slot (2 hours) to understand the response from the consumers. This proposed discount is applicable for the consumers with consumption more than 500 units/month in the LT-I (C) Domestic Category. The installation of smart meters shall be optional for the consumers. The cost of the smart meter with modem, as per recent bids is estimated to be Rs. 2,503 per smart meter. The cost of the smart meter along with the installation cost after adjusting for the grants from central government schemes like IPDS has to be borne by the consumer by paying EMI for a period of 24 months. The licensee is submitting the above proposal for the approval of the Hon’ble Commission.

b. New Tariff Category – Electric Vehicles:

Globally, Electric Vehicles (EVs) is emerging as a new technology disruption. Two major factors driving the trend for higher penetration of EVs are steep reduction in the battery technology costs and decarbonisation policies introduced by different economies the world over. Government of India (GoI) has also set an ambitious target of 100% incremental EV sales by 2030 which is estimated to result in oil imports savings of $ 60-70 billion annually. GoI formulated FAME-India (Faster Adoption and Manufacturing of (hybrid) & Electric Vehicles in India)) in March 2015.

Electric vehicles can typically get charged at the consumer premises or at designated charging infrastructure facilities. Tariffs for electric vehicles has already been set in few states.

Page 16: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

So far, two states viz. Maharashtra and Delhi have announced tariff for EV charging stations. As per Forum of Regulators (FoR) report, below are the prevailing tariff for EV charging stations in Maharashtra and Delhi:

State Unit Average Cost of Supply

Tariff for EV Charging Stations

Maharashtra# INR/kWh 6.81 11.40 (same as Commercial category tariff)

Delhi INR/kWh 7.63^ 5.50 #Based on MYT of MSEDCL, ^Based on TATA Power DDL Tariff Order FY 2017-18

Tariff for sale of power to EV Chargers:

EV charging stations similar to petrol bunks will provide electricity for charging the electric vehicles. Given the future potential for EVs, it is important to have a separate tariff category for EV charging stations.

As per excerpts from report titled “Study on Impact of Electric Vehicles on the Grid” by Forum of Regulators (FOR), “it is recommended to create a separate category for public charging of Electric Vehicles by the respective Regulatory Commission. Further, it is recommended that the tariff for EV category should be close to Average Cost of Supply (ACoS) for a Distribution Licensee with an incremental charge added to the ACoS for the recovery of the investment in the public EV charging infrastructure”.

The Average Cost of Service for Andhra Pradesh for FY2018-19 is Rs. 6.16/unit.

The table below highlights the possible impact of electricity tariffs on the running cost of electric vehicles. As can be seen in below table, change in tariff by INR 1/kWh is estimated to increase operation cost of EV by ~INR 0.16/km.

Electricity tariff (INR/kWh) Operation cost (INR/km.) 5 0.82 6 0.98 7 1.15 8 1.31 9 1.48 10 1.64

Hence, considering the Average Cost of Service and the incremental cost of charging infrastructure, to promote EV adoption in Andhra Pradesh, the retail tariff for Electric

Page 17: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Vehicle is proposed to be set at Rs. 6.95 per unit and Time of Day (TOD) Tariff as shown below:

EV category Tariff INR 6.95/kWh Time of Day (ToD) tariff

INR 1.00/kWh levied for from 06:00 AM to 10:00 AM and 06:00 PM to 10:00 PM Concession of INR 1.00/kWh for usage between 10:00 PM to 06:00 AM

8 Cross Subsidy Surcharge

The licensee has calculated the cross surcharge subsidy based on the formula specified in

the revised National Tariff Policy issued on 28.01.16.

As per the said Tariff Policy, the surcharge is to be computed as per the following formula;

S= T – [C/ (1-L/100) + D+ R]

Where,

‘S’ in Rs./unit is the Cross Subsidy Surcharge ,

‘T’ is the tariff payable by the relevant category of consumers in Rs./unit, including reflecting the Renewable Purchase Obligation,

‘C’ is the per unit weighted average cost of power purchase by the Licensee, including meeting the Renewable Purchase Obligation in Rs./unit ,

‘D’ is the aggregate of transmission, distribution and wheeling charge applicable to the relevant voltage level in Rs./unit and ‘L’ in percentage is the aggregate of transmission, distribution and commercial losses, applicable to the relevant voltage level and

‘R’ is the cost of carrying regulatory assets in Rs./kWh.

Provided that the surcharge shall not exceed 20% of the tariff applicable to the category of the consumers seeking open access.

Page 18: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

The category-wise CSS computation for APSPDCL is as follows: Category Average

Revenue Realization (Only Demand & Energy Charges)

Per Unit Cost of Power Purchase

Wheeling Charges

Applicable Loss

Cost of Regulatory Asset

CSS (Rs./Unit) 20 % of Average Revenue Realization

CSS (Rs./Unit)

High Tension HT Category at 11 kV HT I (A): General 8.82 4.19 0.79 10.24% 0.00 3.36 1.76 1.76 HT I (B): Energy Intensive Industries

5.82 4.19 0.79 10.24% 0.00 0.36 1.16 0.36

HT I (C): Aquaculture and Animal Husbandry

4.10 4.19 0.79 10.24% 0.00 - 0.82 -

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants

6.88 4.19 0.79 10.24% 0.00 1.42 1.38 1.38

HT II: Others 10.18 4.19 0.79 10.24% 0.00 4.72 2.04 2.04 HT II (B): Religious Places 5.16 4.19 0.79 10.24% 0.00 - 1.03 - HT II (C): Function Halls/Auditoriums

11.77 4.19 0.79 10.24% 0.00 6.31 2.35 2.35

HT III: Public Infrastructure and Tourism

9.18 4.19 0.79 10.24% 0.00 3.72 1.84 1.84

HT IV Government LIS 5.82 4.19 0.79 10.24% 0.00 0.36 1.16 0.36 HT IV Private Irrigation and Agriculture

5.82 4.19 0.79 10.24% 0.00 0.36 1.16 0.36

HT IV CPWS 4.89 4.19 0.79 10.24% 0.00 - 0.98 - HT VI: Townships & Residential Colonies

6.55 4.19 0.79 10.24% 0.00 1.09 1.31 1.09

HT VIII: Temporary 9.50 4.19 0.79 10.24% 0.00 4.04 1.90 1.90 Category: RESCOs 0.32 4.19 0.79 10.24% 0.00 - 0.06 - HT Category at 33 kV HT I (A): General 7.19 4.19 0.39 7.08% 0.00 2.29 1.44 1.44 HT I (B): Energy Intensive Industries

5.37 4.19 0.39 7.08% 0.00 0.47 1.07 0.47

HT I (C) : Aquaculture and Animal Husbandry

3.86 4.19 0.39 7.08% 0.00 - 0.77 -

HT I (D) : Poultry Hatcheries and Poultry Feed Mixing Plants

7.50 4.19 0.39 7.08% 0.00 2.60 1.50 1.50

HT II: Others 9.08 4.19 0.39 7.08% 0.00 4.18 1.82 1.82 HT II (B): Religious Places 5.36 4.19 0.39 7.08% 0.00 0.46 1.07 0.46 HT II (C) : Function Halls / Auditoriums

11.77 4.19 0.39 7.08% 0.00 6.87 2.35 2.35

HT III: Public Infrastructure and Tourism

10.49 4.19 0.39 7.08% 0.00 5.59 2.10 2.10

HT IV Agriculture 5.82 4.19 0.39 7.08% 0.00 0.92 1.16 0.92 HT IV CPWS 4.89 4.19 0.39 7.08% 0.00 - 0.98 - HT VI: Townships & Residential Colonies

6.75 4.19 0.39 7.08% 0.00 1.85 1.35 1.35

HT Category at 132 kV HT I (A): General 6.88 4.19 0.37 3.83% 0.00 2.16 1.38 1.38 HT I (B): Energy Intensive Industries

4.95 4.19 0.37 3.83% 0.00 0.23 0.99 0.23

HT II: Others 8.22 4.19 0.37 3.83% 0.00 3.50 1.64 1.64 HT IV Agriculture 5.82 4.19 0.37 3.83% 0.00 1.10 1.16 1.10 HT V: Railway Traction 5.01 4.19 0.37 3.83% 0.00 0.29 1.00 0.29

Page 19: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

9 Additional Surcharge

Contrary to ARR filings, actual open access sales during FY 2017-18 registered an increase compared to FY 2016-17 (given below). This has resulted in backing down of certain stations lead to higher fixed cost per unit due to low asset utilization. Month-wise open access sales in the previous 12 months i.e. from October-2016 to September-2017 is shown below.

Actual Open Access Sales (MU)

Month EPDCL SPDCL Total

Oct-16 54 90 143Nov-16 42 82 124Dec-16 50 135 185Jan-17 43 154 197Feb-17 44 174 218Mar-17 49 159 209Apr-17 23 135 157May-17 46 186 233Jun-17 52 164 215Jul-17 48 172 220Aug-17 21 139 160Sep-17 14 49 63Total 485 1,639 2,124

Considering the above, during the FY 2018-19, Licensee(s) have not considered open access sales coming back to Licensee due to low tariffs prevailing on the power exchange/ market during certain time blocks of the year. This has resulted in backing down of generators during certain time blocks leading to stranded assets. Fixed cost due to stranded generating assets is being loaded in the ARR and recovered from all consumers (burdening Domestic and Agricultural consumers).

The licensee humbly requests the Hon’ble Commission to consider the revised methodology and allow the licensees to collect the Additional Surcharge considering the Actual Open Access Sales (in Oct-2016 - Sep-2017 period). The Licensee proposes an additional surcharge of Rs. 0.95/kWh.

Based on the information available, the Applicant has made sincere efforts to comply with the Regulation of the Honourable Commission and discharge its obligations to the best of its abilities. However, should any further material information become available in the near future, the Applicant shall file such additional information and consequently amend/ revise the application.

Page 20: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)
Page 21: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

1

Contents

1 Introduction _____________________________________________________________ 5

1.1 Filings based on Multi-Year Tariff (MYT) Principles _________________________________ 5

1.2 Filing Contents ______________________________________________________________ 5

2 Analysis of expected performance for Current Year FY 2017-18 for Retail Supply Business 7

2.1 Introduction ________________________________________________________________ 7

2.2 Operating Performance _______________________________________________________ 7 2.2.1 Energy Balance ____________________________________________________________________ 7 2.2.2 Distribution Loss __________________________________________________________________ 7 2.2.3 Metered Sales ____________________________________________________________________ 8 2.2.4 Agricultural Sales __________________________________________________________________ 8

2.3 Financial Performance ________________________________________________________ 8 2.3.1 Revenues ________________________________________________________________________ 8 2.3.2 Expenditure and Revenue Gap _______________________________________________________ 9

3 Power Purchase Cost for Current Year (FY 2017-18) Second Half and Ensuing Year (FY 2018-19) ___________________________________________________________________ 10

3.1 Basis of Estimation of Quantity and Cost of Power Purchase _________________________ 10

3.2 Power Purchase Allocation: ___________________________________________________ 11

3.3 Installed Capacity of Major Generating Stations ___________________________________ 12 3.3.1 State GENCO (APGENCO and TSGENCO) ______________________________________________ 12 3.3.2 APGENCO _______________________________________________________________________ 12 3.3.3 TSGENCO _______________________________________________________________________ 13

3.4 CENTRAL GENERATING STATIONS ______________________________________________ 13

3.5 Independent Power Producers (IPPs) ___________________________________________ 15 GGPP (216.824 MW): _____________________________________________________________________ 15 M/s. SPGL (205.187 MW): _________________________________________________________________ 15 M/s. LANCO KONDAPALLI-I (361.92 MW): _____________________________________________________ 15 M/s. RELIANCE (220 MW): _________________________________________________________________ 15

New Gas based IPPs _______________________________________________________________ 16

3.6 AP Gas Power Corporation Ltd (“APGPCL”): Joint Sector ____________________________ 16

3.7 Non-Conventional Energy (NCE) Sources ________________________________________ 17

3.8 Mini-Power Plants __________________________________________________________ 17

3.9 Long Term Purchases ________________________________________________________ 18 Thermal PowerTech Corporation India Limited (230.55MW): ______________________________________ 18

Long Term – KSK Mahanadi (400 MW): ________________________________________________ 18

3.10 BASIS OF ESTIMATION OF ENERGY AVAILABILITY FOR H2 FY 2017-18 AND FY 2018-19 ____ 19

APGENCO (ANDHRA PRADESH GENERATION CORPORATION LTD): __________________________ 19 Thermal Energy: _________________________________________________________________________ 19 Hydro Energy: ___________________________________________________________________________ 19

CENTRAL GENERATION STATIONS ____________________________________________________ 21

APGPCL _________________________________________________________________________ 22

Page 22: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2

Gas based IPPs ___________________________________________________________________ 23 M/s. Reliance: ___________________________________________________________________________ 23 M/s. LANCO: ____________________________________________________________________________ 23 GGPP (Godavari Gas Power Plant): __________________________________________________________ 23 M/s. SPGL: ______________________________________________________________________________ 24

New Gas based IPPs: _______________________________________________________________ 25

3.11 Non-Conventional Energy (NCE) Sources ________________________________________ 25

Projects Commissioned but not having APERC consent: ___________________________________ 25

FY:2018-19_______________________________________________________________________ 25

For upcoming projects: _____________________________________________________________ 25

The following are the upcoming projects considered _____________________________________ 26

Solar: ___________________________________________________________________________ 27

FY:2018-19_______________________________________________________________________ 28

3.12 Biomass, Bagasse, Industrial Waste and Mini Hydel Projects: ________________________ 28

FY:2018-19_______________________________________________________________________ 29

3.13 Biomass Projects: ___________________________________________________________ 29

3.14 Mini Hydel ________________________________________________________________ 29

3.15 Mini Power Plants __________________________________________________________ 30

3.16 Long Term ________________________________________________________________ 30

3.17 Bilateral/Exchanges Purchases ________________________________________________ 31 Summary _______________________________________________________________________________ 31

3.18 POWER PURCHASE COST _____________________________________________________ 32

3.19 APGENCO (ANDHRA PRADESH GENCO &APPDCL) _________________________________ 32

3.20 Note: ____________________________________________________________________ 34

3.21 CGS: _____________________________________________________________________ 36

NTPC - Ramagundam Stage III (500MW) _______________________________________________ 37

NTPC - Talcher Stage –II (4 X 500MWs) ________________________________________________ 38

NTPC - Simhadri Stage –I (2 X 500MW) ________________________________________________ 40

3.22 NTPC - Simhadri Stage –II (2 X 500MWs) ________________________________________ 41

NLC TPS-II Stage-I (3X210 MW)) ______________________________________________________ 42

NLC TPS-II Stage-II (4X210 MW)) _____________________________________________________ 43

NPCIL-KAIGA Stage I & II (2x220 + 2x220 MW) __________________________________________ 44

NPCIL- (MAPS) (2X220 MW) _________________________________________________________ 45

NTECL, VALLUR (3X500 MW) (JV OF NTPC & TANGEDCO) __________________________________ 46

NTPL, Tuticorin (2X500 MW) (NLC & TANGEDCO) ________________________________________ 47

3.23 NNTPS (52.46 MW) _________________________________________________________ 51

APGPCL _________________________________________________________________________ 52

The per unit cost proposed by APGPCL for FY 2018-19: ___________________________________ 53

Page 23: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

3

B. The liabilities pending before various Courts are not covered in the above mentioned APERC Fixed Cost Components. ______________________________________________________ 54

1. Though hearings are going on, to meet the exigencies that may occur in various Court cases, APGPCL loaded Rs. 3.53 per unit in Stage-I fixed Cost, and Rs. 2.962 per unit in Stage-II fixed cost , which is unfair. ______________________________________________________________ 54

Gas based IPPs ___________________________________________________________________ 55

SPECTRUM ______________________________________________________________________ 56

LANCO KONDAPALLI _______________________________________________________________ 56

RELIANCE INFRASTRUCTURE LTD. (BSES) _______________________________________________ 57

NON CONVENTIONAL ENERGY (NCE) SOURCES: _________________________________________ 57

Long Term &Medium Term __________________________________________________________ 61

Long Term – KSK Mahanadi _________________________________________________________ 63

Short Term and Bilateral/ Inter-State purchases _________________________________________ 64

b.-EXCHANGE ____________________________________________________________________ 64

D-D Purchases/ Sales ______________________________________________________________ 64

3.24 UI Charges (Deviation Charges) ________________________________________________ 64

ENERGY REQUIREMENT ____________________________________________________________ 65

SUMMARY OF POWER PURCHASE FOR CURRENT YEAR H2 FY 2017-18 AND ENSUING YEAR FY 2018-19 ______________________________________________________________________________ 65

PGCIL & ULDC Charges ________________________________________________________ 67

3.25 Payment of PGCIL charges due to utilization of CGS share and KSK Mahanadi & TPTCL ___ 67

3.26 PGCIL ULDC Charges & POSOCO SRLDC fees & Charges _____________________________ 69

4 Losses _________________________________________________________________ 70

4.1 DISCOM losses _____________________________________________________________ 70

4.2 TRANSCO losses ____________________________________________________________ 70

4.3 Losses external to APTRANSCO system _________________________________________ 70

5 Expenditure Projections for APSPDCL ________________________________________ 71

5.1 APTransco Charges _________________________________________________________ 71

5.2 PGCIL and ULDC Charges _____________________________________________________ 71

5.3 SLDC Charges ______________________________________________________________ 72

5.4 Distribution Costs __________________________________________________________ 74

5.5 Interest on Consumer Security Deposits ________________________________________ 74

5.6 Supply Margin _____________________________________________________________ 75

5.7 Other Costs _______________________________________________________________ 76 5.7.1 DELP: __________________________________________________________________________ 76 5.7.2 Solar pumpsets: __________________________________________________________________ 76 5.7.3 Reserve fund towards to relief to victims of electrical accidents ___________________________ 78 The licensee is depositing every month Rs.1.29 Crs. into a separate Bank A/c to be used for the purpose of providing relief to victims of electrical accidents in FY 2017-18. Further it is proposed to provide Rs.15 Crs. towards reserve fund for FY 2018-19. ________________________________________________________ 78

Page 24: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

4

5.8 Summary of ARR ___________________________________________________________ 78

6 Revenue Projections ______________________________________________________ 79

6.1 Sales Forecast _____________________________________________________________ 79 6.1.1 Trend Method ___________________________________________________________________ 79 6.1.2 LT Sales forecast _________________________________________________________________ 80 6.1.3 HT sales forecast _________________________________________________________________ 90

6.2 Revenue from Current Tariffs _________________________________________________ 97 6.2.1 Detailed category wise Revenue computation _________________________________________ 100 6.2.2 Low Tension Categories ___________________________________________________________ 100 6.2.3 High Tension Categories __________________________________________________________ 104

7 Average Revenue Realized vs Average CoS break up for APSPDCL in FY 2018-19 _____ 107

8 Performance Parameters _________________________________________________ 108 8.1.1 Compensation awarded by the CGRF to the consumers for deficiency of service as per the Regulations of the Commission ____________________________________________________________ 108 8.1.2 Details of Electrical Accidents and ex-gratia paid during FY 2016-17 and FY 2017-18 (upto Sep’17): 109 8.1.3 Replacement of burnt transformers, installation of additional transformers. ________________ 110 8.1.4 Number of burnt-out, non-functioning or faulty meters (Circle-wise). ______________________ 110 8.1.5 Performance with regard to attending fuse-off calls. ___________________________________ 111 8.1.6 Breakdowns and interruptions in power supply to consumers (Circle-wise) and time taken for restoration. ____________________________________________________________________________ 112 8.1.7 Frequency and voltage at various levels of interface over the period. ______________________ 113 8.1.8 Pending applications and connections released to different categories of consumers _________ 113 8.1.9 Arrears of consumers over Rs.50, 000 pending for over six months and details of bad debts written off 113 8.1.10 Court cases involving the Licensee ________________________________________________ 114 8.1.11 Number of cases filed in respect of pilferage of power in various categories giving comparative picture with respect to FY 2016-17 & 2017-18 (upto Sep’17) ____________________________________ 120

9 Cost of Service for FY 2018-19 _____________________________________________ 121

9.1 Introduction ______________________________________________________________ 121

10 Retail Supply Business True-up for FY 2016-17 and Provisional True-up for FY 2017-18 : 125

11 Tariff Proposals and Revenue at Proposed Tariff for FY 2018-19 __________________ 125

12 Determination of Cross Subsidy Surcharge for FY 2018-19 _______________________ 132

13 Additional Surcharge ____________________________________________________ 134

14 Prayer ________________________________________________________________ 147

Anexure-1 ________________________________________________________________________

COS Formats ____________________________________________________________________

Retail Supply Formats _____________________________________________________________

Page 25: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

5

1 Introduction

1.1 Filings based on Multi-Year Tariff (MYT) Principles

The Andhra Pradesh Electricity Regulatory Commission framed the “Terms and

Conditions for determination of Tariff for Wheeling and retail supply of electricity” Regulation

4 of 2005 and First Amendment Regulation 2014 (“Regulation 1”), lays down the principles for

determination of Aggregate Revenue Requirement (ARR) for (a) Distribution Business and (b)

Retail Supply Business of the licensees. The ARR so determined for each of the businesses will

form the basis for fixation of charges for wheeling and for retail sale of electricity.

In the Regulation, the Commission has also laid down the procedures for filing under

multi-year tariff principles. The multi-year period is defined as the Control Period and the first

Control Period is defined as the three year period starting from financial year 2006-07 and

continuing till the end of financial year 2008-09. The second control period was defined as the

five year period starting from FY 2009-10 to FY 2013-14. The current filing pertains to the third

Control Period (FY 2014-15 to FY 2018-19). The Commission has specified in Para 6.2 of the

Regulation the following procedure for ARR filing for the distribution and retail supply

business:

“The ARR filing for the Distribution business shall be for the entire Control Period.

For the Retail Supply business the ARR filing will be on annual basis …...”

The current filing follows the principles laid down under this Regulation for determination

of the ARR for the retail supply business for the year FY 2018-19, which is the fifth year of the

Third Control Period.

1.2 Filing Contents

The filing is structured in the following way:

Section 2 provides analysis of expected performance for FY 2017-18 for Retail supply Business

comprising:

- Operating Performance

- Financial Performance

A brief analysis of the financial and operational performance of the licensee during FY

2016-17 and FY 2017-18 (with projections for second half of FY) are given.

Page 26: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

6

Expenditure Projections

o Power Purchase Cost

Power Purchase and Procurement Cost

o Transmission Charges

o PGCIL & ULDC Charges

o SLDC Charges

o Distribution Cost

o Interest on Consumer Security Deposits

o Supply Margin

o Other Costs

o Aggregate Revenue Requirement for Retail Supply Business

Revenue Projections

o Sales Forecast

o Revenue from Current Tariffs

o Non-tariff Income at Current Charges

o Revenue at Current Tariffs and Charges

Revenue Gap

o Revenue Deficit / Surplus at Current Tariff and Charges

o Proposals to handle the Deficit / Surplus

o Government Subsidy Requirement

Other Filings

o Cross Subsidy Surcharge

o Additional Surcharge

The sales forecast has been used to determine the revenue from tariff for retail sale of

electricity for the fifth year of the third control period and the energy input required for meeting

the demand. The power procurement plan is based on the availability of the generation sources

during FY 2018-19, cost of procurement (fixed, variable and others) and the merit order dispatch

of various sources to meet the demand expected during various months.

Due to reorganization of the State of Andhra Pradesh, two districts i.e., Anantapur &

Kurnool districts were merged into APSPDCL w.e.f 02-06-2014. In this context, for FY 2013-14

and FY 2014-15 (during Apr & May, 2014) all the figures / data considered are actuals and

pertains to six districts of APSPDCL (viz., Krishna, Guntur, Prakasam, SPSR Nellore,

Chittoor& Kadapa). And from June, 2014 onwards all the figures pertain to entire eight districts

of APSPDCL including newly added Anantapur & Kurnool districts.

Page 27: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

7

2 Analysis of expected performance for Current Year FY 2017-18

for Retail Supply Business

2.1 Introduction

This chapter analyses the performance of the licensee during the Current Year as compared to

the previous year. Only the key operating and financial parameters have been considered for this

analysis.

2.2 Operating Performance

2.2.1 Energy Balance

2.2.2 Distribution Loss

As seen from the above table, the actual losses for the FY 2016-17 is 8.466% and reduced

compared to previous year loss of 8.467%. The licensee is expected to meet voltage wise loss

level targets set by the Honourable APERC. The licensee has taken following steps to reduce the

losses further.

Strict monitoring of feeders to ensure the assured number of hours of supply to

agricultural sector.

Reduction of both technical and commercial losses by vigorously conducting 11 KV

feeder wise energy audits around 1609 Nos. feeders in the company.

Year

Actual No. of 11 KV

T & Mhq. feeders for

which energy audit

done

11 KV 2 MVAR

capacitor banks

added to the system

Additional 33/11

KV sub-stations

charged Excl.

EHT (%)

Incl.

EHT (%)

FY 2009-10 14.03 12.98 823 90

FY 2010-11 13.37 12.21 853 122 13

FY 2011-12 12.53 11.29 866 136 67

FY 2012-13 11.87 10.71 966 193 128

FY 2013-14 11.84 10.68 1024 35 208

FY 2014-15 11.72 10.33 1348 75 75

FY 2015-16 9.57 8.47 1424 35 33

FY 2016-17 9.54 8.47 1563 30 30

FY 2017-18 (H1) 9.25 8.30 1609 19 19

Page 28: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

8

Erection of additional substations, DTRs, 11KV capacitor banks and bifurcation of

feeders, etc.,

HVDS conversion of balance agricultural pumpsets.

Moving to monthly billing across the DISCOMS and rolling out of IR port meters or

other new metering technologies.

During the year 2011-12, 866 Nos. 11 KV Town & MHQ feeders were considered for energy

audit whereas during the FY 2016-17, 1563 Nos. feeders are available in E-AUDIT for which

energy audit is done on regular basis at corporate office level.

30 Nos. additional 11 KV 2 MVAR capacitor banks were proposed for erection during the FY

2016-17 and completed.

For the year 2016-17, 30 Nos. additional 33/11 KV sub-stations were charged and for the year

FY 2017-18, 114 Nos. additional 33/11 KV sub-stations are proposed out of this 19 Nos. were

already charged to reduce over loaded substations, 33 KV & 11 KV lines and to maintain good

voltage profiles at the consumers end.

2.2.3 Metered Sales

As can be seen from the table above, in 2016-17, the percentage of metered sales is 63.93 % as

against 64.49% during 2015-16.

The total load curtailment (due to Load relief) during FY 2016-17 is 18.05 MU, which is very

negligible and due to certain emergencies. In FY 2017-18, the metered sales are expected to

increase by 1245.70 MU over 2016-17 levels, which is 5.80% increase and also the percentage

metered sales is expected to raise from 63.93% (FY 2016-17) to 64.23% (FY 2017-18)

2.2.4 Agricultural Sales

In the previous year 2016-17 the actual Agriculture Consumption is 9269.50 MU. In the current

year FY 2017-18 during the first half, the agriculture consumption is 3726.97 MU and the

projection for the entire year is 9536.85 MU, which is 795 MU excess over the approved

agricultural sales (9%).

2.3 Financial Performance

2.3.1 Revenues

The net revenue (Incl. NTI) for FY 2017-18 is expected to be Rs 13482.95 Crores.

Page 29: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

9

For the key categories, the licensee has estimated the revenue as below:

The actual revenue during FY 2016-17 is Rs. 12380.11 crores (including non-tariff income). The

NTI during FY 2016-17 is Rs.71.21 crores. During FY 2017-18, the estimated revenue from sale

of power (inclusive of Non-tariff income) is Rs. 13482.95 crores. The expected NTI during FY

2017-18 is Rs. 111.23 crores.

2.3.2 Expenditure and Revenue Gap

The following table provides an overview of APSPDCL’s financial performance for the current

year and compares it with the APERC orders:

Page 30: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

10

3 Power Purchase Cost for Current Year (FY 2017-18) Second

Half and Ensuing Year (FY 2018-19)

3.1 Basis of Estimation of Quantity and Cost of Power Purchase

This section discusses the methodology and assumptions considered for estimating the

quantum and corresponding cost of power purchase of the Licensee for the second half of

the Financial Year ending March 31, 2018 and for the Financial Year ending March 31,

2019.

As per section 92 read with the Twelfth Schedule of the Andhra Pradesh Reorganization

Act, 2014 for bifurcation of united Andhra Pradesh (Central Act No. 6 of 2014, dated

01.03.2014), the districts of Anantapur and Kurnool which was within the jurisdiction of

the erstwhile Andhra Pradesh Central Power Distribution Company Ltd. (APCPDCL, now

Southern Power Distribution Company of Telangana Limited (TSSPDCL)) was reassigned

to the Andhra Pradesh Southern Power Distribution Company Ltd. (APSPDCL). The

proportionate share of power was transferred from the allocated share of the erstwhile

APCPDCL to APSPDCL.

Before the bifurcation of united Andhra Pradesh, with the implementation of Multi-Buyer

Model (MBM) in the state from June 9, 2005, each of the four Discoms of united Andhra

Pradesh had been allocated a certain share of the generating stations contracted by

APTRANSCO. According to G.O.Ms. No.20 (dated 08.05.2014), based on the last 5

years’ average consumption of Anantapur and Kurnool districts, 17.45% of power earlier

allocated to the erstwhile APCPDCL was transferred to APSPDCL. Power allocation

percentages for Andhra Pradesh Discoms and Telangana Discoms have been modified

accordingly. Andhra Pradesh has to be allocated a percentage of 46.11% of the erstwhile

Andhra Pradesh share.

As per the directions of Government of Andhra Pradesh, Regulation of Power was effected

by APGENCO to TSDISCOMS for non-payment of dues payable to APGENCO w.e.f

11.06.2017. Similarly power was regulated by TSGENCO also to APDISCOMS, for non-

settlement of dues w.e.f 11.06.2017. In view of the above APGENCO requested

APDISCOMS to avail 100% power in view of Regulation of Power. Hence entire power

is being availed by APDISCOMS w.e.f 11.06.2017.

The revised power allocation percentages for the two Discoms of Andhra Pradesh

(APEPDCL and APSPDCL) are mentioned below.

S. No.

Name of the Distribution Company

Allocation Percentage

1

APEPDCL

34.27 %

2

APSPDCL

65.73 %

Page 31: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

11

3.2 Power Purchase Allocation:

100% of energy availability from upcoming APGENCO station RTPP Stage IV

(600 MW) has been considered as per geographical location of the Plant.

100% Power from APGENCO hydel stations have been allocated based on

their geographical location including Inter State Projects such as Machkund &

TBDam.

Non-conventional Energy has been allocated to the DISCOMs as per the PPA till

31st July 2017. As per the G.O. RT No. 118 dated 27th July 2017, NCE allocation

has been done in the ratio of 34.27% and 65.73% for APEPDCL and APSPDCL

respectively.

100% power from the mini-power plant Srivathsa has been allocated to APEPDCL

as per the PPA.

Godavari Gas Power Plant (erstwhile GVK Phase-I) has been acquired by

APDISCOMs on 22nd April 2016 and 100% share has been allocated to

APDiscoms. Further, AP Discoms are in the process of finalizing the PPA for

GGPP with APGENCO.

As per the Regulation of Power dated 11th June 2017, allocation of 100% power

from existing APGENCO thermal stations was considered for APDiscoms from

11th June 2017.

The power from CGS stations has been considered as per the MoP allocation.

Under Long term PPA, a contracted capacity of 230.55 MW from M/s.

Thermal Powertech Corporation India Limited (TPCIL) through case-I bidding route

valid for a period of 25 years w.e.f. 20.04.2015.

Under Long term PPA, a contracted capacity of 400 MW from M/s. KSK

Mahanadi, through case-I bidding route is valid up to 31.03.2021.

AP Discoms are in the process of finalizing the renewal of PPAs with M/s

Lanco Kondapalli & M/s Spectrum and have considered energy availability from

these plants at 40% PLF.

The energy deficit in APDiscoms due to any shortfall in coal supplies and

unforeseen outages of power plants etc., will be met through procurement from

bilateral sources.

APDISCOMs are also procuring Power from Power Exchanges to meet the day to

day exigencies in demand and power supply.

Page 32: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

12

In the following paragraphs, the capacities and availabilities of all the generating

sources have been described. The actual energy availability in MU for each

Discom has been projected based on the above allocation principles.

3.3 Installed Capacity of Major Generating Stations

3.3.1 State GENCO (APGENCO and TSGENCO)

The table below shows the projected capacities of the Thermal and Hydel

generating stations of APGENCO including 100 % share from the interstate Hydel

projects.

3.3.2 APGENCO

Energy allocation for existing APGENCO thermal stations has been considered at

100% and also from Damodaram Sanjeevaiah TPP I & II and RTPP IV. For

APGENCO Hydel stations, allocation of power is as per geographical location

(100%). Allocation of power from inter-state hydel projects have been taken as

100% due to regulation of power to TSDISCOMs and vice versa.

Rayalaseema Thermal Power Project Stage – IV (1 x 600 MW) is being set

up by APGENCO. The then APDiscoms have signed a PPA with APGENCO

on 22.11.2010. The Amended and Restated PPA is yet to enter by APGENCO

with APDICOMs by limiting to two DISCOMs of AP. APGENCO has informed

that the Project is in advanced stage of construction and is likely to be commenced

by April’2018.

Source Projected erstwhile

AP share (MW)

Projected AP share

(MW)

THERMAL

Dr. NTTPS ( I, II, III)(6 x 210MW) 1260 1260

Dr. NTTPS – IV )(1 x 500MW) 500 500

RTPP-I)(2 x 210MW) 420 420

RTPP-II) (2 x 210MW) 420 420

RTPP- III ) (1 x 210MW) 210 210

RTPP- IV) ( 1x 600MW) 600 600

Damodaram Sanjeevaiah TPP I (1 x800MW) 800 800

Damodaram Sanjeevaiah TPP I (1 x800MW) 800 800

TOTAL THERMAL 5010 5010

HYDEL

Interstate projects:

Machkund, Orissa (AP share 70%) 84 84

T.B. Station, Karnataka (AP share 80%) 57.6 57.6

Page 33: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

13

Source Projected erstwhile

AP share (MW)

Projected AP share

(MW)

State projects:

Donkarayi (1 x 25MW) 25 25

Upper Sileru (4 x 60MW) 240 240

Lower Sileru (4 x 115MW) 460 460

Srisailam right bank PH (7 x110MW) 770 770

Nagarjuna Sagar right canal PH (3x30MW) 90 90

PABR (2 x 10MW) 20 20

Mini hydro (2 x 0.5MW) 1 1

Nagarjuna Sagar Tail Pond(2 x 50 50

25MW)

TOTAL HYDEL 1797.6 1797.6

TOTAL APGENCO 6807.6 6807.6

3.3.3 TSGENCO

The energy from TSGENCO has not been considered due to Regulation of

Power to APDISCOMS from 11.06.2017.

3.4 CENTRAL GENERATING STATIONS

AP Discoms had entered into Power Purchase Agreements with Central Generating

Stations to purchase power from NTPC (SR), NTPC (SR) Stage-III, NTPC -

Talcher-II, NTPC Simhadri-I & II, Vallur (JV) Power Project, Tuticorin Thermal

Power Plant, Neyveli Lignite Corporation Ltd (“NLC”), Madras Atomic

Power Station (“MAPS”),

Kaiga Atomic Power Station (“KAPS”) and NTPC- Kudgi Power Project. Further, MOP,

GOI had allocated 500 MWs to AP under JNNSM Phase II out of which 425 MW from

NTPC (SR) Stations and 75 MW from ER & WR.

1000 MW (2x500 MW) Neyveli New Thermal Power Station (NNTPS) is being set up by

M/s. NLC India Limited at Neyveli, Tamilnadu. The then APDiscoms have signed a PPA

with NLCIL on 30.11.2010. Earlier the allocation of power from NNTPS to united AP

was 113.77 as per MoP, GoI letter dated 29.10.2010. After bifurcation of the State, the

allocation percentage for CGS stations have been considered as 46.11% (as per G.O.Ms.

No. 20) and hence the projected AP share is 5.26% of Project Capacity of 1000 MW i.e.,

52.46 MW.

Page 34: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

14

Name of the Station Total Installed

Capacity

Projected AP share

(MW) (MW) % (of

Total

Installed

Capacity) NTPC-(SR) Ramagundam I & II 2,100 252.86 12.04

NTPC-(SR) Stage – Ramagundam- III 500 63.01 12.6

NTPC-Talcher-II 2,000 164.36 8.22

NTPC Simhadri Stage-I 1,000 461.1 46.11

NTPC Simhadri Stage-II 1,000 184.38 18.44

NLC TS II Stage-I 630 46.1 7.32

NLC TS II Stage-II 840 83.43 9.93

NPC-MAPS 440 18.31 4.16

NPC-Kaiga 1 & 2 440 55.9 12.71

NPC-Kaiga 3 & 4 440 59.6 13.55

Vallur (JV) NTPC with TANGEDCO 1,500 112.92 7.53

NLC-TNPL Tuticorin 1,000 139.06 13.91

NTPC-Kudgi 2,400 211.2 8.8

NTPC JNNSM Phase I 39.19 39.19 NA

NTPC JNNSM Phase II 500 500 NA

NNTPS 1000 52.46 5.24

TOTAL CGS 15829.19 2443.88 15.44

Page 35: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

15

3.5 Independent Power Producers (IPPs)

The following Gas based IPPs are under commercial operation in Andhra Pradesh:

GGPP (216.824 MW):

Upon the expiry of PPA with M/s. GVK-I on 20.06.2015, APDISCOMs have bought

out GVK Phase-I on 22nd April 2016 and the plant is being operated by

APDISCOMs by deputing employees from APGENCO. The plant is tentatively

named as Godavari Gas Power Plant (GGPP). The plant is proposed to be handed

over to APGENCO and the required PPA will be entered with APGENCO by

APDISCOMs. The Plant Load Factor for GGPP has been considered at 43%-45% for

the second half of FY 2017-18 and FY 2018-19.

M/s. SPGL (205.187 MW):

Upon the expiry of PPA on 18.04.2016, APDISCOMs proposed to renew the PPA for

a further period of 15 years and the proposal was submitted to GoAP for approval. Once

the approval is received from GoAP, APDISCOMs will submit the draft PPA before

Hon’ble APERC for approval. The Plant Load Factor (PLF) for Spectrum has been

considered at 40% for the second half of FY 2017-18 and FY 2018-19.

M/s. LANCO KONDAPALLI-I (361.92 MW):

PPA with the gas-based plant at Vijayawada by Lanco Kondapalli Power Ltd (“Lanco

Kondapalli”) expired on 01.01.2016. After negotiations with the generator and approval

from GoAP, the draft PPA was filed before Honourable APERC for approval. The

Plant Load Factor (PLF) for LANCO has been considered at 40% for the second half

of FY 2017-18 and FY 2018-19.

M/s. RELIANCE (220 MW):

Due to non-availability of Gas the plant is not in running condition .The PPA is valid

upto 23.12.2017.Hence the plant is not considered for second half of FY 2017-18

and FY 2018-19.

Projected APDISCOMs share for FY 2018-19 is as mentioned below:

Source Projected AP share (MW)

Godavari Gas Power Plant 216.824

Spectrum 205.187

Page 36: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

16

Source Projected AP share (MW)

Lanco Kondapalli (Gas) 361.92

Reliance BSES 0

TOTAL GAS-BASED IPPs 783.93

New Gas based IPPs

GVK Extension (220 MW), GMR Vemagiri (370 MW), Gouthami (464 MW),

and Konaseema (444.08 MW) are the new IPPs which have been commissioned

during the years 2006 (Vemagiri), 2009 (GVK Extension, Gouthami) and 2010

(Konaseema). The Natural gas supplies from RIL KG D-6 fields to the aforesaid

IPPs became zero from 01.03.2013 onwards. Hence there is no generation under

long term PPA till to date. Further there is no official communication from MoP

&NG on availability of natural gas supplies to the said projects.

The e-bid RLNG Scheme was ended by 31.03.2017. Further MoP, GOI has not

extended the scheme.

APDISCOMs are not paying any fixed charges at present even though some of the

IPPs are declaring their availability with alternate fuel / RLNG/ gas supplies available

from Deep water fields, as the said availability was rejected by DISCOMs due to its high

cost.

3.6 AP Gas Power Corporation Ltd (“APGPCL”): Joint Sector

APGPCL is a joint sector gas-based power project. The allocation of power from this

project is in proportion to the equity share capital of APTRANSCO/ APDISCOMs. The

total installed capacity of the project along with the DISCOMs share is as given below:

Source Installed

Capacity

(MW)

Projected AP

Share

(MW)

AP Share (%)

Stage I 100 9.33 9.33%

Stage II 172 24.96 14.51%

Total 272 34.29 12.61%

Page 37: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

17

3.7 Non-Conventional Energy (NCE) Sources

The installed capacities of NCE projects in Andhra Pradesh projected for FY 2017-18

2nd half and FY 2018-19 are as given below. NCE based projects have been allocated

to the AP Discoms based on their geographical presence/location (NCE projects have

signed PPAs with Discoms where they are located. Hence the entire power is

allocated to that Discom.) till 31st July 2017 and subsequently in the ratio of

34.27% and 65.73% for APEPDCL and APSPDCL respectively.

Type of Project

Projected AP

Share (MW)

-

FY 2017-18 (2nd

half)

Projected

AP Share

(MW) - FY

2018-19

NCE - Bio-Mass 144.50 144.50

NCE - Bagasse 105.20 105.20

NCE - Municipal Waste to Energy 0.00 0.00

NCE - Industrial Waste based

power project

21.66 21.66

NCE - Wind Power 4810.55 4810.55

NCE - Mini Hydel 46.10 46.10

NCE - NCL Energy Ltd 8.25 8.25

NCE - Solar Projects (SPD) 556.00 556.00

NCE- Solar Parks 2050.00 2050.00

NCE-Others 0.00 0.00

NVVNL Bundled Power -SOLAR 85.00 85.00

NTPC Ramagundam Solar Power 10.00 10.00

Total 7,837.26 7,837.26

3.8 Mini-Power Plants

M/s. Srivathsa (17.202MW): APTRANSCO/ APEPDCL had entered into a

Power Purchase Agreement with Srivathsa (17.202 MW) power plant and is

valid up to 31.03.2018.

The GSA between M/s. Srivathsa and GAIL is valid upto the year 2021.

APEPDCL is proposing power supply for FY 2018-19 with the PLF 45%, with

the same terms and conditions of existing PPA.

Page 38: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

18

M/s. LVS (36.8MW): Plant is not in running condition due to high cost of

fuel. The PPA between APEPDCL and M/s. LVS expired on 07.10.2017

and this capacity is not considered for FY2018-19.

Source Projected AP share

(MW)

M/s. Srivathsa 17.202

M/s. LVS 0

TOTAL 17.202

3.9 Long Term Purchases

Thermal PowerTech Corporation India Limited (230.55MW):

APDISCOMs and Telangana DISCOMs have signed a Power Purchase Agreement

with M/s. Thermal Powertech corporation India Limited (TPCIL) for a contracted

capacity of 500 MW under Long term basis through case-I bidding for a period of 25

years w.e.f. 20.04.2015. APDISCOMs have been allocated a share of 46.11% (as per

GoMS No.20) i.e., 230.55 MW out of the said total contracted capacity of 500

MW. The plant is connected to CTU network and as per the PPA APDISCOMs are

obligated to reimburse the applicable Long Term Open Access (LTOA) charges to the

generator.

Long Term – KSK Mahanadi (400 MW):

Erstwhile four APDISCOMs have entered into Power Purchase Agreement Dated

31.07.2012 with M/s. KSK Mahanadi Power Company Limited for supply of

aggregate capacity of 400 MW power to APDISCOMs under Medium Term Open

Access under Case-I Bidding for a period of 3 years and availed power from 14.08.2013

to 15.06.2016. APDISCOMs have been allocated a share of 46.11% (as GO Ms. No. 20)

i.e., 184.44 MW out of the total contracted capacity of 400 MW. Subsequently, the

APDISCOMs viz., APEPDCL & APSPDCL have separately entered into Agreement

Dated 19.12.2014 with M/s. KSK Mahanadi Power Company Limited for supply of 400

MW power exclusively to APDISCOMs for the period from 16.06.2016 to 31.03.2021

by extending the initially entered agreement. The Hon’ble APERC vide order dated

19.08.2015 in O.P.No. 3 of 2015 has approved the said plan under the said

Agreement dated 19.12.2014 and stated that the same may be considered as a Long

Term Power Purchase Agreement. The plant is located in Western Region and is

connected to CTU network. As per the PPA, APDISCOMs are obligated to reimburse

the applicable Long Term Open Access (LTOA) charges to the generator.

Page 39: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

19

3.10 BASIS OF ESTIMATION OF ENERGY AVAILABILITY FOR H2 FY 2017-18

AND FY 2018-19

APGENCO (ANDHRA PRADESH GENERATION CORPORATION LTD):

Thermal Energy:

The Energy availability for H2 of FY 2017-18 has been projected based on the

actual performance of the plants up to September 2017 and projected performance based

on the actual PLF of respective stations for 2017-18 (H1). For FY 2018-19, the

energy availability has been projected based on the projected performance estimated

by APGENCO and maintenance schedules of the plants.

RTPP-IV (600 MW) has been assumed to be commissioned from 1stApril’18.

Energy availability from APGENCO thermal plants is as below:

GENCO Thermal (Net Energy Availability- MUs)

S. No. Station Name H2 FY 2017-18 FY 2018-19

APGENCO

1 Dr NTTPS-I,II,III 3,507.93 6,900

2 Dr NTTPS-IV 1,356.77 3,040

3 RTPP-I 1,175.96 2,344.40

4 RTPP-II 1,197 2,344.40

5 RTPP-III 384.31 1,172.20

6 RTPP-IV - 2,428.24

7 Damodaram

Sanjeevaiah Thermal

Station-I Unit-1

1,252.37 4,616.18

8 Damodaram

Sanjeevaiah Thermal

Station-I Unit-2

1,065.97 4,607.06

Total APGENCO 9,940.32 27,452.46

Hydro Energy:

The hydro energy availability for H2 FY 2017-18 is expected to be 796.68 MU based

on the actual schedule energy during 2017-18 (H1) including inter-state hydel stations,

since there is inadequate rain fall in the catchment area of respective projects during the

current year. Therefore 2500 MU is projected for FY 2018-19.

Page 40: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

20

Energy allocation for hydel stations is based on geographical location. It has been

observed over the past few years that the actual generation from hydel stations has

been consistently lower than the value approved in the Tariff Orders issued by APERC

as the reservoirs are being used more and more for irrigation than for power generation.

The table below shows the actual hydro energy generation from FY 2002-03 to FY

2016- 17.In this regard, the hydel projections have been considered to be similar to the

10 year average generation.

Year Approved hydro

energy availability

in MU (As per

Tariff Orders)

Actual hydro

energy

generation in

MU

Variation between

Approved and Actual

hydro energy

availability (%)

2002-03 6,999 3,337 -52%

2003-04 6,757 2,959 -56%

2004-05 6,423 5,267 -18%

2005-06 5,979 7,873 32%

2006-07 7,586 9,328 23%

2007-08 8,592 9,566 11%

2008-09 9,046 7,729 -15%

2009-10 8,969 5,499 -39%

2010-11 7,662 6,751 -12%

2011-12 8,238 6,221 -24%

2012-13 6,407 3,171 -50%

2013-14 7,057 6,761 -37%

2015-16 3,404 2,320 -32%

2016-17 3,241.45 2,180.52 -33%

2017-18 H1 1,472.10 782.47 -47%

The following table shows the station-wise projected availability for H2 FY 2017-18

and FY 2018-19

APGENCO Hydel ( Net Energy Availability-MUs)

S. No. Station Name H2 FY 2017-

18 FY 2018-19

1 MACHKUND PH AP Share 149.5 325.71

2 TUNGBHADRA PH AP Share 15.04 75.07

3 USL 154.92 342.54

4 LSR 380.98 866.25

Page 41: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

21

APGENCO Hydel ( Net Energy Availability-MUs)

S. No. Station Name H2 FY 2017-

18 FY 2018-19

5 DONKARAYI 40.31 66.33

6 SSLM (Right Bank) 54.80 631.62

7 NSRCPH 0 82.17

8 PABM 0 5.72

9 Mini hydro(Chettipeta) 1.14 2.62

10 Nagarjuna sagar tail pond

dam PH 0 101.97

Total 796.68 2,500

CENTRAL GENERATION STATIONS

The energy availability for H2 of FY 2017-18 has been projected based on the actual

performance up to September 2017 and the projections received from CGS generators.

For FY 2018-19, the energy availability has been projected based on the projected

performance estimated by CGS and maintenance schedules of the plants and also based

on the details of energy availabilities received from respective generators.

NTPC had commissioned the Kudgi Unit-1 on 31.07.2017 and AP had been allocated

145 MWs from this unit with the inclusion of unallocated power also. NTPC has

submitted the availability projections from Kudgi entire complex along with tentative

COD of Unit 2 & Unit 3 and cumulative allocated capacity of about 211 MW.

Based on the total availability of various power purchase sources, Kudgi availability for

H2 FY 2017-18 and FY 2018-19 are tabulated below along with consideration of

500MWs JNNSM Phase II NTPC’s allocated power also.

The Neyveli New Thermal Power Station (NNTPS) has a total installed capacity of 1,000

MW (2 x 500 MW). From this project, the residuary A.P will get a share of 5.26%

i.e.,52.46 MW power. Now, the Project is in advanced stage of construction and is

likely to be commenced in the month of July’2018. Based on the projections estimated

by NLC, the net energy availability for FY 2018-19 from this project is projected as

68.59 MU.

The CGS stations projected 16,112 MU for FY 2018-19. But APDISCOMs have

considered 13169 MU in anticipation of shortage of coal and energy requirement of

APDISCOMs.

Page 42: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

22

Energy availability projections from CGS for H2 FY 2017-18 and FY 2018-19 along

with Kudgi and NTPC’s allocated power of 500MW under JNNSM Phase II are

tabulated below:

Central Generating Stations ( Net Energy Availability - MUs )

S.

No.

Station Name H2 FY 2017-18 FY 2018-19

1 NTPC-(SR) Ramagundam I & II 918.21 1370

2 NTPC-(SR) Stage – Ramagundam- III 219.25 320.27

3 NTPC-Talcher-II 652.52 1016.15

4 NTPC- Simhadri Stage-I 1578.3 2507.82

5 NTPC- Simhadri Stage –II 603.1 988.58

6 NLC TS II Stage-I 129.32 197.44

7 NLC TS II Stage-II 226.26 368.45

8 NPC-MAPS 61.73 100.05

9 NPC-Kaiga 1 & 2 203.81 354.60

10 NPC-Kaiga 3 & 4 195.79 365.85

11 Bundled Power under JVNSM 137.81 256.81

12 Vallur (JV) NTPC with TANGEDCO 363.75 643.42

13 Tuticorin Thermal Power Plant 440.79 695.21

14 NTPC – Kudigi 237.39 699.99

15 NTPC JNNSM Phase II (500MWs) 1727.81 3215.37

16 NNTPS -- 68.59

TOTAL 7695.85 13168.59

APGPCL

The projections for APGPCL – I and APGPCL – II are as shown below. For H2

FY 2017-18, the projection is same as the approved energy in the APERC Tariff

Order. For 2018-19 projections, the gas supply is considered at 0.45 MMSCMD.

APGPCL Allocated Capacity (Energy Availability- MUs )

S. No. Station Name H2 FY 2017-18 FY 2018-19

1 APGPCL I - Allocated capacity 13.83 19.44

2 APGPCL II - Allocated capacity 49.57 61.97

Total 63.40 81.41

Page 43: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

23

Gas based IPPs The availability of power from the generating stations of GGPP, Spectrum, Lanco

Kondapalli have been projected based on the current gas supply levels. Actual energy

availability till September- 2017, has been factored while estimating energy availability

for H2 FY 2017-18 and FY 2018-19, 40%-45% PLF has been assumed.

M/s. Reliance:

In respect of M/s. Reliance the PLF for H2 FY 2017-18 has been considered as Zero.

For FY 2018-19, M/s. Reliance Project has not been considered, as the PPA is going

to be expired on 23.12.2017.

M/s. LANCO:

The PPA subsisting with M/s LANCO expired on1st January 2016. The

APDISCOMs opted for Renewal of PPA as per the terms of expired PPA and the

projections have been furnished expecting that the PPA would get renewed. The

proposals for procurement of power during H2 FY 2017-18 was filed before APERC

vide IA No. 08 of 2017 in OP No. 28 & 29 of 2016 and the same is approved vide

order dated 29/11/2017.The GoAP has given permission for renewal of the PPA with

LANCO and the draft PPA is submitted before APERC. The entire capacity of

LANCO is being scheduled to AP DISCOMs with effect from 01.01.2016.

GGPP (Godavari Gas Power Plant):

The PPA subsisting with M/s GVK Phase-I expired on 20.06.2015 and M/s GVK-I

was scheduling entire power only to APDISCOMs w.e.f. 20.06.2015 as TSDISCOMs

did not claim any share upon expiry of PPA. M/s GVK was bought out by

APDISCOMs on 22nd April 2016 and has been now renamed as Godavari Gas Power

Plant.

GoAP was requested vide letter dated 21.06.2016 to permit APDISCOMs to form a

joint venture (private limited company) in respect of GGPP. Because of the operational

issues of GGPP, it was decided to hand over the 216 MW GGPP to APGENCO from

APDISCOMs on mutually agreeable terms. In this regard, a letter was addressed to

GoAP requesting to permit APDISCOMs to hand over the 216MW GGPP plant at

Jegurupadu to APGENCO.

Meanwhile, Hon’ble APERC in its Tariff order 2017-18 stated that “The old IPPs

i.e., M/s. Lanco Kondapalli, M/s. Spectrum (SPGL) and M/s. GVK whose PPAs have

expired and whose per unit costs are high compared to that of other stations and

Exchanges, have not been considered for dispatch”. As per the Tariff order dated

31.03.2017 and as per the instructions received from GoAP, it was decided to

discontinue the scheduling from M/s. LKPL and M/s. SPGL with immediate effect.

Since GGPP being own project of APDISCOMs was continued to generate.

However a petition I.A. No. 8 of 2017 in O.P.No.28 & 29 of 2016 was filed by

APDISCOMs requesting Hon’ble APERC to permit APDISCOMs to procure energy

from the above plants. The same was approved by Honourable APERC on 29-11-2017.

Page 44: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

24

For GGPP, Energy availability for the year 2017-18 H2 and 2018-19 were given based

on the projections that the gas is available to run two gas turbines in part load @ 30

MW each in combined cycle mode. Thus, 100MW generation per month is

considered for projections. A PLF of 45% was considered for 2017-18 H2 and a

PLF of 43% was considered for 2018-19 considering the scheduled outages for the

respective years.

M/s. SPGL:

The PPA with M/s SPGL of 205.187 MW gas based plant was expired on 18th

April 2016. On the expiry of PPA, the plant is operated on ad-hoc arrangement to

schedule the entire capacity to APDISCOMs on the same terms and conditions as the

expired PPA, and the costs would be trued up/down subject to the approval of

Hon’ble APERC. The APDISCOMs proposed to renew the plant for the next 15

years and the proposal was submitted to GoAP for approval.

Though Hon’ble Commission allowed dispatches for the year 2016-17, the

dispatches were not allowed by the commission in the Tariff order for 2017-18.

Further the GoAP has given instructions to strictly follow the APERC tariff guidelines.

Hence the plant was not allowed any dispatches from 08.04.2017. A petition I.A.No 8

of 2017 in O.P.No.28 & 29 of 2016 was filed by APDISCOMs requesting to permit

APDISCOMs to procure energy from M/s.SPGL since it is a cheaper power. The same

was approved by Honourable APERC on 29-11-2017.

Meanwhile, GoAP directed APDISCOMs to resume the generation from M/s. SPGL

to avoid the financial loss to DISCOMs and also directed to renew the expired PPA

subsisting with M/s. SPGL by negotiating the tariff with the generator for filing

before Hon’ble APERC. Accordingly the generator submitted the revised proposal and

the same is submitted to GoAP for approval. As per the instructions of GoAP, the plant

is allowed dispatches from 27.09.2017 onwards. As per the directions of APDISCOMs,

M/s. SPGL has submitted their revised proposal on fixed charges computation for

renewing the expired PPA for a further period of 15 years. The revised proposal

submitted by M/s. SPGL was submitted to GoAP requesting to accord permission to

APDISCOMs to go for renewal of the M/s. SPGL and to file the draft PPA before the

Hon’ble APERC.

For the FY 2017-18 H1, there was no offtake from the generator from 09.04.2017

to 26.09.2017 due to the instructions issued in Tariff order 2017-18. The energy

for the month of May & June 2017 was availed from M/s. SPGL as per the

request from APSLDC for few days due to transmission constraints in Kakinada

region and to avoid load shedding.

For H2 FY 2017-18 and FY 2018-19 M/s. SPGL has projected a PLF of 65%,

whereas DISCOMs are projecting 40% as per the present gas availability.

Old gas based IPPs (Energy Availability-MU) S. No. Station Name H2 FY 2017-18 FY 2018-19

1 Godavari Gas Power Plant 409.35 783.60

2 Spectrum 347.75 697.41

3 Lanco Kondapalli (Gas) 613.40 1,230.12

Page 45: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

25

4 Reliance BSES 0 0

Total 1,370.50 2,711.13

New Gas based IPPs: Energy availability from the New IPPs viz; GVK Extn, GMR Vemagiri, Gautami

& Konaseema is considered to be zero based on the Natural gas supplies from RIL

KG D-6 fields.

S.No New IPPs FY 2017-18

H2 (MU)

FY 18-

19

(MU) 1 GVK Extension Project 0 0

2 Vemagiri Power Generation Ltd 0 0

3 Gautami Power Ltd 0 0

4 Konaseema EPS Oakwell

power Ltd.

0 0

3.11 Non-Conventional Energy (NCE) Sources

Wind:

FY:2017-18 (H2)

Projects Commissioned and having APERC consent:

Anticipated Energy for the 2nd half of the FY 2017-18 (i.e., Oct 2017 to

Mar’2018) has been arrived by considering the actual energy supplied during

2nd half of the FY 2016- 17(i.e., Oct 2016 to Mar’2017).

Projects Commissioned but not having APERC consent:

Out of the 41 Nos wind power projects which are pending before APERC for

consent, 39 Nos projects were commissioned by the end of FY:2016-17 i.e,

March, 2017. For those projects which are not having full year data for FY:2016-

17 the energy has been considered based on the previous year CUF trend for the

months of October to March of the existing projects.

FY:2018-19

Existing Projects

Anticipated Energy for the FY: 2018-19 (April 2018 to March 2019) has been

arrived by considering the energy supplied during FY 2017-18 .

For upcoming projects:

Anticipated Energy for the FY: 2018-19 (April 2018 to March 2019) has

been arrived by considering the previous year monthly CUFs trend to arrive

monthly energy.

Page 46: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

26

For the projects having consented PPAs but yet to commission and

for the projects signed PPA which are pending ratification before GoAP, the

average CUF of 22% is considered for arriving energy duly considering

stabilization period also.

For the projects to be commissioned in 2nd half of FY:2018-19, CUF of

around 10% is considered keeping in view of the lean (i.e., November to March)

and stabilization period.

The following are the upcoming projects considered

S.

No

Projects Capacity

MW

Remarks

1 M/s. Axis Wind

Farms (Rayalaseema)

105 The PPA is submitted to APERC for consent

(one of the 41PPAs). Developer

proposed to commission by the

end of FY:2017-18.

M/s. Axis Energy

Ventures limited

(Adani Wind Energy

(AP) limited)

50.4 The PPA is submitted to APERC for consent

(one of the 41PPAs). Developer proposed to

commission by the end of FY:2017-18.

M/s. Axis Energy

Ventures

176.4 Considered for 2nd half of 2017-18 subject

to ratification of GoAP on APPCC decision.

The tariff for these projects is Rs.4.76/Unit as

determined by APERC vide orders

dtd:30.03.2017 subject to outcome of the

petitions O.P.No.01 of 2017 and O.P.No.05 of

2017 pending before APERC.

M/s. Axis Energy

Ventures

585.9 GoAP vide letter dtd:14.09.2017 accorded

approval for entering PPAs of capacity

600MW with M/s. Axis Energy Ventures as

per PIA, subject to the condition that APERC

shall determine the project specific tariff for

these projects after taking into consideration

the prevailing competitive bidding tariffs for

wind power in the country. The tariff for these

projects is considered as adhoc tariff of

Rs.4.76/Unit subject to tariff determined by

APERC as per the GoAP directions.

Page 47: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

27

M/s. ZR Green Energy 8 GoAP was informed that M/s. ZR Green

Energy Ltd did not furnish an undertaking on

foregoing the GBI. Later, the developer

agreed to forego GBI, accordingly submitted

the undertaking. But the project is likely to be

commissioned in 2018-19. The tariff

considered for this project is Rs.4.76/Unit as

determined by APERC vide orders

dtd:30.03.2017 subject to outcome of the

petitions O.P.No.01 of 2017 and O.P.No.05 of

2017 pending before APERC.

Tariff for the Wind Power Projects are as follows:

1. Rs 3.50/unit as per APERC order dt:01.05.2009 inclusive of Taxes.

2. Rs 4.70/unit as per APERC order dt:15.11.2012 inclusive of Taxes.

3. Rs.4.83/unit without AD benefit and Rs 4.25/unit with AD benefit is

exclusive of taxes (MAT pass through) as per APERC order dt:1.08.2015

4. Rs.4.84/unit without AD benefit and Rs 4.25/unit with AD benefit is

exclusive of taxes (MAT pass through) as per APERC order

dt:26.03.2016.

5. Projects under REC mechanism, the pooled cost arrived @ Rs.3.73/Unit

for FY:2016-17 applicable for FY:2017-18 subject to APERC approval is

considered in the ARR for FY:2017-18 (H2) and for FY:2018-19 also, as the

pooled cost for FY:2017-18 applicable for FY:2018-19 cannot be determined

now.

6. The 50% of the pooled cost (Rs.3.73/unit) i.e., Rs 1.865/unit is considered for

the FY 2017-18 for the projects M/s. RCI and M/s. Bharath Wind Farms.

7. M/s. Nile Limited and M/s IL&FS Limited extended PPA @ Rs.2.23/ Unit.

8. The tariff has been considered as Rs.4.76/Unit as determined by APERC

vide orders dtd:30.03.2017 subject to outcome of the petitions O.P.No.01 of

2017 and O.P.No.05 of 2017. In respect of M/s. Axis Energy Ventures

projects 585.9 MW capacity subject to determination of specific tariff by

APERC as per the GoAP directions.

Note: The tariff for the wind power projects for FY:2018-19 has been

considered under Regulation 01 of 2015 (With GBI of Rs 0.50).

Solar:

FY:2017-18 (H2)

1. Anticipated Energy for the existing projects for the 2nd half of the FY 2017-18

(Oct 2017 to Mar’2018) has been arrived by considering the Actual Energy

supplied during FY 2016-17 (Oct 2016 to Mar’2017).

2. For the APGENCO 5 MW canal bund solar power project at Gollagudem (V),

Ungatur (M), in West Godavari District ,the anticipated Energy for the 2nd half of

Page 48: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

28

the FY 2017-18 (Oct 2017 to Mar’2018) has been arrived as per the projections

submitted by APGENCO.

3. For the NREDCAP 1 MW Canal Top Solar Power project on Losari Canal,

the anticipated Energy for the 2nd half of the FY 2017-18 (Oct 2017 to

Mar’2018) has been arrived as per the projections submitted by NREDCAP.

4. For the NTPC 1000 MW solar power project at Gani ,Kurnool, the anticipated

Energy for the 2nd half of the FY 2017-18 (Oct 2017 to Mar’2018) has been

arrived by considering @ 21% PLF (Maximum CUF mentioned in the PPAs

signed by NTPC with SPDs).

FY:2018-19

5. Anticipated Energy for the existing projects for the 1st half of the FY: 2018-19

(April 2018 to Sept 2018) has been arrived by considering the Actual Energy

supplied during 1st half of the FY 2017-18 (April 2017 to Sept 2017).

6. The Anticipated Energy for the existing projects for the 2nd half of the FY

2018-19 (Oct 2018 to Mar’2019) has been arrived by considering anticipated

energy projected in the 2nd half of the FY 2017-18 (Oct 2017 to Mar’2018).

7. For the APGENCO 5 MW canal bund solar power project at Gollagudem (V),

Ungatur (M), in West Godavari District, the anticipated Energy for the FY:

2018-19 has been arrived as per the projections submitted by APGENCO.

8. For the NREDCAP 1 MW Canal Top Solar Power project on Losari Canal,

the anticipated Energy for the FY: 2018-19 has been arrived as per the projections

submitted by NREDCAP.

9. For the NTPC 1000 MW solar power project at Gani , Kurnool , the

anticipated Energy for the FY: 2018-19 has been arrived by considering @ 21%

PLF( Maximum CUF mentioned in the PPAs signed by NTPC with SPDs).

10. The 400 MW solar power project to be set up by SECI at Galiveedu Mandal,

Kadapa district is expected to be commissioned by September 2018. The

anticipated energy @ 20% PLF from October'2018 to March'2019 is considered

for the year FY 2018-19.

11. For the 400MW solar power project to be set up by APGENCO at

Talaricheruvu(V), near Tadipatri, Ananthapur District, is expected to be

commissioned by September 2018. The anticipated energy @ 20% PLF from

October'2018 to March'2019 is considered for the year FY 2018-19.

12. For the ARR projections only solar energy is considered for the bundled

power projects (Kurnool 1000 MW Solar Park at Gani & NTPC NVVNL

Bundled Power Project under JNNSM Scheme) and commercial wing will

project the thermal power projections.

3.12 Biomass, Bagasse, Industrial Waste and Mini Hydel Projects:

FY:2017-18 (H2)

Anticipated Energy for the 2nd half of the FY 2017-18 (Oct 2017 to Mar’2018) has

been arrived by considering 110% of the actual energy supplied during 2nd half of the

FY 2016- 17(Oct 2016 to Mar’2017).

Page 49: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

29

FY:2018-19

Anticipated Energy for the 1st half of the FY: 2018-19 (April 2018 to Sept 2018) has

been arrived by considering 110% of the actual energy supplied during 1st half of the

FY 2017- 18 (April 17 to September 17).

Anticipated energy for the 2nd half of the FY 2018-19 (Oct 2018 to Mar’2019) has

been arrived by considering anticipated energy projected in the 2nd half of the FY

2017-18(Oct 2017 to Mar’2018).

Biomass, Bagasse, Biomass, Industrial Waste and Mini Hydel developers are being

paid the tariff as per the APERC orders and the same is considered which is

exclusive of Electricity Duty, and MAT/Income Tax for the 2nd half of FY2017-18

and for FY:2018-19. As and when claimed by the developers, the same has to be

reimbursed.

New capacity additions considered in respect of Biomass and Mini Hydel projects is

as follows:

3.13 Biomass Projects:

M/s.Vishnu Vidyut India Limited energy has been considered with an average

PLF of 30% from the month of Oct’2017 to March 2019 since APERC issued

consent to this project PPA and the tariff is as per APERC order.

3.14 Mini Hydel

M/s. Khandaleru Power Company Limited (6 MW) energy has been considered

with an average PLF of 32% from Nov’2017 to March’2019 and tariff for this

projects is considered as Rs. 3.73/unit(Computed Pooled cost subject to approval

of APERC) which is exclusive of Electricity Duty and Royalty charges.

Energy availability projections for H2 FY 2017-18 and FY 2018-19 from

various NCE sources is as summarized in the following table:

Non-Conventional Energy Sources ( Net Energy Availability - MUs )

S. No. Station Name H2 FY 2017-18 FY 2018-19

1 Bio Mass Power Projects including

Co- gen

189.21 350

2 Bagasse Cogeneration Projects. 72.08 75.13

3 Wind Power Projects 1937.69 7808.58

4 Mini Hydel Power Projects 78.11 105.05

5 Industrial Waste Based Power Projects 16.91 30.45

6 Municipal Waste Based Power Projects 0 0

Page 50: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

30

7 NCL Energy Ltd. 9.2 13.6

8 Solar Power Projects 548.30 1064.04

9 Solar Parks 1137.62 2690.17

10 NVVNL Bundled Power -SOLAR 21.59 36.39

11 NTPC Ramagundam Solar Power 5.14 9.50

Total 4015.85 12182.91

Mini Power Plants

M/s. Srivathsa:

The energy availability from Srivathsa for FY 2017-18 H2 and FY 2018-19 has

been projected at around 45% PLF.

M/s. LVS:

In respect of LVS, a petition has been filed before the Hon’ble High court to declare

the PPA as inadmissible and hence no availability has been considered for H2 FY

201 7-1 8 and FY 2018-19.

Mini-Power Plants Allocated to EPDCL (Energy Availability-MUs)

S, No. Station Name FY 2017-18 H2 FY 2018-19

1 Srivathsa 32.95 68.41

2 LVS 0 0

Total 32.95 68.41

3.15 Long Term

Long Term – Thermal Power Tech Corporation India Limited

The energy availability projections in respect of M/s. TPCIL for the FY 18-19 as

received from Generator duly taking into consideration of annual maintenance /

Unit overhaul is 1,985.31 MU. The energy availability / despatch is limited to 1,825

MU as per the directions of GoAP and energy requirements of APDISCOMs.

With respect to H2 FY 17-18, the energy availability and despatch has been

considered as per the Retail Supply Tariff Order FY 17-18 notified by APERC.

Generator

Name

H2 FY 2017-18 FY 2018-19 Energy

Availability

(MU)

Energy

Dispatch

(MU)

Energy

Availability

(MU)

Energy

Dispatch

(MU)

TPCIL 855.81 855.81 1,825 1,825

Long Term – KSK Mahanadi

The energy availability projections in respect of M/s. KSK Mahanadi for the FY

2018-19 as received from Generator duly taking into consideration of annual

maintenance

Page 51: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

31

/ Unit overhaul is 3504 MU. The energy availability / despatch is limited to 2500 MU

as per the directions of GoAP and energy requirements of APDISCOMs.

With respect to H2 FY 17-18, the energy availability and despatch has

been considered as per the Retail Supply Tariff Order FY 17-18 notified by APERC.

Generator Name

H2 FY 2017-18 FY 2018-19

Energy

Availability

(MU)

Energy

Dispatc

h (MU)

Energy

Availability

(MU)

Energy

Dispatc

h (MU) KSK Mahanadi 1,292.66 1,292.66 2,500 2,500

The projection of 2,500 MUs is based on the actual delivery by the Generators for the

FY 2017-18.

3.16 Bilateral/Exchanges Purchases

Bilateral Purchases

As per the load forecast of APSLDC, (detailed time block wise demand supply

is enclosed in energy requirement write-up) there is a RTC power requirement of

around 500 MW in the months of January, February, March, April and May.

Accordingly, APDISCOMs are planning to invite bids for RTC power during these

months in H2 FY 2017-18 and FY 2018-19.

Accordingly, APDISCOMs have projected energy availability of 12 MU per day for

3 months in H2 FY 2017-18 and 5 months in FY 2018-19.

POWER EXCHANGE

AP Discoms have projected around 6 MU per day of power purchase from

power exchanges to meet the deficit on need basis.

Summary

A summary of the source wise current estimate of energy available for H2 FY 2017-

18 and FY 2018-19 is presented below.

Generating Station

Energy Availability (MU)

H2 FY 2017-18 FY 2018-19

APGenco (APGenco & DSTPP –I&II)-

Thermal 9940.32 27452.46

APGenco (APGenco )- Hydel 796.68 2500.00

CGS 7695.85 13168.59

APGPCL 63.40 81.41 IPPs 1370.50 2711.13

NCEs 4015.84 12182.91 Mini Power Plants (Srivathsa) 32.95 68.41

Page 52: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

32

HNPCL 1733.50 0 Long Term (KSK & TPCIL) 2148.47 4324.99

Bilateral Purchases 1080.00 1812.00 Exchange 540.00 810.00 Other short term sources 1380.62 1061.23

Total 30798.14 66173.14

3.17 POWER PURCHASE COST

APDISCOMs have limited the payments to generating stations to the approved values

in tariff order of FY 2017-18 for H1 FY 2017-18. Even though the generating

stations are claiming variations in fuel cost as pass through, APDISCOMs have not

accepted such deviations in variable cost beyond the APERC approved values.

APDISCOMs shall only pay such additional variable cost upon approval of the

Appropriate Commission.

3.18 APGENCO (ANDHRA PRADESH GENCO &APPDCL)

The annual fixed costs for all existing APGENCO stations for FY 2017-18 have

been considered as approved by APERC in its order dated 26.03.2016 in OP

No.3/2016 filed by APGENCO for determination of tariff for FY 2014-19.

APGENCO also projected the same. APERC vide its letter Lr.No.APERC/Secy/tariff/

F.No.65/D.No.505 of 2017 dated 07.06.2017 has directed that APDISCOMs shall

continue to pay adhoc tariff of Rs. 3.63/kWh to SDSTPS subject to any further or

final orders of the Commission.

The tariff for RTPP-IV has not yet been determined by the Hon’ble APERC. The

licensee has estimated the fixed costs based on CERC norms and the details

provided by APGENCO. Rayalaseema Thermal Power Project Stage-IV (1*600 MW)

is being set up by APGENCO. The then APDISCOMs have signed a PPA with

APGENCO on 22.11.2010. The Amended and Restated PPA is yet to be entered by

APGENCO with APDISCOMs by limiting to two DISCOMs of AP. The net

availability from the RTPP Stage – IV is considered as 2,428.24 MU considering

stabilization of the unit post COD . The interim tariff of Rs. 4.24/kWh (Rs. 1.10/Kwh

towards fixed cost and Rs. 3.14/Kwh towards variable cost) is proposed to be

considered for RTPP-IV for payment on actual generation till a final tariff is decided

by the Commission. The auxiliary consumption is considered as 7.5%. The tariff

application is yet to be filed before Hon’ble Commission by APGENCO.

The total fixed costs for all the AP GENCO thermal and hydel stations1 including

both existing and new stations is Rs.1,658.68 Crs for H2 of FY 2017-18 including

interest on pension bonds amount of Rs. 378.98 Cr and Rs. 4,582.80 Crs for FY 2018-

19 including interest on pension bonds amount of Rs. 808.28 Cr. Fixed cost of

APGenco stations has been considered in full as approved by Hon’ble Commission

and Licensee will pay full fixed charges considering “ Must Pay” status for state

gencos. APGenco stations shall be considered as “Must Run” while dispatching of

energy and subject to grid conditions and the directions given by SLDC provided no

additional financial burden to the APDiscoms.

Page 53: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

33

The fixed costs for GENCO Thermal and Hydel stations have been tabulated below:

Station Fixed Costs for

FY 2017-18 H2

(Rs.

Cr.)

Fixed Costs for

FY 2018-19 (Rs.

Cr.)

APGENCO-Thermal

VTPS I 112.25 231.88

VTPS II 112.25 231.88

VTPS III 112.25 231.88

VTPS IV 228.33 444.03

RTPP I 135.71 276.71

RTPP Stage-II 207.18 405.24

RTPP Stage-III 138.46 269.76

RTPP Stage-IV - 267.11

1The fixed costs for TSGENCO stations have not been considered

Station Fixed Costs for

FY 2017-18 H2

(Rs.

Cr.)

Fixed Costs for

FY 2018-19 (Rs.

Cr.)

Damodaram Sanjeevaiah

Thermal power station –I Unit-1

0

470.85

Damodaram Sanjeevaiah

Thermal power station –I Unit-2

0

469.92

Interest on pension bonds 378.98 808.28

APGENCO Thermal Total 1,425.39 4,107.54

Total Thermal

APGENCO –Hydel

MACHKUND PH AP Share 15.33 31.89

TUNGBHADRA PH AP Share 10.51 21.87

USL 27.94 57.45

LSR 53.55 110.11

Page 54: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

34

DONKARAYI 2.91 5.98

SSLM 84.45 170.52

NSRCPH 8.87 17.85

PABM 5.22 10.55

Mini hydro 0.39 0.78

Nagarjuna sagar tail pond dam PH 24.13 48.26

Total Hydro 233.29 475.26

TOTAL GENCO 1,658.68 4,582.80

3.19 Note:

Due to regulation of power to TSDISCOMs by APGENCO and to APDISCOMs by

TSGENCO w.e.f 11.06.2017, APGENCO requested to avail 100% power from

APGENCO thermal stations and interstate projects.

APERC approved FC&VC to the extent of 46.11% (AP share) from APGENCO

and TSGENCO stations in the tariff order for FY 2017-18.

As there is no approval from APERC for the energy supplied by APGENCO over

and above the energy approved as per the allocation of power (46.11%), a committee

was constituted with representatives of APDISCOMs, APGENCO, APTRANSCO &

SLDC for negotiation of tariff for the additional energy supplied by APGENCO thermal

stations to APDISCOMs (53.89% of TSDISCOMs share).

In the minutes of Meeting dtd.18.07.2017, the following decisions have been taken by

the committee-

i) To avail the excess power of APGENCO which was stopped to TSDISCOMs

by paying the same Fixed Cost & Variable Cost as what APDISCOMs

would have paid to TSDISCOMs due to regulation of power.

ii) The differential Fixed Cost of Rs. 227.47 Cr, the differential Variable Cost of

Rs.

237.33 Cr. (i.e., Rs.0.43 per unit (Rs. 2.7 - Rs.2.27 = Rs. 0.43)) and the

differential additional interest on pension bonds of Rs. 380 Cr will be

admitted by APDISCOMs subject to approval of APERC and to recognize

the revenue in the ARR for FY 2017-18. The total impact of the above is

additional burden of around Rs. 844.80 Cr. It may vary based on the actual

energy availed by APDISCOMs.

iii) The same was communicated to GoAP & Hon’ble Commission vide lr. dt.

22.09.2017 and directions from GoAP is awaited.

Subsequently the following decisions were taken by APGENCO and APDISCOMs

on 18.10.2017-

a) To pay 100% Fixed Charges to APGENCO in anticipation of approval from

Page 55: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

35

GoAP & APERC w.e.f. 11.06.2017 due to regulation of power to TSGENCO.

b) To pay the Variable Charges as per the rate approved in the tariff order for

FY 2017-18 for the energy of 46.11% of total power supplied by

APGENCO & for the energy over and above the 46.11% the energy charges at

weighted average rate of TSGENCO stations @ Rs.2.27/Kwh w.e.f.

11.06.2017 due to power regulation to TS.

c) Additional interest on pension bonds to the extent of TS share to be

admitted. Accordingly, the payments are being admitted w.e.f. 11.06.2017.

1. APGENCO & DSTPP projected the energy availability based on minimum

guaranteed coal linkages in Fuel Supply Agreements. APGENCO proposed to

procure imported coal to meet the shortfall in domestic coal, if any, to the extent of

10% of total requirement.

2. APGENCO has projected an Income Tax of Rs. 6.64 Crore as per the audited

accounts of FY 2016-17. APDISCOMs have considered the same for FY 2018-19.

With respect to APGENCO Thermal stations the FCA bills for FY 2017-18 H1 Q2 has

been received for Rs. 163.94 Cr. Currently, there is no tariff order for SDSTPS-I & II, an

adhoc payment of Rs. 3.63 Rs/kWh is being admitted for FY 2017-18 as per APERC

letter Lr.No.APERC/Secy/tariff/F.No.65/D.No.505 of 2017 dated 07.06.2017 subject to

any further or final orders of the Commission and the same has been assumed for H2 FY

2017-18. For FY 2018-19, the energy charges are considered at an adhoc rate of

Rs.3.63/kWh at present (VC-Rs.2.61/kWh as projected by the generator & balance of

Rs.1.02/kWh is considered towards FC). If tariff is finalized by Hon’ble Commission &

source of revenue is indicated/approved the same will be admitted in respect of DSTPP-I

& II.

For the determination of variable cost for FY 2018-19 for APGENCO stations, the

projections submitted by APGENCO was taken and restricted to 3% escalation over

the approved variable cost for FY 2017-18.

Due to inadequate supply of coal from M/s MCL, the coal stocks at APGENCO

& DSTPP-I & II is depleted. Hence GoAP has given permission to procure imported

coal to certain extent (10%) to meet the demand.

Hence, considering the above, and the norms stated by the Hon’ble APERC, the

variable costs for APGENCO stations for FY 2017-18 H2 and FY 2018-19 are as

indicated in the following table :

Station Variable

rate

(Rs./kWh)

H2 FY 2017-18

Variable

rate

(Rs./kWh)

FY 2018-19

APGENCO Stations

VTPS (I, II, III) 2.59 2.67

Page 56: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

36

VTPS-IV 2.34 2.41

RTPP-I 3.05 3.14

RTPP-II 3.05 3.14

RTPP-III 3.05 3.14

RTPP – IV** - 3.14

Damodaram SanjeeviahTPS-I 3.63 2.61

Damodaram SanjeeviahTPS-I 3.63 2.61

** The interim tariff of Rs. 4.24/kWh (Rs. 1.10/kWh towards fixed cost and Rs.

3.14/kWh towards variable cost) is proposed to be considered for RTPP-IV.

The incentives for GENCO thermal stations are calculated based on APERC

Regulation No 1 of 2008, at a flat rate of 25 paisa/kWh for ex-bus scheduled energy

corresponding to scheduled generation in excess of ex-bus energy corresponding to

target Plant Load Factor.

3.20 CGS:

NTPC - Ramagundam Stage I & II (3x200 MW & 3x500MW)

NTPC had established Ramagundam Super Thermal Power Station Stage I & II with

total installed capacity of 2100 MW and this station is being treated as Inter State

Generating Station having firm allocations as well as unallocated power allocation to

all SR beneficiaries. The firm allocations had been issued by Ministry of Power,

GoI. The unallocated power allocation (15%) of total installed capacity has been

changed from time to time based on the necessity of any SR state. Presently, AP has a

firm share of 252.86 MW inclusive of unallocated share also. In every month SRPC

has been certifying the availability of station and scheduled energy of respective

state for payment of fixed charges as well as variable charges. SRPC has been

certifying the scheduled energy in every month of each state based on the data being

submitted by SRLDC, from all nodal points of that state.

Hon’ble Central Electricity Regulatory Commission which was constituted under the

provisions of Electricity Act, 2003 has been giving the regulations to Terms and

conditions of Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well

as Inter State Transmission Licensee (PGCIL) in every control period i.e., presently

2014-19 are in force. Based on the regulations of CERC for determination of tariff

(fixed charges) and also as per the formats for filings before CERC, NTPC had

submitted the petition before CERC for approval of fixed charges to control period

2014-19. After thorough examination of filings as filed by NTPC, CERC had issued the

orders to the control period 2014-19 for making payment of total fixed charges by all

SR beneficiaries as per the certification of SRPC in monthly Regional Energy Account

(REA). CERC had approved the fixed charges to Ramagundam Stage I & II with the

total value of Rs.1,068.23 Crs for FY 2018-19 with the inclusion of moisture content

correction factor in the coal as mentioned in the orders of CERC.

Page 57: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

37

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NTPC

was requested to furnish the availability projections in every month for Ramagundam

Stage I

& II along with overhauling (to consider revisions if any for FY 2017-18) for H2

FY 2017-18 & 2018-19. Based on the projections of NTPC Ramagundam Stage-I &

II and also duly considering the requirement of energy during FY 2018-19 of

APDISCOMs to dispatch the energy from all long term power purchases, NTPC

Ramagundam Stage-I & II power project energy availability is considered as 1,370 MU

with an annual PLF of 66%. However, APDISCOMs had considered the fixed

charges to the extent of recoverable PLF of 85%.

The fixed charges are computed based on the projected available PLF in every month

duly considering the total approved fixed charges of CERC for H2 FY 2017-18 & FY

2018-19 along with considering the incentive at the rate of 50 paisa per unit over and

above the threshold PLF of 85%. The variable charges per unit are arrived by

considering 3% escalation of variable charges per unit approved by APERC in the

Tariff Order of FY 17-With this, the fixed charge works out to Rs.128.63 Crs and

variable charges Rs.299.15 Crs for FY 2018-19 by considering the PLF as 66%

(Plant Load Factor) i.e., considering the variable cost per unit as Rs. 2.18.

The differential amounts in variable cost over and above the approved figures, if any,

are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs. Crs

Variable Charges in

Rs. Crs.

Total Charges in

Rs. Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

Rama

g

unda

m I &

II

89%

66%

62.21

128.63

220.00

299.15

282.21

427.78

NTPC - Ramagundam Stage III (500MW)

NTPC had established Ramagundam Super Thermal Power Station Stage III with total

installed capacity of 500 MW and this station is being treated as Inter State Generating

Station having firm allocations as well as un-allocated power allocation to all SR

beneficiaries. The firm allocations had been issued by Ministry of Power, GoI. The

unallocated power allocation (15%) of total installed capacity has been changed from time

to time based on the necessity of any SR state. Presently, AP has a firm share of 63.01

MW inclusive of unallocated share also. In every month SRPC has been certifying the

availability of station and scheduled energy of respective state for payment of fixed

charges as well as variable charges. SRPC has been certifying the scheduled energy in

every month of the respective state based on the data being submitted by SRLDC, from all

nodal points of respective state.

Hon’ble Central Electricity Regulatory Commission which was constituted under the

provisions of Electricity Act, 2003 has been giving the regulations to Terms and

Page 58: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

38

conditions of Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well

as Inter State Transmission Licensee (PGCIL) in every control period i.e., presently

2014-19 are in force. Based on the regulations of CERC for determination of tariff

(fixed charges) and also as per the formats for filings before CERC, NTPC had

submitted the petition before CERC for approval of fixed charges to control period

2014-19. After thorough examination of filings as filed by NTPC, CERC had issued the

orders to the control period 2014-19 for making payment of total fixed charges by all

SR beneficiaries as per the certification of SRPC in monthly Regional Energy Account

(REA). CERC had approved the fixed charges to Ramagundam Stage III with the total

value of Rs.272.49 Crs for FY 2018-19 with the inclusion of moisture content

correction factor in the coal as mentioned in the orders of CERC.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NTPC

was requested to furnish the availability projections in every month of Ramagundam

Stage III along with overhauling (to consider revisions if any for FY 2017-18) for H2

FY 2017-18 & 2018-19. Based on the projections of NTPC Ramagundam Stage-III

and also duly considering the requirement of energy during 18-19 of APDISCOMs

to dispatch the energy from all long term power purchases, NTPC Ramagundam

Stage-III power project energy availability is considered as 320.27 MU with an annual

PLF of 62% for FY 2018-19. However, APDISCOMs had considered the fixed charges

to the extent of recoverable PLF of 85%.

The fixed charges are computed based on the projected available PLF in every month

duly considering the total approved fixed charges of CERC for H2 FY 2017-18 & FY

2018-19 and also incentive at the rate of 50 paisa per unit over and above the

threshold PLF of 85%. The variable charges per unit are arrived by considering 3%

escalation of variable charges per unit approved by APERC in the Tariff Order of FY

2017-18. With this, the fixed charge works out to Rs. 34.34 Crs and variable charges

Rs.68.94 Crs for FY 2018- 19 by considering the PLF as 62% (Plant Load Factor) i.e.,

considering the variable cost per unit as Rs. 2.15. The differential amounts in variable

cost over and above the approved figures, if any, are to be paid by APDISCOMs which

attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs. Crs

Variable Charges

in Rs. Crs.

Total Charges in

Rs. Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-

18

FY 18-

19

Ramag

undam

III

85%

62%

17.04

34.34

50.73

68.94

67.77

103.28

NTPC - Talcher Stage –II (4 X 500MWs)

NTPC had established Talcher Super Thermal Power Station Stage II with total

installed capacity of 2000 MW and this station is being treated as Inter State

Generating Station having firm allocations as well as un-allocated power

allocation to all SR beneficiaries. The firm allocations had been issued by

Ministry of Power, GoI. The unallocated power allocation (15%) of total installed

capacity has been changed from time to time based on the necessity of any SR

state. Presently, AP has a firm share of 164.36 MW inclusive of unallocated share

Page 59: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

39

also. In every month SRPC has been certifying the availability of station and

scheduled energy of respective state for payment of fixed charges as well as

variable charges. SRPC has been certifying the scheduled energy in every month of

the each state based on the data being submitted by SRLDC, from all nodal points of

that state.

Hon’ble Central Electricity Regulatory Commission which was constituted

under the provisions of Electricity Act, 2003 has been giving the regulations to

Terms and conditions of Tariff to Inter State Generating Stations (NTPC, NLC &

Others) as well as Inter State Transmission Licensee (PGCIL) in every control

period i.e., presently 2014-19 are in force. Based on the regulations of CERC for

determination of tariff (fixed charges) and also as per the formats for filings

before CERC, NTPC had submitted the petition before CERC for approval of

fixed charges to control period 2014-19. After thorough examination of filings as

filed by NTPC, CERC had issued the orders to the control period 2014-19 for

making payment of total fixed charges by all SR beneficiaries as per the

certification of SRPC in monthly Regional Energy Account (REA). CERC had

approved the fixed charges to Talcher Stage II with the total value of Rs.1013.23

Crs for FY 2018- 19 with the inclusion of moisture content correction factor in the

coal as mentioned in the orders of CERC.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NTPC

was requested to furnish the availability projections in every month of Talcher Stage II

along with overhauling (to consider revisions if any for FY 2017-18) for H2 FY

2017-18 & 2018-19. Based on the projections of NTPC Talcher Stage-II and also

duly considering the requirement of energy during 18-19 of APDISCOMs to dispatch

the energy from all long term power purchases, NTPC Talcher Stage-II power project

energy availability is considered as 1016.15 MU with an annual PLF of 75% for

FY 2018-19. However, APDISCOMs had considered the fixed charges to the extent of

recoverable PLF of 85%. The fixed charges are computed based on the projected

available PLF in every month duly considering the total approved fixed charges of

CERC for H2 FY 2017-18 & FY 2018-19 and also incentive at the rate of 50 paisa

per unit over and above the threshold PLF of 85%. The variable charges per unit are

arrived by considering 3% escalation of variable charges per unit approved by APERC

in the Tariff Order of FY 2017-18. With this, the fixed charge works out to Rs. 83.27

Crs for FY 18-19 and variable charges Rs.141.59 Crs for FY 2018-19 by considering

the PLF as 75% (Plant Load Factor) i.e., considering the variable cost per unit as

Rs.1.39. (i.e., considering 3% escalation of September-17 actual variable cost per unit

which is less than the APERC approved variable cost per unit for FY 17-18). The

differential amounts in variable cost over and above the approved figures, if any,

are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18 FY 18-19 H2 17-18

FY 18-

19

Talcher

II

96%

75%

47.83

83.27

86.59

141.59

134.42

224.85

Page 60: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

40

NTPC - Simhadri Stage –I (2 X 500MW)

NTPC had established Simhadri Super Thermal Power Station Stage – I with total

installed capacity of 1000 MW and presently this station is being treated as

Inter State Generating Station having power allocation to AP & Telangana in

the ratio of 46.11 &

53.89 respectively. These allocations had come into existence after enactment

of AP Reorganisation Act, 2014. Presently, AP has a firm share of 461.10 MW.

In every month SRPC has been certifying the availability of station and scheduled

energy of AP state for payment of fixed charges as well as variable charges.

SRPC has been certifying the scheduled energy in every month of AP state

based on the data being submitted by SRLDC, from all nodal points of the state.

Hon’ble Central Electricity Regulatory Commission which was constituted

under the provisions of Electricity Act, 2003 has been giving the

regulations to Terms and conditions of Tariff to Inter State Generating Stations

(NTPC, NLC & Others) in every control period i.e., presently 2014-19 are in

force. Based on the regulations of CERC for determination of tariff (fixed

charges) and also as per the formats for filings before CERC, NTPC had

submitted the petition before CERC for approval of fixed charges to control

period 2014-19. After thorough examination of filings as filed by NTPC, CERC

had issued the orders to the control period 2014-19 for making payment of

total fixed charges by AP & Telangana as per the certification of SRPC in

monthly Regional Energy Account (REA). CERC had approved the fixed charges

to Simhadri Stage-I with the total value of Rs.671.19 Crs for FY 2018-19 with the

inclusion of moisture content correction factor in the coal as mentioned in the

orders of CERC.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC,

NTPC was requested to furnish the availability projections in every month in

respect of Simhadri Stage-I along with overhauling (to consider revisions if any

for FY 2017-18) for H2 FY 2017-18 & 2018-19. Based on the projections of

NTPC Simhadri Stage-I and also duly considering the requirement of energy

during 18-19 of APDISCOMs to dispatch the energy from all long term power

purchases, NTPC Simhadri Stage-I power project energy availability is considered

as 2507.82 MU with an annual PLF of 66%. However, APDISCOMs had

considered the fixed charges to the extent of recoverable PLF of 85%. The fixed

charges are computed based on the projected available PLF in every month duly

considering the total approved fixed charges of CERC for H2 FY 2017-18 &

2018-19 along with considering the incentive at the rate of 50 paisa per unit over

and above the threshold PLF of 85%. The variable charges per unit are arrived

by considering 3% escalation of variable charges per unit approved by APERC in

the Tariff Order of FY 17-18. With this, the fixed charge works out to Rs. 309.48

Crs for FY 2018-19 and variable charges Rs. 671.60 Crs for FY 2018-19 by

considering the PLF as 66% (Plant Load Factor) i.e., considering the variable cost

per unit as Rs. 2.68.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Page 61: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

41

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs. Crs

Variable Charges in

Rs. Crs.

Total Charges in

Rs. Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

Simhad

ri

Stage-I

83%

66%

155.17

309.48

412.73

671.60

567.89

981.08

3.21 NTPC - Simhadri Stage –II (2 X 500MWs)

NTPC had established Simhadri Super Thermal Power Station Stage II with total

installed capacity of 1000 MW and this station is being treated as Inter State

Generating Station having firm allocations as well as un-allocated power allocation to

all SR beneficiaries. The firm allocations had been issued by Ministry of Power, GoI.

The unallocated power allocation (15%) of total installed capacity has been changing

from time to time based on the necessity of any SR state. Presently, AP has a firm

share of 184.38 MW inclusive of unallocated share also. Every month, SRPC has been

certifying the availability of station and scheduled energy of each state for payment

of fixed charges as well as variable charges. SRPC has been certifying the

scheduled energy in every month of each state based on the data being submitted by

SRLDC, from all nodal points of that state.

Hon’ble Central Electricity Regulatory Commission which was constituted under the

provisions of Electricity Act, 2003 has been giving the regulations to Terms and

conditions of Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well

as Inter State Transmission Licensee (PGCIL) in every control period i.e., presently

2014-19 are in force. Based on the regulations of CERC for determination of tariff

(fixed charges) and also as per the formats for filings before CERC, NTPC had

submitted the petition before CERC for approval of fixed charges to control period

2014-19. After thorough examination of filings as filed by NTPC, CERC had issued the

orders to the control period 2014-19 for making payment of total fixed charges by all

SR beneficiaries as per the certification of SRPC in monthly Regional Energy Account

(REA). CERC had approved the fixed charges to Simhadri Stage II with the total value

of Rs.1094.98 Crs for FY 2018- 19 with the inclusion of moisture content correction

factor in the coal as mentioned in the orders of CERC.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NTPC

was requested to furnish the availability projections in every month of Simhadri Stage II

along with overhauling (to consider revisions if any for FY 2017-18) for H2 FY

2017-18 & 2018-19. Based on the projections of NTPC Simhadri Stage-II and also

duly considering the requirement of energy during 18-19 of APDISCOMs to dispatch

the energy from all long term power purchases, NTPC Simhadri Stage-II power project

energy availability is considered as 988.58 MU with an annual PLF of 65%.

However, APDISCOMs had considered the fixed charges to the extent of recoverable

PLF of 85%.

The fixed charges are computed based on the projected available PLF in every month

duly considering the total approved fixed charges of CERC for H2 FY 2017-18 & 2018-

Page 62: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

42

19 and also incentive at the rate of 50 paisa per unit over and above the threshold PLF

of 85%. The variable charges per unit are arrived by considering 3% escalation of

variable charges per unit approved by APERC in the Tariff Order of FY 2017-18.

With this, the fixed charge works out to Rs. 201.89 Crs for FY 2018-19 and variable

charges Rs. 264.74 Crs for FY 2018-19 by considering the PLF as 65% (Plant Load

Factor) i.e., considering the variable cost per unit as Rs. 2.68.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

Simhad

ri

Stage-

II

79%

65%

103.65

201.89

158.07

264.74

261.72

466.63

NLC TPS-II Stage-I (3X210 MW))

Neyveli Lignite Corporation limited (NLC India Limited) had established TPS –II at

Neyveli with Stage-I (630 MW) and this station is being treated as Inter State Generating

Station having firm allocations as well as un-allocated power allocation to all SR

beneficiaries excluding the NLC mines share allocation of 7.94%. The firm allocations

had been issued by Ministry of Power, GoI. The unallocated power allocation (15%) of

total installed capacity has been changing from time to time based on the necessity of any

SR state. Presently, AP has a firm share of 46.10 MW (Stage-I) inclusive of unallocated

share also. Every month, SRPC has been certifying the availability of station and

scheduled energy of each state for payment of fixed charges as well as variable charges.

SRPC has been certifying the scheduled energy in every month of each state based on the

data being submitted by SRLDC, from all nodal points of that state.

Hon’ble Central Electricity Regulatory Commission which was constituted under the

provisions of Electricity Act, 2003 has been giving the regulations to Terms and

conditions of Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well as

Inter State Transmission Licensee (PGCIL) in every control period i.e., presently 2014-19

are in force. Based on the regulations of CERC for determination of tariff (fixed charges)

and also as per the formats for filings before CERC, NLC had submitted the petition

before CERC for approval of fixed charges to control period 2014-19. After thorough

examination of filings as filed by NLC, CERC had issued the orders to the control period

2014-19 for making payment of total fixed charges by all SR beneficiaries as per the

certification of SRPC in monthly Regional Energy Account (REA). CERC had approved

the fixed charges for NLC TPS-II Stage-I with the total value of Rs. 299.80 Crs for FY

2018-19.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NLC India

Ltd was requested to furnish the availability projections in every month of NLC TPS -II

Page 63: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

43

along with overhauling (to consider revisions if any for FY 2017-18) for H2 FY 2017-18

& 2018-19. Based on the projections of NLC TPS-II Stage-I and also duly considering the

requirement of energy during 18-19 of APDISCOMs to dispatch the energy from all

long term power purchases, NLC TPS-II Stage-I power project energy availability is

considered as 197.44 MU with an annual PLF of 56%. However, APDISCOMs had

considered the fixed charges to the extent of recoverable PLF of 75%.

The fixed charges are computed based on the projected available PLF in every month

duly considering the total approved fixed charges of CERC for H2 FY 2017-18 & 2018-

19 and also incentive at the rate of 50 paisa per unit over and above the threshold PLF of

80%. The variable charges per unit are arrived by considering 3% escalation of variable

charges per unit approved by APERC in the Tariff Order of FY 2017-18. With this, the

fixed charge works out to Rs. 21.94 Crs for FY 18-19 and variable charges Rs. 56.82 Crs

for FY 2018-19 by considering the PLF as 56% (Plant Load Factor) i.e., considering the

variable cost per unit as Rs. 2.88. (i.e., considering 3% escalation of September-17 actual

variable cost per unit which is less than the APERC approved variable cost per unit for

FY 17-18).

The differential amounts in variable cost over and above the approved figures, if any, are

to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

NLC

TPS-II

(Stage

–I)

71%

56%

10.55

21.94

35.45

56.82

46.00

78.76

NLC TPS-II Stage-II (4X210 MW))

Neyveli Lignite Corporation limited (NLC India Limited) had established TPS –II at

Neyveli with Stage-II (840 MW) and this station is being treated as Inter State Generating

Station having firm allocations as well as un-allocated power allocation to all SR

beneficiaries excluding the NLC mines share allocation of 5.95%. The firm allocations

had been issued by Ministry of Power, GoI. The unallocated power allocation (15%) of

total installed capacity has been changing from time to time based on the necessity of any

SR state. Presently, AP has a firm share of 83.43 MW (Stage-II) inclusive of unallocated

share also. Every month, SRPC has been certifying the availability of station and

scheduled energy of each state for payment of fixed charges as well as variable charges.

SRPC has been certifying the scheduled energy in every month of each state based on the

data being submitted by SRLDC, from all nodal points of that state.

Hon’ble Central Electricity Regulatory Commission which was constituted under the

provisions of Electricity Act, 2003 has been giving the regulations to Terms and

conditions of Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well

as Inter State Transmission Licensee (PGCIL) in every control period i.e., presently

2014-19 are in force. Based on the regulations of CERC for determination of tariff

Page 64: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

44

(fixed charges) and also as per the formats for filings before CERC, NLC had

submitted the petition before CERC for approval of fixed charges to control period

2014-19. After thorough examination of filings as filed by NLC, CERC had issued the

orders to the control period 2014-19 for making payment of total fixed charges by all

SR beneficiaries as per the certification of SRPC in monthly Regional Energy Account

(REA). CERC had approved the fixed charges for NLC TPS-II Stage-II with the total

value of Rs. 414.29 Crs for FY 2018-19.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NLC

India Ltd was requested to furnish the availability projections in every month of NLC

TPS -II along with overhauling (to consider revisions if any for FY 2017-18) for H2

FY 2017-18 & 2018-19. Based on the projections of NLC TPS-II Stage-II and also

duly considering the requirement of energy during 18-19 of APDISCOMs to dispatch

the energy from all long term power purchases, NLC TPS-II Stage-II power project

energy availability is considered as 368.45 MU with an annual PLF of 56%.

However, APDISCOMs had considered the fixed charges to the extent recoverable PLF

of 75%.

The fixed charges are computed based on the projected available PLF in every

month duly considering the total approved fixed charges of CERC for H2 FY 2017-18

& 2018- 19 and also incentive at the rate of 50 paisa per unit over and above the

threshold PLF of 80%. The variable charges per unit are arrived by considering 3%

escalation of variable charges per unit approved by APERC in the Tariff Order of FY

2017-18. With this, the fixed charge works out to Rs. 41.15 Crs for FY 18-19 and

variable charges Rs. 106.04 Crs for FY 2018-19 by considering the PLF as 56% (Plant

Load Factor) i.e., considering the variable cost per unit as Rs. 2.88. (i.e., considering

3% escalation of September-17 actual variable cost per unit which is less than the

APERC approved variable cost per unit for FY 17-18).

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY

18-19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

NLC

TPS-II

(Stage

–II)

69%

56%

18.24

41.15

62.02

106.04

80.26

147.19

NPCIL-KAIGA Stage I & II (2x220 + 2x220 MW)

NPCIL had implemented Kaiga Atomic Power Station Stage I (Units 1 & 2) and Stage II

(Units 3 & 4) with total capacity of 880 MW in Karnataka. Ministry of Power,

Government of India had allocated the share to AP with a capacity of 55.90 MW (from

units 1 & 2) and 59.60 MW (from units 3 & 4). Kaiga station is a MUST RUN station

and availability from this station is being declared in every day by the generator to

Page 65: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

45

SRLDC. The tariff comes under the purview of single part and was determined by

Department of Atomic Energy (DAE). The monthly availed energy of SR beneficiaries

is being certified by SRPC in monthly REA. As per the certification of SRPC in the

REA, the payment to NPCIL is being done. NPCIL (KAIGA) had submitted the

projections of energy to be supplied to AP during H2 FY 2017-18 & FY 2018-19

along with overhauls. Based on this, APDISCOMs had projected the energy

availabilities from this project along with power purchase cost to this extent and the

power purchase cost works out to Rs. 232.26 Crs for FY 2018-19. The variable

charges per unit are arrived by considering 3% escalation of variable charges per unit

approved by APERC in the Tariff Order of FY 17-

18. The single part tariff of this project for FY 2018-19 is considered as Rs. 3.22 per

unit. The differential amounts in variable cost over and above the approved figures,

if any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name of

the

Generating

Station

Projected

Plant Load

Factor

Fixed

Charges in

Rs. Crs

Variable

Charges in

Rs. Crs.

Total Charges

in Rs. Crs H2

FY

17-18

FY

18-

19

H2

FY

17-18

FY

18-

19

H2

FY

17-18

FY 18-

19

H2

FY

17-18

FY 18-

19

NPCIL- KAIGA NA NA NA NA 64.31 114.32 64.31 114.32

Name of

the

Generating

Station

Projected

Plant Load

Factor

Fixed

Charges in

Rs. Crs

Variable

Charges in

Rs. Crs.

Total Charges

in Rs. Crs H2

FY

17-18

FY

18-

19

H2

FY

17-18

FY

18-

19

H2

FY

17-18

FY 18-

19

H2

FY

17-18

FY 18-

19

(1&2 Units)

NPCIL- KAIGA

(3 & 4 Units) NA NA NA NA 61.79 117.94 61.79 117.94

NPCIL- (MAPS) (2X220 MW)

Under Department of Atomic Energy (DAE), NPCIL had implemented Madras Atomic

Power Station (MAPS) 2x220 MW at Kalpakkam. At the time of commencement of

COD, Ministry of Power, Government of India had allocated power from this project to

AP along with other SR beneficiaries. Presently, AP has a share of 18.31 MW from this

project and Department of Atomic Energy had determined the single part tariff to this

project for payment of energy charges to NPCIL based on the certification of energy by

SRPC in every month in the monthly REAs. MAPS station is a MUST RUN station and

availability from this station is being declared in every day by the generator to SRLDC.

Based on the availability of this station on day to day basis, APSLDC has been issuing the

schedules to SRLDC as per the procedures evolved earlier. NPCIL (MAPS) had

submitted the projections of energy to be supplied to AP during H2 FY 2017-18 & FY

2018-19 along with overhauls. Based on this, APDISCOMs had projected the energy

availabilities from this project along with power purchase cost to this extent and the

power purchase cost works out to Rs. 22.26 Crs for FY 2018-19. The variable charges

Page 66: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

46

per unit are arrived by considering 3% escalation of variable charges per unit approved by

APERC in the Tariff Order of FY 2017-18. The single part tariff of this project for FY

2018-19 is considered as Rs. 2.23 per unit.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name of

the

Generating

Station

Projected

Plant Load

Factor

Fixed

Charges in

Rs.Crs

Variable

Charges in

Rs.Crs.

Total

Charges in

Rs. Crs H2 FY

17-18

FY

18-19

H2 FY

17-18

FY

18-19

H2 FY

17-18

FY

18-19

H2

17-18

FY

18-19

NPCIL- MAPS NA NA NA NA 13.73 22.26 13.73 22.26

NTECL, VALLUR (3X500 MW) (JV OF NTPC & TANGEDCO)

NTPC & TANGEDCO (Joint Venture called NTECL) had established NTECL, Vallur

Super Thermal Power Station with total installed capacity of 1500 MW and this station

is being treated as Inter State Generating Station having firm allocations as well as

un- allocated power allocation to all SR beneficiaries. The firm allocations had been

issued by Ministry of Power, GoI. The unallocated power allocation (15%) of total

installed capacity has been changed from time to time based on the necessity of any

SR state. Presently, AP has a firm share of 112.92 MW inclusive of unallocated share

also. In every month SRPC has been certifying the availability of station and

scheduled energy of respective state for payment of fixed charges as well as variable

charges. SRPC has been certifying the scheduled energy in every month of the each

state based on the data being submitted by SRLDC, from all nodal points of that state.

Hon’ble Central Electricity Regulatory Commission which was constituted under the

provisions of Electricity Act, 2003 has been giving the regulations to Terms and

conditions of Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well

as Inter State Transmission Licensee (PGCIL) in every control period i.e., presently

2014-19 are in force. Based on the regulations of CERC for determination of tariff

(fixed charges) and also as per the formats for filings before CERC, NTPC had

submitted the petition before CERC for approval of fixed charges to control period

2014-19. After thorough examination of filings as filed by NTPC, CERC had issued the

orders to the control period 2014-19 for making payment of total fixed charges by all

SR beneficiaries as per the certification of SRPC in monthly Regional Energy Account

(REA). CERC had approved the fixed charges to Vallur Thermal Power Plant with the

total value of Rs.1870.86 Crs for FY 2018-19 with the inclusion of moisture content

correction factor in the coal as mentioned in the orders of CERC.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC,

NTECL Valluru was requested to furnish the availability projections in every month

along with overhauling (to consider revisions if any for FY 2017-18) for H2 FY 2017-

18 & 2018-19. Based on the projections of NTECL Vallur and also duly considering

the requirement of energy during 18-19 of APDISCOMs to dispatch the energy from

all long term power purchases, NTECL Vallur power project energy availability is

Page 67: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

47

considered as 643.42 MU with an annual PLF of 70%. However, APDISCOMs had

considered the fixed charges to the extent of recoverable PLF of 85%.

The fixed charges are computed based on the projected available PLF in every

month duly considering the total approved fixed charges of CERC for H2 FY 2017-18

& 2018- 19 and also incentive at the rate of 50 paise per unit over and above the

threshold PLF of 85%. The variable charges per unit are arrived by considering 3%

escalation of variable charges per unit approved by APERC in the Tariff Order of FY

2017-18. With this, the fixed charge works out to Rs.140.84 Crs for FY 18-19 and

variable charges Rs.141.83 Crs for FY 2018-19 by considering the PLF as 70% (Plant

Load Factor) i.e., considering the variable cost per unit as Rs.2.20

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

NTEC

L,

Vallur

79%

70%

71.24

140.84

102.58

141.83

173.82

282.67

NTPL, Tuticorin (2X500 MW) (NLC & TANGEDCO)

NTPL (Joint Venture of NLC India Ltd & TANGEDCO) had established

Thermal Power Station at Tuticorin in Tamilnadu with total installed capacity of

1500 MW and this station is being treated as Inter State Generating Station

having firm allocations as well as un-allocated power allocation to all SR

beneficiaries. The firm allocations had been issued by Ministry of Power, GoI.

The unallocated power allocation (15%) of total installed capacity has been

changed from time to time based on the necessity of any SR state. Presently, AP

has a firm share of 139.06 MW inclusive of unallocated share also. In every month

SRPC has been certifying the availability of station and scheduled energy of

respective state for payment of fixed charges as well as variable charges. SRPC has

been certifying the scheduled energy in every month of the each state based on the

data being submitted by SRLDC, from all nodal points of that state.

Hon’ble Central Electricity Regulatory Commission which was constituted

under the provisions of Electricity Act, 2003 has been giving the regulations to

Terms and conditions of Tariff to Inter State Generating Stations (NTPC, NLC &

Others) as well as Inter State Transmission Licensee (PGCIL) in every control

period i.e., presently 2014-19 are in force. Based on the regulations of CERC for

determination of tariff (fixed charges) and also as per the formats for filings before

CERC, NTPL Tuticorin had submitted the petition before CERC for approval of

fixed charges to control period 2014-19. After thorough examination of filings as

filed by NTPL Tuticorin, CERC had issued the orders to the control period 2014-

19 for making payment of total fixed charges by all SR beneficiaries as per

Page 68: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

48

the certification of SRPC in monthly Regional Energy Account (REA). CERC

had approved the fixed charges to NTPL Tuticorin Thermal Power Plant with the

total value of Rs.1099.68 Crs for FY 2018-19.

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC,

NTPL Tuticorin was requested to furnish the availability projections in every

month along with overhauling (to consider revisions if any for FY 2017-18) for H2

FY 2017-18 & 2018-19. Based on the projections of NTPL Tuticoran and also duly

considering the requirement of energy during 18-19 of APDISCOMs to dispatch

the energy from all long term power purchases, NTPL power project energy

availability is considered as 695.21 MU with an annual PLF of 61%. However,

APDISCOMs had considered the fixed charges to the extent of recoverable PLF

of 85%.

The fixed charges are computed based on the projected available PLF in every

month duly considering the total approved fixed charges of CERC for H2 FY

2017-18 & 2018- 19 and also incentive at the rate of 50 paise per unit over and

above the threshold PLF of 85%. The variable charges per unit are arrived by

considering 3% escalation of variable charges per unit approved by APERC in the

Tariff Order of FY 17-18. With this, the fixed charge works out to Rs.152.92 Crs

for FY 18-19 and variable charges Rs. 166.12 Crs for FY 2018-19 by considering

the PLF as 61% (Plant Load Factor) i.e., considering the variable cost per unit as

Rs.2.39.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY

18-19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

NTPL

Tuticor

in

77%

61%

76.84

152.92

137.97

166.12

214.80

319.05

NTPC, Kudgi (3X800 MW)

NTPC had established Thermal Power Station at Kudgi in Karnataka with total

installed capacity of 2400 MW and this station is being treated as Inter State

Generating Station having firm allocations as well as un-allocated power allocation to

all SR beneficiaries. The firm allocations had been issued by Ministry of Power, GoI.

The unallocated power allocation (15%) of total installed capacity has been changed

from time to time based on the necessity of any SR state. The Kudgi Unit-I of 800

MW COD was declared on 31.07.2017 and the Unit-II of 800 MW is under trial run

operation and this Unit-II COD is likely to be by the end of November’17. The Kudgi

Unit-III of 800 MW COD is declared tentatively during January’18.Presently, AP has a

firm share of 145.12 MW inclusive of unallocated share also from Unit-I. In every

month SRPC has been certifying the availability of station and scheduled energy of

respective state for payment of fixed charges as well as variable charges. SRPC has

Page 69: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

49

been certifying the scheduled energy in every month of the each state based on the

data being submitted by SRLDC, from all nodal points of that state.

NTPC had submitted the petition before Hon’ble Central Electricity Regulatory

Commission for determination of tariff of Kudgi from COD to 31.03.2019. Till

the approval of tariff order by CERC for control period 14-19, NTPC considered to

receive the payment of fixed charges to the extent of 85% filings value before CERC

for FY 17- 18 & FY 18-19. CERC, which was constituted under the provisions of

Electricity Act, 2003, has been giving the regulations to Terms and conditions of

Tariff to Inter State Generating Stations (NTPC, NLC & Others) as well as Inter State

Transmission Licensee (PGCIL) in every control period i.e., presently 2014-19 are in

force. Based on the regulations of CERC for determination of tariff (fixed charges) and

also as per the formats for filings before CERC, NTPC had submitted the petition

before CERC for approval of fixed charges to control period 2014-19. After thorough

examination of filings as filed by NTPC, CERC will issue the final orders for the

control period 2014-19 for making payment of total fixed charges by all SR

beneficiaries as per the certification of SRPC in monthly Regional Energy Account

(REA).

In order to submit the ARR for FY 2018-19 filings before Hon’ble APERC, NTPC

was requested to furnish the availability projections in every month along with

overhauling (to consider revisions if any for FY 2017-18) for H2 FY 2017-18 &

2018-19. Based on the request of APDISCOMs, NTPC had submitted the availability

projections along with overhauls. Based on the projections of NTPC and also duly

considering the requirement of energy during 18-19 of APDISCOMs to dispatch the

energy from all long term power purchases, Kudgi power project energy availability is

considered as 699.99MU with an annual PLF of 40%. However, APDISCOMs had

considered the fixed charges to the extent of PLF as projected by the respective

generator and energy dispatch as 576.61 MU.

The fixed charges are computed based on the projected available PLF of the generator

in every month duly considering the total approved fixed charges of CERC for H2

FY 2017-18 & FY 2018-19 and also incentive at the rate of 50 paise per unit over and

above the threshold PLF of 85%. Since, the variable cost for Kudgi has not been

approved by the APERC in the tariff order for FY 2017-18, the variable charges per

unit are arrived by considering 3% escalation on the actual rate of September’2017.

With this, the fixed charge works out to Rs.161.84 Crs for FY 18-19 and variable

charges Rs. 206.56 Crs for FY 2018-19 by considering the PLF as 40% (Plant Load

Factor) i.e., considering the variable cost per unit as Rs.3.58.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name

of the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19

NTPC

Kudgi 27% 40% 43.86 161.84 82.56 206.56 126.42 368.40

Page 70: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

50

JNNSM PHASE I (39.19 MW)

Earlier APDISCOMs had entered into agreement with NVVNL for purchase of solar

power under JNNSM Phase I with solar power of 39.19 MWs and NTPC thermal power

also as 39.19 MWs. The energy under JNNSM phase I has been certified by SRPC in

monthly REAs and APDISCOMs are paying the fixed charges as well as variable charges

based on the orders of CERC to the control period 14-19. The tariff of JNNSM Phase

tariff is computed by NVVNL by taking into weighted average cost of fixed & variable

(single part) of the respective NTPC (SR) stations. For FY 18-19, it is projected

256.81MU from NTPC Stations with a capacity of 39.19 MWs at a total cost of Rs. 91.86

Crs and the weighted average cost is considered as 3.58 per unit by considering the

Sep’17 cost with an escalation of 3%.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name of

Generating

Station

Projected Plant

Load Factor

Fixed Charges in

Rs. Crs

Variable Charges

in Rs. Crs.

Total Charges in

Rs. Crs.

H2 FY 17-18 FY 18-19 H2 FY 17-18 FY 18-19 H

2

F

Y

1

7

-

1

8

F

Y

1

8

-

1

9

H

2

1

7

-

1

8

F

Y

1

8

-

1

9

JNNSM

Phase-I

NA

NA

NA

NA

4

7

.

8

6

9

1

.

8

6

4

7

.

8

6

9

1

.

8

6

JNNSM PHASE II (500MWs)

APDISCOMs had entered into agreement NVVNL for purchase of solar power

under JNNSM Phase II with an total capacity of 1250 MW as solar power and 625

MWs NTPC thermal power in the ratio of 2:1. Presently, NTPC has been

supplying 500 MWs to APDISCOMs from NTPC Thermal Stations in SR, WR &

ER. The availability projections from this JNNSM phase II is considered

3,215.37 MU and at a cost of Rs. 1,126.78 Crs with the weighted average cost of

Rs. 3.50 per unit (fixed plus variable cost) by considering the Sep’17 cost with an

escalation of 3%.

The differential amounts in variable cost over and above the approved figures, if

any, are to be paid by APDISCOMs which attracts interest as per CERC norms.

Name of

the

Genera

ting

Station

Projected Plant

Load Factor

Fixed Charges in

Rs.Crs

Variable Charges in

Rs.Crs.

Total Charges in

Rupees Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-18 FY 18-

19 JNNS

M

Phase-

II

NA

NA

NA

NA

587.85

1126.78

587.85

1126.78

Page 71: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

51

3.22 NNTPS (52.46 MW)

The Neyveli New Thermal Power Station (NNTPS) has a total installed capacity of

1,000 MW (2 x 500 MW). From this project, the residuary A.P will get a share

of 5.26% i.e., 52.46 MW power. Now, the Project is in advanced stage of

construction and is likely to be commenced in the month of July’2018. NLC has

projected fixed cost of Rs. 2.18/kWh and variable Cost of Rs. 2.49/kWh for FY

2018-19. Hence the estimated fixed charges and Variable charges for FY 2018-19

is Rs. 14.95 Cr., and Rs. 17.04 Cr., respectively.

Name of

the

Generating

Station

Projected

Plant Load

Factor

Fixed

Charges in

Rs. Crs.

Variable

Charges in Rs.

Crs.

Total Charges

in Rs. Crs

FY 18-19 FY 18-19 FY 18-19 FY 18-19

NNTPS 22% 14.95 17.04 31.99

Page 72: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

52

A summary of energy availability and cost from CGS stations is as below:

Sl.

N

o

Name of the Station

FY 2018-19

PLF

(in %)

Energy

Availab

ility (in

MU)

Energy

Despatch

(in MU)

Fixed

Cost (in

Crores)

Variabl

e

Cost(in

Crores)

Total

Cost (in

Cr.)

VC

Rs./Unit

1 NTPC-Ramagundam

STPS St-I&II 66 1370.00 1370.00 128.63 299.15 427.78 2.18

2 NTPC-Ramagundam

STPS St-III 62 320.27 320.27 34.34 68.94 103.28 2.15

3 NTPC TALCHER- II 75 1016.15 1016.15 83.27 141.59 224.85 1.39

4 NTPC Simhadri st- I 66 2507.82 2507.82 309.48 671.60 981.08 2.68

5 NTPC Simhadri st- II 65 988.58 988.58 201.89 264.74 466.63 2.68

6 NTPC Kudgi st- I 40 699.99 576.61 161.84 206.56 368.40 3.58

7 NTECL Vallur 70 643.42 643.42 140.84 141.83 282.67 2.20

8 NLC –TPS II St-1 54 197.44 197.44 21.94 56.82 78.76 2.88

9 NLC –TPS II St-2 56 368.45 368.45 41.15 106.04 147.19 2.88

10 NTPL, Tuticoran (JV

of NLC & TNEB) 61 695.21 695.21 152.92 166.12 319.05 2.39

11 MAPS 100.05 100.05 0.00 22.26 22.26 2.23

12 KAIGA 1 & 2 354.60 354.60 0.00 114.32 114.32 3.22

13 KAIGA 3 & 4 365.85 365.85 0.00 117.94 117.94 3.22

14 JNNSM Phase-I 256.81 256.81 0.00 91.86 91.86 3.58

15 JNNSM Phase-II 3215.37 3215.37 1126.78 1126.78 3.50

16 NNTPS 22 68.59 68.59 14.95 17.04 31.99 2.49

Sub-Total

13168.59 13045.21 1291.25 3613.59 4904.85 2.77

APGPCL

The power purchase cost projected for H2 FY 2017-18 are as per approved tariff order

of APERC for FY 2017-18.

The power purchase cost for FY 2018-19 are as per the projections given by APGPCL.

The calculations for FY 2018-19 were done on the basis of availability of 0.45

MMSCMD of Natural Gas with the usage of part load i.e., about 90 MW (out of

272 MW). Proposed gas cost for FY 2018-19 is USD 2.89 per MMBTU for APM

Gas (89.5%), USD 4.20 per MMBTU for Ravva Cairn Gas ( 6.03%) and USD 4.30 for

Ravva Satellite Gas (4.47%) , which is effective from October 2017.

Page 73: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

53

S.No Particulars H2 FY 2017-18

FY 2018-19

1 Gas Availability in SCMD 6,50,000 4,50,000

2 Gas Rate – per MMBTU 2.50 USD 2.89 USD for APM Gas

(89.5%). 4.20 for

Ravva Cairn Gas

(6.03%) and 4.3 for

Ravva Satellite Gas

(4.47%)

3 Exchange Dollar Rate [$] 66.94 64.44

4 Fixed cost st-I (Rs. Crs)

Before considering

Demand Charges and

other income

8.703

5 Fixed cost St-I (Rs.Cr.)

After considering

Demand charges and

other income

0.525 8.492

6 Fixed Cost St-II (Rs.Cr.)

Before Considering

Demand Charges and other

income

22.900

7 Fixed Cost St-II (Rs.Cr.)

After considering

Demand Charges and

other income

2.125 21.716

5 Variable Cost Unit Rate : Rs.

Stage-I 2.34 2.743

Stage-II 2.09 2.743

The per unit cost proposed by APGPCL for FY 2018-19:

A. For St-I, Fixed cost per unit before considering Demand Charges and other

income is Rs. 4.479/unit and after considering Demand Charges and other

Income is Rs. 4.370/unit

B. For St-I, Variable cost is Rs. 2.743/unit

C. For St-II, Fixed cost unit rate before considering Demand Charges and

other income is Rs. 3.696/unit and after considering Demand Charges and

other Income is Rs. 3.505/unit

D. For St-II, Variable cost is Rs. 2.743/unit

Page 74: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

54

E. The Variable Cost is based on the prevailing gas price as on 01.10.2017. The

gas prices are regulated by Govt. of India and changes every six months. The

variable cost may increase or decrease (FCA) and is to be passed through.

2. APGPCL has informed that in order to cope up various liabilities which are

pending before Various Courts, Rs. 200 Cr. was loaded in FY 2018-19 tariff.

Note: A. The fixed cost components covered as per APERC Regulation 1 of 2008 are

(i) Return on Capital Employed (RoCE), (ii) Depreciation, (iii) O & M

Expenses and ( iv) Income Tax.

B. The liabilities pending before various Courts are not covered in the

above mentioned APERC Fixed Cost Components.

(I) Further, the MoU between APTRANSCO and APGPCL has expired on

25.12.2012. Hence, APTRANSCO has served notice to APGPCL for entering

a new Agreement. APGPCL filed Writ Petition and got stay order and hence

the MoU is still continuing. The case is pending before Hon’ble High Court.

(II) The matter related to inflated demand charges is pending before Hon’ble

APERC and hearing is going on.

(III) The major case pending is the writ petition filed by APGPCL against

GAIL before Hon’ble High Court of Delhi wherein GAIL has raised

demand notice for an amount of Rs. 308 Cr. towards differential price of

APM gas to Non APM gas for the period from 01.07.2005 to 31.12.2012.

(IV) In the Electricity differential Duty case (Demand notice for Rs. 138 Cr. from

Chief Electrical Inspectorate, GoAP.), Hon’ble High Court of Andhra

Pradesh and Telengana delivered judgment against APGPCL and hence

APGPCL filed review petition before Hon’ble High Court of Andhra Pradesh

and Telengana.

All of the above cases are at hearing stages and final verdict is awaited from

Various Courts.

1. Though hearings are going on, to meet the exigencies that may

occur in various Court cases, APGPCL loaded Rs. 3.53 per unit in

Stage-I fixed Cost, and Rs. 2.962 per unit in Stage-II fixed cost , which is

unfair.

2. If the Court liability is not taken into consideration, the proposed fixed

cost per unit before considering Demand Charges and other income

for Stage-I will be Rs. 0.95 and for St-II will be Rs. 0.73 and after

considering demand charges and other income for Stage-I will be Rs.

0.84 and for Stage-II will be Rs. 0.54.

Page 75: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

55

In view of the above, APDISCOMs propose the following charges

for APGPCL at around 25-30% PLF for FY 2018-19:

Particulars Fixed

Cost

(Rs./kWh

)

Variable

Cost

(Rs./kWh)#

Total

Cost

(Rs./kWh

)

APGPCL Stage-I 0.49* 2.41 2.90

APGPCL Stage-II 0.43 2.15 2.58

* Inclusive of demand charges of Rs. 0.11/kWh.

# The variable cost considered is as per the Gas price on 1st October,

2017.The gas price is regulated by Govt. of India and changes every 6 months

.The increase or decrease of gas price is to be passed through.

Gas based IPPs

Godavari Gas Power Plant

The PPA with GVK Phase-I expired on 20.06.2015 and subsequently the

APDISCOMs bought out GVK Phase I project on 22nd April 2016. The project

was renamed to Godavari Gas Power Plant. The variable cost considered is as per the

gas price prevailing on 1st October, 2017. The variable charge of Rs.2.46/kWh is

considered for H2 FY 2017-18 and FY 2018-19. The estimated variable charge for FY

2017-18 H2 has been considered as Rs.100.70 Crs and Rs.192.76 Crs for FY 2018-19.

The Fixed charges include Interest, Depreciation, Insurance, salaries and other operational

and maintenance expenses incurred for GGPP. For 2017-18 H2, 5% escalation was

given on FC over 2017-18 H1. For the FY 2018-19, Fixed Cost is projected based on the

Capital cost if the plant is taken over by APGENCO. The capital costs includes

total buyout amount, including registration charges. The R&M expenditure to be

incurred by APGENCO is not considered in FC Levelized calculations. The R&M cost

is proposed to be included in the tariff only after completion of R&M activity.

Debt:Equity ratio of 70:30 has been considered for the purpose of arriving tariff. The

Levelized tariff for 15 years is proposed as per APERC regulations in force and will

be placed before Hon’ble APERC for approval. The tentative fixed charge for the FY

2018-19 works out to Rs.115.39 Crs at a threshold PLF of 80% (Rs.0.79/Kwh).

The fixed cost for FY 2017-18 H2 has been considered as Rs. 43.58 Cr. and Rs.

115.39 Cr. for FY 2018-19.

Accordingly, at PLF of 45% H2 FY 2017-18 the per unit fixed cost is Rs.1.06

and Variable cost is Rs. 2.46. The total per unit cost is Rs.3.52.

At PLF of 43% for FY 2018-19, the per unit fixed cost is Rs.1.47 and Variable cost

of Rs.2.46. The total per unit cost is Rs.3.93.

The variable cost considered is as per the Gas price on 1st October, 2017.The gas price

is regulated by Govt. of India and changes every 6 months .The increase or decrease of

gas price is to be passed through.

Page 76: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

56

SPECTRUM

The PPA with M/s SPGL expired on 18th April 2016. The plant is being operated on

ad- hoc arrangement to schedule the entire capacity to APDISCOMs on the same

terms and conditions as per the expired PPA, and the costs would be trued up/down

subject to the approval of Hon’ble APERC. The proposal for the renewal of the PPA

will be submitted to the Hon’ble APERC upon the receipt of the permission from

the Government of Andhra Pradesh.

Projections for the FY 2017-18 H2 are made considering a single part tariff of

Rs.3.31/Kwh provisionally as per the submissions made by APDISCOMs and M/s.

SPGL in the I.A.No. 8 of 2017 in O.P.No.28 & 29 of 2016. The estimated total cost at a

PLF of 40% for FY 2017-18 H2 is Rs.115.10 Crs at a single part tariff of Rs.3.31/Kwh.

For the FY 2018-19, Fixed cost Projections are made based on the projected values

after renewal of the plant submitted by M/s. SPGL which is submitted to GoAP for

approval. The variable cost considered is as per the gas price prevailing on 1st October,

2017. The estimated fixed costs for FY 2018-19 is Rs.113.38 Cr and Variable cost is Rs.

166.68 Crs. Accordingly, at PLF of 40% in H2 FY 2017-18 the single part tariff

Rs3.31/KWH is projected (This is submitted by the generator to APERC for the year

2017-18).

At PLF of 40% for FY 2018-19, the per unit fixed cost is Rs.1.63 and Variable cost

of Rs.2.39. The total per unit cost is Rs.4.02 (FC is projected by the generator for

renewal of contract for a further period of 15 years from FY 2018-19).

The variable cost considered is as per the Gas price on 1st October, 2017.The gas price

is regulated by Govt. of India and changes every 6 months. The increase or decrease of

gas price is to be passed through.

LANCO KONDAPALLI

The PPA with M/s LANCO expired on 1st January 2016. The plant is operated on ad-

hoc arrangement to schedule the entire capacity to APDISCOMs on the same terms

and conditions as the expired PPA, till first week of April’17, and the costs would be

trued up/down subject to the approval of Hon’ble APERC.

For H2 of 2017-18 fixed cost of Rs. 0.96/kWh and variable cost of Rs. 2.33/kWh is

considered making a total of Rs. 3.29/kWh as per the APERC order dated 29/11/2017.

Page 77: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

57

For FY 2018-19, the per unit fixed cost is Rs. 1.06, Variable cost is Rs. 2.26 and the

total per unit cost is Rs.3.32 (FC is projected by the generator for renewal of

contract for a further period of 10 years from 2018-19) at a PLF of 40%.The

estimated fixed costs for FY 2018-19 is Rs. 130 crores.

The variable cost considered is as per the Gas price on 1st October, 2017.The gas

price is regulated by Govt. of India and changes every 6 months .The increase or

decrease of gas price is to be passed through.

RELIANCE INFRASTRUCTURE LTD. (BSES)

No fixed and variable charges have been paid to the company for H1 FY 2017-18 as

there has been no generation. Variable charges have been considered at Rs.

2.10/kWh for H2 FY 2017-18 as per the natural gas pricing guidelines 2014.

However, Zero availability has been considered for H2 FY 2017-18. Further, energy

availability has not been considered for FY 2018-19, as the PPA is going to be

expired on 23.12.2017.

Based on the formula provided in the PPA and considering 46.11% of the fixed cost

for erstwhile Andhra Pradesh (as per G.O. Ms. No. 20), the fixed costs are being paid. Name of

the

Generating

Station

Projected Plant

Availability (MU)

Fixed Charges in

Rs. Crs

Variable Charges

in Rs. Crs.

Total Charges in

Rs. Crs

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-

18

FY 18-

19

Godavari

Gas

Power

Plant

409.35

783.60

43.58

115.39

100.70

192.77

144.28

308.16

Spectrum 347.75 697.41 0 113.38 115.10 166.68 115.10 280.01

Lanco 613.40 1230.12 58.89 130.00 142.92 278.01 201.81 408.01

Reliance 0 NA 0 NA 0 NA 0 NA

Total 1370.50 2711.13 43.58 358.77 417.61 637.46 461.19 996.18

New IPPs & Merchant Plants

No fixed and variable charges are considered from the new IPP plants.

NON CONVENTIONAL ENERGY (NCE) SOURCES:

The Commission issued orders on 20.03.2004, fixing power purchase price applicable for

NCE Projects (Biomass/Industrial Waste, Bagasse & Mini Hydel) from 01.04.2004 to

31.03.2009. The NCE Project Developers filed cases before the Appellate Tribunal against

the APERC orders. The Appellate tribunal set aside APERC Orders dated. 20.03.2004.

APTRANSCO and APDISCOMs filed Appeals before Supreme Court against ATE

Orders. The Hon’ble Supreme Court passed Orders dated. 08.07.2010 setting aside ATE

Orders. The Supreme Court remanded the matter to APERC with a direction to hear NCE

Project developers afresh and determine /fix tariff/power purchase price. APERC has

initiated the public hearing in this matter from 28.09.2010 and passed three divergent

Page 78: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

58

orders vide its order dt:12.09.2011. The APERC orders are challenged before Appellate

Tribunal for Electricity by NCE developers & APDISCOMs.

The Appellate Tribunal in its order dt:20.12.2012, while fixing the parameters, directed

APERC to fix the tariff accordingly to be payable to Non-conventional Energy

Developers for the period 2004-2009. Aggrieved by the APTEL order dt:20.12.2012,

APDISCOMs filed Civil Appeals Nos 1376-1385 of 2013 before Hon’ble Supreme Court.

The apex court admitted the appeals and are pending for disposal.

The APDISCOMs filed an application I.A. No.22 of 2013 in O.P. No.1075 of 2000

praying the APERC to defer the hearing of the remand proceedings on NCE tariff cases as

ordered by the Appellate Tribunal for Electricity in order dt:20.12.2012 till the final

disposal of civil appeals (1376 to 1385) filed before Hon’ble Supreme Court. The

APERC dismissed the I.A. No.22 of 2013 with the opinion that DISCOMs cannot ask for

deferment of the tariff order to give effect to the APTEL order on the plea that the petition

has been filed before Hon’ble Supreme Court and the same is admitted for hearing. The

APERC issued order dt: 22.06.2013, pursuant to APTEL order dt: 20.12.2012,

determining the tariff payable to NCE developers for the period 01.04.2004 to

31.03.2009. The DISCOMs filed Special Leave Petition in the Hon'ble Supreme Court

against the order dated 22.6.2013 passed by the APERC vide SLP (Civil) No. 30416 to

30428 of 2013.

APERC issued suo-moto order dt:6.8.13 determining variable cost tariff in respect of

Bagasse & Biomass (including Industrial Waste) projects giving consequential effect to

the order dated 31.03.2009 in O.P No.5 of 2009 based on Hon’ble APTEL order dated

20.12.2012 & 30.04.2013. DISCOMs filed SLP against APERC order dated 06.08.2013 in

the Hon'ble Supreme Court vide SLP (Civil) No. 19508 of 2013.

The Special Leave Petitions (Civil) 30416-28 filed against APERC order dt:22.6.13 &

19508 filed against APERC order dt:06.08.13 came up for admission on 28.10.2013 and

the Lordships were not inclined to grant permission to file Special Leave Petitions directly

against the orders of APERC and directed to withdraw the Special Leave Petitions.

Accordingly, the Special Leave Petitions were withdrawn.

As such, IAs were filed in C.A 1376-85 of 2013 before Hon’ble Supreme Court requesting

for grant of stay of APERC orders dt:22.06.2013 & 06.08.2013 and Appeal Nos. 83 & 84

of 2014 were filed before APTEL against APERC orders dt:22.06.2013 & 06.08.2013. The

same were dismissed by APTEL vide order dt: 21.07.2014 as not maintainable.

Subsequently, appeals 10448 & 10499 are filed before Hon’ble Supreme Court against the

orders of APTEL dt: 21.07.2014. The appeals are tagged with CA 1376- 85 of 2013 and are

listed on 04.01.2018 for hearings.

About Rs. 406 Crs was already paid to the NCE developers in accordance with the various

court orders (in the united Andhra Pradesh state).

However, upon the directions of Hon’ble Supreme Court dt: 16.12.2013, APDISCOMs

are implementing tariff to the NCE developers as per APERC order dt: 22.06.2013 from

the date of order, viz., 22.06.2013.

Page 79: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

59

Further, vide orders dt:11.03.2014 & 13.03.2014, Hon’ble Supreme Court of India directed

to release 50% amount due to the NCE developers. Accordingly, the NCE developers

were paid Rs.214.96 Crs in erstwhile Andhra Pradesh.

APERC determined the variable cost for the control period FY 2014-19 vide APERC

order dt: 16.05.2014. Further, APERC determined the fixed cost tariff for the Biomass,

Bagasse, Mini Hydel & Industrial Waste projects for beyond 10 years of operation vide

APERC orders dt:19.07.2014, 05.08.2014, 23.08.2014 & 01.09.2014 respectively. The

fixed cost & variable cost are adopted as per the above orders for cost projections for H2

FY 2017-18 and FY 2018-19. However, review petitions have been filed by AP Discoms on

APERC orders dt: 19.07.2014, 05.08.2014, 23.08.2014 & 01.09.2014. The Hon’ble

Commission dismissed/rejected these review petitions vide common order

dated:07.02.2015. Hence, appeals DFR Nos. 645 & 646 of 2015 were filed before APTEL.

Subsequently, APTEL numbered the DFR Nos 645 as 224 of 2015 & 646 as 42 of 2016.

Further, appeal No 224 of 2015 filed by APDISCOMs against APERC order

dated:07.02.2015 was dismissed by APTEL.

Further, the Biomass developers filed appeals No 284 & 250 of 2014 before APTEL on

APERC order dt: 16.05.2014 & 19.07.2014 wherein APERC determined variable cost

tariff for FY 2014-19 & fixed cost tariff for biomass projects beyond 10 years of operation

respectively. Also, bagasse developers preferred appeal No 297 of 2014 before APTEL

against APERC orders dt: 16.05.2014. Appeal No 42 of 2016 filed by

APDISCOMs against APERC order dated:19.07.2014 are posted for hearing on

18.01.2018 along with appeal NOs 284, 250 & 297 of 2014.

The Mini Hydel developers preferred appeal No 268 of 2014 before APTEL against

APERC order dt: 23.08.2014. The APTEL vide its order dated:20.01.2016 in the said

appeal remanding the matter to APERC towards fixation of tariff beyond 10 years of

operation to appellants viz., M/s PMC Power Private Limited, M/s Bhavani Hydro Power

Projects Private Limited and M/s NCL Industries Limited. Accordingly, the three mini

hydel developers filed petition No.8, 9 & 10 of 2016.Subsequently, APERC vide orders

dated:18.06.2016 determined project specific tariff to the M/s PMC Power Private Limited,

M/s Bhavani Hydro Power Projects Private Limited and M/s NCL Industries Limited

from 11th to 20th year of operation and issued separate orders in the above petitions .

Aggrieved by the APERC orders dated:18.06.2016 , APDSCOMs filed appeal Nos.246, 247

& 248 of 2016 before the APTEL. M/s PMC limited filed appeal NO 238 of 2017 Against

APERC order dated:18.06.2016 before APTEL. The APTEL tagged the Appeals filed by

DISCOMS vide appeal No 246, 247 & 248 of 2016 as well as appeal NO 238 of 2016 filed

by PMC limited and same are listed for hearing on 29.01.2018. Pursuant to the APERC

order in OP NO 10 of 2016 based on the information submitted by M/s NCL Industries

Limited ,APERC revised the tariff beyond 10 years of operation vide its order

dated:26.11.2016. Further, M/s NCL Industries Limited also approached APTEL vide

DFR NO 363 of 2017 against APERC order dated:18.06.2016 & 26.11.2016. Subsequently,

the APTEL numbers the Appeal as 343 of 2017 and the same is listed on 10.01.2018.

Tariff for the Wind Power Projects are as follows:

Rs 3.50/unit as per APERC order dt:01.05.2009 inclusive of Taxes. Rs 4.70/unit as per

APERC order dt:15.11.2012 inclusive of Taxes.

Page 80: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

60

Rs.4.83/unit without AD benefit and Rs 4.25/unit with AD benefit is exclusive of taxes

(MAT pass through) as per APERC order dt:1.08.2015

Rs.4.84/unit without AD benefit and Rs 4.25/unit with AD benefit is exclusive of taxes

(MAT pass through) as per APERC order dt:26.03.2016.

Projects under REC mechanism, the pooled cost arrived @ Rs.3.73/Unit for FY:2016-17

applicable for FY:2017-18 subject to APERC approval is considered in the ARR for

FY:2017-18 (H2) and for FY:2018-19 also, as the pooled cost for FY:2017-18 applicable

for FY:2018-19 cannot be determined now.

The 50% of the pooled cost (Rs.3.73/unit) i.e., Rs 1.865/unit is considered for the FY

2017-18 for the projects M/s. RCI and M/s. Bharath Wind Farms.

M/s. Nile Limited and M/s IL&FS Limited extended PPA @ Rs.2.23/ Unit.

The tariff has been considered as Rs.4.76/Unit as determined by APERC vide orders

dtd:30.03.2017 subject to outcome of the petitions O.P.No.01 of 2017 and O.P.No.05 of

2017. In respect of M/s. Axis Energy Ventures projects 585.9 MW capacity subject to

determination of specific tariff by APERC as per the GoAP directions.

Note: The tariff for the wind power projects for FY:2018-19 has been considered under

Regulation 01 of 2015 (With GBI of Rs 0.50).

The weighted average costs per unit (or Tariff Order rates) for NCE sources considered

for FY 2018-19 are shown in the table below:

Project Type

Weighted average Cost /

Tariff Order Rate

Considered for H2 FY 2017-

18 (Rs. / kWh)

Weighted average Cost /

Tariff Order Rate

Considered for FY 2018-19

(Rs. / kWh)

NCE – Bio-mass including

Co – Gen

6.19 7

NCE – Bagasse 4.16 4.81

NCE – Municipal Waste to

Energy

0 0

NCE – Industrial Waste

based power project

5.81 6.85

NCE – Wind Power 4.72 4.73

NCE – Mini Hydel 2.57 2.72

NCE – NCL Energy Ltd. 1.81 1.81

NCE – Solar Power 5.97 5.95

NCE – Solar Parks 5.04 5.12

NVVNL Bundled Power –

SOLAR

10.66 10.65

NTPC Ramagundam Solar

Power

9.35 9.35

Page 81: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

61

MINI POWER PLANTS

M/s. Srivathsa: The recovery of fixed charges is limited to the delivery of

110 MU energy units. The fixed cost payable is Rs.1.59 Crs for H2 FY 2017-

18 and Rs.3.30 Crs for FY 2018-19. The variable tariff for H2 FY 2017-18 has

been considered based on the Natural Gas Pricing Guidelines-2014. The

variable cost for FY 2018-19 has been considered to be the same as that of H2

FY 2017-18.The PPA will expire on 31.03.2018.

For H2 FY 2017-18, the fixed cost is Rs.0.48/kWh, Variable cost is Rs. 2.60/kWh

and the total cost is Rs. 3.08/kWh at 45% PLF.

For FY 2018-19, the fixed cost is Rs.0.48/kWh, Variable cost is Rs. 2.60/kWh

and the total cost is Rs. 3.08/kWh at 47% PLF.

M/s. LVS: In respect of M/s. LVS, a petition has been filed before the

Hon’ble High court to declare the PPA void and hence no power purchase cost

is considered for H2 of FY 2017-18. The PPA expired on 07.10.2017.

Name of the

Generating

Station

Energy (MU) Fixed Charges in Rs.

Crs

Variable Charges

in Rs. Crs.

Total Charges in

Rs. Crs

H2 FY 17-

18

FY

18-19

H2 FY 17-

18

FY 18-

19

H2 FY

17-18

FY 18-

19

H2 17-

18

FY 18-

19

Srivathsa 32.95 68.41 1.59 3.30 8.57 17.79 10.16 21.09

Long Term &Medium Term

Long Term – Thermal PowerTech Corporation India Limited

The tariff for M/s. Thermal Powertech was discovered through bid based

route for which the Hon’ble APERC already gave approval. Hence the fixed cost

and variable costs are considered based on the Tariff approved by Hon’ble APERC

for the year FY 18-19.

All applicable non-escalable Tariff components are considered as per

approved tariff in PPA. Escalable tariff components are projected based on the

following assumptions.

SBI TT Rates assumed as 64.00 for conversion of USD

component to Rupee terms.

CERC Annual inflation, Escalation rate on domestic coal,

Escalation rate on inland transportation from Apr-18 to Mar-19

considered as 10% on escalable component.

CERC Escalation rates for H2 17-18 considered same as H1 2017-

18 escalation rates.

The fixed cost is considered limiting to 85% PLF and variable cost arrived

as per energy despatch projections.

Page 82: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

62

The incentive is payable as per the terms stipulated in the approved PPA.

Generator

Name

H2 FY 2017-18 FY 2018-19

Fixed

Cost

(Crs.)

Variable

Cost (Crs.)

Incentives

(Crs.)

Fixed Cost

(Crs.)

Variable

Cost (Crs.)

Incentives

(Crs.)

TPCIL 152.33 162.6 0 300.06 357.25 6.72

Variable cost per unit of Rs.1.90/kWh have been considered for H2 FY 2017-18

and Rs. 1.96/kWh for FY 2018-19 has been considered. Fixed cost per unit of Rs.

1.78/kWh and Rs.1.75/kWh have been considered for H2 FY 2017-18 and FY

2018-19 respectively. Fixed and variable cost per unit is to be considered as

average per unit costs for FY 2018- 19. In addition, Licensee would like to bring

to the notice of the Hon’ble Commission the following unapproved cost during

FY 2017-18 for consideration and allow to recover as part of ARR projection FY

2018-19 ( currently, Licensee has not considered

Incentive: The Generator has been consistently maintaining a PLF of 90% which

makes it eligible for incentive due to higher PLF based on provisions of PPA.

Hon’ble Commission may approve the incentive applicable based on actual availability.

PGCIL Charges: In case of Thermal PowerTech (LTOA), APDISCOMs have to

reimburse the PGCIL charges being paid by the generator as per RTA and also

other bills. The total payable charges for Thermal Power Tech works out to about

Rs. 100.57 Crs. As shown below:

Generator

Name

PGCIL Charges (Rs. Cr.)

H1 FY 17-18 H2 FY 17-18 Total FY 17-18

TPCIL 53.48 47.09 100.57

APDISCOMs have been utilizing the power from Thermal Power Tech for which

the plant is connected to CTU network. As per the contractual obligations of the

long term PPAs, APDISCOMs are liable to reimburse the PGCIL charges to the

generator. But in view of certain inadvertencies in ARR filing for FY 17-18, the

Hon’ble APERC disallowed PGCIL charges. Because of this, though PPA

mandates APDISCOMs to pay for the energies availed and incidental PGCIL

charges, APDISCOMs have made payments limiting to the approved figures of

Hon’ble APERC in T.O FY 17-18. However APDISCOMs have brought the above

discrepancies to APERC through petition vide I.A.No.9 of 2017 in O.P.No.28 &

29 of 2016 dated 26.08.2017. Hon’ble APERC has admitted the contention of the

APDISCOMs and directed AP Govt to suggest to recover the amounts either through

tariff hike/Govt subsidy/truing up. Consequent to the judgement of petition, it is now

proposed to include these differential amounts in the tariff projections of FY 2018-19.

Page 83: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

63

Long Term – KSK Mahanadi

All applicable non-escalable Tariff components are considered as per approved tariff

in PPA. The fixed cost is considered limiting to 85% PLF and variable cost arrived

as per energy despatch projections.

Generator

Name

H2 FY 2017-18 FY 2018-19

Fixed

Cost

Variable

Cost (Crs.)

Incentives

(Crs.)

Fixed Cost

(Crs.)

Variable

Cost (Crs.)

Incentive

s (Crs.)

KSK

Mahanadi 177.09 297.31 0 446.76 650.00 0

Variable cost per unit of Rs.2.30/kWh have been considered for H2 FY 2017-18 and

Rs. 2.60/kWh for FY 2018-19 has been considered. Fixed cost per unit of Rs.

1.37/kWh and Rs.1.50/kWh have been considered for H2 FY 2017-18 and FY 2018-

19 respectively. In addition, Licensee would like to bring to the notice of the

Hon’ble Commission the following unapproved cost during FY 2017-18 for

consideration and allow to recover as part of ARR projection FY 2018-19 ( currently,

Licensee has not considered):

Disapproved Fixed Cost: The Fixed Cost for projected FY 2017-18 is Rs. 446.76

Cr. The Hon’ble Commission in its Tariff Order for FY 2017-18 approved Fixed Cost

of Rs.

355.16 Cr. This resulted in an unapproved fixed cost of Rs. 355.16 Cr. The

Hon’ble Commission may approve the unapproved fixed cost of Rs. 91.60 Cr. as part

of projection for FY 2018-19.

Incentive: The Generator has been consistently maintaining a PLF of 90% which

makes it eligible for incentive due to higher PLF based on provisions of PPA.

Hon’ble Commission may approve the incentive applicable based on actual availability.

PGCIL Charges: In case of KSK (LTOA), APDISCOMs have to reimburse the

PGCIL charges being paid by the generator as per RTA and also other bills. The

total payable charges for KSK works out to about Rs. 179.81 Crs. as shown below:

Generator

Name

PGCIL Charges (Rs. Cr.)

H1 FY 17-18 H2 FY 17-18 Total FY 17-18

KSK Mahanadi 92.78 87.03 179.81

APDISCOMs have been utilizing the power from KSK for which the plant is

connected to CTU network. As per the contractual obligations of the long term PPAs,

APDISCOMs are liable to reimburse the PGCIL charges to the generator. But in view

of certain inadvertencies in ARR filing for FY 17-18, the Hon’ble APERC

Page 84: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

64

disallowed PGCIL charges. Because of this, though PPA mandates APDISCOMs to

pay for the energies availed and incidental PGCIL charges, APDISCOMs have made

payments limiting to the approved figures of Hon’ble APERC in T.O FY 17-18.

However APDISCOMs have brought the above discrepancies to APERC through

petition vide I.A.No.9 of 2017 in O.P.No.28 & 29 of 2016 dated 26.08.2017.

Hon’ble APERC has admitted the contention of the APDISCOMs and directed AP

Govt to suggest to recover the amounts either through tariff hike/Govt subsidy/truing

up. Consequent to the judgement of petition, it is now proposed to include these

differential amounts in the tariff projections of FY 2018-19.

Short Term and Bilateral/ Inter-State purchases

a. Bilateral Purchases

The per unit cost of Rs. 4.08 / kWh (APERC approved tariff for FY 2017-18) is considered

for short term purchases and the corresponding cost is 241.16 Crs. for H2 FY 2017-18 and

Rs. 258.7 Crs. for FY 2018-19.

b.-EXCHANGE

The per unit cost of Rs. 4.08 / kWh (APERC approved tariff for FY 2017-18) is considered

for Power procured through Exchanges and the corresponding cost is 220.32 Crs. for H2

FY 2017-18 and Rs. 272.94 Crs. for FY 2018-19

D-D Purchases/ Sales

Month-wise availability of each APDiscom has been calculated based on PPA allocation.

The requirement of each Discom at APTRANSCO periphery has been calculated, by

grossing up the sales with losses. The D-D purchases / sales for each Discom have been

estimated after taking into account the respective allocations to each Discom as per the

Final Transfer Scheme. The D-D pool price has been considered at Rs. 4.08/kWh for FY

2017-18 (price of energy from bilateral purchases).

3.23 UI Charges (Deviation Charges)

The Hon’ble CERC had issued the regulations on Deviation Charges from time to time in

order to safeguard the dynamic grid operation. All SLDCs are under the control of

RLDCs to maintain the system frequency within the range of 49.70 Hz to 50.05 Hz. The

nodal and touch points are approved by SRPC forum within the presence of all

beneficiaries and SRLDC. Based on these nodal points, SRLDC has been obtaining the

data from respective stations in every week and same has been submitted to SRPC. SRPC

has been issuing the account for under-drawls and over-drawls of energy in 96 blocks in a

day every week. Further, all SR beneficiaries have been receiving the deviation charges

account either in the form of receivable or in the form of payable in every week. Based on

the certification, AP along with other beneficiaries have to pay/ receive the deviation

charges (UI charges) to SRLDC pool account. Presently, APSLDC has been operating the

AP grid in technical and commercial manner. The UI paid amount for H1 FY 2017-18 has

been considered for H2 FY 2017-18 and the entire FY 2017-18 has been considered for

Page 85: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

65

FY 2018-19 also. The Commission may approve this amount as projected by

APDISCOMs.

ENERGY REQUIREMENT

Based on the availability shown above and the energy requirement from all the Discoms,

the actual energy to be purchased Discom-wise has been projected as follows:

DISCOMS

H2 FY 2017-18

FY 2018-19

MU

MU

APEPDCL

10,082

21,977

APSPDCL

19,543

39,566

Total

29,570

61,543

The above energy requirement of the licensees has been arrived at by grossing up the

sales of the licensee sales with appropriate transmission and distribution losses. The

external loss (PGCIL losses) on the power purchased from CGS (excluding NTPC

Simhadri), KSK Mahanadi and Thermal Powertech only has also been factored in the

above energy requirement.

SUMMARY OF POWER PURCHASE FOR CURRENT YEAR H2 FY 2017-18

AND ENSUING YEAR FY 2018-19

Based on the availability, requirement and costs for each source, the summary of power

purchase cost for Andhra Pradesh for H2 FY 2017-18 is projected as follows:

Source

2017-18 H2 Projection

Power

Purchase (MU)

Available

Power

Purchase (MU)

Despatch

Costs PP Cost

(INR/kWh

) (INR Crs)

APGENCO

Thermal&

DSTPP-

I&II

9940.32

9645.68

3666.51

3.80

APGENCO

Hydel 796.68 796.68 233.29 2.93

Page 86: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

66

CGS 7695.85 7695.85 2727.50 3.55

APGPCL 63.40 63.40 16.31 2.57

IPPs – Gas (**) 1370.50 1370.50 461.19 3.37

NCE 4,015.84 4,015.84 2,017.19 5.02

TPCIL 855.81 855.81 314.94 3.68

Srivatsa 32.95 32.95 10.16 3.08

KSK Mahanadi 1292.66 1292.66 474.41 3.67

Hinduja 1733.50 1733.50 662.20 3.82

Bilateral

Purchases 1,080.00 591.09 241.16 4.08

Power Exchange 540.00 540.00 220.32 4.08

UI 330.62 330.62 87.18 2.64

Other short

term sources 1050 951.21 388.09 4.08

Pension

liabilities of

APGENCO

378.98

Total 30798.14 29915.79 11899.43 3.98

(**) For the plants M/s. LKPL and M/s. SPGL, the tariff has been considered as per

order dated 29/11/2017 in I.A.No.8 of 2017 in O.P.No. 28 & 29 of 2016 filed before

Hon’ble APERC.

Based on the availability, requirement and costs for each source, the summary of

power purchase cost for Andhra Pradesh for FY 2018-19 is projected as follows:

Source

FY 2018-19 Projection

Power Purchase

(MU) Available

Power Purchase (MU)

Despatch

Costs PP Cost

(INR/k

Wh)

(INR Crs)

APGENCO

Thermal&

DSTPP-I&II

27452.46

27404.04

10,868.78

3.97

APGENCO

Hydel 2500 2500 475.26 1.90

Page 87: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 67

CGS 13168.59 13045.21 4904.85 3.76

APGPCL 81.41 81.41 21.64 2.66

IPPs - Gas 2711.13 2711.13 996.22 3.67

NCE 12182.91 12182.91 6080.97 4.99

TPCIL 1825 1825 664.03 3.64

Srivathsa 68.41 68.41 21.09 3.08

KSK Mahanadi 2500 2500 1096.76 4.39

Bilateral

Purchases 1812.00 634.07 258.70 4.08

Power

Exchange 810.00 668.96 272.94 4.08

UI 661.23 661.23 174.35 2.64

Other short

term sources 400 360.97 147.28 4.08

Pension

liabilities of

APGENCO

808.28

Total 66,173.14 64,643.34 26,791.15 4.14

PGCIL & ULDC Charges

3.24 Payment of PGCIL charges due to utilization of CGS share and KSK Mahanadi &

TPTCL

APDISCOMs are paying monthly PGCIL charges due to utilization of Power from Central

Generating Stations and 2 CTU connected private generators (KSK, Mahanadi & Thermal Power

Tech). CERC had issued the regulations on sharing of Inter State Transmission Charges and

Losses and amended these regulations from time to time. CERC had formulated the

validation committee for determination of POC charges in every quarter. The validation

committee has been finalizing the charges payable by respective state and Inter State

Generators in every quarter by validating the data in prescribed formats as submitted by

utilities. The determined POC charges is being submitted to CERC for further approval in every

quarter by mentioning POC rate per MW per month. APDISCOMs have a share of 1,790 MW

from Central Generating Stations exclusive of Simhadri Stage-I. SRPC has been certifying

Page 88: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 68

the payable charges by APDISCOMs along with other states in the monthly Regional

Transmission Account (RTA). Based on the RTA, PGCIL has been making the claims of Inter

State Transmission Charges on APDISCOMs subject to crediting the STOA offset credits &

STOA charges in every month. As per Transmission Service Agreement (TSA) entered with

PGCIL, as per regulations, PGCIL is entitled to recover the entire YTC charges in four bills. In

bill-1, PGCIL is claiming the Inter State Transmission Charges on APDISCOMs as per RTA

which is being certified by SRPC and RTDA bill-2 claims are raised by PGCIL due to variation

in utilization MWs through PGCIL network. In bill-3 PGCIL is claiming the balance

recoverable PGCIL charges in every quarter i.e., duly considering the payments being received

through bill-1 & bill-2. The balance amounts in bill-3 is claimed by PGCIL on payment prorate

basis of bill-1 & bill-2 duly considering the all the beneficiaries across the country. PGCIL is

claiming the FERV and other eligible amounts from time to time in bill-4 i.e., as per the

provisions of regulations and TSA.

CERC had determined the POC rate for 3rd quarter of FY 2017-18 at a value of Rs.3.32 lakhs

per MW per month. Based on this, the payable POC charges per month works out to Rs. 63 Crs

inclusive of bill-2, 3 & 4. The Inter State Transmission Charges per month of Rs. 63 Crs (CGS

share) has been considered for FY 2018-19 and H2 FY 2017-18 excluding the unpredictable

charges of STOA being received in every month. Further, in anticipation of addition of new

transmission elements in the CTU system, 5% escalation over the previous year charges is taken.

S.No. Description POC rate per

MW per

month based

on Oct’17

Total

allocatio

n in

MWs

Payable

PGCIL

charges per month

in Rs. Crs incl. of

Bill-2,3&4

Payable

charges to

PGCIL per

annum Rs. Crs

for FY 18-19

1 CGS Share Rs.3.32

Lakhs

1,790 63 756

2 Thermal

Power

Tech

(LTOA)

Rs.3.32

Lakhs

230.55 8.5 102

3 KSK

Mahanadi

(LTOA)

Rs.32 Lakhs 400 15 180

Total 1038

The Hon’ble APERC may kindly allow the above amount of Rs.1,038 Crs for FY 18-19 as payable

PGCIL for evacuation of power through PGCIL Network becauseAPDISCOMs have been

utilizing the power from CGS to the tune of 1,790 MW (exclusively CGS) and a total of 630.55

MWs from Thermal Power Tech & KSK Mahanadi Limited for which both the plants are connected

to CTU network.

Page 89: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 69

3.25 PGCIL ULDC Charges & POSOCO SRLDC fees & Charges

APDISCOMs have been making payments of ULDC charges to PGCIL in every month to the

extent of AP share and it works out to Rs. 5.06 Crores per annum and the same may be

considered as power purchase cost towards ULDC network charges and may be approved by

APERC.

In case of POSOCO SRLDC fees & charges, APDISCOMs are paying the charges as per the

orders of CERC. The amount projected for SRLDC fees & charges payment for FY 18-19 duly

considering the amount already paid to POSOCO for HI FY 17-18. The projection of Rs.

1.41 Crores for SRLDC fees & charges during FY 18-19 may be considered.

Page 90: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 70

4 Losses

4.1 DISCOM losses

The DISCOM losses for H2 FY 2017-18 is taken as per APERC approved values and 2% reduction

is considered for FY 2018-19.The below table provides the voltage level losses for projecting

APSPDCL energy requirement for H2 FY 2017-18 and FY 2018-19.

The following table gives the details of losses projected by SPDCL for 2017-18 and 2018-19.

4.2 TRANSCO losses

The Transco losses for H2 FY 2017-18 and for FY 2018-19 have been taken as per approved losses.

4.3 Losses external to APTRANSCO system

The losses external to the APTRANSCO system are considered to be 3.57 % for H2 FY 17-18 and also

for FY 2018-19. This is applicable for procurement of power from Central Generating Stations and other

medium and short term purchases. However, external losses have not been considered for bilateral /

inter-state purchases due to considering average landed power purchase cost at APTransco periphery.

Page 91: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 71

5 Expenditure Projections for APSPDCL

5.1 APTransco Charges

The Transmission Cost has been computed based on the Transmission Tariff order for the FYs

2013-14, FY 2014-15, 2015-16, FY 2016-17, FY 2017-18 and 2018-19 and is tabulated below:

Form - 1.1 – Transmission Cost

As per revised regulatory formats the transmission load has been apportioned between load not

eligible for open access & load eligible for open access and the transmission cost is arrived by

applying the respective transmission tariff. For the FY 2014-15, contracted demand of APSPDCL of

six districts are considered for entire 12 months and contracted demand of newly added Anantapur

& Kurnool districts are considered for 10 months for computation of transmission charges.

Contracted demand of Anantapur & Kurnool districts is taken as 17.45% of contracted demand of

erstwhile APCPDCL.

5.2 PGCIL and ULDC Charges

The PGCIL and ULDC charges have been computed based on the information sought by the

licensee from APTransco. For FY 2013-14 to FY 2016-17, the figures shown are actuals.

APDISCOMs are paying monthly PGCIL charges due to utilization of Power from Central

Page 92: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 72

Generating Stations and 2 CTU connected private generators (KSK, Mahanadi & Thermal Power

Tech). APDISCOMs have a share of 1,790 MW from Central Generating Stations exclusive of

Simhadri Stage-I. In case of Thermal PowerTech (LTOA), APDISCOMs have to reimburse the

PGCIL charges being paid by the generator as per RTA and also other bills. Further, Inter State

Transmission charges also have to be reimbursed to KSK Mahanadi (LTOA) every month as per

RTA. The total charges payable for KSK Mahanadi & Thermal Power Tech works out to about Rs.

23.50 Crs per month. The PGCIL charges are computed as per CERC Regulations and are as shown

below. The APSPDCL portion of the total PGCIL charges based on share of 65.73% works out to

Rs.682.28 Crores.

S.No. Description

POC rate per

MW per

month based

on Oct’17

Total

allocation

in MWs

PGCIL charges

per month in Rs.

Crs incl. of Bill-

2,3&4

PGCIL charges

per annum Rs.

Crs for FY 18-

19

1 CGS Share Rs.3.32 Lakhs 1,790 63 756

2 Thermal Power

Tech (LTOA)

Rs.3.32 Lakhs 230.55 8.5 102

3 KSK Mahanadi

(LTOA)

Rs.32 Lakhs 400 15 180

Total 1038

5.3 SLDC Charges

The SLDC Charges have been adopted as per the tariff orders. The charges have been

apportioned based on load not eligible for open access and load eligible for open access. The

approved SLDC charges for 2017-18 are Rs. 24.90 Crs. and projected charges of Rs.26.56 Crs. for

FY 2018-19. For the FY 2014-15, contracted demand of APSPDCL of six districts are considered

for entire 12 months and contracted demand of newly added Anantapur &Kurnool districts are

considered for 10 months for computation of transmission charges. Contracted load of Anantapur &

Kurnool districts is taken as 17.45% of contracted load of erstwhile APCPDCL.

Page 93: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 73

Form – 1.2 SLDC Charges

Page 94: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 74

5.4 Distribution Costs

The distribution cost as per the Tariff Orders are considered. For FY 2013-14, the distribution

cost of APSPDCL with six districts are considered. For FY 2014-15, the distribution cost of

APSPDCL with six districts and distribution cost of Anantapur & Kurnool districts are considered

for 10 months duly taking a proportion of distribution cost of erstwhile APCPDCL (17.45%) are

considered for arriving distribution cost. For FY 2017-18 & FY 2018-19, the distribution cost of

APSPDCL with six districts and for Anantapur & Kurnool districts a proportion of distribution cost

of erstwhile APCPDCL (17.45%) are considered for arriving total distribution cost.

5.5 Interest on Consumer Security Deposits

Interest on Security Deposit are calculated based on the past trend. The interest is calculated @

6.25% per annum for 2017-18 and 2018-19 on the average of opening and closing balances. For

previous year 2016-17 the actual average rate of interest is found to be 6.54% per annum

Page 95: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 75

Form 1.5: The computation on Interest on Consumer Security Deposit is given below

As per APERC Regulation 6 of 2004 stipulates "Security Deposit amount shall be two months charges in case of

monthly billing and 3 months charges for bi-monthly billing".

.....

"The interest accruing to the credit of the consumer shall be adjusted annually against the amounts outstanding

from the consumer to the Licensee as on 1st May of every year and the amounts becoming due from the consumer

to the Licensee immediately thereafter."

5.6 Supply Margin

The licensee has projected Supply Margin for FY 2017-18 and FY 2018-19. The supply

margin for 2013-14, 2014-15, 2015-16, FY 2016-17, FY 2017-18 and FY 2018-19 are as follows.

Form – 1.6 - Supply Margin Rs. in Crores

FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18 FY 2018-19

Supply Margin Amount 12.33 12.12 13.13 13.00 12.79 13.05

Page 96: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 76

5.7 Other Costs

The licensee has projected the following expenditure under other costs:

1) Amount payable towards DELP to M/s EESL, New Delhi

2) Amount payable towards solar pumpsets

3) Amount payable towards Energy Efficient Pump sets

4) Reserve fund towards to relief to victims of electrical accidents

5.7.1 DELP:

The licensee with the approval of Honourable Commission has distributed 2 Nos. LED bulbs in all

the districts of its jurisdiction. In accordance with the approval of the Honourable Commission, the

licensee has projected the amounts payable to M/s EESL, New Delhi. Number of LEDs distributed

up to end of FY 2015-16 is around 1.10 Cr. for which Discom incurred 49.27 Cr. in FY 2016-17 and

is liable to pay Rs. 51.25 Cr. in FY 17-18 and Rs. 37.71 Cr. in FY 2018-19 as annuity payments.

5.7.2 Solar pumpsets:

The licensee has erected 5,750 Nos. of solar pumpsets in FY 2016-17 and is expected to erect

further 6,214 Nos. and 8010 Nos. each in FY 2017-18 and FY 2018-19 respectively.

The following table summarizes the Agricultural demand met through solar off-grid power out of

total Agricultural demand of the licensee.

Particulars FY 2017-18 FY 2018-19

Agricultural Demand met through Grid Power (MU) 9536.85 9761.55

Agricultural Demand met through Solar Pumpsets* (MU) 50.32 95.66

Total Agricultural Demand (MU) 9587.17 9857.21

* Each 5HP Pumpset is expected to produce 6000 Units of energy per year

The power purchase cost saved by these schemes have already been factored in the power purchase

calculations.

The consumer contribution is 11% of the project cost, the MNRE, Govt. of India provides 33% of

the project cost as subsidy and balance 56% is to be borne by the licensee. The following table

Page 97: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 77

shows the cost-breakup of solar-pumpsets and Discom’s contribution for which it is liable to pay

annuity payments.

Amounts payable towards Energy Efficient pump sets. The licensee proposed to replace 65,000 Nos. of

old pumpsets with BEE 5 Star rated 5 HP energy efficient submersible pump sets with smart control

panels. The details of the project costs are given below.

The above project was approved by Honourable APERC vide order in OP.No.20 of 2017, dated 17-

06-2017. The licensee is projecting to incur costs of Rs.9.79 Crs. and Rs.29.25 Crs. towards

repayment of loan towards the above projects for FY 2017-18 and FY 2018-19 respectively.

Page 98: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 78

5.7.3 Reserve fund towards to relief to victims of electrical accidents

The licensee is depositing every month Rs.1.29 Crs. into a separate Bank A/c to be used for the

purpose of providing relief to victims of electrical accidents in FY 2017-18. Further it is proposed to

provide Rs.15 Crs. towards reserve fund for FY 2018-19.

The licensee has projected payment towards this project in FY 2017-18. The other costs during FY

2017-18 & FY 2018-19 are submitted below.

Rs. Crs.

5.8 Summary of ARR

Aggregate Revenue Requirement (ARR) for Retail Supply Business

(Form-1) (Rs. in Crores)

Page 99: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 79

6 Revenue Projections

6.1 Sales Forecast

The factors affecting the actual consumption are numerous and often beyond the control of the

licensee due to factors such as Government Policy, economic climate, weather conditions and force

majeure events like natural disasters. Therefore, an accurate point-estimate of the consumption

(sales by licensee) is not possible. Under such a situation, the attempt is to look into various factors

and estimate the interrelationships to arrive at a reasonably accurate forecast within a range and use

a single point-estimate within the range for the limited purpose of estimating future costs / revenues.

6.1.1 Trend Method

This method is a non-causal model of demand forecasting which assumes that the underlying

factors, which drive the demand for electricity, are expected to follow the same trend as in the past

and hence the forecast for electricity is also based on the assumption that the past trend in

consumption of electricity will continue in the future. The strength of this method, when used with

balanced judgment, lies in its ability to reflect recent changes and therefore is probably best suited

for a short-term projection as used for the ARR/ Tariff filing. However, the trend-based approach

has to be adjusted for judgment on the characteristics of the specific consumer groups/ categories.

For example, while this method may provide a better estimate of consumption by the domestic and

commercial categories of consumers, it may not be very suitable for the industrial category because

of the high dependence of demand on the end-use and also on the macroeconomic variables.

In any case, the forecasts arrived at by using the trend method need to be modified for impact of any

other considerations like increasing commercialization/ development in certain districts/ regions to

incorporate the impact of econometric variables and the load reliefs issued in the past. The Licensee

has projected the category –wise sales based on the modified trend approach. Sales Forecast for the

ensuing year has been developed based primarily on analysis of historic data for the period FY

2011-12 to H1 of FY 2017-18. The following inputs have been taken to arrive at sales consumption

for H2 of FY 2017-18 and FY 2018-19.

Page 100: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 80

Actual sales (6 districts + Anantapur & Kurnool) captured from FY2011-12 to FY2016-17

CAGR computed for historical sales for FY 2011-12 to FY 2016-17

Actual sales (6 districts + Anantapur & Kurnool) captured for FY 2017-18 H1

Sales projected for FY 2017-18 H2 using CAGR as growth rate over FY 2016-17 H2 actual sales

(except for LT Agriculture where growth rate is linked to the growth in connections)

CAGR computed for actual sales from FY 2011-12 to FY 2017-18

Growth rate used on FY 2017-18 projected sales to forecast sales for FY 2018-19

Additional loads for Lift irrigation schemes, CRDA and Industrial clusters etc., added for

projecting FY 2017-18 & FY 2018-19 restricted sales

Load restrictions captured for FY 2016-17 H1& H2 and FY 2017-18 H1

No Load restrictions are expected in H2 FY 2017-18 & FY 2018-19

Hence, sales for FY 2017-18 (H1 FY 2017-18 actuals and H2 FY 2017-18 projections) and FY

2018-19 are projected after considering additional loads & LRs on actual sales

6.1.2 LT Sales forecast

Sales Forecast for FY 2018-19 has been developed based primarily on analysis of historic data for

the period FY 2011-12 to FY 2016-17. The ARR for the retail supply business is being filed for the

FY 2018-19. The Licensee submits the following forecasts of energy sales (in million units) as part

of the current application to the Hon’ble Commission. For the FY 2014-15, the sales pertaining to

Anantapur & Kurnool districts are considered from 2nd June, 2014.

6.1.2.1 LT Cat-I: Domestic Supply

The consumption of power by the domestic category is 7598.85 MU in the year

2016-17 consisting of 4088.79 MU in the first half and 3510.06 MU in the second half of the year.

The consumption of power by the domestic category in the first half of the 2017-18 is

4507.60 MU. The sales forecast for H2 of FY 2017-18 has been done for the months October to

March 2018 by projecting an appropriate growth rate over the sales of the corresponding months of

Page 101: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 81

FY 2016-17 and adding the load relief quantum. The sales so arrived shall reflect the unrestricted

sales (sales projected such that there would be no load shedding). The sales for second half of FY

2017-18 for this category will be 3842.58 MU, the total estimated for FY 2017-18 is 8350.18 MU.

For the year FY 2018-19, the licensee has projected sales using an appropriate growth rate

over 2017-18 projected sales. The licensee has projected the unrestricted sales for FY 2018-19, as it

would like to plan no load restriction measures for FY 2018-19. The unrestricted sales projected for

FY 2018-19 for this category is 9168.39 MU. The growth rate of sales for FY 2017-18 over FY 2016-

17 is 9.89% and for FY 2018-19 over FY 2017-18 is 9.80%.

6.1.2.2 LT Cat-II: Non-Domestic / Commercial Supply

The consumption of power by the non-domestic category is 1655.76 MU in the year 2016-17

consisting of 877.87 MU in the first half and 777.89MU in the second half of the year.

APSPDCL is experiencing an increase in the commercial activity due to an increase in the

release of new services as well as higher levels of specific consumption by these commercial

establishments. For 2017-18, the first half sales are 944.85 MU. The sales forecast for H2 of FY

2017-18 has been done for the months October to March 2018 by projecting an appropriate growth

rate over the sales of the corresponding months of FY 2016-17 and adding the load relief quantum.

The sales so arrived shall reflect the unrestricted sales. The sales forecast for second half of FY

2017-18 for this category is 834.68 MU. SPDCL has projected the sales for entire FY 2017-18 at

1779.53 MU.

The licensee has added a growth rate of 7.11 % to project the sales for FY 2018-19. The licensee has

projected the unrestricted sales for FY 2018-19, as it would like to plan considering no load-

Page 102: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 82

shedding during the year. The sales projected for FY 2018-19 for this category is 1906.11 MU. The

growth rate of sales for FY 2017-18 over FY 2016-17 is 7.48% and for FY 2018-19 over FY 2017-

18 is 7.11%.

6.1.2.3 LT Cat-III: Industrial Supply

The consumption of power by the category is 1686.22 MU in FY 2016-17 consisting of

843.72 MU in the first half and 842.50 MU in the second half of the year.

During the year 2017-18, APSPDCL has achieved sales of 1017.16 MU in the first half. The

sales forecast for H2 of FY 2017-18 has been done for the months October to March 2018 by

projecting an appropriate growth rate over the sales of the corresponding months of FY 2016-17.

Load relief quantities of corresponding months are added to arrive unrestricted sales projections.

The sales so arrived shall reflect the unrestricted sales (sales projected such that there would be no

load shedding). The sales forecast for second half of FY 2017-18 for this category is 970.09 MU.

The overall sales for 2017-18 are likely to be 1987.26 MU. For projecting sales of FY 2018-19, the

Company has added a growth rate of 15.90% over FY 2017-18 sales. No load relief is expected in

the FY 2018-19. The licensee has projected the sales for this category as 2303.21 MU. The growth

rate of sales for 8 districts for FY 2017-18 over FY 2016-17 is 17.85% and for FY 2018-19 over FY

2017-18 is 15.90%.

6.1.2.4 LT-IV - Cottage Industries & Dhobi Ghats etc.

The consumption of power by this category is 39.94 MU in FY 2016-17 consisting of 20.77

MU in the first half and 19.17 MU in the second half of the year.

Page 103: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 83

The sales in this category during first half of FY 2017-18 is 20.75 MU. The sales forecast for

H2 of FY 2017-18 has been done for the months October to March 2018 by projecting an

appropriate growth rate over the sales of the corresponding months of FY 2016-17. Load relief

quantities of corresponding months are added to arrive unrestricted sales projections. The sales so

arrived shall reflect the unrestricted sales (sales projected such that there would be no load

shedding). The sales for second half of FY 2017-18 for this category is 20.02 MU. For the year FY

2018-19, the licensee has projected unrestricted sales using an appropriate growth rate over 2017-18

projected sales. The licensee has projected the unrestricted sales for FY 2018-19 for this category as

42.63 MU. The growth rate of sales for 8 districts for FY 2017-18 over FY 2016-17 is 2.05% and

for FY 2018-19 over FY 2017-18 is 4.59%.

6.1.2.5 LT-V - Agriculture

a) The Licensed area of APSPDCL covers eight Districts after bifurcation of AP state. Farmers

in these eight Districts largely depend on lifting of ground water for their irrigation needs.

The Energy Demand has been growing consistently over the past years. Usually, two crops

are grown in a year and in some areas where plenty of water is available, particularly in

Krishna and Guntur districts & part of other districts, third crop is also grown. Among all the

crops, Paddy is the most preferred crop being grown in all the eight Districts resulting in high

Energy Demand on Irrigation. In recent years, depth of water table is increased, resulting in

increase in the Energy demand.

b) Large no. of the pump sets under usage are of not as per standard specifications and such

pump sets draw more Energy. Also the farmers are replacing the old pump sets with higher

capacity pump sets whenever the depth of water table increases.

Page 104: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 84

c) The Government of Andhra Pradesh declared a modified agriculture policy in January 2005

aimed towards incentivizing Demand side management in the agriculture sector. One of the

key features of the policy is to install Capacitors for all the existing pump sets. So far,

89.15% of the existing pump sets as on 30.09.2017 are provided with Capacitors by the

consumers. The licensee is taking all necessary steps to provide Capacitors for the balance

pump sets also.

d) There are 12,57,874 Nos. agricultural services in the licensee’s area as on 31-03-2016.

During FY 2016-17, 68,691 Nos. of new agricultural connection are added, thus resulting in

total no.of agricultural connections increased to 13,26,565 Nos. as on 31-03-2017. During

FY 2017-18, the licensee has planned to release 48,400 Nos. agricultural connections, out of

which 35,600 Nos. are released upto September, 2017. By this addition of new connections,

the total no.of agricultural connections in the licensee area will be 13,62,165 Nos. at end of

FY 2017-18 (H1). Further, there are 12,800 Nos. applications are pending for release of new

agricultural connections as on 30-09-2017. And the licensee proposes to release supply to

50,000 Nos. new agricultural connections during the FY 2018-19. The circle wise break up

of no.of agricultural connections existing, added and projections for FY 2017-18 to FY 2018-

19 are furnished in the table below:

Page 105: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 85

e) The majority of the agricultural connections are with bore wells. Hence, the average capacity

of the pump-sets are increasing at every year. The connected load details of agricultural

connections are furnished in the below table:

f) Initiatives of the licensee to control agricultural sales in line with Tariff Order :

The licensee has took all possible measures to control agricultural sales within the limits of

Tariff Order. The following initiatives are taken in this regard.

Strict implementation of 7 Hrs. supply-a-day.

Anti-pilferage measures.

APSPDCL has taken Demand side management measures with publicity through

handouts, electronic media etc., to the farmers to install energy efficient pump sets,

required rating of capacitors, HDPE pipe lines at suction and delivery and frictionless

foot-valves to save energy and to avail subsidized tariff.

Wide publicity is being given among the consumers on installation of capacitors

With the initiatives of MNRE, Govt. of India, erection of solar pump sets project has

been under taken at a large scale. PFCGEL is acting as financial agency, MNRE is giving

33% as subsidy, the consumer is contributing 11% and balance 56% is to be borne by the

licensee. So far, 7968 Nos. solar pump sets were commissioned at the end of 21-11-2017.

Agreement entered with M/s EESL, New Delhi for conducting survey and preparation of

DPR at Hindupur Mandal of Anantapur district for AgDSM project (for replacement of

Page 106: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 86

existing old inefficient pump sets with ISI pump sets). Survey was completed and work is

to be taken up.

HVDS: The APSPDCL has taken to convert existing LT network in to HVDS for all

agricultural connections. Majority of services in the districts of Vijayawada, Guntur,

Prakasam, Nellore, Tirupati and Kadapa are already provided supply with HVDS. Works

are in progress in all the districts of the licensee to provide HVDS to all agricultural

connections.

The proposal for providing Grid connected Solar panels to all the agricultural connections

in Venkatachalam Mandal of SPSR Nellore District has been approved by the

Honourable Commission. Tender process is under progress.

g) Factors for increased agricultural sales :

The following factors are expected for the increased agricultural sales in the licensee area.

Due to increase in depth of water table, some of the farmers replaced existing pump sets

resulting in increased energy demand.

Releasing of agricultural services at a large number due to increasing demand for new

services.

Low rainfall in majority of the districts and low water levels in the projects.

h) Sales estimates with ISI methodology :

Sales estimates in respect of Anantapur & Kurnool circles are being done with ISI

methodology for the entire period from Apr’16 to Sep’17. For Kadapa district, the sales

estimates are being done with ISI methodology from July, 2016 (from Apr’15 to June’2016,

the estimation were made as per the earlier agreed methodology). For all other districts, sales

estimations are being done as per ISI methodology from June’2015 (for Apr’15 & May’15,

sales estimation were made as per the earlier agreed methodology).

Page 107: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 87

i) Sales estimation : Actuals for FY 2016-17, FY 2017-18 (H1) and projections for FY

2017-18 (H2) and FY 2018-19.

(i) Based on the methods as explained above, the sales actual sales is considered for FY

2016-17 and FY 2017-18 (H1).

(ii) For FY 2017-18 (H2) and FY 2018-19, sales projections are made based on the

historical sales, considering new services released / to be released and anticipated

seasonal changes.

(iii) The agricultural demand met through Off-Grid Solar pumpsets (Around 96 MUs) is

adjusted to the Agricultural demand for the Licensee.

(iv) The pilot grid connected solar pumpset tender has also been considered and adjusted

to the Agricultural Demand for the Licensee.

(v) The actual sales estimated and projections made as discussed in the above paras are

furnished in the below tables:

Page 108: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 88

The above sales are inclusive of paying category services.

The following issues were considered while projecting agricultural consumption for FY 2017-

18 and for the next year FY 2018-19:

The consumption of power by the category is 9269.50 MU in 2016-17 consisting of 3957.84 MU

in the first half and 5311.66 MU in the second half of the year.

While the consumption during 2016-17 H2 is higher than that of H1, the same trend is expected to

continue in second half of 2017-18. The Agricultural consumption during H2 of 2017-18 is

expected to be higher than H1 (3726.97 MU) and is estimated at 5809.87 MU and total for FY

2017-18 is 9536.85 MU.

Growth in agriculture restricted sales are linked to the growth rate in agriculture connections as

mentioned above. The licensee is projecting 2.36% growth in sales for FY 2018-19 over the total

sales for FY 2017-18. The licensee is confident that the growth-rate projected would take care of

the increase in specific consumption, consumption increase because of new services to be released

in FY 2018-19.

The licensee has assumed 7 hours of supply to agricultural consumers, in its projections,

considering the present power supply situation in the state.

Page 109: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 89

6.1.2.6 LT Category- VI: Local bodies, Street lighting and public waterworks

The consumption of power by the category is 638.57 MU in FY 2016-17 consisting of 305.60 MU

in the first half and 332.98 MU in the second half of the year.

The Consumption of street light and public water works in the first half of FY2017-18 is

371.05 MU. The sales forecast for H2 of FY 2017-18 has been done for the months October to

March 2018 by projecting an appropriate growth rate over the sales of the corresponding months of

FY 2016-17. No load relief is considered under this category for FY 2017-18 and FY 2018-19 also.

The sales so arrived shall reflect the unrestricted sales. The sales for second half of FY 2017-18 for

this category is 352.73 MU. For the sales in FY 2017-18, the Licensee has added a moderate

growth rate of 6.57% to project the sales for FY 2018-19. The sales projected for FY 2018-19 for

this category is 771.31 MU. The growth rate of sales for FY 2017-18 over FY 2016-17 is 13.34%

and for FY 2018-19 over FY 2017-18 is 6.57%.

6.1.2.7 LT Category VII: General purpose

The consumption of power by the category is 95.89 MU in FY 2016-17 consisting of 48.18 MU in

the first half and 47.71 MU in the second half of the year.

The Consumption of general purpose category in the first half of 2017-18 is 51.91 MU. The sales

forecast for H2 of FY 2017-18 has been done for the months October to March 2018 by projecting

an appropriate growth rate over the sales of the corresponding months of FY 2016-17 and adding

the load relief quantum. The sales so arrived shall reflect the unrestricted sales (sales projected such

that there would be no load shedding). The sales for second half of FY 2017-18 for this category are

50.77 MU. For the year FY 2018-19, the licensee has projected sales using an appropriate growth

Page 110: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 90

rate over FY 2017-18 unrestricted sales. Growth rate of FY 2018-19 unrestricted sales over 2017-18

projected sales is 6.39%. The licensee has projected the unrestricted sales for FY 2018-19 for this

category is 109.24 MU. The growth rate of sales for FY 2017-18 over FY 2016-17 is 7.08% and for

FY 2018-19 over FY 2017-18 is 6.39%.

6.1.3 HT sales forecast

Details of the trends envisaged for key categories are discussed in the following sections.

6.1.3.1 HT Cat-I – Industrial

The consumption of power by the HT-Industrial category is 6,887.82 MU in FY 2016-17

consisting of 3,612 MU in the first half and 3,275.82 MU in the second half of the year.

The consumption of power by the HT-Industrial category in the first half of the

FY 2017-18 is 3,332.99 MU. The sales forecast for H2 of FY 2017-18 has been done for the months

October’17 to March 2018 by projecting an appropriate growth rate over the sales of the

corresponding months of FY 2016-17. To estimate the projections for FY 2018-19, appropriate

growth rate along with projections for upcoming Industrial Clusters were considered.

The licensee has projected sales for this category for FY 2018-19 is 7,436.73 MU. The growth rate

of sales for FY 2017-18 over FY 2016-17 is -2.28% and for FY 2018-19 over FY 2017-18 is

10.49%.

Page 111: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 91

6.1.3.2 HT Cat-II: Non-Industrial (Others)

The consumption of power by the HT Non-Industrial category was 702.98 MU in the FY 2016-17

consisting of 372.38 MU in the first half and 330.61 MU in the second half of the year.

The consumption for the category is 418.92 MU in the first half of the FY 2017-18. The sales

forecast for H2 of FY 2017-18 has been done for the months October’16 to March 2018 by

projecting an appropriate growth rate over the sales of the corresponding months of

FY2016-17 and adding the load relief units. The sales so arrived shall reflect the unrestricted sales.

The sales for second half of FY 2017-18 for this category is 349.31MU. For the year FY 2018-19,

the licensee has projected sales using an appropriate growth rate over FY 2017-18 projected sales.

The licensee has projected the unrestricted sales for FY 2018-19, considering no load restriction

measures for the year. The sales projected for FY 2018-19 for this category is 802.72 MU. The

growth rate of sales for FY 2017-18 over FY 2016-17 is 9.28% and for FY 2018-19 over FY 2017-

18 is 4.49%.

6.1.3.3 HT III: Public Infrastructure and Tourism:

The sales projections for this category of consumers are given below for FY 2017-18 and FY

2018-19.

Note : The growth rate of sales for FY 2016-17 over FY 2015-16 is high (123.59%) due to inclusion of Hotels, Resorts,

Amusement parks, urban Haats, Tourism etc. into this category during FY 2016-17 Tariff Order.

Page 112: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 92

6.1.3.4 HT Cat-IV: Irrigation & Agriculture

The consumption of power by the HT Irrigation & Agriculture category is 1,010.80 MU in FY

2016-17 consisting of 269.63 MU in the first half and 741.17 MU in the second half of the year.

The consumption for the category is 138.86 MU in the first half of the FY 2017-18. APSPDCL

projects 914.09 MU in the second half of the FY 2017-18. The Licensee has collected the likely

commissioning dates of the upcoming lift irrigation schemes in consultation with irrigation

department and projected the sales for FY2017-18. In APSPDCL, the following are major State

Government Lift Irrigation Schemes are expected to be operational.

Accordingly, APSPDCL is projecting a sale of 1164.71 MU during FY 2018-19. The growth rate of

sales for FY 2017-18 over FY 2016-17 is 4.17% and for FY 2018-19 over FY 2017-18 is 10.61%.

6.1.3.5 HT Cat-V: Railway traction

The consumption of power by this category was 649.67 MU in FY 2016-17 consisting of

328.31 MU in the first half and 321.36 MU in the second half of the year.

Page 113: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 93

For 2017-18, the consumption for the first half is 368.72 MU and APSPDCL has projected

consumption of 328.81 MU for the second half. The overall consumption for the 2017-18 is 697.53

MU.

The projected consumption for the FY 2018-19 is 721.49 MU. The growth rate of sales for FY

2017-18 over FY 2016-17 is 7.37% and for FY 2018-19 over FY 2017-18 is 3.44%.

6.1.3.6 HT Cat-VI: Townships and Residential Colonies

The consumption of power by this category is 34.76 MU in the FY 2016-17 consisting of 21.22 MU

in the first half and 13.55 MU in the second half of the year.

During FY 2017-18, the consumption for the first half is 14.44 MU and APSPDCL has projected a

consumption of 13.70 MU for the second half as the consumption of this category. APSPDCL is

projecting an expected growth rate of 32.35% for FY 2018-19 resulting in 37.24 MU (by adding

upcoming residential quarters in CRDA Area) (unrestricted sales).The growth rate of sales for FY

2017-18 over FY 2016-17 is -19.07% and for FY 2018-19 over FY 2017-18 is 32.35%.

6.1.3.7 RESCOs

The consumption of power by this category was 413.14 MU in FY 2016-17 consisting of

203.21 MU in the first half and 209.93 MU in the second half of the year.

Page 114: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 94

For FY 2017-18, APSPDCL has projected increase in consumption to 390.60 MU, out of which the

first half sales accounts for 160.89 MU. The projected consumption for FY 2018-19 is 500.03 MU.

The growth rate of sales for FY 2017-18 over FY 2016-17 is -5.46% and for FY 2018-19 over FY

2017-18 is 28.02%. The reason for projecting higher growth rate for FY 2018-19 is due to the

recharging of bore wells due to abundant rainfall in the Resco area.

Sales Forecast category wise and Voltage level wise (Form – 3) Sales in MU

Category 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19

Actuals Projections

LT Category 9968.21 9716.43 10951.15 11223.49 12181.94 17262.87 19119.26 20986.20 22522.61 24064.07

Domestic 3605.65 3861.84 4121.19 4221.00 4428.14 5946.78 6953.98 7598.85 8350.18 9168.39

Non-domestic/Commercial 850.52 901.31 986.59 983.56 977.02 1314.61 1550.90 1655.76 1779.53 1906.11

Industrial 740.82 796.76 989.83 965.28 866.11 1380.24 1466.13 1686.22 1987.26 2303.21

Cottage Industries,

Dhobighats & Others 24.52 25.01 24.42 22.17 21.58 32.32 36.65 39.94 40.76 42.63

Irrig & Agriculture 4167.82 3664.49 4366.34 4587.91 5513.46 8006.78 8482.33 9269.50 9536.85 9761.55

Local Bodies, St. Lighting &

PWS 533.87 419.62 412.35 394.51 327.53 489.42 539.94 638.57 723.78 771.31

General Purpose 43.69 46.87 49.02 48.47 47.13 77.14 88.61 95.89 102.68 109.24

Temporary Supply 1.31 0.55 1.40 0.59 0.96 15.57 0.72 1.47 1.58 1.63

HT Category at 11 kv 1280.22 1473.82 1540.02 1440.86 1730.18 2343.35 2350.76 2655.53 2947.69 3426.04

HT I (A): General 695.90 727.84 702.16 690.10 875.16 1146.52 998.74 1080.90 1221.15 1492.01

Lights and Fans 17.04 20.58 8.02 1.67 1.89 31.67 104.47 66.51 49.43 52.79

Industrial Colonies 1.16 1.56 1.76 2.33 1.40 2.50 2.55 1.95 3.73 4.10

Seasonal Industries 0.00 23.12 24.45 36.06 40.95 59.05 39.91 45.07 44.49 45.47

Time of Day Tariffs (6 PM to 10 PM)

0.00 76.21 107.29 70.24 117.14 175.69 217.10 199.47 247.20 277.81

HT I (B): Energy Intensive

Industries 2.68 0.00 0.00 0.00 0.00 0.00 0.00 0.46 0.50 0.29

HT I (C): Aquaculture and Animal Husbandry

0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.74 39.31 40.49

HT I (D): Poultry Hatcheries and

Poultry Feed Mixing Plants 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.38 24.35 25.08

HT II: Others 292.89 311.54 335.93 292.28 304.15 377.31 461.94 456.02 492.99 512.91

Time of Day Tariffs (6 PM to 10 PM)

0.00 0.00 0.00 55.89 58.75 78.31 89.44 90.73 96.16 99.04

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.96 5.48 5.65

HT II (C): Function Halls/Auditoriums

0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.06 6.75 6.95

HT III: Public Infrastructure

and Tourism 0.00 0.00 0.00 1.28 7.22 14.59 18.64 37.24 39.81 41.00

Page 115: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 95

Category 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19

Actuals Projections

Time of Day Tariffs (6 PM to 10 PM)

0.00 0.00 0.00 0.00 1.33 3.28 3.30 7.94 8.43 8.68

HT IV Government LIS 22.76 17.26 40.41 19.32 27.09 88.38 18.52 59.80 47.50 47.98

HT IV Private Irrigation and Agriculture

0.00 0.54 9.79 0.31 0.00 23.95 54.90 107.32 155.88 192.48

HT IV CPWS 0.00 2.39 0.69 10.10 16.23 24.75 2.91 1.88 48.07 50.58

HT VI: Townships & Residential Colonies

47.55 51.03 33.99 26.53 21.39 33.04 39.89 32.89 25.75 22.58

HT VII: Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0.80 0.00 0.00 0.00 0.08 0.00 0.00 0.07 0.11 0.12

Category: RESCOs 199.44 241.74 275.53 234.74 257.40 284.31 298.45 413.14 390.60 500.03

HT Category at 33 kv 1279.98 1817.55 2076.16 1987.56 2135.81 3264.72 3630.35 3306.71 3280.15 3457.55

HT I (A): General 1179.48 1482.15 1625.99 1652.33 1728.35 2405.91 2687.13 2350.79 2224.01 2265.05

Lights and Fans 5.65 6.21 3.01 0.60 0.48 32.09 47.52 38.85 37.08 37.77

Industrial Colonies 2.29 4.59 7.07 9.34 7.26 11.20 12.29 9.87 9.17 9.40

Seasonal Industries 0.00 33.28 27.73 34.88 33.83 45.39 41.30 23.05 18.30 19.19

Time of Day Tariffs (6 PM to

10 PM) 0.00 159.51 251.28 156.71 220.51 393.86 544.51 463.48 449.30 485.02

HT I (B): Energy Intensive Industries

49.36 83.66 105.52 55.63 65.77 230.75 105.00 183.26 227.87 249.99

HT I (C): Aquaculture and

Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.04 0.05 0.05

HT I (D): Poultry Hatcheries and

Poultry Feed Mixing Plants 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.37 11.00 11.33

HT II: Others 35.54 40.91 43.67 60.83 62.18 67.62 95.67 92.68 89.29 99.50

Time of Day Tariffs (6 PM to

10 PM) 0.00 0.00 0.00 9.90 11.28 13.32 19.26 18.43 15.96 16.44

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.20 26.58 26.85

HT II (C): Function

Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.44 1.46

HT III: Public Infrastructure

and Tourism 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.17 7.05 7.26

Time of Day Tariffs (6 PM to

10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.71 1.54 1.59

HT IV Government LIS 6.61 6.53 10.16 5.58 5.38 37.70 23.15 42.57 0.00 0.00

HT IV Private Irrigation and

Agriculture 0.00 0.00 0.26 0.00 0.00 10.20 52.28 52.35 87.20 125.54

HT IV CPWS 0.00 0.72 0.00 0.95 0.00 15.25 0.00 0.00 71.92 86.48

HT VI: Townships &

Residential Colonies 1.05 0.00 1.48 0.82 0.77 1.44 2.25 1.87 2.38 14.65

HT VII: Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Category: RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 kv 1168.87 1433.44 1820.88 1792.94 1976.53 3490.59 3612.00 3786.06 3497.09 3837.97

HT I (A): General 640.23 825.77 1109.07 1036.33 1107.02 1914.08 2126.19 1828.51 1530.42 1727.09

Lights and Fans 0.82 2.13 0.58 0.81 0.50 15.41 25.74 15.28 17.67 16.94

Industrial Colonies 5.66 5.36 5.96 10.01 5.81 12.38 14.52 11.00 12.44 13.79

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM)

0.00 78.78 135.73 87.44 119.84 317.23 407.14 388.07 401.91 472.51

HT I (B): Energy Intensive

Industries 0.00 0.00 0.00 44.74 86.78 138.77 131.41 117.76 161.17 190.56

HT I (C ): Aquaculture and 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 116: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 96

Category 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19

Actuals Projections

Animal Husbandry

HT I (D): Poultry and Hatcheries

and Poultry Feed Mixing Plants 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II: Others 0.00 0.00 0.00 3.42 8.85 14.25 22.93 24.65 28.06 28.91

Time of Day Tariffs (6 PM to

10 PM) 0.00 0.00 0.00 0.54 1.58 2.50 3.82 4.25 4.88 5.03

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (C) : Function Halls /

Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.64 0.00

HT III: Public Infrastructure

and Tourism 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to

10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT IV Government LIS 0.00 0.00 0.00 0.00 0.00 328.13 187.51 746.87 0.00 0.00

HT IV Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 642.37 661.64

HT IV CPWS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT V: Railway Traction 522.15 521.40 569.54 609.65 646.15 747.84 692.74 649.67 697.53 721.49

HT VI: Townships &

Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VII: Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Category: RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total (LT + HT) 13697.27 14441.24 16388.21 16444.85 18024.46 26361.53 28712.37 30734.50 32247.54 34785.63

YoY Growth 5.43% 13.48% 0.35% 9.61% 46.25% 8.92% 7.04% 4.92% 7.87%

Page 117: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 97

6.2 Revenue from Current Tariffs

The computation of revenue at current tariff for FY 2017-18 and FY 2018-19 for each customer

category is carried out as follows:

Revenue from Tariffs =

Energy Estimate * Approved Energy Charges … ……………………..……….. (a)

+ Contracted Demand / Load Estimate * Approved Demand / Fixed Charges ………..... (b)

+ Incremental Revenue on account of Monthly Minimum Charges (‘MMC’) … (c)

+ Customer Charges (d)

+ Other Charges ----- (e)

Energy charges:

For customer categories having telescopic energy tariffs, the energy estimates have been

apportioned into the slabs and then have been multiplied with the corresponding slab tariff. The

apportionment has been based on the historical break up of telescopic consumption into the various

slabs as captured in the billing information database. The energy charges are calculated as per the

billing parameters i.e., kWh and kVAh for the category and the existing tariff rates of that category.

Demand/Fixed Charges: The estimate of demand has been made in “HP/kW” or in “MVA” as the

case maybe. Billing demand has been assumed to grow in proportion to the growth of sales in FY

2018-19. Additional demand due to additional load has been added to arrive at final demand for the

year FY 2018-19.

Monthly Minimum charges (MMC): The ‘incremental’ revenue due to MMC for each category

is the difference between cost of units recorded and monthly minimum charges notified in the tariff

order in respect of LT categories.

Customer Charges: Customer charges are as approved in tariff Order for each of the category of

consumers. As per the revised regulatory formats income from customer charges is considered as

part of revenue from tariffs.

Page 118: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 98

Other Charges: These are the charges other than the above charges.

Based on the above approach, the gross revenue (excl. NTI) for FY 2017-18 is expected to be Rs.

13,371.71 Cr, while that for FY 2018-19 is expected to be Rs 14,661.11 Cr. The NTI for FY 2017-18

is Rs. 111.23 Crs., while for FY 2018-19 NTI is Rs.155.36 crores. The table below provides the

category-wise revenue for FY 2017-18 and FY 2018-19:

Category-wise revenue (Excl. NTI) (Form-5) (Rs. Crores)

Category FY 2017-18 FY 2018-19

LT Category 6620.43 7263.51

Domestic 3073.06 3410.11

Non-domestic/Commercial 1788.86 1916.27

Industrial 1142.88 1282.40

Cottage Industries, Dhobi Ghats& Others 16.73 17.48

Irrig & Agriculture 78.70 82.83

Local Bodies, St. Lighting & PWS 439.65 468.82

General Purpose 78.87 83.87

Temporary Supply 1.67 1.72

HT Category at 11 kv 2238.48 2570.89

HT I (A): General 1139.63 1394.98

Lights and Fans 0.00 0.00

Industrial Colonies 2.35 2.59

Seasonal Industries 53.35 54.17

Time of Day Tariffs (6 PM to 10 PM) 182.44 205.03

HT I (B): Energy Intensive Industries 0.29 0.17

HT I (C): Aquaculture and Animal Husbandry 16.03 16.74

HT I (D): Poultry Hatcheries and Poultry Feed Mixing Plants 16.81 17.31

HT II: Others 515.74 539.29

Time of Day Tariffs (6 PM to 10 PM) 83.75 86.26

HT II (B): Religious Places 2.84 2.93

HT II (C): Function Halls/Auditoriums 8.08 8.34

HT III: Public Infrastructure and Tourism 37.22 38.46

Time of Day Tariffs (6 PM to 10 PM) 7.04 7.25

HT IV Government LIS 28.20 28.50

HT IV Private Irrigation and Agriculture 91.43 112.96

HT IV CPWS 23.69 24.92

HT VI: Townships & Residential Colonies 16.97 14.85

HT VII: Green Power 0.00 0.00

HT VIII: Temporary 0.11 0.11

Category: RESCOs 12.50 16.00

HT Category at 33 kv 2321.74 2423.80

Page 119: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 99

Category FY 2017-18 FY 2018-19

HT I (A): General 1649.13 1666.41

Lights and Fans 0.00 0.00

Industrial Colonies 5.80 5.94

Seasonal Industries 16.66 16.84

Time of Day Tariffs (6 PM to 10 PM) 310.92 335.63

HT I (B): Energy Intensive Industries 122.38 134.27

HT I (C) : Aquaculture and Animal Husbandry 0.02 0.02

HT I (D) : Poultry Hatcheries and Poultry Feed Mixing Plants 8.34 8.50

HT II: Others 84.12 92.09

Time of Day Tariffs (6 PM to 10 PM) 12.81 13.20

HT II (B): Religious Places 13.94 14.41

HT II (C) : Function Halls / Auditoriums 1.70 1.71

HT III: Public Infrastructure and Tourism 7.01 8.06

Time of Day Tariffs (6 PM to 10 PM) 1.19 1.23

HT IV Government LIS 0.00 0.00

HT IV Agriculture 50.84 73.22

HT IV CPWS 35.21 42.34

HT VI: Townships & Residential Colonies 1.68 9.93

HT VII: Green Power 0.00 0.00

HT VIII: Temporary 0.00 0.00

HT Category at 132 kv 2191.06 2402.92

HT I (A): General 1094.30 1218.56

Lights and Fans 0.00 0.00

Industrial Colonies 7.86 8.72

Seasonal Industries 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 260.84 306.66

HT I (B): Energy Intensive Industries 79.79 94.34

HT I (C ): Aquaculture and Animal Husbandry 0.00 0.00

HT I (D): Poultry and Hatcheries and Poultry Feed Mixing Plants 0.00 0.00

HT II: Others 23.43 23.99

Time of Day Tariffs (6 PM to 10 PM) 3.79 3.91

HT II (B): Religious Places 0.00 0.00

HT II (C) : Function Halls / Auditoriums 0.76 0.00

HT III: Public Infrastructure and Tourism 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0.00 0.00

HT IV Government LIS 0.00 0.00

HT IV Agriculture 373.91 385.12

HT IV CPWS 0.00 0.00

HT V: Railway Traction 346.38 361.62

HT VI: Townships & Residential Colonies 0.00 0.00

HT VII: Green Power 0.00 0.00

HT VIII: Temporary 0.00 0.00

Total (LT + HT) 13371.71 14661.11

Page 120: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 100

6.2.1 Detailed category wise Revenue computation

The detailed category wise computation of revenue is as follows.

6.2.2 Low Tension Categories

6.2.2.1 LT I: Domestic Category

To overcome the drawbacks in the tariff structure continued upto FY 2016-17, a new simplified tariff

structure of domestic category was introduced in the tariff order for FY 2017-18 by grouping the

consumers based on FY 2016-17 annual consumption. The licensee would like to propose the same

grouping structure for FY 2018-19 as per the filings made by the licensee in FY 2017-18 filings based

on the annual consumption of FY 2017-18.Group A: Only Domestic consumers with annual

consumption upto 900 Units ( upto 50 units/ month)

Group B: Only Domestic consumers with annual consumption greater than 900 Units and upto

2,700 Units

Group C: Domestic consumers with annual consumption more than 2,700 Units and three phase

consumers.

Accordingly, revenue at current tariff is projected. Estimated revenue for FY 2017-18 &

FY 2018-19 are submitted below:

Based on the above the total revenue estimate for the category is Rs. 3073.06 Crores for FY 2017-18

and Rs.3410.11 Crores for FY 2018-19.

Page 121: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 101

6.2.2.2 LT II: Non-Domestic & Commercial Category

Based on the above the total revenue estimate for the category is Rs.1788.86 Crores for FY

2017-18 and Rs.1916.27 Crores for FY 2018-19.

6.2.2.3 LT III: Industrial (Normal & Optional) Category

The revenue computation has been done for FY 2017-18 and FY 2018-19 slab wise and

submitted below:

The total revenue estimate for the category is Rs 1142.88 Crores for FY 2017-18 and Rs.1282.40

Crores for FY 2018-19.

Page 122: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 102

6.2.2.4 LT IV: Cottage Industries &Dhobi Ghat Category

The total revenue estimate for the category is Rs 16.73 Crores for FY 2017-18 and Rs.17.48 Crores

for FY 2018-19.

6.2.2.5 LT V: Agriculture Category

The revenue from agricultural category has been computed with reference to each

subcategory. Agricultural consumers following DSM measures with less than or equal to three

service connections or agricultural consumers having agricultural land less than or equal to 2.5 acres

are eligible for free power. The other subcategories come under paying category. The revenue

computation from the category is given below:

Based on the above computations the gross revenue from agricultural category is Rs.78.70

Crores for FY 2017-18 and Rs.82.83 Crores for FY 2018-19.

Page 123: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 103

6.2.2.6 LT VI: Street Lighting & PWS Category

The total revenue estimate for the category is Rs.439.65 Crores for FY 2017-18 and Rs.468.82

Crores for FY 2018-19.

6.2.2.7 LT VII: General Purpose Category

The total revenue estimate for the category is Rs.78.87 Crores for FY 2017-18 and Rs.83.87

Crores for FY 2018-19

6.2.2.8 LT VIII: Temporary supply Category

The total revenue estimate for the category is Rs.1.67 Crores for FY 2017-18 and Rs.1.72

Crores for FY 2018-19.

Page 124: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 104

6.2.3 High Tension Categories

6.2.3.1 HT Cat-I: Industrial

Based on the above the total revenue estimate for the category is Rs.4966.94 Crores for FY

2017-18 and Rs.5486.88 Crores for FY 2018-19.

6.2.3.2 HT Cat-II: Others

Based on the above consumption the total revenue estimate for the category is Rs.750.96 Crores

for FY 2017-18 and Rs.786.14 Crores for FY 2018-19.

Page 125: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 105

6.2.3.3 HT Cat-III: Aviation activity at Airports

Based on the above consumption the total revenue estimate for the category is Rs.52.46 Crores for

FY 2017-18 and Rs.55.00 Crores for FY 2018-19.

6.2.3.4 HT Cat- IV: Irrigation & Agriculture

The total revenue estimate for the category is Rs.603.28 Crores for FY 2017-18 and Rs.667.07

Crores for FY 2018-19.

6.2.3.5 HT Cat-V: Railway Traction

The total revenue estimate for the category is Rs 346.38 Crores for FY 2017-18 and Rs.361.62

Crores for FY 2018-19.

Page 126: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 106

6.2.3.6 HT Cat -VI: Township & Residential Colonies

The total revenue estimate for the category is Rs 18.65 Crores for FY 2017-18 and Rs.24.77

Crores for FY 2018-19.

6.2.3.7 HT Cat-VIII: RESCOs

The total revenue estimate for the category is Rs 12.50 Crores for FY 2017-18 and Rs.16.00 Crores

for FY 2018-19.

Page 127: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 107

7 Average Revenue Realized vs Average CoS break up for APSPDCL in

FY 2018-19

Average Revenue Realized (ARR) for FY 2017-18 is Rs.4.21/kWh

Average Cost of Supply (CoS) for APSPDCL - Rs. 6.16/kWh

Average CoS break-up (per unit of Sales) for APSPDCL is as follows

FY 17-18 Approved

(Rs./Unit)

FY 17-18 Projected

(Rs./Unit)

FY 18-19 Projected

(Rs./Unit)

Power purchase cost 3.84 4.02 4.19

T&D Loss Cost 0.52 0.53 0.54

Network 1.13 1.19 1.31

Other Cost 0.09 0.77 0.08

Cost of Service 5.58 5.82 6.16

The estimated revenue gap for the licensee for FY 2018-19 is as follows:

Page 128: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 108

8 Performance Parameters

The details as required by the APERC as per the fresh directive (1) in the Retail supply Tariff order

2008-09 are given below:

8.1.1 Compensation awarded by the CGRF to the consumers for deficiency of service as per the

Regulations of the Commission

Compensation paid by the licensee to consumers for deficiency of service as per the Regulations of the Commission

Compensation awarded for the year 2016-2017

S.No C.G.No &

Date Circle Date of Order

Compensation awarded

Brief Cause

1 122/2015-16 Guntur 08-12-16 Rs. 7,300/-

For default of resolving the grievance for

146 days @ Rs.50/- per day

Compensation paid by the licensee to consumers for deficiency of service as per the Regulations of the Commission

Compensation awarded for the year 2017-2018 (Upto Sep’ 17)

S.No C.G.No &

Date Circle Date of Order

Compensation awarded

Brief Cause

1 386/2015-16 Anantapur 26-09-17 Rs.10,000/- Delay in resolving the

billing complaint due to defect in Transformer

Page 129: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 109

8.1.2 Details of Electrical Accidents and ex-gratia paid during FY 2016-17 and FY 2017-18 (upto

Sep’17):

2016-17 (Non-Departmental) 2017-18 (upto Sep'17)

(Non-Departmental)

S.

No Circle

Human Animal Human Animal

Fatal Non-

fatal Fatal

Non-

fatal Fatal

Non-

fatal Fatal

Non-

fatal

1 Vijayawada 41 2 86 0 10 2 52 0

2 Guntur 17 2 32 0 21 5 34 0

3 Ongole 11 1 12 0 13 0 37 0

4 Nellore 11 0 27 0 14 0 12 0

5 Tirupati 7 3 1 0 13 4 3 0

6 Kadapa 11 2 6 0 17 2 12 0

7 Anantapur 69 6 28 0 43 9 16 0

8 Kurnool 75 18 25 0 63 7 19 0

Total 242 34 217 0 194 29 185 0

Ex-gratia Paid

Circle

FY 2016-17 FY 2017-18 (upto Sep, 2017)

Human

(Nos.)

Amount

(Rs.)

Animal

(Nos.)

Amount

(Rs.)

Human

(Nos.)

Amount

(Rs.)

Animal

(Nos.)

Amount

(Rs.)

Vijayawada 60 1200000 14 2700000 43 860000 15 2900000

Guntur 64 1280000 6 1200000 2 40000 2 400000

Ongole 2 104000 0 0 8 260000 0 0

Nellore 20 400000 5 1000000 6 120000 1 200000

Tirupati 0 0 2 400000 0 0 1 200000

Kadapa 6 264000 11 2200000 0 0 3 900000

Anantapur 7 140000 4 800000 0 0 1 500000

Kurnool 4 80000 1 200000 0 0 0 0

SPDCL 163 3468000 43 8500000 59 1280000 23 5100000

Page 130: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 110

8.1.3 Replacement of burnt transformers, installation of additional transformers.

S.

No Circle

2016-17 2017-18 (upto Sep'17)

Total No.

of DTRs

Failed

Replacement

of failed

transformers

Installation

of additional

transformers

Total No. of

DTRs

Failed

Replacement

of failed

transformers

Installation

of additional

transformers

1 Vijayawada 2655 2655 724 1367 1367 328

2 Guntur 3432 3432 586 2178 2178 301

3 Ongole 5901 5901 114 526 526 40

4 Nellore 5331 5331 701 2895 2895 177

5 Tirupati 7317 7317 2419 3520 3520 1527

6 Kadapa 7434 7434 4781 4055 4055 2999

7 Anantapur 6991 6991 10906 3580 3577 3944

8 Kurnool 5739 5739 7452 2972 2972 3175

Total 44800 44800 27683 21093 21090 12491

8.1.4 Number of burnt-out, non-functioning or faulty meters (Circle-wise).

Burnt meters for FY 2016-17

Circle

Defective as on Defective during Replaced during Defective as

on 31-03-2017 4/1/2016 2016-2017 2016-2017

1 Ph. 3 Ph. Total 1 Ph. 3 Ph. Total 1 Ph. 3 Ph. Total 1 Ph. 3Ph Total

Vijayawada 411 107 518 2715 1556 4271 2885 1585 4470 241 78 319

Guntur 844 317 1161 5256 815 6071 3831 991 4822 2269 141 2410

Ongole 619 68 687 2717 431 3148 2170 821 2991 1180 62 1242

Nellore 1173 312 1485 11064 3095 14159 10519 2971 13490 1083 310 1393

Tirupati 3610 1050 4660 1650 550 2200 1650 550 2200 3327 980 4307

Kadapa 595 47 642 1590 462 2223 1701 453 2325 484 56 540

Anantapur 427 62 489 7111 1325 8436 6852 1293 8145 686 94 780

Kurnool 162 23 185 4812 826 5638 4823 830 5653 151 19 170

Total 7841 1986 9827 36915 9060 46146 34431 9494 44096 9421 1740 11161

Struck-up meters for FY 2016-17

Circle

Defective as on Defective during Replaced during Defective as

on 31-03-2017 4/1/2016 2016-2017 2016-2017

1 Ph. 3 Ph. Total 1 Ph 3 Ph Total 1 Ph 3 Ph Total 1 Ph 3Ph Total

Vijayawada 5914 421 6335 41614 4053 45667 43291 4192 47483 4237 282 4519

Guntur 14542 475 15017 48727 3036 51763 47296 3019 50315 15973 492 16465

Ongole 4267 197 4464 37954 1525 39479 38643 1775 40418 6224 202 6426

Nellore 6908 564 7472 66194 5050 71244 63068 4854 67922 7927 532 8459

Tirupati 36345 360 36705 36400 324 36724 36400 324 36724 36400 324 36724

Kadapa 5268 84 5352 31402 1797 33115 32863 1681 34460 3807 200 4007

Anantapur 964 70 1034 55786 2525 58311 55928 2497 58425 822 98 920

Kurnool 138 26 164 35365 2570 37935 35454 2574 38028 49 22 71

Total 74346 2197 76543 353442 20880 374238 352943 20916 373775 75439 2152 77591

Page 131: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 111

Burnt meters for FY 2017-18 (upto Sep, 2017)

Circle

Defective as on Defective during Replaced during Defective as

on 30-09-2017 1/4/2017 2017-18 (upto

September 2017)

2017-18 (upto September

2017)

1 Ph 3 Ph Total 1 Ph 3 Ph Total 1 Ph 3 Ph Total 1 Ph 3 Ph Total

Vijayawada 268 81 349 1084 598 1682 1107 551 1658 245 128 373

Guntur 2269 141 2410 11790 663 12453 11628 782 12410 2431 22 2453

Ongole 207 27 234 1441 226 1667 1023 231 1254 1162 94 1256

Nellore 1081 308 1389 6446 1487 7933 6241 1352 7593 1031 300 1331

Tirupati 3327 980 4307 810 302 1112 810 302 1112 810 302 1112

Kadapa 484 56 540 1364 238 1602 1276 214 1490 572 80 652

Anantapur 628 75 703 3762 847 4609 3898 827 4725 492 95 587

Kurnool 86 11 97 2836 539 3375 2837 524 3361 85 26 111

Total 8350 1679 10029 29533 4900 34433 28820 4783 33603 6828 1047 7875

Stuck-up meters for FY 2017-2018 (upto Sep, 2017)

Circle

Defective as on Defective during Replaced during Defective as

on 30-09-2017 1/4/2017 2017-18 (upto

September 2017)

FY 2017-18 (upto

September 2017)

1 Ph 3 Ph Total 1 Ph 3 Ph Total 1 Ph 3 Ph Total 1 Ph 3 Ph Total

Vijayawada 4261 275 4536 24778 1999 26777 24014 1861 25875 5025 413 5438

Guntur 15973 492 16465 63085 1454 64539 66426 1905 68331 12632 41 12673

Ongole 3173 135 3308 18126 769 18895 17265 738 18003 5536 245 5781

Nellore 7055 521 7576 37219 2260 39479 37260 2143 39403 4856 396 5252

Tirupati 36400 324 36724 16450 142 16592 16450 142 16592 16450 142 16592

Kadapa 3807 200 4007 11267 522 11789 11964 534 12498 3110 188 3298

Anantapur 676 99 775 31386 1431 32817 31525 1464 32989 537 66 603

Kurnool 49 22 71 21120 920 22040 21113 925 22038 56 17 73

Total 71394 2068 73462 223431 9497 232928 226017 9712 235729 48202 1508 49710

8.1.5 Performance with regard to attending fuse-off calls.

Performance with regard to attending fuse -off calls

S.No Circle

2016-17 2017-18 (Upto Sep, 2017)

Received With in the

stipulated time Received

With in the stipulated time

1 Vijayawada 26941 23407 19150 16472

2 Guntur 22666 19964 17330 15454

3 Ongole 6806 4259 4803 2355

4 Nellore 18602 16550 12185 10357

5 Tirupati 17734 12971 12834 9591

6 Kadapa 7951 4484 5912 4432

7 Anantapur 4691 4592 3880 1257

8 Kurnool 5455 2598 4730 2615

APSPDCL 110846 88825 80824 62533

Page 132: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 112

8.1.6 Breakdowns and interruptions in power supply to consumers (Circle-wise) and time taken

for restoration.

33/11KV Breakdowns

Circle

2016-17 2017-18 (upto Sep'2017)

33KV 11KV 33KV 11KV

Nos Duration Nos Duration Nos Duration Nos Duration

Vijayawada 496 1897:08 1125 2954:58 392 2161:03 855 2384:26

Guntur 377 3043:37 1513 4921:41 298 2206:08 800 2289:26

Ongole 264 1822:11 659 2325:55 260 1175:40 460 2159:30

Nellore 187 1092:01 379 1704:45 241 1557:05 615 1992:17

Tirupati 216 1728:14 1966 5184:46 155 857:10 892 4048:51

Kadapa 244 1791:55 741 4185:22 204 1131:07 1106 4871:15

Anantapur 279 2677:25 1038 5599:59 212 2063:18 796 3797:20

Kurnool 213 1023:24 415 2449:56 149 904:23 280 1396:48

TOTAL 2276 15075:55 7836 29327:22 1911 12055:54 5804 22939:53

Page 133: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 113

8.1.7 Frequency and voltage at various levels of interface over the period.

Month Average Max. Min.

Hz. Hz. Date Hz. Date

Apr.16 49.98 50.32 26-04-16 49.73 01-04-16

May.16 50.00 50.44 24-05-16 49.78 18-05-16

Jun.16 49.99 50.37 27-06-16 49.76 09-06-16

July.16 50.01 50.35 05-07-16 49.80 02-07-16

Aug.16 50.00 50.35 10-08-16 49.79 21-08-16

Sep.16 50.00 50.24 02-09-16 49.67 19-09-16

Oct.16 50.00 50.25 02-10-16 49.74 20-10-16

Nov.16 49.99 50.27 17-11-16 49.54 30-11-16

Dec.16 49.99 50.31 27-12-16 49.67 12-12-16

Jan.17 50.00 50.33 14-01-17 49.67 23-01-17

Feb.17 50.00 50.34 17-02-17 49.76 01-02-17

Mar.17 49.99 50.34 05-03-17 49.76 27-03-17

Average 2016-17 50.00

Apr.17 49.99 50.26 30-04-17 49.66 18-04-17

May.17 49.99 50.32 21-05-17 49.64 11-05-17

Jun.17 50.00 50.24 07-06-17 49.96 02-06-17

Jul.17 49.99 50.02 07-07-17 49.96 02-07-17

Aug.17 49.99 50.20 20-08-17 49.65 08-08-17

Sep.17 49.98 50.32 17-09-17 49.62 23-09-17

Average 2017-18 49.99

8.1.8 Pending applications and connections released to different categories of consumers

8.1.9 Arrears of consumers over Rs.50, 000 pending for over six months and details of bad debts

written off

Defaulters list of individual consumers (circle wise) whose arrears are more than Rs.50,000/- as

on 30-09-2017 is displayed in APSPDCL website (www.apspdcl.in)

Page 134: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 114

8.1.10 Court cases involving the Licensee

Before HON'BLE SUPREME COURT, NEW DELHI Sl.

No. Case No. Appellant Respondents Description of case Remarks

1 CA No.1376-85 of 2013

APDISCOMs & TSDISCOMs

NCE developers Filed against APTEL order dt:20.12.2012 in the matter of determination of tariff for NCE projects for control period 2004-09.

All the cases are tagged. Listed on

22.08.2017

2 CA No. 11331 of 2013

B. Gopal Reddy APDISCOMs & TSDISCOMs

Against APTEL order dt:20.12.2012 .

3 CA No. 11336 of 2013

Sardar Power APDISCOMs & TSDISCOMs

Against APTEL order dt:30.04.2013

4 CA No. 11335 of 2013

Sardar Power APDISCOMs & TSDISCOMs

Against APTEL order dt:20.12.2012

5 CA No. 7860-61 of 2013

BEDA APDISCOMs & TSDISCOMs

Against APTEL order dt:20.12.2012

6 CA No. 11333 of 2013

BEDA APDISCOMs & TSDISCOMs

Against APTEL order dt:30.04.2013

7 CA No. 11337 of 2013

SISMA APDISCOMs & TSDISCOMs

Against APTEL order dt:20.12.2012

8 CA No. 10448 of 2014

APDISCOMs & TSDISCOMs

NCE developers Against APTEL order dt:21.07.2014 passed in Appeal Nos. 83 of 2014 against APERC order dt:22.06.2013

9 CA No. 10499 of 2014

APDISCOMs & TSDISCOMs

NCE developers Against APTEL order dt:21.07.2014 passed in Appeal Nos. 84 of 2014 against APERC order dt:06.08.2013

10 CA No. 13832 of 2015

BEDA APDISCOMs & TSDISCOMs

Against APTEL order dt:23.07.2014 passed in Appeal Nos. 239& 241 of 2013 against APERC order dt:06.08.2013

11 CA No.2235-2243 of 2008

APDISCOMs Biomass Co-gen developer in

united AP

Against APTEL order dt:28.09.2006 passed in Appeal Nos.4,5,6,7,8 of 2006 against APERC order dt:28.04.2004

Admitted the matter on 18.04.2017 Listed on 20.07.2017

12 Dairy No 16350 of 2017

APTRANSCO/APSPDCL M/s SNJ Sugars and Products Limited

Curative Petition filed before the Supreme Court against Supreme Court order dated:04.10.2016 in RP No 3235 of 2016

Supreme court taken the matter as Dairy No 16350 and yet to be admitted.

Page 135: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 115

Before APPELLATE TRIBUNAL FOR ELECTIRICITY, NEW DELHI

Sl No. Appeal No. Appellant Respondents Description of case Remarks

1 250 of 2014 BEDA (Biomass Energy

Developers Association)

APDISCOMs & TSDISCOMs

Filed against APERC order dt:19.07.2014 determining fixed cost tariff for the Biomass projects beyond 10 years of operation

Treated as batch and Listed on

19.09.2017

2 284 of 2014 BEDA APDISCOMs & TSDISCOMs

Filed against APERC order dt:16.05.2014 determining varible cost tariff for the NCE projects for FY 2014-15 to FY 18-19

3 297 of 2014 SISMA (South India Sugar Mills

Association)

APDISCOMs & TSDISCOMs

Filed against APERC order dt:16.05.2014 determining varible cost tariff for the NCE projects for FY 2014-15 to FY 18-19

4 42 of 2016 APDISCOMs BEDA (Biomass Energy

Developers Association)

Filed against APERC order dt:19.07.2014 determining fixed cost tariff for the Biomass projects beyond 10 years of operation

5 246 of 2016 APSPDCL M/s Bhavani Hydro

Filed against APERC order dt:18.06.2016 in OP No 9 of 2016 determining the applicable fixed cost tariff to M/s Bhavani Hydro projects beyond 10 years of operation

Treated as batch and Listed on

19.09.2017

6 247 of 2016 APSPDCL M/s PMC Filed against APERC order dt:18.06.2016 in OP No 8 of 2016 determining the applicable fixed cost tariff to M/s PMC beyond 10 years of operation

7 248 of 2016 APSPDCL M/s NCL Industries Limited

Filed against APERC order dt:18.06.2016 in OP No 10 of 2016 determining the applicable fixed cost tariff to M/sNCL Industries Limited beyond 10 years of operation

8 238 of 2016 M/s PMC APSPDCL Filed against APERC order dt:18.06.2016 in OP No 8 of 2016 determining the applicable fixed cost tariff to M/s Bhavani Hydro projects beyond 10 years of operation

9 IA 286 & 287 of 2017 in DFR 363

of 2017

M/s NCL Industries

Limited

APSPDCL Filed against APERC orders dt:18.06.2016 & 26.11.2016 in OP No 10 of 2016 determining the applicable fixed cost tariff to M/s Bhavani Hydro projects beyond 10 years of operation

Listed the matter on 29.08.2017

10 119 of 2017 M/s.Weizmann Limited

APSPDCL Filed against APERC order dt:18.02.2017 in OP No.30 of 2016 rejected the fixation or the approval of the tariff for the post period of 20 years of PPA, i.e after expiry of PPA.

Posed for 13.12.2017.

Page 136: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 116

Before HON'BLE High COURT,A.P Sl.

No. Appeal No. Appellant Respondents Description of case Cost of Litigation

1

WP No.7217 of 2014

M/s.SNJ Sugars

M./s. APTRANSCO APSPDCL, APPCC,

The Chief Engineer, and The Dy. Chief

Controller of Accounts (PP &SS)

Against the recovering/adjusting the amounts payable by APDISCOMs to the petitioner company on account of the power supply made and to set aside the impugned letter vide Lr.No.Dy.CCA/APPCC/SAO(PP&S)-I/DNo.738/13.

Rs.5, 30, 37,471(Principal) and interest thereon from 2012

2

WA No. 681 of 2013

M/s.Balaji Energy Limited

APSPDCL , APERC & A.P. Small Hydro

Power Developers Association

Appeal filed against order dated 26.03.2013 in W.P.No.3267 of 2010

3

WP No.20728 of

2016

M/s.Balaji Energy Limited

SECY, DEPT OF ENERGY,

HYDERABAD & APSPDCL

Petition is filed by developer declaring that the order dated 23.8.2014 passed by APERC fixing tariff for the Mini Hydel power projects which have Completed 10 years of COD as being contrary to Section 3 and the Proviso to Section 61 of the Electricity Act, 2003 and, consequently, directing the Respondent to pay tariff to the petitioner as per the order of the APERC dated 7.3.2007 and directing that the petitioner may sell the power to the parties. APSPDCL furnished the para wise remarks and approved draft counter was communicated to APSPDCL.

4

CC No.2092 of 2016

M/s.Balaji Energy Limited

H.Y. DORA, CHITTOOR DIST

For contempt of the order the dated 29.06.2016 passed by this Hon'ble Court WPMP No. 25412 of 16 in Writ Petition No. 20728 of 16

5

WP No.13160 of

2016

M/s.Sardar Power Limited

A.P.E.R.C., HYD & APEPDCL

Petition is filed by developer against APERC order dated 23.8.2014. The Hon’ble High Court issued orders dt:21.04.2016 in WPMP No.16474 of 2016 in WP No.13160 of 2016, as follows: “There shall be an interim suspension as prayed for”. File circulated and as per approval requested APEPDCL for filing the counter.

Page 137: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 117

Before HON'BLE APERC Sl.

No. Case No. Appellant Respondents Description of case Cost of

Litigation

1 O.P No.57 of 2014

M/s. Sardar Power

Limited

APEPDCL As per the directions of Hon’ble APTEL in order dt:20.12.2012, M/s.Sardar Power filed petition before APERC seeking re-determination of capital cost and there by tariff for first 10 years of operation.

2 O.P. No. 15 of 2014

M/s. E.ID. Pary (India)

Ltd

APTRANSCO&

APDISCOMs

The developer filed petition before APERC in relation to non-payment of fixed charges by truing annualized threshold PLF of 55% as per the tariff determined by the Commission to the petitioner under the Power Purchase Agreement.

42,823,048

3 OP No. 20 of 2015

M/s.Empee Power

APSPDCL Petition filed by the developer seeking revision of tariff as provided in clause 2.2 of PPA dt:23.05.2007 by re-determining the fixed cost of the petitioner's project or alternatively apply generic tariff as fixed in order dt:22.06.2013.

4 OP No 26 of 2016

M/s JITF APSPDCL Petition under Section 86 (1) (a) of the Electricity Act, 2003 r/w Regulation 55 for a direction to apply agricultural tariff to Solid Waste Management Project to be setup in the State of A.P., under promotional benefit in line with the Hon’ble Supreme Court & Ministry of Urban Development directives.

5 O.P. No. 2 of 2017

M/s. Richmond Power Pvt. Ltd.

APEPDCL Petition filed u/s 86 (1) (a) of the Electricity Act, 2003 r/w Regulation 55 [Saving of inherent power of the Commission] of the APERC (Conduct of Business) Regulations, 1999

6 OP NO 01 of 2017

APDISCOMs M/s. Vijayeebhava Enterprises Pvt Ltd & 43 others

Public Hearing on the Petition filed under Regulation 55 (2) & (3) of APERC (Conduct of Business) Regulation, 1999 to amend tariff orders in respect of wind power projects to be incompliance with Regulation 20 of Regulation No.1 of 2015.

7 OP NO 05 of 2017

APDISCOMs Nil Public Hearing on the Petition filed under Regulation 55 (1) & (2) of APERC (Conduct of Business) Regulations, 1999 and Regulation 23 to 26 of the APERC (Terms and Conditions for tariff determination for wind power

Page 138: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 118

Before HON'BLE APERC Sl.

No. Case No. Appellant Respondents Description of case Cost of

Litigation

projects in the State of AP for the period of FY 2015-16 to FY 2019-20) Regulations, 2015 requesting the Commission to curtail or limit the control period of the above mentioned Regulation No.1 of 2015 upto 31-03-2017

8 O.P. No. 7 of 2017

M/s. SEI Green Flash Pvt. Ltd

APSPDCL & APPCC

Petition filed under Section 86 (1) (e) & (f) of the Electricity Act, 2003 r/w Regulations55, 57 & 59 of APERC (Conduct of Business) Regulations, 1999 requesting the Commission to set aside the Letter No.CGM / P, MM & IPC / F.SEI Green / D.No.558/16 dt.20-09-2016 and for other reliefs

9 O.P. No. 8 of 2017

M/s. SEI Arushi Pvt. Ltd

APSPDCL & APPCC

Petition filed under Section 86 (1) (e) & (f) of the Electricity Act, 2003 r/w Regulations 55, 57 & 59 of APERC (Conduct of Business) Regulations, 1999 requesting the Commission to set aside the Letter No.CGM / P, MM & IPC / F.SEI Arushi / D.No.559 /16 dt.20-09-2016 and for other reliefs

10 O.P.No. 9 of 2017

M/s. Rain Coke Ltd

APSPDCL & APPCC

Petition filed under Section 86 (1) (e) & (f) of the Electricity Act, 2003 r/w Regulations 55, 57 & 59 of APERC (Conduct of Business) Regulations, 1999 requesting the Commission to set aside the Letter No.CGM / P, MM & IPC / F. Rain Coke / D.No.557/16 dt.20-09-2016 and for other reliefs

11 O.P. No. 16 of 2017

M/s. WAANEEP Solar Pvt Ltd

APSPDCL & APPCC

Petition filed under Section 86 (1) (e) & (f) of the Electricity Act, 2003 r/w Regulations 55, 57 & 59 of APERC (Conduct of Business) Regulations, 1999 requesting the Commission to set aside the Letter No.CGM / P, MM & IPC / F.WAANEEP / D.No.556 /16 dt.20-09-2016 and for other reliefs

12 EP NO 01 of 2017 in

Appeal No 228 of 2012

(Before APTEL)

M/s SNJ Sugars & Products Limited

APTRANSCO& APSPDCL

ATE remanded the matter on 31.05.2017 to APERC for calculation amounts due to the petitioner only within two months from the date of receipt of the order

169,096,632

Page 139: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 119

Before HON'BLE APERC Sl.

No. Case No. Appellant Respondents Description of case Cost of

Litigation

13 OP NO 36 of 2017

M/s Orange Uravakonda

APSPDCL Petition under Section 86 (1) (f) of the Electricity Act, 2003 r/w Article 10.4 of the Power Purchase Agreement dated 31-05-2016 entered between the parties in relation to non-acceptance of monthly invoices and non-payment for supply of electricity from 100.8 MW capacity wind power project of the petitioner at Belugappa in Anantapur District

14 O.P. No. 37 of 2017 & I.A.No. 13 of 2017

M/s. Tata Power Renewable Energy Ltd.,

APSPDCL & 3 others

Petition under Section 86 (1) (f) of the Electricity Act, 2003 r/w APERC (Conduct of Business) Regulations, 1999 challenging deduction of the Generation Based Incentive (GBI) amount from the payments due to the petitioner on account of energy supplied under the PPA Dt. 31-10-2016 and to refund the same with interest

15 O.P. No. 38 of 2017 & I.A.No. 14 of 2017

M/s. JED Solar Parks Pvt Ltd

APSPDCL & 3 others

Petition under Section 86 (1) (f) of the Electricity Act, 2003 r/w APERC (Conduct of Business) Regulations, 1999 challenging deduction of the Generation Based Incentive (GBI) amount from the payments due to the petitioner on account of energy supplied under the PPA Dt. 31-10-2016 and to refund the same with interest

16 O.P. No. 39 of 2017 & I.A.No. 15 of 2017

M/s. POLY Solar Parks Pvt Ltd.

APSPDCL & 3 others

Petition under Section 86 (1) (f) of the Electricity Act, 2003 r/w APERC (Conduct of Business) Regulations, 1999 challenging deduction of the Generation Based Incentive (GBI) amount from the payments due to the petitioner on account of energy supplied under the PPA Dt. 31-10-2016 and to refund the same with interest

17 APERC invited the public hearings in the matter of 41 Nos. PPAs entered by APSPDCL with various wind developer on 23.09.2017

Page 140: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 120

8.1.11 Number of cases filed in respect of pilferage of power in various categories giving

comparative picture with respect to FY 2016-17 & 2017-18 (upto Sep’17)

Page 141: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 121

9 Cost of Service for FY 2018-19

9.1 Introduction

Category wise Load Curves

Load Shapes of different categories of consumers are constructed based on the hourly

demand data from feeder samples.

o Data is collected from sample feeders from all the circles for each category

o From each sample feeder hourly data was collected for upto 10 days per quarter.

o The samples include normal working days as well as non-working days like

Sundays, Festivals and other Holidays.

Based on the collected feeder samples, load curve for each category has been arrived.

Estimation of Coincident and Non-Coincident Demand for each Category

Demand at customer voltage level for FY 2018-19 is estimated using the load curves and

FY 2018-19 projected sales of each category.

Hourly demand for each category is grossed up with respective T&D losses to arrive at

the demand contributed by each category to the grid demand.

Maximum Demand of each category is considered as Non-Coincident Demand.

Based on the hourly demands of each category at the grid level the peak time is arrived.

Corresponding demand contributed by each category during the peak hour is considered

as Coincident Demand.

Page 142: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 122

Based on the above methodology Coincident Demand (MW) and Non-Coincident Demand

(MW) for APSPDCL for FY 2018-19

S.No. Category

Coincident

Demand

(MW)

Non-

Coincident

Demand

(MW)

Low Tension Supply

1 Domestic - Category I 977 1,487

2 Non-domestic Supply - Category II 238 332

3 Industrial Supply - Category III 345 351

4 Cottage Industries - Category IV 6 6

5 Irrigation and Agriculture - Category V 1,465 1,484

6 Public Lighting - Category VI 94 136

7 General Purpose - Category VII 13 19

8 Temporary - Category VIII 0 0

Total Low Tension Supply 3,139 3,817

High Tension Supply

9 Industrial Segregated - Cat- I (11KV) 254 256

10 Industrial Segregated - Cat- I (33KV) 391 393

11 Indusl. Segregated - Cat-I (220/132KV) 297 299

12 Indusl. Non-Segregated - Cat- II (11KV) 79 112

13 Indusl. Non-Segregated - Cat- II (33KV) 17 24

14 Indusl. Non-Segre - Cat-II (220/132KV) 4 5

15 Irrigation and Agriculture - Cat-IV (11KV) 53 53

16 Irrigation and Agriculture - Cat-IV (33KV) 37 38

17 Irrigation and Agriculture - Cat-IV (132KV) 112 113

18 Railway Traction - Cat V (132KV) 84 87

19 Colony Consumption (11KV) 3 3

20 Colony Consumption (33KV) 2 2

21 Temporary 0 0

22 RESCOS Cat VI 66 66

Total High Tension Supply 1,399 1,450

Total Demand 4,538 5,267

Page 143: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 123

Allocation of expenditure to consumer categories

Power Purchase Cost Allocation

o As fixed costs of power purchase is driven primarily by the system peak demand,

hence fixed cost component of Power Purchase is allocated to various categories

based on the Coincident Demand.

o Variable costs are allocated based on the energy requirement of each category

Transmission Cost Allocation

o Transmission Costs including PGCIL Costs, SLDC Costs and ULDC Charges is

dependent on the Non-Coincident Demand and hence are allocated in proportion

to the Non-Coincident Demand of each category.

Distribution Cost Allocation

o Distribution Cost consists of Employee Expenses, Interest and Depreciation costs

of Distribution Assets. These costs are dependent on both the Non-coincident

Demand of each category as well as on the number of customers.

o 80% of the distribution cost of the licensee is allocated based on the Non-

Coincident Demand

o 20% of the distribution costs is allocated in the proportion of number of

consumers in each category.

Interest on Security Deposit

o As Consumer Security Deposit is dependent on the energy consumed by each

category, interest on CSD is allocated based on the energy requirement of each

category

Page 144: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 124

Supply Margin

o Supply Margin is linked to the Distribution Assets. Hence the Supply Margin is

allocated in the proportion of Non-Coincident Demand.

Other Costs

o Other costs are incurred on distribution assets and hence is allocated in proportion

to the Non-Coincident Demand of each category.

Allocation of Expenditure of APSPDCL for FY 2018-19

Cost Description

Demand

Related

Expenditure

(Rs Crs)

Energy

Related

Expenditure

(Rs Crs)

Consumer

Related

Expenditure

(Rs Crs)

Total

Expenditure

Power Purchase Cost 4594.79 11978.08 0.00 16572.87

Transmission + PGCIL + ULDC +

SLDC Costs 1652.95 0.00 0.00 1652.95

Distribution Cost 2553.37 0.00 366.30 2919.66

Supply Margin 13.05 0.00 0.00 13.05

Interest on Consumption Deposit 0.00 154.10 0.00 154.10

Others 116.76 0.00 0.00 116.76

Total 8930.92 12132.18 366.30 21429.39

Page 145: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 125

10 Retail Supply Business True-up for FY 2016-17 and Provisional True-

up for FY 2017-18 :

The licensee will submit the True-up for FY 2016-17 and provisional True-up for FY 2017-18

separately at a later date.

11 Tariff Proposals and Revenue at Proposed Tariff for FY 2018-19

- LT –V ( C ) : Others - Rural Horticulture with Connected Load upto 5HP

As per the directions of GoAP, licensee proposes a separate sub-category i.e. Rural Horticulture with

Connected Load upto 5 HP within the LT-V(C) others with proposed energy charge of Rs. 1.50/kWh.

Fixed/ Demand charges will remain as applicable.

Number of Consumers benefitted are 1,362 consumers and Revenue Loss of Rs.1.44 Crore

- LT – 1 ( C) Smart Meters with ToD Discount for Domestic Consumers ( Optional)

As per clause 8.4.3 of National Tariff Policy 16, “Appropriate Commission shall, therefore, mandate

smart meters for:

(a) Consumers with monthly consumption of 500 units and more at the earliest but not later than

31.12.2017;

(b) Consumers with monthly consumption above 200 units by 31.12.2019”.

Licensee would like to propose roll out of SMART Meters in the state of Andhra Pradesh in a phased

manner. This is applicable only for all consumers whose consumption is greater than 500 units/ month.

Smart meter facility is an optional to the consumers. Licensee would like to extend certain benefits to

this segment of the consumers such as Time of Day ( ToD) incentives, real time messages from licensee,

meter readings, prepaid etc in a phased manner.

To start with, Licensee would like to propose only ToD incentive for consumers during the year FY

2018-19. This will help the Licensee to meet the demand during the morning peak hours without any

additional purchases by load shift/ demand response. During the implementation, licensee may approach

Hon’ble Commission for any additional features to be rolled out.

During the recent tender by EESL, the cost of the smart meter with modem is arrived of Rs. 2,503 per

smart meter. The cost of the smart meter along with the installation cost after adjusting for the any

grants from central government schemes like IPDS will be recovered from the opted consumers

Page 146: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 126

during EMI for a period of 24 months. Licensee humbly requests Hon’ble Commission to approve the

proposal.

The licensee shall start rollout of smart meters within 6 months of approval from Hon’ble Commission.

For the consumers with smart meters, the licensee would like to propose a ToD discount or incentive of

Rs.1.00/Unit during 10 AM-12 PM slot (2 hours) to understand the response from the consumers.

Licensee will adjust the incentive at the end of the month by recording consumption during the proposed

time block.

Initially, ToD discount of Rs.1.00/Unit may lead to a revenue loss but eventually Licensee avoids power

purchase during morning peak hours of 6-10 AM. Moreover, if the demand shift is permanent then

Licensee may add more solar which supports during the proposed time block. Power cost on exchange

during the proposed time block is available at lower cost. Considering the above, Licensee expects

minimal loss during FY 18-19 i.e. 2 hrs time block for 4-6 months.

Once the demand response of the consumers is identified, the licensee will seek the approval of the

Hon’ble Commission for change in tariff structure or any additional features.

- LT II (C) : Non-Domestic - Electric Vehicles:

The licensee would propose a separate sub-category for the electric vehicles within the LT:II Non-

domestic category.

Sub-catgeory: LT:II (C) Electric Vehicles

Energy Charges INR 6.95/kWh

Time of Day (ToD) tariff Additional charge of INR 1.00/kWh levied for usuage from 06:00 AM to

10:00 AM and 06:00 PM to 10:00 PM

Rebate of INR 1.00/kWh offered for usage between 10:00 PM to 06:00 AM

The detailed write-up on tariff proposal for electric vehicles is as follows.

Introduction: Electric Vehicle

In the world of technology disruptions, a new force which is emerging is electric vehicles (EVs). Two

major factors driving the trend for higher penetration of EVs are steep reduction in the battery

technology costs and decarbonisation policies introduced by different economies the world over. The

trends in battery costs are promising with significant reductions witnessed during the last five years. EV

price parity with internal combustion engines (ICEs) depends upon type of vehicle, and usage. It is

expected that EVs shall achieve price parity with ICEs by 2022-24.

Globally, the support on policy and regulatory front has helped accelerate the demand for EVs. Over 2.1

million vehicles were sold globally in 2016 compared to 1 million vehicles in 2015 resulting in sale of 1

Page 147: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 127

million vehicles in 18 months. Due to high upfront ownership cost of electric vehicles, incentive for

increasing EV adoption have been announced across nations.

Norway: Electric Vehicles are exempt from non-recurring vehicle taxes including road tax, toll

and parking fees. This has resulted in EVs reaching a record market share of around 48% in Sept

2017.

Japan: In 2016, a scheme was introduced to provide higher subsidies for electric cars with

maximum subsidy equivalent to $7700 per car. Consequently, the sales of EVs with larger

batteries and higher range increased by almost 50% in 2016.

China: EVs are exempt from acquisition/ excise taxes along with other financial incentives and

are allowed waivers from license plate availability restrictions, thereby resulting in strong sales

volumes (~3.5 Lakh cars) and 40 % growth rate in 2016 compared to 2015.

India Scenario:

Government of India (GoI) has also set an ambitious target of 100% incremental EV sales by 2030

which is estimated to result in oil imports savings of $ 60-70 billion annually. GoI formulated FAME-

India (Faster Adoption and Manufacturing of (hybrid) & Electric Vehicles in India)) in March 2015. The

four focus areas of FAME India scheme are Technology development, demand creation, pilot projects

and charging infrastructure. The scheme is valid for 6 years till 2020. While, phase I was originally

planned for 2 years from April 2015 to March 2017, it has since been extended by 12 months till 31st

March 2018. Taking the cue from the central government, many States have also announced policy

enablers for promoting EV usage. So far, Karnataka has unveiled EV and Energy Storage Policy 2017

and Telangana issued the draft EV policy -2017.

Electric vehicles can typically get charged at the consumer premises or at designated charging

infrastructure facilities. Tariffs for electric vehicles has already been set in few states.

Prevailing EV Tariffs for Charging Stations in States:

So far, two states viz. Maharashtra and Delhi have announced tariff for EV charging stations. As per

Forum of Regulators (FoR) report, below are the prevailing tariff for EV charging stations in

Maharashtra and Delhi:

State Unit Average

Cost of

Supply

Tariff for EV Charging Stations

Maharashtra# INR/kWh 6.81 11.40 (same as Commercial category tariff)

Delhi INR/kWh 7.63^ 5.50 #Based on MYT of MSEDCL, ^Based on TATA Power DDL Tariff Order FY 2017-18

Page 148: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 128

Charging Infrastructure Standards

Availability of charging infrastructure to provide electric supply to the EV’s is important to rise the EV

adoption. In November 2017, Ministry of Heavy Industries & Public Enterprises, GoI has issued

technical specifications for EV charging infrastructure in India. It classified EV chargers into 3

categories as shown below:

Bharat AC-001 Chargers (output of 230V single phase; 15A)

Bharat DC-001 Chargers (Output of 10kW power with 48V or 60V/72V with 15 kW; 200A

maximum)

Bharat DC-002 Chargers (technical specifications are awaited; ~100kW power)

Recently EESL, a joint venture of NTPC limited, Power Finance Corporation, Rural Electrification

Corporation and Power Grid, has invited tenders for procurement of 10,000 Electric Vehicles and setting

up 3000 slow (AC-001) charging equipment and 1000 fast (DC-001) charging equipment. To accelerate

setting up charging infrastructure in NCR region, EESL invited a snap did for setting up 200 slow (AC-

001) charging equipment and 50 fast (DC-001) charging equipment.

Andhra Pradesh – Encouraging EVs

Andhra Pradesh has always been frontrunner in adopting new technologies and promoting sustainable

green practices. AP has already become the leading state in installation of renewable energy power

plants, with combined wind and solar capacity of 6 GW.

Government of AP is keen to encourage electric vehicles usage in the State and become a leading EV

state in the country. GoAP envisages Andhra Pradesh to be a prime destination for both development/

manufacturing of batteries, EV’s, EV components and charging equipment, not only for India but also

globally.

Based on the economic parity, the EV adoption is likely to follow an “S” curve – exponential growth

beyond 2025. Accordingly, by 2030, it is estimated that electric vehicles might consume 17,000-22,000

MUs annually which constitutes over 15% of the power demand in the state and reduce ~12 Million tons

of Carbon dioxide emissions annually for Andhra Pradesh.

Tariff for sale of power to EV Chargers:

EV charging stations similar to petrol bunks will provide electricity for charging the electric vehicles.

Given the future potential for EVs, it is important to have a separate tariff category for EV charging

stations.

As per excerpts from report titled “Study on Impact of Electric Vehicles on the Grid” by Forum of

Regulators (FOR), “it is recommended to create a separate category for public charging of Electric

Vehicles by the respective Regulatory Commission. Further, it is recommended that the tariff for EV

category should be close to Average Cost of Supply (ACoS) for a Distribution Licensee with an

Page 149: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 129

incremental charge added to the ACoS for the recovery of the investment in the public EV charging

infrastructure”.

The Average Cost of Service for Andhra Pradesh for FY2018-19 is Rs. 6.16/unit.

The table below highlights the possible impact of electricity tariffs on the running cost of electric

vehicles. As can be seen in below table, change in tariff by INR 1/kWh is estimated to increase

operation cost of EV by ~INR 0.16/km.

Electricity tariff (INR/kWh) Operation cost (INR/km.)

5 0.82

6 0.98

7 1.15

8 1.31

9 1.48

10 1.64

The investments of public charging infrastructure depends on the technology and type of charger

installed. Currently, investment cost of Bharat DC-001 charger (~90 minutes charging time) is estimated

at around Rs. 3.5 lakh/unit. The investment costs increase with better charging time. As per the report on

“Costs Associated with Non-Residential Electric Vehicle Supply Equipment” by US Department of

Energy, each unit of Bharat DC-002 (~20 minutes charging time) costs approximately INR 16.25

lakh/unit with average installation cost of INR 13.65/unit.

As per specifications by Ministry of Heavy Industries, the energy delivered by DC-001 charger is

around 15kWh per hour and as per report “Electric Vehicle charging Stations” by Hydro Quebec, the

energy delivered by DC-002 charger is around 100kWh per hour. Considering a load factor / utilization

rate of 50% for charging infrastructure, the levelized fixed cost of setting up charging infrastructure is

estimated to be around INR 0.75/kWh - INR 1.50/kWh.

However following factors affect charging infrastructure costs:

Charging infrastructure costs are on the decline. The time taken for charging the EVs is also

coming down.

Charging infrastructure costs vary considerably depending on scale. Also, higher utilization due

to rise in EV adoption will result in lower usage charges.

GoI incentives such as FAME India schemes are providing incentives for setting up charging

infrastructure

Furthermore, innovative financing/structuring options shall emerge to recover cost of setting up

charging infrastructure.

Page 150: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 130

Hence, considering the Average Cost of Service and the incremental cost of charging infrastructure, to

promote EV adoption in Andhra Pradesh, the retail tariff for Electric Vehicle is proposed to be set at Rs.

6.95 per unit.

Time of Day (TOD) Tariff:

In order to promote public use of charging infrastructure during non-peak hours, INR 1.00/ kWh Time

of Day (ToD) Tariff is levied on energy consumption during the period from 06:00 AM to 10:00 AM

and 06:00 PM to 10:00 PM, in addition to the normal energy charges. Similarly concession of INR 1.00/

kWh Time of Day (ToD) Tariff is given on energy consumption during the period from 10:00 PM to

06:00 AM.

EV category Tariff INR 6.95/kWh

Time of Day (ToD) tariff INR 1.00/kWh levied for from 06:00 AM to 10:00 AM

and 06:00 PM to 10:00 PM

Concession of INR 1.00/kWh for usage between 10:00

PM to 06:00 AM

Investment in charging infrastructure:

Range anxiety is amongst the barriers for adoption of electric vehicles by the consumers. It is important

to invest in development of charging infrastructure to enable higher EV penetration in the State.

Discoms have an important role in developing the charging infrastructure in the current regulatory

regime.

Below are excerpts from report titled “Study on Impact of Electric Vehicles on the Grid” by Forum of

Regulators (FOR) on possible business models for setting up charging infrastructure:

“In the context of Electricity Act 2003 (The Act) and its provisions, the following observations are

made:

1. As per The Act, the provision of public EV charging service to the users amounts to

distribution/supply of electricity.

2. Specific amendments to the Act can be made, allowing EV charging businesses to resell the electricity

without specific licensing arrangements,

3. In the current legal provisions, following three business models are feasible, which are detailed here:

a. Distribution Licensee owned EV charging infrastructure- Supply of electricity to vehicle owners

would be part of the activities of the Distribution Licensee

The retail supply tariff for supplying to the electric vehicle owners will be determined by the

SERC

Page 151: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 131

b. Distribution Licensee Franchised EV charging infrastructure- Utility can authorize a third party

(Franchisee) to install and/or operate charging stations on its behalf in its area of supply. The

franchisee can also be a public private partnership (PPP)

Charging stations can receive electricity at a single point as bulk supply. The single point supply

tariff as well as the tariff cap for retail sale will be determined by the SERC

Franchisee can be allowed to purchase power through open access without applying Cross

Subsidy Surcharge

c. Privately-owned battery swapping stations- Utility, its distribution franchisee or any other third party

can aggregate the demand for batteries and set up battery swapping stations

Battery swapping will not amount to electricity resale and hence third parties can set up the

stations with intimation to the Distribution Licensee to avail special category tariff.

The Charging Station can receive electricity in bulk at single point from a distribution licensee

or through open access to charge the batteries, as per provisions of the Act.

The bulk supply tariff/single point supply tariff will be determined by the SERC”

Accordingly, Discoms will invest in building up battery charging infrastructure to help meet the

requirement of electricity from the EVs. The charging infrastructure has to be developed in a phased

manner to promote EV adoption across the cities.

AP Discoms propose to set up EV charging infrastructure throughout Andhra Pradesh with focus on 3

major cities viz. Vijayawada, Tirupati and Visakhapatnam during FY 2018-19. The charging

infrastructure will be established at select locations including - government offices, commercial spaces,

and public buildings for the above mentioned cities. The battery charging infrastructure will also be set

up in other municipalities and National and State Highways (~ 1 per every 50 Kms.) to help encourage

EV adoption in the State.

The modalities for setting up the charging infrastructure including the investment estimates, bid process

and vendor responsibilities etc. are being worked out and shall be communicated to APERC

subsequently.

APDiscoms will float tender for selection of EV charging infrastructure EPC players after approval of

the proposed retail tariff for electric vehicle users. Licensee expects 8-10 months for bid process,

identify the suitable commercial land, construction etc. Hence, the licensee has not estimated any sales

or revenue from this EV category in FY 2018-19.

Page 152: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 132

12 Determination of Cross Subsidy Surcharge for FY 2018-19

The licensee has calculated the cross surcharge subsidy based on the formula specified in the revised

National Tariff Policy issued on 28.01.16.

As per the said Tariff Policy, the surcharge is to be computed as per the following formula;

S= T – [C/ (1-L/100) + D+ R]

Where,

‘S’ in Rs./unit is the Cross Subsidy Surcharge ,

‘T’ is the tariff payable by the relevant category of consumers in Rs./unit, including reflecting the

Renewable Purchase Obligation,

‘C’ is the per unit weighted average cost of power purchase by the Licensee, including meeting the

Renewable Purchase Obligation in Rs./unit ,

‘D’ is the aggregate of transmission, distribution and wheeling charge applicable to the relevant voltage

level in Rs./unit and ‘L’ in percentage is the aggregate of transmission, distribution and commercial

losses, applicable to the relevant voltage level and

‘R’ is the cost of carrying regulatory assets in Rs. /unit.

Provided that the surcharge shall not exceed 20% of the tariff applicable to the category of the

consumers seeking open access.

Computation of CSS

For the computation of CSS;

T – is the average revenue realization excluding NTI, customer charges, minimum charges, DPS

C – Weighted average Cost of Power purchase (As per Tariff filing)

D – Calculated from the MYT orders of Transmission and Distribution

L – As per Tariff filing

R – Considered as zero

The category-wise CSS computation for APSPDCL is as follows :

Page 153: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 133

Category

Average

Revenue

Realization

(Only Demand

& Energy

Charges)

Per Unit

Cost of

Power

Purchase

Wheeling

Charges

Applicable

Loss

Cost of

Regulatory

Asset

CSS

(Rs./Unit)

20 % of

Average

Revenue

Realization

CSS

(Rs./Unit)

High Tension

HT Category at 11 kv

HT I (A): General 8.82 4.19 0.79 10.24% 0.00 3.36 1.76 1.76

HT I (B): Energy Intensive

Industries 5.82 4.19 0.79 10.24% 0.00 0.36 1.16 0.36

HT I (C): Aquaculture and

Animal Husbandry 4.10 4.19 0.79 10.24% 0.00 - 0.82 -

HT I (D): Poultry

Hatcheries abd Poultry

Feed Mixing Plants

6.88 4.19 0.79 10.24% 0.00 1.42 1.38 1.38

HT II: Others 10.18 4.19 0.79 10.24% 0.00 4.72 2.04 2.04

HT II (B): Religious Places 5.16 4.19 0.79 10.24% 0.00 - 1.03 -

HT II (C): Function

Halls/Auditoriums 11.77 4.19 0.79 10.24% 0.00 6.31 2.35 2.35

HT III: Public

Infrastructure and Tourism 9.18 4.19 0.79 10.24% 0.00 3.72 1.84 1.84

HT IV Government LIS 5.82 4.19 0.79 10.24% 0.00 0.36 1.16 0.36

HT IV Private Irrigation and

Agriculture 5.82 4.19 0.79 10.24% 0.00 0.36 1.16 0.36

HT IV CPWS 4.89 4.19 0.79 10.24% 0.00 - 0.98 -

HT VI: Townships &

Residential Colonies 6.55 4.19 0.79 10.24% 0.00 1.09 1.31 1.09

HT VIII: Temporary 9.50 4.19 0.79 10.24% 0.00 4.04 1.90 1.90

Category: RESCOs 0.32 4.19 0.79 10.24% 0.00 - 0.06 -

HT Category at 33 kv

HT I (A): General 7.19 4.19 0.39 7.08% 0.00 2.29 1.44 1.44

HT I (B): Energy Intensive

Industries 5.37 4.19 0.39 7.08% 0.00 0.47 1.07 0.47

HT I (C) : Aquaculture and

Animal Husbandry 3.86 4.19 0.39 7.08% 0.00 - 0.77 -

HT I (D) : Poultry

Hatcheries and Poultry

Feed Mixing Plants

7.50 4.19 0.39 7.08% 0.00 2.60 1.50 1.50

HT II: Others 9.08 4.19 0.39 7.08% 0.00 4.18 1.82 1.82

HT II (B): Religious Places 5.36 4.19 0.39 7.08% 0.00 0.46 1.07 0.46

HT II (C) : Function Halls /

Auditoriums 11.77 4.19 0.39 7.08% 0.00 6.87 2.35 2.35

HT III: Public

Infrastructure and Tourism 10.49 4.19 0.39 7.08% 0.00 5.59 2.10 2.10

HT IV Agriculture 5.82 4.19 0.39 7.08% 0.00 0.92 1.16 0.92

HT IV CPWS 4.89 4.19 0.39 7.08% 0.00 - 0.98 -

HT VI: Townships &

Residential Colonies 6.75 4.19 0.39 7.08% 0.00 1.85 1.35 1.35

HT Category at 132 kv

HT I (A): General 6.88 4.19 0.37 3.83% 0.00 2.16 1.38 1.38

HT I (B): Energy Intensive

Industries 4.95 4.19 0.37 3.83% 0.00 0.23 0.99 0.23

HT II: Others 8.22 4.19 0.37 3.83% 0.00 3.50 1.64 1.64

HT IV Agriculture 5.82 4.19 0.37 3.83% 0.00 1.10 1.16 1.10

HT V: Railway Traction 5.01 4.19 0.37 3.83% 0.00 0.29 1.00 0.29

Page 154: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 134

13 Additional Surcharge

Application for Additional Surcharge for FY 2018-19

Background:

Section 42(4) of the Electricity Act states that “Where the State Commission permits a consumer or

class of consumers to receive supply of electricity from a person other than the distribution licensee

of his area of supply, such consumer shall be liable to pay an additional surcharge on the charges of

wheeling, as may be specified by the State Commission, to meet the fixed cost of such distribution

licensee arising out of his obligation to supply”.

Further, Cl. 8.5.4 of the National Tariff Policy-2016 states that “The additional surcharge for

obligation to supply as per section 42(4) of the Act should become applicable only if it is conclusively

demonstrated that the obligation of a licensee, in terms of existing power purchase commitments, has

been and continues to be stranded, or there is an unavoidable obligation and incidence to bear fixed

costs consequent to such a contract”.

Need for Additional Surcharge for FY 18-19

During the FY 2017-18, Licensee(s) projected higher HT sales (assuming no open access sales) and

higher revenue considering retention of HT consumers with the proposed tariff rationalization

and additional surcharge. However, Hon’ble Commission has continued with same tariff structure

with a marginal increase in fixed and energy charges. Additional surcharge petition filed by

Licensee(s) is pending for Hon’ble Commission decision.

Contrary to ARR filings, actual open access sales during FY 2017-18 registered an increase

compared to FY 2016-17 (given below). This has resulted in backing down of certain stations lead

to higher fixed cost per unit due to low asset utilization. Month-wise open access sales in the

previous 12 months i.e. from October-2016 to September-2017 is shown below.

Actual Open Access Sales (MU)

Month EPDCL SPDCL Total

Oct-16 54 90 143 Nov-16 42 82 124 Dec-16 50 135 185 Jan-17 43 154 197 Feb-17 44 174 218 Mar-17 49 159 209 Apr-17 23 135 157

Page 155: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 135

Actual Open Access Sales (MU)

Month EPDCL SPDCL Total

May-17 46 186 233 Jun-17 52 164 215 Jul-17 48 172 220 Aug-17 21 139 160 Sep-17 14 49 63 Total 485 1,639 2,124

Considering the above, during the FY 2018-19, Licensee(s) have not considered open access sales

coming back to Licensee due to low tariffs prevailing on the power exchange/ market during

certain time blocks of the year. This has resulted in backing down of generators during certain

time blocks leading to stranded assets. Fixed cost due to stranded generating assets is being

loaded in the ARR and recovered from all consumers (burdening Domestic and Agricultural

consumers). This may be addressed with any of the following options

- Allow Licensee to recover additional surcharge ( as per the clause 8.5.4 of the NTP 2016)

by duly acknowledging stranded assets

- Marginal tariff increase to the respective category only ( to the extent of stranded assets)

- Equal opportunity to the Licensee and OA Generator/ Power exchange.

o Tariff flexibility - Licensee should be allowed to increase / decrease energy

charges upto +/ -10% to reflect power exchange prices

o No first charge while settlement of energy ( as per Regulation 2 of 2016) or allow

grid support charges for scheduled consumers

Methodology for determination of Additional Surcharge

Purchase of power by the electricity consumers from Open Access results in under recovery of

fixed costs of stranded assets due to backing down of generating stations in case of surplus power.

As the state is in power surplus for FY 2017-18, the licensees have an unavoidable fixed cost

obligation for FY 2017-18 and will have to bear the fixed costs consequent to the Power Purchase

Agreements and the generation assets would get stranded in case of shift to open access sales.

Hence, the licensees have filed for Additional Surcharge to cover the loss arising from under

recovery of fixed costs of stranded assets. Licensee would like to adopt same methodology for the

FY 2018-19.

Page 156: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 136

As the open sales has been increasing in the state when compared to the previous years, the

licensee(s) have considered a minimal growth rate of 10% for open sales in FY 2018-19. The

expected open access sales in the state is shown below.

Month EPDCL SPDCL Total

Apr 25 148 173 May 51 205 256 Jun 57 180 237 Jul 52 189 242 Aug 24 153 176 Sep 15 54 69 Oct 59 99 158 Nov 46 90 136 Dec 55 149 204 Jan 47 169 217 Feb 48 192 240 Mar 54 175 230 Total 533 1,803 2,336

Without considering the open access sales, the stranded capacity (MU) and the fixed cost of the

stranded capacity (Rs. Cr) is shown below. For bilateral purchases, 20% of the Tariff is taken as

penalty in the calculations.

Total Stranded Capacity and Fixed Cost of the stranded capacity (Without Open Access Sales)

Stations Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Fixed

Cost

(Rs.

Cr)

NTPC Simhadri

Stage I - - 4.06 - - - - - - - - - 4.06 0.50

NLC Stage-I - - 17.43 - - - - - - - - - 17.43 1.94

NLC Stage-II - - 25.52 - - - - - - - - - 25.52 2.85

RTPP Stage-III - - 100.47 100.68 - - - - - - - - 201.15 56.66

RTPP Stage-IV - - 119.88 123.88 101.02 - - - - - - - 344.77 32.54

RTPP I - - 150.71 207.65 207.65 - - - 145.44 101.08 - - 812.53 137.77

RTPP Stage-II - - 208.68 165.40 215.63 - - - 215.63 215.63 48.42 - 1,069.39 239.96

Kudigi - 54.22 57.71 59.64 59.64 35.41 - - 61.62 64.61 46.47 - 439.32 101.57

PTC - - 90.00 90.00 120.00 180.00 - - - - - - 480.00 0.00

Other Short

Term Sources - - - - - - 15.45 23.58 - - - - 39.03 0.00

Bilateral

Purchases

(Generators /

Traders)

113.60 372.00 - - - - - - - 372.00 336.00 3.00 1,196.61 97.64

TOTAL 113.60 426.22 774.46 747.23 703.94 215.41 15.45 23.58 422.69 753.32 430.89 3.00 4,629.80 671.43

Page 157: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 137

Considering the open access sales, the stranded capacity and the fixed cost of the stranded

capacity is shown below. Total Stranded Capacity and Fixed Cost of the stranded capacity (With Open Access Sales)

Stations Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Fixed

Cost

(Rs.

Cr)

NTPC Simhadri

Stage I

NLC Stage-I

NLC

Stage-II

RTPP Stage-III

RTPP Stage-IV - - 23.34 - - - - - - - - - 23.34 2.20

RTPP I - - 150.71 183.37 127.07 - - - - - - - 461.14 78.19

RTPP Stage-II - - 208.68 165.40 215.63 - - - 151.36 93.47 - - 834.54 187.26

Kudigi - - 57.71 59.64 59.64 - - - 61.62 64.61 - - 303.22 70.11

PTC - - 90.00 90.00 120.00 144.20 - - - - - - 444.20 0.00

Other Short

Term Sources - - - - - - - - - - - - - 0.00

Bilateral

Purchases

(Generators /

Traders)

- 162.68 - - - - - - - 372.00 183.60 - 718.27 58.61

TOTAL - 162.68 530.44 498.40 522.34 144.20 - - 212.98 530.08 183.60 - 2,784.71 396.37

Hence, the stranded capacity and the fixed cost of the stranded capacity due to open access sales is

shown below. Stranded Capacity and Fixed Cost of the stranded capacity (Due to Open Access Sales)

Stations Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Fixed

Cost

(Rs.

Cr)

NTPC Simhadri

Stage I - - 4.06 - - - - - - - - - 4.06 0.50

NLC Stage-I - - 17.43 - - - - - - - - - 17.43 1.94

NLC

Stage-II - - 25.52 - - - - - - - - - 25.52 2.85

RTPP Stage-III - - 100.47 100.68 - - - - - - - - 201.15 56.66

RTPP Stage-IV - - 96.54 123.88 101.02 - - - - - - - 321.43 30.34

RTPP I - - - 24.28 80.58 - - - 145.44 101.08 - - 351.38 59.58

RTPP Stage-II - - - - - - - - 64.27 122.16 48.42 - 234.86 52.70

Kudigi - 54.22 - - - 35.41 - - - - 46.47 - 136.10 31.47

PTC - - - - - 35.80 - - - - - - 35.80 0.00

Other Short

Term Sources - - - - - - 15.45 23.58 - - - - 39.03 0.00

Bilateral

Purchases

(Generators /

Traders)

113.60 209.32 - - - - - - - - 152.40 3.00 478.34 39.03

TOTAL 113.60 263.55 244.02 248.83 181.60 71.21 15.45 23.58 209.71 223.25 247.29 3.00 1,845.09 275.06

Page 158: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 138

Month-wise computation of fixed cost of the stranded assets due to open access and Additional

surcharge is shown below. Month Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Fixed Cost of

Stranded Assets (Rs.

Cr)

9.27 29.62 42.70 44.17 23.20 8.19 - - 39.08 44.55 34.04 0.25 275.06

OA Sales (MU) 173.17 255.80 236.84 241.52 176.26 69.12 203.54 216.68 240.02 229.50 1,812.94

Additional Surcharge

(Rs./Unit) 0.54 1.16 1.80 1.83 1.32 1.18 - - 1.92 2.06 1.42 0.01 1.52

The power purchase quantity and fixed costs stranded by re-running the merit order for the

revised sales is shown below. (Detailed Merit Order attached as Annexures)

Computation of Additional Surcharge for FY 18-19

Particulars Unit Without OA With OA Difference

Energy Availability MU 66173.14 66,173.14 -

Energy Despatch MU 61,543.34 63,388.43 (1,845.09)

Back Down Energy MU 4,629.80 2,784.71 1,845.09

Fixed Cost of Breakdown Energy Rs. Cr 671.43 396.37 275.06

Fixed cost of stranded capacity due to open access sales to continue in FY 2018-19 and adjusted

for margin from sale of surplus power is Rs. 173 Crs.

Particulars Unit Value

Fixed cost of stranded capacity Rs. Cr 275.06

OA Sales (During Off-Peak Months) MU 1,812.94

Additional Surcharge Rs./Unit 1.52

Profit Margin (from sale of surplus Power) Rs./Unit 0.56 Net Additional Surcharge Rs./Unit 0.95

Due to open access, average fixed cost gets increased from Rs. 1.10/Unit to Rs. 1.13/Unit. This

increase in fixed costs leads to an additional burden of Rs. 173 Crore being imposed on other

categories like Domestic, Agriculture etc.

Hence, the licensee is filing for additional surcharge for certain months (April, May, June, July,

August, September, December, January, February in FY 18-19) based on the fixed cost of the

stranded assets in those months.

Prayer The licensees humbly requests the Honourable Commission to consider the revised methodology and allow the licensees to collect the Additional Surcharge considering the Actual Open Access Sales (in Oct-2016 - Sep-2017 period).

Page 159: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 139

Annexure 1: Merit Order without Open Access

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

MACHKUND PH AP

Share 24.75 27.72 27.72 27.72 29.70 27.72 27.72 27.72 27.72 25.74 23.76 27.72 325.71

TUNGBHADRA PH

AP Share 3.54 0.62 0.04 5.52 9.90 11.88 11.88 7.92 7.92 5.94 5.94 3.96 75.07

Upper Sileru Power

House (AP) 19.80 9.90 9.90 19.80 29.70 17.82 29.70 23.76 23.76 32.67 54.45 71.28 342.54

Lower Sileru Power

House (AP) 89.10 24.75 19.80 49.50 79.20 59.40 69.30 69.30 79.20 108.90 108.90 108.90 866.25

DONKARAYI (AP) 1.98 0.99 0.99 0.99 5.94 5.94 8.91 8.91 8.91 8.91 5.94 7.92 66.33

Srisailam Right

Bank Power House

(AP)

7.92 - - - 118.80 138.60 158.40 19.80 19.80 59.40 89.10 19.80 631.62

Nagarjunasagar

Right Bank Power

House (AP)

1.98 - - - 3.96 9.90 19.80 19.80 11.88 7.92 3.96 2.97 82.17

Penna Ahobilam

(AP) 0.03 0.04 0.08 0.09 1.10 1.10 1.19 0.73 0.59 0.38 0.20 0.20 5.72

MINI

HYDEL(Chettipeta)-

AP

0.13 - 0.07 0.38 0.30 0.33 0.07 0.05 0.28 0.39 0.28 0.37 2.62

Nagarjunasagar

Tail Pond Dam

Power House

0.99 0.99 0.99 4.95 8.91 14.85 14.85 17.82 17.82 9.90 4.95 4.95 101.97

NPC-MAPS 8.82 4.29 6.45 9.11 9.11 8.82 9.11 8.82 9.11 9.11 8.16 9.11 100.05

NPC-Kaiga unit I&ii 31.25 32.02 31.25 16.14 24.14 31.25 32.02 31.25 32.02 32.02 29.22 32.02 354.60

NPC-Kaiga unit

III&IV 32.24 33.05 32.24 33.05 33.05 32.24 33.05 32.24 16.52 24.79 30.34 33.05 365.85

Bundled power

under JVNSM 21.59 22.35 20.64 20.98 20.29 20.03 21.49 21.84 22.01 23.51 19.94 22.15 256.81

Page 160: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 140

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

NCE - Bio-Mass 29.36 32.73 29.86 31.66 20.96 16.29 29.88 24.85 30.83 33.25 32.75 37.57 350.00

NCE - Bagasse 0.08 - 2.97 - - - 2.00 8.95 19.07 17.58 16.17 8.30 75.13

NCE - Industrial

Waste based power

project

1.68 1.72 3.01 3.23 1.63 2.27 2.00 0.49 3.64 4.15 3.65 2.98 30.45

NCE - Wind Power 434.45 654.05 1,186.77 1,451.98 1,120.96 571.97 455.37 318.15 336.04 403.84 441.88 433.10 7,808.58

NCE - Mini Hydel 3.45 2.16 6.72 6.48 2.19 4.57 16.11 15.63 14.77 14.49 10.16 8.30 105.05

NCE - NCL Energy

Ltd - - - 0.80 0.80 2.80 2.80 2.80 2.80 0.80 - - 13.60

NCE - Solar Projects

(SPD) 100.35 96.41 79.38 82.13 78.14 79.14 91.70 85.26 86.51 91.15 97.32 96.55 1,064.04

NCE- Solar Parks 187.00 194.06 181.72 186.57 131.09 166.82 279.50 269.76 277.93 279.40 254.76 281.55 2,690.17

NVVNL Bundled

Power -SOLAR 5.97 3.58 1.89 1.89 0.35 1.13 2.21 4.43 2.39 1.16 4.10 7.30 36.39

NTPC Ramagundam

Solar Power 0.82 0.89 0.69 0.68 0.56 0.72 0.85 0.85 0.86 0.84 0.81 0.93 9.50

JNNSM Phase-II 269.54 278.89 259.17 264.09 256.64 252.60 269.55 272.17 275.19 291.53 249.25 276.75 3,215.37

Talcher Stage 2 88.53 87.72 65.54 71.36 74.23 88.19 92.07 89.13 92.07 92.07 83.18 92.07 1,016.15

Thermal Power

Tech 152.82 157.91 152.82 157.91 157.91 152.82 157.91 152.82 123.61 157.91 142.63 157.91 1,824.98

NTPC (SR)-

Ramagundam Stage

3

31.25 32.38 28.48 16.19 10.35 28.48 29.51 28.48 29.51 29.51 26.64 29.51 320.27

APGPCL II -

Allocated capacity 5.11 5.28 5.11 5.28 5.11 5.11 5.28 5.11 5.28 5.08 4.94 5.28 61.97

NTPC (SR)-

Ramagundam

Stage1&2

110.78 116.36 110.78 119.88 119.98 105.30 103.54 117.05 108.43 127.03 114.70 116.16 1,370.00

Vallur Thermal

Power Plant 57.04 58.94 40.70 54.41 58.94 55.14 46.88 39.97 58.33 59.61 53.86 59.61 643.42

Page 161: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 141

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

Kondapalli (Gas) 101.11 104.48 101.11 104.48 104.48 101.11 104.48 101.11 104.48 104.48 94.37 104.48 1,230.12

Tuticorin 45.08 52.41 52.19 61.79 60.16 60.16 61.79 60.16 61.79 61.79 56.10 61.79 695.21

Spectrum 57.32 59.23 57.32 59.23 59.23 57.32 59.23 57.32 59.23 59.23 53.50 59.23 697.41

APGPCL I -

Allocated capacity 1.60 1.66 1.60 1.66 1.60 1.60 1.65 1.60 1.66 1.60 1.55 1.66 19.44

VTPS IV 260.57 269.26 260.57 138.97 269.26 260.57 269.26 260.57 269.26 269.26 243.20 269.26 3,040.00

GGPP 69.30 71.70 69.30 71.70 71.70 69.30 71.70 69.30 71.70 71.70 64.50 11.70 783.60

NNTPS - - - 2.39 6.77 8.42 8.68 8.42 8.68 8.68 7.86 8.68 68.59

Srivathsa

(Exclusive EPDCL) 5.62 5.81 5.62 5.81 5.81 5.62 5.81 5.62 5.81 5.81 5.25 5.81 68.41

KSK Mahanadi

(MT) 205.48 212.33 205.48 212.33 212.33 205.48 212.33 205.48 212.33 212.33 191.78 212.33 2,500.01

Damodaram

Sanjeevaiah

Thermal power

plant - I

393.15 406.25 393.15 194.78 450.77 393.15 400.69 398.53 406.25 400.69 366.94 411.82 4,616.18

Damodaram

Sanjeevaiah

Thermal power

plant - II

393.15 406.25 398.53 445.21 194.78 393.15 400.69 393.15 406.25 400.69 368.95 406.25 4,607.06

UI 45.85 100.50 86.73 74.62 5.36 17.55 45.85 100.50 86.73 74.62 5.36 17.55 661.23

VTPS I 188.84 195.14 188.84 195.14 147.99 188.84 160.47 173.08 195.14 195.14 176.25 195.14 2,200.00

VTPS II 212.62 219.71 162.26 219.71 219.71 100.71 145.10 212.62 219.71 219.71 198.44 219.71 2,350.00

VTPS III 201.43 208.14 151.07 157.79 208.14 201.43 208.14 201.43 208.14 208.14 188.00 208.14 2,350.00

NTPC Simhadri

Stage II 83.84 87.58 83.84 86.69 76.21 58.84 86.69 83.84 86.69 87.28 78.75 88.33 988.58

NTPC Simhadri

Stage I 220.53 226.52 152.45 116.82 228.02 220.53 228.02 220.53 228.02 228.02 206.30 228.02 2,503.76

NLC Stage-I 18.20 18.68 - 12.79 18.44 13.15 16.12 11.60 17.13 18.56 16.84 18.50 180.01

Page 162: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 142

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

NLC Stage-II 34.64 35.61 - 33.27 26.40 29.80 24.79 31.25 24.47 35.45 31.90 35.37 342.93

RTPP Stage-III 100.47 103.82 - 3.15 53.59 100.47 103.82 100.47 103.82 103.82 93.78 103.82 971.05

RTPP Stage-IV 119.88 123.88 - - 22.86 119.88 289.04 279.72 289.04 289.04 261.07 289.04 2,083.46

RTPP I 200.95 207.65 - - - 200.95 157.41 200.95 62.21 106.56 187.55 207.65 1,531.87

RTPP Stage-II 208.68 215.63 - - - 100.47 179.57 208.68 - - 146.35 215.63 1,275.01

Kudigi 57.71 5.42 - - - 22.30 59.64 57.71 - - - 57.88 260.67

PTC - - - - - - 150.00 180.00 - - - - 330.00

Other Short Term

Sources - - - - - - 234.55 126.42 - - - - 360.97

Bilateral Purchases

(Generators /

Traders)

246.40 - - - - - - - - - - 369.00 615.39

TOTAL 5,194.78 5,217.46 4,675.86 4,841.09 4,857.56 4,844.05 5,710.15 5,475.94 4,873.33 5,121.56 4,966.52 5,765.06 61,543.34

Page 163: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 143

Annexure 2: Merit Order with Open Access

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total MACHKUND PH AP

Share 24.75 27.72 27.72 27.72 29.70 27.72 27.72 27.72 27.72 25.74 23.76 27.72 325.71

TUNGBHADRA PH

AP Share 3.54 0.62 0.04 5.52 9.90 11.88 11.88 7.92 7.92 5.94 5.94 3.96 75.07

Upper Sileru Power

House (AP) 19.80 9.90 9.90 19.80 29.70 17.82 29.70 23.76 23.76 32.67 54.45 71.28 342.54

Lower Sileru Power

House (AP) 89.10 24.75 19.80 49.50 79.20 59.40 69.30 69.30 79.20 108.90 108.90 108.90 866.25

DONKARAYI (AP) 1.98 0.99 0.99 0.99 5.94 5.94 8.91 8.91 8.91 8.91 5.94 7.92 66.33

Srisailam Right

Bank Power House

(AP)

7.92 - - - 118.80 138.60 158.40 19.80 19.80 59.40 89.10 19.80 631.62

Nagarjunasagar

Right Bank Power

House (AP)

1.98 - - - 3.96 9.90 19.80 19.80 11.88 7.92 3.96 2.97 82.17

Penna Ahobilam

(AP) 0.03 0.04 0.08 0.09 1.10 1.10 1.19 0.73 0.59 0.38 0.20 0.20 5.72

MINI

HYDEL(Chettipeta)-

AP

0.13 - 0.07 0.38 0.30 0.33 0.07 0.05 0.28 0.39 0.28 0.37 2.62

Nagarjunasagar

Tail Pond Dam

Power House

0.99 0.99 0.99 4.95 8.91 14.85 14.85 17.82 17.82 9.90 4.95 4.95 101.97

NPC-MAPS 8.82 4.29 6.45 9.11 9.11 8.82 9.11 8.82 9.11 9.11 8.16 9.11 100.05

NPC-Kaiga unit I&ii 31.25 32.02 31.25 16.14 24.14 31.25 32.02 31.25 32.02 32.02 29.22 32.02 354.60

NPC-Kaiga unit

III&IV 32.24 33.05 32.24 33.05 33.05 32.24 33.05 32.24 16.52 24.79 30.34 33.05 365.85

Bundled power

under JVNSM 21.59 22.35 20.64 20.98 20.29 20.03 21.49 21.84 22.01 23.51 19.94 22.15 256.81

Page 164: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 144

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

NCE - Bio-Mass 29.36 32.73 29.86 31.66 20.96 16.29 29.88 24.85 30.83 33.25 32.75 37.57 350.00

NCE - Bagasse 0.08 - 2.97 - - - 2.00 8.95 19.07 17.58 16.17 8.30 75.13

NCE - Municipal

Waste to Energy - - - - - - - - - - - - -

NCE - Industrial

Waste based power

project

1.68 1.72 3.01 3.23 1.63 2.27 2.00 0.49 3.64 4.15 3.65 2.98 30.45

NCE - Wind Power 434.45 654.05 1,186.77 1,451.98 1,120.96 571.97 455.37 318.15 336.04 403.84 441.88 433.10 7,808.58

NCE - Mini Hydel 3.45 2.16 6.72 6.48 2.19 4.57 16.11 15.63 14.77 14.49 10.16 8.30 105.05

NCE - NCL Energy

Ltd - - - 0.80 0.80 2.80 2.80 2.80 2.80 0.80 - - 13.60

NCE - Solar Projects

(SPD) 100.35 96.41 79.38 82.13 78.14 79.14 91.70 85.26 86.51 91.15 97.32 96.55 1,064.04

NCE- Solar Parks 187.00 194.06 181.72 186.57 131.09 166.82 279.50 269.76 277.93 279.40 254.76 281.55 2,690.17

NVVNL Bundled

Power -SOLAR 5.97 3.58 1.89 1.89 0.35 1.13 2.21 4.43 2.39 1.16 4.10 7.30 36.39

NTPC Ramagundam

Solar Power 0.82 0.89 0.69 0.68 0.56 0.72 0.85 0.85 0.86 0.84 0.81 0.93 9.50

JNNSM Phase-II 269.54 278.89 259.17 264.09 256.64 252.60 269.55 272.17 275.19 291.53 249.25 276.75 3,215.37

Talcher Stage 2 88.53 87.72 65.54 71.36 74.23 88.19 92.07 89.13 92.07 92.07 83.18 92.07 1,016.15

Thermal Power

Tech 152.82 157.91 152.82 157.91 157.91 152.82 157.91 152.82 123.61 157.91 142.63 157.91 1,824.98

NTPC (SR)-

Ramagundam Stage

3

31.25 32.38 28.48 16.19 10.35 28.48 29.51 28.48 29.51 29.51 26.64 29.51 320.27

APGPCL II -

Allocated capacity 5.11 5.28 5.11 5.28 5.11 5.11 5.28 5.11 5.28 5.08 4.94 5.28 61.97

Page 165: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 145

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total NTPC (SR)-

Ramagundam

Stage1&2

110.78 116.36 110.78 119.88 119.98 105.30 103.54 117.05 108.43 127.03 114.70 116.16 1,370.00

Vallur Thermal

Power Plant 57.04 58.94 40.70 54.41 58.94 55.14 46.88 39.97 58.33 59.61 53.86 59.61 643.42

Kondapalli (Gas) 101.11 104.48 101.11 104.48 104.48 101.11 104.48 101.11 104.48 104.48 94.37 104.48 1,230.12

Tuticorin 45.08 52.41 52.19 61.79 60.16 60.16 61.79 60.16 61.79 61.79 56.10 61.79 695.21

Spectrum 57.32 59.23 57.32 59.23 59.23 57.32 59.23 57.32 59.23 59.23 53.50 59.23 697.41

APGPCL I -

Allocated capacity 1.60 1.66 1.60 1.66 1.60 1.60 1.65 1.60 1.66 1.60 1.55 1.66 19.44

VTPS IV 260.57 269.26 260.57 138.97 269.26 260.57 269.26 260.57 269.26 269.26 243.20 269.26 3,040.00

GGPP 69.30 71.70 69.30 71.70 71.70 69.30 71.70 69.30 71.70 71.70 64.50 11.70 783.60

NNTPS - - - 2.39 6.77 8.42 8.68 8.42 8.68 8.68 7.86 8.68 68.59

Srivathsa

(Exclusive EPDCL) 5.62 5.81 5.62 5.81 5.81 5.62 5.81 5.62 5.81 5.81 5.25 5.81 68.41

KSK Mahanadi

(MT) 205.48 212.33 205.48 212.33 212.33 205.48 212.33 205.48 212.33 212.33 191.78 212.33 2,500.01

Damodaram

Sanjeevaiah

Thermal power

plant - I

393.15 406.25 393.15 194.78 450.77 393.15 400.69 398.53 406.25 400.69 366.94 411.82 4,616.18

Damodaram

Sanjeevaiah

Thermal power

plant - II

393.15 406.25 398.53 445.21 194.78 393.15 400.69 393.15 406.25 400.69 368.95 406.25 4,607.06

UI 45.85 100.50 86.73 74.62 5.36 17.55 45.85 100.50 86.73 74.62 5.36 17.55 661.23

VTPS I 188.84 195.14 188.84 195.14 147.99 188.84 160.47 173.08 195.14 195.14 176.25 195.14 2,200.00

Page 166: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 146

Station Energy Despatch - FY 2018-19 (MU)

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

VTPS II 212.62 219.71 162.26 219.71 219.71 100.71 145.10 212.62 219.71 219.71 198.44 219.71 2,350.00

VTPS III 201.43 208.14 151.07 157.79 208.14 201.43 208.14 201.43 208.14 208.14 188.00 208.14 2,350.00

NTPC Simhadri

Stage II 83.84 87.58 83.84 86.69 76.21 58.84 86.69 83.84 86.69 87.28 78.75 88.33 988.58

NTPC Simhadri

Stage I 220.53 226.52 156.50 116.82 228.02 220.53 228.02 220.53 228.02 228.02 206.30 228.02 2,507.82

NLC Stage-I 18.20 18.68 17.43 12.79 18.44 13.15 16.12 11.60 17.13 18.56 16.84 18.50 197.44

NLC Stage-II 34.64 35.61 25.52 33.27 26.40 29.80 24.79 31.25 24.47 35.45 31.90 35.37 368.45

RTPP Stage-III 100.47 103.82 100.47 103.82 53.59 100.47 103.82 100.47 103.82 103.82 93.78 103.82 1,172.20

RTPP Stage-IV 119.88 123.88 96.54 123.88 123.88 119.88 289.04 279.72 289.04 289.04 261.07 289.04 2,404.90

RTPP I 200.95 207.65 - 24.28 80.58 200.95 157.41 200.95 207.65 207.65 187.55 207.65 1,883.25

RTPP Stage-II 208.68 215.63 - - - 100.47 179.57 208.68 64.27 122.16 194.77 215.63 1,509.86

Kudigi 57.71 59.64 - - - 57.71 59.64 57.71 - - 46.47 57.88 396.77

PTC - - - - - 35.80 150.00 180.00 - - - - 365.80

Other Short Term

Sources - - - - - - 250.00 150.00 - - - - 400.00

Bilateral Purchases

(Generators /

Traders)

360.00 209.32 - - - - - - - - 152.40 372.00 1,093.73

TOTAL 5,308.38 5,481.01 4,919.87 5,089.92 5,039.16 4,915.26 5,725.60 5,499.52 5,083.04 5,344.80 5,213.82 5,768.07 63,388.43

Page 167: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

APSPDCL Page 147

14 Prayer

Based on the information available, the Applicant has made sincere efforts to comply with the

Regulation of the Honourable Commission and discharge its obligations to the best of its

abilities. However, should any further material information become available in the near future,

the Applicant shall file such additional information and consequently amend/ revise the

application.

In the aforesaid facts and circumstances, the Applicant requests that this Honourable

Commission may be pleased to:

a. Take the accompanying ARR, Tariff Proposal, Cross Subsidy Surcharge and Additional

Surcharge Application of APSPDCL on record and treat it as complete;

b. Grant suitable opportunity to APSPDCL within a reasonable time frame to file additional

material information that may be subsequently available;

c. Consider and approve APSPDCL’s ARR and Tariff application including all requested

regulatory treatments in the filing;

d. Pass such order as the Honourable Commission may deem fit and proper in the facts and

circumstances of the case.

Page 168: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

 

 

 

 

 

 

 

 

 

 

Cost of Service 

(COS)  

 

 

 

 

 

 

 

 

 

Page 169: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Company Name SPDCL

Filing date (dd/mm/yy) 30-11-2017

Multi Year Tariff Period 2014 - 19

Year 2018-19

Data Type CoS Inputs

S. No. Title Form No.

1 New Consumer Categories Form 1

2 ARR -Retail Supply Business Form 2

3 Percentage Cost Allocation Form 3

4 Cost Allocation Factors Form 4

5 Transmission Contracts Form 5

6 Percentage Losses Form 6

7 Classification of Asset Base Form 7

Page 170: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1 New Consumer Categories

Notes:

1 Add any proposed category here, in the tables provided under corresponding voltage levels.

2 Select the category which is being modified/replaced in the EXISTING CATEGORY Field.

3 Provide the name of the proposed category in the PROPOSED CATEGORY Field

4 This form should be consistent with Form A of Retail Supply of Electricity Forms

Remarks

Existing

Category

Proposed

CategoryRemarks

Existing

Category

Proposed

CategoryRemarks Codes

Modification/Rep

lacement of

existing

Category

For LT Category For HT Category - 11kV

For HT Category - 132kV

Proposed

CategoryCodes

Modification/

Replacement of

existing

Category

Existing

CategoryRemarksCodes

Modification/Re

placement of

existing

Category

For HT Category - 33kV

Existing

Category

Proposed

CategoryCodes

Modification/Re

placement of

existing

Category

Page 171: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 2

Demand Energy Customer

1 Transmission Cost 931.18 931.18 0.00 0.00

2 SLDC Cost 26.56 26.56 0.00 0.00

3 Distribution Cost 2919.66 2553.37 0.00 366.30

4 PGCIL Expenses 682.28 682.28 0.00 0.00

5 ULDC Charges 12.93 12.93 0.00 0.00

6 Network and SLDC Cost (1+2+3+4+5) 4572.61 4206.32 0.00 366.30

7 Power Purhcase / Procurement Cost 16572.87 4594.79 11978.08 0.00

8 Interest on Consumer Security Deposits 154.10 0.00 154.10 0.00

9 Supply Margin in Retail Supply Business 13.05 13.05 0.00 0.00

10 Other Costs, if any 116.76 116.76 0.00 0.00

11 Supply Cost (7+8+9+10) 16856.78 4724.60 12132.18 0.00

12 Aggregate Revenue Requirement (6+11) 21429.39 8930.92 12132.18 366.30

Amount

(Rs crores)

Revenue Requirement Item

2018-19

Cost Allocation

(Rs crores)

Page 172: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 3

Demand Energy Customer

Total Power Purchase Cost 16572.87

Fixed Cost 4054.69 100.00 0.00 0.00

Variable Cost 11978.08 0.00 100.00 0.00

Incentive 4.42 100.00 0.00 0.00

Income Tax 4.36 34.00 66.00 0.00

Others 531.32 0.00 100.00 0.00

Interest on Consumer Security Deposits 0.00 0.00 100.00 0.00

Supply Margin in Retail Supply Business 0.00 100.00 0.00 0.00

Other Costs, if any 0.00 100.00 0.00 0.00

Supply Cost 16572.87

Particulars % allocation

2018-19

Amount

(Rs crores)

Page 173: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 4

Energy

MU

Capacity

MW

Commercial

Loss

%

Non-coincident

Demand

%

Coincident

Demand

Morning

%

Coincident

Demand

Evening

%

Class

Load

Factor

Class

Coincidence

Factor -

Morning

Class

Coincidence

Factor -

Evening

LT Category 24064.07 17145.91 11287001 0.00 14869.24 6.18

Category I Domestic 9168.39 7658.13 8793640 0.00 45% 45% 45% 45% 74% 74% 74% 6061.87 6.61

Category II - Non-domestic/Commercial 1906.11 1686.00 811406 0.00 12% 12% 12% 12% 78% 80% 77% 1294.66 6.79

Category III (A & B) - Industrial 2303.21 1649.03 84388 0.00 15% 15% 15% 15% 98% 100% 97% 1569.28 6.81

Category IV - Cottage Industries & Dhobighats 42.63 44.35 11990 0.00 0% 0% 0% 0% 98% 100% 97% 29.38 6.89

Category V - Irrigation and Agriculture 9761.55 5592.34 1410967 0.00 0% 0% 0% 0% 99% 100% 98% 5295.66 5.43

Category VI - Local Bodies, St. Lighting & PWS 771.31 421.09 112005 0.00 24% 24% 24% 24% 77% 77% 76% 539.35 6.99

Category VII - General Purpose 109.24 94.60 62542 0.00 3% 3% 3% 3% 77% 77% 76% 77.90 7.13

Category VIII-Temporary Supply 1.63 0.36 63 0.00 0% 0% 0% 0% 77% 77% 76% 1.13 6.96HT Category at 11 KV 3426.04 1402.20 6748 0.00 2233.11 6.52

HT-I Industry Segregated 1938.03 849.26 3971 0.00 0% 0% 0% 0% 100% 100% 99% 1277.88 6.59

Lights & Fans 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Colony consumption 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Seasonal Industries 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-I (B) Ferro-Alloys 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-II Industrial Non-Segregated 674.24 282.66 1731 0.00 0% 0% 0% 0% 78% 80% 76% 428.16 6.35

HT-IV A Govt. Lift Irrigation Schemes 291.04 264.47 1014 0.00 0% 0% 0% 0% 99% 100% 98% 256.24 8.80

HT-IV B Agriculture 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-VI Townships and Residential Colonies 22.58 5.81 31 0.00 0% 0% 0% 0% 66% 67% 66% 13.53 5.99

RESCOs 500.03 0.00 1 0.00 0% 0% 0% 0% 66% 67% 66% 257.23 5.14

Temporary Supply 0.12 0.00 0 0.00 0% 0% 0% 0% 66% 67% 66% 0.06 5.14HT Category at 33 KV 3457.55 960.86 558 0.00 2038.62 5.90

HT-I Industry Segregated 3077.79 649.91 367 0.00 0% 0% 0% 0% 100% 100% 99% 1739.51 5.65

Lights & Fans 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Colony consumption 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Seasonal Industries 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-I (B) Ferro-Alloys 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-II Industrial Non-Segregated 153.08 70.13 51 0.00 0% 0% 0% 0% 78% 80% 76% 95.80 6.26

HT-IV A Govt. Lift Irrigation Schemes 212.02 233.82 118 0.00 0% 0% 0% 0% 99% 100% 98% 193.55 9.13

HT-IV B Agriculture 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-VI Townships and Residential Colonies 14.65 6.98 22 0.00 0% 0% 0% 0% 66% 67% 66% 9.76 0.00

RESCOs 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Temporary Supply 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00HT Category at 132 KV 3837.97 1268.80 89 0.00 2273.43 5.92

HT-I Industry Segregated 2420.90 535.95 51 0.00 0% 0% 0% 0% 100% 100% 99% 1331.05 5.50

Lights & Fans 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Colony consumption 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Seasonal Industries 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-I (B) Ferro-Alloys 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-II Industrial Non-Segregated 33.93 8.01 1 0.00 0% 0% 0% 0% 0% 0% 0% 18.20 5.36

HT-IV A Govt. Lift Irrigation Schemes 661.64 432.02 13 0.00 0% 0% 0% 0% 0% 0% 0% 492.45 7.44

HT-IV B Agriculture 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

HT-V Railway Traction 721.49 292.81 24 0.00 0% 0% 0% 0% 98% 97% 99% 431.72 5.98

HT-VI Townships and Residential Colonies 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

RESCOs 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Temporary Supply 0.00 0.00 0 0.00 0% 0% 0% 0% 0% 0% 0% 0.00 0.00

Total 34785.63 20777.76 11294396 0.00 21414.39 6.16

Cost allocation

(Rs Cr)Consumer Category

Sales

Number of

Consumers

Cost to

Serve (Rs/

kWh)

Cost Allocation Factor

Load (MVA / MW) -

HP Converted to

MVA Approved

Commercial Loss

Remarks

FACTORS

2018-19

Page 174: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5 - Transmission Contracts

Particulars 2018-19

Total Installed Generation Capacity - Discom's Share (MW)

Transmission Contracts of Discoms with APTransco (MW/MVA)

Transmission Contracts of Discoms with PGCIL (MW/MVA)

Discom's Share in CGS (MW)

Discom's NCP (MW)

Discom's CP (MW)

Page 175: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 6

Particulars 2018-19

Energy Losses %

Technical LT Losses 3.31%

Technical HT Losses (11 kV) 3.40%

Technical HT Losses (33 kV) 3.37%

Total Technical Losses 10.08%

Commercial LT Losses 1.10%

Commercial HT Losses (11 kV) 0.00%

Commercial HT Losses (33 kV) 0.00%

Total Commercial Losses 1.10%

Total Energy Losses 11.18%

Demand Losses %

Technical LT Losses 3.31%

Technical HT Losses (11 kV) 3.40%

Technical HT Losses (33 kV) 3.37%

Total Technical Losses 10.08%

Commercial LT Losses 1.10%

Commercial HT Losses (11 kV) 0.00%

Commercial HT Losses (33 kV) 0.00%

Total Commercial Losses 1.10%

Total Demand Losses 11.18%

Transmission loss %

APTransco Losses 3.03%

PGCIL Losses 3.57%

Total Transmission Losses %

Page 176: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

Demand Energy Customer

Assets Base for Discom

Land & Rights 69.49 80.00 20.00

Buildings 113.10 80.00 20.00

Hydraulic Works 2.94 80.00 20.00

Other Civil Works 273.16 80.00 20.00

Plant & Machinery 6421.58 80.00 20.00

Lines, Cable, Network, etc. 4461.85 80.00 20.00

Vehicles 7.89 80.00 20.00

Furniture and Fixtures 42.16 80.00 20.00

Office Equipments 138.37 80.00 20.00

Spare parts and other assets 1.65 80.00 20.00

Borrowings for Working Capital 4262.43 80.00 20.00

Less: Contribution, Grants, Subsidies

Total Assets With Adjustments 15,794.61

Voltage wise-Distibution Assets 15,794.61

LT 4346.96

11kV 8533.72

33kV 2913.93

Assets Base for Generation

Total Assets

Assets Base for Transmission

Total Assets

Asset

2018-19

Total Assets

Rs crores

Classification of Asset Base

% allocation

Page 177: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Retail Supply 

Formats (RSF) 

Page 178: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Company Name APSPDCL

Filing Date (dd/mm/yy) 11/30/2017

Multi Year Tariff Period FY 2015-19

Year FY 2018-19

Commission' s Regulations Reg-4/2005

Business type Retail Supply of Electricity

1 Aggregate Revenue Requirement for Retail Supply Business Form 1

2 Transmission Cost Form 1.1

3 SLDC Charges Form 1.2

4 Distribution Cost Form 1.3

5 Power Purchase and Procurement Cost (For Regulated Business) Form 1.4

6 NCE Generation (Base Year) Form 1.4 (i)

7 NCE Generation (Year 1) Form 1.4(ii)

8 NCE Generation (Year 2) Form 1.4(iii)

9 NCE Generation (Year 3) Form 1.4(iv)

10 NCE Generation (Year 4) Form 1.4(v)

11 NCE Generation (Year 5) Form 1.4(vi)

12 Power Purchase and Procurement Cost (For Non-regulated Business) Form 1.4a

13 Sales to Licensees Form 1.4b

14 Discom-Discom Purchases Form 1.4c

15 Interest on Consumer Security Deposits Form 1.5

16 Supply Margin Form 1.6

17 Other Costs Form 1.7

18 New consumer categories Form A

19 Cost of Service: Embedded Cost Method Form 2

20 Sales Forecast Form 3

21 Power Purchase Requirement Form 4

22 Energy Losses (Distribution System) Form 4a

23 Transmission Losses Form 4b

24 Energy Availability Form 4.1

25 Energy Dispatch Form 4.2

26 Revenue from Current Tariffs Form 5

27 Incentives at current Tariffs Form 5a

28 Consumers switching to competition Form 5b

29 Consumers served under Open Access as per Section 42 and Section 49 of E Act Form 5c

30 Non-tariff Income at current charges Form 6

31 Total Revenue at Current tariff and Charges Form 7

32 Revenue Deficit/Surplus at current tariff and charges Form 8

33 Revenue Deficit/Surplus and Proposed Adjustments Form 9

34 Revenue from Proposed Tariffs Form 10

35 Incentives at Proposed Tariffs Form 10a

36 Non-tariff Income at proposed charges Form 11

37 Total Revenue at Proposed Tariff and Charges Form 12

38 Cost and Revenue Form 13

S. No. Title Form No.

Page 179: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Notes:

1) Base Year Base Year for the First control period FY15-19 is FY2013-14

2014-15 Year 1 is the First Year of the control Period, FY2014-15

2015-16 Year 2 is the Second Year of the control Period, FY2015-16

2016-17 Year 3 is the Third Year of the control Period, FY2016-17

2017-18 Year 4 is the Fourth Year of the control Period, FY2017-18

2018-19 Year 5 is the Five Year of the control Period, FY2018 -19

2) Filings 2018-19, Licensees shall provide

Full projections for FY2018-19

Estimates for FY2017-18 based on actuals for first half of the year

Actuals for FY 2016-17

3)

4)

5) New Categories

The Licensees shall add the proposed categories in Form A, the new categories would be then updated automatically in other forms

The new categories are segregated voltage-wise in Form A

6)

7) Phasing of Open Access as per Regulation 2 of 2005 of APERC

Eligibility Criteria for Open Access

Phase Eligibility criteria Commencement date

1 Consumers availing of power from NCE developers

irrespective of the quantum of contracted capacity

September, 2005

2 Contracted capcity being greater than 5 MW September, 2005

3 Contracted capacity being greater than 2 MW September, 2006

4 Contracted capacity being greater than 1 MW April, 2008

8) Terminology for Open Access Status

1 Load not eligible for Open Access

2 Load Eligible for Open Access

3 Availed (within area of supply)

4 Availed ( Outside Area of supply)

Load within the area of supply of the licensees and satisfying the eligibility criteria to avail open

access as per Commission's Regulation during the period under consideration whether availing

power through Open Access or not.

Load within the area of supply of the Licensee and availing power through Open Access whether

from the same Licensee or any other supplier.

Load outside the area of supply of the Licensee but availing power through Open Access from the

Licensee under consideration.

Regulated Business: The retail supply of electricity to (i) consumers within the area of supply of the licensee and not eligible to

avail Open Access as per Commission’s Regulations (ii) consumers within the area of supply of the licensee and eligible to avail

Open Access but not exercising their option of availing open access.

Non-regulated Business: The retail supply of electricity to consumers availing supply under open access from the licensee either

forming the part of area of supply of the licensee or outside the area of supply of the licensee.

Direct Non-Tariff Income: Non-Tariff income which is directly identifiable with a consumer category.

Apportioned Non-Tariff Income: Non-Tariff income which is not directly identifiable with a consumer category. It shall be

appropriately apportioned across various consumer categories.

Modification/addition of Slabs/sub categories for LT consumers should be carried out in Form 7 for Current Tariff and Form 12 for

Proposed Tariff.See notes in the relevant form for details

Load within the area of supply of the licensees not satisfying the eligibility criteria to avail open access

as per Commission's Regulation during the time period under consideration.

Page 180: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Index sheet

Form 1

Amount( In Rs crores)

Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

1 Transmission Cost Form 1.1 246.51 478.70 693.86 484.01 846.14 931.18

2 SLDC Cost Form 1.2 9.60 19.86 21.05 23.00 24.90 26.56

3 Distribution Cost Form 1.3 1,273.30 1,481.60 2,153.24 2,383.14 2,541.10 2,919.66

4 PGCIL Expenses 128.19 217.12 358.59 521.34 421.02 682.28

5 ULDC Charges 5.90 6.89 4.30 4.32 11.75 12.93

6 Network and SLDC Cost (1+2+3+4+5) 1,663.50 2,204.17 3,231.04 3,415.82 3,844.91 4,572.61

7 Power Purchase / Procurement Cost Form 1.4 7,663.14 12,217.29 13,898.27 15,137.14 14,659.29 16,572.87

8 Interest on Consumer Security Deposits Form 1.5 90.53 122.83 127.61 129.41 138.18 154.10

9 Supply Margin in Retail Supply Business Form 1.6 12.33 12.12 13.13 13.00 12.79 13.05

10 Other Costs, if any Form 1.7 0.00 0.00 43.90 136.10 96.83 116.76

11 Supply Cost (7+8+9+10) 7,765.99 12,352.24 14,082.91 15,415.65 14,907.09 16,856.78

12 Aggregate Revenue Requirement (6+11) 9,429.49 14,556.41 17,313.94 18,831.47 18,752.01 21,429.39

Note:

1 The Revenue Requirement Items are cost borne for supply of power to consumers within the area of supply of the Licensees and not availing supply under Open Access.

2 Transmission Cost refers to the transmission cost borne by the licensee to serve the consumers within the area of the supply and not availing supply under Open Access

3 SLDC cost refers to the SLDC Charges paid to serve the consumers within the area of the supply and not availing supply under Open Access

4 Distribution Cost refers to the distribution cost borne by the licensee to serve the consumers within the area of the supply and not availing supply under Open Access

5 PGCIL and ULDC Expenses to be submitted in this form.

Aggregate Revenue Requirement for Retail Supply Business

Revenue Requirement Item (Rs. Crs.) Details link

For Control Period

Page 181: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.1

Base Year

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO 3050.55 61.03 223.41 1388.45 61.03 101.68Adjustments made by APTransco -78.58

Total 3050.55 144.83 1388.45 101.68 0.00 0.00 0.00 0.00

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term Contracts

((A) + (B)) 3050.55 144.83 1388.45 101.68 0.00 0.00 0.00 0.00

Load Eligible for Open Access

Transmission Cost

Transmission Cost to be segregated between Load not eligible for Open Access, Load eligible for Open Access, Load within the area of supply and availing power under

Open Access as per Section 42 and 49 of E ACT.(Refer to Notes for the relevant definitions.)

1) Loads Eligible for Open Access is as per Section 8.1 of Regulation 2 of 2005 of APERC

See Notes Sheet for Phasing of Open Access in the state of Andhra Pradesh.

2) Provide PGCIL and ULDC charges directly in Form 1.

(A) Long Term and Firm Contracts

Name of Transmission service provider Load not eligible for Open Access

Open Access

Load Eligible for Open Access Availed (within area of supply) Availed ( Outside Area of supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply) Availed ( Outside Area of supply) Name of Transmission service provider Load not eligible for Open Access

Open Access

Page 182: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2014-15 Year 1

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO 4131.55 65.30 323.75 2259.99 65.30 177.09Less : Anantapur & Kurnool for Apr & May -22.14Paid towards Addl. Capacities

Total 4131.55 301.61 2259.99 177.09 0.00 0.00 0.00 0.00

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term Contracts

((A) + (B)) 4131.55 301.61 2259.99 177.09 0.00 0.00 0.00 0.00

(A) Long Term and Firm Contracts

Name of Transmission service provider Load not eligible for Open Access

Open Access

Load Eligible for Open Access Availed (within area of supply) Availed ( Outside Area of supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply) Availed ( Outside Area of supply) Name of Transmission service provider Load not eligible for Open Access

Open Access

Load Eligible for Open Access

Page 183: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2015-16 Year 2

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO 4988.63 76.66 458.91 2121.80 76.66 195.19Add: towards difference in actuals against

approved (Transmission charges) 38.40Add: towards difference in actuals against

approved (SLDC Charges) 1.36

Total 4988.63 498.67 2121.80 195.19 0.00 0.00 0.00 0.00

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term Contracts

((A) + (B)) 4988.63 498.67 2121.80 195.19 0.00 0.00 0.00 0.00

Load Eligible for Open Access

(A) Long Term and Firm Contracts

Name of Transmission service provider Load not eligible for Open Access

Open Access

Load Eligible for Open Access

Name of Transmission service provider Load not eligible for Open Access

Open Access

Availed ( Outside Area of supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply) Availed ( Outside Area of supply)

Availed (within area of supply)

Page 184: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2016-17 Year 3

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO 5160.04 91.36 565.71 2380.76 91.36 261.01Adjustment : APERC Order dated 7-11-15 in

OP.No. 13 of 2015 true up of Transmission

business for 2nd Control period -178.36Reimbursement of Wheeling charges to licensee

from APTransco -164.34

Total 5160.04 223.01 2380.76 261.01 0.00 0.00 0.00 0.00

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term Contracts

((A) + (B)) 5160.04 223.01 2380.76 261.01 0.00 0.00 0.00 0.00

(A) Long Term and Firm Contracts

Load Eligible for Open Access Availed (within area of supply) Availed ( Outside Area of supply)

(B) Short Term and Temporary Contracts

Name of Transmission service provider Load not eligible for Open Access

Open Access

Availed (within area of supply) Availed ( Outside Area of supply) Name of Transmission service provider Load not eligible for Open Access

Open Access

Load Eligible for Open Access

Page 185: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2017-18 Year 4

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO 5381.06 95.37 615.83 2499.80 95.37 286.09Low Interest Loans - TRANSCO -36.84Low Capex-TRANSCO -18.94

Total 5381.06 560.05 2499.80 286.09 0.00 0.00 0.00 0.00

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term Contracts

((A) + (B)) 5381.06 560.05 2499.80 286.09 0.00 0.00 0.00 0.00

Load Eligible for Open Access

(A) Long Term and Firm Contracts

Name of Transmission service provider

Load not eligible for Open Access

Open Access

Load Eligible for Open Access

Name of Transmission service provider

Load not eligible for Open Access

Open Access

Availed ( Outside Area of supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply) Availed ( Outside Area of supply)

Availed (within area of supply)

Page 186: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2018-19 Year 5

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO 5591.86 94.44 633.71 2624.79 94.44 297.46

Total 5591.86 633.71 2624.79 297.46 0.00 0.00 0.00 0.00

MWTariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/month)

Cost

(Rs. Crs.)

APTRANSCO

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term Contracts

((A) + (B)) 5591.86 633.71 2624.79 297.46 0.00 0.00 0.00 0.00

(A) Long Term and Firm Contracts

Name of Transmission service provider

Load not eligible for Open Access

Open Access

Load Eligible for Open Access Availed (within area of supply) Availed ( Outside Area of supply)

Load Eligible for Open Access Availed (within area of supply) Availed ( Outside Area of supply)

(B) Short Term and Temporary Contracts

Name of Transmission service provider

Load not eligible for Open Access

Open Access

Page 187: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Index sheet

Form 1.2 SLDC Charges

Base Year

MWTariff

(Rs./MW/year)

Cost

(Rs. Crs.)MW

Tariff

(Rs./MW/

month)

Cost

(Rs. Crs.)

Load not eligible for Open Access 3050.55 4755.66 1.45 3050.55 1406.08 5.15 6.60

Open Access

Load Eligible for Open Access 1388.45 4755.66 0.66 1388.45 1406.08 2.34 3.00

Availed (within area of supply) 0.00 0.00 0.00

Availed ( Outside Area of supply) 0.00 0.00 0.00

Year 1 2014-15

MWTariff

(Rs./MW/year)

Cost

(Rs. Crs.)MW

Tariff

(Rs./MW/

month)

Cost

(Rs. Crs.)

Load not eligible for Open Access 4131.55 2535.65 1.05 4131.55 2378.11 11.79 12.84

Open Access

Load Eligible for Open Access 2259.99 2535.65 0.57 2259.99 2378.11 6.45 7.02

Availed (within area of supply) 0.00 0.00 0.00

Availed ( Outside Area of supply) 0.00 0.00 0.00

Year 2 2015-16

MWTariff

(Rs./MW/year)

Cost

(Rs. Crs.)MW

Tariff

(Rs./MW/

month)

Cost

(Rs. Crs.)

Load not eligible for Open Access 4988.63 3092.78 1.54 4988.63 2209.34 13.23 14.77

Open Access

Load Eligible for Open Access 2121.80 3092.78 0.66 2121.80 2209.34 5.63 6.28

Availed (within area of supply) 0.00 0.00 0.00

Availed ( Outside Area of supply) 0.00 0.00 0.00

SLDC Charges to be segregated between Load not eligible for Open Access, Load eligible for Open Access, Load within the area of supply and availing power

under Open Access as per Section 42 and 49 of E ACT.(Refer to Notes for the relevant definitions.)

Loads Eligible for Open Access is as per Section 8.1 of Regulation 2 of 2005 of APERC

See Notes Sheet for Phasing of Open Access in the state of Andhra Pradesh.

Annual Fee Charges

Total Cost

(Rs. Crs.)Remarks

Annual Fee Charges

Total Cost

(Rs. Crs.)Remarks

Annual Fee Charges

Total Cost

(Rs. Crs.)Remarks

Page 188: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Year 3 2016-17

MWTariff

(Rs./MW/year)

Cost

(Rs. Crs.)MW

Tariff

(Rs./MW/

month)

Cost

(Rs. Crs.)

Load not eligible for Open Access 5160.04 3533.18 1.82 5160.04 2247.62 13.92 15.74

Open Access

Load Eligible for Open Access 2380.76 3533.18 0.84 2380.76 2247.62 6.42 7.26

Availed (within area of supply) 0.00 0.00 0.00

Availed ( Outside Area of supply) 0.00 0.00 0.00

Year 4 2017-18

MWTariff

(Rs./MW/year)

Cost

(Rs. Crs.)MW

Tariff

(Rs./MW/

month)

Cost

(Rs. Crs.)

Load not eligible for Open Access 5381.06 3995.39 2.15 5381.06 2300.31 14.85 17.00

Open Access

Load Eligible for Open Access 2499.80 3995.39 1.00 2499.80 2300.31 6.90 7.90

Availed (within area of supply) 0.00 0.00 0.00

Availed ( Outside Area of supply) 0.00 0.00 0.00

Year 5 2018-19

MWTariff

(Rs./MW/year)

Cost

(Rs. Crs.)MW

Tariff

(Rs./MW/

month)

Cost

(Rs. Crs.)

Load not eligible for Open Access 5591.86 4214.27 2.36 5591.86 2342.73 15.72 18.08Open Access

Load Eligible for Open Access 2624.79 4214.27 1.11 2624.79 2342.73 7.38 8.49Availed (within area of supply) 0.00 0.00 0.00

Availed ( Outside Area of supply) 0.00 0.00 0.00

Annual Fee Charges

Total Cost

(Rs. Crs.)Remarks

Annual Fee Charges

Total Cost

(Rs. Crs.)Remarks

Annual Fee Charges

Total Cost

(Rs. Crs.)Remarks

Page 189: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.3

Base Year

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

SPDCL ( 33 KV) 857.57 27.38 29.66 0.00SPDCL ( 11 KV) 104.70 180.53 23.88 0.00SPDCL LT 363.66 0.00 0.00Total ( Non Eligible OA Cost) 3617.05 1219.76Total 3617.05 1219.76 962.27 53.54 0.00 0.00 0.00 0.00

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term

Contracts ((A) + (B))3617.05 1219.76 962.27 53.54 0.00 0.00 0.00 0.00

Distribution Cost

(A) Long Term and Firm Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access Availed (within area of supply)Availed ( Outside Area of

supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply)Availed ( Outside Area of

supply) Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access

Distribution Cost to be segregated between Load not eligible for Open Access, Load eligible for Open Access, Load within the area of supply and availing power under Open Access as per Section 42

and 49 of E ACT.(Refer to Notes for the relevant definitions.)

Loads Eligible for Open Access is as per Section 8.1 of Regulation 2 of 2005 of APERC, See Notes Sheet for Phasing of Open Access in the state of Andhra Pradesh.

Page 190: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Yr 1 2014-15

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

SPDCL ( 33 KV) 848.87 7.66 8.21SPDCL ( 11 KV) 96.32 164.61 20.03SPDCL LT 0.00 0.00 0.00

Total ( Non Eligible OA Cost) 5446.35 1453.35Total 5446.35 1453.35 945.20 28.24 0.00 0.00 0.00 0.00

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total Long term + Short term

Contracts ((A) + (B))5446.35 1453.35 945.20 28.24 0.00 0.00 0.00 0.00

Yr-2 2015-16

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

SPDCL ( 33 KV) 10.35 794.92 15.51 15.57SPDCL ( 11 KV) 1047.64 76.45 220.82 21.32SPDCL LT 3707.26 0.00 0.00 0.00Total ( Non Eligible OA Cost) 0.00 #REF!Total 4765.25 2116.34 871.37 36.90 0.00 0.00 0.00 0.00

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term

Contracts ((A) + (B))4765.25 2116.34 871.37 36.90 0.00 0.00 0.00 0.00

(A) Long Term and Firm Contracts

Remarks

Load Eligible for Open Access

(A) Long Term and Firm Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Availed ( Outside Area of

supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply)Availed ( Outside Area of

supply)

Availed (within area of supply)

Remarks

Load Eligible for Open Access Availed (within area of supply)Availed ( Outside Area of

supply)

(B) Short Term and Temporary Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Availed (within area of supply)Availed ( Outside Area of

supply) Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access

Page 191: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Yr 3 2016-17

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

SPDCL ( 33 KV) 29.90 831.92 15.39 16.17SPDCL ( 11 KV) 1109.68 93.76 227.14 26.90SPDCL LT 3966.40 0.00 0.00 0.00Total ( Non Eligible OA Cost) 0.00 #REF!

Total 5105.98 2340.07 925.68 43.07 0.00 0.00 0.00 0.00

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term

Contracts ((A) + (B))5105.98 2340.07 925.68 43.07 0.00 0.00 0.00 0.00

Yr 4 2017-18

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

SPDCL ( 33 KV) 48.43 873.51 15.11 16.67SPDCL ( 11 KV) 1189.26 98.45 232.26 28.88SPDCL LT 4243.86 0.00 0.00 0.00Total ( Non Eligible OA Cost) 0.00 0.00

Low Capex-DISCOMS 0.00

Total 5481.55 2495.55 971.97 45.56 0.00 0.00 0.00 0.00

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term

Contracts ((A) + (B))5481.55 2495.55 971.97 45.56 0.00 0.00 0.00 0.00

Remarks

Load Eligible for Open Access

(A) Long Term and Firm Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access Availed (within area of supply)

Open Access

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Availed ( Outside Area of

supply)

(B) Short Term and Temporary Contracts

Availed (within area of supply)Availed ( Outside Area of

supply)

(A) Long Term and Firm Contracts

Remarks

Load Eligible for Open Access Availed (within area of supply)Availed ( Outside Area of

supply)

(B) Short Term and Temporary Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access

Name of Distribution service

provider

Load not eligible for Open

Access

Availed (within area of supply)Availed ( Outside Area of

supply)

Page 192: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Yr 5 2018-19

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

SPDCL ( 33 KV) 69.80 15.17 1.34 917.19 15.17 17.58SPDCL ( 11 KV) 1273.53 240.68 387.17 103.37 240.68 31.43SPDCL LT 4540.81 0.00 2482.15 0.00 0.00 0.00Total ( Non Eligible OA Cost) 0.00 0.00 0.00 0.00 0.00 0.00

Total 5884.14 2870.66 1020.56 49.00 0.00 0.00 0.00 0.00

MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/mont

h)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)MW

Tariff

(Rs./kW/

month)

Cost

(Rs. Crs.)

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Long term + Short term

Contracts ((A) + (B))5884.14 2870.66 1020.56 49.00 0.00 0.00 0.00

(A) Long Term and Firm Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Availed (within area of supply)Availed ( Outside Area of

supply)

Remarks

Load Eligible for Open Access Availed (within area of supply)Availed ( Outside Area of

supply)

(B) Short Term and Temporary Contracts

Name of Distribution service

provider

Load not eligible for Open

Access

Open Access

Remarks

Load Eligible for Open Access

Page 193: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.4 Power Purchase and Procurement Cost (For Regulated Business#)

#Refer to Notes for the definition

Base Year

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 513.98 513.98 49.38 170.68 0.00 0.00 0.00 220.06 0.96 0.00 0.00 0.00 3.32 4.28

RTPP Stage-II 613.81 613.81 90.77 203.83 0.00 0.00 0.00 294.60 1.48 0.00 0.00 0.00 3.32 4.80

RTPP Stage-III 285.72 285.72 68.85 94.88 0.00 0.00 0.00 163.73 2.41 0.00 0.00 0.00 3.32 5.73

KTPS A 847.19 847.19 80.89 208.55 0.00 0.00 0.00 289.45 0.95 0.00 0.00 0.00 2.46 3.42

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 721.71 721.71 48.76 141.43 0.00 0.00 0.00 190.19 0.68 0.00 0.00 0.00 1.96 2.64

KTPS Stage VI 721.22 721.22 127.32 193.09 0.00 0.00 0.00 320.41 1.77 0.00 0.00 0.00 2.68 4.44

RTS B 89.24 89.24 11.75 21.91 0.00 0.00 0.00 33.65 1.32 0.00 0.00 0.00 2.45 3.77

NTS 0.00 0.00 0.00 0.00 3.56 0.00 0.00 3.56 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 654.35 654.35 147.43 137.48 0.00 0.00 0.00 284.91 2.25 0.00 0.00 0.00 2.10 4.35

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Dr.NTTPS Unit I,II,III 1813.24 1813.24 107.26 512.13 0.00 0.00 0.00 619.40 0.59 0.00 0.00 0.00 2.82 3.42

Dr.NTTPS IV 801.59 801.59 112.11 242.92 0.00 0.00 0.00 355.04 1.40 0.00 0.00 0.00 3.03 4.43

TOTAL THERMAL 0.00 0.00 7062.05 7062.05 844.53 1926.90 3.56 0.00 0.00 2774.99 1.20 0.01 0.00 0.00 2.73 3.93

MACHKUND PH AP Share 69.20 69.20 3.38 0.00 0.00 0.00 0.00 3.38 0.49 0.00 0.00 0.00 0.00 0.49

TUNGBHADRA PH AP Share 34.09 34.09 2.32 0.00 0.00 0.00 0.00 2.32 0.68 0.00 0.00 0.00 0.00 0.68

USL 100.53 100.53 9.92 0.00 0.00 0.00 0.00 9.92 0.99 0.00 0.00 0.00 0.00 0.99

LSR 277.85 277.85 19.01 0.00 0.00 0.00 0.00 19.01 0.68 0.00 0.00 0.00 0.00 0.68

DONKARAYI 25.68 25.68 1.03 0.00 0.00 0.00 0.00 1.03 0.40 0.00 0.00 0.00 0.00 0.40

SSLM 328.90 328.90 34.84 0.00 0.00 0.00 0.00 34.84 1.06 0.00 0.00 0.00 0.00 1.06

NSPH 297.09 297.09 30.03 0.00 0.00 0.00 0.00 30.03 1.01 0.00 0.00 0.00 0.00 1.01

NSRCPH 46.64 46.64 3.31 0.00 0.00 0.00 0.00 3.31 0.71 0.00 0.00 0.00 0.00 0.71

NSLCPH 21.60 21.60 2.21 0.00 0.00 0.00 0.00 2.21 1.02 0.00 0.00 0.00 0.00 1.02

POCHAMPAD PH 14.30 14.30 2.82 0.00 0.00 0.00 0.00 2.82 1.97 0.00 0.00 0.00 0.00 1.97

NIZAMSAGAR PH 2.80 2.80 1.04 0.00 0.00 0.00 0.00 1.04 3.74 0.00 0.00 0.00 0.00 3.74

PABM 1.06 1.06 2.09 0.00 0.00 0.00 0.00 2.09 19.64 0.00 0.00 0.00 0.00 19.64

MINI HYDRO&OTHERS 2.09 2.09 1.27 0.00 0.00 0.00 0.00 1.27 6.08 0.00 0.00 0.00 0.00 6.08

SINGUR 0.95 0.95 1.90 0.00 0.00 0.00 0.00 1.90 19.85 0.00 0.00 0.00 0.00 19.85

SSLM LCPH 295.12 295.12 111.84 0.00 0.00 0.00 0.00 111.84 3.79 0.00 0.00 0.00 0.00 3.79

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 59.34 59.34 27.57 0.00 0.00 0.00 0.00 27.57 4.65 0.00 0.00 0.00 0.00 4.65

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH Stage 2 4.28 4.28 1.11 0.00 0.00 0.00 0.00 1.11 2.59 0.00 0.00 0.00 0.00 2.59

TOTAL APGENCO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1581.51 1581.51 255.68 0.00 0.00 0.00 0.00 255.68 1.62 0.00 0.00 0.00 0.00 1.62

TOTAL APGENCO 0.00 0.00 8643.56 8643.56 1100.21 1926.90 3.56 0.00 0.00 3030.67 1.27 0.00 0.00 0.00 2.23 3.51

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 1058.01 1058.01 65.05 222.80 0.00 0.00 0.00 287.84 0.61 0.00 0.00 0.00 2.11 2.72

NTPC (SR) Stage III 295.11 295.11 27.74 79.22 0.00 0.00 0.00 106.96 0.94 0.00 0.00 0.00 2.68 3.62

Total NTPC(SR) 0.00 0.00 1353.12 1353.12 92.79 302.01 0.00 0.00 0.00 394.81 0.69 0.00 0.00 0.00 2.23 2.92

NTPC (ER)

Farakka 4.56 4.56 1.58 2.47 0.00 0.00 0.00 4.05 3.47 0.00 0.00 0.00 5.42 8.89

Kahalgaon 2.03 2.03 0.14 1.20 0.00 0.00 0.00 1.35 0.71 0.00 0.00 0.00 5.94 6.65

Talcher - Stage 1 2.94 2.94 0.28 0.48 0.00 0.00 0.00 0.76 0.94 0.00 0.00 0.00 1.64 2.58

Talcher Stage 2 606.84 606.84 52.38 92.50 0.00 0.00 0.00 144.88 0.86 0.00 0.00 0.00 1.52 2.39

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 616.36 616.36 54.38 96.65 0.00 0.00 0.00 151.04 0.88 0.00 0.00 0.00 1.57 2.45

Total NTPC 0.00 0.00 1969.47 1969.47 147.18 398.67 0.00 0.00 0.00 545.84 0.75 0.00 0.00 0.00 2.02 2.77

NLC TS-II

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Page 194: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Stage-I 182.51 182.51 13.42 39.28 0.00 0.00 0.00 52.70 0.74 0.00 0.00 0.00 2.15 2.89

Stage-II 319.17 319.17 22.69 65.55 0.00 0.00 0.00 88.24 0.71 0.00 0.00 0.00 2.05 2.76

Total NLC 0.00 0.00 501.69 501.69 36.11 104.83 0.00 0.00 0.00 140.94 0.72 0.00 0.00 0.00 2.09 2.81

NPC

NPC-MAPS 38.96 38.96 0.00 8.08 0.00 0.00 0.00 8.08 0.00 0.00 0.00 0.00 2.07 2.07

NPC-Kaiga unit I 208.15 208.15 1.18 62.81 0.00 0.00 0.00 63.99 0.06 0.00 0.00 0.00 3.02 3.07

NPC-Kaiga unit II 211.21 211.21 -0.30 63.73 0.00 0.00 0.00 63.43 -0.01 0.00 0.00 0.00 3.02 3.00

Total NPC 0.00 0.00 458.33 458.33 0.88 134.62 0.00 0.00 0.00 135.50 0.02 0.00 0.00 0.00 2.94 2.96

NTPC - Simhadri

NTPC Simhadri Stage I 1598.22 1598.22 189.87 380.40 0.00 0.00 0.00 570.27 1.19 0.00 0.00 0.00 2.38 3.57

NTPC Simhadri Stage II 710.92 710.92 123.87 170.97 0.00 0.00 0.00 294.84 1.74 0.00 0.00 0.00 2.40 4.15

Total NTPC- Simhadri 0.00 0.00 2309.14 2309.14 313.74 551.36 0.00 0.00 0.00 865.11 1.36 0.00 0.00 0.00 2.39 3.75

CGS - New

Vallur Thermal Power Plant 116.77 116.77 24.95 24.95 0.00 0.00 0.00 49.89 2.14 0.00 0.00 0.00 2.14 4.27

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 5355.40 5355.40 522.86 1214.42 0.00 0.00 0.00 1737.28 0.98 0.00 0.00 0.00 2.27 3.24

APGPCL

APGPCL I - Allocated capacity 13.36 13.36 0.55 3.47 0.00 0.00 0.00 4.02 0.41 0.00 0.00 0.00 2.60 3.01

APGPCL I - Unutilised capacity 1.84 1.84 0.00 0.47 0.00 0.00 0.00 0.47 0.00 0.00 0.00 0.00 2.56 2.56

APGPCL II - Allocated capacity 35.90 35.90 1.04 9.96 0.00 0.00 0.00 11.00 0.29 0.00 0.00 0.00 2.77 3.06

APGPCL II - Unutilised capacity 1.43 1.43 0.00 0.40 0.00 0.00 0.00 0.40 0.00 0.00 0.00 0.00 2.83 2.83

Total APGPCL 0.00 0.00 52.53 52.53 1.58 14.31 0.00 0.00 0.00 15.89 0.30 0.00 0.00 0.00 2.72 3.02

IPPS

GVK 212.57 212.57 23.27 46.59 0.00 0.00 0.00 69.85 1.09 0.00 0.00 0.00 2.19 3.29

Spectrum 234.67 234.67 23.01 58.13 0.00 0.00 0.00 81.14 0.98 0.00 0.00 0.00 2.48 3.46

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 313.73 313.73 49.37 70.74 0.00 0.00 0.00 120.11 1.57 0.00 0.00 0.00 2.25 3.83

BSES 102.55 102.55 10.34 16.79 0.00 0.00 0.00 27.13 1.01 0.00 0.00 0.00 1.64 2.65

GVK Extension 0.32 0.32 0.06 -6.48 0.00 0.00 0.00 -6.42 1.81 0.00 0.00 0.00 -200.63 -198.82

Vemagiri 34.13 34.13 3.64 25.49 0.00 0.00 0.00 29.12 1.07 0.00 0.00 0.00 7.47 8.53

Gautami 0.00 0.00 2.97 -12.77 0.00 0.00 0.00 -9.80 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 1.00 1.00 0.11 -35.59 0.00 0.00 0.00 -35.48 1.10 0.00 0.00 0.00 -355.35 -354.25

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 898.97 898.97 112.76 162.89 0.00 0.00 0.00 275.66 1.25 0.00 0.00 0.00 1.81 3.07

NCE

NCE - Bio-Mass 151.39 151.39 263.18 263.18 0.00 0.00 0.00 0.00 17.38 17.38

NCE - Bagasse 83.33 83.33 35.78 35.78 0.00 0.00 0.00 0.00 4.29 4.29

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 177.22 177.22 63.51 63.51 0.00 0.00 0.00 0.00 3.58 3.58

NCE - Mini Hydel 37.95 37.95 48.51 48.51 0.00 0.00 0.00 0.00 12.78 12.78

NCE - NCL Energy Ltd 4.55 4.55 0.00 0.82 0.00 0.00 0.00 0.82 0.00 0.00 0.00 0.00 1.80 1.80

NCE-Others 4.80 4.80 -185.65 -185.65 0.00 0.00 0.00 0.00 -386.57 -386.57

TOTAL NCE 0.00 0.00 459.25 459.25 0.00 226.14 0.00 0.00 0.00 226.14 0.00 0.00 0.00 0.00 4.92 4.92

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

other short term sources 3184.88 3184.88 0.00 1749.05 0.00 0.00 0.00 1749.05 0.00 0.00 0.00 0.00 5.49 5.49

Reactive Charges 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.00 0.00 0.00

Open Access on Short Term Trading 108.77 108.77 0.00 59.73 0.00 0.00 0.00 59.73 0.00 0.00 0.00 0.00 5.49 5.49

D to D PP Cost (Inter Discom) 1282.92 1282.92 0.00 704.55 0.00 0.00 0.00 704.55 0.00 0.00 0.00 0.00 5.49 5.49

KSK Mahanadi (MT) 363.53 363.53 55.72 95.72 0.00 0.00 0.00 151.44 1.53 0.00 0.00 0.00 2.63 4.17

D Trade cost (IST) 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.50 0.00 0.00 0.00 0.00 0.00 0.00

#REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 195: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

TOTAL OTHERS 0.00 0.00 4940.09 4940.09 55.72 2611.81 0.00 0.00 0.00 2667.53 0.11 0.00 0.00 0.00 5.29 5.40

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI Underdrawal -69.33 -69.33 0.00 -16.28 0.00 0.00 0.00 -16.28 0.00 0.00 0.00 0.00 2.35 2.35

IST -23.11 -23.11 0.00 -7.85 0.00 0.00 0.00 -7.85 0.00 0.00 0.00 0.00 3.40 3.40

Adv. Income Tax for the FY 2013-14 0.00 0.00 0.00 0.00 0.00 26.26 0.00 26.26 0.00 0.00 0.00 0.00 0.00 0.00

Fixed Cost True up for Thermal stations 0.00 0.00 -22.70 0.00 0.00 0.00 0.00 -22.70 0.00 0.00 0.00 0.00 0.00 0.00

Differential Tariff as per APERC Order for the

FY 2013-2014 0.00 0.00 -50.54 0.00 0.00 0.00 0.00 -50.54 0.00 0.00 0.00 0.00 0.00 0.00

Differential Tariff as per APERC Order for the

FY 2009-2013 0.00 0.00 -218.91 0.00 0.00 0.00 0.00 -218.91 0.00 0.00 0.00 0.00 0.00 0.00

FCA of 1st Qtr, 2nd Qtr, 3rd Qtr and 4th Qtr

station wise included for the FY 2013-14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 -92.44 -92.44 -292.16 -24.13 0.00 26.26 0.00 -290.02 31.60 0.00 -2.84 0.00 2.61 31.37

TOTAL (From All Sources) 0.00 0.00 20257.36 20257.36 1500.98 6132.34 3.56 26.26 0.00 7663.14 0.74 0.00 0.01 0.00 3.03 3.78

Note:

1) Details of NCE Plant wise to be filled in Form 1.4 [i,ii,iii,iv]

2) Hydro cost break up details to be provided based on appropriate methodology. In case it is not possible to segregate the cost

Station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 196: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

2014-15

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

APGENCO

Thermal

VTPS I 2354.77 2354.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 994.55 994.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 700.67 700.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 786.15 786.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 368.88 368.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 1125.88 1125.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 878.33 878.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 47.07 47.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 1115.15 1115.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 1069.71 1069.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Damodaram Sanjeevaiah Thermal power plant - I 0.00 0.00 392.10 392.10 0.00 0.00 0.00 0.00 0.00 0.00

AP & TS GENCO Stations Thermal Power Cost (14-15) 0.00 0.00 1097.71 2723.28 3820.99 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 9441.17 9441.17 1097.71 3115.39 0.00 0.00 0.00 4213.09 1.16 0.00 0.00 0.00 3.30 4.46

MACHKUND PH AP Share 136.53 136.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 81.26 81.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 255.06 255.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 608.57 608.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 65.16 65.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 404.11 404.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 104.73 104.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 2.53 2.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 1.04 1.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.74 0.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 6.93 6.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 189.19 189.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 320.81 320.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 62.50 62.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

AP & TS GENCO Stations Hydro Power Cost (14-15) 0.41 0.41 126.30 126.30 3099.97 0.00 0.00 0.00 0.00 3099.97

0.18 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 2240.73 2240.73 126.30 0.00 0.00 0.00 0.00 126.30 0.56 0.00 0.00 0.00 0.00 0.56

TOTAL APGENCO 0.00 0.00 11681.90 11681.90 1224.01 3115.39 0.00 0.00 0.00 4339.40 1.05 0.00 0.00 0.00 2.67 3.71

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 1471.66 1471.66 76.01 359.55 435.56 0.52 0.00 0.00 0.00 2.44 2.96

NTPC (SR) Stage III 421.84 421.84 33.89 95.75 129.64 0.80 0.00 0.00 0.00 2.27 3.07

Total NTPC(SR) 0.00 0.00 1893.50 1893.50 109.90 455.30 0.00 0.00 0.00 565.20 0.58 0.00 0.00 0.00 2.40 2.98

NTPC (ER)

Farakka 0.00 0.00 -0.03 -0.03 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 844.87 844.87 66.83 129.43 196.26 0.79 0.00 0.00 0.00 1.53 2.32

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 844.87 844.87 66.80 129.43 0.00 0.00 0.00 196.22 0.79 0.00 0.00 0.00 1.53 2.32

Total NTPC 0.00 0.00 2738.37 2738.37 176.70 584.72 0.00 0.00 0.00 761.42 0.65 0.00 0.00 0.00 2.14 2.78

NLC TS-II

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Page 197: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Stage-I 233.94 233.94 53.37 19.87 73.24 2.28 0.00 0.00 0.00 0.85 3.13

Stage-II 412.01 412.01 90.84 34.91 125.75 2.20 0.00 0.00 0.00 0.85 3.05

Total NLC 0.00 0.00 645.96 645.96 144.21 54.78 0.00 0.00 0.00 198.99 2.23 0.00 0.00 0.00 0.85 3.08

NPC

NPC-MAPS 65.08 65.08 13.50 13.50 0.00 0.00 0.00 0.00 2.07 2.07

NPC-Kaiga unit I 512.20 512.20 172.02 172.02 0.00 0.00 0.00 0.00 3.36 3.36

NPC-Kaiga unit II 44.18 44.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 621.45 621.45 0.00 185.52 0.00 0.00 0.00 185.52 0.00 0.00 0.00 0.00 2.99 2.99

NTPC - Simhadri

NTPC Simhadri Stage I 2078.23 2078.23 211.47 551.19 762.65 1.02 0.00 0.00 0.00 2.65 3.67

NTPC Simhadri Stage II 932.13 932.13 152.80 238.38 391.18 1.64 0.00 0.00 0.00 2.56 4.20

Total NTPC- Simhadri 0.00 0.00 3010.36 3010.36 364.27 789.57 0.00 0.00 0.00 1153.84 1.21 0.00 0.00 0.00 2.62 3.83

CGS - New

Vallur Thermal Power Plant 233.97 233.97 42.38 45.16 87.54 1.81 0.00 0.00 0.00 1.93 3.74

Bundled power under JVNSM 0.00 0.00 23.89 23.89 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC KUDANKULAM 0.00 0.00 24.45 24.45 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 7250.12 7250.12 727.56 1708.10 0.00 0.00 0.00 2435.65 1.00 0.00 0.00 0.00 2.36 3.36

APGPCL

APGPCL I - Allocated capacity 9.31 9.31 0.61 2.82 3.43 0.66 0.00 0.00 0.00 3.03 3.69

APGPCL I - Unutilised capacity 0.40 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 31.50 31.50 1.50 8.60 10.10 0.48 0.00 0.00 0.00 2.73 3.21

APGPCL II - Unutilised capacity 0.31 0.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 41.51 41.51 2.12 11.42 0.00 0.00 0.00 13.54 0.51 0.00 0.00 0.00 2.75 3.26

IPPS

GVK 155.32 155.32 24.64 50.87 75.51 1.59 0.00 0.00 0.00 3.28 4.86

Spectrum 146.48 146.48 35.36 49.04 84.40 2.41 0.00 0.00 0.00 3.35 5.76

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 162.71 162.71 35.32 103.25 138.57 2.17 0.00 0.00 0.00 6.35 8.52

BSES 47.82 47.82 1.38 12.22 13.61 0.29 0.00 0.00 0.00 2.56 2.85

GVK Extension 0.00 0.00 7.36 0.00 7.36 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 512.33 512.33 104.06 215.39 0.00 0.00 0.00 319.45 2.03 0.00 0.00 0.00 4.20 6.24

NCE

NCE - Bio-Mass 73.53 73.53 130.05 130.05 17.69 0.00 0.00 0.00 #REF! 17.69

NCE - Bagasse 23.02 23.02 35.93 35.93 15.61 0.00 0.00 0.00 #REF! 15.61

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 974.74 974.74 519.89 519.89 5.33 0.00 0.00 0.00 #REF! 5.33

NCE - Mini Hydel 36.50 36.50 15.79 15.79 4.33 0.00 0.00 0.00 #REF! 4.33

NCE - NCL Energy Ltd 15.10 15.10 2.56 2.56 0.00 0.00 0.00 0.00 1.69 1.69

NCE-Others 8.01 8.01 22.15 22.15 0.00 0.00 0.00 0.00 27.65 27.65

TOTAL NCE 0.00 0.00 1130.90 1130.90 0.00 726.37 0.00 0.00 0.00 726.37 0.00 0.00 0.00 0.00 6.42 6.42

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Sponge Iron 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Heavy Water Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kesoram 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 198: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Corporate Power (MT) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahandi 828.50 828.50 131.41 217.53 348.93 1.59 0.00 0.00 0.00 2.63 4.21

Hinduja 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Thermal Powertech 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 828.50 828.50 131.41 217.53 0.00 0.00 0.00 348.93 1.59 0.00 0.00 0.00 2.63 4.21

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 54.24 54.24 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 6292.59 6292.59 3507.53 3507.53 0.00 0.00 0.00 0.00 5.57 5.57

Reactive Charges 0.00 0.00 0.64 0.64 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Discom to Discom Cost ( D to D, UI, & D trade) (As per IBSS) 0.00 0.00 471.54 471.54 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 6292.59 6292.59 0.00 4033.96 0.00 0.00 0.00 4033.96 0.00 0.00 0.00 0.00 6.41 6.41

TOTAL (From All Sources) 0.00 0.00 27737.84 27737.84 2189.15 10028.14 0.00 0.00 0.00 12217.29 0.79 0.00 0.00 0.00 3.62 4.40

Note:

1) Details of NCE Plant wise to be filled in Form 1.4 [i,ii,iii,iv]

2) Hydro cost break up details to be provided based on appropriate methodology. In case it is not possible to segregate the cost

Station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 199: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

2015-16

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 2325.92 2325.92 131.09 746.77 877.86 0.56 0.00 0.00 0.00 3.21 3.77

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 824.78 824.78 144.16 246.49 390.65 1.75 0.00 0.00 0.00 2.99 4.74

RTPP I 703.78 703.78 67.60 240.48 308.09 0.96 0.00 0.00 0.00 3.42 4.38

RTPP Stage-II 773.39 773.39 125.28 252.35 377.63 1.62 0.00 0.00 0.00 3.26 4.88

RTPP Stage-III 365.94 365.94 74.81 121.25 196.06 2.04 0.00 0.00 0.00 3.31 5.36

KTPS A 1214.24 1214.24 98.47 299.32 397.79 0.81 0.00 0.00 0.00 2.47 3.28

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 1124.73 1124.73 175.48 288.47 463.95 1.56 0.00 0.00 0.00 2.56 4.13

RTS B 103.60 103.60 11.80 27.15 38.95 1.14 0.00 0.00 0.00 2.62 3.76

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 1056.28 1056.28 176.12 253.46 429.58 1.67 0.00 0.00 0.00 2.40 4.07

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage V (TS) 998.39 998.39 61.54 203.19 264.73 0.62 0.00 0.00 0.00 2.04 2.65

0 3026.52 3026.52 0.00 1076.78 1076.78 0.00 0.00 0.00 0.00 3.56 3.56

TOTAL THERMAL 0.00 0.00 12517.56 12517.56 1066.36 3755.71 0.00 0.00 0.00 4822.07 0.85 0.00 0.00 0.00 3.00 3.85

MACHKUND PH AP Share 138.16 138.16 3.87 0.00 3.87 0.28 0.00 0.00 0.00 0.00 0.28

TUNGBHADRA PH AP Share 52.77 52.77 3.87 0.00 3.87 0.73 0.00 0.00 0.00 0.00 0.73

USL 327.61 327.61 89.76 0.00 89.76 2.74 0.00 0.00 0.00 0.00 2.74

LSR 794.90 794.90 17.71 0.00 17.71 0.22 0.00 0.00 0.00 0.00 0.22

DONKARAYI 75.95 75.95 1.08 0.00 1.08 0.14 0.00 0.00 0.00 0.00 0.14

SSLM 130.40 130.40 130.99 0.00 130.99 10.05 0.00 0.00 0.00 0.00 10.05

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.29 -0.29 12.39 0.00 12.39 -422.80 0.00 0.00 0.00 0.00 -422.80

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 4.40 4.40 7.15 0.00 7.15 16.24 0.00 0.00 0.00 0.00 16.24

MINI HYDRO&OTHERS 1.29 1.29 0.48 0.00 0.48 3.74 0.00 0.00 0.00 0.00 3.74

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Differential Fixed cost 14-15 0.00 0.00 94.02 0.00 94.02 0.00 0.00 0.00 0.00 0.00 0.00

Interest on Pension Bonds 14-15 & 15-16 (AP) & Differential Cost between Scheduled Energy & Energy as per RATIO 14-15 89.44 89.44 0.00 579.49 579.49 0.00 0.00 0.00 0.00 64.79 64.79

TOTAL HYDRO 0.00 0.00 1614.64 1614.64 361.33 579.49 0.00 0.00 0.00 940.82 2.24 0.00 0.00 0.00 3.59 5.83

TOTAL APGENCO 0.00 0.00 14132.20 14132.20 1427.69 4335.20 0.00 0.00 0.00 5762.89 1.01 0.00 0.00 0.00 3.07 4.08

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 1404.42 1404.42 72.14 314.33 386.47 0.51 0.00 0.00 0.00 2.24 2.75

NTPC (SR) Stage III 387.55 387.55 33.51 88.38 121.88 0.86 0.00 0.00 0.00 2.28 3.14

Total NTPC(SR) 0.00 0.00 1791.97 1791.97 105.64 402.71 0.00 0.00 0.00 508.35 0.59 0.00 0.00 0.00 2.25 2.84

NTPC (ER)

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 882.41 882.41 66.64 113.96 180.60 0.76 0.00 0.00 0.00 1.29 2.05

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 882.41 882.41 66.64 113.96 0.00 0.00 0.00 180.60 0.76 0.00 0.00 0.00 1.29 2.05

Total NTPC 0.00 0.00 2674.39 2674.39 172.28 516.67 0.00 0.00 0.00 688.95 0.64 0.00 0.00 0.00 1.93 2.58

NLC TS-II

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Page 200: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Stage-I 219.84 219.84 15.07 69.69 84.77 0.69 0.00 0.00 0.00 3.17 3.86

Stage-II 372.08 372.08 24.81 88.18 112.99 0.67 0.00 0.00 0.00 2.37 3.04

Total NLC 0.00 0.00 591.92 591.92 39.89 157.88 0.00 0.00 0.00 197.76 0.67 0.00 0.00 0.00 2.67 3.34

NPC

NPC-MAPS 81.37 81.37 0.00 17.00 17.00 0.00 0.00 0.00 0.00 2.09 2.09

NPC-Kaiga unit I 657.18 657.18 0.00 202.77 202.77 0.00 0.00 0.00 0.00 3.09 3.09

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 738.55 738.55 0.00 219.77 0.00 0.00 0.00 219.77 0.00 0.00 0.00 0.00 2.98 2.98

NTPC - Simhadri

NTPC Simhadri Stage I 2209.07 2209.07 247.85 536.44 784.29 1.12 0.00 0.00 0.00 2.43 3.55

NTPC Simhadri Stage II 1005.30 1005.30 151.89 243.40 395.28 1.51 0.00 0.00 0.00 2.42 3.93

Total NTPC- Simhadri 0.00 0.00 3214.37 3214.37 399.74 779.84 0.00 0.00 0.00 1179.58 1.24 0.00 0.00 0.00 2.43 3.67

CGS - New

Bundled power under JVNSM 189.16 189.16 0.00 53.79 53.79 0.00 0.00 0.00 0.00 2.84 2.84

Vallur Thermal Power Plant 290.82 290.82 47.17 59.46 106.63 1.62 0.00 0.00 0.00 2.04 3.67

Kudigi 66.75 66.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 0.00 0.00 0.00 24.75 24.75 0.00 0.00 0.00 0.00 0.00 0.00

NLC Tamilnadu Power Ltd Stage.1 261.57 261.57 45.96 60.33 106.28 1.76 0.00 0.00 0.00 2.31 4.06

TOTAL CGS 0.00 0.00 8027.51 8027.51 705.04 1872.48 0.00 0.00 0.00 2577.51 0.88 0.00 0.00 0.00 2.33 3.21

APGPCL

APGPCL I - Allocated capacity 13.09 13.09 0.73 4.17 4.90 0.56 0.00 0.00 0.00 3.18 3.74

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 46.26 46.26 1.61 13.23 14.84 0.35 0.00 0.00 0.00 2.86 3.21

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 59.35 59.35 2.34 17.40 0.00 0.00 0.00 19.74 0.39 0.00 0.00 0.00 2.93 3.33

IPPS

GVK 302.04 302.04 69.62 88.71 158.33 2.30 0.00 0.00 0.00 2.94 5.24

Spectrum 186.79 186.79 34.69 65.02 99.70 1.86 0.00 0.00 0.00 3.48 5.34

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 238.87 238.87 47.34 108.64 155.97 1.98 0.00 0.00 0.00 4.55 6.53

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 35.05 35.05 0.00 16.48 16.48 0.00 0.00 0.00 0.00 4.70 4.70

Vemagiri 174.30 174.30 9.00 89.96 98.97 0.52 0.00 0.00 0.00 5.16 5.68

Gautami 31.00 31.00 3.46 20.39 23.85 1.12 0.00 0.00 0.00 6.58 7.69

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 968.07 968.07 164.11 389.18 0.00 0.00 0.00 553.29 1.70 0.00 0.00 0.00 4.02 5.72

NCE

NCE - Bio-Mass 284.37 284.37 0.00 195.13 195.13 0.00 0.00 0.00 0.00 6.86 6.86

NCE - Bagasse 43.59 43.59 0.00 17.95 17.95 0.00 0.00 0.00 0.00 4.12 4.12

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 9.33 9.33 0.00 5.57 5.57 0.00 0.00 0.00 0.00 5.96 5.96

NCE - Wind Power 1751.67 1751.67 0.00 763.16 763.16 0.00 0.00 0.00 0.00 4.36 4.36

NCE - Mini Hydel 34.94 34.94 0.00 9.97 9.97 0.00 0.00 0.00 0.00 2.85 2.85

NCE - NCL Energy Ltd 7.24 7.24 0.00 1.22 1.22 0.00 0.00 0.00 0.00 1.69 1.69

NCE-Others 63.97 63.97 0.00 48.91 48.91 0.00 0.00 0.00 0.00 7.65 7.65

TOTAL NCE 0.00 0.00 2195.11 2195.11 0.00 1041.91 0.00 0.00 0.00 1041.91 0.00 0.00 0.00 0.00 4.75 4.75

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 881.52 881.52 135.78 232.33 368.10 1.54 0.00 0.00 0.00 2.64 4.18

Hinduja (HNPCL) Unit#1 520 MW COD from 10.01.16, Unit# 520 MW COD is 03.07.16 298.45 298.45 0.00 101.05 101.05 0.00 0.00 0.00 0.00 3.39 3.39

Thermal Power Tech (COD from 20.04.2015) 1123.85 1123.85 197.62 200.03 397.65 1.76 0.00 0.00 0.00 1.78 3.54

Page 201: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

RVK Energy Pvt Ltd (IPP upto 30.9.15) 3.83 3.83 0.00 1.72 1.72 0.00 0.00 0.00 0.00 4.50 4.50

GMR Rajahmundry Energy (PSDF Scheme) 419.57 419.57 0.00 180.98 180.98 0.00 0.00 0.00 0.00 4.31 4.31

Lanco Kondapalli Phase-II (PSDF Scheme) 245.08 245.08 0.00 115.19 115.19 0.00 0.00 0.00 0.00 4.70 4.70

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 2972.29 2972.29 333.39 831.30 0.00 0.00 0.00 1164.69 1.12 0.00 0.00 0.00 2.80 3.92

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 97.97 97.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 4788.43 4788.43 0.00 2538.19 2538.19 0.00 0.00 0.00 0.00 5.30 5.30

POSOCO Deviation Charges(UI Charges) 0.00 0.00 0.00 63.47 63.47 0.00 0.00 0.00 0.00 0.00 0.00

Reactive Charges 0.00 0.00 0.00 0.20 0.20 0.00 0.00 0.00 0.00 0.00 0.00

POSOCO SRLDC Fee & Charges 0.00 0.00 0.00 1.36 1.36 0.00 0.00 0.00 0.00 0.00 0.00

POSOCO Congestion Charges 0.00 0.00 0.00 0.64 0.64 0.00 0.00 0.00 0.00 0.00 0.00

NTPC UI Charges -61.79 -61.79 0.00 -6.61 -6.61 0.00 0.00 0.00 0.00 1.07 1.07

Discom to Discom Cost ( D to D, UI, & D trade) (As per IBSS) 0.00 0.00 0.00 180.98 180.98 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 4824.61 4824.61 0.00 2778.24 0.00 0.00 0.00 2778.24 0.00 0.00 0.00 0.00 5.76 5.76

TOTAL (From All Sources) 0.00 0.00 33179.15 33179.15 2632.57 11265.70 0.00 0.00 0.00 13898.27 0.79 0.00 0.00 0.00 3.40 4.19

Note:

1) Details of NCE Plant wise to be filled in Form 1.4 [i,ii,iii,iv]

2) Hydro cost break up details to be provided based on appropriate methodology. In case it is not possible to segregate the cost

Station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 202: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

2016-17

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 1906.58 1906.58 198.83 610.11 0.00 0.00 0.00 808.94 1.04 0.00 0.00 0.00 3.20 4.24

VTPS II 858.75 858.75 139.99 259.34 0.00 0.00 0.00 399.34 1.63 0.00 0.00 0.00 3.02 4.65

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 535.28 535.28 81.13 202.87 0.00 0.00 0.00 284.00 1.52 0.00 0.00 0.00 3.79 5.31

RTPP Stage-II 549.33 549.33 128.81 208.20 0.00 0.00 0.00 337.01 2.34 0.00 0.00 0.00 3.79 6.13

RTPP Stage-III 289.61 289.61 86.34 109.76 0.00 0.00 0.00 196.10 2.98 0.00 0.00 0.00 3.79 6.77

KTPS A 428.35 428.35 33.41 72.39 0.00 0.00 0.00 105.80 0.78 0.00 0.00 0.00 1.69 2.47

KTPS B 398.11 398.11 33.41 67.28 0.00 0.00 0.00 100.69 0.84 0.00 0.00 0.00 1.69 2.53

KTPS C 378.34 378.34 33.41 63.94 0.00 0.00 0.00 97.35 0.88 0.00 0.00 0.00 1.69 2.57

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 990.32 990.32 62.65 153.50 0.00 0.00 0.00 216.15 0.63 0.00 0.00 0.00 1.55 2.18

RTS B 120.35 120.35 12.01 44.11 0.00 0.00 0.00 56.12 1.00 0.00 0.00 0.00 3.67 4.66

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 1167.55 1167.55 179.28 291.89 0.00 0.00 0.00 471.17 1.54 0.00 0.00 0.00 2.50 4.04

Kakatiya Thermal Power Plant Stage II 1203.86 1203.86 178.63 339.49 0.00 0.00 0.00 518.12 1.48 0.00 0.00 0.00 2.82 4.30

Damodaram Sanjeevaiah Thermal power plant - I 2572.61 2572.61 0.00 933.86 0.00 0.00 0.00 933.86 0.00 0.00 0.00 0.00 3.63 3.63

Damodaram Sanjeevaiah Thermal power plant - II 2739.09 2739.09 0.00 994.29 0.00 0.00 0.00 994.29 0.00 0.00 0.00 0.00 3.63 3.63

TOTAL THERMAL 0.00 0.00 14138.12 14138.12 1167.90 4351.02 0.00 0.00 0.00 5518.92 0.83 0.00 0.00 0.00 3.08 3.90

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 184.89 184.89 8.94 0.00 0.00 0.00 0.00 8.94 0.48 0.00 0.00 0.00 0.00 0.48

TUNGBHADRA PH AP Share 37.21 37.21 6.13 0.00 0.00 0.00 0.00 6.13 1.65 0.00 0.00 0.00 0.00 1.65

USL 216.91 216.91 35.80 0.00 0.00 0.00 0.00 35.80 1.65 0.00 0.00 0.00 0.00 1.65

LSR 532.85 532.85 68.61 0.00 0.00 0.00 0.00 68.61 1.29 0.00 0.00 0.00 0.00 1.29

DONKARAYI 39.48 39.48 3.73 0.00 0.00 0.00 0.00 3.73 0.94 0.00 0.00 0.00 0.00 0.94

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 3.98 3.98 11.62 0.00 0.00 0.00 0.00 11.62 29.19 0.00 0.00 0.00 0.00 29.19

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 8.30 8.30 6.80 0.00 0.00 0.00 0.00 6.80 8.20 0.00 0.00 0.00 0.00 8.20

MINI HYDRO&OTHERS 1.40 1.40 0.49 0.00 0.00 0.00 0.00 0.49 3.51 0.00 0.00 0.00 0.00 3.51

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srisailam Right Bank Power House (AP) 408.24 408.24 110.19 0.00 0.00 0.00 0.00 110.19 2.70 0.00 0.00 0.00 0.00 2.70

RTPP Stage-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1433.26 1433.26 252.31 0.00 0.00 0.00 0.00 252.31 1.76 0.00 0.00 0.00 0.00 1.76

TOTAL APGENCO 0.00 0.00 15571.38 15571.38 1420.21 4351.02 0.00 0.00 0.00 5771.23 0.91 0.00 0.00 0.00 2.79 3.71

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 1343.65 1343.65 104.62 298.96 0.00 0.00 0.00 403.57 0.78 0.00 0.00 0.00 2.22 3.00

NTPC (SR) Stage III 328.59 328.59 31.69 73.09 0.00 0.00 0.00 104.78 0.96 0.00 0.00 0.00 2.22 3.19

Total NTPC(SR) 0.00 0.00 1672.24 1672.24 136.30 372.05 0.00 0.00 0.00 508.35 0.82 0.00 0.00 0.00 2.22 3.04

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.06 0.00 0.00 0.00 0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 831.75 831.75 73.52 139.34 0.00 0.00 0.00 212.86 0.88 0.00 0.00 0.00 1.68 2.56

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 831.75 831.75 73.59 139.34 0.00 0.00 0.00 212.92 0.88 0.00 0.00 0.00 1.68 2.56

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 0.00 0.00 2503.99 2503.99 209.89 511.38 0.00 0.00 0.00 721.27 0.84 0.00 0.00 0.00 2.04 2.88

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 212.47 212.47 18.25 53.29 0.00 0.00 0.00 71.55 0.86 0.00 0.00 0.00 2.51 3.37

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Page 203: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Stage-II 368.93 368.93 31.84 162.14 0.00 0.00 0.00 193.97 0.86 0.00 0.00 0.00 4.39 5.26

Total NLC 0.00 0.00 581.40 581.40 50.09 215.43 0.00 0.00 0.00 265.52 0.86 0.00 0.00 0.00 3.71 4.57

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 78.08 78.08 0.00 17.11 0.00 0.00 0.00 17.11 0.00 0.00 0.00 0.00 2.19 2.19

NPC-Kaiga unit I 536.35 536.35 0.00 172.79 0.00 0.00 0.00 172.79 0.00 0.00 0.00 0.00 3.22 3.22

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 614.43 614.43 0.00 189.90 0.00 0.00 0.00 189.90 0.00 0.00 0.00 0.00 3.09 3.09

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 2099.42 2099.42 219.98 586.70 0.00 0.00 0.00 806.68 1.05 0.00 0.00 0.00 2.79 3.84

NTPC Simhadri Stage II 881.32 881.32 139.63 245.41 0.00 0.00 0.00 385.04 1.58 0.00 0.00 0.00 2.78 4.37

Total NTPC- Simhadri 0.00 0.00 2980.74 2980.74 359.61 832.11 0.00 0.00 0.00 1191.72 1.21 0.00 0.00 0.00 2.79 4.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 180.49 180.49 0.00 56.53 0.00 0.00 0.00 56.53 0.00 0.00 0.00 0.00 3.13 3.13

Vallur Thermal Power Plant 354.87 354.87 70.88 87.78 0.00 0.00 0.00 158.66 2.00 0.00 0.00 0.00 2.47 4.47

Kudigi 0.00 0.00 -83.92 0.00 0.00 0.00 0.00 -83.92 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 495.43 495.43 86.28 128.54 0.00 0.00 0.00 214.82 1.74 0.00 0.00 0.00 2.59 4.34

NPC KUDANKULAM 119.86 119.86 0.00 51.00 0.00 0.00 0.00 51.00 0.00 0.00 0.00 0.00 4.25 4.25

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 7831.20 7831.20 692.82 2072.68 0.00 0.00 0.00 2765.50 0.88 0.00 0.00 0.00 2.65 3.53

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 12.25 12.25 1.30 3.45 0.00 0.00 0.00 4.75 1.06 0.00 0.00 0.00 2.82 3.88

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 43.37 43.37 2.00 10.22 0.00 0.00 0.00 12.23 0.46 0.00 0.00 0.00 2.36 2.82

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 55.62 55.62 3.31 13.67 0.00 0.00 0.00 16.98 0.59 0.00 0.00 0.00 2.46 3.05

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 17.83 17.83 4.69 4.43 0.00 0.00 0.00 9.12 2.63 0.00 0.00 0.00 2.48 5.11

Spectrum 602.22 602.22 69.22 139.85 0.00 0.00 0.00 209.06 1.15 0.00 0.00 0.00 2.32 3.47

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 549.49 549.49 88.25 161.42 0.00 0.00 0.00 249.66 1.61 0.00 0.00 0.00 2.94 4.54

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 22.36 22.36 0.00 10.39 0.00 0.00 0.00 10.39 0.00 0.00 0.00 0.00 4.64 4.64

Vemagiri 86.68 86.68 0.00 40.26 0.00 0.00 0.00 40.26 0.00 0.00 0.00 0.00 4.65 4.65

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 589.63 589.63 8.83 145.35 0.00 0.00 0.00 154.17 0.15 0.00 0.00 0.00 2.47 2.61

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 1868.21 1868.21 170.98 501.68 0.00 0.00 0.00 672.67 0.92 0.00 0.00 0.00 2.69 3.60

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 280.96 280.96 0.00 118.33 0.00 0.00 0.00 118.33 0.00 0.00 0.00 0.00 4.21 4.21

NCE - Bagasse 38.82 38.82 0.00 17.92 0.00 0.00 0.00 17.92 0.00 0.00 0.00 0.00 4.62 4.62

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 10.32 10.32 0.00 5.98 0.00 0.00 0.00 5.98 0.00 0.00 0.00 0.00 5.80 5.80

NCE - Wind Power 2869.67 2869.67 0.00 1262.48 0.00 0.00 0.00 1262.48 0.00 0.00 0.00 0.00 4.40 4.40

NCE - Mini Hydel 81.86 81.86 0.00 21.59 0.00 0.00 0.00 21.59 0.00 0.00 0.00 0.00 2.64 2.64

NCE - NCL Energy Ltd 1.80 1.80 0.00 0.32 0.00 0.00 0.00 0.32 0.00 0.00 0.00 0.00 1.81 1.81

NCE-Others 1162.07 1162.07 0.00 693.63 0.00 0.00 0.00 693.63 0.00 0.00 0.00 0.00 5.97 5.97

TOTAL NCE 0.00 0.00 4445.50 4445.50 0.00 2120.26 0.00 0.00 0.00 2120.26 0.00 0.00 0.00 0.00 4.77 4.77

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 1074.36 1074.36 197.69 239.30 0.00 0.00 0.00 436.99 1.84 0.00 0.00 0.00 2.23 4.07

Hinduja 2139.13 2139.13 0.00 795.92 0.00 0.00 0.00 795.92 0.00 0.00 0.00 0.00 3.72 3.72

Thermal Power Tech 1079.13 1079.13 198.01 198.03 0.00 0.00 0.00 396.03 1.83 0.00 0.00 0.00 1.84 3.67

1000MW DBFO 310.84 310.84 0.00 144.39 0.00 0.00 0.00 144.39 0.00 0.00 0.00 0.00 4.65 4.65

TOTAL OTHERS 0.00 0.00 5023.79 5023.79 395.70 1573.24 0.00 0.00 0.00 1968.93 0.79 0.00 0.00 0.00 3.13 3.92

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 3.52 0.00 0.00 0.00 3.52 0.00 0.00 0.00 0.00 0.00 0.00

Page 204: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.36 0.00 0.00 0.00 0.36 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 2.66 0.00 0.00 0.00 0.00 2.66 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 4.32 0.00 0.00 0.00 0.00 4.32 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 308.65 0.00 0.00 0.00 0.00 308.65 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 630.03 0.00 0.00 0.00 0.00 630.03 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 215.42 0.00 0.00 0.00 0.00 215.42 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 20.34 0.00 0.00 0.00 0.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00

D-D Purchases/Sales 112.57 112.57 0.00 51.05 0.00 0.00 0.00 51.05 0.00 0.00 0.00 0.00 4.53 4.53

1009.54 1009.54 0.00 472.41 0.00 0.00 0.00 472.41 0.00 0.00 0.00 0.00 4.68 4.68

-1090.82 -1090.82 0.00 92.65 0.00 0.00 0.00 92.65 0.00 0.00 0.00 0.00 -0.85 -0.85

0.00 0.00 65.09 0.00 0.00 0.00 0.00 65.09 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 1.22 0.00 0.00 0.00 1.22 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 -141.14 0.00 0.00 0.00 0.00 -141.14 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 94.97 0.00 0.00 0.00 0.00 94.97 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 31.29 31.29 1200.35 621.21 0.00 0.00 0.00 1821.57 383.66 0.00 0.00 0.00 198.55 582.21

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 0.00 0.00 34826.99 34826.99 3883.37 11253.77 0.00 0.00 0.00 15137.14 1.12 0.00 0.00 0.00 3.23 4.35

Note:

1) Details of NCE Plant wise to be filled in Form 1.4 [i,ii,iii,iv]

2) Hydro cost break up details to be provided based on appropriate methodology. In case it is not possible to segregate the cost

Station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 205: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

2017-18

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 1346.34 1346.34 132.11 328.12 0.00 0.00 67.21 527.44 0.98 0.00 0.00 0.50 2.44 3.92

VTPS II 1346.34 1346.34 132.11 328.12 0.00 0.00 67.21 527.44 0.98 0.00 0.00 0.50 2.44 3.92

VTPS III 1346.34 1346.34 132.11 328.12 0.00 0.00 67.21 527.44 0.98 0.00 0.00 0.50 2.44 3.92

VTPS IV 1555.81 1555.81 268.72 359.03 0.00 0.00 80.02 707.76 1.73 0.00 0.00 0.51 2.31 4.55

RTPP I 1327.98 1327.98 159.72 355.57 0.00 0.00 67.21 582.50 1.20 0.00 0.00 0.51 2.68 4.39

RTPP Stage-II 1383.07 1383.07 243.83 371.01 0.00 0.00 67.21 682.06 1.76 0.00 0.00 0.49 2.68 4.93

RTPP Stage-III 414.93 414.93 162.95 111.86 0.00 0.00 33.61 308.42 3.93 0.00 0.00 0.81 2.70 7.43

KTPS A 88.23 88.23 9.09 24.09 0.00 0.00 0.00 33.18 1.03 0.00 0.00 0.00 2.73 3.76

KTPS B 90.92 90.92 9.09 24.82 0.00 0.00 0.00 33.91 1.00 0.00 0.00 0.00 2.73 3.73

KTPS C 85.96 85.96 9.09 23.47 0.00 0.00 0.00 32.56 1.06 0.00 0.00 0.00 2.73 3.79

KTPS D 220.18 220.18 13.39 44.48 0.00 0.00 0.00 57.86 0.61 0.00 0.00 0.00 2.02 2.63

KTPS Stage VI 234.74 234.74 32.21 47.42 0.00 0.00 0.00 79.63 1.37 0.00 0.00 0.00 2.02 3.39

RTS B 25.71 25.71 2.99 7.97 0.00 0.00 0.00 10.96 1.17 0.00 0.00 0.00 3.10 4.27

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 235.60 235.60 32.19 49.95 0.00 0.00 0.00 82.14 1.37 0.00 0.00 0.00 2.12 3.49

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 264.21 0.77 2.01 0.00 267.00 0.00 0.00 0.00 0.00 0.00 0.00

Damodaram Sanjeevaiah Thermal power

plant 1651.00 1619.93 0.00 588.03 0.00 0.00 0.00 588.03 0.00 0.00 0.00 0.00 3.63 3.63

KTPS Stage V (TS) 1405.27 1242.66 0.00 451.09 0.00 0.00 0.00 451.09 0.00 0.00 0.00 0.00 3.63 3.63

TOTAL THERMAL 0.00 0.00 12758.43 12564.75 1339.60 3707.33 0.77 2.01 449.70 5499.41 1.07 0.00 0.00 0.36 2.95 4.38

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 185.13 185.13 18.04 0.00 0.00 0.00 0.00 18.04 0.97 0.00 0.00 0.00 0.00 0.97

TUNGBHADRA PH AP Share 19.82 19.82 12.37 0.00 0.00 0.00 0.00 12.37 6.24 0.00 0.00 0.00 0.00 6.24

USL 204.23 204.23 36.72 0.00 0.00 0.00 0.00 36.72 1.80 0.00 0.00 0.00 0.00 1.80

LSR 502.24 502.24 70.38 0.00 0.00 0.00 0.00 70.38 1.40 0.00 0.00 0.00 0.00 1.40

DONKARAYI 53.14 53.14 3.82 0.00 0.00 0.00 0.00 3.82 0.72 0.00 0.00 0.00 0.00 0.72

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.15 -0.15 11.66 0.00 0.00 0.00 0.00 11.66 -776.04 0.00 0.00 0.00 0.00 -776.04

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.09 -0.09 6.86 0.00 0.00 0.00 0.00 6.86 -742.81 0.00 0.00 0.00 0.00 -742.81

MINI HYDRO&OTHERS 1.50 1.50 0.51 0.00 0.00 0.00 0.00 0.51 3.37 0.00 0.00 0.00 0.00 3.37

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House -0.03 -0.03 35.55 0.00 0.00 0.00 0.00 35.55 ####### 0.00 0.00 0.00 0.00 -11221.71

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 72.25 72.25 111.02 0.00 0.00 0.00 0.00 111.02 15.37 0.00 0.00 0.00 0.00 15.37

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1038.04 1038.04 306.94 0.00 0.00 0.00 0.00 306.94 2.96 0.00 0.00 0.00 0.00 2.96

TOTAL APGENCO 0.00 0.00 13796.47 13602.79 1646.54 3707.33 0.77 2.01 449.70 5806.35 1.21 0.00 0.00 0.33 2.73 4.27

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 1195.37 1195.37 80.68 270.08 0.00 0.00 0.30 351.05 0.67 0.00 0.00 0.00 2.26 2.94

NTPC (SR) Stage III 294.23 294.23 22.00 64.72 0.00 0.00 0.15 86.87 0.75 0.00 0.00 0.01 2.20 2.95

Total NTPC(SR) 0.00 0.00 1489.60 1489.60 102.68 334.80 0.00 0.00 0.44 437.92 0.69 0.00 0.00 0.00 2.25 2.94

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 794.28 794.28 52.78 112.37 0.00 0.00 3.20 168.36 0.66 0.00 0.00 0.04 1.41 2.12

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 794.28 794.28 52.78 112.37 0.00 0.00 3.20 168.36 0.66 0.00 0.00 0.04 1.41 2.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 0.00 0.00 2283.88 2283.88 155.46 447.17 0.00 0.00 3.65 606.28 0.68 0.00 0.00 0.02 1.96 2.65

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Page 206: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 162.49 162.49 13.52 46.97 0.00 0.00 0.10 60.59 0.83 0.00 0.00 0.01 2.89 3.73

Stage-II 291.23 291.23 23.56 83.94 0.00 0.00 0.15 107.66 0.81 0.00 0.00 0.01 2.88 3.70

Total NLC 0.00 0.00 453.72 453.72 37.09 130.92 0.00 0.00 0.25 168.25 0.82 0.00 0.00 0.01 2.89 3.71

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 74.54 74.54 0.00 16.19 0.00 0.00 0.20 16.38 0.00 0.00 0.00 0.03 2.17 2.20

NPC-Kaiga unit I 283.35 283.35 0.00 88.89 0.00 0.00 0.20 89.08 0.00 0.00 0.00 0.01 3.14 3.14

NPC-Kaiga unit II 294.13 294.13 0.00 92.04 0.00 0.00 0.20 92.24 0.00 0.00 0.00 0.01 3.13 3.14

Total NPC 0.00 0.00 652.02 652.02 0.00 197.12 0.00 0.00 0.59 197.71 0.00 0.00 0.00 0.01 3.02 3.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 1934.31 1934.31 194.40 504.48 0.00 0.00 2.71 701.59 1.00 0.00 0.00 0.01 2.61 3.63

NTPC Simhadri Stage II 753.60 753.60 127.94 196.77 0.00 0.00 1.77 326.49 1.70 0.00 0.00 0.02 2.61 4.33

Total NTPC- Simhadri 0.00 0.00 2687.91 2687.91 322.34 701.25 0.00 0.00 4.49 1028.08 1.20 0.00 0.00 0.02 2.61 3.82

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 174.40 174.40 0.00 59.46 0.00 0.00 0.00 59.46 0.00 0.00 0.00 0.00 3.41 3.41

Vallur Thermal Power Plant 443.49 443.49 71.65 111.17 0.00 0.00 0.54 183.36 1.62 0.00 0.00 0.01 2.51 4.13

Kudigi 227.96 227.96 41.48 80.41 0.00 0.00 0.89 122.78 1.82 0.00 0.00 0.04 3.53 5.39

Tuticorin 516.47 516.47 87.63 143.29 0.00 0.00 0.25 231.16 1.70 0.00 0.00 0.00 2.77 4.48

NPC KUDANKULAM 1478.03 1478.03 0.00 493.40 0.00 0.00 0.00 493.40 0.00 0.00 0.00 0.00 3.34 3.34

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 8917.88 8917.88 715.65 2364.18 0.00 0.00 10.65 3090.48 0.80 0.00 0.00 0.01 2.65 3.47

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 23.44 23.44 0.89 5.60 0.00 0.00 0.00 6.49 0.38 0.00 0.00 0.00 2.39 2.77

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 82.24 82.24 3.52 17.62 0.00 0.00 0.00 21.13 0.43 0.00 0.00 0.00 2.14 2.57

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 105.68 105.68 4.40 23.22 0.00 0.00 0.00 27.62 0.42 0.00 0.00 0.00 2.20 2.61

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 651.74 651.74 55.93 152.68 0.00 0.00 0.00 208.61 0.86 0.00 0.00 0.00 2.34 3.20

Spectrum 275.20 275.20 2.13 87.14 0.00 0.00 0.00 89.27 0.08 0.00 0.00 0.00 3.17 3.24

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 424.21 424.21 2.40 136.92 0.00 0.00 0.00 139.32 0.06 0.00 0.00 0.00 3.23 3.28

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 1351.16 1351.16 60.46 376.74 0.00 0.00 0.00 437.20 0.45 0.00 0.00 0.00 2.79 3.24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 204.87 204.87 0.00 123.86 0.00 0.00 0.00 123.86 0.00 0.00 0.00 0.00 6.05 6.05

NCE - Bagasse 47.83 47.83 0.00 19.82 0.00 0.00 0.00 19.82 0.00 0.00 0.00 0.00 4.14 4.14

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 15.81 15.81 0.00 9.14 0.00 0.00 0.00 9.14 0.00 0.00 0.00 0.00 5.79 5.79

NCE - Wind Power 5109.71 5109.71 0.00 2273.03 0.00 0.00 0.00 2273.03 0.00 0.00 0.00 0.00 4.45 4.45

NCE - Mini Hydel 56.78 56.78 0.00 14.59 0.00 0.00 0.00 14.59 0.00 0.00 0.00 0.00 2.57 2.57

NCE - NCL Energy Ltd 7.96 7.96 0.00 1.44 0.00 0.00 0.00 1.44 0.00 0.00 0.00 0.00 1.81 1.81

NCE-Others 2439.25 2439.25 0.00 1240.62 0.00 0.00 0.00 1240.62 0.00 0.00 0.00 0.00 5.09 5.09

TOTAL NCE 0.00 0.00 7882.20 7882.20 0.00 3682.52 0.00 0.00 0.00 3682.52 0.00 0.00 0.00 0.00 4.67 4.67

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 1681.77 1681.77 233.46 386.81 0.00 0.00 0.00 620.27 1.39 0.00 0.00 0.00 2.30 3.69

Hinduja 2285.27 2285.27 129.90 743.07 0.00 0.00 0.00 872.97 0.57 0.00 0.00 0.00 3.25 3.82

Thermal Power Tech 1157.46 1157.46 200.76 216.36 0.00 0.00 0.00 417.12 1.73 0.00 0.00 0.00 1.87 3.60

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1000MW DBFO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 207: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

TOTAL OTHERS 0.00 0.00 5124.50 5124.50 564.13 1346.23 0.00 0.00 0.00 1910.36 1.10 0.00 0.00 0.00 2.63 3.73

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 354.96 354.96 0.00 144.83 0.00 0.00 0.00 144.83 0.00 0.00 0.00 0.00 4.08 4.08

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 434.66 434.66 0.00 114.61 0.00 0.00 0.00 114.61 0.00 0.00 0.00 0.00 2.64 2.64

Other Short Term Sources 1160.67 1095.74 0.00 437.24 0.00 0.00 0.00 437.24 0.00 0.00 0.00 0.00 3.99 3.99

D-D Purchases/Sales 772.21 450.83 0.00 168.45 0.00 0.00 0.00 168.45 0.00 0.00 0.00 0.00 3.74 3.74

0 -804.52 -804.52 0.00 -319.71 0.00 0.00 0.00 -319.71 0.00 0.00 0.00 0.00 3.97 3.97

0 0.00 -2060.40 0.00 -840.64 0.00 0.00 0.00 -840.64 0.00 0.00 0.00 0.00 4.08 4.08

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 1917.98 -528.73 0.00 -295.23 0.00 0.00 0.00 -295.23 0.00 0.00 0.00 0.00 5.58 5.58

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 0.00 0.00 39095.86 36455.47 2991.18 11204.98 0.77 2.01 460.35 14659.29 0.82 0.00 0.00 0.13 3.07 4.02

Note:

1) Details of NCE Plant wise to be filled in Form 1.4 [i,ii,iii,iv]

Page 208: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

2018-19

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 1446.15 1446.15 151.77 385.79 0.00 0.65 79.41 617.63 1.05 0.00 0.00 0.55 2.67 4.27

VTPS II 1544.75 1544.75 151.77 412.09 0.00 0.65 79.41 643.93 0.98 0.00 0.00 0.51 2.67 4.17

VTPS III 1544.75 1544.75 151.77 412.09 0.00 0.65 79.41 643.93 0.98 0.00 0.00 0.51 2.67 4.17

VTPS IV 1998.32 1998.32 291.10 481.64 0.00 0.78 94.54 868.06 1.46 0.00 0.00 0.47 2.41 4.34

RTPP I 1541.07 1541.07 181.24 484.12 0.00 0.65 79.41 745.43 1.18 0.00 0.00 0.52 3.14 4.84

RTPP Stage-II 1541.07 1509.24 265.73 474.13 0.00 0.65 79.41 819.92 1.76 0.00 0.00 0.53 3.14 5.43

RTPP Stage-III 770.53 770.53 177.00 242.06 0.00 0.33 39.71 459.09 2.30 0.00 0.00 0.52 3.14 5.96

KTPS A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 3034.40 3034.40 309.51 791.98 0.00 0.00 0.00 1101.49 1.02 0.00 0.00 0.00 2.61 3.63

Kakatiya Thermal Power Plant Stage II 3028.41 3028.41 308.90 790.41 0.00 0.00 0.00 1099.31 1.02 0.00 0.00 0.00 2.61 3.63

Damodaram Sanjeevaiah Thermal power

plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1596.18 1596.18 175.58 501.44 0.00 0.00 0.00 677.02 1.10 0.00 0.00 0.00 3.14 4.24

TOTAL THERMAL 0.00 0.00 18045.63 18013.81 2164.37 4975.76 0.00 4.36 531.32 7675.81 1.20 0.00 0.00 0.29 2.76 4.26

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 214.10 214.10 20.96 0.00 0.00 0.00 0.00 20.96 0.98 0.00 0.00 0.00 0.00 0.98

TUNGBHADRA PH AP Share 49.35 49.35 14.38 0.00 0.00 0.00 0.00 14.38 2.91 0.00 0.00 0.00 0.00 2.91

USL 225.17 225.17 37.76 0.00 0.00 0.00 0.00 37.76 1.68 0.00 0.00 0.00 0.00 1.68

LSR 569.42 569.42 72.38 0.00 0.00 0.00 0.00 72.38 1.27 0.00 0.00 0.00 0.00 1.27

DONKARAYI 43.60 43.60 3.93 0.00 0.00 0.00 0.00 3.93 0.90 0.00 0.00 0.00 0.00 0.90

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 54.01 54.01 11.73 0.00 0.00 0.00 0.00 11.73 2.17 0.00 0.00 0.00 0.00 2.17

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 3.76 3.76 6.93 0.00 0.00 0.00 0.00 6.93 18.44 0.00 0.00 0.00 0.00 18.44

MINI HYDRO&OTHERS 1.72 1.72 0.51 0.00 0.00 0.00 0.00 0.51 2.98 0.00 0.00 0.00 0.00 2.98

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 67.03 67.03 31.72 0.00 0.00 0.00 0.00 31.72 4.73 0.00 0.00 0.00 0.00 4.73

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

415.19 415.19 112.09 0.00 0.00 0.00 0.00 112.09 2.70 0.00 0.00 0.00 0.00 2.70

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1643.36 1643.36 312.41 0.00 0.00 0.00 0.00 312.41 1.90 0.00 0.00 0.00 0.00 1.90

TOTAL APGENCO 0.00 0.00 19688.99 19657.16 2476.78 4975.76 0.00 4.36 531.32 7988.22 1.26 0.00 0.00 0.27 2.53 4.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 900.56 900.56 84.55 196.65 0.00 0.00 0.00 281.20 0.94 0.00 0.00 0.00 2.18 3.12

NTPC (SR) Stage III 210.53 210.53 22.57 45.32 0.00 0.00 0.00 67.89 1.07 0.00 0.00 0.00 2.15 3.22

Total NTPC(SR) 0.00 0.00 1111.08 1111.08 107.12 241.96 0.00 0.00 0.00 349.09 0.96 0.00 0.00 0.00 2.18 3.14

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 0.00 667.96 54.74 93.07 0.00 0.00 0.00 147.81 0.82 0.00 0.00 0.00 1.39 2.21

Others 667.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 667.96 667.96 54.74 93.07 0.00 0.00 0.00 147.81 0.82 0.00 0.00 0.00 1.39 2.21

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 0.00 0.00 1779.04 1779.04 161.86 335.03 0.00 0.00 0.00 496.89 0.91 0.00 0.00 0.00 1.88 2.79

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Page 209: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 129.79 129.79 14.42 37.35 0.00 0.00 0.00 51.77 1.11 0.00 0.00 0.00 2.88 3.99

Stage-II 242.20 242.20 27.05 69.71 0.00 0.00 0.00 96.75 1.12 0.00 0.00 0.00 2.88 3.99

Total NLC 0.00 0.00 371.98 371.98 41.47 107.06 0.00 0.00 0.00 148.53 1.11 0.00 0.00 0.00 2.88 3.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 65.76 65.76 0.00 14.63 0.00 0.00 0.00 14.63 0.00 0.00 0.00 0.00 2.23 2.23

NPC-Kaiga unit I 233.09 233.09 0.00 75.15 0.00 0.00 0.00 75.15 0.00 0.00 0.00 0.00 3.22 3.22

NPC-Kaiga unit II 240.49 240.49 0.00 77.53 0.00 0.00 0.00 77.53 0.00 0.00 0.00 0.00 3.22 3.22

Total NPC 0.00 0.00 539.34 539.34 0.00 167.31 0.00 0.00 0.00 167.31 0.00 0.00 0.00 0.00 3.10 3.10

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 1648.49 1648.49 203.44 441.47 0.00 0.00 0.00 644.91 1.23 0.00 0.00 0.00 2.68 3.91

NTPC Simhadri Stage II 649.83 649.83 132.71 174.02 0.00 0.00 0.00 306.74 2.04 0.00 0.00 0.00 2.68 4.72

Total NTPC- Simhadri 0.00 0.00 2298.33 2298.33 336.15 615.49 0.00 0.00 0.00 951.64 1.46 0.00 0.00 0.00 2.68 4.14

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit IV 168.81 168.81 0.00 60.38 0.00 0.00 0.00 60.38 0.00 0.00 0.00 0.00 3.58 3.58

Bundled power under JVNSM 422.95 422.95 92.58 93.23 0.00 0.00 0.00 185.81 2.19 0.00 0.00 0.00 2.20 4.39

Vallur Thermal Power Plant 460.13 379.03 106.38 135.78 0.00 0.00 0.00 242.17 2.81 0.00 0.00 0.00 3.58 6.39

456.99 456.99 100.52 109.20 0.00 0.00 0.00 209.72 2.20 0.00 0.00 0.00 2.39 4.59

2113.59 2113.59 0.00 740.68 0.00 0.00 0.00 740.68 0.00 0.00 0.00 0.00 3.50 3.50

45.09 45.09 9.83 11.20 0.00 0.00 0.00 21.03 2.18 0.00 0.00 0.00 2.49 4.66

TOTAL CGS 0.00 0.00 8656.26 8575.15 848.79 2375.37 0.00 0.00 0.00 3224.16 0.99 0.00 0.00 0.00 2.77 3.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 12.78 12.78 0.63 3.08 0.00 0.00 0.00 3.70 0.49 0.00 0.00 0.00 2.41 2.90

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 40.74 40.74 1.75 8.77 0.00 0.00 0.00 10.52 0.43 0.00 0.00 0.00 2.15 2.58

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 53.51 53.51 2.38 11.85 0.00 0.00 0.00 14.23 0.44 0.00 0.00 0.00 2.21 2.66

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 515.09 515.09 75.85 126.71 0.00 0.00 0.00 202.56 1.47 0.00 0.00 0.00 2.46 3.93

Spectrum 458.43 458.43 74.53 109.57 0.00 0.00 0.00 184.09 1.63 0.00 0.00 0.00 2.39 4.02

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 808.61 808.61 85.45 182.75 0.00 0.00 0.00 268.20 1.06 0.00 0.00 0.00 2.26 3.32

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 1782.14 1782.14 235.83 419.02 0.00 0.00 0.00 654.86 1.32 0.00 0.00 0.00 2.35 3.67

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 230.07 230.07 0.00 161.03 0.00 0.00 0.00 161.03 0.00 0.00 0.00 0.00 7.00 7.00

NCE - Bagasse 49.38 49.38 0.00 23.74 0.00 0.00 0.00 23.74 0.00 0.00 0.00 0.00 4.81 4.81

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 20.01 20.01 0.00 13.70 0.00 0.00 0.00 13.70 0.00 0.00 0.00 0.00 6.85 6.85

NCE - Wind Power 5132.90 5132.90 0.00 2425.55 0.00 0.00 0.00 2425.55 0.00 0.00 0.00 0.00 4.73 4.73

NCE - Mini Hydel 69.05 69.05 0.00 18.76 0.00 0.00 0.00 18.76 0.00 0.00 0.00 0.00 2.72 2.72

NCE - NCL Energy Ltd 8.94 8.94 0.00 1.61 0.00 0.00 0.00 1.61 0.00 0.00 0.00 0.00 1.81 1.81

NCE-Others 2497.97 2497.97 0.00 1352.88 0.00 0.00 0.00 1352.88 0.00 0.00 0.00 0.00 5.42 5.42

TOTAL NCE 0.00 0.00 8008.32 8008.32 0.00 3997.27 0.00 0.00 0.00 3997.27 0.00 0.00 0.00 0.00 4.99 4.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Corporate Power (MT) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 1643.36 1643.36 293.67 427.27 0.00 0.00 0.00 720.95 1.79 0.00 0.00 0.00 2.60 4.39

Page 210: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant CapacityDISCOM's

shareDISCOM's share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

Availability and Dispatch (MU) Cost (Rs. Crs.)Unit Cost

(Rs. / kWh)

Hinduja 1199.63 1199.63 197.24 234.84 4.42 0.00 0.00 436.50 1.64 0.04 0.00 0.00 1.96 3.64

RLNG based IPP's 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 2842.99 2842.99 490.91 662.11 4.42 0.00 0.00 1157.44 1.73 0.02 0.00 0.00 2.33 4.07

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 532.45 439.74 0.00 179.41 0.00 0.00 0.00 179.41 0.00 0.00 0.00 0.00 4.08 4.08

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 434.66 434.66 0.00 114.61 0.00 0.00 0.00 114.61 0.00 0.00 0.00 0.00 2.64 2.64

Other Short Term Sources 262.94 237.28 0.00 96.81 0.00 0.00 0.00 96.81 0.00 0.00 0.00 0.00 4.08 4.08

Pool Transaction (Purchases) 0.00 416.80 0.00 170.05 0.00 0.00 0.00 170.05 0.00 0.00 0.00 0.00 4.08 4.08

0.00 -2169.23 0.00 -733.59 0.00 0.00 0.00 -733.59 0.00 0.00 0.00 0.00 3.38 3.38

0.00 -712.24 0.00 -290.60 0.00 0.00 0.00 -290.60 0.00 0.00 0.00 0.00 4.08 4.08

Bi-lateral Purchases( PTC etc.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pool Transaction (Purchases) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pool Transaction ( Sales) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 1230.04 -1353.00 0.00 -463.30 0.00 0.00 0.00 -463.30 0.00 0.00 0.00 0.00 3.42 3.42

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 0.00 0.00 42262.25 39566.29 4054.69 11978.08 4.42 4.36 531.32 16572.87 1.02 0.00 0.00 0.13 3.03 4.19

Note:

1) Details of NCE Plant wise to be filled in Form 1.4 [i,ii,iii,iv,v,vi]

2) Hydro cost break up details to be provided based on appropriate methodology. In case it is not possible to segregate the cost

Station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 211: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Index sheet

Form 1.4a Power Purchase and Procurement Cost (For Non-regulated Business#)

Base Year

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

APGENCO

Thermal

VTPS I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 513.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 613.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 285.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 847.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 721.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 721.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 89.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 654.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1813.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

801.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 7062.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 69.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 34.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 100.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 277.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 25.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 328.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 297.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 46.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 21.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 14.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 2.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 1.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 2.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 295.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 59.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1581.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL APGENCO 0.00 0.00 8643.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 1058.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) Stage III 295.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(SR) 0.00 0.00 1353.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

# Refer to Notes for the definition

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 212: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NTPC (ER)

Farakka 4.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 2.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 2.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 606.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 616.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 0.00 0.00 1969.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II

Stage-I 182.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-II 319.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NLC 0.00 0.00 501.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC

NPC-MAPS 38.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit I 208.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit II 211.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 458.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri

NTPC Simhadri Stage I 1598.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage II 710.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC- Simhadri 0.00 0.00 2309.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New

116.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 5355.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL

APGPCL I - Allocated capacity 13.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Unutilised capacity 1.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 35.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Unutilised capacity 1.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 52.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS

GVK 212.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Spectrum 234.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 313.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BSES 102.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 34.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 898.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 213: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NCE

NCE - Bio-Mass 151.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bagasse 83.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 177.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Mini Hydel 37.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - NCL Energy Ltd 4.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 0.00 0.00 459.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3184.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 4940.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-69.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-23.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 -92.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 0.00 0.00 20257.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note: Hydro cost break up details need to be provided based on appropriate methodology. In case it is not possible to segregate the cost

station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 214: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

2014-15

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 2354.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 994.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 700.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 786.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 368.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 1125.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 878.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 47.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 1115.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 1069.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 9441.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 136.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 81.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 255.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 608.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 65.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 404.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 104.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 2.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 1.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 6.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 189.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 320.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 62.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 2240.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL APGENCO 0.00 0.00 11681.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 1471.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) Stage III 421.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(SR) 0.00 0.00 1893.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 215: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NTPC (ER)

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 844.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 844.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 0.00 0.00 2738.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II

Stage-I 233.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-II 412.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NLC 0.00 0.00 645.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC

NPC-MAPS 65.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit I 512.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit II 44.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 621.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri

NTPC Simhadri Stage I 2078.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage II 932.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC- Simhadri 0.00 0.00 3010.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New

233.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 7250.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL

APGPCL I - Allocated capacity 9.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Unutilised capacity 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 31.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Unutilised capacity 0.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 41.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS

GVK 155.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Spectrum 146.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 162.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BSES 47.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 512.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 216: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NCE

NCE - Bio-Mass 73.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bagasse 23.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 974.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Mini Hydel 36.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - NCL Energy Ltd 15.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 0.00 0.00 1130.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 828.50 828.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 6292.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 6292.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 0.00 0.00 27737.84 828.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note: Hydro cost break up details need to be provided based on appropriate methodology. In case it is not possible to segregate the cost

station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 217: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

2015-16

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 2325.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 824.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 703.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 773.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 365.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 1214.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 1124.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 103.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 1056.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

998.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3026.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 12517.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 138.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 52.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 327.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 794.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 75.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 130.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 4.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

89.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1614.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL APGENCO 0.00 0.00 14132.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 1404.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) Stage III 387.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(SR) 0.00 0.00 1791.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 218: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NTPC (ER)

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 882.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 882.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 0.00 0.00 2674.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II

Stage-I 219.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-II 372.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NLC 0.00 0.00 591.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC

NPC-MAPS 81.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit I 657.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 738.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri

NTPC Simhadri Stage I 2209.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage II 1005.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC- Simhadri 0.00 0.00 3214.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New

189.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00

290.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00

66.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

261.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 0.00 0.00 8027.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL

APGPCL I - Allocated capacity 13.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 46.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 59.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS

GVK 302.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Spectrum 186.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 238.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 35.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 174.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 968.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 219: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NCE

NCE - Bio-Mass 284.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bagasse 43.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 9.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 1751.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Mini Hydel 34.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - NCL Energy Ltd 7.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 63.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 0.00 0.00 2195.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

881.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00

298.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1123.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00

419.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00

245.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 2972.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 97.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 4788.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-61.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 4824.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 0.00 0.00 33179.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note: Hydro cost break up details need to be provided based on appropriate methodology. In case it is not possible to segregate the cost

station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 220: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Yr 32016-17

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 1906.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 858.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 535.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 549.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 289.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 428.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 398.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 378.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 990.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 120.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 1167.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 1203.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2572.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2739.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 14138.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MACHKUND PH AP Share 184.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 37.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 216.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 532.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 39.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 3.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 8.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 1.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

408.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1433.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL APGENCO 0.00 0.00 15571.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Central Generating Stations 0.00

NTPC 0.00

NTPC (SR) 0.00

NTPC (SR) 1343.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) Stage III 328.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(SR) 0.00 0.00 1672.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 221: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NTPC (ER) 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 831.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 831.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Total NTPC 0.00 0.00 2503.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NLC TS-II 0.00

Stage-I 212.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-II 368.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NLC 0.00 0.00 581.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NPC 0.00

NPC-MAPS 78.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit I 536.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 614.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NTPC - Simhadri 0.00

NTPC Simhadri Stage I 2099.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage II 881.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC- Simhadri 0.00 0.00 2980.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

CGS - New 0.00

180.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00

354.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

495.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

119.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL CGS 0.00 0.00 7831.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

APGPCL 0.00

APGPCL I - Allocated capacity 12.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 43.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 55.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

IPPS 0.00

GVK 17.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Spectrum 602.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 549.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 22.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 86.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

589.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 1868.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 222: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

0.00

0.00

NCE 0.00

NCE - Bio-Mass 280.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bagasse 38.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 10.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 2869.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Mini Hydel 81.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - NCL Energy Ltd 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 1162.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 0.00 0.00 4445.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

OTHERS 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2139.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1079.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

420.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

310.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 5023.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MARKET 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

112.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1009.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-1090.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 31.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL (From All Sources) 0.00 0.00 34826.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note: Hydro cost break up details need to be provided based on appropriate methodology. In case it is not possible to segregate the cost

station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 223: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Yr 42017-18

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 1346.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 1346.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 1346.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 1555.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 1327.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 1383.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 414.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 88.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 90.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 85.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 220.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 234.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 25.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 235.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1651.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1405.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 12758.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MACHKUND PH AP Share 185.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 19.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 204.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 502.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 53.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 1.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House -0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

72.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1038.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL APGENCO 0.00 0.00 13796.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Central Generating Stations 0.00

NTPC 0.00

NTPC (SR) 0.00

NTPC (SR) 1195.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) Stage III 294.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(SR) 0.00 0.00 1489.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 224: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NTPC (ER) 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 794.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 794.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Total NTPC 0.00 0.00 2283.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NLC TS-II 0.00

Stage-I 162.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-II 291.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NLC 0.00 0.00 453.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NPC 0.00

NPC-MAPS 74.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit I 283.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit II 294.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 652.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NTPC - Simhadri 0.00

NTPC Simhadri Stage I 1934.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage II 753.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC- Simhadri 0.00 0.00 2687.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

CGS - New 0.00

174.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

443.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00

227.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

516.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1478.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL CGS 0.00 0.00 8917.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

APGPCL 0.00

APGPCL I - Allocated capacity 23.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 82.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 105.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

IPPS 0.00

GVK 651.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Spectrum 275.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 424.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 1351.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 225: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

0.00

0.00

NCE 0.00

NCE - Bio-Mass 204.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bagasse 47.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 15.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 5109.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Mini Hydel 56.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - NCL Energy Ltd 7.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 2439.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 0.00 0.00 7882.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

OTHERS 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1681.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2285.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1157.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 5124.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MARKET 0.00

PTC 354.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 434.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 1160.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00

772.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-804.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 1917.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL (From All Sources) 0.00 0.00 39095.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note: Hydro cost break up details need to be provided based on appropriate methodology. In case it is not possible to segregate the cost

station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 226: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Yr 52018-19

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Income Tax Others Total Fixed Incentives Income Tax Others Variable Total

APGENCO

Thermal

VTPS I 1446.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 1544.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 1544.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 1998.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 1541.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-II 1541.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-III 770.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 3034.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage II 3028.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1596.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 0.00 0.00 18045.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MACHKUND PH AP Share 214.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TUNGBHADRA PH AP Share 49.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

USL 225.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LSR 569.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DONKARAYI 43.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 54.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 3.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MINI HYDRO&OTHERS 1.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 67.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 0.00 0.00 1228.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL APGENCO 0.00 0.00 19273.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Central Generating Stations 0.00

NTPC 0.00

NTPC (SR) 0.00

NTPC (SR) 900.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) Stage III 210.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(SR) 0.00 0.00 1111.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 227: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

NTPC (ER) 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 667.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 0.00 0.00 667.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

Total NTPC 0.00 0.00 1779.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NLC TS-II 0.00

Stage-I 129.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-II 242.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NLC 0.00 0.00 371.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NPC 0.00

NPC-MAPS 65.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit I 233.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-Kaiga unit II 240.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 0.00 0.00 539.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

NTPC - Simhadri 0.00

NTPC Simhadri Stage I 1648.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage II 649.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC- Simhadri 0.00 0.00 2298.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

CGS - New 0.00

168.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00

422.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00

460.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00

456.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2113.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL CGS 0.00 0.00 8611.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

APGPCL 0.00

APGPCL I - Allocated capacity 12.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 40.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 0.00 0.00 53.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

IPPS 0.00

GVK 515.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Spectrum 458.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 808.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 0.00 0.00 1782.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 228: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Generating Station D Link

Plant Type

Must Run = 1

Others = 2

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incntv Inc. Tax Others Total Fixed Inctv Inc. Tax Others Variable Total

Availability and Dispatch

(MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

0.00

0.00

NCE 0.00

NCE - Bio-Mass 230.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bagasse 49.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 20.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 5132.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Mini Hydel 69.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - NCL Energy Ltd 8.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 2497.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE 0.00 0.00 8008.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

OTHERS 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1643.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1199.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 0.00 0.00 2842.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

MARKET 0.00

PTC 532.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 434.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 262.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 0.00 0.00 1230.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL (From All Sources) 0.00 0.00 41801.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note: Hydro cost break up details need to be provided based on appropriate methodology. In case it is not possible to segregate the cost

station wise, provide the total details in the empty rows in the APGenco Hydro stations section saying ALL APGenco Hydro (Combined)

Page 229: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.4(i) NCE Generation (Base Year)

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Incentives Inc. Tax Others Variable Total

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bio-mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Industrial Waste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL- NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Form 1.4(ii) NCE Generation (2014-15)

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Incentives Inc. Tax Others Variable Total

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bio-mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Industrial Waste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL- NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Unit Cost

(Rs. / kWh)

TYPE Name LocationAvailability and Dispatch (MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Cost (Rs. Crs.)

Plant wise NCE Generation and Cost Details for Base Year. The total should be consistent with values provided in Form 1.4 under NCE.

TYPE Name LocationAvailability and Dispatch (MU)

Page 230: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.4(iii) NCE Generation (2015-16)

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Incentives Inc. Tax Others Variable Total

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bio-mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Industrial Waste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL- NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Form 1.4(iv) NCE Generation (2016-17)

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Incentives Inc. Tax Others Variable Total

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bio-mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Industrial Waste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL- NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Form 1.4(iv) NCE Generation (2017-18)

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Incentives Inc. Tax Others Variable Total

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bio-mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Industrial Waste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL- NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TYPE Name LocationAvailability and Dispatch (MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

TYPE Name LocationAvailability and Dispatch (MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

TYPE Name LocationAvailability and Dispatch (MU) Cost (Rs. Crs.)

Unit Cost

(Rs. / kWh)

Page 231: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.4(iv) NCE Generation (2018-19)

Plant

Capacity

DISCOM's

share

DISCOM's

share

(MW) (%) (MW) Net Availability Dispatch Fixed Variable Incentive Inc. Tax Others Total Fixed Incentives Inc. Tax Others Variable Total

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bio-mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Bagasse 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Industrial Waste 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Wind Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL Mini Hydel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL- NCL Energy Ltd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE-Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL NCE - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Unit Cost

(Rs. / kWh)TYPE Name LocationAvailability and Dispatch (MU) Cost (Rs. Crs.)

Page 232: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.4b Sales to Licensees

Base Year

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores)

Rate at which

power is sold

(Rs/kWh)

Amt received

through sales

(Rs crores)

Remarks

1 State Discoms 0.00 0.00 0.00 0.00

A CPDCL 0.00 0.00 0.00 0.00

B EPDCL 0.00 0.00 0.00 0.00

C NPDCL 0.00 0.00 0.00 0.00

D SPDCL 0.00 0.00 0.00 0.00

2 Other State licensees/Consumers 0.00 0.00 0.00 0.00

A Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00

B UI Sales 0.00 0.00 0.00 0.00

C Pool Transaction ( Sales) 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00

2014-15

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores)

Rate at which

power is sold

(Rs/kWh)

Amt received

through sales

(Rs crores)

Remarks

1 State Discoms 0.00 0.00 0.00 0.00

A CPDCL 0.00 0.00 0.00 0.00

B EPDCL 0.00 0.00 0.00 0.00

C NPDCL 0.00 0.00 0.00 0.00

D SPDCL 0.00 0.00 0.00 0.00

2 Other State licensees/Consumers 0.00 0.00 0.00 0.00

A Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00

B UI Sales 0.00 0.00 0.00 0.00

C Pool Transaction ( Sales) 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00

2015-16

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores)

Rate at which

power is sold

(Rs/kWh)

Amt received

through sales

(Rs crores)

Remarks

1 State Discoms 0.00 0.00 0.00 0.00

A CPDCL 0.00 0.00 0.00 0.00

B EPDCL 0.00 0.00 0.00 0.00

C NPDCL 0.00 0.00 0.00 0.00

D SPDCL 0.00 0.00 0.00 0.00

2 Other State licensees/Consumers 0.00 0.00 0.00 0.00

A Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00

B UI Sales 0.00 0.00 0.00 0.00

C Pool Transaction ( Sales) 0.00 0.00 0.00 0.00

D Inter state sales 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00

Refers to the sales to other licensees/consumers within or outside the state, out of the approved quantum of power for regulated business

Page 233: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2016-17

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores)

Rate at which

power is sold

(Rs/kWh)

Amt received

through sales

(Rs crores)

Remarks

1 State Discoms 0.00 0.00 0.00 0.00

A CPDCL 0.00 0.00 0.00 0.00

B EPDCL 0.00 0.00 0.00 0.00

C NPDCL 0.00 0.00 0.00 0.00

D SPDCL 0.00 0.00 0.00 0.00

2 Other State licensees/Consumers 0.00 0.00 0.00 0.00

A Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00

B UI Sales 0.00 0.00 0.00 0.00

C Pool Transaction ( Sales) 0.00 0.00 0.00 0.00

D Inter state sales 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00 0.00

2017-18

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores)

Rate at which

power is sold

(Rs/kWh)

Amt received

through sales

(Rs crores)

Remarks

1 State Discoms 0.00 0.00 0.00 0.00

A CPDCL 0.00 0.00 0.00 0.00

B EPDCL 0.00 0.00 0.00 0.00

C NPDCL 0.00 0.00 0.00 0.00

D SPDCL 0.00 0.00 0.00 0.00

2 Other State licensees/Consumers 0.00 0.00 0.00 0.00

A Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00

B UI Sales 0.00 0.00 0.00 0.00

C Pool Transaction ( Sales) 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00 0.00

2018-19

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores)

Rate at which

power is sold

(Rs/kWh)

Amt received

through sales

(Rs crores)

Remarks

1 State Discoms 0.00 0.00 0.00 0.00

A CPDCL 0.00 0.00 0.00 0.00

B EPDCL 0.00 0.00 0.00 0.00

C NPDCL 0.00 0.00 0.00 0.00

D SPDCL 0.00 0.00 0.00 0.00

2 Other State licensees/Consumers 0.00 0.00 0.00 0.00

A Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00

B UI Sales 0.00 0.00 0.00 0.00

C Pool Transaction ( Sales) 0.00 0.00 0.00 0.00

Total 0.00 0.00 0.00 0.00

Page 234: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.4c Discom-Discom Purchases

Base yearBase Year

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores) Rate (Rs/kWh) Remarks

1 CPDCL 0.00 0.00 0.00

2 EPDCL 1282.92 704.55 0.00

3 NPDCL 0.00 0.00 0.00

4 SPDCL 0.00 0.00 0.00

Total 1282.92 704.55 5.49

Year 1 2014-15

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores) Rate (Rs/kWh) Remarks

1 CPDCL 0.00 0.00 0.00

2 EPDCL 0.00 0.00 0.00

3 NPDCL 0.00 0.00 0.00

4 SPDCL 0.00 0.00 0.00

Total 0.00 0.00 0.00

Year 2 2015-16

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores) Rate (Rs/kWh) Remarks

1 CPDCL 0.00 0.00 0.00

2 EPDCL 0.00 0.00 0.00

3 NPDCL 0.00 0.00 0.00

4 SPDCL 0.00 0.00 0.00

Total 0.00 0.00 0.00

Year 3 2016-17

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores) Rate (Rs/kWh) Remarks

1 CPDCL 0.00 0.00 0.00

2 EPDCL 0.00 0.00 0.00

3 NPDCL 0.00 0.00 0.00

4 SPDCL 0.00 0.00 0.00

Total 0.00 0.00 0.00

Year 4 2017-18

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores) Rate (Rs/kWh) Remarks

1 CPDCL 0.00 0.00 0.00

2 EPDCL 0.00 0.00 0.00

3 NPDCL 0.00 0.00 0.00

4 SPDCL 0.00 0.00 0.00

Total 0.00 0.00 0.00

Year 5 2018-19

S. No. Discom Name Details link Quantity (MU) Cost (Rs Crores) Rate (Rs/kWh) Remarks

1 CPDCL 0.00 0.00 0.00

2 EPDCL 0.00 0.00 0.00

3 NPDCL 0.00 0.00 0.00

4 SPDCL 0.00 0.00 0.00

Total 0.00 0.00 0.00

Page 235: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Index Sheet

Form 1.5

Amount (In Rs crores)

Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

A Opening Balance 1007.27 1118.07 1365.86 1870.47 2089.71 2331.96

B Additions during the Year 187.05 359.28 694.17 401.50 433.62 468.31

C Deductions during the Year 76.25 111.49 189.56 182.26 191.37 200.94

D Closing Balance 1118.07 1365.86 1870.47 2089.71 2331.96 2599.32

E Average Balance ((A+D)/2) 1062.67 1241.97 1618.17 1980.09 2210.83 2465.64

F Interest @ % p.a. # 8.52 9.89 7.89 6.54 6.25 6.25

G Interest Cost (E*F) 90.53 122.83 127.61 129.41 138.18 154.10

Note: Interest Rate to be entered as a number, e.g. interest rate of 4.56% should be typed as "4.56" in the cells.

Details of Actuals incurred (based on audited Annual Acounts)

I Interest @ % p.a. # 8.52 9.89 7.89 6.54 6.25 6.25

J Interest Cost (E*F) 90.53 122.83 127.61 129.41 138.18 154.10

Interest on Consumer Security Deposits

Revenue Requirement Item (Rs. Crs.) Details link

For Control Period

Page 236: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 1.6 Supply Margin

Amount (In Rs crores)

Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

A Supply Margin Amount 12.33 12.12 13.13 13.00 12.79 13.05

Particulars Details link

For Control Period

Page 237: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Index sheet

Form 1.7

Amount (In Rs crores)

Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

1 Payments to M/s.EESL towards DELP 0 0.00 0.00 13.53 49.27 51.25 37.71

2 Solar pumpsets 0 0.00 0.00 30.37 86.83 20.33 34.80

3 Energy Efficient pump sets 0 0.00 0.00 0.00 0.00 9.75 29.25

4 Towards Electrical accidents compensation 0 0.00 0.00 0.00 0.00 15.50 15.00

Total 0 0.00 0.00 43.90 136.10 96.83 116.76

Other Costs

S.No. ParticularsDetails

link

For Control Period

Page 238: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 2

Cost of Service: Embedded Cost Method

Total Cost

Allocation

(Rs.Crs)

Sales (MU)CoS

(Rs/unit)

LT Category 14869.24 24064.07 6.18

Category I (A&B) - Domestic 6061.87 9168.39 6.61

Category II (A,B & C) - Non-domestic/Commercial 1294.66 1906.11 6.79

Category III (A & B) - Industrial 1569.28 2303.21 6.81

Category IV (A,B &C) - Cottage Industries & Dhobighats 29.38 42.63 6.89

Category V (A, B & C) - Irrigation and Agriculture 5295.66 9761.55 5.43

Category VI (A & B) - Local Bodies, St. Lighting & PWS 539.35 771.31 6.99

Category VII (A & B) - General Purpose 77.90 109.24 7.13

Category VIII (A & B) -Temporary Supply 1.13 1.63 6.96

0.00 0.00 0.00

HT Category at 11 KV 2233.11 3426.04 6.52

HT-I Industry Segregated 983.95 1492.01 6.59

Lights & Fans 34.79 52.79 6.59

Colony consumption 2.70 4.10 6.59

Seasonal Industries 29.96 45.47 6.59

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 183.08 277.81 6.59

HT-I (B) Ferro-Alloys 0.19 0.29 6.59

HT-II - Others 325.72 512.91 6.35

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 62.89 99.04 6.35

HT-III Aviation activity at Airports 26.04 41.00 6.35

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 5.51 8.68 6.35

HT-IV A Govt. Lift Irrigation Schemes 42.35 47.98 8.83

HT-IV A Private Agriculture 169.38 192.48 8.80

HT - IV (B) Composite P.W.S Schemes 44.51 50.58 8.80

HT-VI Townships and Residential Colonies 13.53 22.58 5.99

HT-VII - Green Power 0.00 0.00 0.00

HT - VIII - Temporary Supply 0.06 0.12 5.14

HT- RESCOs 257.23 500.03 5.14

HT I (C): Aquaculture and Animal Husbandry 26.68 40.49 6.59

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 16.53 25.08 6.59

HT II (B): Religious Places 3.58 5.65 6.35

HT II (C): Function Halls/Auditoriums 4.41 6.95 6.35

0.00 0.00 0.00

HT Category at 33 KV 2038.62 3457.55 5.90

HT-I Industry Segregated 1280.31 2265.05 5.65

Lights & Fans 21.34 37.77 5.65

Colony consumption 5.31 9.40 5.65

Seasonal Industries 10.84 19.19 5.65

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 274.04 485.02 5.65

HT-I (B) Ferro-Alloys 141.25 249.99 5.65

HT-II - Others 62.25 99.50 6.26

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 10.29 16.44 6.26

HT-III Aviation activity at Airports 4.54 7.26 6.26

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.99 1.59 6.26

HT-IV A Govt. Lift Irrigation Schemes 0.00 0.00 0.00

HT-IV A Private Agriculture 114.60 125.54 9.13

HT - IV (B) Composite P.W.S Schemes 78.94 86.48 9.13

Consumer Categories

2018-19

Page 239: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Total Cost

Allocation

(Rs.Crs)

Sales (MU)CoS

(Rs/unit)

Consumer Categories

2018-19

HT-VI Townships and Residential Colonies 9.76 14.65 6.66

HT-VII - Green Power 0.00 0.00 0.00

HT - VIII - Temporary Supply 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.03 0.05 5.65

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 6.40 11.33 5.65

HT II (B): Religious Places 16.81 26.85 6.26

HT II (C): Function Halls/Auditoriums 0.91 1.46 6.26

0.00 0.00 0.00

HT Category at 132 KV 2273.43 3837.97 5.92

HT-I Industry Segregated 949.46 1727.09 5.50

Lights & Fans 9.32 16.94 5.50

Colony consumption 7.59 13.79 5.50

Seasonal Industries 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 259.88 472.51 5.50

HT-I (B) Ferro-Alloys 104.81 190.56 5.50

HT-II - Others 15.51 28.91 5.36

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 2.70 5.03 5.36

HT-III Aviation activity at Airports 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-IV A Govt. Lift Irrigation Schemes 0.00 0.00 0.00

HT-IV A Private Agriculture 492.45 661.64 7.44

HT - IV (B) Composite P.W.S Schemes 0.00 0.00 0.00

HT-V Railway Traction 431.72 721.49 5.98

HT-VI Townships and Residential Colonies 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00

HT - VIII - Temporary Supply 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00

0.00 0.00 0.00

Total 21414.39 34785.63 6.16

Page 240: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 3

Base Year

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

LT Category 1036.84 1101.28 1004.41 954.63 1058.54 937.06 856.40 1008.17 1026.89 1102.00 945.32 1150.40 12181.94

Category I (A&B) - Domestic 342.55 403.49 428.38 415.05 394.85 415.79 212.78 415.93 380.97 360.51 336.26 321.58 4428.14

Category II (A,B & C) - Non-domestic/Commercial 83.77 91.04 97.58 94.63 89.45 91.46 30.25 86.40 79.78 79.57 78.31 74.78 977.02

Category III (A & B) - Industrial 89.50 83.92 72.17 69.38 66.10 75.27 2.14 79.44 73.59 81.72 86.34 86.54 866.11

Category IV (A,B &C) - Cottage Industries & Dhobighats 1.89 1.87 1.93 1.86 2.13 2.06 0.02 2.08 1.73 2.06 2.30 1.64 21.58

Category V (A, B & C) - Irrigation and Agriculture 483.30 487.35 370.79 340.56 472.33 318.80 608.52 390.04 458.06 544.11 406.91 632.68 5513.46

Category VI (A & B) - Local Bodies, St. Lighting & PWS 31.28 29.54 29.92 28.66 29.09 29.31 1.74 30.36 28.56 29.27 30.67 29.12 327.53

Category VII (A & B) - General Purpose 4.46 3.85 3.58 4.46 4.57 4.34 0.95 3.91 4.06 4.56 4.45 3.95 47.13

Category VIII (A & B) -Temporary Supply 0.08 0.22 0.05 0.03 0.01 0.02 0.01 0.01 0.14 0.21 0.08 0.11 0.96

HT Category at 11 KV 111.75 142.24 149.59 149.78 132.37 146.39 146.46 131.22 153.96 148.67 152.13 165.62 1730.18

HT-I Industry Segregated 51.87 73.00 79.15 72.30 66.11 75.17 75.96 65.42 79.82 74.37 76.27 85.73 875.16

Lights & Fans 1.82 0.00 0.00 0.04 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.89

Colony consumption 0.14 0.19 0.21 0.15 0.12 0.14 0.14 0.12 0.18 0.00 0.00 0.00 1.40

Seasonal Industries 2.55 2.07 3.06 3.27 1.54 1.67 2.22 3.62 5.26 4.82 4.91 5.97 40.95

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 5.93 7.40 8.13 6.97 7.89 10.67 11.11 9.45 12.09 11.60 12.30 13.60 117.14

HT-I (B) Ferro-Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-II - Others 21.65 26.21 28.60 29.76 26.45 27.37 26.36 23.77 25.25 23.09 22.51 23.12 304.15

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 4.31 5.22 5.41 5.58 4.91 5.04 5.20 4.43 4.89 4.61 4.64 4.52 58.75

HT-III Aviation activity at Airports 0.13 0.38 0.75 0.71 0.58 0.46 1.06 0.86 0.72 0.56 0.55 0.46 7.22

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.09 0.11 0.13 0.10 0.09 0.21 0.14 0.14 0.12 0.11 0.09 1.33

HT -IV A Govt Lift Irrigation 1.91 1.49 0.38 2.18 0.60 1.24 1.71 1.54 2.50 2.84 4.72 5.97 27.09

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0.81 1.89 1.22 6.28 0.54 0.63 0.76 0.47 0.87 0.67 0.86 1.22 16.23

HT-VI Townships and Residential Colonies 1.94 2.30 2.61 2.57 1.81 1.53 1.62 1.72 1.45 1.32 1.24 1.28 21.39

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - VIII - Temporary Supply 0.00 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08

HT- RESCOs 18.67 21.93 19.96 19.84 21.69 22.38 20.11 19.68 20.78 24.67 24.02 23.67 257.40

HT Category at 33 KV 136.03 142.76 146.52 150.41 176.84 190.55 205.50 167.21 201.02 197.22 209.35 212.41 2135.81

HT-I Industry Segregated 113.37 119.81 124.54 125.75 144.83 152.90 165.12 132.30 158.63 157.22 166.37 167.51 1728.35

Lights & Fans 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48

Colony consumption 0.74 0.86 0.87 0.85 0.74 0.90 0.92 0.67 0.71 0.00 0.00 0.00 7.26

Seasonal Industries 3.73 2.64 2.09 1.60 0.73 0.73 0.95 3.23 4.55 4.29 4.42 4.85 33.83

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 9.07 9.66 9.81 11.55 18.57 22.92 24.92 19.40 22.77 22.56 24.24 25.02 220.51

HT-I (B) Ferro-Alloys 2.42 2.94 2.97 3.16 5.13 6.46 7.42 6.57 7.85 6.44 7.35 7.05 65.77

Page 241: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

HT-II - Others 4.81 5.53 5.21 6.22 5.66 5.44 4.98 4.06 5.20 5.15 5.02 4.88 62.18

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.83 0.97 0.93 1.11 1.01 1.00 0.92 0.76 0.87 0.98 0.97 0.92 11.28

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.51 0.27 0.00 0.07 0.09 0.13 0.21 0.16 0.34 0.54 0.93 2.12 5.38

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.06 0.07 0.08 0.09 0.07 0.06 0.06 0.06 0.08 0.05 0.05 0.05 0.77

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 145.58 165.42 148.83 156.44 160.75 169.54 170.79 139.42 160.15 160.14 181.85 217.64 1976.53

HT-I Industry Segregated 81.59 93.34 82.43 88.23 89.20 93.16 95.58 71.72 86.01 89.63 103.95 132.19 1107.02

Lights & Fans 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50

Colony consumption 0.66 0.81 0.77 0.64 0.59 0.62 0.68 0.54 0.50 0.00 0.00 0.00 5.81

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 5.30 7.41 7.04 7.79 9.77 11.99 12.27 8.74 10.85 9.76 12.37 16.55 119.84

HT-I (B) Ferro-Alloys 5.14 5.52 4.85 5.80 8.29 9.15 8.63 7.78 7.94 7.59 7.17 8.91 86.78

HT-II - Others 0.41 0.52 0.55 0.63 0.67 0.76 0.87 0.79 0.84 1.03 0.89 0.89 8.85

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.08 0.09 0.10 0.11 0.12 0.13 0.16 0.15 0.15 0.18 0.16 0.16 1.58

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 51.92 57.71 53.09 53.23 52.11 53.73 52.61 49.69 53.86 51.95 57.31 58.94 646.15

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 1430.20 1551.71 1449.35 1411.25 1528.51 1443.54 1379.14 1446.01 1542.01 1608.04 1488.65 1746.07 18024.46

Page 242: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

2014-15

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

LT Category 1015.09 1104.09 1383.22 1510.26 1637.83 1462.77 1600.84 1368.18 1476.32 1597.67 1407.73 1698.87 17262.87

Category I (A&B) - Domestic 309.40 400.79 537.82 571.39 541.23 542.43 568.04 566.47 524.13 469.40 465.72 449.97 5946.78

Category II (A,B & C) - Non-domestic/Commercial 71.45 88.26 116.65 125.76 115.56 120.07 126.21 120.33 114.09 108.18 103.48 104.56 1314.61

Category III (A & B) - Industrial 84.19 87.65 112.37 116.87 113.06 128.90 128.09 127.55 124.09 115.25 120.04 122.19 1380.24

Category IV (A,B &C) - Cottage Industries & Dhobighats 1.72 1.98 2.69 2.66 2.54 2.99 2.89 2.83 2.97 3.01 3.34 2.70 32.32

Category V (A, B & C) - Irrigation and Agriculture 508.07 491.74 565.84 644.73 818.03 618.92 725.89 502.75 659.99 852.30 664.12 954.40 8006.78

Category VI (A & B) - Local Bodies, St. Lighting & PWS 36.30 28.83 41.76 42.97 40.80 42.12 42.05 41.11 43.66 42.40 43.98 43.46 489.42

Category VII (A & B) - General Purpose 3.96 4.81 6.02 5.81 6.59 7.32 7.64 7.09 7.31 7.13 6.99 6.49 77.14

Category VIII (A & B) -Temporary Supply 0.01 0.03 0.06 0.06 0.03 0.03 0.03 0.05 0.08 0.02 0.07 15.12 15.57

HT Category at 11 KV 146.24 183.22 204.24 175.05 184.60 199.80 183.72 192.85 197.02 194.80 205.86 275.94 2343.35

HT-I Industry Segregated 72.63 103.19 106.06 84.51 94.07 99.24 84.35 95.30 97.61 93.78 101.43 114.35 1146.52

Lights & Fans 2.55 0.01 2.35 2.48 3.39 2.27 2.49 2.54 2.72 2.18 5.90 2.79 31.67

Colony consumption 0.20 0.27 0.23 0.16 0.20 0.23 0.17 0.22 0.19 0.19 0.22 0.21 2.50

Seasonal Industries 3.58 2.92 4.35 3.77 2.20 2.03 2.04 4.44 7.19 7.56 8.45 10.52 59.05

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 8.30 10.46 15.62 13.00 15.20 15.95 13.80 15.63 16.09 15.42 17.33 18.89 175.69

HT-I (B) Ferro-Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-II - Others 22.52 28.19 34.53 36.49 34.65 35.70 33.52 32.63 30.61 28.48 26.09 33.90 377.31

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 4.49 5.61 6.67 7.23 7.04 7.40 7.17 6.86 6.53 6.22 5.38 7.70 78.31

HT-III Aviation activity at Airports 0.63 0.64 1.55 1.45 1.32 1.34 1.39 1.38 1.29 1.22 1.19 1.19 14.59

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.01 0.15 0.39 0.33 0.30 0.32 0.31 0.30 0.31 0.29 0.27 0.31 3.28

HT -IV A Govt Lift Irrigation 4.94 3.20 2.82 0.65 0.40 0.79 3.37 3.75 6.41 7.63 7.64 46.79 88.38

HT -IV A Private Irrigation & Agriculture 0.00 0.00 4.88 1.10 0.35 0.45 1.09 1.05 1.47 1.73 1.46 10.39 23.95

HT- IV B - CP Water Supply Schemes 2.10 4.05 0.00 2.31 0.75 0.98 2.44 2.61 3.11 3.45 2.94 0.00 24.75

HT-VI Townships and Residential Colonies 1.24 1.61 3.15 3.29 3.27 3.24 3.23 3.05 2.97 2.75 2.81 2.42 33.04

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 23.07 22.92 21.65 18.29 21.47 29.84 28.34 23.09 20.52 23.90 24.75 26.48 284.31

HT Category at 33 KV 189.01 199.77 262.17 266.62 302.07 293.30 272.88 293.64 293.31 284.91 298.83 308.21 3264.72

HT-I Industry Segregated 158.76 169.37 196.05 197.32 221.69 215.51 197.67 214.53 212.08 200.44 211.45 211.03 2405.91

Lights & Fans 0.67 0.00 3.37 2.36 2.76 2.85 5.72 2.61 3.23 2.48 2.66 3.38 32.09

Colony consumption 1.04 1.21 1.16 0.78 0.90 0.93 0.86 0.86 0.84 0.74 0.80 1.07 11.20

Seasonal Industries 5.23 3.74 5.04 2.75 1.27 0.48 0.36 2.81 4.89 4.94 6.18 7.72 45.39

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 12.70 13.65 37.05 30.49 37.63 39.04 32.99 37.06 36.85 36.87 39.53 40.00 393.86

HT-I (B) Ferro-Alloys 3.38 4.16 10.80 22.33 29.13 25.80 24.24 24.72 22.68 25.73 26.37 11.41 230.75

HT-II - Others 5.01 5.95 6.50 6.76 6.16 5.84 5.02 4.98 4.81 4.89 4.41 7.30 67.62

Page 243: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.87 1.05 1.20 1.21 1.10 1.22 1.11 1.11 1.01 1.09 0.83 1.53 13.32

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 1.32 0.59 0.39 0.19 0.63 0.86 2.59 2.71 4.13 4.36 3.62 16.32 37.70

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.42 0.11 0.03 0.03 0.07 0.08 0.32 0.39 0.38 8.36 10.20

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 2.18 0.68 0.59 2.09 2.05 2.35 2.86 2.44 0.00 15.25

HT-VI Townships and Residential Colonies 0.04 0.05 0.19 0.16 0.09 0.15 0.16 0.12 0.12 0.11 0.15 0.10 1.44

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 185.88 213.58 239.91 286.87 304.62 318.43 322.52 343.05 337.64 331.95 341.83 264.32 3490.59

HT-I Industry Segregated 114.25 131.96 139.01 187.57 191.53 176.73 168.34 171.99 155.68 154.51 166.12 156.41 1914.08

Lights & Fans 0.70 0.00 1.15 1.37 1.61 1.60 1.47 1.63 1.59 1.51 1.64 1.13 15.41

Colony consumption 0.92 1.15 1.06 1.04 1.16 1.19 1.08 1.06 0.88 0.92 1.01 0.91 12.38

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 7.42 10.48 24.36 23.39 31.29 39.27 27.62 29.79 29.80 32.32 33.61 27.88 317.23

HT-I (B) Ferro-Alloys 7.19 7.81 13.66 8.24 10.28 12.74 9.04 14.11 16.03 15.31 11.95 12.40 138.77

HT-II - Others 0.42 0.56 1.30 1.25 1.26 1.32 1.37 1.24 1.34 1.57 1.32 1.31 14.25

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.08 0.10 0.22 0.21 0.21 0.22 0.25 0.23 0.24 0.28 0.24 0.23 2.50

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.55 3.85 17.39 48.11 62.51 70.88 64.01 60.83 0.00 328.13

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 54.89 61.53 59.15 63.25 63.42 67.96 65.24 60.49 61.21 61.52 65.11 64.06 747.84

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 1536.23 1700.66 2089.54 2238.79 2429.12 2274.30 2379.95 2197.71 2304.30 2409.33 2254.26 2547.35 26361.53

Page 244: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

2015-16

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

LT Category 1489.54 1696.01 1425.08 1805.04 1601.68 1473.80 1693.42 1249.22 1526.12 1645.81 1731.04 1782.50 19119.26

Category I (A&B) - Domestic 592.21 630.26 600.28 609.40 644.57 626.31 616.34 600.15 500.04 504.68 492.86 536.87 6953.98

Category II (A,B & C) - Non-domestic/Commercial 132.43 135.42 144.29 132.34 136.25 136.53 127.51 133.45 112.01 118.92 117.01 124.74 1550.90

Category III (A & B) - Industrial 132.49 136.06 144.53 130.54 132.72 119.75 111.82 113.05 102.22 109.57 116.44 116.94 1466.13

Category IV (A,B &C) - Cottage Industries & Dhobighats 3.18 3.17 2.87 3.05 3.13 3.15 2.85 3.19 2.73 3.34 2.85 3.15 36.65

Category V (A, B & C) - Irrigation and Agriculture 576.66 739.58 481.93 880.06 632.66 534.62 782.26 344.30 757.29 854.80 952.69 945.48 8482.33

Category VI (A & B) - Local Bodies, St. Lighting & PWS 44.87 44.43 44.81 42.18 44.39 45.12 45.79 47.56 44.40 47.08 42.91 46.41 539.94

Category VII (A & B) - General Purpose 7.63 7.06 6.26 7.45 7.93 8.28 6.84 7.46 7.41 7.38 6.01 8.88 88.61

Category VIII (A & B) -Temporary Supply 0.06 0.03 0.11 0.03 0.03 0.04 0.01 0.06 0.03 0.02 0.27 0.03 0.72

HT Category at 11 KV 197.70 186.60 186.86 196.16 191.19 189.12 176.08 179.79 172.25 186.50 214.03 274.47 2350.76

HT-I Industry Segregated 82.75 87.94 87.50 88.32 86.37 86.39 81.07 81.47 74.76 77.81 45.97 118.39 998.74

Lights & Fans 8.81 2.35 1.95 1.91 2.64 2.20 2.99 2.23 10.10 9.01 47.40 12.87 104.47

Colony consumption 0.20 0.22 0.21 0.23 0.27 0.20 0.20 0.18 0.20 0.20 0.20 0.23 2.55

Seasonal Industries 4.71 2.03 3.01 4.04 1.85 1.36 1.71 4.12 5.30 3.72 3.57 4.51 39.91

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 18.04 17.39 17.35 17.71 17.45 17.48 16.54 16.65 16.79 17.23 18.30 26.17 217.10

HT-I (B) Ferro-Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-II - Others 37.82 39.18 40.10 39.59 39.04 39.52 37.21 35.27 32.27 31.57 34.62 55.75 461.94

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 7.14 7.44 7.68 7.48 7.38 7.49 7.18 6.98 6.45 6.48 6.86 10.88 89.44

HT-III Aviation activity at Airports 1.57 1.59 1.61 1.50 1.58 1.60 1.54 1.49 1.28 1.27 1.28 2.36 18.64

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.29 0.29 0.29 0.27 0.27 0.18 0.20 0.29 0.26 0.26 0.26 0.45 3.30

HT -IV A Govt Lift Irrigation 2.92 0.93 0.49 0.90 0.59 0.87 1.20 1.96 2.28 2.56 1.87 1.96 18.52

HT -IV A Private Irrigation & Agriculture 5.11 4.47 3.59 3.72 4.60 4.63 4.77 5.31 4.72 4.59 4.06 5.33 54.90

HT- IV B - CP Water Supply Schemes 0.22 0.23 0.27 0.25 0.24 0.24 0.21 0.21 0.22 0.24 0.22 0.36 2.91

HT-VI Townships and Residential Colonies 3.14 3.34 3.56 3.37 3.33 3.38 3.17 3.31 2.84 2.97 2.91 4.58 39.89

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 24.99 19.21 19.26 26.88 25.58 23.59 18.09 20.33 14.79 28.59 46.50 30.65 298.45

HT Category at 33 KV 290.06 290.46 292.33 296.05 298.98 291.96 290.30 296.52 282.31 291.08 293.15 417.15 3630.35

HT-I Industry Segregated 208.85 212.16 217.62 220.23 223.10 219.39 215.15 210.80 205.00 216.07 220.69 318.07 2687.13

Lights & Fans 3.44 3.67 3.33 3.28 3.37 3.19 3.19 9.92 3.54 3.06 3.18 4.34 47.52

Colony consumption 1.03 1.04 1.05 1.04 1.06 1.05 1.13 1.02 0.84 0.82 0.87 1.35 12.29

Seasonal Industries 5.14 3.82 3.80 1.94 1.09 0.17 0.28 4.31 5.72 5.41 5.20 4.42 41.30

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 42.95 43.05 44.06 45.40 45.66 44.42 43.29 41.55 41.89 44.65 43.51 64.08 544.51

HT-I (B) Ferro-Alloys 13.25 12.45 9.55 11.09 11.95 9.58 10.81 10.32 8.16 3.42 1.55 2.85 105.00

HT-II - Others 8.13 8.46 8.08 7.14 6.91 7.36 8.48 7.18 6.81 7.20 8.12 11.79 95.67

Page 245: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 1.63 1.67 1.64 1.47 1.43 1.52 1.72 1.45 1.35 1.41 1.66 2.32 19.26

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.95 0.21 0.05 0.71 0.94 1.70 2.41 3.98 3.80 3.47 2.77 2.15 23.15

HT -IV A Private Irrigation & Agriculture 4.55 3.75 2.92 3.54 3.27 3.36 3.64 5.79 5.08 5.41 5.44 5.52 52.28

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.15 0.17 0.22 0.21 0.21 0.20 0.20 0.19 0.13 0.15 0.16 0.26 2.25

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 293.14 291.91 289.06 277.10 293.75 283.27 356.67 333.54 233.09 277.50 288.55 394.43 3612.00

HT-I Industry Segregated 178.75 180.42 180.88 165.77 186.28 176.26 161.91 155.05 136.85 172.73 184.24 247.05 2126.19

Lights & Fans 1.75 1.74 1.61 7.00 1.97 1.71 2.15 1.63 1.45 1.43 1.26 2.03 25.74

Colony consumption 1.30 1.36 1.31 1.26 1.30 1.27 1.20 1.15 1.05 0.99 0.93 1.41 14.52

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 33.68 33.23 32.63 32.17 34.54 33.68 29.85 31.29 27.04 33.41 33.46 52.18 407.14

HT-I (B) Ferro-Alloys 13.21 11.86 9.90 9.67 10.55 10.69 10.40 10.10 10.15 11.24 10.26 13.39 131.41

HT-II - Others 1.39 1.38 1.71 1.69 1.76 1.85 2.01 1.76 1.84 1.93 2.13 3.48 22.93

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.23 0.23 0.28 0.29 0.31 0.32 0.38 0.31 0.30 0.29 0.32 0.56 3.82

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.55 0.50 0.53 0.46 0.52 1.46 96.52 80.47 5.36 0.42 0.31 0.40 187.51

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 62.27 61.19 60.20 58.79 56.51 56.03 52.25 51.81 49.05 55.06 55.64 73.92 692.74

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 2270.44 2464.99 2193.33 2574.36 2385.59 2238.14 2516.47 2059.08 2213.77 2400.88 2526.77 2868.54 28712.37

Page 246: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

2016-17

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

LT Category 1824.61 1653.73 1421.58 1579.03 1899.54 1764.85 1936.05 1854.52 1524.99 1729.49 1746.47 2051.35 20986.20

Category I (A&B) - Domestic 665.80 758.26 684.00 631.40 653.57 695.75 636.14 715.80 552.85 511.73 531.33 562.20 7598.85

Category II (A,B & C) - Non-domestic/Commercial 149.04 161.32 145.15 136.44 140.70 145.23 133.71 140.11 126.23 124.59 125.42 127.83 1655.76

Category III (A & B) - Industrial 140.78 143.31 142.25 137.44 136.33 143.61 140.73 140.57 131.15 135.95 143.09 151.01 1686.22

Category IV (A,B &C) - Cottage Industries & Dhobighats 3.70 3.04 3.12 3.07 3.26 4.58 3.20 3.27 3.21 3.48 2.97 3.05 39.94

Category V (A, B & C) - Irrigation and Agriculture 806.92 531.43 395.20 611.80 907.12 705.37 959.83 789.04 647.15 890.50 879.93 1145.21 9269.50

Category VI (A & B) - Local Bodies, St. Lighting & PWS 49.12 48.75 45.16 50.77 50.10 61.70 54.52 56.89 56.15 55.54 56.03 53.84 638.57

Category VII (A & B) - General Purpose 9.20 7.55 6.64 7.87 8.41 8.51 7.78 8.65 8.20 7.62 7.34 8.12 95.89

Category VIII (A & B) -Temporary Supply 0.06 0.07 0.06 0.24 0.05 0.10 0.13 0.20 0.05 0.09 0.35 0.08 1.47

HT Category at 11 KV 249.43 206.55 184.88 213.27 271.07 219.99 243.55 220.78 201.79 205.24 203.59 235.40 2655.53

HT-I Industry Segregated 98.83 86.26 77.59 78.65 74.94 91.55 96.81 97.52 92.11 90.28 90.00 106.36 1080.90

Lights & Fans 14.82 8.44 7.24 7.19 7.53 4.93 6.59 2.41 2.01 1.46 2.08 1.82 66.51

Colony consumption 0.15 0.19 0.12 0.14 0.17 0.14 0.14 0.15 0.18 0.16 0.18 0.24 1.95

Seasonal Industries 3.43 1.81 2.09 3.61 2.56 5.23 6.18 2.61 4.02 3.82 4.68 5.05 45.07

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 23.06 19.60 17.60 18.00 17.01 14.40 15.09 15.09 14.44 14.22 14.19 16.77 199.47

HT-I (B) Ferro-Alloys 0.03 0.04 0.06 0.05 0.02 0.03 0.03 0.03 0.04 0.03 0.03 0.04 0.46

HT-II - Others 44.71 39.75 37.36 42.42 41.11 38.41 39.48 34.84 33.63 30.71 32.51 41.10 456.02

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 8.80 7.82 7.34 8.26 7.96 7.54 7.52 6.89 6.89 6.44 6.79 8.48 90.73

HT-III Aviation activity at Airports 3.67 3.67 3.22 3.36 3.76 3.04 3.09 2.55 2.39 2.46 2.57 3.46 37.24

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.70 0.69 0.62 0.64 0.74 0.73 0.67 0.65 0.59 0.59 0.57 0.75 7.94

HT -IV A Govt Lift Irrigation 0.68 0.40 0.23 0.51 7.79 3.16 5.96 8.62 8.30 11.12 7.99 5.04 59.80

HT -IV A Private Irrigation & Agriculture 4.27 3.50 3.91 3.44 57.62 4.84 4.91 4.61 4.39 7.34 4.76 3.72 107.32

HT- IV B - CP Water Supply Schemes 0.22 0.11 0.33 0.56 0.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.88

HT-VI Townships and Residential Colonies 3.65 3.47 3.34 3.29 3.35 3.05 3.27 2.87 1.62 1.55 1.56 1.87 32.89

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.04 0.00 0.00 0.00 0.07

HT - RESCOs 37.40 25.92 20.06 39.22 42.46 38.15 49.21 36.67 26.21 30.83 31.59 35.42 413.14

HT I (C): Aquaculture and Animal Husbandry 1.31 1.53 1.45 1.38 1.08 2.08 2.24 2.78 2.41 1.69 1.63 2.15 21.74

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 2.66 2.38 1.76 1.97 1.74 1.79 1.74 1.76 1.86 1.83 1.82 2.07 23.38

HT II (B): Religious Places 0.36 0.32 0.30 0.31 0.30 0.39 0.33 0.34 0.28 0.32 0.32 0.41 3.96

HT II (C): Function Halls/Auditoriums 0.67 0.65 0.27 0.28 0.28 0.52 0.30 0.35 0.39 0.40 0.32 0.63 5.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 33 KV 314.92 294.51 293.72 297.08 298.03 251.95 260.77 268.52 266.56 251.07 238.02 271.54 3306.71

HT-I Industry Segregated 238.71 218.47 210.91 212.10 203.68 180.03 186.17 189.16 188.55 172.82 162.90 187.30 2350.79

Lights & Fans 3.60 3.37 3.19 2.68 3.16 2.69 3.05 6.68 2.66 2.32 2.41 3.04 38.85

Colony consumption 0.98 1.03 1.11 0.94 0.91 0.69 0.85 0.80 0.70 0.57 0.59 0.71 9.87

Seasonal Industries 3.05 1.02 2.36 1.25 1.13 0.11 0.19 0.65 2.88 3.52 3.41 3.47 23.05

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 48.24 46.38 42.84 44.21 41.76 33.10 34.84 34.96 34.24 32.78 31.92 38.21 463.48

HT-I (B) Ferro-Alloys 3.44 7.75 16.85 18.51 17.87 16.94 16.93 17.16 16.27 18.23 16.29 17.01 183.26

HT-II - Others 9.45 8.93 8.76 8.81 8.12 7.36 7.86 7.96 7.18 5.63 5.71 6.91 92.68

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 1.98 1.81 1.77 1.80 1.39 1.55 1.55 1.55 1.44 1.09 1.13 1.37 18.43

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.54 0.43 0.37 0.33 0.43 0.41 0.66 3.17

Page 247: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.12 0.10 0.09 0.09 0.09 0.09 0.14 0.71

HT -IV A Govt Lift Irrigation 0.37 0.28 0.18 0.27 8.57 2.36 3.35 4.54 6.97 4.77 5.66 5.25 42.57

HT -IV A Private Irrigation & Agriculture 3.34 3.34 3.31 3.24 8.37 5.08 4.15 3.57 4.18 5.75 4.34 3.67 52.35

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.22 0.15 0.17 0.18 0.18 0.18 0.13 0.12 0.12 0.12 0.13 0.18 1.87

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.82 1.10 1.43 1.85 1.75 0.04 0.05 0.00 0.00 0.00 0.00 0.00 7.04

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.72 0.88 0.82 1.23 1.14 1.16 1.11 0.92 0.97 0.81 0.79 0.81 11.37

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.14 2.25 2.82 7.20

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 254.47 295.57 279.28 259.11 289.96 358.45 390.31 396.50 379.58 347.33 277.93 257.56 3786.06

HT-I Industry Segregated 152.59 184.36 175.56 156.11 169.13 145.92 154.86 163.90 143.55 132.22 114.89 135.41 1828.51

Lights & Fans 1.66 1.49 1.51 1.21 1.15 1.06 1.23 1.21 1.06 1.17 1.11 1.42 15.28

Colony consumption 0.92 0.96 1.05 0.98 0.99 0.81 0.92 0.90 0.87 0.86 0.75 0.99 11.00

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 32.49 37.50 34.01 33.85 34.00 30.14 31.25 32.68 29.45 29.97 27.11 35.61 388.07

HT-I (B) Ferro-Alloys 10.93 11.18 9.61 8.45 7.92 7.76 8.09 9.05 8.36 8.31 12.77 15.31 117.76

HT-II - Others 2.27 1.98 2.19 2.05 2.11 1.81 1.59 2.05 1.86 2.02 2.05 2.69 24.65

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.39 0.33 0.37 0.36 0.36 0.31 0.28 0.34 0.33 0.36 0.35 0.46 4.25

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.32 0.27 0.33 0.32 18.22 119.21 138.70 135.01 140.88 116.85 66.02 10.73 746.87

HT -IV A Private Irrigation & Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 52.91 57.49 54.65 55.77 56.07 51.43 53.38 51.38 53.22 55.56 52.88 54.94 649.67

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 2643.43 2450.36 2179.46 2348.49 2758.60 2595.25 2830.68 2740.33 2372.92 2533.13 2466.01 2815.85 30734.50

Page 248: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

2017-18

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

LT Category 1947.63 1941.39 1669.96 1817.13 1693.19 1571.63 2126.61 2037.89 1671.34 1892.25 1909.33 2244.25 22522.61

Category I (A&B) - Domestic 737.84 785.60 804.13 718.54 733.12 728.36 701.85 787.33 605.74 557.84 577.92 611.89 8350.18

Category II (A,B & C) - Non-domestic/Commercial 158.55 165.10 167.17 148.97 154.44 150.61 143.44 150.45 135.44 133.65 134.55 137.17 1779.53

Category III (A & B) - Industrial 172.70 183.49 179.88 164.48 165.49 151.12 162.35 162.00 150.96 156.46 164.18 174.15 1987.26

Category IV (A,B &C) - Cottage Industries & Dhobighats 3.46 3.38 3.50 3.23 3.59 3.58 3.34 3.41 3.35 3.63 3.10 3.18 40.76

Category V (A, B & C) - Irrigation and Agriculture 804.78 723.42 436.97 717.11 570.31 474.39 1049.44 865.01 707.57 973.63 962.08 1252.13 9536.85

Category VI (A & B) - Local Bodies, St. Lighting & PWS 60.57 72.34 70.74 56.00 56.98 54.43 57.76 60.27 59.52 58.84 59.32 57.02 723.78

Category VII (A & B) - General Purpose 9.57 7.98 7.43 8.73 9.09 9.11 8.28 9.21 8.72 8.11 7.81 8.64 102.68

Category VIII (A & B) -Temporary Supply 0.17 0.09 0.14 0.07 0.16 0.03 0.14 0.20 0.05 0.09 0.36 0.08 1.58

HT Category at 11 KV 300.56 223.12 222.47 235.48 215.24 245.05 260.59 236.40 215.70 253.88 252.42 286.78 2947.69

HT-I Industry Segregated 101.27 102.14 97.59 103.98 101.27 101.44 103.63 104.39 98.60 96.64 96.34 113.86 1221.15

Lights & Fans 15.69 1.68 1.61 1.61 4.19 7.15 7.05 2.57 2.15 1.57 2.23 1.94 49.43

Colony consumption 1.73 0.21 0.17 0.18 0.20 0.20 0.14 0.15 0.18 0.16 0.18 0.24 3.73

Seasonal Industries 3.63 2.58 3.84 4.77 1.77 0.88 6.34 2.67 4.13 3.91 4.79 5.18 44.49

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 68.98 15.78 15.15 16.08 15.78 15.51 16.79 16.79 16.06 15.82 15.79 18.66 247.20

HT-I (B) Ferro-Alloys 0.04 0.04 0.04 0.06 0.05 0.05 0.04 0.04 0.04 0.03 0.03 0.04 0.50

HT-II - Others 48.30 48.30 43.41 45.18 44.21 43.43 40.95 36.14 34.88 31.85 33.72 42.62 492.99

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 9.34 9.04 8.43 8.32 8.44 8.29 7.74 7.10 7.09 6.63 6.99 8.74 96.16

HT-III Aviation activity at Airports 3.96 4.12 3.42 3.44 3.32 3.38 3.40 2.80 2.63 2.71 2.83 3.81 39.81

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.80 0.79 0.69 0.77 0.71 0.74 0.69 0.67 0.61 0.60 0.58 0.78 8.43

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 6.02 8.71 8.39 11.23 8.07 5.09 47.50

HT -IV A Private Irrigation & Agriculture 1.96 1.23 2.02 0.34 1.49 14.67 4.80 4.51 4.29 42.21 39.69 38.68 155.88

HT- IV B - CP Water Supply Schemes 2.35 3.81 7.89 7.05 4.07 22.91 0.00 0.00 0.00 0.00 0.00 0.00 48.07

HT-VI Townships and Residential Colonies 2.22 2.45 2.15 2.06 2.00 1.99 3.31 2.90 1.63 1.57 1.58 1.89 25.75

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.06 0.00 0.00 0.00 0.11

HT - RESCOs 33.64 23.75 29.54 35.19 21.55 17.22 53.85 40.13 28.68 33.73 34.56 38.75 390.60

HT I (C): Aquaculture and Animal Husbandry 3.29 3.58 3.19 2.96 2.91 3.64 3.43 4.25 3.69 2.59 2.49 3.30 39.31

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 2.22 2.31 2.07 2.21 2.05 2.08 1.79 1.81 1.92 1.89 1.87 2.13 24.35

HT II (B): Religious Places 0.53 0.60 0.53 0.60 0.58 0.59 0.33 0.35 0.28 0.33 0.33 0.42 5.48

HT II (C): Function Halls/Auditoriums 0.62 0.73 0.73 0.67 0.66 0.89 0.31 0.36 0.41 0.41 0.33 0.65 6.75

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 33 KV 252.81 274.95 255.18 267.38 269.10 309.04 269.50 286.60 285.51 270.25 257.07 282.76 3280.15

HT-I Industry Segregated 176.14 195.68 178.54 188.99 186.05 201.03 188.00 191.02 190.40 174.52 164.50 189.14 2224.01

Lights & Fans 2.42 2.63 2.56 2.89 2.33 3.89 3.08 6.74 2.69 2.34 2.44 3.07 37.08

Colony consumption 0.68 0.80 0.72 1.12 0.79 0.80 0.86 0.81 0.70 0.58 0.59 0.72 9.17

Seasonal Industries 1.28 0.79 0.31 0.18 0.15 0.12 0.21 0.71 3.16 3.86 3.73 3.80 18.30

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 33.78 37.40 35.30 38.94 39.12 40.12 37.82 37.95 37.17 35.58 34.65 41.47 449.30

HT-I (B) Ferro-Alloys 18.07 18.12 17.78 19.97 23.17 22.68 17.96 18.21 17.25 19.34 17.28 18.04 227.87

HT-II - Others 7.86 7.94 6.26 6.99 6.87 7.00 8.84 8.95 8.07 6.33 6.42 7.76 89.29

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 1.46 1.27 1.14 1.26 1.23 1.24 1.60 1.59 1.48 1.12 1.17 1.41 15.96

HT-III Aviation activity at Airports 0.76 0.76 0.67 0.73 0.70 0.71 0.44 0.39 0.34 0.45 0.42 0.68 7.05

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.17 0.17 0.14 0.16 0.15 0.15 0.10 0.09 0.09 0.09 0.09 0.15 1.54

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 2.89 1.12 0.27 0.01 0.50 5.78 4.51 14.99 18.27 15.31 16.51 7.06 87.20

HT- IV B - CP Water Supply Schemes 2.74 3.86 7.26 2.33 4.35 22.04 4.74 4.08 4.78 6.57 4.96 4.20 71.92

Page 249: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

HT-VI Townships and Residential Colonies 0.27 0.31 0.24 0.24 0.25 0.25 0.14 0.12 0.12 0.12 0.13 0.19 2.38

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.00 0.00 0.00 0.05

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.91 0.93 0.89 0.89 0.94 0.86 1.14 0.95 1.00 0.83 0.82 0.83 11.00

HT II (B): Religious Places 3.39 3.17 3.10 2.24 1.84 2.03 0.00 0.00 0.00 3.21 3.37 4.22 26.58

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.43 0.66 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.44

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 192.63 235.19 229.73 232.76 247.52 257.99 399.03 405.30 388.47 356.06 286.29 266.11 3497.09

HT-I Industry Segregated 92.83 122.50 116.75 120.49 131.81 132.29 149.16 157.86 138.26 127.35 110.66 130.43 1530.42

Lights & Fans 0.96 1.25 1.24 1.39 1.46 4.43 1.19 1.16 1.02 1.13 1.07 1.37 17.67

Colony consumption 0.84 1.22 1.15 1.17 1.07 1.08 1.03 1.00 0.98 0.96 0.83 1.10 12.44

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 19.51 28.84 30.13 30.49 33.11 33.76 37.97 39.70 35.79 36.42 32.94 43.27 401.91

HT-I (B) Ferro-Alloys 14.59 15.77 14.14 13.37 10.61 14.12 10.27 11.49 10.62 10.55 16.21 19.43 161.17

HT-II - Others 2.89 2.49 2.48 2.56 2.70 2.33 1.64 2.11 1.91 2.08 2.11 2.77 28.06

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.51 0.42 0.42 0.45 0.47 0.42 0.29 0.35 0.34 0.37 0.36 0.47 4.88

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 1.58 0.92 2.10 1.05 1.35 8.94 142.86 139.06 145.11 120.35 68.00 11.06 642.37

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 58.91 61.78 61.32 61.54 64.80 60.38 54.62 52.57 54.45 56.85 54.11 56.22 697.53

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.26 0.13 0.25 0.00 0.00 0.00 0.00 0.00 0.00 0.64

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 2693.64 2674.65 2377.34 2552.75 2425.06 2383.71 3055.72 2966.19 2561.04 2772.44 2705.12 3079.90 32247.54

Page 250: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

2018-19

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

LT Category 2079.31 2085.30 1810.32 1952.66 1823.11 1691.87 2263.51 2177.46 1784.28 2004.16 2022.38 2369.70 24064.07

Category I (A&B) - Domestic 805.66 864.12 886.27 792.36 804.77 799.18 775.26 866.87 665.19 609.90 630.70 668.11 9168.39

Category II (A,B & C) - Non-domestic/Commercial 169.81 176.82 179.01 159.51 165.42 161.20 153.68 161.26 145.12 143.17 144.14 146.97 1906.11

Category III (A & B) - Industrial 198.85 213.27 209.18 191.51 192.35 175.27 188.24 187.65 174.68 180.99 189.39 201.85 2303.21

Category IV (A,B &C) - Cottage Industries & Dhobighats 3.62 3.53 3.66 3.38 3.76 3.75 3.50 3.57 3.50 3.80 3.24 3.32 42.63

Category V (A, B & C) - Irrigation and Agriculture 826.50 741.91 448.75 736.85 586.22 484.72 1072.33 883.88 723.01 994.87 983.07 1279.44 9761.55

Category VI (A & B) - Local Bodies, St. Lighting & PWS 64.52 77.08 75.40 59.68 60.75 58.02 61.56 64.23 63.46 62.70 63.18 60.74 771.31

Category VII (A & B) - General Purpose 10.18 8.48 7.91 9.30 9.68 9.70 8.81 9.79 9.28 8.62 8.30 9.18 109.24

Category VIII (A & B) -Temporary Supply 0.17 0.09 0.14 0.07 0.17 0.03 0.14 0.21 0.05 0.09 0.37 0.09 1.63

HT Category at 11 KV 364.19 241.34 241.94 257.12 232.78 262.63 318.61 290.12 265.82 305.44 304.29 341.77 3426.04

HT-I Industry Segregated 108.15 109.08 104.22 111.04 108.14 108.34 141.99 142.80 136.62 134.52 134.21 152.91 1492.01

Lights & Fans 16.75 1.79 1.72 1.72 4.47 7.63 7.53 2.75 2.29 1.67 2.38 2.08 52.79

Colony consumption 1.90 0.23 0.19 0.20 0.22 0.22 0.15 0.16 0.19 0.17 0.20 0.26 4.10

Seasonal Industries 3.71 2.63 3.92 4.87 1.81 0.90 6.48 2.73 4.22 4.00 4.90 5.29 45.47

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 77.52 17.73 17.03 18.07 17.74 17.43 18.87 18.87 18.05 17.78 17.74 20.97 277.81

HT-I (B) Ferro-Alloys 0.02 0.02 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.02 0.03 0.29

HT-II - Others 50.26 50.25 45.17 47.01 46.00 45.18 42.60 37.60 36.29 33.14 35.08 44.34 512.91

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 9.62 9.31 8.69 8.57 8.69 8.54 7.97 7.31 7.31 6.83 7.20 9.00 99.04

HT-III Aviation activity at Airports 4.07 4.25 3.52 3.54 3.42 3.48 3.51 2.89 2.71 2.79 2.91 3.92 41.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.82 0.81 0.71 0.79 0.74 0.76 0.71 0.69 0.63 0.62 0.60 0.80 8.68

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 6.08 8.80 8.47 11.34 8.15 5.14 47.98

HT -IV A Private Irrigation & Agriculture 37.02 1.24 2.04 0.35 1.50 14.81 4.85 4.55 4.33 42.64 40.09 39.06 192.48

HT- IV B - CP Water Supply Schemes 2.47 4.01 8.30 7.41 4.28 24.10 0.00 0.00 0.00 0.00 0.00 0.00 50.58

HT-VI Townships and Residential Colonies 1.95 2.15 1.88 1.81 1.76 1.75 2.90 2.55 1.43 1.37 1.39 1.66 22.58

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.07 0.00 0.00 0.00 0.12

HT - RESCOs 43.07 30.40 37.81 45.06 27.60 22.05 68.92 51.37 36.71 43.18 44.24 49.61 500.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 33 KV 263.50 285.73 265.52 277.41 279.98 326.17 283.88 305.64 305.91 289.34 275.91 298.56 3457.55

HT-I Industry Segregated 179.39 199.29 181.83 192.48 189.48 204.74 191.47 194.54 193.91 177.74 167.54 192.63 2265.05

Lights & Fans 2.46 2.68 2.61 2.95 2.37 3.96 3.14 6.87 2.74 2.39 2.48 3.13 37.77

Colony consumption 0.70 0.82 0.74 1.14 0.81 0.82 0.88 0.83 0.72 0.59 0.61 0.73 9.40

Seasonal Industries 1.34 0.83 0.32 0.19 0.15 0.12 0.22 0.75 3.31 4.05 3.91 3.98 19.19

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 36.47 40.37 38.10 42.04 42.23 43.31 40.83 40.97 40.12 38.41 37.40 44.77 485.02

HT-I (B) Ferro-Alloys 19.82 19.88 19.50 21.90 25.43 24.88 19.70 19.97 18.93 21.22 18.96 19.80 249.99

HT-II - Others 8.76 8.84 6.97 7.79 7.65 7.80 9.85 9.97 8.99 7.05 7.16 8.65 99.50

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 1.50 1.30 1.17 1.30 1.27 1.27 1.64 1.64 1.53 1.15 1.20 1.46 16.44

HT-III Aviation activity at Airports 0.79 0.79 0.69 0.75 0.72 0.73 0.46 0.40 0.35 0.46 0.43 0.71 7.26

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.17 0.17 0.15 0.16 0.15 0.16 0.10 0.09 0.09 0.09 0.09 0.15 1.59

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 4.15 1.61 0.38 0.02 0.72 8.31 6.49 21.58 26.30 22.04 23.76 10.17 125.54

HT- IV B - CP Water Supply Schemes 3.30 4.64 8.73 2.81 5.23 26.51 5.70 4.91 5.74 7.90 5.96 5.05 86.48

HT-VI Townships and Residential Colonies 0.29 0.33 0.26 0.26 0.27 0.27 2.16 2.14 2.15 2.15 2.16 2.22 14.65

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.43 0.66 0.36 0.00 0.00 0.00 0.00 0.00 0.00 1.46

Page 251: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Sales / Forecast Sales (MU) April May June July August September October November December January February March Total

HT Category at 132 KV 197.15 240.45 235.16 237.68 252.17 263.20 450.96 457.23 440.60 408.07 337.74 317.54 3837.97

HT-I Industry Segregated 89.04 117.50 111.98 115.57 126.43 126.89 186.27 194.61 175.81 165.35 149.34 168.30 1727.09

Lights & Fans 0.92 1.20 1.19 1.33 1.40 4.25 1.14 1.12 0.98 1.09 1.02 1.31 16.94

Colony consumption 0.93 1.36 1.27 1.30 1.19 1.20 1.14 1.11 1.08 1.07 0.93 1.22 13.79

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 22.94 33.90 35.42 35.85 38.92 39.68 44.64 46.67 42.07 42.81 38.73 50.86 472.51

HT-I (B) Ferro-Alloys 17.25 18.65 16.72 15.81 12.55 16.69 12.15 13.58 12.55 12.47 19.17 22.97 190.56

HT-II - Others 2.98 2.57 2.56 2.63 2.78 2.40 1.69 2.17 1.97 2.14 2.17 2.85 28.91

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.53 0.43 0.44 0.46 0.48 0.43 0.30 0.36 0.35 0.39 0.37 0.48 5.03

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 1.63 0.95 2.16 1.08 1.39 9.21 147.15 143.23 149.46 123.96 70.04 11.39 661.64

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 60.93 63.90 63.42 63.66 67.02 62.45 56.49 54.37 56.32 58.80 55.97 58.15 721.49

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT -VIII - Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 2904.16 2852.81 2552.95 2724.87 2588.05 2543.87 3316.96 3230.45 2796.61 3007.01 2940.32 3327.58 34785.63

Page 252: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 4

Total Sales, MU 18024.46 26361.53 28712.37 30734.50 32247.54 34785.63

Sales ( LT, 11kV, 33kV) (MU) Form 3 16047.93 22870.94 25100.37 26948.44 28750.45 30947.66

EHT Sales (MU) Form 3 1976.53 3490.59 3612.00 3786.06 3497.09 3837.97

0.00 0.00 0.00 0.00 0.00 0.00

Total Losses, MU 2154.67 3036.71 3946.13 3852.61 4215.89 4459.70

Distribution System Losses (MU) Form 4a 2154.67 3036.71 2656.12 2842.66 3111.05 3270.57

Transmission System Losses (MU) 0.00 0.00 1290.01 1009.94 1104.84 1189.13

0.00 0.00 0.00 0.00 0.00 0.00

Total Losses, (%) 10.68 10.33 12.08 11.14 11.56 11.36

Transmission Losses (%) 0.00 0.00 3.95 2.92 3.03 3.03

Distribution System Losses(%) Form 4a 11.84 11.72 9.57 9.54 9.76 9.56

Input to Distribution System 18202.60 25907.65 27756.49 29791.10 31861.50 34218.23

0.00 0.00 0.00 0.00 0.00 0.00

Power Purchase Requirement (MU) 20179.13 29398.24 32658.50 34587.10 36463.44 39245.33

Availability Form 4.1 20257.36 27737.84 33179.15 34826.99 39095.86 41415.60

Dispatch Form 4.2 20257.36 27737.84 33179.15 34826.99 36455.47 39566.29

Surplus /(deficit) 78.23 -1660.40 520.65 239.88 2632.43 2170.26

Note:

1.                  Transmission Losses percentage e.g. 4.52 % to be entered in numbers as 4.52 in Form 4b only

2.                  Transmission Losses to include PGCIL Losses.

3.                  The Transmission Losses percentage should be consistent with calculations in Form 4b

2017-18 2018-19

Power Purchase Requirement

Particulars Detail Links Base Year 2014-15 2015-16 2016-17

Page 253: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

New Consumer Categories

Add any proposed category here, in the tables provided under corresponding voltage levels.

Select the category which is being modified/replaced in the EXISTING CATEGORY Field.

Provide the name of the proposed category in the PROPOSED CATEGORY Field

Modifications of Slabs/SubCategories should be done in the Form 7/ Form 12. See the notes in the corresponding Forms for detailed instructions

For LT Category For HT Category - 11kV

For HT Category - 33kV For HT Category - 132kV

Modification/Replacement of

existing CategoryExisting Category Proposed Category Remarks

Modification/Replacement of

existing CategoryExisting Category Proposed Category Remarks

Modification/Replacement of existing

CategoryExisting Category Proposed Category Remarks

Modification/Replacement of existing

CategoryExisting Category Proposed Category Remarks

Page 254: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 4a Energy Losses (Distribution System)

Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

I. Losses in 33 KV System and Connected Equipment

(i) Total Energy delivered into 33 KV Distribution System from EHT SSs A 18129.82 25887.71 27735.12 29768.17 31836.97 34191.89

(ii) Energy delivered by all other Generating Stations at 33kV B 0.00 0.00 0.00 0.00 0.00 0.00

(iii) Energy consumed by HT consumers at 33KV (Sales + Third Party) X 2135.81 3264.72 3630.35 3306.71 3280.15 3457.55

(iv) Energy Delivered into 11 KV and LT System from 33/11 KV SSs C 15268.81 21587.47 23052.01 25392.78 27461.63 29582.07

Losses (33 kV System) (A + B) - (C + X) 725.20 1035.51 1052.76 1068.68 1095.19 1152.27

% Losses (33 kV System)100 x [(A+B)-(C+X)] /

(A+B)4.00 4.00 3.80 3.59 3.44 3.37

II. Losses in 11 KV System and Connected Equipment 0.00 0.00 0.00 0.00 0.00 0.00

(i) Energy delivered into 11 KV system from 33/11kV SSs C 15268.81 21587.47 23052.01 25392.78 27461.63 29582.07

(ii) Energy delivered into 11 KV Distribution System from EHT SSs D 72.78 19.94 21.37 22.93 24.53 26.34

(iii) Energy delivered at 11kV from all other Generating Stations E 0.00 0.00 0.00 0.00 0.00 0.00

(iv) Total Energy delivered into 11 KV and LT Distribution System C+D+E 15341.59 21607.42 23073.37 25415.72 27486.16 29608.41

(v) Energy consumed by HT consumers at 11KV (Sales + Third Party) Y 1730.18 2343.35 2350.76 2655.53 2947.69 3426.04

(vi) Total Output from 11kV to LT F 12959.39 18345.75 19836.60 21837.60 23584.70 25175.69

Losses (11kV System) (C + D + E) - (Y + F) 652.02 918.32 886.02 922.59 953.77 1006.69

% Losses (11kV System)[(C+D+E)-(Y+F)] x 100 /

(C+D+E)4.25 4.25 3.84 3.63 3.47 3.40

0.00 0.00 0.00 0.00 0.00 0.00

III. Losses in LT system and connected equipment 0.00 0.00 0.00 0.00 0.00 0.00

(i) Energy delivered to LT system from 11/400 V DTRs F 12959.39 18345.75 19836.60 21837.60 23584.70 25175.69

(ii) Energy sold to metered categories Z 6668.48 9256.09 10636.93 11716.70 12985.76 14302.53

(iii) Energy sold to un-metered categories N 5513.46 8006.78 8482.33 9269.50 9536.85 9761.55

Losses (LT System) F-(Z+N) 777.45 1082.89 717.34 851.39 1062.09 1111.62

% Losses (LT System) [F-(Z+N)] x 100 / (F) 6.00 5.90 3.62 3.90 4.50 4.42

IV. Total losses in the Distribution System 0.00 0.00 0.00 0.00 0.00 0.00

(i) Total Input to the distribution system A + B + D + E 18202.60 25907.65 27756.49 29791.10 31861.50 34218.23

(ii) Total Output from the Distribution Sytem X + Y + Z + N 16047.93 22870.94 25100.37 26948.44 28750.45 30947.66

(iii) EHT Sales G 1976.53 3490.59 3612.00 3786.06 3497.09 3837.97

Distribution System Losses(A + B + D + E)-(X + Y + Z

+ N)2154.67 3036.71 2656.12 2842.66 3111.05 3270.57

0.00 0.00 0.00 0.00 0.00 0.00

% Distribution System Losses ( Excluding EHT Sales)[(A+B+D+E)-(X+Y+Z+N)] x

100 / (A+B+D+E)11.84 11.72 9.57 9.54 9.76 9.56

0.00 0.00 0.00 0.00 0.00 0.00

% Distribution System Losses ( Including EHT Sales)[(A+B+D+E)-(X+Y+Z+N)] x

100 / (A+B+D+E +G)10.68 10.33 8.47 8.47 8.80 8.59

Particulars

Page 255: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 4b

Total Transmission Losses (Inclusive of PGCIL) (%)

Input to APTransco Network (MU)

APTransco Losses (%) 3.95 2.92 3.03 3.03

APTransco Losses (MU)

Input to PGCIL (For CGS) (MU)

PGCIL Losses (%) (For CGS) 3.57 3.57 3.57 3.57

PGCIL Losses (MU) (For CGS)

2018-19

Transmission Losses

Relates to detailed calculation of the Transmission Losses percentage entered in Form 4. The working of the losses (MU &

percentages) to be entered under working notes Form 4b.

Particulars Detail Links Base Year 2014-15 2015-16 2016-17 2017-18

Page 256: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 4.1

Base Year

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 55.35 56.69 52.46 33.22 23.03 15.37 36.16 33.55 51.77 55.11 48.47 52.81 513.98 513.98

RTPP Stage-II 59.78 58.50 55.50 56.13 54.46 30.88 37.67 50.47 40.26 57.64 56.68 55.83 613.81 613.81

RTPP Stage-III 21.80 29.35 26.53 27.01 24.15 20.14 20.13 21.39 13.19 28.14 27.32 26.57 285.72 285.72

KTPS A 79.43 81.26 67.84 55.52 50.14 65.85 70.57 72.51 78.65 76.63 66.27 82.52 847.19 847.19

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 73.41 64.82 63.33 49.10 0.68 51.68 63.70 69.07 70.25 74.69 68.29 72.71 721.71 721.71

KTPS Stage VI 63.75 68.13 42.87 53.86 50.43 62.19 62.41 65.48 66.20 62.50 55.94 67.45 721.22 721.22

RTS B 7.50 8.68 7.40 7.51 7.34 7.21 7.27 7.87 6.23 8.58 6.58 7.09 89.24 89.24

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 57.57 72.09 51.68 5.41 45.64 59.97 57.30 53.26 63.84 70.11 53.13 64.34 654.35 654.35

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Dr.NTTPS Unit I,II,III 156.86 170.99 139.81 159.92 122.60 150.41 101.69 136.71 154.69 176.38 162.96 180.22 1813.24 1813.24

Dr.NTTPS IV 74.71 72.23 61.67 69.18 68.91 66.94 55.59 65.95 62.83 70.74 67.63 65.21 801.59 801.59

TOTAL THERMAL 650.16 682.73 569.09 516.84 447.38 530.65 512.49 576.25 607.91 680.54 613.26 674.75 7062.05 7062.05

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 7.54 8.58 5.52 6.07 5.62 6.22 4.51 5.19 5.14 4.94 4.26 5.60 69.20 69.20

TUNGBHADRA PH AP Share 0.58 0.87 -0.11 2.52 6.50 5.09 4.10 4.18 1.97 3.65 2.58 2.16 34.09 34.09

USL 11.12 3.18 6.93 9.29 2.34 4.15 9.07 10.90 10.02 11.19 8.81 13.54 100.53 100.53

LSR 26.12 25.43 18.86 21.04 22.96 18.16 23.46 24.93 25.09 25.47 19.65 26.66 277.85 277.85

DONKARAYI 2.12 1.63 0.83 0.99 2.29 2.31 3.03 3.08 3.10 2.96 1.14 2.20 25.68 25.68

SSLM 30.05 13.27 5.58 20.91 82.36 54.58 20.32 10.67 11.58 20.96 27.89 30.74 328.90 328.90

NSPH 8.57 -0.11 -0.10 0.75 106.76 69.51 36.11 11.47 12.33 17.08 12.81 21.91 297.09 297.09

NSRCPH 0.00 0.00 0.00 0.00 7.70 9.26 8.25 9.17 6.62 4.55 1.09 0.00 46.64 46.64

NSLCPH 0.00 0.00 0.00 0.00 5.06 6.28 3.59 3.41 2.33 0.93 0.00 0.00 21.60 21.60

POCHAMPAD PH 0.00 0.00 -0.01 0.73 2.84 2.05 2.68 0.27 0.60 1.61 1.78 1.76 14.30 14.30

NIZAMSAGAR PH -0.01 -0.01 -0.01 -0.01 -0.01 0.36 0.19 -0.01 0.16 0.81 0.63 0.68 2.80 2.80

PABM 0.00 0.00 -0.01 0.06 0.46 0.29 -0.01 -0.01 -0.01 -0.01 0.11 0.19 1.06 1.06

MINI HYDRO&OTHERS 0.03 0.00 0.01 0.09 0.29 0.28 0.32 0.08 0.26 0.25 0.24 0.25 2.09 2.09

SINGUR 0.09 -0.01 -0.01 0.00 0.00 0.09 -0.01 -0.01 0.00 0.09 0.17 0.54 0.95 0.95

SSLM LCPH 0.75 -0.01 0.00 0.60 116.81 86.35 43.92 5.23 3.24 3.53 9.83 24.88 295.12 295.12

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share -0.01 -0.01 -0.02 8.29 23.28 13.47 11.02 2.31 0.82 0.24 -0.02 -0.02 59.34 59.34

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD Stig-II 0.00 0.00 0.00 0.20 0.44 0.35 0.94 0.03 0.04 0.75 0.74 0.78 4.28 4.28

PULICHINTAL(New Project) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 86.94 52.81 37.49 71.53 385.72 278.80 171.51 90.89 83.28 98.98 91.73 131.86 1581.51 1581.51

TOTAL APGENCO 737.09 735.54 606.58 588.36 833.09 809.45 684.00 667.15 691.19 779.52 704.98 806.61 8643.56 8643.56

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 100.56 104.39 74.54 81.48 67.69 72.24 71.01 91.37 101.67 93.86 96.66 102.55 1058.01 1058.01

NTPC (SR) Stage III 25.91 25.78 22.46 23.49 22.62 23.04 22.37 25.45 19.28 32.41 27.41 24.89 295.11 295.11

Total NTPC(SR) 126.47 130.17 97.00 104.97 90.31 95.28 93.38 116.82 120.95 126.27 124.07 127.44 1353.12 1353.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 4.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.56 4.56

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)

Energy Availability

Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

Page 257: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

Kahalgaon 2.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.03 2.03

Talcher - Stage 1 2.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.94 2.94

Talcher Stage 2 39.74 36.95 45.02 48.40 48.19 49.05 44.21 57.41 58.60 61.32 54.73 63.21 606.84 606.84

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 49.26 36.95 45.02 48.40 48.19 49.05 44.21 57.41 58.60 61.32 54.73 63.21 616.36 616.36

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 175.73 167.12 142.02 153.37 138.50 144.33 137.59 174.23 179.55 187.59 178.80 190.65 1969.47 1969.47

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 16.34 16.77 14.97 17.88 15.57 14.05 9.59 12.87 11.46 19.54 15.55 17.93 182.51 182.51

Stage-II 28.76 28.21 28.26 27.43 18.04 18.95 23.55 22.65 29.63 35.20 27.21 31.27 319.17 319.17

Total NLC 45.11 44.98 43.22 45.31 33.61 33.00 33.14 35.53 41.09 54.74 42.76 49.20 501.69 501.69

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 2.16 2.15 2.16 2.28 2.28 2.20 4.48 3.07 4.74 4.76 3.90 4.77 38.96 38.96

NPC-Kaiga unit I 16.95 18.29 18.28 19.89 20.39 19.52 19.05 15.39 12.38 16.06 15.14 16.82 208.15 208.15

NPC-Kaiga unit II 15.73 19.92 19.14 20.69 21.39 15.08 15.21 10.88 21.93 20.46 18.44 12.36 211.21 211.21

Total NPC 34.84 40.36 39.58 42.86 44.06 36.80 38.74 29.33 39.05 41.27 37.47 33.96 458.33 458.33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 142.42 131.69 141.14 129.70 148.68 137.57 124.05 82.95 130.01 139.51 138.12 152.37 1598.22 1598.22

NTPC Simhadri Stage II 62.16 56.76 62.75 50.67 32.64 46.28 43.00 62.20 69.83 81.84 71.83 70.96 710.92 710.92

Total NTPC- Simhadri 204.58 188.44 203.89 180.37 181.32 183.85 167.06 145.15 199.84 221.35 209.95 223.34 2309.14 2309.14

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vallur Thermal Power Plant 6.79 4.97 3.79 8.16 2.26 8.39 10.56 10.55 9.97 23.18 15.16 12.99 116.77 116.77

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 467.05 445.87 432.51 430.06 399.75 406.38 387.08 394.78 469.49 528.14 484.14 510.14 5355.40 5355.40

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 0.96 0.90 1.12 1.09 0.94 0.92 0.88 0.89 1.04 0.98 1.41 2.22 13.36 13.36

APGPCL I - Unutilised capacity 0.64 0.01 0.04 0.03 0.05 0.04 0.02 0.01 0.12 0.15 0.24 0.50 1.84 1.84

APGPCL II - Allocated capacity 3.38 3.23 3.41 3.83 3.32 3.21 3.12 3.12 3.89 3.58 1.82 0.00 35.90 35.90

APGPCL II - Unutilised capacity 0.85 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.43 1.43

Total APGPCL 5.83 4.72 4.57 4.94 4.31 4.17 4.02 4.02 5.04 4.71 3.47 2.72 52.53 52.53

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 16.78 16.62 18.45 17.24 15.86 15.20 16.04 18.35 21.96 21.35 18.65 16.08 212.57 212.57

Spectrum 18.60 17.26 17.63 17.59 16.56 15.10 16.17 20.07 26.98 25.05 21.77 21.88 234.67 234.67

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 33.12 31.36 26.86 25.85 24.00 21.59 25.52 26.00 11.96 22.03 29.55 35.90 313.73 313.73

BSES 7.88 7.23 11.42 10.20 8.33 7.94 7.66 8.19 11.92 9.59 7.17 5.02 102.55 102.55

GVK Extension 0.00 0.22 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.32 0.32

Vemagiri 24.53 9.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.13 34.13

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 101.92 82.29 74.46 70.87 64.75 59.83 65.39 72.61 72.82 78.02 77.15 78.88 898.97 898.97

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 258: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 14.59 14.06 14.06 12.31 11.76 12.08 9.27 9.15 4.40 14.36 16.57 18.77 151.39 151.39

NCE - Bagasse 1.23 0.00 5.80 7.61 12.55 5.56 0.00 3.60 7.34 12.69 14.36 12.60 83.33 83.33

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 0.28 0.32 19.67 6.32 19.12 21.54 29.68 5.56 30.84 3.70 26.77 13.43 177.22 177.22

NCE - Mini Hydel 0.59 0.01 0.00 0.00 0.19 1.26 0.44 2.99 7.56 7.93 7.58 9.40 37.95 37.95

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.48 0.93 0.76 0.86 0.77 0.59 0.17 0.00 0.00 4.55 4.55

NCE-Others 0.25 0.39 0.34 0.29 0.28 0.33 0.30 0.31 0.30 0.37 0.76 0.89 4.80 4.80

TOTAL NCE 16.94 14.79 39.87 27.01 44.83 41.53 40.56 22.36 51.02 39.21 66.04 55.09 459.25 459.25

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources/Traders 183.40 277.86 211.21 282.31 267.55 273.57 304.40 241.54 280.43 264.53 275.41 322.66 3184.88 3184.88

Heavy Water Plant * 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Open Access on Short Term Trading 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 108.77 108.77

D to D PP Cost (Inter Discom) 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 1282.92 1282.92

KSK Mahanadi (MT) 0.00 0.00 0.00 0.00 23.22 28.95 35.76 57.60 56.22 61.32 46.07 54.40 363.53 363.53

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 299.37 393.84 327.19 398.28 406.74 418.49 456.13 415.11 452.63 441.82 437.46 493.03 4940.09 4940.09

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI Underdrawal -9.02 -6.41 -6.05 -5.31 -6.14 -7.22 -8.48 -7.38 -5.32 -1.59 -0.62 -5.78 -69.33 -69.33

IST 0.00 -0.10 -4.67 -4.04 -3.75 -6.59 -2.49 -1.47 0.00 0.00 0.00 0.00 -23.11 -23.11

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET -9.02 -6.50 -10.72 -9.34 -9.90 -13.81 -10.97 -8.86 -5.32 -1.59 -0.62 -5.78 -92.44 -92.44

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 1619.19 1670.54 1474.45 1510.19 1743.58 1726.04 1626.20 1567.18 1736.86 1869.83 1772.61 1940.69 20257.36 20257.36

Page 259: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

2014-15

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 161.92 157.05 204.20 200.53 158.55 158.87 188.93 223.90 227.01 227.65 205.35 240.80 2354.77 2354.77

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 66.68 60.66 95.03 88.10 90.01 80.72 93.18 92.09 48.69 97.03 89.41 92.93 994.55 994.55

RTPP I 48.56 39.24 43.50 44.77 53.52 60.09 71.50 65.77 65.57 67.66 65.16 75.33 700.67 700.67

RTPP Stage-II 58.29 51.09 67.42 49.30 71.42 52.14 77.00 63.41 69.87 74.76 68.91 82.54 786.15 786.15

RTPP Stage-III 28.16 23.27 32.39 31.31 13.10 26.93 37.76 33.10 31.82 34.86 34.88 41.29 368.88 368.88

KTPS A 74.39 68.37 89.52 94.28 88.97 77.33 106.65 103.13 97.48 98.63 107.79 119.34 1125.88 1125.88

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 63.55 58.83 79.29 77.02 74.95 67.61 74.29 49.24 47.14 100.37 85.63 100.43 878.33 878.33

RTS B 6.99 7.45 9.44 9.13 9.14 3.84 0.00 0.00 1.08 0.00 0.00 0.00 47.07 47.07

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 72.84 71.90 93.56 102.10 99.81 91.86 102.29 99.39 103.67 103.16 83.06 91.51 1115.15 1115.15

Kakatiya Thermal Power Plant Stage II 68.06 63.62 91.15 97.18 85.36 81.71 92.49 93.48 101.79 99.41 93.62 101.85 1069.71 1069.71

Damodaram Sanjeevaiah Thermal power plant - I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Damodaram Sanjeevaiah Thermal power plant - II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 649.43 601.47 805.51 793.71 744.85 701.11 844.10 823.51 794.12 903.54 833.81 946.02 9441.17 9441.17

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 6.55 4.54 6.00 9.33 9.19 6.22 11.42 10.43 12.98 19.85 19.37 20.65 136.53 136.53

TUNGBHADRA PH AP Share 0.38 -0.13 -0.17 0.49 4.94 7.90 16.11 12.97 10.15 11.79 9.31 7.51 81.26 81.26

USL 12.75 8.81 8.65 8.00 11.08 6.93 22.98 28.22 30.05 34.37 31.21 52.00 255.06 255.06

LSR 29.13 28.79 7.95 27.47 30.92 30.90 69.43 68.42 69.99 81.40 76.49 87.68 608.57 608.57

DONKARAYI 2.90 2.86 1.02 3.66 3.30 3.22 7.32 7.43 6.76 8.21 8.68 9.80 65.16 65.16

SSLM 19.85 0.38 4.84 2.06 128.71 126.60 93.19 -0.30 -0.29 -0.28 -0.25 29.60 404.11 404.11

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 0.00 0.00 0.00 0.00 1.94 12.21 31.84 25.56 18.47 10.48 4.27 -0.02 104.73 104.73

NSLCPH 0.00 0.00 0.00 0.00 0.24 2.29 0.00 0.00 0.00 0.00 0.00 0.00 2.53 2.53

POCHAMPAD PH 0.97 0.00 -0.01 0.00 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 1.04 1.04

NIZAMSAGAR PH 0.00 0.00 -0.01 -0.01 0.18 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.74 0.74

PABM -0.01 -0.01 -0.01 -0.01 0.80 0.34 0.56 1.80 1.97 0.31 0.57 0.61 6.93 6.93

MINI HYDRO&OTHERS 2.28 -0.11 4.19 12.23 48.92 120.45 0.21 0.09 0.27 0.29 0.18 0.20 189.19 189.19

SINGUR 0.58 0.09 -0.01 0.17 0.06 0.11 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

SSLM LCPH 16.31 -0.11 -0.20 2.82 143.64 158.35 0.00 0.00 0.00 0.00 0.00 0.00 320.81 320.81

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share -0.02 -0.03 0.00 0.92 27.29 34.34 0.00 0.00 0.00 0.00 0.00 0.00 62.50 62.50

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD Stig-II 0.43 0.00 -0.05 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.41 0.41

Pochmpadu St.IV (TS) 0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.18 0.18

TOTAL HYDRO 92.28 45.07 32.20 67.13 411.21 510.55 253.07 154.61 150.34 166.42 149.84 208.01 2240.73 2240.73

TOTAL APGENCO 741.71 646.54 837.70 860.84 1156.06 1211.66 1097.17 978.12 944.46 1069.95 983.65 1154.04 11681.90 11681.90

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 103.52 83.32 123.60 121.91 132.67 100.93 114.93 153.77 137.94 131.75 126.94 140.38 1471.66 1471.66

NTPC (SR) Stage III 27.71 25.19 41.21 27.86 13.64 32.40 35.98 38.90 34.46 33.21 75.25 36.02 421.84 421.84

Total NTPC(SR) 131.24 108.51 164.82 149.77 146.31 133.33 150.91 192.67 172.40 164.97 202.19 176.40 1893.50 1893.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU) Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)

Page 260: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 59.17 60.51 64.81 60.94 71.76 77.61 84.38 83.35 84.75 81.00 32.30 84.28 844.87 844.87

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 59.17 60.51 64.81 60.94 71.76 77.61 84.38 83.35 84.75 81.00 32.30 84.28 844.87 844.87

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 190.41 169.02 229.63 210.72 218.07 210.93 235.29 276.02 257.15 245.97 234.48 260.68 2738.37 2738.37

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 17.12 16.55 22.93 22.80 22.20 20.60 11.18 19.38 16.13 21.60 20.70 22.77 233.94 233.94

Stage-II 29.49 28.28 37.97 31.39 31.76 31.81 35.43 36.03 32.07 40.55 36.61 40.63 412.01 412.01

Total NLC 46.61 44.83 60.90 54.19 53.96 52.41 46.60 55.41 48.20 62.15 57.31 63.40 645.96 645.96

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 4.56 4.09 6.38 6.52 6.49 6.11 3.90 5.56 1.64 5.67 6.59 7.56 65.08 65.08

NPC-Kaiga unit I 16.04 16.69 22.52 47.84 48.87 48.20 56.40 46.89 48.83 56.49 53.78 49.64 512.20 512.20

NPC-Kaiga unit II 13.11 15.23 20.15 -4.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.18 44.18

Total NPC 33.71 36.01 49.05 50.05 55.37 54.31 60.30 52.45 50.47 62.16 60.37 57.21 621.45 621.45

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 153.46 153.49 202.24 206.21 164.22 202.81 134.35 119.75 158.57 195.57 178.48 209.08 2078.23 2078.23

NTPC Simhadri Stage II 75.22 67.44 108.57 88.14 57.31 44.30 52.37 87.30 86.93 88.04 85.12 91.40 932.13 932.13

Total NTPC- Simhadri 228.68 220.93 310.81 294.35 221.54 247.11 186.72 207.05 245.50 283.60 263.60 300.48 3010.36 3010.36

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vallur Thermal Power Plant 17.97 18.43 23.41 23.60 17.65 12.74 15.47 22.20 14.67 21.53 19.99 26.30 233.97 233.97

Bundled power under JVNSM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 517.38 489.22 673.81 632.91 566.59 577.51 544.38 613.13 615.98 675.41 635.75 708.06 7250.12 7250.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 1.19 0.88 1.17 0.55 0.00 0.00 0.00 0.75 1.31 1.12 0.85 1.49 9.31 9.31

APGPCL I - Unutilised capacity 0.03 0.12 0.17 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.40 0.40

APGPCL II - Allocated capacity 2.50 3.37 4.21 2.07 0.00 0.00 0.00 1.99 4.78 4.10 3.07 5.40 31.50 31.50

APGPCL II - Unutilised capacity 0.30 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.31 0.31

Total APGPCL 4.01 4.36 5.55 2.71 0.00 0.00 0.00 2.75 6.09 5.22 3.92 6.89 41.51 41.51

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 11.94 14.67 6.10 4.09 0.00 0.00 9.12 20.86 21.51 21.89 20.03 25.10 155.32 155.32

Spectrum 15.84 17.24 16.53 3.90 0.00 0.00 2.06 15.38 24.95 18.42 15.40 16.76 146.48 146.48

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 30.52 29.04 40.88 10.52 4.69 4.91 1.34 10.03 5.02 7.20 8.99 9.58 162.71 162.71

BSES 1.16 5.42 8.91 2.88 0.00 0.00 8.66 13.32 7.47 0.00 0.00 0.00 47.82 47.82

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 59.46 66.37 72.42 21.39 4.69 4.91 21.18 59.59 58.95 47.50 44.42 51.43 512.33 512.33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 261: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 8.34 10.63 13.55 15.39 11.05 14.56 0.00 0.00 0.00 0.00 0.00 0.00 73.53 73.53

NCE - Bagasse 1.74 0.00 0.00 0.00 6.87 14.41 0.00 0.00 0.00 0.00 0.00 0.00 23.02 23.02

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 31.45 77.45 187.18 238.25 227.38 213.03 0.00 0.00 0.00 0.00 0.00 0.00 974.74 974.74

NCE - Mini Hydel 1.33 3.58 5.75 4.86 10.85 10.13 0.00 0.00 0.00 0.00 0.00 0.00 36.50 36.50

NCE - NCL Energy Ltd 0.00 0.00 0.00 1.41 2.77 2.86 2.81 2.50 1.76 0.98 0.00 0.00 15.10 15.10

NCE-Others 1.51 1.76 1.57 1.32 1.51 0.34 0.00 0.00 0.00 0.00 0.00 0.00 8.01 8.01

TOTAL NCE 44.37 93.42 208.05 261.24 260.43 255.34 2.81 2.50 1.76 0.98 0.00 0.00 1130.90 1130.90

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Sponge Iron 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Essar steels 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 54.91 46.05 14.55 87.34 59.37 86.15 83.38 73.21 88.56 72.92 79.16 82.90 828.50 828.50

Hinduja 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RLNG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 54.91 46.05 14.55 87.34 59.37 86.15 83.38 73.21 88.56 72.92 79.16 82.90 828.50 828.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 291.92 299.18 527.83 645.86 613.85 597.86 593.61 511.89 573.61 498.23 529.38 609.36 6292.59 6292.59

Pool Transaction (Purchases) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Jhajjar 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pool Purchase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pool Sales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 291.92 299.18 527.83 645.86 613.85 597.86 593.61 511.89 573.61 498.23 529.38 609.36 6292.59 6292.59

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 1713.77 1645.14 2339.91 2512.30 2660.99 2733.44 2342.54 2241.18 2289.40 2370.23 2276.28 2612.67 27737.84 27737.84

Page 262: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

2015-16

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 202.30 228.06 175.63 193.77 197.13 172.60 203.84 177.14 193.29 173.83 159.72 248.59 2325.92 2325.92

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 78.32 90.23 74.71 81.40 84.27 74.44 98.99 27.52 -2.96 42.73 65.59 109.54 824.78 824.78

RTPP I 59.45 69.21 56.52 47.79 57.25 56.87 63.46 54.31 56.22 54.35 52.14 76.20 703.78 703.78

RTPP Stage-II 66.27 77.93 57.42 65.92 51.66 69.85 69.67 47.69 62.73 57.65 54.59 92.00 773.39 773.39

RTPP Stage-III 33.67 36.80 26.53 32.26 12.33 35.43 34.63 26.51 29.98 27.12 25.95 44.73 365.94 365.94

KTPS A 118.06 111.86 94.26 79.49 98.71 88.42 103.18 85.16 109.79 115.08 94.84 115.41 1214.24 1214.24

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 101.47 100.63 33.07 95.60 98.58 86.77 103.76 95.85 106.02 107.07 97.27 98.63 1124.73 1124.73

RTS B 0.10 7.18 9.44 11.09 8.48 8.77 9.65 9.56 10.29 10.29 9.96 8.79 103.60 103.60

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 98.65 99.95 80.54 95.95 91.72 98.19 90.31 94.62 88.34 25.78 97.89 94.33 1056.28 1056.28

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage V (TS) 92.38 95.36 85.10 80.34 82.01 75.56 80.89 86.10 63.75 67.36 90.41 99.13 998.39 998.39

107.44 57.68 228.45 182.33 219.15 247.65 352.94 213.92 295.22 371.66 367.34 382.76 3026.52 3026.52

TOTAL THERMAL 958.11 974.90 921.68 965.94 1001.28 1014.55 1211.33 918.37 1012.67 1052.93 1115.70 1370.11 12517.56 12517.56

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 14.12 10.04 6.30 12.13 13.73 10.61 12.86 13.02 9.71 8.74 15.35 11.55 138.16 138.16

TUNGBHADRA PH AP Share 0.60 -0.39 -0.17 2.38 11.23 10.03 9.41 10.14 3.34 6.51 -0.09 -0.21 52.77 52.77

USL 36.41 25.77 16.28 31.05 31.02 11.60 15.87 12.99 21.62 44.07 37.04 43.89 327.61 327.61

LSR 70.54 69.41 50.41 70.14 60.75 60.70 60.99 55.07 67.98 72.57 77.13 79.21 794.90 794.90

DONKARAYI 8.76 8.62 6.28 8.33 4.03 7.45 7.78 6.96 5.49 3.67 4.36 4.22 75.95 75.95

SSLM 11.24 13.42 -0.32 -0.27 6.17 10.40 5.05 36.42 9.99 -0.24 19.57 18.97 130.40 130.40

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.03 -0.03 -0.02 -0.03 -0.02 -0.03 -0.02 -0.02 -0.02 -0.02 -0.02 -0.03 -0.29 -0.29

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.01 -0.01 -0.01 -0.01 0.15 0.41 2.16 0.57 1.02 0.18 -0.01 -0.02 4.40 4.40

MINI HYDRO&OTHERS 0.03 0.00 0.01 0.19 0.13 0.11 0.19 0.06 0.17 0.17 0.03 0.20 1.29 1.29

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Differential Fixed cost 14-15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Interest on Pension Bonds 14-15 & 15-16 (AP) & Differential Cost between Scheduled Energy & Energy as per RATIO 14-150.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.44 89.44 89.44

TOTAL HYDRO 141.67 126.83 78.76 123.90 127.17 111.29 114.28 135.21 119.30 135.64 153.36 247.23 1614.64 1614.64

TOTAL APGENCO 1099.78 1101.72 1000.44 1089.84 1128.46 1125.85 1325.61 1053.59 1131.96 1188.57 1269.06 1617.34 14132.20 14132.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 127.21 148.28 85.25 109.66 134.62 93.48 110.89 108.38 126.64 116.30 111.87 131.85 1404.42 1404.42

NTPC (SR) Stage III 33.10 47.90 23.09 35.04 33.93 29.88 32.00 28.68 31.04 29.65 29.46 33.78 387.55 387.55

Total NTPC(SR) 160.32 196.18 108.34 144.70 168.55 123.36 142.89 137.06 157.68 145.95 141.32 165.62 1791.97 1791.97

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

Page 263: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 79.44 83.66 51.07 78.27 62.63 76.41 76.97 72.26 78.68 69.26 74.27 79.48 882.41 882.41

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 79.44 83.66 51.07 78.27 62.63 76.41 76.97 72.26 78.68 69.26 74.27 79.48 882.41 882.41

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 239.76 279.84 159.41 222.97 231.18 199.77 219.86 209.32 236.36 215.21 215.60 245.11 2674.39 2674.39

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 21.49 22.34 16.58 22.80 22.17 17.55 15.77 10.75 11.12 19.84 17.32 22.11 219.84 219.84

Stage-II 38.32 39.81 30.22 29.51 30.39 27.52 31.30 18.91 25.51 33.90 28.89 37.80 372.08 372.08

Total NLC 59.82 62.15 46.79 52.30 52.55 45.07 47.07 29.66 36.63 53.74 46.22 59.92 591.92 591.92

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 7.42 7.74 7.64 8.01 7.90 6.19 7.44 5.46 3.79 5.43 7.14 7.21 81.37 81.37

NPC-Kaiga unit I 55.77 61.67 58.68 55.33 40.86 57.25 51.84 51.63 57.13 56.38 54.03 56.61 657.18 657.18

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 63.19 69.41 66.32 63.34 48.76 63.44 59.28 57.09 60.92 61.81 61.16 63.82 738.55 738.55

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 198.18 226.57 161.99 198.61 214.56 197.62 207.22 126.68 98.67 188.34 177.01 213.61 2209.07 2209.07

NTPC Simhadri Stage II 87.04 121.55 63.50 96.24 83.40 43.85 93.61 80.54 85.34 84.31 71.37 94.57 1005.30 1005.30

Total NTPC- Simhadri 285.21 348.11 225.49 294.86 297.96 241.47 300.84 207.22 184.01 272.64 248.38 308.18 3214.37 3214.37

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 16.25 16.53 13.60 15.78 16.02 13.87 15.90 15.34 16.58 15.85 15.86 17.59 189.16 189.16

Vallur Thermal Power Plant 26.46 29.07 20.33 23.68 23.98 21.40 29.85 22.66 20.28 24.91 29.79 18.41 290.82 290.82

Kudigi 20.95 12.33 8.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.83 19.69 66.75 66.75

Tuticorin 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC Tamilnadu Power Ltd Stage.1 0.00 0.00 7.30 8.16 13.13 17.94 24.44 30.47 31.52 39.45 41.98 47.17 261.57 261.57

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 711.63 817.43 548.19 681.10 683.58 602.96 697.23 571.76 586.31 683.62 663.83 779.89 8027.51 8027.51

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 1.60 1.13 1.59 1.36 1.17 1.13 1.03 0.75 0.75 0.77 0.83 0.97 13.09 13.09

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 5.59 3.94 5.60 4.81 4.11 3.77 3.46 2.55 2.57 2.91 3.07 3.88 46.26 46.26

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 7.19 5.06 7.19 6.17 5.28 4.91 4.49 3.31 3.32 3.68 3.90 4.85 59.35 59.35

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 17.72 36.95 17.50 50.21 39.64 32.62 19.06 17.14 21.73 16.39 20.10 12.98 302.04 302.04

Spectrum 12.98 16.66 19.53 20.82 19.46 16.20 9.57 9.58 16.62 13.71 11.18 20.49 186.79 186.79

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 7.64 10.66 11.24 11.03 19.00 19.53 17.32 13.70 14.90 26.65 35.15 52.06 238.87 238.87

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.99 17.07 0.00 0.00 0.00 35.05 35.05

Vemagiri 43.31 0.00 0.00 0.00 27.08 28.38 37.09 2.65 0.00 35.80 0.00 0.00 174.30 174.30

Gautami 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00 31.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 264: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

TOTAL IPPS 112.66 64.27 48.26 82.06 105.18 96.73 83.04 61.06 70.31 92.54 66.43 85.53 968.07 968.07

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 13.47 20.83 25.36 23.70 26.26 24.50 19.63 18.74 21.19 30.03 28.50 32.15 284.37 284.37

NCE - Bagasse 1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.64 13.15 15.09 10.89 43.59 43.59

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.12 0.79 0.54 1.34 1.53 1.29 0.57 2.35 0.28 -0.07 0.57 0.03 9.33 9.33

NCE - Wind Power 43.86 82.13 189.64 384.22 318.09 207.72 43.95 99.17 93.44 99.02 108.63 81.79 1751.67 1751.67

NCE - Mini Hydel 0.86 0.00 0.61 0.52 0.54 0.92 2.69 1.42 1.81 8.85 7.74 8.99 34.94 34.94

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.31 1.90 2.33 1.84 0.69 0.17 0.00 0.00 0.00 7.24 7.24

NCE-Others 5.11 5.01 2.58 1.91 2.93 3.37 4.19 5.62 4.39 9.62 8.62 10.62 63.97 63.97

TOTAL NCE 65.24 108.77 218.73 411.99 351.25 240.14 72.86 127.98 123.92 160.61 169.15 144.47 2195.11 2195.11

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 84.55 88.58 79.25 84.92 72.16 68.85 83.37 66.57 76.65 52.40 53.13 71.08 881.52 881.52

Hinduja (HNPCL) Unit#1 520 MW COD from 10.01.16, Unit# 520 MW COD is 03.07.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.95 107.58 159.92 0.00 298.45 298.45

Thermal Power Tech (COD from 20.04.2015) 36.87 60.09 105.60 99.25 77.31 107.15 111.81 103.72 110.33 102.36 98.37 111.01 1123.85 1123.85

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 0.00 0.00 3.05 0.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.83 3.83

GMR Rajahmundry Energy (PSDF Scheme) 0.00 0.00 0.00 0.79 5.00 32.50 27.61 59.41 59.10 0.00 82.11 153.04 419.57 419.57

Lanco Kondapalli Phase-II (PSDF Scheme) 0.00 0.00 0.00 0.00 0.00 0.00 39.21 55.73 43.11 57.93 37.37 11.73 245.08 245.08

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 121.41 148.67 184.85 188.01 155.25 208.50 262.00 285.43 320.14 320.27 430.90 346.85 2972.29 2972.29

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 2.97 14.44 13.74 25.55 5.29 46.20 25.53 -2.95 0.25 -15.02 -1.40 -16.63 97.97 97.97

Other Short Term Sources 514.47 618.99 453.96 514.05 476.26 363.05 419.30 330.36 312.36 246.28 225.93 313.43 4788.43 4788.43

POSOCO Deviation Charges(UI Charges) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Reactive Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POSOCO SRLDC Fee & Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POSOCO Congestion Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC UI Charges -5.48 -4.94 -5.03 -7.80 -2.62 -0.41 -6.23 -5.02 -3.57 -5.78 -9.50 -5.41 -61.79 -61.79

Discom to Discom Cost ( D to D, UI, & D trade) (As per IBSS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 511.95 628.49 462.67 531.79 478.93 408.84 438.60 322.39 309.03 225.48 215.03 291.39 4824.61 4824.61

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 2629.86 2874.42 2470.33 2990.96 2907.93 2687.93 2883.83 2425.52 2544.99 2674.76 2818.30 3270.32 33179.15 33179.15

Page 265: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

2016-17

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 224.83 168.81 78.49 96.47 139.88 93.48 198.66 226.06 190.46 180.63 128.49 180.35 1906.58 1906.58

VTPS II 111.81 77.52 49.43 67.26 72.23 43.78 89.67 84.41 49.25 67.90 64.01 81.48 858.75 858.75

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 79.12 54.60 29.46 33.36 27.51 19.91 55.11 61.53 49.70 33.02 35.45 56.52 535.28 535.28

RTPP Stage-II 87.31 53.31 23.81 14.10 40.63 12.62 63.78 68.96 50.84 40.12 31.99 61.83 549.33 549.33

RTPP Stage-III 42.19 22.05 20.66 22.77 3.99 22.00 31.05 32.21 24.49 23.26 17.81 27.14 289.61 289.61

KTPS A 35.11 38.04 38.36 39.06 39.81 34.61 34.20 35.43 32.96 26.93 32.65 41.19 428.35 428.35

KTPS B 36.96 37.86 38.39 36.46 37.08 33.98 34.56 21.76 15.68 30.02 35.32 40.05 398.11 398.11

KTPS C 34.32 33.46 31.74 33.16 34.41 32.28 31.07 21.69 22.08 34.76 32.50 36.87 378.34 378.34

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 93.74 99.21 89.75 84.29 45.98 76.80 87.68 90.37 48.73 87.58 84.88 101.31 990.32 990.32

RTS B 10.34 11.19 10.91 10.50 9.94 10.91 11.24 3.01 10.99 10.83 9.20 11.28 120.35 120.35

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 89.42 101.01 91.64 105.72 86.27 100.51 96.23 93.30 105.00 103.30 95.49 99.67 1167.55 1167.55

Kakatiya Thermal Power Plant Stage II 94.61 99.37 100.74 99.34 97.33 101.34 104.84 103.54 104.59 103.58 96.37 98.20 1203.86 1203.86

Damodaram Sanjeevaiah Thermal power plant - I 238.94 178.48 251.07 -2.26 202.65 258.90 255.50 227.42 216.01 234.53 212.96 298.41 2572.61 2572.61

Damodaram Sanjeevaiah Thermal power plant - II 216.49 255.29 285.84 251.41 72.59 160.81 306.40 293.18 280.97 227.65 206.33 182.14 2739.09 2739.09

TOTAL THERMAL 1395.20 1230.21 1140.29 891.64 910.30 1001.94 1399.98 1362.87 1201.74 1204.11 1083.44 1316.42 14138.12 14138.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 8.55 16.73 13.53 15.53 15.87 16.02 17.07 16.76 16.83 16.99 14.44 16.57 184.89 184.89

TUNGBHADRA PH AP Share 1.96 0.11 -0.14 1.43 11.38 6.32 8.83 5.87 0.76 0.79 0.14 -0.24 37.21 37.21

USL 10.65 5.97 6.11 13.56 18.24 11.30 17.55 15.63 14.75 20.97 35.02 47.15 216.91 216.91

LSR 50.95 13.03 10.74 30.60 47.95 35.77 44.12 41.67 49.94 66.41 69.83 71.84 532.85 532.85

DONKARAYI 0.82 0.00 0.00 0.00 3.74 3.57 5.48 5.55 5.75 5.79 3.80 4.97 39.48 39.48

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.03 -0.03 -0.03 -0.02 -0.02 -0.02 1.06 3.16 -0.02 -0.02 -0.02 -0.02 3.98 3.98

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.02 -0.02 -0.02 -0.02 1.48 1.45 2.37 1.46 0.49 1.03 0.10 -0.01 8.30 8.30

MINI HYDRO&OTHERS 0.02 0.00 0.05 0.18 0.17 0.07 0.15 0.09 0.19 0.16 0.14 0.17 1.40 1.40

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srisailam Right Bank Power House (AP) 4.04 -0.30 -0.36 -0.43 129.14 59.95 79.30 0.17 15.91 44.38 64.20 12.23 408.24 408.24

RTPP Stage-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 76.95 35.48 29.87 60.82 227.96 134.42 175.95 90.37 104.61 156.50 187.66 152.66 1433.26 1433.26

TOTAL APGENCO 1472.14 1265.69 1170.16 952.46 1138.25 1136.36 1575.93 1453.25 1306.35 1360.61 1271.10 1469.08 15571.38 15571.38

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 125.49 120.93 74.99 95.72 98.28 109.19 124.11 124.57 116.62 119.38 109.63 124.73 1343.65 1343.65

NTPC (SR) Stage III 32.83 31.39 22.37 29.81 29.05 29.61 19.56 7.14 33.15 31.27 28.88 33.53 328.59 328.59

Total NTPC(SR) 158.32 152.33 97.36 125.53 127.33 138.80 143.67 131.71 149.77 150.65 138.51 158.26 1672.24 1672.24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU) Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)

Page 266: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 76.84 76.77 56.23 76.84 63.48 53.73 62.78 65.33 79.17 75.43 68.10 77.04 831.75 831.75

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 76.84 76.77 56.23 76.84 63.48 53.73 62.78 65.33 79.17 75.43 68.10 77.04 831.75 831.75

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 235.16 229.09 153.59 202.37 190.80 192.53 206.45 197.04 228.94 226.09 206.61 235.31 2503.99 2503.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 21.82 19.35 16.82 17.66 18.88 16.28 15.21 19.00 15.33 17.14 14.87 20.11 212.47 212.47

Stage-II 38.91 34.26 23.11 31.38 28.77 29.38 32.58 30.33 28.44 28.35 27.32 36.10 368.93 368.93

Total NLC 60.74 53.61 39.93 49.04 47.65 45.65 47.78 49.33 43.77 45.48 42.18 56.21 581.40 581.40

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 5.09 6.81 6.57 6.97 7.05 4.22 7.09 7.48 5.85 7.63 7.26 6.07 78.08 78.08

NPC-Kaiga unit I 46.65 31.59 34.72 41.49 41.40 39.66 53.02 53.36 51.97 55.84 39.62 47.04 536.35 536.35

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 51.74 38.40 41.29 48.46 48.45 43.88 60.11 60.83 57.81 63.47 46.88 53.11 614.43 614.43

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 203.34 197.12 150.73 188.26 178.30 146.74 187.28 146.07 148.31 181.46 166.60 205.20 2099.42 2099.42

NTPC Simhadri Stage II 91.28 87.11 59.18 79.43 71.83 64.28 81.12 89.23 56.82 58.18 63.58 79.26 881.32 881.32

Total NTPC- Simhadri 294.62 284.23 209.91 267.70 250.13 211.03 268.40 235.30 205.13 239.64 230.18 284.47 2980.74 2980.74

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 16.86 16.00 13.46 14.11 14.10 13.71 15.28 14.07 15.91 15.47 14.90 16.61 180.49 180.49

Vallur Thermal Power Plant 27.84 26.11 16.77 22.93 33.09 32.24 32.36 34.06 31.18 36.41 24.85 37.02 354.87 354.87

Kudigi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 50.67 49.55 20.57 39.78 36.81 43.10 40.58 50.51 35.93 46.63 40.46 40.84 495.43 495.43

NPC KUDANKULAM 21.77 22.08 21.99 22.89 22.90 8.01 0.22 0.00 0.00 0.00 0.00 0.00 119.86 119.86

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 759.39 719.08 517.51 667.28 643.94 590.15 671.19 641.15 618.68 673.19 606.07 723.57 7831.20 7831.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 0.93 0.76 1.44 0.85 0.50 0.45 0.65 1.03 1.30 1.61 1.53 1.20 12.25 12.25

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 3.67 2.99 5.65 3.28 1.83 1.51 2.17 3.39 4.12 5.68 4.97 4.10 43.37 43.37

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 4.60 3.75 7.09 4.13 2.33 1.96 2.82 4.42 5.42 7.29 6.50 5.30 55.62 55.62

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 17.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.83 17.83

Spectrum 15.13 25.85 53.06 61.13 55.91 57.56 51.13 56.90 61.04 60.13 55.91 48.46 602.22 602.22

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 42.58 32.52 11.03 28.52 37.46 30.64 49.32 64.39 67.58 61.29 63.48 60.69 549.49 549.49

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 22.36 0.00 0.00 0.00 0.00 0.00 0.00 22.36 22.36

Vemagiri 0.00 23.41 33.11 0.00 23.74 6.42 0.00 0.00 0.00 0.00 0.00 0.00 86.68 86.68

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 13.70 21.29 45.28 52.08 71.61 76.03 67.92 28.87 44.84 66.06 48.88 53.07 589.63 589.63

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 89.24 103.07 142.49 141.74 188.71 193.00 168.37 150.16 173.46 187.49 168.27 162.22 1868.21 1868.21

Page 267: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 25.68 24.03 23.33 24.07 20.56 21.27 21.99 16.61 23.93 26.47 24.97 28.05 280.96 280.96

NCE - Bagasse 3.31 0.00 0.00 0.00 0.00 0.00 1.82 6.44 11.55 7.63 6.30 1.78 38.82 38.82

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.05 1.16 0.55 0.39 1.08 0.93 0.65 0.00 1.21 1.56 1.56 1.18 10.32 10.32

NCE - Wind Power 75.03 172.06 297.45 388.03 447.74 409.89 258.27 90.66 141.50 181.68 252.89 154.46 2869.67 2869.67

NCE - Mini Hydel 2.87 3.49 4.87 3.93 5.65 9.47 10.35 10.90 10.13 9.45 6.15 4.61 81.86 81.86

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.17 0.86 0.43 0.34 0.00 0.00 0.00 0.00 0.00 1.80 1.80

NCE-Others 53.91 72.10 61.24 79.72 85.88 78.40 105.74 99.16 100.50 151.22 124.04 150.16 1162.07 1162.07

TOTAL NCE 160.84 272.84 387.44 496.31 561.78 520.40 399.16 223.77 288.81 378.01 415.91 340.25 4445.50 4445.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 71.40 53.21 34.76 86.58 110.46 76.60 41.25 103.43 100.66 129.40 121.92 144.70 1074.36 1074.36

Hinduja 0.00 95.69 227.94 228.62 174.54 117.04 180.19 168.24 185.09 185.57 245.21 330.99 2139.13 2139.13

Thermal Power Tech 54.68 80.42 90.44 93.08 103.90 79.01 99.48 106.22 86.95 71.24 98.24 115.46 1079.13 1079.13

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 112.56 0.00 48.60 119.79 139.37 0.00 0.00 0.00 0.00 0.00 0.00 420.32 420.32

1000MW DBFO 79.46 0.69 38.49 38.55 99.29 54.37 0.00 0.00 0.00 0.00 0.00 0.00 310.84 310.84

TOTAL OTHERS 205.54 342.58 391.63 495.43 607.97 466.38 320.92 377.90 372.71 386.21 465.37 591.15 5023.79 5023.79

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

D-D Purchases/Sales 10.12 6.88 0.00 17.26 23.27 8.97 55.25 8.69 -10.03 9.84 10.50 -28.18 112.57 112.57

363.09 201.49 30.49 54.22 62.72 5.25 113.07 139.15 21.18 8.66 8.95 1.28 1009.54 1009.54

7.77 -148.84 -199.01 -176.61 -152.88 -68.32 0.74 51.22 -95.33 -75.48 -103.07 -131.02 -1090.82 -1090.82

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 380.98 59.53 -168.52 -105.13 -66.89 -54.09 169.06 199.05 -84.19 -56.99 -83.62 -157.92 31.29 31.29

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 3072.73 2766.54 2447.80 2652.20 3076.10 2854.16 3307.44 3049.71 2681.24 2935.82 2849.60 3133.65 34826.99 34826.99

Page 268: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

2017-18

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 64.56 67.21 84.10 133.16 116.90 111.78 130.92 126.70 130.92 130.92 118.25 130.92 1346.34 1346.34

VTPS II 64.56 67.21 84.10 133.16 116.90 111.78 130.92 126.70 130.92 130.92 118.25 130.92 1346.34 1346.34

VTPS III 64.56 67.21 84.10 133.16 116.90 111.78 130.92 126.70 130.92 130.92 118.25 130.92 1346.34 1346.34

VTPS IV 95.18 92.76 151.98 101.18 93.50 129.36 151.91 147.01 151.91 151.91 137.21 151.91 1555.81 1555.81

RTPP I 59.53 71.36 69.19 118.36 140.41 96.13 131.67 127.42 131.67 131.67 118.92 131.67 1327.98 1327.98

RTPP Stage-II 68.30 77.90 96.46 118.64 124.01 110.94 134.02 129.70 134.02 134.02 121.05 134.02 1383.07 1383.07

RTPP Stage-III 24.35 34.91 5.52 -0.37 35.63 62.28 43.03 41.64 43.03 43.03 38.86 43.03 414.93 414.93

KTPS A 41.17 37.05 10.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.23 88.23

KTPS B 39.10 40.41 11.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.92 90.92

KTPS C 37.17 37.20 11.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.96 85.96

KTPS D 95.62 95.37 29.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 220.18 220.18

KTPS Stage VI 102.21 98.34 34.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 234.74 234.74

RTS B 10.91 11.25 3.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.71 25.71

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 102.73 98.62 34.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 235.60 235.60

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Damodaram Sanjeevaiah Thermal power plant 244.95 212.73 -2.35 64.43 258.97 49.02 140.22 135.70 140.22 140.22 126.65 140.22 1651.00 1651.00

RTPP Stage-IV 105.84 146.47 200.28 -2.11 36.32 217.76 119.35 115.50 119.35 119.35 107.80 119.35 1405.27 1405.27

TOTAL THERMAL 1220.72 1256.00 907.58 799.61 1039.52 1000.83 1112.96 1077.06 1112.96 1112.96 1005.26 1112.96 12758.43 12758.43

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 15.24 17.23 14.38 10.74 16.61 12.67 16.74 16.20 16.74 16.74 15.12 16.74 185.13 185.13

TUNGBHADRA PH AP Share 0.69 -0.09 -0.18 1.82 1.63 6.08 1.68 1.63 1.68 1.68 1.52 1.68 19.82 19.82

USL 17.33 20.49 16.01 9.77 12.54 26.27 17.35 16.79 17.35 17.35 15.67 17.35 204.23 204.23

LSR 51.35 9.91 13.98 57.16 50.76 68.65 42.66 41.28 42.66 42.66 38.53 42.66 502.24 502.24

DONKARAYI 4.40 0.66 2.31 6.97 5.02 7.28 4.51 4.37 4.51 4.51 4.08 4.51 53.14 53.14

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.03 -0.03 -0.02 -0.02 -0.02 -0.02 0.00 0.00 0.00 0.00 0.00 0.00 -0.15 -0.15

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.02 -0.01 -0.01 -0.02 -0.02 -0.01 0.00 0.00 0.00 0.00 0.00 0.00 -0.09 -0.09

MINI HYDRO&OTHERS 0.08 0.00 0.10 0.19 0.17 0.21 0.13 0.12 0.13 0.13 0.12 0.13 1.50 1.50

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 -0.02 -0.02 0.00 0.00 0.00 0.00 0.00 0.00 -0.03 -0.03

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Godavari Gas Power Plant 10.20 -0.30 -0.30 -0.30 -0.25 27.18 6.14 5.94 6.14 6.14 5.54 6.14 72.25 72.25

KTPS Stage V 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 99.25 47.85 46.27 86.29 86.42 148.28 89.20 86.32 89.20 89.20 80.57 89.20 1038.04 1038.04

TOTAL APGENCO 1319.97 1303.84 953.84 885.90 1125.93 1149.11 1202.17 1163.39 1202.17 1202.17 1085.83 1202.17 13796.47 13796.47

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 110.09 112.32 92.01 104.65 71.48 101.25 103.19 99.41 102.74 102.74 92.76 102.74 1195.37 1195.37

NTPC (SR) Stage III 32.49 31.06 22.44 24.25 15.54 24.32 27.98 23.03 23.86 23.86 21.54 23.86 294.23 294.23

Total NTPC(SR) 142.57 143.38 114.45 128.90 87.03 125.57 131.17 122.44 126.59 126.59 114.30 126.59 1489.60 1489.60

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Yearly

Auxiliary

Net Energy

Availability Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

Page 269: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 72.81 64.72 63.46 62.97 43.46 57.93 63.70 72.55 74.98 74.98 67.74 74.98 794.28 794.28

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 72.81 64.72 63.46 62.97 43.46 57.93 63.70 72.55 74.98 74.98 67.74 74.98 794.28 794.28

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 215.39 208.10 177.91 191.87 130.49 183.50 194.87 194.99 201.57 201.57 182.04 201.57 2283.88 2283.88

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 19.38 16.44 9.61 8.76 9.48 13.80 12.00 13.66 14.48 15.49 14.00 15.39 162.49 162.49

Stage-II 34.08 28.75 14.97 22.22 13.08 29.39 25.34 19.72 23.11 27.81 25.07 27.68 291.23 291.23

Total NLC 53.46 45.19 24.58 30.99 22.57 43.20 37.34 33.38 37.59 43.30 39.07 43.07 453.72 453.72

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 2.97 3.66 5.26 7.29 7.50 7.30 7.53 6.59 6.78 6.78 6.10 6.78 74.54 74.54

NPC-Kaiga unit I 22.30 26.11 25.14 26.62 25.20 24.01 24.74 21.88 22.38 22.38 20.21 22.38 283.35 283.35

NPC-Kaiga unit II 27.44 28.18 27.35 28.88 27.43 26.14 26.93 20.30 14.16 23.15 21.01 23.15 294.13 294.13

Total NPC 52.71 57.95 57.75 62.80 60.12 57.44 59.20 48.77 43.32 52.32 47.32 52.32 652.02 652.02

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 218.44 200.20 140.85 78.92 115.38 143.05 140.00 178.22 183.98 183.98 166.71 184.59 1934.31 1934.31

NTPC Simhadri Stage II 72.79 89.52 60.25 68.02 37.32 29.26 47.99 68.96 71.27 71.75 64.72 71.75 753.60 753.60

Total NTPC- Simhadri 291.23 289.72 201.10 146.94 152.69 172.31 188.00 247.19 255.25 255.73 231.43 256.34 2687.91 2687.91

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 14.47 14.68 13.26 14.72 13.62 13.05 13.50 15.20 15.71 15.84 14.31 16.03 174.40 174.40

Vallur Thermal Power Plant 65.23 41.30 24.36 28.67 20.69 24.13 19.69 32.31 47.16 48.20 43.55 48.20 443.49 443.49

Kudigi 0.00 0.00 0.00 0.65 28.57 42.71 23.74 25.12 25.96 27.26 24.62 29.34 227.96 227.96

Tuticorin 62.54 42.76 19.99 45.29 36.19 19.95 27.02 51.93 53.90 53.90 49.09 53.90 516.47 516.47

NPC KUDANKULAM 0.00 0.00 0.00 57.69 147.08 137.50 155.88 193.39 199.90 201.37 181.83 203.40 1478.03 1478.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 755.02 699.70 518.95 579.62 612.01 693.78 719.24 842.28 880.36 899.50 813.25 904.17 8917.88 8917.88

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 1.80 2.47 2.10 2.79 2.63 2.58 1.53 1.51 1.55 1.55 1.41 1.55 23.44 23.44

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 6.09 8.73 7.81 9.39 8.73 8.90 5.50 5.38 5.56 5.56 5.02 5.56 82.24 82.24

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 7.89 11.20 9.91 12.18 11.35 11.47 7.02 6.89 7.11 7.11 6.43 7.11 105.68 105.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 50.81 56.20 67.44 62.28 67.91 78.02 51.77 34.31 46.93 46.93 42.20 46.93 651.74 651.74

Spectrum 14.37 21.10 8.71 0.00 0.00 2.43 38.94 37.68 38.94 38.94 35.17 38.94 275.20 275.20

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 17.14 0.00 0.00 0.00 0.00 3.86 68.68 66.46 68.68 68.68 62.03 68.68 424.21 424.21

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 82.33 77.30 76.15 62.28 67.91 84.31 159.38 138.46 154.55 154.55 139.40 154.55 1351.16 1351.16

Page 270: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 21.70 24.28 6.45 6.99 11.92 9.13 19.64 16.34 20.26 21.86 21.53 24.76 204.87 204.87

NCE - Bagasse 0.04 0.00 0.40 0.00 0.00 0.00 1.32 5.89 12.54 11.55 10.63 5.46 47.83 47.83

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.53 0.54 0.54 0.75 0.97 1.36 1.31 0.32 2.39 2.73 2.40 1.96 15.81 15.81

NCE - Wind Power 275.62 478.85 918.33 1370.70 511.79 280.70 265.55 154.95 169.70 218.96 236.72 227.85 5109.71 5109.71

NCE - Mini Hydel 1.45 0.56 0.52 0.50 0.49 1.91 9.69 10.28 9.71 9.53 6.68 5.46 56.78 56.78

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.00 0.02 1.89 1.84 1.84 1.84 0.53 0.00 0.00 7.96 7.96

NCE-Others 138.75 134.69 109.02 594.17 166.67 170.15 188.83 182.33 184.66 187.86 185.20 196.92 2439.25 2439.25

TOTAL NCE 438.10 638.92 1035.27 1973.12 691.87 465.14 488.18 371.94 401.10 453.00 463.16 462.40 7882.20 7882.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 176.31 134.20 142.37 107.94 125.22 146.01 144.73 140.06 144.73 144.73 130.73 144.73 1681.77 1681.77

Hinduja 203.08 318.60 110.00 27.01 219.96 267.11 194.09 187.83 194.09 194.09 175.31 194.09 2285.27 2285.27

Thermal Power Tech 108.92 102.67 89.24 102.28 94.99 96.81 95.82 92.73 95.82 95.82 86.55 95.82 1157.46 1157.46

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1000MW DBFO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 488.31 555.47 341.61 237.23 440.17 509.93 434.65 420.62 434.65 434.65 392.58 434.65 5124.50 5124.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 122.27 118.32 0.00 0.00 0.00 114.38 354.96 354.96

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 30.14 66.07 57.01 49.05 3.53 11.54 30.14 66.07 57.01 49.05 3.53 11.54 434.66 434.66

Other Short Term Sources 117.36 73.60 59.87 84.09 47.24 88.31 394.40 262.94 0.00 0.00 0.00 32.87 1160.67 1160.67

D-D Purchases/Sales 45.65 11.55 5.08 0.00 0.00 0.00 0.00 0.00 0.00 244.53 220.87 244.53 772.21 772.21

-12.49 -115.38 -109.00 -109.02 -118.27 -113.35 -79.21 -29.43 -25.48 -32.47 -37.45 -22.97 -804.52 -804.52

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 180.66 35.84 12.95 24.11 -67.50 -13.51 467.61 417.89 31.53 261.11 186.95 380.35 1917.98 1917.98

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 3272.28 3322.26 2948.69 3774.43 2881.75 2900.24 3478.24 3361.47 3111.46 3412.08 3087.59 3545.39 39095.86 39095.86

Page 271: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

2018-19

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 124.13 128.27 124.13 128.27 97.28 124.13 105.48 113.77 128.27 128.27 115.86 128.27 1446.15 1446.15

VTPS II 139.76 144.42 106.66 144.42 144.42 66.20 95.38 139.76 144.42 144.42 130.45 144.42 1544.75 1544.75

VTPS III 132.41 136.82 99.31 103.72 136.82 132.41 136.82 132.41 136.82 136.82 123.58 136.82 1544.75 1544.75

VTPS IV 171.28 176.99 171.28 91.35 176.99 171.28 176.99 171.28 176.99 176.99 159.87 176.99 1998.32 1998.32

RTPP I 132.09 136.49 99.07 136.49 136.49 132.09 103.47 132.09 136.49 136.49 123.29 136.49 1541.07 1541.07

RTPP Stage-II 137.17 141.74 137.17 108.72 141.74 66.05 118.04 137.17 141.74 141.74 128.03 141.74 1541.07 1541.07

RTPP Stage-III 66.05 68.25 66.05 68.25 35.22 66.05 68.25 66.05 68.25 68.25 61.64 68.25 770.53 770.53

KTPS A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 258.43 267.05 258.43 128.04 296.31 258.43 263.39 261.97 267.05 263.39 241.20 270.71 3034.40 3034.40

Kakatiya Thermal Power Plant Stage II 258.43 267.05 261.97 292.65 128.04 258.43 263.39 258.43 267.05 263.39 242.53 267.05 3028.41 3028.41

Damodaram Sanjeevaiah Thermal power plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-IV 78.80 81.43 78.80 81.43 81.43 78.80 190.00 183.87 190.00 190.00 171.61 190.00 1596.18 1596.18

TOTAL THERMAL 1498.57 1548.52 1402.88 1283.35 1374.76 1353.88 1521.21 1596.82 1657.09 1649.77 1498.05 1660.75 18045.63 18045.63

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 16.27 18.22 18.22 18.22 19.52 18.22 18.22 18.22 18.22 16.92 15.62 18.22 214.10 214.10

TUNGBHADRA PH AP Share 2.33 0.41 0.03 3.63 6.51 7.81 7.81 5.21 5.21 3.90 3.90 2.60 49.35 49.35

USL 13.02 6.51 6.51 13.02 19.52 11.71 19.52 15.62 15.62 21.48 35.79 46.86 225.17 225.17

LSR 58.57 16.27 13.02 32.54 52.06 39.05 45.55 45.55 52.06 71.58 71.58 71.58 569.42 569.42

DONKARAYI 1.30 0.65 0.65 0.65 3.90 3.90 5.86 5.86 5.86 5.86 3.90 5.21 43.60 43.60

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 1.30 0.00 0.00 0.00 2.60 6.51 13.02 13.02 7.81 5.21 2.60 1.95 54.01 54.01

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 0.02 0.03 0.05 0.06 0.72 0.72 0.78 0.48 0.39 0.25 0.13 0.13 3.76 3.76

MINI HYDRO&OTHERS 0.08 0.00 0.04 0.25 0.20 0.21 0.05 0.03 0.18 0.25 0.18 0.24 1.72 1.72

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.65 0.65 0.65 3.25 5.86 9.76 9.76 11.71 11.71 6.51 3.25 3.25 67.03 67.03

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srisailam Right Bank Power House (AP) 5.21 0.00 0.00 0.00 78.09 91.11 104.12 13.02 13.02 39.05 58.57 13.02 415.19 415.19

Ramagiri Wind Mills (AP) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 98.75 42.74 39.17 71.62 188.99 189.01 224.69 128.72 130.08 171.00 195.54 163.06 1643.36 1643.36

TOTAL APGENCO 1597.31 1591.25 1442.05 1354.96 1563.75 1542.89 1745.90 1725.53 1787.16 1820.78 1693.59 1823.81 19688.99 19688.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 72.82 76.49 72.82 78.80 78.87 69.22 68.06 76.94 71.28 83.50 75.39 76.36 900.56 900.56

Yearly Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

Page 272: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

NTPC (SR) Stage III 20.54 21.28 18.72 10.64 6.80 18.72 19.40 18.72 19.40 19.40 17.51 19.40 210.53 210.53

Total NTPC(SR) 93.36 97.77 91.54 89.45 85.67 87.94 87.46 95.66 90.67 102.90 92.91 95.76 1111.08 1111.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Others 58.19 57.67 43.08 46.91 48.79 57.97 60.52 58.59 60.52 60.52 54.68 60.52 667.96 667.96

Total NTPC(ER) 58.19 57.67 43.08 46.91 48.79 57.97 60.52 58.59 60.52 60.52 54.68 60.52 667.96 667.96

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 151.55 155.44 134.63 136.35 134.46 145.91 147.98 154.25 151.19 163.42 147.58 156.28 1779.04 1779.04

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 11.97 12.28 11.46 8.41 12.12 8.64 10.60 7.63 11.26 12.20 11.07 12.16 129.79 129.79

Stage-II 22.77 23.41 16.77 21.87 17.36 19.59 16.30 20.54 16.08 23.30 20.97 23.25 242.20 242.20

Total NLC 34.74 35.69 28.23 30.28 29.48 28.23 26.89 28.17 27.34 35.50 32.03 35.41 371.98 371.98

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 5.80 2.82 4.24 5.99 5.99 5.80 5.99 5.80 5.99 5.99 5.36 5.99 65.76 65.76

NPC-Kaiga unit I 20.54 21.05 20.54 10.61 15.87 20.54 21.05 20.54 21.05 21.05 19.21 21.05 233.09 233.09

NPC-Kaiga unit II 21.19 21.72 21.19 21.72 21.72 21.19 21.72 21.19 10.86 16.29 19.94 21.72 240.49 240.49

Total NPC 47.54 45.59 45.98 38.32 43.58 47.54 48.76 47.54 37.90 43.33 44.51 48.76 539.34 539.34

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 144.96 148.90 102.88 76.79 149.89 144.96 149.89 144.96 149.89 149.89 135.61 149.89 1648.49 1648.49

NTPC Simhadri Stage II 55.11 57.57 55.11 56.98 50.09 38.68 56.98 55.11 56.98 57.38 51.77 58.06 649.83 649.83

Total NTPC- Simhadri 200.08 206.47 157.99 133.77 199.98 183.64 206.87 200.08 206.87 207.26 187.38 207.95 2298.33 2298.33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 14.19 14.69 13.57 13.79 13.34 13.17 14.12 14.35 14.47 15.46 13.11 14.56 168.81 168.81

Vallur Thermal Power Plant 37.50 38.74 26.75 35.77 38.74 36.25 30.82 26.27 38.34 39.18 35.40 39.18 422.95 422.95

Kudigi 37.94 39.20 37.94 39.20 39.20 37.94 39.20 37.94 40.51 42.47 30.55 38.05 460.13 460.13

Tuticorin 29.63 34.45 34.31 40.62 39.55 39.55 40.62 39.55 40.62 40.62 36.87 40.62 456.99 456.99

JNNSM Phase-Ii 177.18 183.33 170.37 173.60 168.70 166.04 177.19 178.91 180.89 191.63 163.84 181.92 2113.59 2113.59

NNTPS 0.00 0.00 0.00 1.57 4.45 5.54 5.71 5.54 5.71 5.71 5.17 5.71 45.09 45.09

TOTAL CGS 730.34 753.60 649.75 643.27 711.48 703.80 738.15 732.58 743.83 784.57 696.45 768.44 8656.26 8656.26

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 1.05 1.09 1.05 1.09 1.05 1.05 1.08 1.05 1.09 1.05 1.02 1.09 12.78 12.78

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 3.36 3.47 3.36 3.47 3.36 3.36 3.47 3.36 3.47 3.34 3.25 3.47 40.74 40.74

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 4.41 4.56 4.41 4.56 4.41 4.41 4.56 4.41 4.56 4.39 4.27 4.56 53.51 53.51

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 45.55 47.13 45.55 47.13 47.13 45.55 47.13 45.55 47.13 47.13 42.40 7.69 515.09 515.09

Spectrum 37.68 38.94 37.68 38.94 38.94 37.68 38.94 37.68 38.94 38.94 35.17 38.94 458.43 458.43

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 66.46 68.68 66.46 68.68 68.68 66.46 68.68 66.46 68.68 68.68 62.03 68.68 808.61 808.61

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 149.69 154.74 149.69 154.74 154.74 149.69 154.74 149.69 154.74 154.74 139.60 115.30 1782.14 1782.14

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 273: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March Total

Yearly

Auxiliary

Consumption

(MU)

Net Energy

Availability

(MU)Generating Station D Link

PLF

(%)

Variable

Cost (Rs. /

kWh)

Gross Energy Availability (MU)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 19.30 21.52 19.63 20.81 13.78 10.71 19.64 16.33 20.26 21.85 21.53 24.70 230.07 230.07

NCE - Bagasse 0.05 0.00 1.95 0.00 0.00 0.00 1.32 5.89 12.54 11.56 10.63 5.45 49.38 49.38

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 1.10 1.13 1.98 2.13 1.07 1.49 1.31 0.32 2.39 2.73 2.40 1.96 20.01 20.01

NCE - Wind Power 285.58 429.94 780.12 954.45 736.85 375.98 299.33 209.13 220.90 265.46 290.47 284.70 5132.90 5132.90

NCE - Mini Hydel 2.26 1.42 4.42 4.26 1.44 3.00 10.59 10.28 9.71 9.53 6.68 5.46 69.05 69.05

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.53 0.53 1.84 1.84 1.84 1.84 0.53 0.00 0.00 8.94 8.94

NCE-Others 193.35 193.87 173.32 178.32 138.14 162.90 246.01 236.84 241.69 244.89 234.67 253.95 2497.97 2497.97

TOTAL NCE 501.65 647.88 981.42 1160.49 891.81 555.92 580.05 480.64 509.33 556.54 566.38 576.22 8008.32 8008.32

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Corporate Power (MT) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 135.07 139.57 135.07 139.57 139.57 135.07 139.57 135.07 139.57 139.57 126.06 139.57 1643.36 1643.36

Thermal Power Tech 100.45 103.80 100.45 103.80 103.80 100.45 103.80 100.45 81.25 103.80 93.76 103.80 1199.63 1199.63

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 235.53 243.37 235.53 243.37 243.37 235.53 243.37 235.53 220.83 243.37 219.82 243.37 2842.99 2842.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 59.16 59.16 78.88 118.32 98.60 118.32 0.00 0.00 0.00 0.00 532.45 532.45

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 30.14 66.07 57.01 49.05 3.53 11.54 30.14 66.07 57.01 49.05 3.53 11.54 434.66 434.66

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 164.34 98.60 0.00 0.00 0.00 0.00 262.94 262.94

Bilateral Purchases (Generators / Traders) 236.64 244.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 244.53 220.87 244.53 1191.10 1191.10

Bi-lateral Sales( PTC etc.) 0.00 0.00 -460.14 -460.14 -460.14 -131.47 0.00 0.00 -262.94 -262.94 0.00 0.00 -2037.76 -2037.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 266.78 310.60 -343.97 -351.93 -377.73 -1.61 293.08 282.99 -205.93 30.65 224.39 256.07 383.38 383.38

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 3485.72 3706.00 3118.88 3209.48 3191.84 3190.63 3759.85 3611.36 3214.54 3595.04 3544.49 3787.77 41415.60 41415.60

Page 274: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 4.2 Energy Dispatch

Base Year

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 55.35 56.69 52.46 33.22 23.03 15.37 36.16 33.55 51.77 55.11 48.47 52.81 513.98

RTPP Stage-II 59.78 58.50 55.50 56.13 54.46 30.88 37.67 50.47 40.26 57.64 56.68 55.83 613.81

RTPP Stage-III 21.80 29.35 26.53 27.01 24.15 20.14 20.13 21.39 13.19 28.14 27.32 26.57 285.72

KTPS A 79.43 81.26 67.84 55.52 50.14 65.85 70.57 72.51 78.65 76.63 66.27 82.52 847.19

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 73.41 64.82 63.33 49.10 0.68 51.68 63.70 69.07 70.25 74.69 68.29 72.71 721.71

KTPS Stage VI 63.75 68.13 42.87 53.86 50.43 62.19 62.41 65.48 66.20 62.50 55.94 67.45 721.22

RTS B 7.50 8.68 7.40 7.51 7.34 7.21 7.27 7.87 6.23 8.58 6.58 7.09 89.24

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 57.57 72.09 51.68 5.41 45.64 59.97 57.30 53.26 63.84 70.11 53.13 64.34 654.35

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Dr.NTTPS Unit I,II,III 156.86 170.99 139.81 159.92 122.60 150.41 101.69 136.71 154.69 176.38 162.96 180.22 1813.24

Dr.NTTPS IV 74.71 72.23 61.67 69.18 68.91 66.94 55.59 65.95 62.83 70.74 67.63 65.21 801.59

TOTAL THERMAL 650.16 682.73 569.09 516.84 447.38 530.65 512.49 576.25 607.91 680.54 613.26 674.75 7062.05

MACHKUND PH AP Share 7.54 8.58 5.52 6.07 5.62 6.22 4.51 5.19 5.14 4.94 4.26 5.60 69.20

TUNGBHADRA PH AP Share 0.58 0.87 -0.11 2.52 6.50 5.09 4.10 4.18 1.97 3.65 2.58 2.16 34.09

USL 11.12 3.18 6.93 9.29 2.34 4.15 9.07 10.90 10.02 11.19 8.81 13.54 100.53

LSR 26.12 25.43 18.86 21.04 22.96 18.16 23.46 24.93 25.09 25.47 19.65 26.66 277.85

DONKARAYI 2.12 1.63 0.83 0.99 2.29 2.31 3.03 3.08 3.10 2.96 1.14 2.20 25.68

SSLM 30.05 13.27 5.58 20.91 82.36 54.58 20.32 10.67 11.58 20.96 27.89 30.74 328.90

NSPH 8.57 -0.11 -0.10 0.75 106.76 69.51 36.11 11.47 12.33 17.08 12.81 21.91 297.09

NSRCPH 0.00 0.00 0.00 0.00 7.70 9.26 8.25 9.17 6.62 4.55 1.09 0.00 46.64

NSLCPH 0.00 0.00 0.00 0.00 5.06 6.28 3.59 3.41 2.33 0.93 0.00 0.00 21.60

POCHAMPAD PH 0.00 0.00 -0.01 0.73 2.84 2.05 2.68 0.27 0.60 1.61 1.78 1.76 14.30

NIZAMSAGAR PH -0.01 -0.01 -0.01 -0.01 -0.01 0.36 0.19 -0.01 0.16 0.81 0.63 0.68 2.80

PABM 0.00 0.00 -0.01 0.06 0.46 0.29 -0.01 -0.01 -0.01 -0.01 0.11 0.19 1.06

MINI HYDRO&OTHERS 0.03 0.00 0.01 0.09 0.29 0.28 0.32 0.08 0.26 0.25 0.24 0.25 2.09

SINGUR 0.09 -0.01 -0.01 0.00 0.00 0.09 -0.01 -0.01 0.00 0.09 0.17 0.54 0.95

SSLM LCPH 0.75 -0.01 0.00 0.60 116.81 86.35 43.92 5.23 3.24 3.53 9.83 24.88 295.12

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share -0.01 -0.01 -0.02 8.29 23.28 13.47 11.02 2.31 0.82 0.24 -0.02 -0.02 59.34

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD Stig-II 0.00 0.00 0.00 0.20 0.44 0.35 0.94 0.03 0.04 0.75 0.74 0.78 4.28

PULICHINTAL(New Project) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 86.94 52.81 37.49 71.53 385.72 278.80 171.51 90.89 83.28 98.98 91.73 131.86 1581.51

TOTAL APGENCO 737.09 735.54 606.58 588.36 833.09 809.45 684.00 667.15 691.19 779.52 704.98 806.61 8643.56

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 100.56 104.39 74.54 81.48 67.69 72.24 71.01 91.37 101.67 93.86 96.66 102.55 1058.01

NTPC (SR) Stage III 25.91 25.78 22.46 23.49 22.62 23.04 22.37 25.45 19.28 32.41 27.41 24.89 295.11

Total NTPC(SR) 126.47 130.17 97.00 104.97 90.31 95.28 93.38 116.82 120.95 126.27 124.07 127.44 1353.12

NTPC (ER)

Generating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

Page 275: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

Farakka 4.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.56

Kahalgaon 2.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.03

Talcher - Stage 1 2.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.94

Talcher Stage 2 39.74 36.95 45.02 48.40 48.19 49.05 44.21 57.41 58.60 61.32 54.73 63.21 606.84

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 49.26 36.95 45.02 48.40 48.19 49.05 44.21 57.41 58.60 61.32 54.73 63.21 616.36

Total NTPC 175.73 167.12 142.02 153.37 138.50 144.33 137.59 174.23 179.55 187.59 178.80 190.65 1969.47

NLC TS-II

Stage-I 16.34 16.77 14.97 17.88 15.57 14.05 9.59 12.87 11.46 19.54 15.55 17.93 182.51

Stage-II 28.76 28.21 28.26 27.43 18.04 18.95 23.55 22.65 29.63 35.20 27.21 31.27 319.17

Total NLC 45.11 44.98 43.22 45.31 33.61 33.00 33.14 35.53 41.09 54.74 42.76 49.20 501.69

NPC

NPC-MAPS 2.16 2.15 2.16 2.28 2.28 2.20 4.48 3.07 4.74 4.76 3.90 4.77 38.96

NPC-Kaiga unit I 16.95 18.29 18.28 19.89 20.39 19.52 19.05 15.39 12.38 16.06 15.14 16.82 208.15

NPC-Kaiga unit II 15.73 19.92 19.14 20.69 21.39 15.08 15.21 10.88 21.93 20.46 18.44 12.36 211.21

Total NPC 34.84 40.36 39.58 42.86 44.06 36.80 38.74 29.33 39.05 41.27 37.47 33.96 458.33

NTPC - Simhadri

NTPC Simhadri Stage I 142.42 131.69 141.14 129.70 148.68 137.57 124.05 82.95 130.01 139.51 138.12 152.37 1598.22

NTPC Simhadri Stage II 62.16 56.76 62.75 50.67 32.64 46.28 43.00 62.20 69.83 81.84 71.83 70.96 710.92

Total NTPC- Simhadri 204.58 188.44 203.89 180.37 181.32 183.85 167.06 145.15 199.84 221.35 209.95 223.34 2309.14

CGS - New

Vallur Thermal Power Plant 6.79 4.97 3.79 8.16 2.26 8.39 10.56 10.55 9.97 23.18 15.16 12.99 116.77

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 467.05 445.87 432.51 430.06 399.75 406.38 387.08 394.78 469.49 528.14 484.14 510.14 5355.40

APGPCL

APGPCL I - Allocated capacity 0.96 0.90 1.12 1.09 0.94 0.92 0.88 0.89 1.04 0.98 1.41 2.22 13.36

APGPCL I - Unutilised capacity 0.64 0.01 0.04 0.03 0.05 0.04 0.02 0.01 0.12 0.15 0.24 0.50 1.84

APGPCL II - Allocated capacity 3.38 3.23 3.41 3.83 3.32 3.21 3.12 3.12 3.89 3.58 1.82 0.00 35.90

APGPCL II - Unutilised capacity 0.85 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.43

Total APGPCL 5.83 4.72 4.57 4.94 4.31 4.17 4.02 4.02 5.04 4.71 3.47 2.72 52.53

IPPS

GVK 16.78 16.62 18.45 17.24 15.86 15.20 16.04 18.35 21.96 21.35 18.65 16.08 212.57

Spectrum 18.60 17.26 17.63 17.59 16.56 15.10 16.17 20.07 26.98 25.05 21.77 21.88 234.67

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 33.12 31.36 26.86 25.85 24.00 21.59 25.52 26.00 11.96 22.03 29.55 35.90 313.73

BSES 7.88 7.23 11.42 10.20 8.33 7.94 7.66 8.19 11.92 9.59 7.17 5.02 102.55

GVK Extension 0.00 0.22 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.32

Page 276: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

Vemagiri 24.53 9.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.13

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 101.92 82.29 74.46 70.87 64.75 59.83 65.39 72.61 72.82 78.02 77.15 78.88 898.97

NCE

NCE - Bio-Mass 14.59 14.06 14.06 12.31 11.76 12.08 9.27 9.15 4.40 14.36 16.57 18.77 151.39

NCE - Bagasse 1.23 0.00 5.80 7.61 12.55 5.56 0.00 3.60 7.34 12.69 14.36 12.60 83.33

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 0.28 0.32 19.67 6.32 19.12 21.54 29.68 5.56 30.84 3.70 26.77 13.43 177.22

NCE - Mini Hydel 0.59 0.01 0.00 0.00 0.19 1.26 0.44 2.99 7.56 7.93 7.58 9.40 37.95

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.48 0.93 0.76 0.86 0.77 0.59 0.17 0.00 0.00 4.55

NCE-Others 0.25 0.39 0.34 0.29 0.28 0.33 0.30 0.31 0.30 0.37 0.76 0.89 4.80

TOTAL NCE 16.94 14.79 39.87 27.01 44.83 41.53 40.56 22.36 51.02 39.21 66.04 55.09 459.25

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources/Traders 183.40 277.86 211.21 282.31 267.55 273.57 304.40 241.54 280.43 264.53 275.41 322.66 3184.88

Heavy Water Plant * 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Open Access on Short Term Trading 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 9.06 108.77

D to D PP Cost (Inter Discom) 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 106.91 1282.92

KSK Mahanadi (MT) 0.00 0.00 0.00 0.00 23.22 28.95 35.76 57.60 56.22 61.32 46.07 54.40 363.53

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 299.37 393.84 327.19 398.28 406.74 418.49 456.13 415.11 452.63 441.82 437.46 493.03 4940.09

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI Underdrawal -9.02 -6.41 -6.05 -5.31 -6.14 -7.22 -8.48 -7.38 -5.32 -1.59 -0.62 -5.78 -69.33

IST 0.00 -0.10 -4.67 -4.04 -3.75 -6.59 -2.49 -1.47 0.00 0.00 0.00 0.00 -23.11

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET -9.02 -6.50 -10.72 -9.34 -9.90 -13.81 -10.97 -8.86 -5.32 -1.59 -0.62 -5.78 -92.44

TOTAL (From All Sources) 1619.19 1670.54 1474.45 1510.19 1743.58 1726.04 1626.20 1567.18 1736.86 1869.83 1772.61 1940.69 20257.36

Page 277: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

2014-15

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 161.92 157.05 204.20 200.53 158.55 158.87 188.93 223.90 227.01 227.65 205.35 240.80 2354.77

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 66.68 60.66 95.03 88.10 90.01 80.72 93.18 92.09 48.69 97.03 89.41 92.93 994.55

RTPP I 48.56 39.24 43.50 44.77 53.52 60.09 71.50 65.77 65.57 67.66 65.16 75.33 700.67

RTPP Stage-II 58.29 51.09 67.42 49.30 71.42 52.14 77.00 63.41 69.87 74.76 68.91 82.54 786.15

RTPP Stage-III 28.16 23.27 32.39 31.31 13.10 26.93 37.76 33.10 31.82 34.86 34.88 41.29 368.88

KTPS A 74.39 68.37 89.52 94.28 88.97 77.33 106.65 103.13 97.48 98.63 107.79 119.34 1125.88

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 63.55 58.83 79.29 77.02 74.95 67.61 74.29 49.24 47.14 100.37 85.63 100.43 878.33

RTS B 6.99 7.45 9.44 9.13 9.14 3.84 0.00 0.00 1.08 0.00 0.00 0.00 47.07

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 72.84 71.90 93.56 102.10 99.81 91.86 102.29 99.39 103.67 103.16 83.06 91.51 1115.15

Kakatiya Thermal Power Plant Stage II 68.06 63.62 91.15 97.18 85.36 81.71 92.49 93.48 101.79 99.41 93.62 101.85 1069.71

Damodaram Sanjeevaiah Thermal power plant - I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Damodaram Sanjeevaiah Thermal power plant - II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL THERMAL 649.43 601.47 805.51 793.71 744.85 701.11 844.10 823.51 794.12 903.54 833.81 946.02 9441.17

MACHKUND PH AP Share 6.55 4.54 6.00 9.33 9.19 6.22 11.42 10.43 12.98 19.85 19.37 20.65 136.53

TUNGBHADRA PH AP Share 0.38 -0.13 -0.17 0.49 4.94 7.90 16.11 12.97 10.15 11.79 9.31 7.51 81.26

USL 12.75 8.81 8.65 8.00 11.08 6.93 22.98 28.22 30.05 34.37 31.21 52.00 255.06

LSR 29.13 28.79 7.95 27.47 30.92 30.90 69.43 68.42 69.99 81.40 76.49 87.68 608.57

DONKARAYI 2.90 2.86 1.02 3.66 3.30 3.22 7.32 7.43 6.76 8.21 8.68 9.80 65.16

SSLM 19.85 0.38 4.84 2.06 128.71 126.60 93.19 -0.30 -0.29 -0.28 -0.25 29.60 404.11

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 0.00 0.00 0.00 0.00 1.94 12.21 31.84 25.56 18.47 10.48 4.27 -0.02 104.73

NSLCPH 0.00 0.00 0.00 0.00 0.24 2.29 0.00 0.00 0.00 0.00 0.00 0.00 2.53

POCHAMPAD PH 0.97 0.00 -0.01 0.00 0.00 0.09 0.00 0.00 0.00 0.00 0.00 0.00 1.04

NIZAMSAGAR PH 0.00 0.00 -0.01 -0.01 0.18 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.74

PABM -0.01 -0.01 -0.01 -0.01 0.80 0.34 0.56 1.80 1.97 0.31 0.57 0.61 6.93

MINI HYDRO&OTHERS 2.28 -0.11 4.19 12.23 48.92 120.45 0.21 0.09 0.27 0.29 0.18 0.20 189.19

SINGUR 0.58 0.09 -0.01 0.17 0.06 0.11 0.00 0.00 0.00 0.00 0.00 0.00 1.00

SSLM LCPH 16.31 -0.11 -0.20 2.82 143.64 158.35 0.00 0.00 0.00 0.00 0.00 0.00 320.81

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share -0.02 -0.03 0.00 0.92 27.29 34.34 0.00 0.00 0.00 0.00 0.00 0.00 62.50

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD Stig-II 0.43 0.00 -0.05 0.00 0.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.41

0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.18

TOTAL HYDRO 92.28 45.07 32.20 67.13 411.21 510.55 253.07 154.61 150.34 166.42 149.84 208.01 2240.73

TOTAL APGENCO 741.71 646.54 837.70 860.84 1156.06 1211.66 1097.17 978.12 944.46 1069.95 983.65 1154.04 11681.90

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 103.52 83.32 123.60 121.91 132.67 100.93 114.93 153.77 137.94 131.75 126.94 140.38 1471.66

NTPC (SR) Stage III 27.71 25.19 41.21 27.86 13.64 32.40 35.98 38.90 34.46 33.21 75.25 36.02 421.84

Total NTPC(SR) 131.24 108.51 164.82 149.77 146.31 133.33 150.91 192.67 172.40 164.97 202.19 176.40 1893.50

Generating Station D Link

Variable

Cost (Rs.

Energy Dispatch (MU)

Page 278: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

NTPC (ER)

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 59.17 60.51 64.81 60.94 71.76 77.61 84.38 83.35 84.75 81.00 32.30 84.28 844.87

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 59.17 60.51 64.81 60.94 71.76 77.61 84.38 83.35 84.75 81.00 32.30 84.28 844.87

Total NTPC 190.41 169.02 229.63 210.72 218.07 210.93 235.29 276.02 257.15 245.97 234.48 260.68 2738.37

NLC TS-II

Stage-I 17.12 16.55 22.93 22.80 22.20 20.60 11.18 19.38 16.13 21.60 20.70 22.77 233.94

Stage-II 29.49 28.28 37.97 31.39 31.76 31.81 35.43 36.03 32.07 40.55 36.61 40.63 412.01

Total NLC 46.61 44.83 60.90 54.19 53.96 52.41 46.60 55.41 48.20 62.15 57.31 63.40 645.96

NPC

NPC-MAPS 4.56 4.09 6.38 6.52 6.49 6.11 3.90 5.56 1.64 5.67 6.59 7.56 65.08

NPC-Kaiga unit I 16.04 16.69 22.52 47.84 48.87 48.20 56.40 46.89 48.83 56.49 53.78 49.64 512.20

NPC-Kaiga unit II 13.11 15.23 20.15 -4.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.18

Total NPC 33.71 36.01 49.05 50.05 55.37 54.31 60.30 52.45 50.47 62.16 60.37 57.21 621.45

NTPC - Simhadri

NTPC Simhadri Stage I 153.46 153.49 202.24 206.21 164.22 202.81 134.35 119.75 158.57 195.57 178.48 209.08 2078.23

NTPC Simhadri Stage II 75.22 67.44 108.57 88.14 57.31 44.30 52.37 87.30 86.93 88.04 85.12 91.40 932.13

Total NTPC- Simhadri 228.68 220.93 310.81 294.35 221.54 247.11 186.72 207.05 245.50 283.60 263.60 300.48 3010.36

CGS - New

Vallur Thermal Power Plant 17.97 18.43 23.41 23.60 17.65 12.74 15.47 22.20 14.67 21.53 19.99 26.30 233.97

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 517.38 489.22 673.81 632.91 566.59 577.51 544.38 613.13 615.98 675.41 635.75 708.06 7250.12

APGPCL

APGPCL I - Allocated capacity 1.19 0.88 1.17 0.55 0.00 0.00 0.00 0.75 1.31 1.12 0.85 1.49 9.31

APGPCL I - Unutilised capacity 0.03 0.12 0.17 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.40

APGPCL II - Allocated capacity 2.50 3.37 4.21 2.07 0.00 0.00 0.00 1.99 4.78 4.10 3.07 5.40 31.50

APGPCL II - Unutilised capacity 0.30 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.31

Total APGPCL 4.01 4.36 5.55 2.71 0.00 0.00 0.00 2.75 6.09 5.22 3.92 6.89 41.51

IPPS

GVK 11.94 14.67 6.10 4.09 0.00 0.00 9.12 20.86 21.51 21.89 20.03 25.10 155.32

Spectrum 15.84 17.24 16.53 3.90 0.00 0.00 2.06 15.38 24.95 18.42 15.40 16.76 146.48

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 30.52 29.04 40.88 10.52 4.69 4.91 1.34 10.03 5.02 7.20 8.99 9.58 162.71

BSES 1.16 5.42 8.91 2.88 0.00 0.00 8.66 13.32 7.47 0.00 0.00 0.00 47.82

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 279: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 59.46 66.37 72.42 21.39 4.69 4.91 21.18 59.59 58.95 47.50 44.42 51.43 512.33

NCE

NCE - Bio-Mass 8.34 10.63 13.55 15.39 11.05 14.56 0.00 0.00 0.00 0.00 0.00 0.00 73.53

NCE - Bagasse 1.74 0.00 0.00 0.00 6.87 14.41 0.00 0.00 0.00 0.00 0.00 0.00 23.02

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Wind Power 31.45 77.45 187.18 238.25 227.38 213.03 0.00 0.00 0.00 0.00 0.00 0.00 974.74

NCE - Mini Hydel 1.33 3.58 5.75 4.86 10.85 10.13 0.00 0.00 0.00 0.00 0.00 0.00 36.50

NCE - NCL Energy Ltd 0.00 0.00 0.00 1.41 2.77 2.86 2.81 2.50 1.76 0.98 0.00 0.00 15.10

NCE-Others 1.51 1.76 1.57 1.32 1.51 0.34 0.00 0.00 0.00 0.00 0.00 0.00 8.01

TOTAL NCE 44.37 93.42 208.05 261.24 260.43 255.34 2.81 2.50 1.76 0.98 0.00 0.00 1130.90

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Essar steels 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 54.91 46.05 14.55 87.34 59.37 86.15 83.38 73.21 88.56 72.92 79.16 82.90 828.50

Hinduja 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 54.91 46.05 14.55 87.34 59.37 86.15 83.38 73.21 88.56 72.92 79.16 82.90 828.50

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 291.92 299.18 527.83 645.86 613.85 597.86 593.61 511.89 573.61 498.23 529.38 609.36 6292.59

Pool Transaction (Purchases) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bi-lateral Sales( PTC etc.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Jhajjar 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pool Purchase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Pool Sales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 291.92 299.18 527.83 645.86 613.85 597.86 593.61 511.89 573.61 498.23 529.38 609.36 6292.59

TOTAL (From All Sources) 1713.77 1645.14 2339.91 2512.30 2660.99 2733.44 2342.54 2241.18 2289.40 2370.23 2276.28 2612.67 27737.84

Page 280: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

2015-16

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 202.30 228.06 175.63 193.77 197.13 172.60 203.84 177.14 193.29 173.83 159.72 248.59 2325.92

VTPS II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 78.32 90.23 74.71 81.40 84.27 74.44 98.99 27.52 -2.96 42.73 65.59 109.54 824.78

RTPP I 59.45 69.21 56.52 47.79 57.25 56.87 63.46 54.31 56.22 54.35 52.14 76.20 703.78

RTPP Stage-II 66.27 77.93 57.42 65.92 51.66 69.85 69.67 47.69 62.73 57.65 54.59 92.00 773.39

RTPP Stage-III 33.67 36.80 26.53 32.26 12.33 35.43 34.63 26.51 29.98 27.12 25.95 44.73 365.94

KTPS A 118.06 111.86 94.26 79.49 98.71 88.42 103.18 85.16 109.79 115.08 94.84 115.41 1214.24

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 101.47 100.63 33.07 95.60 98.58 86.77 103.76 95.85 106.02 107.07 97.27 98.63 1124.73

RTS B 0.10 7.18 9.44 11.09 8.48 8.77 9.65 9.56 10.29 10.29 9.96 8.79 103.60

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 98.65 99.95 80.54 95.95 91.72 98.19 90.31 94.62 88.34 25.78 97.89 94.33 1056.28

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage V (TS) 92.38 95.36 85.10 80.34 82.01 75.56 80.89 86.10 63.75 67.36 90.41 99.13 998.39

0 107.44 57.68 228.45 182.33 219.15 247.65 352.94 213.92 295.22 371.66 367.34 382.76 3026.52

TOTAL THERMAL 958.11 974.90 921.68 965.94 1001.28 1014.55 1211.33 918.37 1012.67 1052.93 1115.70 1370.11 12517.56

MACHKUND PH AP Share 14.12 10.04 6.30 12.13 13.73 10.61 12.86 13.02 9.71 8.74 15.35 11.55 138.16

TUNGBHADRA PH AP Share 0.60 -0.39 -0.17 2.38 11.23 10.03 9.41 10.14 3.34 6.51 -0.09 -0.21 52.77

USL 36.41 25.77 16.28 31.05 31.02 11.60 15.87 12.99 21.62 44.07 37.04 43.89 327.61

LSR 70.54 69.41 50.41 70.14 60.75 60.70 60.99 55.07 67.98 72.57 77.13 79.21 794.90

DONKARAYI 8.76 8.62 6.28 8.33 4.03 7.45 7.78 6.96 5.49 3.67 4.36 4.22 75.95

SSLM 11.24 13.42 -0.32 -0.27 6.17 10.40 5.05 36.42 9.99 -0.24 19.57 18.97 130.40

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.03 -0.03 -0.02 -0.03 -0.02 -0.03 -0.02 -0.02 -0.02 -0.02 -0.02 -0.03 -0.29

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.01 -0.01 -0.01 -0.01 0.15 0.41 2.16 0.57 1.02 0.18 -0.01 -0.02 4.40

MINI HYDRO&OTHERS 0.03 0.00 0.01 0.19 0.13 0.11 0.19 0.06 0.17 0.17 0.03 0.20 1.29

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Differential Fixed cost 14-15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Interest on Pension Bonds 14-15 & 15-16 (AP) & Differential Cost between Scheduled Energy & Energy as per RATIO 14-150.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.44 89.44

TOTAL HYDRO 141.67 126.83 78.76 123.90 127.17 111.29 114.28 135.21 119.30 135.64 153.36 247.23 1614.64

TOTAL APGENCO 1099.78 1101.72 1000.44 1089.84 1128.46 1125.85 1325.61 1053.59 1131.96 1188.57 1269.06 1617.34 14132.20

Central Generating Stations

NTPC

NTPC (SR)

NTPC (SR) 127.21 148.28 85.25 109.66 134.62 93.48 110.89 108.38 126.64 116.30 111.87 131.85 1404.42

NTPC (SR) Stage III 33.10 47.90 23.09 35.04 33.93 29.88 32.00 28.68 31.04 29.65 29.46 33.78 387.55

Total NTPC(SR) 160.32 196.18 108.34 144.70 168.55 123.36 142.89 137.06 157.68 145.95 141.32 165.62 1791.97

Generating Station D Link

Variable

Cost (Rs.

Energy Dispatch (MU)

Page 281: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

NTPC (ER)

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 79.44 83.66 51.07 78.27 62.63 76.41 76.97 72.26 78.68 69.26 74.27 79.48 882.41

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 79.44 83.66 51.07 78.27 62.63 76.41 76.97 72.26 78.68 69.26 74.27 79.48 882.41

Total NTPC 239.76 279.84 159.41 222.97 231.18 199.77 219.86 209.32 236.36 215.21 215.60 245.11 2674.39

NLC TS-II

Stage-I 21.49 22.34 16.58 22.80 22.17 17.55 15.77 10.75 11.12 19.84 17.32 22.11 219.84

Stage-II 38.32 39.81 30.22 29.51 30.39 27.52 31.30 18.91 25.51 33.90 28.89 37.80 372.08

Total NLC 59.82 62.15 46.79 52.30 52.55 45.07 47.07 29.66 36.63 53.74 46.22 59.92 591.92

NPC

NPC-MAPS 7.42 7.74 7.64 8.01 7.90 6.19 7.44 5.46 3.79 5.43 7.14 7.21 81.37

NPC-Kaiga unit I 55.77 61.67 58.68 55.33 40.86 57.25 51.84 51.63 57.13 56.38 54.03 56.61 657.18

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 63.19 69.41 66.32 63.34 48.76 63.44 59.28 57.09 60.92 61.81 61.16 63.82 738.55

NTPC - Simhadri

NTPC Simhadri Stage I 198.18 226.57 161.99 198.61 214.56 197.62 207.22 126.68 98.67 188.34 177.01 213.61 2209.07

NTPC Simhadri Stage II 87.04 121.55 63.50 96.24 83.40 43.85 93.61 80.54 85.34 84.31 71.37 94.57 1005.30

Total NTPC- Simhadri 285.21 348.11 225.49 294.86 297.96 241.47 300.84 207.22 184.01 272.64 248.38 308.18 3214.37

CGS - New

Bundled power under JVNSM 16.25 16.53 13.60 15.78 16.02 13.87 15.90 15.34 16.58 15.85 15.86 17.59 189.16

Vallur Thermal Power Plant 26.46 29.07 20.33 23.68 23.98 21.40 29.85 22.66 20.28 24.91 29.79 18.41 290.82

Kudigi 20.95 12.33 8.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.83 19.69 66.75

Tuticorin 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC Tamilnadu Power Ltd Stage.1 0.00 0.00 7.30 8.16 13.13 17.94 24.44 30.47 31.52 39.45 41.98 47.17 261.57

TOTAL CGS 711.63 817.43 548.19 681.10 683.58 602.96 697.23 571.76 586.31 683.62 663.83 779.89 8027.51

APGPCL

APGPCL I - Allocated capacity 1.60 1.13 1.59 1.36 1.17 1.13 1.03 0.75 0.75 0.77 0.83 0.97 13.09

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 5.59 3.94 5.60 4.81 4.11 3.77 3.46 2.55 2.57 2.91 3.07 3.88 46.26

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 7.19 5.06 7.19 6.17 5.28 4.91 4.49 3.31 3.32 3.68 3.90 4.85 59.35

IPPS

GVK 17.72 36.95 17.50 50.21 39.64 32.62 19.06 17.14 21.73 16.39 20.10 12.98 302.04

Spectrum 12.98 16.66 19.53 20.82 19.46 16.20 9.57 9.58 16.62 13.71 11.18 20.49 186.79

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 7.64 10.66 11.24 11.03 19.00 19.53 17.32 13.70 14.90 26.65 35.15 52.06 238.87

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.99 17.07 0.00 0.00 0.00 35.05

Vemagiri 43.31 0.00 0.00 0.00 27.08 28.38 37.09 2.65 0.00 35.80 0.00 0.00 174.30

Gautami 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 112.66 64.27 48.26 82.06 105.18 96.73 83.04 61.06 70.31 92.54 66.43 85.53 968.07

Page 282: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

NCE

NCE - Bio-Mass 13.47 20.83 25.36 23.70 26.26 24.50 19.63 18.74 21.19 30.03 28.50 32.15 284.37

NCE - Bagasse 1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.64 13.15 15.09 10.89 43.59

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.12 0.79 0.54 1.34 1.53 1.29 0.57 2.35 0.28 -0.07 0.57 0.03 9.33

NCE - Wind Power 43.86 82.13 189.64 384.22 318.09 207.72 43.95 99.17 93.44 99.02 108.63 81.79 1751.67

NCE - Mini Hydel 0.86 0.00 0.61 0.52 0.54 0.92 2.69 1.42 1.81 8.85 7.74 8.99 34.94

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.31 1.90 2.33 1.84 0.69 0.17 0.00 0.00 0.00 7.24

NCE-Others 5.11 5.01 2.58 1.91 2.93 3.37 4.19 5.62 4.39 9.62 8.62 10.62 63.97

TOTAL NCE 65.24 108.77 218.73 411.99 351.25 240.14 72.86 127.98 123.92 160.61 169.15 144.47 2195.11

OTHERS

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 84.55 88.58 79.25 84.92 72.16 68.85 83.37 66.57 76.65 52.40 53.13 71.08 881.52

Hinduja (HNPCL) Unit#1 520 MW COD from 10.01.16, Unit# 520 MW COD is 03.07.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.95 107.58 159.92 0.00 298.45

Thermal Power Tech (COD from 20.04.2015) 36.87 60.09 105.60 99.25 77.31 107.15 111.81 103.72 110.33 102.36 98.37 111.01 1123.85

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 0.00 0.00 3.05 0.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.83

GMR Rajahmundry Energy (PSDF Scheme) 0.00 0.00 0.00 0.79 5.00 32.50 27.61 59.41 59.10 0.00 82.11 153.04 419.57

Lanco Kondapalli Phase-II (PSDF Scheme) 0.00 0.00 0.00 0.00 0.00 0.00 39.21 55.73 43.11 57.93 37.37 11.73 245.08

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 121.41 148.67 184.85 188.01 155.25 208.50 262.00 285.43 320.14 320.27 430.90 346.85 2972.29

MARKET

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 2.97 14.44 13.74 25.55 5.29 46.20 25.53 -2.95 0.25 -15.02 -1.40 -16.63 97.97

Other Short Term Sources 514.47 618.99 453.96 514.05 476.26 363.05 419.30 330.36 312.36 246.28 225.93 313.43 4788.43

POSOCO Deviation Charges(UI Charges) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Reactive Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POSOCO SRLDC Fee & Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POSOCO Congestion Charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC UI Charges -5.48 -4.94 -5.03 -7.80 -2.62 -0.41 -6.23 -5.02 -3.57 -5.78 -9.50 -5.41 -61.79

Discom to Discom Cost ( D to D, UI, & D trade) (As per IBSS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 511.95 628.49 462.67 531.79 478.93 408.84 438.60 322.39 309.03 225.48 215.03 291.39 4824.61

TOTAL (From All Sources) 2629.86 2874.42 2470.33 2990.96 2907.93 2687.93 2883.83 2425.52 2544.99 2674.76 2818.30 3270.32 33179.15

Page 283: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

2016-17

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 224.83 168.81 78.49 96.47 139.88 93.48 198.66 226.06 190.46 180.63 128.49 180.35 1906.58

VTPS II 111.81 77.52 49.43 67.26 72.23 43.78 89.67 84.41 49.25 67.90 64.01 81.48 858.75

VTPS III 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

VTPS IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP I 79.12 54.60 29.46 33.36 27.51 19.91 55.11 61.53 49.70 33.02 35.45 56.52 535.28

RTPP Stage-II 87.31 53.31 23.81 14.10 40.63 12.62 63.78 68.96 50.84 40.12 31.99 61.83 549.33

RTPP Stage-III 42.19 22.05 20.66 22.77 3.99 22.00 31.05 32.21 24.49 23.26 17.81 27.14 289.61

KTPS A 35.11 38.04 38.36 39.06 39.81 34.61 34.20 35.43 32.96 26.93 32.65 41.19 428.35

KTPS B 36.96 37.86 38.39 36.46 37.08 33.98 34.56 21.76 15.68 30.02 35.32 40.05 398.11

KTPS C 34.32 33.46 31.74 33.16 34.41 32.28 31.07 21.69 22.08 34.76 32.50 36.87 378.34

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 93.74 99.21 89.75 84.29 45.98 76.80 87.68 90.37 48.73 87.58 84.88 101.31 990.32

RTS B 10.34 11.19 10.91 10.50 9.94 10.91 11.24 3.01 10.99 10.83 9.20 11.28 120.35

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 89.42 101.01 91.64 105.72 86.27 100.51 96.23 93.30 105.00 103.30 95.49 99.67 1167.55

Kakatiya Thermal Power Plant Stage II 94.61 99.37 100.74 99.34 97.33 101.34 104.84 103.54 104.59 103.58 96.37 98.20 1203.86

Damodaram Sanjeevaiah Thermal power plant - I 238.94 178.48 251.07 -2.26 202.65 258.90 255.50 227.42 216.01 234.53 212.96 298.41 2572.61

Damodaram Sanjeevaiah Thermal power plant - II 216.49 255.29 285.84 251.41 72.59 160.81 306.40 293.18 280.97 227.65 206.33 182.14 2739.09

TOTAL THERMAL 1395.20 1230.21 1140.29 891.64 910.30 1001.94 1399.98 1362.87 1201.74 1204.11 1083.44 1316.42 14138.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 8.55 16.73 13.53 15.53 15.87 16.02 17.07 16.76 16.83 16.99 14.44 16.57 184.89

TUNGBHADRA PH AP Share 1.96 0.11 -0.14 1.43 11.38 6.32 8.83 5.87 0.76 0.79 0.14 -0.24 37.21

USL 10.65 5.97 6.11 13.56 18.24 11.30 17.55 15.63 14.75 20.97 35.02 47.15 216.91

LSR 50.95 13.03 10.74 30.60 47.95 35.77 44.12 41.67 49.94 66.41 69.83 71.84 532.85

DONKARAYI 0.82 0.00 0.00 0.00 3.74 3.57 5.48 5.55 5.75 5.79 3.80 4.97 39.48

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.03 -0.03 -0.03 -0.02 -0.02 -0.02 1.06 3.16 -0.02 -0.02 -0.02 -0.02 3.98

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.02 -0.02 -0.02 -0.02 1.48 1.45 2.37 1.46 0.49 1.03 0.10 -0.01 8.30

MINI HYDRO&OTHERS 0.02 0.00 0.05 0.18 0.17 0.07 0.15 0.09 0.19 0.16 0.14 0.17 1.40

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srisailam Right Bank Power House (AP) 4.04 -0.30 -0.36 -0.43 129.14 59.95 79.30 0.17 15.91 44.38 64.20 12.23 408.24

RTPP Stage-IV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 76.95 35.48 29.87 60.82 227.96 134.42 175.95 90.37 104.61 156.50 187.66 152.66 1433.26

TOTAL APGENCO 1472.14 1265.69 1170.16 952.46 1138.25 1136.36 1575.93 1453.25 1306.35 1360.61 1271.10 1469.08 15571.38

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 125.49 120.93 74.99 95.72 98.28 109.19 124.11 124.57 116.62 119.38 109.63 124.73 1343.65

NTPC (SR) Stage III 32.83 31.39 22.37 29.81 29.05 29.61 19.56 7.14 33.15 31.27 28.88 33.53 328.59

Total NTPC(SR) 158.32 152.33 97.36 125.53 127.33 138.80 143.67 131.71 149.77 150.65 138.51 158.26 1672.24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Generating Station D Link

Variable

Cost (Rs.

Energy Dispatch (MU)

Page 284: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 76.84 76.77 56.23 76.84 63.48 53.73 62.78 65.33 79.17 75.43 68.10 77.04 831.75

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 76.84 76.77 56.23 76.84 63.48 53.73 62.78 65.33 79.17 75.43 68.10 77.04 831.75

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 235.16 229.09 153.59 202.37 190.80 192.53 206.45 197.04 228.94 226.09 206.61 235.31 2503.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 21.82 19.35 16.82 17.66 18.88 16.28 15.21 19.00 15.33 17.14 14.87 20.11 212.47

Stage-II 38.91 34.26 23.11 31.38 28.77 29.38 32.58 30.33 28.44 28.35 27.32 36.10 368.93

Total NLC 60.74 53.61 39.93 49.04 47.65 45.65 47.78 49.33 43.77 45.48 42.18 56.21 581.40

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 5.09 6.81 6.57 6.97 7.05 4.22 7.09 7.48 5.85 7.63 7.26 6.07 78.08

NPC-Kaiga unit I 46.65 31.59 34.72 41.49 41.40 39.66 53.02 53.36 51.97 55.84 39.62 47.04 536.35

NPC-Kaiga unit II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NPC 51.74 38.40 41.29 48.46 48.45 43.88 60.11 60.83 57.81 63.47 46.88 53.11 614.43

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 203.34 197.12 150.73 188.26 178.30 146.74 187.28 146.07 148.31 181.46 166.60 205.20 2099.42

NTPC Simhadri Stage II 91.28 87.11 59.18 79.43 71.83 64.28 81.12 89.23 56.82 58.18 63.58 79.26 881.32

Total NTPC- Simhadri 294.62 284.23 209.91 267.70 250.13 211.03 268.40 235.30 205.13 239.64 230.18 284.47 2980.74

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 16.86 16.00 13.46 14.11 14.10 13.71 15.28 14.07 15.91 15.47 14.90 16.61 180.49

Vallur Thermal Power Plant 27.84 26.11 16.77 22.93 33.09 32.24 32.36 34.06 31.18 36.41 24.85 37.02 354.87

Kudigi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Tuticorin 50.67 49.55 20.57 39.78 36.81 43.10 40.58 50.51 35.93 46.63 40.46 40.84 495.43

NPC KUDANKULAM 21.77 22.08 21.99 22.89 22.90 8.01 0.22 0.00 0.00 0.00 0.00 0.00 119.86

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 759.39 719.08 517.51 667.28 643.94 590.15 671.19 641.15 618.68 673.19 606.07 723.57 7831.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 0.93 0.76 1.44 0.85 0.50 0.45 0.65 1.03 1.30 1.61 1.53 1.20 12.25

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 3.67 2.99 5.65 3.28 1.83 1.51 2.17 3.39 4.12 5.68 4.97 4.10 43.37

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 4.60 3.75 7.09 4.13 2.33 1.96 2.82 4.42 5.42 7.29 6.50 5.30 55.62

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 17.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.83

Spectrum 15.13 25.85 53.06 61.13 55.91 57.56 51.13 56.90 61.04 60.13 55.91 48.46 602.22

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 42.58 32.52 11.03 28.52 37.46 30.64 49.32 64.39 67.58 61.29 63.48 60.69 549.49

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 22.36 0.00 0.00 0.00 0.00 0.00 0.00 22.36

Vemagiri 0.00 23.41 33.11 0.00 23.74 6.42 0.00 0.00 0.00 0.00 0.00 0.00 86.68

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 13.70 21.29 45.28 52.08 71.61 76.03 67.92 28.87 44.84 66.06 48.88 53.07 589.63

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 285: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 89.24 103.07 142.49 141.74 188.71 193.00 168.37 150.16 173.46 187.49 168.27 162.22 1868.21

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 25.68 24.03 23.33 24.07 20.56 21.27 21.99 16.61 23.93 26.47 24.97 28.05 280.96

NCE - Bagasse 3.31 0.00 0.00 0.00 0.00 0.00 1.82 6.44 11.55 7.63 6.30 1.78 38.82

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.05 1.16 0.55 0.39 1.08 0.93 0.65 0.00 1.21 1.56 1.56 1.18 10.32

NCE - Wind Power 75.03 172.06 297.45 388.03 447.74 409.89 258.27 90.66 141.50 181.68 252.89 154.46 2869.67

NCE - Mini Hydel 2.87 3.49 4.87 3.93 5.65 9.47 10.35 10.90 10.13 9.45 6.15 4.61 81.86

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.17 0.86 0.43 0.34 0.00 0.00 0.00 0.00 0.00 1.80

NCE-Others 53.91 72.10 61.24 79.72 85.88 78.40 105.74 99.16 100.50 151.22 124.04 150.16 1162.07

TOTAL NCE 160.84 272.84 387.44 496.31 561.78 520.40 399.16 223.77 288.81 378.01 415.91 340.25 4445.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 71.40 53.21 34.76 86.58 110.46 76.60 41.25 103.43 100.66 129.40 121.92 144.70 1074.36

Hinduja 0.00 95.69 227.94 228.62 174.54 117.04 180.19 168.24 185.09 185.57 245.21 330.99 2139.13

Thermal Power Tech 54.68 80.42 90.44 93.08 103.90 79.01 99.48 106.22 86.95 71.24 98.24 115.46 1079.13

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 112.56 0.00 48.60 119.79 139.37 0.00 0.00 0.00 0.00 0.00 0.00 420.32

1000MW DBFO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1000MW DBFO 79.46 0.69 38.49 38.55 99.29 54.37 0.00 0.00 0.00 0.00 0.00 0.00 310.84

TOTAL OTHERS 205.54 342.58 391.63 495.43 607.97 466.38 320.92 377.90 372.71 386.21 465.37 591.15 5023.79

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

D-D Purchases/Sales 10.12 6.88 0.00 17.26 23.27 8.97 55.25 8.69 -10.03 9.84 10.50 -28.18 112.57

0 363.09 201.49 30.49 54.22 62.72 5.25 113.07 139.15 21.18 8.66 8.95 1.28 1009.54

0 7.77 -148.84 -199.01 -176.61 -152.88 -68.32 0.74 51.22 -95.33 -75.48 -103.07 -131.02 -1090.82

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 380.98 59.53 -168.52 -105.13 -66.89 -54.09 169.06 199.05 -84.19 -56.99 -83.62 -157.92 31.29

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 3072.73 2766.54 2447.80 2652.20 3076.10 2854.16 3307.44 3049.71 2681.24 2935.82 2849.60 3133.65 34826.99

Page 286: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

2017-18

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 64.56 67.21 84.10 133.16 116.90 111.78 130.92 126.70 130.92 130.92 118.25 130.92 1346.34

VTPS II 64.56 67.21 84.10 133.16 116.90 111.78 130.92 126.70 130.92 130.92 118.25 130.92 1346.34

VTPS III 64.56 67.21 84.10 133.16 116.90 111.78 130.92 126.70 130.92 130.92 118.25 130.92 1346.34

VTPS IV 95.18 92.76 151.98 101.18 93.50 129.36 151.91 147.01 151.91 151.91 137.21 151.91 1555.81

RTPP I 59.53 71.36 69.19 118.36 140.41 96.13 131.67 127.42 131.67 131.67 118.92 131.67 1327.98

RTPP Stage-II 68.30 77.90 96.46 118.64 124.01 110.94 134.02 129.70 134.02 134.02 121.05 134.02 1383.07

RTPP Stage-III 24.35 34.91 5.52 -0.37 35.63 62.28 43.03 41.64 43.03 43.03 38.86 43.03 414.93

KTPS A 41.17 37.05 10.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.23

KTPS B 39.10 40.41 11.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.92

KTPS C 37.17 37.20 11.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85.96

KTPS D 95.62 95.37 29.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 220.18

KTPS Stage VI 102.21 98.34 34.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 234.74

RTS B 10.91 11.25 3.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.71

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 102.73 98.62 34.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 235.60

Kakatiya Thermal Power Plant Stage II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Damodaram Sanjeevaiah Thermal power plant 244.95 212.73 -2.35 64.43 258.97 49.02 140.22 135.70 109.15 140.22 126.65 140.22 1619.93

Damodaram Sanjeevaiah Thermal power plant 105.84 146.47 200.28 -2.11 36.32 217.76 119.35 115.50 0.00 76.10 107.80 119.35 1242.66

TOTAL THERMAL 1220.72 1256.00 907.58 799.61 1039.52 1000.83 1112.96 1077.06 962.54 1069.71 1005.26 1112.96 12564.75

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 15.24 17.23 14.38 10.74 16.61 12.67 16.74 16.20 16.74 16.74 15.12 16.74 185.13

TUNGBHADRA PH AP Share 0.69 -0.09 -0.18 1.82 1.63 6.08 1.68 1.63 1.68 1.68 1.52 1.68 19.82

USL 17.33 20.49 16.01 9.77 12.54 26.27 17.35 16.79 17.35 17.35 15.67 17.35 204.23

LSR 51.35 9.91 13.98 57.16 50.76 68.65 42.66 41.28 42.66 42.66 38.53 42.66 502.24

DONKARAYI 4.40 0.66 2.31 6.97 5.02 7.28 4.51 4.37 4.51 4.51 4.08 4.51 53.14

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH -0.03 -0.03 -0.02 -0.02 -0.02 -0.02 0.00 0.00 0.00 0.00 0.00 0.00 -0.15

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM -0.02 -0.01 -0.01 -0.02 -0.02 -0.01 0.00 0.00 0.00 0.00 0.00 0.00 -0.09

MINI HYDRO&OTHERS 0.08 0.00 0.10 0.19 0.17 0.21 0.13 0.12 0.13 0.13 0.12 0.13 1.50

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.00 0.00 0.00 0.00 -0.02 -0.02 0.00 0.00 0.00 0.00 0.00 0.00 -0.03

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 10.20 -0.30 -0.30 -0.30 -0.25 27.18 6.14 5.94 6.14 6.14 5.54 6.14 72.25

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 99.25 47.84 46.27 86.29 86.42 148.28 89.20 86.32 89.20 89.20 80.57 89.20 1038.04

TOTAL APGENCO 1319.97 1303.84 953.84 885.90 1125.93 1149.11 1202.17 1163.39 1051.74 1158.91 1085.83 1202.17 13602.79

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 110.09 112.32 92.01 104.65 71.48 101.25 103.19 99.41 102.74 102.74 92.76 102.74 1195.37

NTPC (SR) Stage III 32.49 31.06 22.44 24.25 15.54 24.32 27.98 23.03 23.86 23.86 21.54 23.86 294.23

Total NTPC(SR) 142.57 143.38 114.45 128.90 87.03 125.57 131.17 122.44 126.59 126.59 114.30 126.59 1489.60

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Generating Station D Link

Variable

Cost (Rs.

Energy Dispatch (MU)

Page 287: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher Stage 2 72.81 64.72 63.46 62.97 43.46 57.93 63.70 72.55 74.98 74.98 67.74 74.98 794.28

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 72.81 64.72 63.46 62.97 43.46 57.93 63.70 72.55 74.98 74.98 67.74 74.98 794.28

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 215.39 208.10 177.91 191.87 130.49 183.50 194.87 194.99 201.57 201.57 182.04 201.57 2283.88

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 19.38 16.44 9.61 8.76 9.48 13.80 12.00 13.66 14.48 15.49 14.00 15.39 162.49

Stage-II 34.08 28.75 14.97 22.22 13.08 29.39 25.34 19.72 23.11 27.81 25.07 27.68 291.23

Total NLC 53.46 45.19 24.58 30.99 22.57 43.20 37.34 33.38 37.59 43.30 39.07 43.07 453.72

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 2.97 3.66 5.26 7.29 7.50 7.30 7.53 6.59 6.78 6.78 6.10 6.78 74.54

NPC-Kaiga unit I 22.30 26.11 25.14 26.62 25.20 24.01 24.74 21.88 22.38 22.38 20.21 22.38 283.35

NPC-Kaiga unit II 27.44 28.18 27.35 28.88 27.43 26.14 26.93 20.30 14.16 23.15 21.01 23.15 294.13

Total NPC 52.71 57.95 57.75 62.80 60.12 57.44 59.20 48.77 43.32 52.32 47.32 52.32 652.02

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 218.44 200.20 140.85 78.92 115.38 143.05 140.00 178.22 183.98 183.98 166.71 184.59 1934.31

NTPC Simhadri Stage II 72.79 89.52 60.25 68.02 37.32 29.26 47.99 68.96 71.27 71.75 64.72 71.75 753.60

Total NTPC- Simhadri 291.23 289.72 201.10 146.94 152.69 172.31 188.00 247.19 255.25 255.73 231.43 256.34 2687.91

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 14.47 14.68 13.26 14.72 13.62 13.05 13.50 15.20 15.71 15.84 14.31 16.03 174.40

Vallur Thermal Power Plant 65.23 41.30 24.36 28.67 20.69 24.13 19.69 32.31 47.16 48.20 43.55 48.20 443.49

Kudigi 0.00 0.00 0.00 0.65 28.57 42.71 23.74 25.12 25.96 27.26 24.62 29.34 227.96

Tuticorin 62.54 42.76 19.99 45.29 36.19 19.95 27.02 51.93 53.90 53.90 49.09 53.90 516.47

NPC KUDANKULAM 0.00 0.00 0.00 57.69 147.08 137.50 155.88 193.39 199.90 201.37 181.83 203.40 1478.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL CGS 755.02 699.70 518.95 579.62 612.01 693.78 719.24 842.28 880.36 899.50 813.25 904.17 8917.88

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 1.80 2.47 2.10 2.79 2.63 2.58 1.53 1.51 1.55 1.55 1.41 1.55 23.44

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 6.09 8.73 7.81 9.39 8.73 8.90 5.50 5.38 5.56 5.56 5.02 5.56 82.24

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 7.89 11.20 9.91 12.18 11.35 11.47 7.02 6.89 7.11 7.11 6.43 7.11 105.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 50.81 56.20 67.44 62.28 67.91 78.02 51.77 34.31 46.93 46.93 42.20 46.93 651.74

Spectrum 14.37 21.10 8.71 0.00 0.00 2.43 38.94 37.68 38.94 38.94 35.17 38.94 275.20

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 17.14 0.00 0.00 0.00 0.00 3.86 68.68 66.46 68.68 68.68 62.03 68.68 424.21

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GMR Rajahmundry Energy ltd.(768 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lanco Kondapalli Power Ltd (1108 MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 82.33 77.30 76.15 62.28 67.91 84.31 159.38 138.46 154.55 154.55 139.40 154.55 1351.16

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 21.70 24.28 6.45 6.99 11.92 9.13 19.64 16.34 20.26 21.86 21.53 24.76 204.87

NCE - Bagasse 0.04 0.00 0.40 0.00 0.00 0.00 1.32 5.89 12.54 11.55 10.63 5.46 47.83

Page 288: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 0.53 0.54 0.54 0.75 0.97 1.36 1.31 0.32 2.39 2.73 2.40 1.96 15.81

NCE - Wind Power 275.62 478.85 918.33 1370.70 511.79 280.70 265.55 154.95 169.70 218.96 236.72 227.85 5109.71

NCE - Mini Hydel 1.45 0.56 0.52 0.50 0.49 1.91 9.69 10.28 9.71 9.53 6.68 5.46 56.78

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.00 0.02 1.89 1.84 1.84 1.84 0.53 0.00 0.00 7.96

NCE-Others 138.75 134.69 109.02 594.17 166.67 170.15 188.83 182.33 184.66 187.86 185.20 196.92 2439.25

TOTAL NCE 438.10 638.92 1035.27 1973.12 691.87 465.14 488.18 371.94 401.10 453.00 463.16 462.40 7882.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 176.31 134.20 142.37 107.94 125.22 146.01 144.73 140.06 144.73 144.73 130.73 144.73 1681.77

Hinduja 203.08 318.60 110.00 27.01 219.96 267.11 194.09 187.83 194.09 194.09 175.31 194.09 2285.27

Thermal Power Tech 108.92 102.67 89.24 102.28 94.99 96.81 95.82 92.73 95.82 95.82 86.55 95.82 1157.46

RVK Energy Pvt Ltd (IPP upto 30.9.15) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1000MW DBFO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 488.31 555.47 341.61 237.23 440.17 509.93 434.65 420.62 434.65 434.65 392.58 434.65 5124.50

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 0.00 0.00 0.00 0.00 122.27 118.32 0.00 0.00 0.00 114.38 354.96

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 30.14 66.07 57.01 49.05 3.53 11.54 30.14 66.07 57.01 49.05 3.53 11.54 434.66

Other Short Term Sources 117.36 73.60 59.87 84.09 47.24 88.31 363.65 228.75 0.00 0.00 0.00 32.87 1095.74

D-D Purchases/Sales 45.65 11.55 5.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 156.81 231.74 450.83

-12.49 -115.38 -109.00 -109.02 -118.27 -113.35 -79.21 -29.43 -25.48 -32.47 -37.45 -22.97 -804.52

-233.17 -360.31 -479.06 -697.60 -182.11 -234.52 31.61 49.18 -50.24 36.49 66.63 -7.30 -2060.40

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET -52.51 -324.47 -466.11 -673.49 -249.61 -248.02 468.46 432.89 -18.71 53.07 189.52 360.26 -528.73

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 3039.10 2961.96 2469.63 3076.82 2699.64 2665.72 3479.09 3376.47 2910.80 3160.78 3090.16 3525.29 36455.47

Page 289: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

2018-19

April May June July August September October November December January February March Total

APGENCO

Thermal

VTPS I 124.13 128.27 124.13 128.27 97.28 124.13 105.48 113.77 128.27 128.27 115.86 128.27 1446.15

VTPS II 139.76 144.42 106.66 144.42 144.42 66.20 95.38 139.76 144.42 144.42 130.45 144.42 1544.75

VTPS III 132.41 136.82 99.31 103.72 136.82 132.41 136.82 132.41 136.82 136.82 123.58 136.82 1544.75

VTPS IV 171.28 176.99 171.28 91.35 176.99 171.28 176.99 171.28 176.99 176.99 159.87 176.99 1998.32

RTPP I 132.09 136.49 99.07 136.49 136.49 132.09 103.47 132.09 136.49 136.49 123.29 136.49 1541.07

RTPP Stage-II 137.17 141.74 137.17 108.72 141.74 66.05 118.04 137.17 141.74 141.74 96.20 141.74 1509.24

RTPP Stage-III 66.05 68.25 66.05 68.25 35.22 66.05 68.25 66.05 68.25 68.25 61.64 68.25 770.53

KTPS A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KTPS Stage VI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTS B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kakatiya Thermal Power Plant Stage I 258.43 267.05 258.43 128.04 296.31 258.43 263.39 261.97 267.05 263.39 241.20 270.71 3034.40

Kakatiya Thermal Power Plant Stage II 258.43 267.05 261.97 292.65 128.04 258.43 263.39 258.43 267.05 263.39 242.53 267.05 3028.41

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RTPP Stage-IV 78.80 81.43 78.80 81.43 81.43 78.80 190.00 183.87 190.00 190.00 171.61 190.00 1596.18

TOTAL THERMAL 1498.57 1548.52 1402.88 1283.35 1374.76 1353.88 1521.21 1596.82 1657.09 1649.77 1466.22 1660.75 18013.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MACHKUND PH AP Share 16.27 18.22 18.22 18.22 19.52 18.22 18.22 18.22 18.22 16.92 15.62 18.22 214.10

TUNGBHADRA PH AP Share 2.33 0.41 0.03 3.63 6.51 7.81 7.81 5.21 5.21 3.90 3.90 2.60 49.35

USL 13.02 6.51 6.51 13.02 19.52 11.71 19.52 15.62 15.62 21.48 35.79 46.86 225.17

LSR 58.57 16.27 13.02 32.54 52.06 39.05 45.55 45.55 52.06 71.58 71.58 71.58 569.42

DONKARAYI 1.30 0.65 0.65 0.65 3.90 3.90 5.86 5.86 5.86 5.86 3.90 5.21 43.60

SSLM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NSRCPH 1.30 0.00 0.00 0.00 2.60 6.51 13.02 13.02 7.81 5.21 2.60 1.95 54.01

NSLCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

POCHAMPAD PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NIZAMSAGAR PH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PABM 0.02 0.03 0.05 0.06 0.72 0.72 0.78 0.48 0.39 0.25 0.13 0.13 3.76

MINI HYDRO&OTHERS 0.08 0.00 0.04 0.25 0.20 0.21 0.05 0.03 0.18 0.25 0.18 0.24 1.72

SINGUR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSLM LCPH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Nagarjunasagar Tail Pond Dam Power House 0.65 0.65 0.65 3.25 5.86 9.76 9.76 11.71 11.71 6.51 3.25 3.25 67.03

Priyadarshini Jurala Hydro Electric Project- AP Share 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lower Jurala Hydro Electric Project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srisailam Right Bank Power House (AP) 5.21 0.00 0.00 0.00 78.09 91.11 104.12 13.02 13.02 39.05 58.57 13.02 415.19

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL HYDRO 98.75 42.74 39.17 71.62 188.99 189.01 224.69 128.72 130.08 171.00 195.54 163.06 1643.36

TOTAL APGENCO 1597.31 1591.25 1442.05 1354.96 1563.75 1542.89 1745.90 1725.53 1787.16 1820.78 1661.76 1823.81 19657.16

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central Generating Stations 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (SR) 72.82 76.49 72.82 78.80 78.87 69.22 68.06 76.94 71.28 83.50 75.39 76.36 900.56

NTPC (SR) Stage III 20.54 21.28 18.72 10.64 6.80 18.72 19.40 18.72 19.40 19.40 17.51 19.40 210.53

Total NTPC(SR) 93.36 97.77 91.54 89.45 85.67 87.94 87.46 95.66 90.67 102.90 92.91 95.76 1111.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC (ER) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Farakka 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kahalgaon 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Talcher - Stage 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Generating Station D Link

Variable

Cost (Rs.

Energy Dispatch (MU)

Page 290: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

Talcher Stage 2 58.19 57.67 43.08 46.91 48.79 57.97 60.52 58.59 60.52 60.52 54.68 60.52 667.96

Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC(ER) 58.19 57.67 43.08 46.91 48.79 57.97 60.52 58.59 60.52 60.52 54.68 60.52 667.96

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total NTPC 151.55 155.44 134.63 136.35 134.46 145.91 147.98 154.25 151.19 163.42 147.58 156.28 1779.04

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NLC TS-II 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Stage-I 11.97 12.28 11.46 8.41 12.12 8.64 10.60 7.63 11.26 12.20 11.07 12.16 129.79

Stage-II 22.77 23.41 16.77 21.87 17.36 19.59 16.30 20.54 16.08 23.30 20.97 23.25 242.20

Total NLC 34.74 35.69 28.23 30.28 29.48 28.23 26.89 28.17 27.34 35.50 32.03 35.41 371.98

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPC-MAPS 5.80 2.82 4.24 5.99 5.99 5.80 5.99 5.80 5.99 5.99 5.36 5.99 65.76

NPC-Kaiga unit I 20.54 21.05 20.54 10.61 15.87 20.54 21.05 20.54 21.05 21.05 19.21 21.05 233.09

NPC-Kaiga unit II 21.19 21.72 21.19 21.72 21.72 21.19 21.72 21.19 10.86 16.29 19.94 21.72 240.49

Total NPC 47.54 45.59 45.98 38.32 43.58 47.54 48.76 47.54 37.90 43.33 44.51 48.76 539.34

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC - Simhadri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NTPC Simhadri Stage I 144.96 148.90 102.88 76.79 149.89 144.96 149.89 144.96 149.89 149.89 135.61 149.89 1648.49

NTPC Simhadri Stage II 55.11 57.57 55.11 56.98 50.09 38.68 56.98 55.11 56.98 57.38 51.77 58.06 649.83

Total NTPC- Simhadri 200.08 206.47 157.99 133.77 199.98 183.64 206.87 200.08 206.87 207.26 187.38 207.95 2298.33

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CGS - New 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Bundled power under JVNSM 14.19 14.69 13.57 13.79 13.34 13.17 14.12 14.35 14.47 15.46 13.11 14.56 168.81

Vallur Thermal Power Plant 37.50 38.74 26.75 35.77 38.74 36.25 30.82 26.27 38.34 39.18 35.40 39.18 422.95

Kudigi 37.94 3.56 37.94 39.20 39.20 37.94 39.20 37.94 25.59 42.47 0.00 38.05 379.03

Tuticorin 29.63 34.45 34.31 40.62 39.55 39.55 40.62 39.55 40.62 40.62 36.87 40.62 456.99

JNNSM Phase-II 177.18 183.33 170.37 173.60 168.70 166.04 177.19 178.91 180.89 191.63 163.84 181.92 2113.59

NNTPS 0.00 0.00 0.00 1.57 4.45 5.54 5.71 5.54 5.71 5.71 5.17 5.71 45.09

TOTAL CGS 730.34 717.96 649.75 643.27 711.48 703.80 738.15 732.58 728.92 784.57 665.90 768.44 8575.15

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL I - Allocated capacity 1.05 1.09 1.05 1.09 1.05 1.05 1.08 1.05 1.09 1.05 1.02 1.09 12.78

APGPCL I - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

APGPCL II - Allocated capacity 3.36 3.47 3.36 3.47 3.36 3.36 3.47 3.36 3.47 3.34 3.25 3.47 40.74

APGPCL II - Unutilised capacity 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total APGPCL 4.41 4.56 4.41 4.56 4.41 4.41 4.56 4.41 4.56 4.39 4.27 4.56 53.51

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

IPPS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK 45.55 47.13 45.55 47.13 47.13 45.55 47.13 45.55 47.13 47.13 42.40 7.69 515.09

Spectrum 37.68 38.94 37.68 38.94 38.94 37.68 38.94 37.68 38.94 38.94 35.17 38.94 458.43

Kondapalli (Naphtha) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kondapalli (Gas) 66.46 68.68 66.46 68.68 68.68 66.46 68.68 66.46 68.68 68.68 62.03 68.68 808.61

BSES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

GVK Extension 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vemagiri 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gautami 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Konaseema 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL IPPS 149.69 154.74 149.69 154.74 154.74 149.69 154.74 149.69 154.74 154.74 139.60 115.30 1782.14

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Bio-Mass 19.30 21.52 19.63 20.81 13.78 10.71 19.64 16.33 20.26 21.85 21.53 24.70 230.07

NCE - Bagasse 0.05 0.00 1.95 0.00 0.00 0.00 1.32 5.89 12.54 11.56 10.63 5.45 49.38

NCE - Municipal Waste to Energy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NCE - Industrial Waste based power project 1.10 1.13 1.98 2.13 1.07 1.49 1.31 0.32 2.39 2.73 2.40 1.96 20.01

NCE - Wind Power 285.58 429.94 780.12 954.45 736.85 375.98 299.33 209.13 220.90 265.46 290.47 284.70 5132.90

NCE - Mini Hydel 2.26 1.42 4.42 4.26 1.44 3.00 10.59 10.28 9.71 9.53 6.68 5.46 69.05

NCE - NCL Energy Ltd 0.00 0.00 0.00 0.53 0.53 1.84 1.84 1.84 1.84 0.53 0.00 0.00 8.94

NCE-Others 193.35 193.87 173.32 178.32 138.14 162.90 246.01 236.84 241.69 244.89 234.67 253.95 2497.97

Page 291: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

April May June July August September October November December January February March TotalGenerating Station D Link

Variable

Cost (Rs.

/ kWh)

Energy Dispatch (MU)

TOTAL NCE 501.65 647.88 981.42 1160.49 891.81 555.92 580.05 480.64 509.33 556.54 566.38 576.22 8008.32

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

OTHERS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Srivathsa 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LVS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Vishakapatnam Steel Plant 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NB Ferro Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Corporate Power (MT) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

KSK Mahanadi (MT) 135.07 139.57 135.07 139.57 139.57 135.07 139.57 135.07 139.57 139.57 126.06 139.57 1643.36

Thermal Power Tech 100.45 103.80 100.45 103.80 103.80 100.45 103.80 100.45 81.25 103.80 93.76 103.80 1199.63

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL OTHERS 235.53 243.37 235.53 243.37 243.37 235.53 243.37 235.53 220.83 243.37 219.82 243.37 2842.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MARKET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PTC 0.00 0.00 10.22 28.11 76.29 108.19 98.60 118.32 0.00 0.00 0.00 0.00 439.74

RCL and Short-Term Sources(IG Wells,Kesoram) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

NPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SPDCL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

UI 30.14 66.07 57.01 49.05 3.53 11.54 30.14 66.07 57.01 49.05 3.53 11.54 434.66

Other Short Term Sources 0.00 0.00 0.00 0.00 0.00 0.00 154.18 83.10 0.00 0.00 0.00 0.00 237.28

Bilateral Purchases (Generators / Traders) 161.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.28 0.00 242.56 416.80

Bi-lateral Sales( PTC etc.) 0.00 0.00 -525.87 -525.87 -460.14 -131.47 0.00 0.00 -262.94 -262.94 0.00 0.00 -2169.23

D-D Purchases/Sales -94.41 -169.40 -94.14 -4.40 -241.26 -290.94 14.14 66.90 -36.18 50.31 81.72 5.42 -712.24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL MARKET 97.70 -103.34 -552.78 -453.11 -621.58 -302.68 297.06 334.38 -242.11 -151.30 85.24 259.51 -1353.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (From All Sources) 3316.63 3256.43 2910.06 3108.30 2948.00 2889.56 3763.83 3662.76 3163.44 3413.10 3342.97 3791.21 39566.29

Page 292: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

LT Category 3363.72 0.00 3363.72 0.00 0.00 0.00 3363.72

Category I (A&B) - Domestic 1588.41 0.00 1588.41 0.00 0.00 0.00 1588.41

Category II (A & B) - Non-domestic/Commercial 863.57 0.00 863.57 0.00 0.00 0.00 863.57

Category LT-II (C) Advertising Hoardings 0.60 0.00 0.60 0.00 0.00 0.00 0.60

Category III (A & B) - Industrial 547.66 0.00 547.66 0.00 0.00 0.00 547.66

Category IV (A,B &C) - Cottage Industries & Dhobighats 8.09 0.00 8.09 0.00 0.00 0.00 8.09

Category V (A,B & C) - Irrigation and Agriculture 150.77 0.00 150.77 0.00 0.00 0.00 150.77

Category VI (A & B) - Local Bodies, St. Lighting & PWS 173.53 0.00 173.53 0.00 0.00 0.00 173.53

Category VII (A & B) - General Purpose 30.18 0.00 30.18 0.00 0.00 0.00 30.18

Category VIII (A & B) -Temporary Supply 0.91 0.00 0.91 0.00 0.00 0.00 0.91

LT-VI (C): NTR Sujala Padhakam 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LT II (D) : Function Halls / Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 11 KV 1252.01 0.00 1252.01 0.00 0.00 0.00 1252.01

HT-I Industry Segregated 748.67 0.00 748.67 0.00 0.00 0.00 748.67

Lights & Fans 1.09 0.00 1.09 0.00 0.00 0.00 1.09

Colony consumption 0.79 0.00 0.79 0.00 0.00 0.00 0.79

Seasonal Industries 28.25 0.00 28.25 0.00 0.00 0.00 28.25

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 78.84 0.00 78.84 0.00 0.00 0.00 78.84

HT-I (B) Ferro-Alloys 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-II - Others 297.15 0.00 297.15 0.00 0.00 0.00 297.15

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 46.42 0.00 46.42 0.00 0.00 0.00 46.42

HT-III Aviation activity at Airports 6.46 0.00 6.46 0.00 0.00 0.00 6.46

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 1.01 0.00 1.01 0.00 0.00 0.00 1.01

HT-IV A Govt. Lift Irrigation Schemes 14.55 0.00 14.55 0.00 0.00 0.00 14.55

HT-IVA Private Agriculture 0.36 0.00 0.36 0.00 0.00 0.00 0.36

HT - IV (B) Composite P.W.S Schemes 7.15 0.00 7.15 0.00 0.00 0.00 7.15

HT-VI Townships and Residential Colonies 12.45 0.00 12.45 0.00 0.00 0.00 12.45

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - VIII -Temporary Supply 0.06 0.00 0.06 0.00 0.00 0.00 0.06

RESCOs 8.75 0.00 8.75 0.00 0.00 0.00 8.75

HT I (B): Energy Intensive Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 33 KV 1428.63 0.00 1428.63 0.00 0.00 0.00 1428.63

HT-I Industry Segregated 1163.74 0.00 1163.74 0.00 0.00 0.00 1163.74

Lights & Fans 0.25 0.00 0.25 0.00 0.00 0.00 0.25

Colony consumption 4.13 0.00 4.13 0.00 0.00 0.00 4.13

Seasonal Industries 21.24 0.00 21.24 0.00 0.00 0.00 21.24

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 138.92 0.00 138.92 0.00 0.00 0.00 138.92

HT-I (B) Ferro-Alloys 32.75 0.00 32.75 0.00 0.00 0.00 32.75

HT-II - Others 56.00 0.00 56.00 0.00 0.00 0.00 56.00

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 8.21 0.00 8.21 0.00 0.00 0.00 8.21

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-IV A Govt. Lift Irrigation Schemes 2.89 0.00 2.89 0.00 0.00 0.00 2.89

HT-IVA Private Agriculture 0.01 0.00 0.01 0.00 0.00 0.00 0.01

HT - IV (B) Composite P.W.S Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.48 0.00 0.48 0.00 0.00 0.00 0.48

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - VIII -Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00

RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

Revenue from Current Tariffs (Rs. Crs.)

Base Year

Page 293: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

Revenue from Current Tariffs (Rs. Crs.)

Base Year

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 1246.07 0.00 1246.07 0.00 0.00 0.00 1246.07

HT-I Industry Segregated 711.33 0.00 711.33 0.00 0.00 0.00 711.33

Lights & Fans 0.24 0.00 0.24 0.00 0.00 0.00 0.24

Colony consumption 3.30 0.00 3.30 0.00 0.00 0.00 3.30

Seasonal Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 70.71 0.00 70.71 0.00 0.00 0.00 70.71

HT-I (B) Ferro-Alloys 39.75 0.00 39.75 0.00 0.00 0.00 39.75

HT-II - Others 8.67 0.00 8.67 0.00 0.00 0.00 8.67

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 1.11 0.00 1.11 0.00 0.00 0.00 1.11

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-IV A Govt. Lift Irrigation Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-IV B Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - IV (C) Composite P.W.S Schemes 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 410.95 0.00 410.95 0.00 0.00 0.00 410.95

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT - IX -Temporary Supply 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT- VIII - RESCOs 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Difference in 132KV Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 7290.42 0.00 7290.42 0.00 0.00 0.00 7290.42

Page 294: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5

LT Category

Category I (A&B) - Domestic

Category II (A & B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A,B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

HT Category at 11 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT Category at 33 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

Revenue from Current Tariffs (Rs. Crs.)

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

4527.73 0.00 4527.73 0.00 0.00 0.00 4527.73

2103.90 0.00 2103.90 0.00 0.00 0.00 2103.90

1182.51 0.00 1182.51 0.00 0.00 0.00 1182.51

0.74 0.00 0.74 0.00 0.00 0.00 0.74

835.79 0.00 835.79 0.00 0.00 0.00 835.79

12.51 0.00 12.51 0.00 0.00 0.00 12.51

67.56 0.00 67.56 0.00 0.00 0.00 67.56

257.97 0.00 257.97 0.00 0.00 0.00 257.97

52.05 0.00 52.05 0.00 0.00 0.00 52.05

14.69 0.00 14.69 0.00 0.00 0.00 14.69

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

1582.68 0.00 1582.68 0.00 0.00 0.00 1582.68

890.05 0.00 890.05 0.00 0.00 0.00 890.05

18.14 0.00 18.14 0.00 0.00 0.00 18.14

1.42 0.00 1.42 0.00 0.00 0.00 1.42

40.74 0.00 40.74 0.00 0.00 0.00 40.74

118.24 0.00 118.24 0.00 0.00 0.00 118.24

0.00 0.00 0.00 0.00 0.00 0.00 0.00

337.30 0.00 337.30 0.00 0.00 0.00 337.30

61.86 0.00 61.86 0.00 0.00 0.00 61.86

11.85 0.00 11.85 0.00 0.00 0.00 11.85

2.49 0.00 2.49 0.00 0.00 0.00 2.49

47.92 0.00 47.92 0.00 0.00 0.00 47.92

12.86 0.00 12.86 0.00 0.00 0.00 12.86

10.92 0.00 10.92 0.00 0.00 0.00 10.92

19.21 0.00 19.21 0.00 0.00 0.00 19.21

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

9.67 0.00 9.67 0.00 0.00 0.00 9.67

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2044.11 0.00 2044.11 0.00 0.00 0.00 2044.11

1528.37 0.00 1528.37 0.00 0.00 0.00 1528.37

17.01 0.00 17.01 0.00 0.00 0.00 17.01

6.36 0.00 6.36 0.00 0.00 0.00 6.36

28.51 0.00 28.51 0.00 0.00 0.00 28.51

248.13 0.00 248.13 0.00 0.00 0.00 248.13

114.92 0.00 114.92 0.00 0.00 0.00 114.92

57.69 0.00 57.69 0.00 0.00 0.00 57.69

9.70 0.00 9.70 0.00 0.00 0.00 9.70

0.08 0.00 0.08 0.00 0.00 0.00 0.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00

20.29 0.00 20.29 0.00 0.00 0.00 20.29

5.48 0.00 5.48 0.00 0.00 0.00 5.48

6.70 0.00 6.70 0.00 0.00 0.00 6.70

0.87 0.00 0.87 0.00 0.00 0.00 0.87

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

2014-15

Page 295: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Revenue from Current Tariffs (Rs. Crs.)

HT II (C): Function Halls/Auditoriums

HT Category at 132 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - IX -Temporary Supply

HT- VIII - RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

Difference in 132KV Total

Total

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

2014-15

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2092.98 0.00 2092.98 0.00 0.00 0.00 2092.98

1163.59 0.00 1163.59 0.00 0.00 0.00 1163.59

7.55 0.00 7.55 0.00 0.00 0.00 7.55

7.03 0.00 7.03 0.00 0.00 0.00 7.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00

187.17 0.00 187.17 0.00 0.00 0.00 187.17

63.56 0.00 63.56 0.00 0.00 0.00 63.56

10.43 0.00 10.43 0.00 0.00 0.00 10.43

1.76 0.00 1.76 0.00 0.00 0.00 1.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

176.23 0.00 176.23 0.00 0.00 0.00 176.23

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

475.68 0.00 475.68 0.00 0.00 0.00 475.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

10247.49 0.00 10247.49 0.00 0.00 0.00 10247.49

Page 296: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5

LT Category

Category I (A&B) - Domestic

Category II (A & B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A,B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

HT Category at 11 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT Category at 33 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

Revenue from Current Tariffs (Rs. Crs.)

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

5083.29 0.00 5083.29 0.00 0.00 0.00 5083.29

2350.52 0.00 2350.52 0.00 0.00 0.00 2350.52

1430.42 0.00 1430.42 0.00 0.00 0.00 1430.42

1.27 0.00 1.27 0.00 0.00 0.00 1.27

905.66 0.00 905.66 0.00 0.00 0.00 905.66

14.10 0.00 14.10 0.00 0.00 0.00 14.10

21.93 0.00 21.93 0.00 0.00 0.00 21.93

296.19 0.00 296.19 0.00 0.00 0.00 296.19

61.68 0.00 61.68 0.00 0.00 0.00 61.68

0.71 0.00 0.71 0.00 0.00 0.00 0.71

0.81 0.00 0.81 0.00 0.00 0.00 0.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00

1681.83 0.00 1681.83 0.00 0.00 0.00 1681.83

835.58 0.00 835.58 0.00 0.00 0.00 835.58

62.89 0.00 62.89 0.00 0.00 0.00 62.89

1.52 0.00 1.52 0.00 0.00 0.00 1.52

39.61 0.00 39.61 0.00 0.00 0.00 39.61

153.49 0.00 153.49 0.00 0.00 0.00 153.49

0.00 0.00 0.00 0.00 0.00 0.00 0.00

422.27 0.00 422.27 0.00 0.00 0.00 422.27

74.24 0.00 74.24 0.00 0.00 0.00 74.24

15.40 0.00 15.40 0.00 0.00 0.00 15.40

2.63 0.00 2.63 0.00 0.00 0.00 2.63

10.50 0.00 10.50 0.00 0.00 0.00 10.50

30.96 0.00 30.96 0.00 0.00 0.00 30.96

1.35 0.00 1.35 0.00 0.00 0.00 1.35

24.18 0.00 24.18 0.00 0.00 0.00 24.18

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

7.20 0.00 7.20 0.00 0.00 0.00 7.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2381.16 0.00 2381.16 0.00 0.00 0.00 2381.16

1761.23 0.00 1761.23 0.00 0.00 0.00 1761.23

26.47 0.00 26.47 0.00 0.00 0.00 26.47

7.33 0.00 7.33 0.00 0.00 0.00 7.33

31.66 0.00 31.66 0.00 0.00 0.00 31.66

360.46 0.00 360.46 0.00 0.00 0.00 360.46

54.93 0.00 54.93 0.00 0.00 0.00 54.93

80.33 0.00 80.33 0.00 0.00 0.00 80.33

14.72 0.00 14.72 0.00 0.00 0.00 14.72

0.09 0.00 0.09 0.00 0.00 0.00 0.09

0.00 0.00 0.00 0.00 0.00 0.00 0.00

13.08 0.00 13.08 0.00 0.00 0.00 13.08

29.49 0.00 29.49 0.00 0.00 0.00 29.49

0.00 0.00 0.00 0.00 0.00 0.00 0.00

1.37 0.00 1.37 0.00 0.00 0.00 1.37

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2015-16

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

Page 297: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Revenue from Current Tariffs (Rs. Crs.)

HT II (C): Function Halls/Auditoriums

HT Category at 132 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - IX -Temporary Supply

HT- VIII - RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

Difference in 132KV Total

Total

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

2015-16

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2242.75 0.00 2242.75 0.00 0.00 0.00 2242.75

1316.35 0.00 1316.35 0.00 0.00 0.00 1316.35

13.25 0.00 13.25 0.00 0.00 0.00 13.25

8.66 0.00 8.66 0.00 0.00 0.00 8.66

0.00 0.00 0.00 0.00 0.00 0.00 0.00

252.43 0.00 252.43 0.00 0.00 0.00 252.43

63.25 0.00 63.25 0.00 0.00 0.00 63.25

17.43 0.00 17.43 0.00 0.00 0.00 17.43

2.82 0.00 2.82 0.00 0.00 0.00 2.82

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

105.76 0.00 105.76 0.00 0.00 0.00 105.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

462.81 0.00 462.81 0.00 0.00 0.00 462.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

11389.02 0.00 11389.02 0.00 0.00 0.00 11389.02

Page 298: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5

LT Category

Category I (A&B) - Domestic

Category II (A & B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A,B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

HT Category at 11 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT Category at 33 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

Revenue from Current Tariffs (Rs. Crs.)

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

5792.91 0.00 5792.91 0.00 0.00 0.00 5792.91

2724.11 0.00 2724.11 0.00 0.00 0.00 2724.11

1567.92 0.00 1567.92 0.00 0.00 0.00 1567.92

1.79 0.00 1.79 0.00 0.00 0.00 1.79

963.57 0.00 963.57 0.00 0.00 0.00 963.57

16.31 0.00 16.31 0.00 0.00 0.00 16.31

75.04 0.00 75.04 0.00 0.00 0.00 75.04

353.28 0.00 353.28 0.00 0.00 0.00 353.28

70.09 0.00 70.09 0.00 0.00 0.00 70.09

1.49 0.00 1.49 0.00 0.00 0.00 1.49

1.12 0.00 1.12 0.00 0.00 0.00 1.12

18.19 0.00 18.19 0.00 0.00 0.00 18.19

1893.39 0.00 1893.39 0.00 0.00 0.00 1893.39

941.60 0.00 941.60 0.00 0.00 0.00 941.60

40.84 0.00 40.84 0.00 0.00 0.00 40.84

1.19 0.00 1.19 0.00 0.00 0.00 1.19

47.41 0.00 47.41 0.00 0.00 0.00 47.41

143.42 0.00 143.42 0.00 0.00 0.00 143.42

0.26 0.00 0.26 0.00 0.00 0.00 0.26

443.81 0.00 443.81 0.00 0.00 0.00 443.81

76.66 0.00 76.66 0.00 0.00 0.00 76.66

31.09 0.00 31.09 0.00 0.00 0.00 31.09

6.43 0.00 6.43 0.00 0.00 0.00 6.43

33.87 0.00 33.87 0.00 0.00 0.00 33.87

60.10 0.00 60.10 0.00 0.00 0.00 60.10

0.95 0.00 0.95 0.00 0.00 0.00 0.95

20.52 0.00 20.52 0.00 0.00 0.00 20.52

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.06 0.00 0.06 0.00 0.00 0.00 0.06

13.22 0.00 13.22 0.00 0.00 0.00 13.22

8.63 0.00 8.63 0.00 0.00 0.00 8.63

15.51 0.00 15.51 0.00 0.00 0.00 15.51

1.99 0.00 1.99 0.00 0.00 0.00 1.99

5.82 0.00 5.82 0.00 0.00 0.00 5.82

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2241.71 0.00 2241.71 0.00 0.00 0.00 2241.71

1625.98 0.00 1625.98 0.00 0.00 0.00 1625.98

22.07 0.00 22.07 0.00 0.00 0.00 22.07

6.00 0.00 6.00 0.00 0.00 0.00 6.00

19.81 0.00 19.81 0.00 0.00 0.00 19.81

311.92 0.00 311.92 0.00 0.00 0.00 311.92

95.86 0.00 95.86 0.00 0.00 0.00 95.86

80.94 0.00 80.94 0.00 0.00 0.00 80.94

14.32 0.00 14.32 0.00 0.00 0.00 14.32

2.60 0.00 2.60 0.00 0.00 0.00 2.60

0.53 0.00 0.53 0.00 0.00 0.00 0.53

0.02 0.00 0.02 0.00 0.00 0.00 0.02

23.84 0.00 23.84 0.00 0.00 0.00 23.84

24.62 0.00 24.62 0.00 0.00 0.00 24.62

1.22 0.00 1.22 0.00 0.00 0.00 1.22

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.65 0.00 2.65 0.00 0.00 0.00 2.65

5.63 0.00 5.63 0.00 0.00 0.00 5.63

3.71 0.00 3.71 0.00 0.00 0.00 3.71

2016-17

Retail Supply (Regulated Business) Surcharges (Open Access)Grid Support

Charges

Total

Revenue

Page 299: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Revenue from Current Tariffs (Rs. Crs.)

HT II (C): Function Halls/Auditoriums

HT Category at 132 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - IX -Temporary Supply

HT- VIII - RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

Difference in 132KV Total

Total

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

2016-17

Retail Supply (Regulated Business) Surcharges (Open Access)Grid Support

Charges

Total

Revenue

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2380.88 0.00 2380.88 0.00 0.00 0.00 2380.88

1189.62 0.00 1189.62 0.00 0.00 0.00 1189.62

8.02 0.00 8.02 0.00 0.00 0.00 8.02

6.69 0.00 6.69 0.00 0.00 0.00 6.69

0.00 0.00 0.00 0.00 0.00 0.00 0.00

244.48 0.00 244.48 0.00 0.00 0.00 244.48

56.65 0.00 56.65 0.00 0.00 0.00 56.65

19.93 0.00 19.93 0.00 0.00 0.00 19.93

3.19 0.00 3.19 0.00 0.00 0.00 3.19

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.01 0.00 0.01 0.00 0.00 0.00 0.01

418.25 0.00 418.25 0.00 0.00 0.00 418.25

0.00 0.00 0.00 0.00 0.00 0.00 0.00

434.03 0.00 434.03 0.00 0.00 0.00 434.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

12308.90 0.00 12308.90 0.00 0.00 0.00 12308.90

Page 300: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5

LT Category

Category I (A&B) - Domestic

Category II (A & B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A,B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

HT Category at 11 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT Category at 33 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

Revenue from Current Tariffs (Rs. Crs.)

Gross

RevenueIncentives Net Revenue Surcharge

Additional

surcharge

6620.43 0.00 6620.43 0.00 0.00 0.00 6620.43

3073.06 0.00 3073.06 0.00 0.00 0.00 3073.06

1762.24 0.00 1762.24 0.00 0.00 0.00 1762.24

3.71 0.00 3.71 0.00 0.00 0.00 3.71

1142.88 0.00 1142.88 0.00 0.00 0.00 1142.88

16.73 0.00 16.73 0.00 0.00 0.00 16.73

78.70 0.00 78.70 0.00 0.00 0.00 78.70

438.43 0.00 438.43 0.00 0.00 0.00 438.43

78.87 0.00 78.87 0.00 0.00 0.00 78.87

1.67 0.00 1.67 0.00 0.00 0.00 1.67

1.23 0.00 1.23 0.00 0.00 0.00 1.23

22.91 0.00 22.91 0.00 0.00 0.00 22.91

2238.48 0.00 2238.48 0.00 0.00 0.00 2238.48

1139.63 0.00 1139.63 0.00 0.00 0.00 1139.63

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.35 0.00 2.35 0.00 0.00 0.00 2.35

53.35 0.00 53.35 0.00 0.00 0.00 53.35

182.44 0.00 182.44 0.00 0.00 0.00 182.44

0.29 0.00 0.29 0.00 0.00 0.00 0.29

515.74 0.00 515.74 0.00 0.00 0.00 515.74

83.75 0.00 83.75 0.00 0.00 0.00 83.75

37.22 0.00 37.22 0.00 0.00 0.00 37.22

7.04 0.00 7.04 0.00 0.00 0.00 7.04

28.20 0.00 28.20 0.00 0.00 0.00 28.20

91.43 0.00 91.43 0.00 0.00 0.00 91.43

23.69 0.00 23.69 0.00 0.00 0.00 23.69

16.97 0.00 16.97 0.00 0.00 0.00 16.97

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.11 0.00 0.11 0.00 0.00 0.00 0.11

12.50 0.00 12.50 0.00 0.00 0.00 12.50

16.03 0.00 16.03 0.00 0.00 0.00 16.03

16.81 0.00 16.81 0.00 0.00 0.00 16.81

2.84 0.00 2.84 0.00 0.00 0.00 2.84

8.08 0.00 8.08 0.00 0.00 0.00 8.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2321.74 0.00 2321.74 0.00 0.00 0.00 2321.74

1649.13 0.00 1649.13 0.00 0.00 0.00 1649.13

0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.80 0.00 5.80 0.00 0.00 0.00 5.80

16.66 0.00 16.66 0.00 0.00 0.00 16.66

310.92 0.00 310.92 0.00 0.00 0.00 310.92

122.38 0.00 122.38 0.00 0.00 0.00 122.38

84.12 0.00 84.12 0.00 0.00 0.00 84.12

12.81 0.00 12.81 0.00 0.00 0.00 12.81

7.01 0.00 7.01 0.00 0.00 0.00 7.01

1.19 0.00 1.19 0.00 0.00 0.00 1.19

0.00 0.00 0.00 0.00 0.00 0.00 0.00

50.84 0.00 50.84 0.00 0.00 0.00 50.84

35.21 0.00 35.21 0.00 0.00 0.00 35.21

1.68 0.00 1.68 0.00 0.00 0.00 1.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.02 0.00 0.02 0.00 0.00 0.00 0.02

8.34 0.00 8.34 0.00 0.00 0.00 8.34

13.94 0.00 13.94 0.00 0.00 0.00 13.94

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

2017-18

Page 301: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Revenue from Current Tariffs (Rs. Crs.)

HT II (C): Function Halls/Auditoriums

HT Category at 132 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - IX -Temporary Supply

HT- VIII - RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

Difference in 132KV Total

Total

Gross

RevenueIncentives Net Revenue Surcharge

Additional

surcharge

Retail Supply (Regulated Business) Surcharges (Open Access) Grid

Support

Charges

Total

Revenue

2017-18

1.70 0.00 1.70 0.00 0.00 0.00 1.70

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2191.06 0.00 2191.06 0.00 0.00 0.00 2191.06

1094.30 0.00 1094.30 0.00 0.00 0.00 1094.30

0.00 0.00 0.00 0.00 0.00 0.00 0.00

7.86 0.00 7.86 0.00 0.00 0.00 7.86

0.00 0.00 0.00 0.00 0.00 0.00 0.00

260.84 0.00 260.84 0.00 0.00 0.00 260.84

79.79 0.00 79.79 0.00 0.00 0.00 79.79

23.43 0.00 23.43 0.00 0.00 0.00 23.43

3.79 0.00 3.79 0.00 0.00 0.00 3.79

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

373.91 0.00 373.91 0.00 0.00 0.00 373.91

0.00 0.00 0.00 0.00 0.00 0.00 0.00

346.38 0.00 346.38 0.00 0.00 0.00 346.38

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.76 0.00 0.76 0.00 0.00 0.00 0.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

13371.71 0.00 13371.71 0.00 0.00 0.00 13371.71

Page 302: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5

LT Category

Category I (A&B) - Domestic

Category II (A & B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A,B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

HT Category at 11 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT Category at 33 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IVA Private Agriculture

HT - IV (B) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

Revenue from Current Tariffs (Rs. Crs.)

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

7263.51 0.00 7263.51 0.00 0.00 0.00 7263.51

3410.11 0.00 3410.11 0.00 0.00 0.00 3410.11

1887.06 0.00 1887.06 0.00 0.00 0.00 1887.06

4.25 0.00 4.25 0.00 0.00 0.00 4.25

1282.40 0.00 1282.40 0.00 0.00 0.00 1282.40

17.48 0.00 17.48 0.00 0.00 0.00 17.48

82.83 0.00 82.83 0.00 0.00 0.00 82.83

467.53 0.00 467.53 0.00 0.00 0.00 467.53

83.87 0.00 83.87 0.00 0.00 0.00 83.87

1.72 0.00 1.72 0.00 0.00 0.00 1.72

1.29 0.00 1.29 0.00 0.00 0.00 1.29

24.96 0.00 24.96 0.00 0.00 0.00 24.96

2570.89 0.00 2570.89 0.00 0.00 0.00 2570.89

1394.98 0.00 1394.98 0.00 0.00 0.00 1394.98

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.59 0.00 2.59 0.00 0.00 0.00 2.59

54.17 0.00 54.17 0.00 0.00 0.00 54.17

205.03 0.00 205.03 0.00 0.00 0.00 205.03

0.17 0.00 0.17 0.00 0.00 0.00 0.17

539.29 0.00 539.29 0.00 0.00 0.00 539.29

86.26 0.00 86.26 0.00 0.00 0.00 86.26

38.46 0.00 38.46 0.00 0.00 0.00 38.46

7.25 0.00 7.25 0.00 0.00 0.00 7.25

28.50 0.00 28.50 0.00 0.00 0.00 28.50

112.96 0.00 112.96 0.00 0.00 0.00 112.96

24.92 0.00 24.92 0.00 0.00 0.00 24.92

14.85 0.00 14.85 0.00 0.00 0.00 14.85

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.11 0.00 0.11 0.00 0.00 0.00 0.11

16.00 0.00 16.00 0.00 0.00 0.00 16.00

16.74 0.00 16.74 0.00 0.00 0.00 16.74

17.31 0.00 17.31 0.00 0.00 0.00 17.31

2.93 0.00 2.93 0.00 0.00 0.00 2.93

8.34 0.00 8.34 0.00 0.00 0.00 8.34

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2423.80 0.00 2423.80 0.00 0.00 0.00 2423.80

1666.41 0.00 1666.41 0.00 0.00 0.00 1666.41

0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.94 0.00 5.94 0.00 0.00 0.00 5.94

16.84 0.00 16.84 0.00 0.00 0.00 16.84

335.63 0.00 335.63 0.00 0.00 0.00 335.63

134.27 0.00 134.27 0.00 0.00 0.00 134.27

92.09 0.00 92.09 0.00 0.00 0.00 92.09

13.20 0.00 13.20 0.00 0.00 0.00 13.20

8.06 0.00 8.06 0.00 0.00 0.00 8.06

1.23 0.00 1.23 0.00 0.00 0.00 1.23

0.00 0.00 0.00 0.00 0.00 0.00 0.00

73.22 0.00 73.22 0.00 0.00 0.00 73.22

42.34 0.00 42.34 0.00 0.00 0.00 42.34

9.93 0.00 9.93 0.00 0.00 0.00 9.93

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.02 0.00 0.02 0.00 0.00 0.00 0.02

8.50 0.00 8.50 0.00 0.00 0.00 8.50

14.41 0.00 14.41 0.00 0.00 0.00 14.41

Surcharges (Open Access) Grid

Support

Charges

Retail Supply (Regulated Business)

2018-19

Total

Revenue

Page 303: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Revenue from Current Tariffs (Rs. Crs.)

HT II (C): Function Halls/Auditoriums

HT Category at 132 KV

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - IX -Temporary Supply

HT- VIII - RESCOs

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

Difference in 132KV Total

Total

Gross

RevenueIncentives

Net

RevenueSurcharge

Additional

surcharge

Surcharges (Open Access) Grid

Support

Charges

Retail Supply (Regulated Business)

2018-19

Total

Revenue

1.71 0.00 1.71 0.00 0.00 0.00 1.71

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2402.92 0.00 2402.92 0.00 0.00 0.00 2402.92

1218.56 0.00 1218.56 0.00 0.00 0.00 1218.56

0.00 0.00 0.00 0.00 0.00 0.00 0.00

8.72 0.00 8.72 0.00 0.00 0.00 8.72

0.00 0.00 0.00 0.00 0.00 0.00 0.00

306.66 0.00 306.66 0.00 0.00 0.00 306.66

94.34 0.00 94.34 0.00 0.00 0.00 94.34

23.99 0.00 23.99 0.00 0.00 0.00 23.99

3.91 0.00 3.91 0.00 0.00 0.00 3.91

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

385.12 0.00 385.12 0.00 0.00 0.00 385.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00

361.62 0.00 361.62 0.00 0.00 0.00 361.62

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

14661.11 0.00 14661.11 0.00 0.00 0.00 14661.11

Page 304: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Index sheet

Form 5 a

Incentives at current Tariffs

No. of

consumers

Incentive

Amount

No. of

consumers

Incentive

Amount

No. of

consumers

Incentive

Amount

No. of

consumers

Incentive

Amount

No. of

consumers

Incentive

Amount

No. of

consumers

Incentive

Amount

LT Category 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

Category I (A&B) - Domestic

Category II (A & B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

Year-4 (2017-18)

Load Factor Incentives

TotalTotal

Base Year Year-1 (2014-15) Year-2 (2015-16) Year-3 (2016-17)

Consumer Category

Load Factor Incentives Load Factor Incentives Load Factor Incentives Load Factor Incentives

Total TotalTotal

Year-5 (2018-19)

Load Factor Incentives

Total

Page 305: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total (LT & HT) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 306: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 5c Consumers served under Open Access as per Section 42 and Section 49 of E Act

Base Year

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

LT Category 0 0.00 0.00

Category I (A&B) - Domestic

Category II (A,B & C) - Non-domestic/Commercial

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

Area 1

Page 307: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total 0 0.00 0.00

Page 308: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

2014-15

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

LT Category 0 0.00 0.00

Category I (A&B) - Domestic

Category II (A,B) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

Area 1

Page 309: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total 0 0.00 0.00

Page 310: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

2015-16

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

LT Category 0 0.00 0.00

Category I (A&B) - Domestic

Category II (A,B & C) - Non-domestic/Commercial

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category V (B) - Agriculture (Tatkal)

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Area 1

Page 311: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total 0 0.00 0.00

Page 312: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

2016-17

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

LT Category 0 0.00 0.00

Category I (A&B) - Domestic

Category II (A,B & C) - Non-domestic/Commercial

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category V (B) - Agriculture (Tatkal)

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

Area 1

Page 313: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total 0 0.00 0.00

Page 314: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

2017-18

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

LT Category 0 0.00 0.00

Category I (A&B) - Domestic

Category II (A,B & C) - Non-domestic/Commercial

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category V (B) - Agriculture (Tatkal)

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0.00

HT-I Industry Segregated

Area 1

Page 315: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total 0 0.00 0.00

Page 316: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

2018-19

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

LT Category 0 0.00 0.00

Category I (A&B) - Domestic

Category II (A,B & C) - Non-domestic/Commercial

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category V (B) - Agriculture (Tatkal)

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

HT Category at 11 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 33 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

Area 1

Page 317: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Name of Area :

Revenue from Current Tariffs (Rs. Crs.) Detail LinksNumber of

consumers

Sales

(MU)

Average Supply Rate

( Rs/kWh)

Amount

( In Rs crores)

Area 1

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

HT Category at 132 KV 0 0.00 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time of Day Incentive

HT-I Industrial Time-of-Day Tariff (10 AM to 2 PM)

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT- IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT- VIII - RESCOs

HT - IX -Temporary Supply

Total 0 0.00 0.00

Page 318: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 6

Items of Non - Tariff Income

(Rs. Crs.)Detail Links Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

Rebate on Power Purchase 0.00 21.39 55.58 61.09 64.15 67.36

Cap S/c 19.68 24.85 32.49 41.59 43.67 45.85

Gain/loss (Billing) 0.02 0.01 0.03 -0.06 -0.06 -0.07

HT EPSS 0.24 1.31 0.07 0.00 0.00 0.00

IED 1.53 2.81 2.95 6.03 6.33 6.65

Int on Bank Deposits -0.16 0.15 0.19 4.16 4.37 4.59

LPF 1.18 0.32 0.67 0.49 0.52 0.54

LVSe 4.22 3.79 3.89 6.16 6.47 6.79

Malpractice 1.48 5.74 3.06 2.92 3.07 3.22

Prior Period HT 0.00 0.00 -9.95 -65.20 -32.00 0.00

Prior Period LT 0.00 0.00 0.00 -4.50 -4.73 0.00

Reactive Income 0.14 1.68 1.67 0.96 1.01 1.06

Receipt of Direct Ta 0.54 1.50 1.92 1.87 1.96 2.06

Recoveries for TP 0.28 0.51 0.50 0.00 0.00 0.00

Theft 6.28 9.43 12.22 15.69 16.47 17.30

Total Non tariff income 35.42 73.49 105.30 71.21 111.23 155.36

Non-tariff Income at Current Charges

This form refers to income other than the income derived from tariffs and does not include cross subsidy surcharge, additional surcharge, etc.

Page 319: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7 Total Revenue at Current Tariff and Charges

Base Year

Energy

Charges

(Rs/kWh) or

(Rs/kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MVA)

Connected Load/

Contract

Demand

(HP)

LT Total - (Existing Categories) 6782288 12181.96 0.00 4823.82 5766099.90

Category- Domestic (All) 5305263 4428.14 0 3837.27 0

Cat I(A) Domestic - upto 50 units/month 2689914 1.45 0.00 0.00 415.10 1489.04 0.00

Cat I(B) Domestic - >50 and upto 100 units/month 1473970 743.08 0.00 1108.44 0.00

0 - 50 units 0 1.45 0.00 0.00 411.38 0.00 0.00

51 - 100 units 1473970 2.60 0.00 0.00 331.70 1108.44 0.00

Cat I(c) Domestic- above 100 & upto 200 units/month 765217 1724.43 0.00 759.25 0.00

0 - 50 units 0 2.60 0.00 0.00 858.32 0.00 0.00

51 - 100 units 0 2.60 0.00 0.00 566.66 0.00 0.00

101 - 150 units 538418 3.60 0.00 0.00 234.20 451.89 0.00

151 - 200 units 226799 3.60 0.00 0.00 65.26 307.35 0.00

Cat-I(D) Domestic, > 200 Units/Month 376162 1545.52 0.00 480.55 0.00

0 - 50 units 0 2.60 0.00 0.00 462.12 0.00 0.00

51 - 100 units 0 3.25 0.00 0.00 369.69 0.00 0.00

101 - 150 units 0 4.88 0.00 0.00 277.27 0.00 0.00

151 - 200 units 0 5.63 0.00 0.00 184.85 0.00 0.00

201 - 250 units 74492 6.38 0.00 0.00 79.22 155.16 0.00

251 - 300 units 263124 6.88 0.00 0.00 47.96 109.20 0.00

301 - 400 units 23436 7.38 0.00 0.00 51.32 105.84 0.00

401 - 500 units 7073 7.88 0.00 0.00 25.57 49.47 0.00

above 500units 8037 8.38 0.00 0.00 47.53 60.87 0.00

Category II - Non-domestic/Commrl (A,B &C) 491821 977.04 0.00 916.60 0.00

Category II - Non-domestic/Commrl (A & B) 491296 976.56 0.00 916.60 0.00

Lt - II (A) Upto 50 units/month 295608 57.03 0.00 301.07 0.00

0-50 units 295608 5.40 600.00 0.00 57.03 301.07 0.00

Lt - II (B) >50 Units/month 195688 919.53 0.00 615.53 0.00

0-50 units 0 6.63 600.00 0.00 216.76 0.00 0.00

51- 100 units 85431 7.38 600.00 0.00 88.59 100.32 0.00

101- 300 units 69477 8.13 600.00 0.00 154.28 142.96 0.00

301- 500 units 14725 8.63 600.00 0.00 76.53 60.61 0.00

Above 500 units 26055 9.13 600.00 0.00 383.37 310.59 0.00

LT-II (C) Advertising Hoardings 525 11.03 600.00 0.00 0.49 1.06 0.00

Category III (1+2) - Industrial 54311 866.11 0.00 0.00 1076880.59

Category III - Industrial (1) 54311 866.11 0.00 0.00 1076880.59

Industrial Normal 42255 6.08 600.00 0.00 823.42 0.00 1016923.47

Pisciculture/Prawn culture 12045 4.63 240.00 0.00 42.60 0.00 59670.12

Sugarcane Crushing 11 4.63 240.00 0.00 0.09 0.00 287.00

Poultry Farms 0 5.63 600.00 0.00 0.00 0.00 0.00

Mushroom & Rabbit Farms 0 5.63 600.00 0.00 0.00 0.00 0.00

Floriculture in Green House 0 5.63 600.00 0.00 0.00 0.00 0.00

Category III - Industrial (Seasonal) (2) 0 0.00 0.00 0.00 0.00

SSI Units

Seasonal Industries

Category IV- Cottage Industries 7558 21.58 0.00 0.00 24727.09

Cat -IV(A) - Cottage Indstr. Upto 15 HP 7558 3.75 240.00 0.00 21.58 0.00 24727.09

Cat -IV(B) - Agro Based Acticity upto 15 HP 0 3.75 240.00 0.00 0.00 0.00 0.00

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data

Page 320: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs/kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MVA)

Connected Load/

Contract

Demand

(HP)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data

Category V (A,B & C) - Agriculture (1+2) 820732 5513.46 0.00 0.00 4500833.74

Category V(A&B) - Agriculture - (1) 819447 5513.46 0.00 0.00 4495772.65

LT (A) with DSM 485001 5513.46 0.00 0.00 2546000.68

Corporate Farmers & IT Assesses 928 2.50 0.00 0.00 26.48 0.00 5396.98

Wet Land Farmers (Holdings >2.5 acre) 8299 0.50 525.00 525.00 89.32 0.00 50960.17

Dry Land Farmers (Connections > 3 nos.) 1009 0.50 525.00 525.00 32.83 0.00 4942.50

Wet Land Farmers (Holdings <= 2.5 acre) 150306 0.00 0.00 0.00 73.24 0.00 699618.86

Dry Land Farmers (Connections <= 3 nos.) 324459 0.00 0.00 0.00 5291.59 0.00 1785082.17

LT (B) without DSM 334446 0.00 0.00 0.00 1949771.97

Corporate Farmers & IT Assesses 2056 3.50 0.00 0.00 0.00 0.00 12867.29

Wet Land Farmers (Holdings >2.5 acre) 12749 1.00 1050.00 1050.00 0.00 0.00 61971.24

Dry Land Farmers (Connections > 3 nos.) 1758 1.00 1050.00 1050.00 0.00 0.00 9507.65

Wet Land Farmers (Holdings <= 2.5 acre) 316 0.50 525.00 525.00 0.00 0.00 2652.00

Dry Land Farmers (Connections <= 3 nos.) 317567 0.50 525.00 525.00 0.00 0.00 1862773.78

Category LT V(C) - Others - (2) 1285.00 0.00 0.00 0.00 5061.09

Salt Farming Units with CL upto15HP 1247 3.70 240.00 240.00 0.00 0.00 4887.34

Rural Horticulture Nurseries upto 15 HP 38 3.70 240.00 240.00 0.00 0.00 173.76

Category VI - Street Lighting & PWS 60985 327.53 0.00 54.82 163658.48

VI(A) - Street Lighting 35722 132.74 0.00 54.82 0.00

Panchayats 25970 5.37 360.00 360.00 72.41 33.65 0.00

Municipalities 4688 5.87 360.00 360.00 28.45 9.34 0.00

Muncipal Corporations 5064 6.37 360.00 360.00 31.87 11.84 0.00

Vi(B) - PWS Schemes 25263 194.80 0.00 0.00 163658.48

Panchayats 22361 4.37 360.00 360.00 145.24 0.00 139166.50

Municipalities 1446 5.37 360.00 360.00 25.82 0.00 12533.04

Municipal Corporations 1456 5.87 360.00 360.00 23.74 0.00 11958.95

Category VII (A&B) 41618 47.13 0.00 15.12 0.00

Cat VII (A) - General Purpose 34278 6.53 240.00 240.00 41.86 12.02 0.00

Cat VII-B - Religious Places (CL <=2KW) 7340 5.27 0.00 3.10 0.00

For all Units 7340 4.70 240.00 240.00 5.27 3.10 0.00

Category VIII-Temporary Supply 0 0.96 0.00 0.00 0.00

Temp. Supply (for all units) 0 9.43 240.00 240.00 0.96 0.00 0.00

New L T Categories ( Total ) 0 0

TOTAL (LT including new categories) 6782288 12181.96 0.00 4823.82 5766099.90

HIGH TENSION 4304 5842.52 0.00 2167.36 0.00

HT Category at 11 kV 3965 1730.18 0.00 850.27 0.00

HT-I Indl General (Segregated) 2582 5.73 4200.00 0.00 875.16 566.60 0.00

Lights & Fans 0 5.73 0.00 0.00 1.89 0.00 0.00

Industrial Colony consumption 0 5.68 0.00 0.00 1.40 0.00 0.00

Seasonal Industries 0 6.90 4200.00 0.00 40.95 0.00 0.00

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) 0 6.73 0.00 0.00 117.14 0.00 0.00

HT - I( B) Ferro-alloys 0 5.41 0.00 0.00 0.00 0.00 0.00

HT-II - Others 1057 6.90 4200.00 0.00 304.15 203.58 0.00

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM) 0 7.90 0.00 0.00 58.75 0.00 0.00

HT III: Airports, Bus Stations and Railway Stations 23 6.58 4200.00 0.00 7.22 4.06 0.00

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM) 0 7.58 0.00 0.00 1.33 0.00 0.00

HT -IV A Govt Lift Irrigation 248 5.37 0.00 0.00 27.09 65.50 0.00

HT -IV A Private Irrigation & Agriculture 0 5.37 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 26 4.39 0.00 0.00 16.23 5.48 0.00

Page 321: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs/kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MVA)

Connected Load/

Contract

Demand

(HP)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data

HT-VI - Townships & Colony Supply 28 5.68 600.00 0.00 21.39 5.06 0.00

HT- VII Green Power 0 10.78 0.00 0.00 0.00 0.00 0.00

HT- VIII Temporary 0 8.60 0.00 0.08 0.00 0.00

RESCOs 1 0.34 0.00 0.00 257.40 0.00 0.00

HT Category at 33 kV 287 2135.81 0.00 661.53 0.00

HT-I Indl General (Segregated) 248 5.30 4200.00 0.00 1728.35 583.97 0.00

Lights & Fans 0 5.30 0.00 0.00 0.48 0.00 0.00

Industrial Colony consumption 0 5.68 0.00 0.00 7.26 0.00 0.00

Seasonal Industries 0 6.28 4200.00 0.00 33.83 0.00 0.00

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) 0 6.30 0.00 0.00 220.51 0.00 0.00

HT - I( B) Ferro-alloys 5 4.98 0.00 0.00 65.77 18.57 0.00

HT-II - Others 23 6.28 4200.00 0.00 62.18 40.34 0.00

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM) 0 7.28 0.00 0.00 11.28 0.00 0.00

HT III: Airports, Bus Stations and Railway Stations 0 6.01 4200.00 0.00 0.00 0.00 0.00

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM) 0 7.01 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 7 5.37 0.00 0.00 5.38 17.83 0.00

HT -IV A Private Irrigation & Agriculture 0 5.37 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 1 4.39 0.00 0.00 0.00 0.35 0.00

HT-VI - Townships & Colony Supply 3 5.68 600.00 0.00 0.77 0.48 0.00

HT- VII Green Power 0 10.78 0.00 0.00 0.00 0.00 0.00

HT- VIII Temporary 0 7.95 0.00 0.00 0.00 0.00

RESCOs 0 0.34 0.00 0.00 0.00 0.00 0.00

HT Category at 132 kV 52 1976.53 0.00 655.57 0.00

HT-I Indl General (Segregated) 33 4.90 4200.00 0.00 1107.02 397.57 0.00

Lights & Fans 0 4.90 0.00 0.00 0.50 0.00 0.00

Industrial Colony consumption 0 5.68 0.00 0.00 5.81 0.00 0.00

Seasonal Industries 0 6.03 4200.00 0.00 0.00 0.00 0.00

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) 0 5.90 0.00 0.00 119.84 0.00 0.00

HT - I( B) Ferro-alloys 1 4.58 0.00 0.00 86.78 18.00 0.00

HT-II - Others 1 6.03 4200.00 0.00 8.85 5.00 0.00

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM) 0 7.03 0.00 0.00 1.58 0.00 0.00

HT III: Airports, Bus Stations and Railway Stations 0 5.72 4200.00 0.00 0.00 0.00 0.00

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM) 0 6.72 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0 5.37 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 0 5.37 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0 4.39 0.00 0.00 0.00 0.00 0.00

HT-V – RailwayTraction 17 6.36 0.00 0.00 646.15 235.00 0.00

HT-VI - Townships & Colony Supply 0 5.68 600.00 0.00 0.00 0.00 0.00

HT- VII Green Power 0 10.78 0.00 0.00 0.00 0.00 0.00

HT- VIII Temporary 0 7.35 0.00 0.00 0.00 0.00

RESCOs 0 0.34 0.00 0.00 0.00 0.00 0.00

TOTAL( LT + HT) 6786592 18024.48 0.00 6991.18 5766099.90

Page 322: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

Base Year

LT Total - (Existing Categories)

Category- Domestic (All)

Cat I(A) Domestic - upto 50 units/month

Cat I(B) Domestic - >50 and upto 100 units/month

0 - 50 units

51 - 100 units

Cat I(c) Domestic- above 100 & upto 200 units/month

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

Cat-I(D) Domestic, > 200 Units/Month

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

201 - 250 units

251 - 300 units

301 - 400 units

401 - 500 units

above 500units

Category II - Non-domestic/Commrl (A,B &C)

Category II - Non-domestic/Commrl (A & B)

Lt - II (A) Upto 50 units/month

0-50 units

Lt - II (B) >50 Units/month

0-50 units

51- 100 units

101- 300 units

301- 500 units

Above 500 units

LT-II (C) Advertising Hoardings

Category III (1+2) - Industrial

Category III - Industrial (1)

Industrial Normal

Pisciculture/Prawn culture

Sugarcane Crushing

Poultry Farms

Mushroom & Rabbit Farms

Floriculture in Green House

Category III - Industrial (Seasonal) (2)

SSI Units

Seasonal Industries

Category IV- Cottage Industries

Cat -IV(A) - Cottage Indstr. Upto 15 HP

Cat -IV(B) - Agro Based Acticity upto 15 HP

Consumer CategoriesEnergy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

2866.46 170.22 83.23 243.80 0.00 3363.72 0.00 3363.72

1345.44 0.00 65.11 177.85 0.00 1588.41 0.00 1588.41

60.19 0.00 65.11 177.85 303.15 303.15

145.89 0.00 0.00 0.00 0.00 145.89 145.89

59.65 0.00 59.65 59.65

86.24 0.00 86.24 86.24

478.30 0.00 0.00 0.00 0.00 478.30 478.30

223.16 0.00 223.16 223.16

147.33 0.00 147.33 147.33

84.31 0.00 84.31 84.31

23.49 0.00 23.49 23.49

661.06 0.00 0.00 0.00 0.00 661.06 0.00 661.06

120.15 0.00 120.15 120.15

120.15 0.00 120.15 120.15

135.31 0.00 135.31 135.31

104.07 0.00 104.07 104.07

50.54 0.00 50.54 50.54

32.99 0.00 32.99 32.99

37.87 0.00 37.87 37.87

20.15 0.00 20.15 20.15

39.83 0.00 39.83 39.83

0.00 0.00 0.00 0.00

781.91 55.00 9.06 18.20 0.00 864.17 0.00 864.17

781.38 54.93 9.06 18.20 0.00 863.57 0.00 863.57

30.79 18.06 0.00 0.00 0.00 48.86 0.00

30.79 18.06 48.86 48.86

750.58 36.87 9.06 18.20 0.00 814.71

143.71 0.00 9.06 18.20 170.97 170.97

65.38 6.02 71.40 71.40

125.43 8.58 134.01 134.01

66.05 3.64 69.68 69.68

350.02 18.64 368.65 368.65

0.54 0.06 0.60 0.00 0.60

520.40 0.00 9.06 18.20 0.00 547.66 0.00 547.66

520.40 0.00 9.06 18.20 0.00 547.66

500.64 0.00 9.06 18.20 527.90 527.90

19.72 0.00 19.72 19.72

0.04 0.00 0.04 0.04

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

8.09 0.00 0.00 0.00 0.00 8.09 0.00 8.09

8.09 - 8.09 8.09

0.00 - 0.00 0.00

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Page 323: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category V (A,B & C) - Agriculture (1+2)

Category V(A&B) - Agriculture - (1)

LT (A) with DSM

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

LT (B) without DSM

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others - (2)

Salt Farming Units with CL upto15HP

Rural Horticulture Nurseries upto 15 HP

Category VI - Street Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

Vi(B) - PWS Schemes

Panchayats

Municipalities

Municipal Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=2KW)

For all Units

Category VIII-Temporary Supply

Temp. Supply (for all units)

New L T Categories ( Total )

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

12.73 108.50 0.00 29.55 0.00 150.77 0.00 150.77

12.73 108.38 0.00 29.50 0.00 150.60 0.00

12.73 2.93 0.00 17.46 0.00 33.12

6.62 - 0.03 6.65 6.65

4.47 2.68 0.30 7.44 7.44

1.64 0.26 0.04 1.94 1.94

0.00 - 5.41 5.41 5.41

0.00 - 11.68 11.68 11.68

0.00 105.44 0.00 12.04 0.00 117.48

0.00 - 0.07 0.07 0.07

0.00 6.51 0.46 6.97 6.97

0.00 1.00 0.06 1.06 1.06

0.00 0.14 0.01 0.15 0.15

0.00 97.80 11.43 109.23 109.23

0.00 0.12 0.00 0.05 0.00 0.17 0.00

0.00 0.12 0.04 0.16 0.16

0.00 0.00 0.00 0.01 0.01

167.16 6.37 0.00 0.00 0.00 173.53 0.00 173.53

75.89 1.97 0.00 0.00 0.00 77.86

38.88 1.21 40.10 40.10

16.70 0.34 17.04 17.04

20.30 0.43 20.73 20.73

91.27 4.40 0.00 0.00 0.00 95.66

63.47 3.74 67.21 67.21

13.87 0.34 14.20 14.20

13.93 0.32 14.26 14.26

29.81 0.36 0.00 0.00 0.00 30.18 0.00 30.18

27.33 0.29 27.62 0.00 27.62

2.48 0.07 0.00 0.00 0.00 2.55 2.55

2.48 0.07 2.55 2.55

0.00 0.00 0.00

0.91 0.00 0.00 0.00 0.00 0.91 0.00 0.91

0.91 0.00 0.91

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2866.46 170.22 83.23 243.80 0.00 3363.72 0.00 3363.72

3152.86 756.79 16.45 0.45 0.15 3926.70 0.00 3926.70

915.11 325.48 10.99 0.43 0.00 1252.01 0.00 1252.01

501.47 237.97 9.00 0.23 748.67 0.00 748.67

1.09 0.00 0.00 0.00 1.09 0.00 1.09

0.79 0.00 0.00 0.00 0.79 0.00 0.79

28.25 0.00 0.00 0.00 28.25 0.00 28.25

78.84 0.00 0.00 0.00 78.84 0.00 78.84

0.00 0.00 0.00 0.00 0.00 0.00 0.00

209.87 85.50 1.73 0.06 297.15 0.00 297.15

46.42 0.00 0.00 0.00 46.42 0.00 46.42

4.75 1.70 0.00 0.00 6.46 0.00 6.46

1.01 0.00 0.00 0.00 1.01 0.00 1.01

14.54 0.00 0.01 0.00 14.55 0.00 14.55

0.00 0.00 0.22 0.14 0.36 0.00 0.36

7.12 0.00 0.03 0.00 7.15 0.00 7.15

Page 324: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 33 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 132 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-V – RailwayTraction

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

TOTAL( LT + HT)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

12.15 0.30 12.45 0.00 12.45

0.00 0.00 0.00 0.00 0.00

0.06 0.00 0.06 0.00 0.06

8.75 0.00 8.75 0.00 8.75

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

1163.91 262.24 2.47 0.02 0.00 1428.63 0.00 1428.63

916.03 245.27 2.44 0.01 1163.74 0.00 1163.74

0.25 0.00 0.00 0.00 0.25 0.00 0.25

4.13 0.00 0.00 0.00 4.13 0.00 4.13

21.24 0.00 0.00 0.00 21.24 0.00 21.24

138.92 0.00 0.00 0.00 138.92 0.00 138.92

32.75 0.00 0.00 0.00 32.75 0.00 32.75

39.05 16.94 0.01 0.00 56.00 0.00 56.00

8.21 0.00 0.00 0.00 8.21 0.00 8.21

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.89 0.00 0.00 0.00 2.89 0.00 2.89

0.00 0.00 0.00 0.00 0.01 0.00 0.01

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.44 0.03 0.01 0.00 0.48 0.00 0.48

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

1073.84 169.08 3.00 0.00 0.15 1246.07 0.00 1246.07

542.44 166.98 1.76 0.00 0.15 711.33 0.00 711.33

0.24 0.00 0.00 0.00 0.00 0.24 0.00 0.24

3.30 0.00 0.00 0.00 0.00 3.30 0.00 3.30

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

70.71 0.00 0.00 0.00 0.00 70.71 0.00 70.71

39.75 0.00 0.00 0.00 0.00 39.75 0.00 39.75

5.33 2.10 1.24 0.00 0.00 8.67 0.00 8.67

1.11 0.00 0.00 0.00 0.00 1.11 0.00 1.11

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

410.95 0.00 410.95 0.00 410.95

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

6019.32 927.02 99.68 244.25 0.15 7290.42 0.00 7290.42

Page 325: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

Base Year

LT Total - (Existing Categories)

Category- Domestic (All)

Cat I(A) Domestic - upto 50 units/month

Cat I(B) Domestic - >50 and upto 100 units/month

0 - 50 units

51 - 100 units

Cat I(c) Domestic- above 100 & upto 200 units/month

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

Cat-I(D) Domestic, > 200 Units/Month

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

201 - 250 units

251 - 300 units

301 - 400 units

401 - 500 units

above 500units

Category II - Non-domestic/Commrl (A,B &C)

Category II - Non-domestic/Commrl (A & B)

Lt - II (A) Upto 50 units/month

0-50 units

Lt - II (B) >50 Units/month

0-50 units

51- 100 units

101- 300 units

301- 500 units

Above 500 units

LT-II (C) Advertising Hoardings

Category III (1+2) - Industrial

Category III - Industrial (1)

Industrial Normal

Pisciculture/Prawn culture

Sugarcane Crushing

Poultry Farms

Mushroom & Rabbit Farms

Floriculture in Green House

Category III - Industrial (Seasonal) (2)

SSI Units

Seasonal Industries

Category IV- Cottage Industries

Cat -IV(A) - Cottage Indstr. Upto 15 HP

Cat -IV(B) - Agro Based Acticity upto 15 HP

Consumer CategoriesSurcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0.00 0.00 0.00 0.00 23.94 3387.66

0.00 0.00 0.00 0.00 8.70 1597.11

303.15

145.89

59.65

86.24

478.30

223.16

147.33

84.31

23.49

0.00 0.00 0.00 661.06

120.15

120.15

135.31

104.07

50.54

32.99

37.87

20.15

39.83

0.00

0.00 0.00 0.00 0.00 1.92 866.09

0.00 0.00 0.00 1.92 865.49

48.86

0.00 0.00 0.00

170.97

71.40

134.01

69.68

368.65

0.00 0.00 0.00 0.60

0.00 0.00 0.00 1.70 549.37

527.90

19.72

0.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.04 8.14

8.09

0.00

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crs)

Non - tariff Income

(Rs crores) Total

Revenue

( Net of

incentives)

(Rs.Crs)

Page 326: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category V (A,B & C) - Agriculture (1+2)

Category V(A&B) - Agriculture - (1)

LT (A) with DSM

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

LT (B) without DSM

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others - (2)

Salt Farming Units with CL upto15HP

Rural Horticulture Nurseries upto 15 HP

Category VI - Street Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

Vi(B) - PWS Schemes

Panchayats

Municipalities

Municipal Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=2KW)

For all Units

Category VIII-Temporary Supply

Temp. Supply (for all units)

New L T Categories ( Total )

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crs)

Non - tariff Income

(Rs crores) Total

Revenue

( Net of

incentives)

(Rs.Crs)

0.00 0.00 0.00 10.84 161.61

0.00

0.00

6.65

7.44

1.94

5.41

11.68

0.00

0.07

6.97

1.06

0.15

109.23

0.16

0.01

0.00 0.00 0.00 0.64 174.17

40.10

17.04

20.73

67.21

14.20

14.26

0.00 0.00 0.00 0.00 0.09 30.27

27.62

2.55

2.55

0.00 0.00 0.00 0.00 0.91

0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 23.94 3387.660.00 0.00 0.00 0.00 11.48 3938.18

0.00 0.00 0.00 0.00 3.40 1255.41

0.00 0.00 0.00 1.72 750.39

0.00 0.00 0.00 0.00 1.09

0.00 0.00 0.00 0.00 0.80

0.00 0.00 0.00 0.08 28.33

0.00 0.00 0.00 0.23 79.07

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.60 297.75

0.00 0.00 0.00 0.12 46.53

0.00 0.00 0.00 0.01 6.47

0.00 0.00 0.00 0.00 1.01

0.00 0.00 0.00 0.05 14.61

0.00 0.00 0.00 0.00 0.36

0.00 0.00 0.00 0.03 7.19

Page 327: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 33 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 132 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others

HT-II - Others Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III- Airport etc Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-V – RailwayTraction

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crs)

Non - tariff Income

(Rs crores) Total

Revenue

( Net of

incentives)

(Rs.Crs)

0.00 0.00 0.00 0.04 12.49

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.06

0.00 0.00 0.00 0.51 9.26

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 4.20 1432.83

0.00 0.00 0.00 3.40 1167.14

0.00 0.00 0.00 0.00 0.26

0.00 0.00 0.00 0.01 4.14

0.00 0.00 0.00 0.07 21.31

0.00 0.00 0.00 0.43 139.35

0.00 0.00 0.00 0.13 32.88

0.00 0.00 0.00 0.12 56.12

0.00 0.00 0.00 0.02 8.23

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.01 2.90

0.00 0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.48

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 3.88 1249.95

0.00 0.00 0.00 2.18 713.51

0.00 0.00 0.00 0.00 0.24

0.00 0.00 0.00 0.01 3.31

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.24 70.94

0.00 0.00 0.00 0.17 39.92

0.00 0.00 0.00 0.02 8.69

0.00 0.00 0.00 0.00 1.12

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 1.27 412.22

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 35.42 7325.85

Page 328: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7 Total Revenue at Current Tariff and Charges2014-15

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

LT Total - (Existing Categories) 8871657 17262.87 0.00 6288.56 7709406.21

Category- Domestic (All) 6846702 5946.78 0.00 5056.42 0.00 Cat I(A) Domestic - upto 50 units/month 3436047 1.45 0.00 0.00 915.77 1,796.51 - Cat I(B) Domestic - >50 and upto 100 units/month 2118671 1626.93 0.00 1443.82 0.00

0 - 50 units 0 1.45 0.00 0.00 908.64 - -

51 - 100 units 2118671 2.60 0.00 0.00 718.28 1,443.82 - Cat I(c) Domestic- > 100 & upto 200 units/month 1091985 1966.45 0.00 1341.05 0.00

0 - 50 units 0 2.60 0.00 0.00 651.46 - -

51 - 100 units 0 2.60 0.00 0.00 651.46 - -

101 - 150 units 776410 3.60 0.00 0.00 519.85 861.37 -

151 - 200 units 315575 3.60 0.00 0.00 143.67 479.67 - Cat-I(D) Domestic, > 200 Units/Month 199999 1437.64 0.00 475.05 0.00

0 - 50 units 0 2.60 0.00 0.00 209.69 - -

51 - 100 units 0 3.25 0.00 0.00 209.69 - -

101 - 150 units 0 4.88 0.00 0.00 209.69 - -

151 - 200 units 0 5.63 0.00 0.00 209.69 - -

201 - 250 units 102730 6.38 0.00 0.00 180.30 196.27 -

251 - 300 units 47062 6.88 0.00 0.00 111.52 109.78 -

301 - 400 units 30294 7.38 0.00 0.00 124.49 86.91 -

401 - 500 units 9081 7.88 0.00 0.00 64.13 32.32 -

above 500units 10832 8.38 0.00 0.00 118.45 49.77 - Category II - Non-domestic/Commrl 666893 1314.61 0.00 1127.42 0.00

Lt - II(A) Upto 50 units/month 399209 84.01 0.00 370.21 0.00

0-50 units 399209 5.40 600.00 0.00 84.01 370.21 - Lt - II (B) >50 Units/month 267684 1229.93 0.00 757.20 0.00

0-50 units 0 6.63 600.00 0.00 160.56 - -

51- 100 units 116490 7.38 600.00 0.00 130.97 122.83 -

101- 300 units 94838 8.13 600.00 0.00 232.13 171.63 -

301- 500 units 19995 8.63 600.00 0.00 117.49 72.35 - Above 500 units 36361 9.13 600.00 0.00 588.78 390.40 -

LT-II (C) Advertising Hoardings 0 11.03 600.00 0.00 0.67 - - Category III (1 +2) - Industrial 68336 1380.24 0.00 0.00 1295271.09

Category III - Industrial (1) 68336 1380.24 0.00 0.00 1295271.09

Industrial Normal 56583 6.08 600.00 0.00 1,328.90 - 1,234,841.13 0 6.75 600.00 0.00 - - -

Pisciculture/Prawn culture 11740 4.63 240.00 0.00 50.76 - 59,998.07

Sugarcane crushing 13 4.63 240.00 0.00 0.58 - 431.90

Poultry farms with above 1000 birds 0 5.63 600.00 0.00 - - -

Mushroom & Rabbit Farms 0 5.63 600.00 0.00 - - -

Floriculture in Green House 0 5.63 600.00 0.00 - - - Category III - Industrial (Seasonal) (2) 0 0.00 0.00 0.00 0.00

Seasonal IndustriesCategory IV- Cottage Industries & Others 10889 32.32 0.00 25.08 18446.13

Cat -IV(A) - Cottage Indstr. Upto 15 HP 10889 3.75 240.00 0.00 32.32 25.08 18,446.13

Cat -IV(B) - Agro Based Acticity upto 15 HP 0 3.75 240.00 0.00 - - -

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data

Page 329: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data

Category LT V(A&B) - Agriculture (1+2+3) 1191896 8006.78 0.00 0.00 6204455.87

Category V(A) - Agriculture 1191896 8006.78 0.00 0.00 6201750.09

With DSM measures 1172898 8003.94 0.00 0.00 6105435.06

Corporate Farmers & IT Assesses 1262 2.50 0.00 0.00 28.11 - 7,031.05 Wet Land Farmers (Holdings >2.5 acre) 9019 0.50 525.00 525.00 93.60 - 53,633.97 Dry Land Farmers (Connections > 3 nos.) 1312 0.50 525.00 525.00 35.41 - 6,478.10 Wet Land Farmers (Holdings <= 2.5 acre) 174227 0.00 0.00 0.00 76.49 - 787,223.92 Dry Land Farmers (Connections <= 3 nos.) 987078 0.00 0.00 0.00 7,770.33 - 5,251,068.02 Non-DSM measures 18998 2.84 0.00 0.00 96315.03

Corporate Farmers & IT Assesses 2550 3.50 0.00 0.00 0.81 - 15,577.02 Wet Land Farmers (Holdings >2.5 acre) 14475 1.00 1050.00 1050.00 1.53 - 70,455.52 Dry Land Farmers (Connections > 3 nos.) 1973 1.00 1050.00 1050.00 0.05 - 10,282.49 Wet Land Farmers (Holdings <= 2.5 acre) 0 0.50 525.00 525.00 0.23 - - Dry Land Farmers (Connections <= 3 nos.) 0 0.50 525.00 525.00 0.22 - - Category LT V(A) (I & II) (2) 0 0.00 0.00 0.00 2705.77

LT V(A) (i) Salt farming units with CL upto 15HP 0 3.70 240.00 240.00 - 2,443.67 LT V(A) (ii) Rural Horticulture Nurseries upto 15 HP 0 3.70 240.00 240.00 - 262.10

Category VI - Local Bodies, St. Lighting & PWS 80302 489.42 0.00 61.38 191233.12

VI(A) - Street Lighting 45754 178.86 0.00 61.38 0.00

Panchayats 33641 5.37 360.00 360.00 99.82 37.40 - Municipalities 6386 5.87 360.00 360.00 39.77 10.84 - Muncipal Corporations 5727 6.37 360.00 360.00 39.27 13.13 -

VI(B) PWS Schemes 34548 310.56 0.00 0.00 191233.12

Minor/Major Panchayats 30273 241.40 0.00 0.00 162078.32

Panchayats 30273 4.37 360.00 360.00 241.40 - 162,078.32 All Nagarpalikas & Municipalities 2470 40.82 0.00 0.00 16137.27

Muncipalities 2470 5.37 360.00 360.00 40.82 - 16,137.27 Municipal Corporations 1805 28.34 0.00 0.00 13017.54

Corporations 1805 5.87 360.00 360.00 28.34 - 13,017.54 Category VII (A&B) 6639 77.14 0.00 18.16 0.00

Cat VII (A) - General Purpose 6174 6.53 240.00 240.00 70.34 16.12 - Cat VII-B - Religious Places (CL <=2KW) 465 6.80 0.00 2.04 0.00

For All Units 465 4.70 240.00 240.00 6.80 2.04 - Category VIII-Temporary Supply 0 15.57 0.00 0.12 0.00

Temp. Supply (for ALL UNITS) 0 9.43 240.00 240.00 15.57 0.12 -

TOTAL (LT including new categories) 8871657 17262.87 0.00 6288.56 7709406.21

HIGH TENSION 5077 9098.66 0.00 2607.04 0.00HT Category at 11 kV 4600 2343.35 0.00 807.54 0.00

HT-I Indl General (Segregated) 2,869 5.73 4,200.00 - 1,146.52 518.66 - Lights & Fans - 5.73 - - 31.67 - - Industrial Colony consumption - 5.68 - - 2.50 - - Seasonal Industries - 6.90 4,200.00 - 59.05 - -

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) - 6.73 - - 175.69 - - HT - I( B) Ferro-alloys - 5.41 - - - 16.83 - HT-II - Others (Non- Industrial) 1,262 6.90 4,200.00 - 377.31 174.61 -

Page 330: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM) - 7.90 - - 78.31 - - HT III: Airports, Bus Stations and Railway Stations 33 6.58 4,200.00 - 14.59 5.26 - HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) - 7.58 - - 3.28 - - HT -IV A Govt Lift Irrigation 398 5.37 - - 88.38 67.81 - HT -IV A Private Irrigation & Agriculture - 5.37 - - 23.95 - - HT- IV B - CP Water Supply Schemes - 4.39 - - 24.75 14.00 - HT-VI - Townships & Colony Supply 37 5.68 600.00 - 33.04 6.47 - HT- VII Green Power - 10.78 - - - 2.14 - HT- VIII Temporary - 8.60 - - 1.76 - RESCOs 1 0.34 - - 284.31 - -

HT Category at 33 kV 400 3264.72 0.00 732.92 0.00

HT-I Indl General (Segregated) 309 5.30 4,200.00 - 2,405.91 595.35 - Lights & Fans - 5.30 - - 32.09 - - Industrial Colony consumption - 5.68 - - 11.20 - - Seasonal Industries - 6.28 4,200.00 - 45.39 - -

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) - 6.30 - - 393.86 - - HT - I( B) Ferro-alloys - 4.98 - - 230.75 45.25 - HT-II - Others (Non- Industrial) 41 6.28 4,200.00 - 67.62 36.12 - HT-II Others - Time-of-Day Tariff (6 PM to 10 PM) - 7.28 - - 13.32 - - HT III: Airports, Bus Stations and Railway Stations 1 6.01 4,200.00 - - 0.20 - HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) - 7.01 - - - - - HT -IV A Govt Lift Irrigation 45 5.37 - - 37.70 45.81 - HT -IV A Private Irrigation & Agriculture - 5.37 - - 10.20 - - HT- IV B - CP Water Supply Schemes - 4.39 - - 15.25 9.61 - HT-VI - Townships & Colony Supply 4 5.68 600.00 - 1.44 0.58 - HT- VII Green Power - 10.78 - - - - - HT- VIII Temporary - 7.95 - - - - RESCOs - 0.34 - - - - -

HT Category at 132 kV 77 3490.59 0.00 1066.58 0.00

HT-I Indl General (Segregated) 41 4.90 4,200.00 - 1,914.08 532.00 - Lights & Fans - 4.90 - - 15.41 - - Industrial Colony consumption - 5.68 - - 12.38 - - Seasonal Industries - 6.03 4,200.00 - - - -

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) - 5.90 - - 317.23 - - HT - I( B) Ferro-alloys - 4.58 - - 138.77 14.40 - HT-II - Others (Non- Industrial) 9 6.03 4,200.00 - 14.25 4.34 - HT-II Others - Time-of-Day Tariff (6 PM to 10 PM) - 7.03 - - 2.50 - - HT III: Airports, Bus Stations and Railway Stations - 5.72 4,200.00 - - - - HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) - 6.72 - - - - - HT -IV A Govt Lift Irrigation 8 5.37 - - 328.13 315.84 - HT -IV A Private Irrigation & Agriculture - 5.37 - - - - - HT- IV B - CP Water Supply Schemes - 4.39 - - - - - HT-V – RailwayTraction 19 6.36 - - 747.84 200.00 - HT-VI - Townships & Colony Supply - 5.68 600.00 - - - - HT- VII Green Power - 10.78 - - - - - HT- VIII Temporary - 7.35 - - - - RESCOs - 0.34 - - - - -

TOTAL( LT + HT) 8876734 26361.53 0.00 8895.60 7709406.21

Page 331: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 72014-15

LT Total - (Existing Categories)

Category- Domestic (All) Cat I(A) Domestic - upto 50 units/month

Cat I(B) Domestic - >50 and upto 100 units/month

0 - 50 units51 - 100 units

Cat I(c) Domestic- > 100 & upto 200 units/month

0 - 50 units51 - 100 units

101 - 150 units 151 - 200 units

Cat-I(D) Domestic, > 200 Units/Month

0 - 50 units 51 - 100 units101 - 150 units151 - 200 units201 - 250 units251 - 300 units301 - 400 units401 - 500 unitsabove 500units

Category II - Non-domestic/Commrl

Lt - II(A) Upto 50 units/month

0-50 unitsLt - II (B) >50 Units/month

0-50 units51- 100 units101- 300 units301- 500 units

Above 500 unitsLT-II (C) Advertising Hoardings

Category III (1 +2) - Industrial

Category III - Industrial (1)

Industrial Normal

Pisciculture/Prawn cultureSugarcane crushingPoultry farms with above 1000 birdsMushroom & Rabbit FarmsFloriculture in Green House

Category III - Industrial (Seasonal) (2)

Seasonal IndustriesCategory IV- Cottage Industries & Others

Cat -IV(A) - Cottage Indstr. Upto 15 HP

Cat -IV(B) - Agro Based Acticity upto 15 HP

Consumer CategoriesEnergy

Charges

(Rs crores)

Demand

/Fixed

charges

(Rs crores)

Minimum

Charges

(Rs crores)

Customer

Charges

(Rs crores)

Others

(Rs crores)

Gross

Revenue from

Tariff

(Rs crores)

4049.91 88.88 79.49 309.46 0.00 4527.73 0.00 4527.73

1805 0.00 65.53 232.97 0.00 2103.90 0.00 2103.90132.79 0.00 65.53 107.76 - 306.08 306.08318.51 0.00 0.00 71.15 0.00 389.66 389.66131.75 0.00 - - - 131.75 131.75186.75 0.00 - 71.15 - 257.90 257.90577.63 0.00 0.00 45.01 0.00 622.64 622.64

169.38 0.00 - - - 169.38 169.38169.38 0.00 - - - 169.38 169.38187.15 0.00 - 31.98 - 219.13 219.13

51.72 0.00 - 13.03 - 64.75 64.75776.47 0.00 0.00 9.06 0.00 785.53 0.00 785.53

54.52 0.00 - - - 54.52 54.5268.15 0.00 - - - 68.15 68.15

102.33 0.00 - - - 102.33 102.33118.05 0.00 - - - 118.05 118.05115.03 0.00 - 4.47 - 119.51 119.51

76.73 0.00 - 2.09 - 78.82 78.8291.87 0.00 - 1.51 - 93.38 93.3850.53 0.00 - 0.45 - 50.99 50.9999.26 0.00 - 0.53 - 99.79 99.79

1076.88 67.64 12.84 25.89 0.00 1183.26 0.00 1183.26

45.36 22.21 12.84 14.31 0.00 94.73 0.00 94.73

45.36 22.21 12.84 14.31 0.00 94.73 94.73

1030.78 45.43 0.00 11.57 0.00 1087.78 0.00 1087.78

106.45 0.00 0.00 0.00 0.00 106.45 106.45

96.65 7.37 0.00 4.71 0.00 108.73 108.73

188.72 10.30 0.00 4.31 0.00 203.33 203.33

101.39 4.34 0.00 0.91 0.00 106.64 106.64

537.56 23.42 0.00 1.65 0.00 562.63 562.63

0.74 0.00 0.00 0.00 0.00 0.74 0.00 0.74

831.74 0.00 0.00 4.05 0.00 835.79 0.00 835.79

831.74 0.00 0.00 4.05 0.00 835.79 835.79807.97 - 0.00 3.33 0.00 811.31 811.31

0.00 - 0.00 0.00 0.00 0.00 0.0023.50 - 0.00 0.71 0.00 24.22 24.22

0.27 - 0.00 0.00 0.00 0.27 0.270.00 - 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.000.00 0.00 0.00 0.00

12.12 0.00 0.00 0.39 0.00 12.51 0.00 12.51

12.12 - 0.00 0.39 0.00 12.51 12.510.00 - 0.00 0.00 0.00 0.00 0.00

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Page 332: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category LT V(A&B) - Agriculture (1+2+3)

Category V(A) - Agriculture

With DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(A) (I & II) (2)

LT V(A) (i) Salt farming units with CL upto 15HP

LT V(A) (ii) Rural Horticulture Nurseries upto 15 HP

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street LightingPanchayatsMunicipalitiesMuncipal Corporations

VI(B) PWS Schemes

Minor/Major PanchayatsPanchayats

All Nagarpalikas & MunicipalitiesMuncipalities

Municipal CorporationsCorporations

Category VII (A&B)Cat VII (A) - General PurposeCat VII-B - Religious Places (CL <=2KW)

For All UnitsCategory VIII-Temporary Supply

Temp. Supply (for ALL UNITS)

TOTAL (LT including new categories)

HIGH TENSIONHT Category at 11 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

Energy

Charges

(Rs crores)

Demand

/Fixed

charges

(Rs crores)

Minimum

Charges

(Rs crores)

Customer

Charges

(Rs crores)

Others

(Rs crores)

Gross

Revenue from

Tariff

(Rs crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

0.00 0.00 0.00

13.94 11.70 0.00 41.92 0.00 67.56 0.00 67.56

13.94 11.63 0.00 41.90 0.00 67.47 0.00

13.48 3.16 0.00 41.23 0.00 57.86

7.03 0.00 0.00 0.04 0.00 7.07 7.074.68 2.82 0.00 0.32 0.00 7.81 7.811.77 0.34 0.00 0.05 0.00 2.16 2.160.00 0.00 0.00 6.12 0.00 6.12 6.120.00 0.00 0.00 34.70 0.00 34.70 34.700.46 8.48 0.00 0.67 0.00 9.61

0.28 0.00 0.00 0.09 0.00 0.37 0.370.15 7.40 0.00 0.51 0.00 8.06 8.060.01 1.08 0.00 0.07 0.00 1.15 1.150.01 0.00 0.00 0.00 0.00 0.01 0.010.01 0.00 0.00 0.00 0.00 0.01 0.01

0.00 0.06 0.00 0.02 0.00 0.09 0.00 0.09 0.06 0.00 0.02 0.00 0.08 0.08 0.01 0.00 0.00 0.00 0.01 0.01

246.01 9.09 0.00 2.87 0.00 257.97 0.00 257.97

101.97 2.21 0.00 1.65 0.00 105.82

53.60 1.35 0.00 1.21 0.00 56.15 56.1523.35 0.39 0.00 0.23 0.00 23.96 23.9625.02 0.47 0.00 0.22 0.00 25.71 25.71

144.05 6.88 0.00 1.22 0.00 152.15 152.15105.49 5.83 0.00 1.06 0.00 112.39 112.39105.49 5.83 0.00 1.06 0.00 112.39 112.39

21.92 0.58 0.00 0.09 0.00 22.59 22.5921.92 0.58 0.00 0.09 0.00 22.59 22.5916.64 0.47 0.00 0.06 0.00 17.17 17.1716.64 0.47 0.00 0.06 0.00 17.17 17.17

49.13 0.44 1.12 1.37 0.00 52.05 0.00 52.0545.93 0.39 1.12 1.16 0.00 48.60 0.00 48.60

3.20 0.05 0.00 0.21 0.00 3.46 3.46

3.20 0.05 0.00 0.21 0.00 3.46 3.46

14.69 0.00 0.00 0.00 0.00 14.69 0.00 14.69

14.69 0.00 0.00 0.00 0.00 14.69 14.69

4049.91 88.88 79.49 309.46 0.00 4527.73 0.00 4527.73

4910.26 784.36 18.24 6.91 0.00 5719.77 0.00 5719.771269.42 293.77 13.29 6.20 0.00 1582.68 0.00 1582.68

656.96 217.84 11.31 3.95 0.00 890.05 0.00 890.05

18.14 0.00 0.00 0.00 0.00 18.14 0.00 18.14

1.42 0.00 0.00 0.00 0.00 1.42 0.00 1.42

40.74 0.00 0.00 0.00 0.00 40.74 0.00 40.74

118.24 0.00 0.00 0.00 0.00 118.24 0.00 118.24

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

260.35 73.33 1.97 1.64 0.00 337.30 0.00 337.30

Page 333: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 33 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 132 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-V – RailwayTraction

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

TOTAL( LT + HT)

Energy

Charges

(Rs crores)

Demand

/Fixed

charges

(Rs crores)

Minimum

Charges

(Rs crores)

Customer

Charges

(Rs crores)

Others

(Rs crores)

Gross

Revenue from

Tariff

(Rs crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

61.86 0.00 0.00 0.00 0.00 61.86 0.00 61.86

9.60 2.21 0.00 0.04 0.00 11.85 0.00 11.85

2.49 0.00 0.00 0.00 0.00 2.49 0.00 2.49

47.46 0.00 0.00 0.47 0.00 47.92 0.00 47.92

12.86 0.00 0.00 0.00 0.00 12.86 0.00 12.86

10.87 0.00 0.00 0.06 0.00 10.92 0.00 10.92

18.77 0.39 0.00 0.05 0.00 19.21 0.00 19.21

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9.67 0.00 0.00 0.00 0.00 9.67 0.00 9.67

1775.45 265.34 2.82 0.51 0.00 2044.11 0.00 2044.11

1275.13 250.05 2.79 0.40 0.00 1528.37 0.00 1528.37

17.01 0.00 0.00 0.00 0.00 17.01 0.00 17.01

6.36 0.00 0.00 0.00 0.00 6.36 0.00 6.36

28.51 0.00 0.00 0.00 0.00 28.51 0.00 28.51

248.13 0.00 0.00 0.00 0.00 248.13 0.00 248.13

114.91 0.00 0.00 0.01 0.00 114.92 0.00 114.92

42.46 15.17 0.01 0.04 0.00 57.69 0.00 57.69

9.70 0.00 0.00 0.00 0.00 9.70 0.00 9.70

0.00 0.08 0.00 0.00 0.00 0.08 0.00 0.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

20.25 0.00 0.00 0.04 0.00 20.29 0.00 20.29

5.48 0.00 0.00 0.00 0.00 5.48 0.00 5.48

6.69 0.00 0.00 0.01 0.00 6.70 0.00 6.70

0.82 0.03 0.01 0.01 0.00 0.87 0.00 0.87

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1865.39 225.26 2.14 0.20 0.00 2092.98 0.00 2092.98

937.90 223.44 2.14 0.11 0.00 1163.59 0.00 1163.59

7.55 0.00 0.00 0.00 0.00 7.55 0.00 7.55

7.03 0.00 0.00 0.00 0.00 7.03 0.00 7.03

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

187.17 0.00 0.00 0.00 0.00 187.17 0.00 187.17

63.56 0.00 0.00 0.00 0.00 63.56 0.00 63.56

8.59 1.82 0.00 0.01 0.00 10.43 0.00 10.43

1.76 0.00 0.00 0.00 0.00 1.76 0.00 1.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

176.20 0.00 0.00 0.02 0.00 176.23 0.00 176.23

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

475.63 0.00 0.00 0.05 0.00 475.68 0.00 475.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8960.16 873.24 97.72 316.37 0.00 10247.49 0.00 10247.49

Page 334: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 72014-15

LT Total - (Existing Categories)

Category- Domestic (All) Cat I(A) Domestic - upto 50 units/month

Cat I(B) Domestic - >50 and upto 100 units/month

0 - 50 units51 - 100 units

Cat I(c) Domestic- > 100 & upto 200 units/month

0 - 50 units51 - 100 units

101 - 150 units 151 - 200 units

Cat-I(D) Domestic, > 200 Units/Month

0 - 50 units 51 - 100 units101 - 150 units151 - 200 units201 - 250 units251 - 300 units301 - 400 units401 - 500 unitsabove 500units

Category II - Non-domestic/Commrl

Lt - II(A) Upto 50 units/month

0-50 unitsLt - II (B) >50 Units/month

0-50 units51- 100 units101- 300 units301- 500 units

Above 500 unitsLT-II (C) Advertising Hoardings

Category III (1 +2) - Industrial

Category III - Industrial (1)

Industrial Normal

Pisciculture/Prawn cultureSugarcane crushingPoultry farms with above 1000 birdsMushroom & Rabbit FarmsFloriculture in Green House

Category III - Industrial (Seasonal) (2)

Seasonal IndustriesCategory IV- Cottage Industries & Others

Cat -IV(A) - Cottage Indstr. Upto 15 HP

Cat -IV(B) - Agro Based Acticity upto 15 HP

Consumer Categories Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0.00 0.00 0.00 0.00 48.12 4575.85

0.00 0.00 0.00 0.00 16.58 2120.48

306.08

389.66

131.75

257.90

622.64

169.38

169.38

219.13

64.75

0.00 0.00 0.00 785.53

54.52

68.15

102.33

118.05

119.51

78.82

93.38

50.99

99.79

0.00 0.00 0.00 3.66 1186.92

94.73

106.45

108.73

203.33

106.64

562.63

0.74

0.00 0.00 0.00 3.85 839.64

835.79

811.31

0.00

24.22

0.27

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.09 12.60

12.51

0.00

Surcharges

Grid

Support

Charges

(Rs. Crs)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Page 335: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category LT V(A&B) - Agriculture (1+2+3)

Category V(A) - Agriculture

With DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(A) (I & II) (2)

LT V(A) (i) Salt farming units with CL upto 15HP

LT V(A) (ii) Rural Horticulture Nurseries upto 15 HP

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street LightingPanchayatsMunicipalitiesMuncipal Corporations

VI(B) PWS Schemes

Minor/Major PanchayatsPanchayats

All Nagarpalikas & MunicipalitiesMuncipalities

Municipal CorporationsCorporations

Category VII (A&B)Cat VII (A) - General PurposeCat VII-B - Religious Places (CL <=2KW)

For All UnitsCategory VIII-Temporary Supply

Temp. Supply (for ALL UNITS)

TOTAL (LT including new categories)

HIGH TENSIONHT Category at 11 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Surcharges

Grid

Support

Charges

(Rs. Crs)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 0.00 0.00 22.32 89.88

7.07

7.81

2.16

6.12

34.70

0.37

8.06

1.15

0.01

0.01

0.00 0.09

0.08

0.01

0.00 0.00 0.00 1.36 259.34

56.15

23.96

25.71

112.39

22.59

17.17

17.17

0.00 0.00 0.00 0.00 0.22 52.27

48.60

3.46

3.46

0.00 0.00 0.00 0.00 0.04 14.73

14.69

0.00 0.00 0.00 0.00 48.12 4575.850.00 0.00 0.00 0.00 25.36 5745.130.00 0.00 0.00 0.00 6.53 1589.21

0.00 0.00 0.00 3.20 893.24

0.00 0.00 0.00 0.09 18.23

0.00 0.00 0.00 0.01 1.43

0.00 0.00 0.00 0.16 40.91

0.00 0.00 0.00 0.49 118.73

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 1.05 338.35

Page 336: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 33 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

HT Category at 132 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-V – RailwayTraction

HT-VI - Townships & Colony Supply

HT- VII Green Power

HT- VIII Temporary

RESCOs

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Surcharges

Grid

Support

Charges

(Rs. Crs)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 0.00 0.00 0.22 62.08

0.00 0.00 0.00 0.04 11.89

0.00 0.00 0.00 0.01 2.50

0.00 0.00 0.00 0.25 48.17

0.00 0.00 0.00 0.07 12.93

0.00 0.00 0.00 0.07 10.99

0.00 0.00 0.00 0.09 19.30

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.79 10.46

0.00 0.00 0.00 0.00 9.10 2053.21

0.00 0.00 0.00 6.71 1535.08

0.00 0.00 0.00 0.09 17.10

0.00 0.00 0.00 0.03 6.39

0.00 0.00 0.00 0.13 28.63

0.00 0.00 0.00 1.10 249.23

0.00 0.00 0.00 0.64 115.56

0.00 0.00 0.00 0.19 57.88

0.00 0.00 0.00 0.04 9.74

0.00 0.00 0.00 0.00 0.08

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.11 20.40

0.00 0.00 0.00 0.03 5.50

0.00 0.00 0.00 0.04 6.74

0.00 0.00 0.00 0.00 0.87

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 9.73 2102.71

0.00 0.00 0.00 5.34 1168.92

0.00 0.00 0.00 0.04 7.59

0.00 0.00 0.00 0.03 7.07

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.88 188.05

0.00 0.00 0.00 0.39 63.95

0.00 0.00 0.00 0.04 10.47

0.00 0.00 0.00 0.01 1.76

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.91 177.14

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 2.08 477.76

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 73.49 10320.98

Page 337: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7 Total Revenue at Current Tariff and Charges

2015-16

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

LT Total - (Existing Categories) 9069420 19114.44 0.00 7324.85 8151333.11

Category- Domestic (All) 6970734 6953.98 0.00 5725.83 0.00

Cat I(A) Domestic - upto 50 units/month 3405399 1.45 0.00 0.00 905.80 1996.90 0.00

Cat I(B) Domestic - >50 and upto 100 units/month 2172769.5 1901.55 0.00 1637.29 0.00

0 - 50 units 0 1.45 0.00 0.00 1030.05 0.00 0.00

51 - 100 units 2172770 2.60 0.00 0.00 871.50 1637.29 0.00

Cat I(c) Domestic- > 100 & upto 200 units/month 1173918.5 2444.42 1518.23 0.00

0 - 50 units 0 2.60 0.00 0.00 796.47 0.00 0.00

51 - 100 units 0 2.60 0.00 0.00 796.47 0.00 0.00

101 - 150 units 828806 3.60 0.00 0.00 662.36 966.27 0.00

151 - 200 units 345113 3.60 0.00 0.00 189.12 551.96 0.00

Category I Domestic 218647 1702.22 0.00 573.41 0.00

0 - 50 units 0 2.60 0.00 0.00 252.81 0.00 0.00

51 - 100 units 0 3.25 0.00 0.00 252.81 0.00 0.00

101 - 150 units 0 4.88 0.00 0.00 252.81 0.00 0.00

151 - 200 units 0 5.63 0.00 0.00 252.81 0.00 0.00

201 - 250 units 111797 6.70 0.00 0.00 219.15 237.76 0.00

251 - 300 units 51372 7.22 0.00 0.00 132.29 131.64 0.00

301 - 400 units 33333 7.75 0.00 0.00 142.51 105.10 0.00

401 - 500 units 10114 8.27 0.00 0.00 69.92 39.42 0.00

More than 500 units 12032 8.80 0.00 0.00 127.09 59.49 0.00

Category II - Non-domestic/Commrl 685202 1550.90 0.00 1261.29 0.00

Lt - II(A) Upto 50 units/month 404469 92.35 0.00 414.90 0.00

0-50 units 404469 5.40 636.00 0.00 92.35 414.90 0.00

Lt - II (B) >50 Units/month 280513 1457.52 0.00 845.76 0.00

0-50 units 0 6.63 636.00 0.00 185.60 0.00 0.00

51- 100 units 120830 7.38 636.00 0.00 152.25 140.14 0.00

101- 300 units 100381 8.54 636.00 0.00 202.38 204.37 0.00

301- 500 units 21087 9.06 636.00 0.00 112.86 78.62 0.00

Above 500 units 38215 9.59 636.00 0.00 804.42 422.62 0.00

LT-II (C) Advertising Hoardings 221 11.58 636.00 0.00 1.03 0.63 0.00

Category III (A & B) - Industrial 68435 1466.13 0.00 222.15 1435031.90

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Page 338: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Category III (A) - Industrial 68435 1466.13 0.00 222.15 1435031.90

(i) Industrial Normal 50109 6.38 636.00 879.72 0.00 1179447.04

(ii) Industrial Optional 0 7.09 636.00 0.00 0.00 0.00

(iii) Pisciculture/Prawn culture 18127 4.63 252.00 582.09 221.97 252132.86

(iv) Sugarcane crushing 15 4.63 252.00 0.14 0.14 384.90

(v) Poultry farms with above 1000 birds 2 5.63 636.00 0.01 0.02 17.17

(vi) Mushroom & Rabbit Farms 3 5.63 636.00 0.01 0.01 13.00

(vii) Floriculture in Green House 180 5.63 636.00 4.18 0.00 3036.92

Category III (B) - Industrial (Optional) 0 0.00 0.00 0.00 0.00

SSI Units 0.00

Seasonal Industries 0.00

Category IV- Cottage Industries, Dhobighats & Others 11038 36.65 0.00 12.54 0.00

Cat -IV(A) - Cottage Indstr. & Dhobhi Ghats 11038 3.75 240.00 240.00 36.65 12.54 0.00

Cat -IV(B) - Poultry farms with above 1000 birds 0 3.75 240.00 240.00 0 0.00 0.00

0.00

Category V (A & B) - Irrig & Agriculture 1224885 8479.53 0 0 6509407

Category V(A) - Agriculture 1224885 8479.53 0 0 6509407

Cat V(A) - Agriculture with DSM measures 1206357 8476.53 0.00 0.00 6410000.74

Corporate Farmers & IT Assesses 1231 2.50 0.00 29.76 0.00 7028.47

Wet Land Farmers (Holdings >2.5 acre) 8796 0.50 0.00 99.13 0.00 54471.98

Dry Land Farmers (Connections > 3 nos.) 1280 0.50 0.00 37.51 0.00 6468.69

Wet Land Farmers (Holdings <= 2.5 acre) 179290 0.00 0.00 81.01 0.00 839253.77

Dry Land Farmers (Connections <= 3 nos.) 1015761 0.00 0.00 8229.12 0.00 5502777.85

Cat V(A) - Agriculture with Non-DSM measures 18528 3.01 0.00 0.00 99406.47

Corporate Farmers & IT Assesses 2487 3.50 0.00 0.86 0.00 15807.59

Wet Land Farmers (Holdings >2.5 acre) 14117 1.00 0.00 1.62 0.00 73182.64

Dry Land Farmers (Connections > 3 nos.) 1924 1.00 0.00 0.05 0.00 10416.24

Wet Land Farmers (Holdings <= 2.5 acre) 0 0.50 0.00 0.24 0.00 0.00

Dry Land Farmers (Connections <= 3 nos.) 0 0.50 0.00 0.23 0.00 0.00

Category LT V(C) - Others 0.00 0.00 0.00 0.00 0.00

Salt farming units with Connected Load upto 15HP 0 3.70 0.00 0.00 0.00 0.00

Rural Horticulture Nurseries 0 3.70 0.00 0.00 0.00 0.00

Category VI - Local Bodies, St. Lighting & PWS 82667 537.92 0.00 63.15 206894.00

Page 339: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

VI(A) - Street Lighting 47147 189.65 0.00 63.15 0.00

Panchayats 34387 5.64 384.00 0.00 102.01 38.21 0.00

Municipalities 6521 6.16 384.00 0.00 43.49 11.34 0.00

Muncipal Corporations 6239 6.69 384.00 0.00 44.15 13.60 0.00

VI(B) PWS Schemes 35520 348.27 0.00 0.00 206894.00

Minor/Major Panchayats 31044 265.89 0.00 0.00 175736.89

Panchayats 31044 4.59 0.00 384.00 265.89 - 175,736.89

All Nagarpalikas & Municipalities 2506 46.07 0.00 0.00 16462.05

Muncipalities 2506 5.64 0.00 384.00 46.07 - 16,462.05

Municipal Corporations 1970 36.31 0.00 0.00 14695.06

Corporations 1970 6.16 0.00 384.00 36.31 - 14,695.06

Category VII (A&B) 26461 88.61 0.00 39.89 0.00

Cat VII (A) - General Purpose 22640 6.86 252.00 0.00 78.50 36.91 -

Cat VII-B - Religious Places (CL <=1KW) 3821 10.11 0.00 2.99 0.00

All units 3821 4.70 240.00 0.00 10.11 2.99 -

0.00

Category VIII-Temporary Supply 0 0.72 0.00 0.00 0.00

All units 0 9.90 252.00 0.00 0.72 - -

0.00

New L T Categories ( Total ) 237 2.02 0.00 0.00 3291.62

LT-VI (C): NTR Sujala Padhakam 237 4.00 120.00 2.02 0.00 3291.62

NTR Sujala Pathakam 4.00 0.00

TOTAL (LT including new categories) 9069657.0 19116.46 0.00 7324.85 8154624.72

HIGH TENSION 5383 9593.11 0.00 2619.65 0.00

HT Category at 11 kV 4870 2350.76 0.00 841.50 0.00

HT-I Indl General (Segregated) 2901 6.02 4452.00 0.00 998.74 521.39 0.00

Lights & Fans 0 6.02 0.00 0.00 104.47 0.00 0.00

Industrial Colony consumption 0 5.96 0.00 0.00 2.55 0.00 0.00

Seasonal Industries 96 7.25 4452.00 0.00 39.91 23.97 0.00

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) 0 7.07 0.00 0.00 217.10 0.00 0.00

HT - I( B) Ferro-alloys 0 5.68 0.00 0.00 0.00 0.00 0.00

HT-II - Others (Non- Industrial) 1319 7.25 4452.00 0.00 461.94 193.20 0.00

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM) 0 8.30 0.00 0.00 89.44 0.00 0.00

HT III: Airports, Bus Stations and Railway Stations 34 6.91 4452.00 0.00 18.64 5.65 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0 7.96 0.00 0.00 3.30 0.00 0.00

HT -IV A Govt Lift Irrigation 321 5.64 0.00 0.00 18.52 62.75 0.00

HT -IV A Private Irrigation & Agriculture 161 5.64 0.00 0.00 54.90 27.90 0.00

HT- IV B - CP Water Supply Schemes 3 4.61 0.00 0.00 2.91 0.56 0.00

Page 340: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT-VI - Townships & Colony Supply 35 5.96 636.00 0.00 39.89 6.09 0.00

HT- VIII Green Power 0 11.32 0.00 0.00 0.00 0.00 0.00

HT-VIII Temporary 0 0.00 0.00 0.00 0.00 0.00 0.00

Rural co-operartives 1 0.24 0.00 0.00 298.45 0.00 0.00

HT Category at 33 kV 435 3630.35 0.00 731.05 0.00

HT-I Indl General (Segregated) 321 5.57 4452.00 0.00 2687.13 593.80 0.00

Lights & Fans 0 5.57 0.00 0.00 47.52 0.00 0.00

Industrial Colony consumption 0 5.96 0.00 0.00 12.29 0.00 0.00

Seasonal Industries 8 6.59 4452.00 0.00 41.30 9.98 0.00

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) 0 6.62 0.00 0.00 544.51 0.00 0.00

HT - I( B) Ferro-alloys 8 5.23 0.00 0.00 105.00 15.86 0.00

HT-II - Others (Non- Industrial) 38 6.59 4452.00 0.00 95.67 38.70 0.00

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM) 0 7.64 0.00 0.00 19.26 0.00 0.00

HT III: Airports, Bus Stations and Railway Stations 1 6.31 4452.00 0.00 0.00 0.20 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0 7.36 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 35 5.64 0.00 0.00 23.15 46.87 0.00

HT -IV A Private Irrigation & Agriculture 21 5.64 0.00 0.00 52.28 25.18 0.00

HT- IV B - CP Water Supply Schemes 0 4.61 0.00 0.00 0.00 0.00 0.00

HT-VI - Townships & Colony Supply 4 5.96 636.00 0.00 2.25 0.46 0.00

HT- VIII Green Power 0 11.32 0.00 0.00 0.00 0.00 0.00

HT-VIII Temporary 0 0.00 0.00 0.00 0.00 0.00 0.00

Rural co-operartives 0 0.24 0.00 0.00 0.00 0.00 0.00

HT Category at 132 kV 78 3612.00 0.00 1047.10 0.00

HT-I Indl General (Segregated) 45 5.15 4452.00 0.00 2126.19 497.14 0.00

Lights & Fans 0 5.15 0.00 0.00 25.74 0.00 0.00

Industrial Colony consumption 0 5.96 0.00 0.00 14.52 0.00 0.00

Seasonal Industries 0 6.33 4452.00 0.00 0.00 0.00 0.00

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM) 0 6.20 0.00 0.00 407.14 0.00 0.00

HT - I( B) Ferro-alloys 1 4.81 0.00 0.00 131.41 14.40 0.00

HT-II - Others (Non- Industrial) 6 6.33 4452.00 0.00 22.93 6.52 0.00

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM) 0 7.38 0.00 0.00 3.82 0.00 0.00

HT III: Airports, Bus Stations and Railway Stations 0 6.01 4452.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0 7.06 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 8 5.64 0.00 0.00 187.51 315.84 0.00

HT -IV A Private Irrigation & Agriculture 0 5.64 0.00 0.00 0.00 0.00 0.00

HT- IV B - CP Water Supply Schemes 0 4.61 0.00 0.00 0.00 0.00 0.00

HT-V – RailwayTraction 19 6.68 0.00 0.00 692.74 213.20 0.00

HT-VI - Townships & Colony Supply 0 5.96 636.00 0.00 0.00 0.00 0.00

HT- VIII Green Power 0 11.32 0.00 0.00 0.00 0.00 0.00

HT-VIII Temporary 0 0.00 0.00 0.00 0.00 0.00

Rural co-operartives 0 0.24 0.00 0.00 0.00 0.00 0.00

TOTAL( LT + HT) 9075040 28709.57 0.00 9944.50 8154624.72

Page 341: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

2015-16

LT Total - (Existing Categories)

Category- Domestic (All)

Cat I(A) Domestic - upto 50 units/month

Cat I(B) Domestic - >50 and upto 100 units/month

0 - 50 units

51 - 100 units

Cat I(c) Domestic- > 100 & upto 200 units/month

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

Category I Domestic

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

201 - 250 units

251 - 300 units

301 - 400 units

401 - 500 units

More than 500 units

Category II - Non-domestic/Commrl

Lt - II(A) Upto 50 units/month

0-50 units

Lt - II (B) >50 Units/month

0-50 units

51- 100 units

101- 300 units

301- 500 units

Above 500 units

LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Consumer Categories

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

4702.31 158.32 29.11 192.74 0.00 5082.48

2164.04 0.00 27 159 0 2350.52

131.34 0.00 24.73 30.25 0.00 186.32

375.95 0.00 2.59 23.74 0.00 402.28

149.36 0.00 2.59 0.14 0.00 152.09

226.59 0.00 0.00 23.60 0.00 250.19

720.70 0.00 0.00 22.60 0.00 743.30

207.08 0.00 0.00 0.06 0.00 207.14

207.08 0.00 0.00 0.04 0.00 207.12

238.45 0.00 0.00 14.93 0.00 253.38

68.08 0.00 0.00 7.57 0.00 75.65

936.06 0.00 0.00 82.56 0.00 1018.62

65.73 0.00 0.00 11.39 0.00 77.12

82.16 0.00 0.00 18.91 0.00 101.08

123.37 0.00 0.00 17.61 0.00 140.98

142.33 0.00 0.00 11.98 0.00 154.31

146.83 0.00 0.00 8.90 0.00 155.73

95.51 0.00 0.00 5.46 0.00 100.98

110.45 0.00 0.00 4.72 0.00 115.17

57.83 0.00 0.00 1.78 0.00 59.60

111.84 0.00 0.00 1.81 0.00 113.65

1333.00 80.22 1.78 16.68 0.00 1431.68

49.87 26.39 1.78 2.52 0.00 80.56

49.87 26.39 1.78 2.52 0.00 80.56

1281.94 53.79 0.00 14.13 0.00 1349.86

123.05 0.00 0.00 4.96 0.00 128.02

112.36 8.91 0.00 3.24 0.00 124.52

172.83 13.00 0.00 3.74 0.00 189.57

102.25 5.00 0.00 0.82 0.00 108.07

771.44 26.88 0.00 1.37 0.00 799.69

1.19 0.04 0.00 0.04 0.00 1.27

833.19 66.43 0.00 6.04 0.00 905.66

Full year revenue excluding external subsidy

Page 342: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category III (A) - Industrial

(i) Industrial Normal

(ii) Industrial Optional

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cat -IV(A) - Cottage Indstr. & Dhobhi Ghats

Cat -IV(B) - Poultry farms with above 1000 birds

Category V (A & B) - Irrig & Agriculture

Category V(A) - Agriculture

Cat V(A) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category VI - Local Bodies, St. Lighting & PWS

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

833.19 66.43 0.00 6.04 0.00 905.66

561.26 55.94 0.00 4.22 0.00 621.42

0.00 0.00 0.00 0.02 0.00 0.02

269.51 10.34 0.00 1.58 0.00 281.43

0.06 0.01 0.00 0.09 0.00 0.16

0.00 0.00 0.00 0.13 0.00 0.13

0.00 0.00 0.00 0.00 0.00 0.00

2.35 0.14 0.00 0.00 0.00 2.49

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

13.75 0.30 0.01 0.04 0.00 14.10

13.75 0.30 0.01 0.04 0.00 14.10

0.00 0.00 0.00 0.00 0.00 0.00

14.76 0 0 7 0 21.93

14.76 0 0 7 0 21.93

14.27 0.00 0.00 6.85 0.00 21.12

7.44 0.00 0.00 0.06 0.00 7.50

4.96 0.00 0.00 0.18 0.00 5.14

1.88 0.00 0.00 0.07 0.00 1.95

0.00 0.00 0.00 1.06 0.00 1.06

0.00 0.00 0.00 5.48 0.00 5.48

0.49 0.00 0.00 0.32 0.00 0.81

0.30 0.00 0.00 0.03 0.00 0.33

0.16 0.00 0.00 0.19 0.00 0.35

0.01 0.00 0.00 0.01 0.00 0.02

0.01 0.00 0.00 0.04 0.00 0.05

0.01 0.00 0.00 0.05 0.00 0.06

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

284.25 10.37 0.00 1.57 0.00 296.19

Page 343: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

All units

Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

NTR Sujala Pathakam

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

113.86 2.43 0.00 1.22 0.00 117.51

57.53 1.47 0.00 0.94 0.00 59.94

26.79 0.44 0.00 0.07 0.00 27.29

29.54 0.52 0.00 0.21 0.00 30.27

170.39 7.94 0.00 0.35 0.00 178.69

122.04 6.75 0.00 0.30 0.00 129.09

122.04 6.75 - 0.30 - 129.09

25.98 0.63 0.00 0.04 0.00 26.65

25.98 0.63 - 0.04 - 26.65

22.37 0.56 0.00 0.01 0.00 22.94

22.37 0.56 - 0.01 - 22.94

58.60 1.00 0.00 2.08 0.00 61.68

53.85 0.93 - 1.38 - 56.16

4.75 0.07 0.00 0.70 0.00 5.52

4.75 0.07 - 0.70 - 5.52

0.00 0.00 0.00

0.71 0.00 0.00 0.00 0.00 0.71

0.71 0.00 - - - 0.71

0.00 0.00 0.00

0.81 0.00 0.00 0.00 0.00 0.81

0.81 0.00 0.00 0.00 0.00 0

0.00

4703.12 158.32 29.11 192.74 0.00 5083.29

5459.55 842.09 0.00 4.10 0.00 6305.74

1346.41 331.71 0.00 3.71 0.00 1681.83

601.24 232.12 0.00 2.22 0.00 835.58

62.89 0.00 0.00 0.00 0.00 62.89

1.52 0.00 0.00 0.00 0.00 1.52

28.94 10.67 0.00 0.00 0.00 39.61

153.49 0.00 0.00 0.00 0.00 153.49

0.00 0.00 0.00 0.00 0.00 0.00

334.91 86.01 0.00 1.35 0.00 422.27

74.24 0.00 0.00 0.00 0.00 74.24

12.88 2.51 0.00 0.01 0.00 15.40

2.63 0.00 0.00 0.00 0.00 2.63

10.44 0.00 0.00 0.06 0.00 10.50

30.96 0.00 0.00 0.00 0.00 30.96

1.34 0.00 0.00 0.01 0.00 1.35

Page 344: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT-VI - Townships & Colony Supply

HT- VIII Green Power

HT-VIII Temporary

Rural co-operartives

HT Category at 33 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VIII Green Power

HT-VIII Temporary

Rural co-operartives

HT Category at 132 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-V – RailwayTraction

HT-VI - Townships & Colony Supply

HT- VIII Green Power

HT-VIII Temporary

Rural co-operartives

TOTAL( LT + HT)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

23.78 0.39 0.00 0.02 0.00 24.18

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

7.16 0.00 0.00 0.04 0.00 7.20

2094.76 286.15 0.00 0.24 0.00 2381.16

1496.73 264.36 0.00 0.14 0.00 1761.23

26.47 0.00 0.00 0.00 0.00 26.47

7.33 0.00 0.00 0.00 0.00 7.33

27.22 4.44 0.00 0.00 0.00 31.66

360.46 0.00 0.00 0.00 0.00 360.46

54.91 0.00 0.00 0.02 0.00 54.93

63.04 17.23 0.00 0.06 0.00 80.33

14.72 0.00 0.00 0.00 0.00 14.72

0.00 0.09 0.00 0.00 0.00 0.09

0.00 0.00 0.00 0.00 0.00 0.00

13.06 0.00 0.00 0.02 0.00 13.08

29.49 0.00 0.00 0.00 0.00 29.49

0.00 0.00 0.00 0.00 0.00 0.00

1.34 0.03 0.00 0.00 0.00 1.37

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

2018.37 224.23 0.00 0.15 0.00 2242.75

1094.99 221.33 0.00 0.04 0.00 1316.35

13.25 0.00 0.00 0.00 0.00 13.25

8.66 0.00 0.00 0.00 0.00 8.66

0.00 0.00 0.00 0.00 0.00 0.00

252.43 0.00 0.00 0.00 0.00 252.43

63.21 0.00 0.00 0.04 0.00 63.25

14.51 2.90 0.00 0.01 0.00 17.43

2.82 0.00 0.00 0.00 0.00 2.82

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

105.76 0.00 0.00 0.00 0.00 105.76

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

462.75 0.00 0.00 0.06 0.00 462.81

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

10162.67 1000.41 29.11 196.84 0.00 11389.02

Page 345: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

2015-16

LT Total - (Existing Categories)

Category- Domestic (All)

Cat I(A) Domestic - upto 50 units/month

Cat I(B) Domestic - >50 and upto 100 units/month

0 - 50 units

51 - 100 units

Cat I(c) Domestic- > 100 & upto 200 units/month

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

Category I Domestic

0 - 50 units

51 - 100 units

101 - 150 units

151 - 200 units

201 - 250 units

251 - 300 units

301 - 400 units

401 - 500 units

More than 500 units

Category II - Non-domestic/Commrl

Lt - II(A) Upto 50 units/month

0-50 units

Lt - II (B) >50 Units/month

0-50 units

51- 100 units

101- 300 units

301- 500 units

Above 500 units

LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Consumer Categories Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0.00 5082.48 0.00 0.00 0.00 0.00 70.11 5152.59

0.00 2350.52 0.00 0.00 0.00 0.00 25.50 2376.02

186.32 186.32

402.28

152.09 152.09

250.19 250.19

743.30

207.14 207.14

207.12 207.12

253.38 253.38

75.65 75.65

0.00 1018.62 0.00 0.00 0.00 1018.62

77.12 77.12

101.08 101.08

140.98 140.98

154.31 154.31

155.73 155.73

100.98 100.98

115.17 115.17

59.60 59.60

113.65 113.65

0.00 1431.68 0.00 0.00 0.00 5.69 1437.37

0.00

80.56 80.56

0.00

128.02 128.02

124.52 124.52

189.57 189.57

108.07 108.07

799.69 799.69

0.00 1.27 1.27

0.00 905.66 0.00 0.00 0.00 5.38 911.04

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Page 346: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category III (A) - Industrial

(i) Industrial Normal

(ii) Industrial Optional

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cat -IV(A) - Cottage Indstr. & Dhobhi Ghats

Cat -IV(B) - Poultry farms with above 1000 birds

Category V (A & B) - Irrig & Agriculture

Category V(A) - Agriculture

Cat V(A) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category VI - Local Bodies, St. Lighting & PWS

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

905.66 905.66

621.42 621.42

0.02 0.02

281.43 281.43

0.16 0.16

0.13 0.13

0.00 0.00

2.49 2.49

0.00

0.00 0.00

0.00 0.00

0.00 14.10 0.00 0.00 0.00 0.13 14.23

14.10 14.10

0.00 0.00

0.00 0.00

0.00 21.93 0.00 0.00 0.00 31.10 53.03

0.00

7.50 7.50

5.14 5.14

1.95 1.95

1.06 1.06

5.48 5.48

0.33 0.33

0.35 0.35

0.02 0.02

0.05 0.05

0.06 0.06

0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 296.19 0.00 0.00 0.00 1.98 298.17

Page 347: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

All units

Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

NTR Sujala Pathakam

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

59.94 59.94

27.29 27.29

30.27 30.27

129.09 129.09

26.65 26.65

22.94 22.94

0.00 61.68 0.00 0.00 0.00 0.00 0.32 62.01

0.00 56.16 56.16

5.52 5.52

5.52 5.52

0.00 0.71 0.00 0.00 0.00 0.00 0.72

0.71 0.71

0.00 0.81 0.00 0.00 0.00 0.00 0.00 0.81

0.00 0.00 0.00 0.00 0.00 0.00

0.00 5083.29 0.00 0.00 0.00 0.00 70.11 5153.40

0.00 6305.74 0.00 0.00 0.00 0.00 35.18 6340.92

0.00 1681.83 0.00 0.00 0.00 0.00 8.62 1690.45

0.00 835.58 0.00 0.00 0.00 3.66 839.24

0.00 62.89 0.00 0.00 0.00 0.38 63.27

0.00 1.52 0.00 0.00 0.00 0.01 1.53

0.00 39.61 0.00 0.00 0.00 0.15 39.75

0.00 153.49 0.00 0.00 0.00 0.80 154.28

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 422.27 0.00 0.00 0.00 1.69 423.96

0.00 74.24 0.00 0.00 0.00 0.33 74.56

0.00 15.40 0.00 0.00 0.00 0.07 15.47

0.00 2.63 0.00 0.00 0.00 0.01 2.64

0.00 10.50 0.00 0.00 0.00 0.07 10.57

0.00 30.96 0.00 0.00 0.00 0.20 31.17

0.00 1.35 0.00 0.00 0.00 0.01 1.36

Page 348: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT-VI - Townships & Colony Supply

HT- VIII Green Power

HT-VIII Temporary

Rural co-operartives

HT Category at 33 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-VI - Townships & Colony Supply

HT- VIII Green Power

HT-VIII Temporary

Rural co-operartives

HT Category at 132 kV

HT-I Indl General (Segregated)

Lights & Fans

Industrial Colony consumption

Seasonal Industries

HT-I Indrl. Time-of-Day Tariff (6 PM to 10 PM)

HT - I( B) Ferro-alloys

HT-II - Others (Non- Industrial)

HT-II Others - Time-of-Day Tariff (6 PM to 10 PM)

HT III: Airports, Bus Stations and Railway Stations

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT -IV A Govt Lift Irrigation

HT -IV A Private Irrigation & Agriculture

HT- IV B - CP Water Supply Schemes

HT-V – RailwayTraction

HT-VI - Townships & Colony Supply

HT- VIII Green Power

HT-VIII Temporary

Rural co-operartives

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

0.00 24.18 0.00 0.00 0.00 0.15 24.33

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 7.20 0.00 0.00 0.00 1.09 8.30

0.00 2381.16 0.00 0.00 0.00 0.00 13.31 2394.47

0.00 1761.23 0.00 0.00 0.00 9.86 1771.09

0.00 26.47 0.00 0.00 0.00 0.17 26.65

0.00 7.33 0.00 0.00 0.00 0.05 7.37

0.00 31.66 0.00 0.00 0.00 0.15 31.81

0.00 360.46 0.00 0.00 0.00 2.00 362.46

0.00 54.93 0.00 0.00 0.00 0.39 55.32

0.00 80.33 0.00 0.00 0.00 0.35 80.68

0.00 14.72 0.00 0.00 0.00 0.07 14.79

0.00 0.09 0.00 0.00 0.00 0.00 0.09

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 13.08 0.00 0.00 0.00 0.08 13.16

0.00 29.49 0.00 0.00 0.00 0.19 29.68

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.37 0.00 0.00 0.00 0.01 1.38

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2242.75 0.00 0.00 0.00 0.00 13.25 2256.00

0.00 1316.35 0.00 0.00 0.00 7.80 1324.15

0.00 13.25 0.00 0.00 0.00 0.09 13.35

0.00 8.66 0.00 0.00 0.00 0.05 8.71

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 252.43 0.00 0.00 0.00 1.49 253.92

0.00 63.25 0.00 0.00 0.00 0.48 63.73

0.00 17.43 0.00 0.00 0.00 0.08 17.51

0.00 2.82 0.00 0.00 0.00 0.01 2.83

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 105.76 0.00 0.00 0.00 0.69 106.44

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 462.81 0.00 0.00 0.00 2.54 465.35

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 11389.02 0.00 0.00 0.00 0.00 105.30 11494.32

Page 349: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2016-17

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

LT Total - (Existing Categories) 9604119 0.00 0.00 0.00 20967.52 0 8870 8427413

Category- Domestic (All) 7360240 0.00 0.00 0.00 7598.85 0.00 6588.16 0.00

Group A: Domestic consumers with annual

consumption < = 600 Units 4,322,592 - - - 2,182.95 - 2,496.82 -

0-50 3,265,782 1.45 - - 1,567.43 - 1,808.51 -

51-100 974,728 2.60 - - 493.83 - 615.41 -

101-200 77,142 3.60 - - 89.74 - 67.40 -

Above 200 4,940 6.90 - - 31.95 - 5.50 -

Group B: All Domestic consumers with consumption

( < =2400 and > 600 units) 2,691,332 - - - 4,071.29 - 3,039.42 -

0-50 253,827 2.60 - - 1,502.24 - 268.76 -

51-100 1,247,197 2.60 - - 1,324.07 - 1,212.10 -

101-200 1,108,040 3.60 - - 1,029.11 - 1,428.85 -

201-300 74,636 6.90 - - 150.99 - 118.67 -

Above 300 7,632 7.75 - - 64.89 - 11.03 -

Group C: All Domestic consumers with annual

consumption >2400 units 346,316 - - - 1,344.60 - 1,051.93 -

0-50 9,063 2.60 - - 208.01 - 21.82 -

51-100 14,970 3.25 - - 202.60 - 36.06 -

101-200 142,452 5.26 - - 366.70 - 388.71 -

201-300 123,836 6.90 - - 243.82 - 361.60 -

301-400 33,777 7.75 - - 126.41 - 123.83 -

401-500 10,456 8.27 - - 67.39 - 47.46 -

Above 500 units 11,762 8.80 - - 129.67 - 72.45 - Category II - Non-domestic/Commrl (A & B) 722821 0.00 0.00 0.00 1639.77 0.00 1478.61 0.00

Lt - II (A) 420780 0.00 0.00 0.00 93.72 0.00 482.45 0.00

0-50 units 420780 5.40 661.44 0.00 93.72 0.00 482.45 0.00

LT II (B): Above 50 Units/Month 301552 0.00 0.00 0.00 1544.64 0.00 994.67 0.00

0-50 0 6.63 661.44 0.00 196.04 0.00 0.00 0.00

51-100 127977 7.38 661.44 0.00 159.08 0.00 163.89 0.00

101-300 108941 8.71 661.44 0.00 240.41 0.00 237.86 0.00

301-500 23097 9.24 661.44 0.00 133.44 0.00 93.84 0.00

Above 500 41537 9.78 661.44 0.00 815.68 0.00 499.08 0.00

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Page 350: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

LT II (C): Advertisement Hoardings 489 11.81 661.44 0.00 1.41 0.00 1.50 0.00

Category III (A & B) - Industrial 69462 0.00 0.00 0.00 1686.22 0.00 469.59 1437591.82

Category III (A) - Industrial 69462 0.00 0.00 0.00 1686.22 0.00 469.59 1437591.82

(i) Industrial Normal 43681 6.51 661.44 661.44 907.26 0.00 0.00 1215434.65

(ii) Industrial Optional (Seasonal) 1 7.23 661.44 661.44 0.01 0.00 0.00 8.50

(iii) Pisciculture/Prawn culture 25317 3.75 252.00 252.00 773.56 0.00 464.78 221973.60

(iv) Sugarcane crushing 22 3.75 252.00 252.00 0.25 0.00 0.49 144.90

(v) Poultry farms with above 1000 birds 4 5.74 661.44 661.44 0.06 0.00 0.03 17.17

(vi) Mushroom & Rabbit Farms 8 5.74 661.44 661.44 0.09 0.00 0.06 13.00

(vii) Floriculture in Green House 429 4.75 661.44 661.44 4.99 0.00 4.22 0.00

Category III (B) - Industrial (Optional) 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSI Units 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Seasonal Industries 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Category IV- Cottage Industries, Dhobighats & Others 11336 0.00 0.00 0.00 39.94 0.00 38.51 0.00

Cottage Industries 11336 3.75 240.00 0.00 39.94 0.00 38.51 0.00

Agro Based Activities 0 3.75 240.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Category V (A,B & C) - Irrig & Agriculture 1292223 0.00 0.00 0.00 9269.50 0.00 0.00 6867617.80

Category V(A+B) - Agriculture 1292223 0.00 0.00 0.00 9269.50 0.00 0.00 6867617.80

Cat V(A)(i) - Agriculture with DSM measures 1272820 0.00 0.00 0.00 9266.21 0.00 0.00 6764327.49

Corporate Farmers & IT Assesses 1267 2.50 0.00 0.00 32.54 0.00 0.00 7231.88

Wet Land Farmers (Holdings >2.5 acre) 9050 0.50 0.00 525.00 108.36 0.00 0.00 56042.34

Dry Land Farmers (Connections > 3 nos.) 1317 0.50 0.00 525.00 41.00 0.00 0.00 6655.75

Wet Land Farmers (Holdings <= 2.5 acre) 189263 0.00 0.00 0.00 88.55 0.00 0.00 885937.96

Dry Land Farmers (Connections <= 3 nos.) 1071923 0.00 0.00 0.00 8995.76 0.00 0.00 5808459.56

Cat V(A)(ii) - Agriculture with Non-DSM measures 19403 0.00 0.00 0.00 3.29 0.00 0.00 103290.31

Corporate Farmers & IT Assesses 2559 3.50 0.00 0.00 0.94 0.00 0.00 16261.56

Wet Land Farmers (Holdings >2.5 acre) 14524 1.00 0.00 1050.00 1.77 0.00 0.00 75292.29

Dry Land Farmers (Connections > 3 nos.) 1980 1.00 0.00 1050.00 0.06 0.00 0.00 10716.46

Wet Land Farmers (Holdings <= 2.5 acre) 217 0.50 0.00 525.00 0.26 0.00 0.00 651.00

Dry Land Farmers (Connections <= 3 nos.) 123 0.50 0.00 525.00 0.25 0.00 0.00 369.00

Category LT V(C) - Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Salt farming units with Connected Load upto 15HP 0 3.70 0.00 240.00 0.00 0.00 0.00 0.00

Rural Horticulture Nurseries 0 3.70 0.00 240.00 0.00 0.00 0.00 0.00

Category VI - Local Bodies, St. Lighting & PWS 91483 0.00 0.00 0.00 635.89 0.00 213.00 122202.94

VI(A) - Street Lighting 52573 0.00 0.00 0.00 184.04 0.00 78.78 0.00

Panchayats 38149 5.75 399.36 0.00 111.01 0.00 48.50 0.00

Municipalities 7139 6.28 399.36 0.00 35.96 0.00 13.91 0.00

Muncipal Corporations 7285 6.82 399.36 0.00 37.06 0.00 16.37 0.00

VI(B) - PWS Schemes 38910 0.00 0.00 0.00 451.85 0.00 134.23 122202.94

Minor/Major Panchayats 34107 0.00 0.00 0.00 362.27 0.00 114.70 103497.14

Panchayats 34107 4.68 0.00 399.36 362.27 0.00 114.70 103497.14

All Nagarpalikas & Municipalities 2603 0.00 0.00 0.00 51.38 0.00 10.72 10149.08

Page 351: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Muncipalities 2603 5.75 0.00 399.36 51.38 0.00 10.72 10149.08

Municipal Corporations 2200 0.00 0.00 0.00 38.20 0.00 8.81 8556.72

Corporations 2200 6.28 0.00 399.36 38.20 0.00 8.81 8556.72

Category VII (A&B) 56525 0.00 0.00 0.00 95.89 0.00 82.05 0.00

Cat VII (A) - General Purpose 43228 7.00 262.08 0.00 84.35 0.00 74.33 0.00

Cat VII-B - Religious Places (CL <=1KW) 13297 0.00 0.00 0.00 11.54 0.00 7.72 0.00

(i) Religious Places (CL > 2kW) 3692 4.89 262.08 0.00 2.57 0.00 1.79 0.00

(ii) Religious Places (CL <= 2kW) 9605 4.70 240.00 0.00 8.97 0.00 5.93 0.00

Category VIII-Temporary Supply 29 0.00 0.00 0.00 1.47 0.00 0.17 0.00

All units 29 10.10 262.08 0.00 1.47 0.00 0.17 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

New L T Categories ( Total ) 2088 0.00 0.00 0.00 18.68 0.00 31.16 1645.81

LT-VI (C): NTR Sujala Padhakam 323 4.00 0.00 120.00 2.69 0.00 0.70 1645.81

LT II (D) : Function Halls / Auditoriums 1765 11.32 0.00 0.00 15.99 0.00 30.47 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL (LT including new categories) 9606207 0.00 0.00 0.00 20986.20 0.00 8901.25 8429058.37

HIGH TENSION 5839 0.00 0.00 0.00 9748.30 0.00 3036.68 0.00

HT Category at 11 kV 5287 0.00 0.00 0.00 2655.53 0.00 1032.12 0.00

HT I (A): General 2942 6.14 4630.08 0.00 1080.90 0.00 591.69 0.00

Lights and Fans 0 6.14 0.00 0.00 66.51 0.00 0.00 0.00

Industrial Colonies 0 6.08 0.00 0.00 1.95 0.00 0.00 0.00

Seasonal Industries 118 7.40 4630.08 0.00 45.07 0.00 30.36 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.19 0.00 0.00 199.47 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 1 5.68 0.00 0.00 0.46 0.00 0.20 0.00

HT I (C): Aquaculture and Animal Husbandry 48 3.75 252.00 0.00 21.74 0.00 16.34 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing

Plants 34 4.75 4630.08 0.00 23.38 0.00 9.41 0.00

HT II: Others 1393 7.40 4630.08 0.00 456.02 0.00 225.64 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.45 0.00 0.00 90.73 0.00 0.00 0.00

HT II (B): Religious Places 9 4.89 262.08 0.00 3.96 0.00 1.75 0.00

HT II (C): Function Halls/Auditoriums 70 11.32 0.00 0.00 5.06 0.00 11.31 0.00

HT III: Public Infrastructure and Tourism 50 7.05 4630.08 0.00 37.24 0.00 10.30 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.10 0.00 0.00 7.94 0.00 0.00 0.00

HT IV Government LIS 280 5.60 0.00 0.00 59.80 0.00 62.74 0.00

HT IV Private Irrigation and Agriculture 252 5.60 0.00 0.00 107.32 0.00 55.90 0.00

Page 352: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT IV CPWS 52 4.70 0.00 0.00 1.88 0.00 9.27 0.00

HT VI: Townships & Residential Colonies 37 6.08 661.44 0.00 32.89 0.00 7.21 0.00

HT VII: Green Power 0 11.32 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0 9.21 6945.12 0.00 0.07 0.00 0.00 0.00

Category: RESCOs 1 0.32 0.00 0.00 413.14 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT Category at 33 kV 465 0.00 0.00 0.00 3306.71 0.00 799.38 0.00

HT I (A): General 348 5.68 4630.08 0.00 2350.79 0.00 626.90 0.00

Lights and Fans 0 5.68 0.00 0.00 38.85 0.00 0.00 0.00

Industrial Colonies 0 6.08 0.00 0.00 9.87 0.00 0.00 0.00

Seasonal Industries 7 6.72 4630.08 0.00 23.05 0.00 9.34 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 6.73 0.00 0.00 463.48 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 9 5.23 0.00 0.00 183.26 0.00 28.34 0.00

HT I (C) : Aquaculture and Animal Husbandry 1 3.75 252.00 0.00 7.04 0.00 0.15 0.00

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants 4 4.75 385.84 0.00 11.37 0.00 5.83 0.00

HT II: Others 37 6.72 4630.08 0.00 92.68 0.00 40.19 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.77 0.00 0.00 18.43 0.00 0.00 0.00

HT II (B): Religious Places 1 4.89 262.08 0.00 7.20 0.00 7.00 0.00

HT II (C) : Function Halls / Auditoriums 0 11.32 0.00 0.00 0.00 0.00 0.00 0.00

HT III: Public Infrastructure and Tourism 2 6.44 4630.08 0.00 3.17 0.00 1.20 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.49 0.00 0.00 0.71 0.00 0.00 0.00

HT IV Government LIS 13 5.60 0.00 0.00 0.00 0.00 19.09 0.00

HT IV Agriculture 28 5.60 0.00 0.00 42.57 0.00 51.13 0.00

HT IV CPWS 10 4.70 0.00 0.00 52.35 0.00 9.14 0.00

HT VI: Townships & Residential Colonies 5 6.08 661.44 0.00 1.87 0.00 1.07 0.00

HT VII: Green Power 0 11.32 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0 8.52 6945.12 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 353: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT Category at 132 kV 87 0.00 0.00 0.00 3786.06 0.00 1205.18 0.00

HT I (A): General 51 5.25 4630.08 0.00 1828.51 0.00 495.69 0.00

Lights and Fans 0 5.25 0.00 0.00 15.28 0.00 0.00 0.00

Industrial Colonies 0 6.08 0.00 0.00 11.00 0.00 0.00 0.00

Seasonal Industries 0 6.46 4630.08 0.00 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 6.30 0.00 0.00 388.07 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 2 4.81 0.00 0.00 117.76 0.00 21.36 0.00

HT I (C ): Aquaculture and Animal Husbandry 0 3.75 252.00 0.00 0.00 0.00 0.00 0.00

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants 0 4.75 4630.08 0.00 0.00 0.00 0.00 0.00

HT II: Others 2 6.46 4630.08 0.00 24.65 0.00 8.66 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.51 0.00 0.00 4.25 0.00 0.00 0.00

HT II (B): Religious Places 0 4.89 262.08 0.00 0.00 0.00 0.00 0.00

HT II (C) : Function Halls / Auditoriums 0 11.32 0.00 0.00 0.00 0.00 0.00 0.00

HT III: Public Infrastructure and Tourism 0 6.13 4630.08 0.00 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.18 0.00 0.00 0.00 0.00 0.00 0.00

HT IV Government LIS 4 5.60 0.00 0.00 0.00 0.00 175.69 0.00

HT IV Agriculture 8 5.60 0.00 0.00 746.87 0.00 249.24 0.00

HT IV CPWS 0 4.70 0.00 0.00 0.00 0.00 0.00 0.00

HT V: Railway Traction 20 6.68 0.00 0.00 649.67 0.00 254.54 0.00

HT VI: Townships & Residential Colonies 0 6.08 661.44 0.00 0.00 0.00 0.00 0.00

HT VII: Green Power 0 11.32 0.00 0.00 0.00 0 0.00 0.00

HT VIII: Temporary 0 7.88 6945.12 0.00 0.00 0 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL( LT + HT) 9612046 0.00 0.00 0.00 30734.50 0.00 11937.93 8429058.37

Page 354: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2016-17

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual

consumption < = 600 Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with consumption

( < =2400 and > 600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual

consumption >2400 units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

Consumer Categories Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

5164 205 64 341 0 5774

2418.67 0.00 50.09 255.35 0.00 2724.11

410.02 - 46.36 136.54 - 592.92

227.28 - 46.36 97.97 - 371.61

128.40 - - 35.09 - 163.49

32.31 - - 3.24 - 35.55

22.04 - - 0.24 - 22.28

1,259.79 - 3.60 103.05 - 1,366.44

390.58 - 3.60 7.61 - 401.80

344.26 - - 44.90 - 389.16

370.48 - - 46.54 - 417.02

104.18 - - 3.58 - 107.77

50.29 - - 0.41 - 50.70

748.86 - 0.13 15.76 - 764.75

54.08 - 0.13 0.27 - 54.48

65.84 - - 0.54 - 66.38

192.89 - - 5.98 - 198.87

168.24 - - 5.94 - 174.18

97.96 - - 1.82 - 99.79

55.73 - - 0.56 - 56.30

114.11 - - 0.64 - 114.75

1430.07 97.80 12.96 28.88 0.00 1569.71

50.61 31.91 12.96 15.15 0.00 110.63

50.61 31.91 12.96 15.15 0.00 110.63

1377.80 65.79 0.00 13.71 0.00 1457.29

129.97 0.00 0.00 0.00 0.00 129.97

117.40 10.84 0.00 5.38 0.00 133.61

209.39 15.73 0.00 5.23 0.00 230.36

123.30 6.21 0.00 1.11 0.00 130.61

797.73 33.01 0.00 1.99 0.00 832.74

Full year revenue excluding external subsidy

Page 355: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

(i) Industrial Normal

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

1.66 0.10 0.00 0.03 0.00 1.79

883.27 76.14 0.00 4.17 0.00 963.57

883.27 76.14 0.00 4.17 0.00 963.57

590.62 59.95 0.00 2.62 0.00 653.19

0.00 0.00 0.00 0.00 0.00 0.00

290.08 15.88 0.00 1.52 0.00 307.49

0.10 0.02 0.00 0.00 0.00 0.11

0.04 0.00 0.00 0.00 0.00 0.04

0.05 0.00 0.00 0.00 0.00 0.06

2.37 0.28 0.00 0.03 0.00 2.67

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

14.98 0.92 0.00 0.41 0.00 16.31

14.98 0.92 0.00 0.41 0.00 16.31

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

16.14 12.38 0.00 46.52 0.00 75.04

16.14 12.38 0.00 46.52 0.00 75.04

15.60 3.29 0.00 45.82 0.00 64.72

8.13 0.00 0.00 0.05 0.00 8.18

5.42 2.94 0.00 0.33 0.00 8.69

2.05 0.35 0.00 0.05 0.00 2.45

0.00 0.00 0.00 6.81 0.00 6.81

0.00 0.00 0.00 38.59 0.00 38.59

0.54 9.08 0.00 0.70 0.00 10.32

0.33 0.00 0.00 0.09 0.00 0.42

0.18 7.91 0.00 0.52 0.00 8.61

0.01 1.13 0.00 0.07 0.00 1.20

0.01 0.03 0.00 0.01 0.00 0.06

0.01 0.02 0.00 0.00 0.00 0.04

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

334.77 15.21 0.00 3.29 0.00 353.28

111.69 3.15 0.00 1.89 0.00 116.73

63.83 1.94 0.00 1.37 0.00 67.14

22.59 0.56 0.00 0.26 0.00 23.40

25.28 0.65 0.00 0.26 0.00 26.19

223.07 12.07 0.00 1.40 0.00 236.54

169.54 10.28 0.00 1.23 0.00 181.05

169.54 10.28 0.00 1.23 0.00 181.05

29.54 0.98 0.00 0.09 0.00 30.62

Page 356: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing

Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

29.54 0.98 0.00 0.09 0.00 30.62

23.99 0.81 0.00 0.08 0.00 24.88

23.99 0.81 0.00 0.08 0.00 24.88

64.52 2.14 0.88 2.55 0.00 70.09

59.05 1.95 0.88 2.07 0.00 63.95

5.47 0.19 0.00 0.48 0.00 6.14

1.25 0.05 0.00 0.13 0.00 1.43

4.22 0.14 0.00 0.35 0.00 4.70

1.49 0.00 0.00 0.00 0.00 1.49

1.49 0.00 0.00 0.00 0.00 1.49

0.00 0.00 0.00 0.00 0.00 0.00

19.18 0.03 0.00 0.11 0.00 19.31

1.08 0.03 0.00 0.01 0.00 1.12

18.10 0 0.00 0.10 0.00 18.19

0.00 0.00 0.00 0.00 0.00 0.00

5183.08 204.63 63.93 341.28 0.00 5792.91

5558.26 950.30 0.00 7.43 0.00 6515.98

1484.21 402.55 0.00 6.64 0.00 1893.39

663.68 273.96 0.00 3.97 0.00 941.60

40.84 0.00 0.00 0.00 0.00 40.84

1.19 0.00 0.00 0.00 0.00 1.19

33.35 14.06 0.00 0.00 0.00 47.41

143.42 0.00 0.00 0.00 0.00 143.42

0.26 0.00 0.00 0.00 0.00 0.26

8.15 0.41 0.00 0.06 0.00 8.63

11.114.36 0.00 0.05 0.00

15.51

337.46 104.47 0.00 1.88 0.00 443.81

76.66 0.00 0.00 0.00 0.00 76.66

1.94 0.05 0.00 0.01 0.00 1.99

5.72 0.00 0.00 0.09 0.00 5.82

26.25 4.77 0.00 0.07 0.00 31.09

6.43 0.00 0.00 0.00 0.00 6.43

33.49 0.00 0.00 0.38 0.00 33.87

60.10 0.00 0.00 0.00 0.00 60.10

Page 357: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

HT Category at 33 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

0.88 0.00 0.00 0.07 0.00 0.95

20.00 0.48 0.00 0.05 0.00 20.52

0.00 0.00 0.00 0.00 0.00 0.00

0.06 0.00 0.00 0.00 0.00 0.06

13.22 0.00 0.00 0.00 0.00 13.22

0.00 0.00 0.00 0.00 0.00 0.00

1926.90 314.23 0.00 0.58 0.00 2241.71

1335.25 290.26 0.00 0.47 0.00 1625.98

22.07 0.00 0.00 0.00 0.00 22.07

6.00 0.00 0.00 0.00 0.00 6.00

15.49 4.32 0.00 0.00 0.00 19.81

311.92 0.00 0.00 0.00 0.00 311.92

95.84 0.00 0.00 0.01 0.00 95.86

2.64 0.00 0.00 0.00 0.00 2.65

5.400.22 0.00 0.01 0.00

5.63

62.28 18.61 0.00 0.05 0.00 80.94

14.32 0.00 0.00 0.00 0.00 14.32

3.52 0.18 0.00 0.00 0.00 3.71

0.00 0.00 0.00 0.00 0.00 0.00

2.04 0.56 0.00 0.00 0.00 2.60

0.53 0.00 0.00 0.00 0.00 0.53

0.00 0.00 0.00 0.02 0.00 0.02

23.84 0.00 0.00 0.00 0.00 23.84

24.60 0.00 0.00 0.01 0.00 24.62

1.14 0.07 0.00 0.01 0.00 1.22

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

Page 358: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

2147.15 233.52 0.00 0.21 0.00 2380.88

959.97 229.51 0.00 0.14 0.00 1189.62

8.02 0.00 0.00 0.00 0.00 8.02

6.69 0.00 0.00 0.00 0.00 6.69

0.00 0.00 0.00 0.00 0.00 0.00

244.48 0.00 0.00 0.00 0.00 244.48

56.64 0.00 0.00 0.01 0.00 56.65

0.00 0.00 0.00 0.00 0.00 0.00

0.000.00 0.00 0.00 0.00

0.00

15.92 4.01 0.00 0.01 0.00 19.93

3.19 0.00 0.00 0.00 0.00 3.19

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.01 0.00 0.01

418.25 0.00 0.00 0.00 0.00 418.25

0.00 0.00 0.00 0.00 0.00 0.00

433.98 0.00 0.00 0.05 0.00 434.03

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

10741.33 1154.92 63.93 348.71 0.00 12308.90

Page 359: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2016-17

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual

consumption < = 600 Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with consumption

( < =2400 and > 600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual

consumption >2400 units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

Consumer CategoriesSurcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0 5773.60 0 0 0 0 49 5822.23

0.00 2724.11 0.00 0.00 0.00 0.00 17.61 2741.72

- 592.92 - - - - - -

- 371.61 - - - - - -

- 163.49 - - - - - -

- 35.55 - - - - - -

- 22.28 - - - - - -

- 1,366.44 - - - - - -

- 401.80 - - - - - -

- 389.16 - - - - - -

- 417.02 - - - - - -

- 107.77 - - - - - -

- 50.70 - - - - - -

- 764.75 - - - - - -

- 54.48 - - - - - -

- 66.38 - - - - - -

- 198.87 - - - - - -

- 174.18 - - - - - -

- 99.79 - - - - - -

- 56.30 - - - - - -

- 114.75 - - - - - - 0.00 1569.71 0.00 0.00 0.00 0.00 3.84 1573.55

0.00 110.63 0.00 0.00 0.00 0.00 0.00 110.63

0.00 110.63 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1457.29 0.00 0.00 0.00 0 0 1457.29

0.00 129.97 0.00 0.00 0.00 0.00 0.00 0.00

0.00 133.61 0.00 0.00 0.00 0.00 0.00 0.00

0.00 230.36 0.00 0.00 0.00 0.00 0.00 0.00

0.00 130.61 0.00 0.00 0.00 0.00 0.00 0.00

0.00 832.74 0.00 0.00 0.00 0.00 0.00 0.00

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

(Rs crores)Total

Revenue

( Net of

incentives)

Page 360: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

(i) Industrial Normal

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

(Rs crores)Total

Revenue

( Net of

incentives)

0.00 1.79 0.00 0.00 0.00 0.00 0.00 1.79

0.00 963.57 0.00 0.00 0.00 0.00 3.91 967.48

0.00 963.57 0.00 0.00 0.00 0.00 0.00 0.00

0.00 653.19 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 307.49 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.11 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2.67 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 16.31 0.00 0.00 0.00 0.00 0.09 16.40

0.00 16.31 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 75.04 0.00 0.00 0.00 0.00 21.48 96.51

0.00 75.04 0.00 0.00 0.00 0.00 0.00 0.00

0.00 64.72 0.00 0.00 0.00 0.00 0.00 0.00

0.00 8.18 0.00 0.00 0.00 0.00 0.00 0.00

0.00 8.69 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2.45 0.00 0.00 0.00 0.00 0.00 0.00

0.00 6.81 0.00 0.00 0.00 0.00 0.00 0.00

0.00 38.59 0.00 0.00 0.00 0.00 0.00 0.00

0.00 10.32 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.42 0.00 0.00 0.00 0.00 0.00 0.00

0.00 8.61 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.20 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 353.28 0.00 0.00 0.00 0.00 1.48 354.76

0.00 116.73 0.00 0.00 0.00 0.00 0.00 0.00

0.00 67.14 0.00 0.00 0.00 0.00 0.00 0.00

0.00 23.40 0.00 0.00 0.00 0.00 0.00 0.00

0.00 26.19 0.00 0.00 0.00 0.00 0.00 0.00

0.00 236.54 0.00 0.00 0.00 0.00 0.00 0.00

0.00 181.05 0.00 0.00 0.00 0.00 0.00 0.00

0.00 181.05 0.00 0.00 0.00 0.00 0.00 0.00

0.00 30.62 0.00 0.00 0.00 0.00 0.00 0.00

Page 361: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing

Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

(Rs crores)Total

Revenue

( Net of

incentives)

0.00 30.62 0.00 0.00 0.00 0.00 0.00 0.00

0.00 24.88 0.00 0.00 0.00 0.00 0.00 0.00

0.00 24.88 0.00 0.00 0.00 0.00 0.00 0.00

0.00 70.09 0.00 0.00 0.00 0.00 0.22 70.31

0.00 63.95 0.00 0.00 0.00 0.00 0.00 63.95

0.00 6.14 0.00 0.00 0.00 0.00 0.00 6.14

0.00 1.43 0.00 0.00 0.00 0.00 0.00 0.00

0.00 4.70 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.49 0.00 0.00 0.00 0.00 0.00 1.50

0.00 1.49 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 19.31 0.00 0.00 0.00 0.00 0.00 19.31

0.00 1.12 0.00 0.00 0.00 0.00 0.00 1.12

0.00 18.19 0.00 0.00 0.00 0.00 0.00 18.19

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 5792.91 0.00 0.00 0.00 0.00 48.63 5841.54

0.00 6515.98 0.00 0.00 0.00 0.00 22.59 6538.570.00 1893.39 0.00 0.00 0.00 0.00 6.15 1899.55

0.00 941.60 0.00 0.00 0.00 0.00 2.50 944.11

0.00 40.84 0.00 0.00 0.00 0.00 0.15 40.99

0.00 1.19 0.00 0.00 0.00 0.00 0.00 1.19

0.00 47.41 0.00 0.00 0.00 0.00 0.10 47.51

0.00 143.42 0.00 0.00 0.00 0.00 0.46 143.88

0.00 0.26 0.00 0.00 0.00 0.00 0.00 0.26

0.00 8.63 0.00 0.00 0.00 0.00 0.05 8.68

0.00 15.51 0.00 0.00 0.000.00 0.05

15.57

0.00 443.81 0.00 0.00 0.00 0.00 1.06 444.87

0.00 76.66 0.00 0.00 0.00 0.00 0.21 76.88

0.00 1.99 0.00 0.00 0.00 0.00 0.01 2.00

0.00 5.82 0.00 0.00 0.00 0.00 0.01 5.83

0.00 31.09 0.00 0.00 0.00 0.00 0.09 31.18

0.00 6.43 0.00 0.00 0.00 0.00 0.02 6.45

0.00 33.87 0.00 0.00 0.00 0.00 0.14 34.00

0.00 60.10 0.00 0.00 0.00 0.00 0.25 60.35

Page 362: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

HT Category at 33 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

(Rs crores)Total

Revenue

( Net of

incentives)

0.00 0.95 0.00 0.00 0.00 0.00 0.00 0.96

0.00 20.52 0.00 0.00 0.00 0.00 0.08 20.60

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.06 0.00 0.00 0.00 0.00 0.00 0.06

0.00 13.22 0.00 0.00 0.00 0.00 0.96 14.18

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2241.71 0.00 0.00 0.00 0.00 7.66 2249.37

0.00 1625.98 0.00 0.00 0.00 0.00 5.45 1631.43

0.00 22.07 0.00 0.00 0.00 0.00 0.09 22.16

0.00 6.00 0.00 0.00 0.00 0.00 0.02 6.03

0.00 19.81 0.00 0.00 0.00 0.00 0.05 19.87

0.00 311.92 0.00 0.00 0.00 0.00 1.07 312.99

0.00 95.86 0.00 0.00 0.00 0.00 0.42 96.28

0.00 2.65 0.00 0.00 0.00 0.00 0.02 2.66

0.00 5.63 0.00 0.00 0.000.00 0.03

5.66

0.00 80.94 0.00 0.00 0.00 0.00 0.21 81.16

0.00 14.32 0.00 0.00 0.00 0.00 0.04 14.36

0.00 3.71 0.00 0.00 0.00 0.00 0.02 3.72

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2.60 0.00 0.00 0.00 0.00 0.01 2.61

0.00 0.53 0.00 0.00 0.00 0.00 0.00 0.53

0.00 0.02 0.00 0.00 0.00 0.00 0.10 0.12

0.00 23.84 0.00 0.00 0.00 0.00 0.12 23.96

0.00 24.62 0.00 0.00 0.00 0.00 0.00 24.62

0.00 1.22 0.00 0.00 0.00 0.00 0.00 1.22

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 363: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

(Open Access)Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

(Rs crores)Total

Revenue

( Net of

incentives)

0.00 2380.88 0.00 0.00 0.00 0.00 8.77 2389.65

0.00 1189.62 0.00 0.00 0.00 0.00 4.24 1193.85

0.00 8.02 0.00 0.00 0.00 0.00 0.04 8.06

0.00 6.69 0.00 0.00 0.00 0.00 0.03 6.71

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 244.48 0.00 0.00 0.00 0.00 0.90 245.38

0.00 56.65 0.00 0.00 0.00 0.00 0.27 56.92

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00

0.00

0.00 19.93 0.00 0.00 0.00 0.00 0.06 19.99

0.00 3.19 0.00 0.00 0.00 0.00 0.01 3.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.01 0.00 0.00 0.00 0.00 1.73 1.74

0.00 418.25 0.00 0.00 0.00 0.00 0.00 418.25

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 434.03 0.00 0.00 0.00 0.00 1.51 435.54

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 12308.90 0.00 0.00 0.00 0.00 71.21 12380.11

Page 364: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2017-18

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

LT Total - (Existing Categories) 10400035 0.00 0.00 0.00 22500.28 0 9576 8382973

Category- Domestic (All) 8033295 0.00 0.00 0.00 8350.18 0.00 6931.20 0.00

Group A: Domestic consumers with annual

consumption < = 600 Units 4,710,342 - - - 2,373.35 - 2,611.23 -

0-50 3,634,753 1.45 - - 1,779.20 - 1,936.48 -

51-100 989,100 2.60 - - 467.49 - 600.79 -

101-200 81,049 3.60 - - 91.13 - 68.13 -

Above 200 5,440 6.90 - - 35.53 - 5.83 -

Group B: All Domestic consumers with consumption

( < =2400 and > 600 units) 2,937,909 - - - 4,467.46 - 3,193.43 -

0-50 277,661 2.60 - - 1,650.23 - 282.85 -

51-100 1,358,490 2.60 - - 1,442.66 - 1,270.19 -

101-200 1,209,703 3.60 - - 1,126.23 - 1,500.78 -

201-300 83,448 6.90 - - 172.85 - 127.65 -

Above 300 8,607 7.75 - - 75.49 - 11.97 -

Group C: All Domestic consumers with annual

consumption >2400 units 385,044 - - - 1,509.37 - 1,126.54 -

0-50 9,865 2.68 - - 226.34 - 22.85 -

51-100 16,297 3.35 - - 220.48 - 37.77 -

101-200 156,873 5.42 - - 407.98 - 411.82 -

201-300 138,982 7.11 - - 281.12 - 390.43 -

301-400 38,119 7.98 - - 147.26 - 134.44 -

401-500 11,783 8.52 - - 78.29 - 51.45 -

Above 500 units 13,125 9.06 - - 147.89 - 77.78 - Category II - Non-domestic/Commrl (A & B) 766886 - - - 1760.17 0.00 1553.03 0.00

Lt - II (A) 432093 - - - 95.79 0.00 482.36 0.00

0-50 units 432093 5.40 660.00 - 95.79 0.00 482.36 -

LT II (B): Above 50 Units/Month 333992 - - - 1661.59 0.00 1068.07 0.00

0-50 0 6.90 900.00 - 214.15 0.00 - -

51-100 134635 7.69 900.00 - 168.42 0.00 171.50 -

101-300 130259 9.06 900.00 - 318.96 0.00 271.86 -

301-500 26542 9.61 900.00 - 161.50 0.00 109.59 -

Above 500 42556 10.19 900.00 - 798.56 0.00 515.13 -

LT II (C): Advertisement Hoardings 801 12.28 900.00 - 2.79 0.00 2.60 -

Category III (A & B) - Industrial 75176 - - - 1987.26 0.00 580.65 1203428.98

Category III (A) - Industrial 75176 - - - 1987.26 0.00 580.65 1203428.98

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Page 365: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

(i) Industrial Normal 43903 6.71 900.00 900.00 937.76 0.00 - 1,203,411.98

(ii) Industrial Optional (Seasonal) 1 7.45 900.00 900.00 0.01 0.00 - 17.00

(iii) Pisciculture/Prawn culture 30666 3.86 360.00 360.00 1042.71 0.00 570.10 -

(iv) Sugarcane crushing 43 3.86 360.00 360.00 0.56 0.00 1.11 -

(v) Poultry farms with above 1000 birds 4 5.91 900.00 900.00 0.07 0.00 0.04 -

(vi) Mushroom & Rabbit Farms 15 5.91 900.00 900.00 0.21 0.00 0.20 -

(vii) Floriculture in Green House 544 4.89 900.00 900.00 5.93 0.00 9.20 -

Category III (B) - Industrial (Optional) 0 - - - 0.00 0.00 0.00 0.00

SSI Units 0 - - - 0.00 0.00 0.00 0.00

Seasonal Industries 0 - - - 0.00 0.00 0.00 0.00

Category IV- Cottage Industries, Dhobighats & Others 11604 - - - 40.76 0.00 42.92 0.00

Cottage Industries 11604 3.75 240.00 - 40.76 0.00 42.92 -

Agro Based Activities 0 3.75 240.00 - 0.00 0.00 - -

Category V (A,B & C) - Irrig & Agriculture 1350767 - - - 9536.85 0.00 0.00 7179544.49

Category V(A+B) - Agriculture 1350767 - - - 9536.85 0.00 0.00 7179544.49

Cat V(A)(i) - Agriculture with DSM measures 1329613 - - - 9533.48 0.00 0.00 7067760.29

Corporate Farmers & IT Assesses 1358 2.50 - - 33.79 0.00 - 7,750.72

Wet Land Farmers (Holdings >2.5 acre) 9700 0.50 - 525.00 112.59 0.00 - 60,070.28

Dry Land Farmers (Connections > 3 nos.) 1412 0.50 - 525.00 42.54 0.00 - 7,136.03

Wet Land Farmers (Holdings <= 2.5 acre) 197715 - - - 92.02 0.00 - 925,503.49

Dry Land Farmers (Connections <= 3 nos.) 1119428 - - - 9252.53 0.00 - 6,067,299.76

Cat V(A)(ii) - Agriculture with Non-DSM measures 21154 - - - 3.37 0.00 0.00 111784.20

Corporate Farmers & IT Assesses 2742 3.50 - - 0.96 0.00 - 17,428.39

Wet Land Farmers (Holdings >2.5 acre) 15568 1.00 - 1,050.00 1.83 0.00 - 80,704.64

Dry Land Farmers (Connections > 3 nos.) 2122 1.00 - 1,050.00 0.06 0.00 - 11,488.18

Wet Land Farmers (Holdings <= 2.5 acre) 445 0.50 - 525.00 0.27 0.00 - 1,333.50

Dry Land Farmers (Connections <= 3 nos.) 277 0.50 - 525.00 0.25 0.00 - 829.50

Category LT V(C) - Others 0.00 - - - 0.00 0.00 0.00 0.00

Salt farming units with Connected Load upto 15HP 0 3.70 - 240.00 0.00 0.00 - -

Rural Horticulture Nurseries 0 3.70 - 240.00 0.00 0.00 - -

Category V (B) - Agriculture (Tatkal) (3) 0 - - - 0.00 0.00 0.00 0.00

Category VI - Local Bodies, St. Lighting & PWS 103301 - - - 720.81 0.00 379.25 0.00

VI(A) - Street Lighting 58192 - - - 191.18 0.00 86.72 0.00

Panchayats 43099 5.98 900.00 - 121.44 0.00 54.89 -

Municipalities 7312 6.53 900.00 - 33.03 0.00 14.26 -

Muncipal Corporations 7781 7.09 900.00 - 36.71 0.00 17.57 -

VI(B) - PWS Schemes 45109 - - - 529.63 0.00 292.53 0.00

Minor/Major Panchayats 40022 - - - 434.41 0.00 252.25 0.00

Panchayats 40022 4.87 - 900.00 434.41 0.00 252.25 -

All Nagarpalikas & Municipalities 2735 - - - 54.10 0.00 22.00 0.00

Muncipalities 2735 5.98 - 900.00 54.10 0.00 22.00 -

Municipal Corporations 2352 - - - 41.12 0.00 18.28 0.00

Corporations 2352 6.53 - 900.00 41.12 0.00 18.28 -

Category VII (A&B) 58946 - - - 102.68 0.00 88.77 0.00

Page 366: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Cat VII (A) - General Purpose 48738 7.28 360.00 - 89.29 0.00 80.41 -

Cat VII-B - Religious Places (CL <=1KW) 10208 - - - 13.40 0.00 8.36 0.00

(i) Religious Places (CL > 2kW) 256 5.04 360.00 - 3.78 0.00 2.22 -

(ii) Religious Places (CL <= 2kW) 9952 4.84 360.00 - 9.62 0.00 6.14 -

Category VIII-Temporary Supply 60 - - - 1.58 0.00 0.34 0.00

All units 60 10.50 360.00 - 1.58 0.00 0.34 -

New L T Categories ( Total ) 2382 - - - 22.33 0.00 35.15 0.00

LT-VI (C): NTR Sujala Padhakam 430 4.00 - 120.00 2.97 0.00 1.47 -

LT II (D) : Function Halls / Auditoriums 1952 11.77 - - 19.36 0.00 33.69 -

0 - - - 0.00 0.00 0.00 0.00

TOTAL (LT including new categories) 10402417 - - - 22522.61 0.00 9611.32 8382973.47

HIGH TENSION 6501 - - - 9724.94 0.00 3295.21 0.00

HT Category at 11 kV 5907 - - - 2947.69 0.00 1195.99 0.00

HT I (A): General 3143 6.33 5700.00 0.00 1221.15 0.00 633.92 0.00

Lights and Fans 0 0.00 0.00 0.00 49.43 0.00 0.00 0.00

Industrial Colonies 0 6.32 0.00 0.00 3.73 0.00 0.00 0.00

Seasonal Industries 139 7.66 5700.00 0.00 44.49 0.00 33.81 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.38 0.00 0.00 247.20 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 2 5.82 0.00 0.00 0.50 0.00 0.41 0.00

HT I (C): Aquaculture and Animal Husbandry 68 3.86 360.00 0.00 39.31 0.00 20.45 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing

Plants 35 4.89 5700.00 0.00 24.35 0.00 8.50 0.00

HT II: Others 1467 7.66 5700.00 0.00 492.99 0.00 237.97 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.71 0.00 0.00 96.16 0.00 0.00 0.00

HT II (B): Religious Places 11 5.03 360.00 0.00 5.48 0.00 1.81 0.00

HT II (C): Function Halls/Auditoriums 82 11.77 0.00 0.00 6.75 0.00 11.72 0.00

HT III: Public Infrastructure and Tourism 66 7.30 5700.00 0.00 39.81 0.00 14.12 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.35 0.00 0.00 8.43 0.00 0.00 0.00

HT IV Government LIS 330 5.82 0.00 0.00 47.50 0.00 75.87 0.00

HT IV Private Irrigation and Agriculture 420 5.82 0.00 0.00 155.88 0.00 131.55 0.00

HT IV CPWS 105 4.89 0.00 0.00 48.07 0.00 18.82 0.00

HT VI: Townships & Residential Colonies 38 6.32 900.00 0.00 25.75 0.00 7.03 0.00

HT VII: Green Power 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0 9.50 8550.00 0.00 0.11 0.00 0.00 0.00

Category: RESCOs 1 0.32 0.00 0.00 390.60 0.00 0.00 0.00

0 - - - 0.00 0.00 0.00 0.00

Page 367: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT Category at 33 kV 505 - - - 3280.15 0.00 859.54 0.00

HT I (A): General 353 5.87 5700.00 0.00 2224.01 0.00 601.83 0.00

Lights and Fans 0 0.00 0.00 0.00 37.08 0.00 0.00 0.00

Industrial Colonies 0 6.32 0.00 0.00 9.17 0.00 0.00 0.00

Seasonal Industries 5 6.98 5700.00 0.00 18.30 0.00 6.81 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 6.92 0.00 0.00 449.30 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 11 5.37 0.00 0.00 227.87 0.00 42.93 0.00

HT I (C) : Aquaculture and Animal Husbandry 1 3.86 360.00 0.00 0.05 0.00 0.07 0.00

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants 4 4.89 5700.00 0.00 11.00 0.00 5.19 0.00

HT II: Others 39 6.98 5700.00 0.00 89.29 0.00 38.12 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.03 0.00 0.00 15.96 0.00 0.00 0.00

HT II (B): Religious Places 3 5.03 360.00 0.00 26.58 0.00 15.58 0.00

HT II (C) : Function Halls / Auditoriums 0 11.77 0.00 0.00 1.44 0.00 0.00 0.00

HT III: Public Infrastructure and Tourism 5 6.69 5700.00 0.00 7.05 0.00 4.01 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.74 0.00 0.00 1.54 0.00 0.00 0.00

HT IV Government LIS 0 5.82 0.00 0.00 0.00 0.00 0.00 0.00

HT IV Agriculture 54 5.82 0.00 0.00 87.20 0.00 121.75 0.00

HT IV CPWS 24 4.89 0.00 0.00 71.92 0.00 21.48 0.00

HT VI: Townships & Residential Colonies 6 6.32 900.00 0.00 2.38 0.00 1.79 0.00

HT VII: Green Power 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0 8.81 8550.00 0.00 0.00 0.00 0.00 0.00

0 - - - 0.00 0.00 0.00 0.00

HT Category at 132 kV 89 - - - 3497.09 0.00 1239.68 0.00

HT I (A): General 49 5.44 5700.00 0.00 1530.42 0.00 458.92 0.00

Lights and Fans 0 0.00 0.00 0.00 17.67 0.00 0.00 0.00

Industrial Colonies 0 6.32 0.00 0.00 12.44 0.00 0.00 0.00

Seasonal Industries 0 6.72 5700.00 0.00 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 6.49 0.00 0.00 401.91 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 3 4.95 0.00 0.00 161.17 0.00 33.38 0.00

HT I (C ): Aquaculture and Animal Husbandry 0 3.86 360.00 0.00 0.00 0.00 0.00 0.00

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants 0 4.89 5700.00 0.00 0.00 0.00 0.00 0.00

HT II: Others 1 6.72 5700.00 0.00 28.06 0.00 8.01 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.77 0.00 0.00 4.88 0.00 0.00 0.00

Page 368: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT II (B): Religious Places 0 5.03 360.00 0.00 0.00 0.00 0.00 0.00

HT II (C) : Function Halls / Auditoriums 0 11.77 0.00 0.00 0.64 0.00 0.00 0.00

HT III: Public Infrastructure and Tourism 0 6.38 5700.00 0.00 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.43 0.00 0.00 0.00 0.00 0.00 0.00

HT IV Government LIS 0 5.82 0.00 0.00 0.00 0.00 0.00 0.00

HT IV Agriculture 14 5.82 0.00 0.00 642.37 0.00 465.26 0.00

HT IV CPWS 0 4.89 0.00 0.00 0.00 0.00 0.00 0.00

HT V: Railway Traction 22 3.55 3600.00 0.00 697.53 0.00 274.12 0.00

HT VI: Townships & Residential Colonies 0 6.32 0.00 0.00 0.00 0.00 0.00 0.00

HT VII: Green Power 0 0.00 0.00 0.00 0.00 0 0.00 0.00

HT VIII: Temporary 0 8.16 8550.00 0.00 0.00 0 0.00 0.00

0 0 0 0 0 0 0 0

TOTAL( LT + HT) 10408918 0.00 0.00 0.00 32247.54 0.00 12906.53 8382973.47

Page 369: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2017-18

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual

consumption < = 600 Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with consumption

( < =2400 and > 600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual

consumption >2400 units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

Consumer Categories

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

5820 291 72 413 0 6596

2697.94 0.00 56.87 318.25 0.00 3073.06

436.85 - 52.70 148.32 - 637.87

257.98 - 52.70 109.04 - 419.73

121.55 - - 35.61 - 157.15

32.81 - - 3.40 - 36.21

24.51 - - 0.26 - 24.77

1,387.37 - 4.03 147.77 - 1,539.16

429.06 - 4.03 11.66 - 444.75

375.09 - - 65.21 - 440.30

405.44 - - 65.32 - 470.77

119.26 - - 5.01 - 124.27

58.51 - - 0.57 - 59.07

873.73 - 0.14 22.17 - 896.04

60.66 - 0.14 0.41 - 61.22

73.86 - - 0.78 - 74.64

221.13 - - 8.47 - 229.60

199.88 - - 8.34 - 208.22

117.51 - - 2.52 - 120.03

66.70 - - 0.78 - 67.48

133.99 - - 0.87 - 134.85

1590.34 128.20 14.58 32.83 0.00 1765.95

51.72 31.84 14.58 15.56 0.00 113.70

51.72 31.84 14.58 15.56 - 113.70

1535.19 96.13 0.00 17.23 0.00 1648.54

147.76 0.00 - - - 147.76

129.52 15.43 - 6.46 - 151.41

288.97 24.47 - 7.03 - 320.48

155.20 9.86 - 1.43 - 166.50

813.73 46.36 - 2.30 - 862.39

3.43 0.23 - 0.05 - 3.71

1035.02 102.18 0.00 5.68 0.00 1142.88

1035.02 102.18 0.00 5.68 0.00 1142.88

Full year revenue excluding external subsidy

Page 370: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

(i) Industrial Normal

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green HouseCategory III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category V (B) - Agriculture (Tatkal) (3)

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

629.24 80.76 - 3.32 - 713.32

0.01 0.00 - 0.00 - 0.01

402.49 20.52 - 2.32 - 425.33

0.22 0.04 - 0.00 - 0.26

0.04 0.00 - 0.00 - 0.04

0.13 0.02 - 0.00 - 0.15

2.90 0.83 - 0.04 - 3.77

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

15.29 1.03 0.00 0.42 0.00 16.73

15.29 1.03 - 0.42 - 16.73

0.00 0.00 - - - 0.00

16.75 13.32 0.00 48.63 0.00 78.70

16.75 13.32 0.00 48.63 0.00 78.70

16.21 3.53 0.00 47.87 0.00 67.60

8.45 0.00 - 0.05 - 8.50

5.63 3.15 - 0.35 - 9.13

2.13 0.37 - 0.05 - 2.55

0.00 0.00 - 7.12 - 7.12

0.00 0.00 - 40.30 - 40.30

0.55 9.79 0.00 0.76 0.00 11.10

0.33 0.00 - 0.10 - 0.43

0.18 8.47 - 0.56 - 9.22

0.01 1.21 - 0.08 - 1.29

0.01 0.07 - 0.02 - 0.10

0.01 0.04 - 0.01 - 0.07

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 - - - 0.00

0.00 0.00 - - - 0.00

0.00 0.00 0.00 0.00 0.00 0.00

390.98 43.11 0.00 4.34 0.00 438.43

120.22 7.80 0.00 2.44 0.00 130.47

72.62 4.94 - 1.81 - 79.37

21.57 1.28 - 0.31 - 23.16

26.03 1.58 - 0.33 - 27.93

270.76 35.31 0.00 1.89 0.00 307.96

211.56 30.44 0.00 1.68 0.00 243.68

211.56 30.44 - 1.68 - 243.68

32.35 2.66 0.00 0.11 0.00 35.12

32.35 2.66 - 0.11 - 35.12

26.85 2.21 0.00 0.10 0.00 29.15

26.85 2.21 - 0.10 - 29.15

71.56 3.20 0.93 3.18 0.00 78.87

Page 371: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing

Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

65.00 2.89 0.93 2.63 - 71.46

6.56 0.30 0.00 0.55 0.00 7.41

1.91 0.08 - 0.01 - 2.00

4.65 0.22 - 0.54 - 5.41

1.66 0.01 0.00 0.00 0.00 1.67

1.66 0.01 - 0.00 - 1.67

23.98 0.02 0.00 0.13 0.00 24.13

1.19 0.02 - 0.02 - 1.23

22.79 0.00 - 0.12 - 22.91

0.00 0.00 0.00 0.00 0.00 0.00

5843.51 291.07 72.38 413.47 0.00 6620.43

5470.38 1270.03 0.00 10.88 0.00 6751.28

1698.17 530.58 0.00 9.73 0.00 2238.48

772.99 361.34 0.00 5.30 0.00 1139.63

0.00 0.00 0.00 0.00 0.00 0.00

2.35 0.00 0.00 0.00 0.00 2.35

34.08 19.27 0.00 0.00 0.00 53.35

182.44 0.00 0.00 0.00 0.00 182.44

0.29 0.00 0.00 0.00 0.00 0.29

15.17 0.74 0.00 0.11 0.00 16.03

11.914.84 0.00 0.06 0.00

16.81

377.63 135.64 0.00 2.48 0.00 515.74

83.75 0.00 0.00 0.00 0.00 83.75

2.76 0.07 0.00 0.02 0.00 2.84

7.94 0.00 0.00 0.14 0.00 8.08

29.06 8.05 0.00 0.11 0.00 37.22

7.04 0.00 0.00 0.00 0.00 7.04

27.65 0.00 0.00 0.56 0.00 28.20

90.72 0.00 0.00 0.71 0.00 91.43

23.51 0.00 0.00 0.18 0.00 23.69

16.27 0.63 0.00 0.06 0.00 16.97

0.00 0.00 0.00 0.00 0.00 0.00

0.11 0.00 0.00 0.00 0.00 0.11

12.50 0.00 0.00 0.00 0.00 12.50

0.00 0.00 0.00 0.00 0.00 0.00

Page 372: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT Category at 33 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

1946.29 374.62 0.00 0.84 0.00 2321.74

1305.50 343.04 0.00 0.60 0.00 1649.13

0.00 0.00 0.00 0.00 0.00 0.00

5.80 0.00 0.00 0.00 0.00 5.80

12.78 3.88 0.00 0.00 0.00 16.66

310.92 0.00 0.00 0.00 0.00 310.92

122.36 0.00 0.00 0.02 0.00 122.38

0.02 0.00 0.00 0.00 0.00 0.02

5.382.96 0.00 0.01 0.00

8.34

62.33 21.73 0.00 0.07 0.00 84.12

12.81 0.00 0.00 0.00 0.00 12.81

13.37 0.56 0.00 0.01 0.00 13.94

1.70 0.00 0.00 0.00 0.00 1.70

4.72 2.28 0.00 0.01 0.00 7.01

1.19 0.00 0.00 0.00 0.00 1.19

0.00 0.00 0.00 0.00 0.00 0.00

50.75 0.00 0.00 0.09 0.00 50.84

35.17 0.00 0.00 0.04 0.00 35.21

1.51 0.16 0.00 0.01 0.00 1.68

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

1825.92 364.83 0.00 0.30 0.00 2191.06

832.55 261.59 0.00 0.17 0.00 1094.30

0.00 0.00 0.00 0.00 0.00 0.00

7.86 0.00 0.00 0.00 0.00 7.86

0.00 0.00 0.00 0.00 0.00 0.00

260.84 0.00 0.00 0.00 0.00 260.84

79.78 0.00 0.00 0.01 0.00 79.79

0.00 0.00 0.00 0.00 0.00 0.00

0.000.00 0.00 0.00 0.00

0.00

18.86 4.57 0.00 0.00 0.00 23.43

3.79 0.00 0.00 0.00 0.00 3.79

Page 373: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

0.00 0.00 0.00 0.00 0.00 0.00

0.76 0.00 0.00 0.00 0.00 0.76

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

373.86 0.00 0.00 0.05 0.00 373.91

0.00 0.00 0.00 0.00 0.00 0.00

247.62 98.68 0.00 0.07 0.00 346.38

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

11313.89 1561.10 72.38 424.34 0.00 13371.71

Page 374: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

2017-18

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual

consumption < = 600 Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with consumption

( < =2400 and > 600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual

consumption >2400 units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

Consumer Categories Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0 6596.30 0 0 0 0 78 6673.99

0.00 3073.06 0.00 0.00 0.00 0.00 28.80 3101.87

- 637.87 - - - - - -

- 419.73 - - - - - -

- 157.15 - - - - - -

- 36.21 - - - - - -

- 24.77 - - - - - -

- 1,539.16 - - - - - -

- 444.75 - - - - - -

- 440.30 - - - - - -

- 470.77 - - - - - -

- 124.27 - - - - - -

- 59.07 - - - - - -

- 896.04 - - - - - -

- 61.22 - - - - - -

- 74.64 - - - - - -

- 229.60 - - - - - -

- 208.22 - - - - - -

- 120.03 - - - - - -

- 67.48 - - - - - -

- 134.85 - - - - - - 0.00 1765.95 0.00 0.00 0.00 0.00 6.14 1772.09

0.00 113.70 0.00 0.00 0.00 0.00 0.00 113.70

0.00 113.70 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1648.54 0.00 0.00 0.00 0 0 1648.54

0.00 147.76 0.00 0.00 0.00 0.00 0.00 0.00

0.00 151.41 0.00 0.00 0.00 0.00 0.00 0.00

0.00 320.48 0.00 0.00 0.00 0.00 0.00 0.00

0.00 166.50 0.00 0.00 0.00 0.00 0.00 0.00

0.00 862.39 0.00 0.00 0.00 0.00 0.00 0.00

0.00 3.71 0.00 0.00 0.00 0.00 0.00 3.71

0.00 1142.88 0.00 0.00 0.00 0.00 6.85 1149.73

0.00 1142.88 0.00 0.00 0.00 0.00 0.00 0.00

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Page 375: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

(i) Industrial Normal

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green HouseCategory III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category V (B) - Agriculture (Tatkal) (3)

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 713.32 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00

0.00 425.33 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.26 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.15 0.00 0.00 0.00 0.00 0.00 0.00

0.00 3.77 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 16.73 0.00 0.00 0.00 0.00 0.14 16.87

0.00 16.73 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 78.70 0.00 0.00 0.00 0.00 32.90 111.60

0.00 78.70 0.00 0.00 0.00 0.00 0.00 0.00

0.00 67.60 0.00 0.00 0.00 0.00 0.00 0.00

0.00 8.50 0.00 0.00 0.00 0.00 0.00 0.00

0.00 9.13 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2.55 0.00 0.00 0.00 0.00 0.00 0.00

0.00 7.12 0.00 0.00 0.00 0.00 0.00 0.00

0.00 40.30 0.00 0.00 0.00 0.00 0.00 0.00

0.00 11.10 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.43 0.00 0.00 0.00 0.00 0.00 0.00

0.00 9.22 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.29 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.07 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 438.43 0.00 0.00 0.00 0.00 2.50 440.92

0.00 130.47 0.00 0.00 0.00 0.00 0.00 0.00

0.00 79.37 0.00 0.00 0.00 0.00 0.00 0.00

0.00 23.16 0.00 0.00 0.00 0.00 0.00 0.00

0.00 27.93 0.00 0.00 0.00 0.00 0.00 0.00

0.00 307.96 0.00 0.00 0.00 0.00 0.00 0.00

0.00 243.68 0.00 0.00 0.00 0.00 0.00 0.00

0.00 243.68 0.00 0.00 0.00 0.00 0.00 0.00

0.00 35.12 0.00 0.00 0.00 0.00 0.00 0.00

0.00 35.12 0.00 0.00 0.00 0.00 0.00 0.00

0.00 29.15 0.00 0.00 0.00 0.00 0.00 0.00

0.00 29.15 0.00 0.00 0.00 0.00 0.00 0.00

0.00 78.87 0.00 0.00 0.00 0.00 0.35 79.22

Page 376: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing

Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 71.46 0.00 0.00 0.00 0.00 0.00 71.46

0.00 7.41 0.00 0.00 0.00 0.00 0.00 7.41

0.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 5.41 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.67 0.00 0.00 0.00 0.00 0.01 1.68

0.00 1.67 0.00 0.00 0.00 0.00 0.00 0.00

0.00 24.13 0.00 0.00 0.00 0.00 0.00 24.13

0.00 1.23 0.00 0.00 0.00 0.00 0.00 1.23

0.00 22.91 0.00 0.00 0.00 0.00 0.00 22.91

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 6620.43 0.00 0.00 0.00 0.00 77.69 6698.12

0.00 6751.28 0.00 0.00 0.00 0.00 33.55 6784.820.00 2238.48 0.00 0.00 0.00 0.00 10.17 2248.65

0.00 1139.63 0.00 0.00 0.00 0.00 4.21 1143.84

0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.17

0.00 2.35 0.00 0.00 0.00 0.00 0.01 2.37

0.00 53.35 0.00 0.00 0.00 0.00 0.15 53.51

0.00 182.44 0.00 0.00 0.00 0.00 0.85 183.29

0.00 0.29 0.00 0.00 0.00 0.00 0.00 0.30

0.00 16.03 0.00 0.00 0.00 0.00 0.14 16.16

0.00 16.81 0.00 0.00 0.000.00 0.08

16.89

0.00 515.74 0.00 0.00 0.00 0.00 1.70 517.45

0.00 83.75 0.00 0.00 0.00 0.00 0.33 84.08

0.00 2.84 0.00 0.00 0.00 0.00 0.02 2.86

0.00 8.08 0.00 0.00 0.00 0.00 0.02 8.10

0.00 37.22 0.00 0.00 0.00 0.00 0.14 37.36

0.00 7.04 0.00 0.00 0.00 0.00 0.03 7.07

0.00 28.20 0.00 0.00 0.00 0.00 0.16 28.37

0.00 91.43 0.00 0.00 0.00 0.00 0.54 91.97

0.00 23.69 0.00 0.00 0.00 0.00 0.17 23.85

0.00 16.97 0.00 0.00 0.00 0.00 0.09 17.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.11 0.00 0.00 0.00 0.00 0.00 0.11

0.00 12.50 0.00 0.00 0.00 0.00 1.35 13.85

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 377: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT Category at 33 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 2321.74 0.00 0.00 0.00 0.00 11.31 2333.06

0.00 1649.13 0.00 0.00 0.00 0.00 7.67 1656.80

0.00 0.00 0.00 0.00 0.00 0.00 0.13 0.13

0.00 5.80 0.00 0.00 0.00 0.00 0.03 5.83

0.00 16.66 0.00 0.00 0.00 0.00 0.06 16.72

0.00 310.92 0.00 0.00 0.00 0.00 1.55 312.47

0.00 122.38 0.00 0.00 0.00 0.00 0.79 123.17

0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.02

0.00 8.34 0.00 0.00 0.000.00 0.04

8.38

0.00 84.12 0.00 0.00 0.00 0.00 0.31 84.43

0.00 12.81 0.00 0.00 0.00 0.00 0.06 12.87

0.00 13.94 0.00 0.00 0.00 0.00 0.09 14.03

0.00 1.70 0.00 0.00 0.00 0.00 0.00 1.70

0.00 7.01 0.00 0.00 0.00 0.00 0.02 7.03

0.00 1.19 0.00 0.00 0.00 0.00 0.01 1.20

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 50.84 0.00 0.00 0.00 0.00 0.30 51.14

0.00 35.21 0.00 0.00 0.00 0.00 0.25 35.46

0.00 1.68 0.00 0.00 0.00 0.00 0.01 1.69

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2191.06 0.00 0.00 0.00 0.00 12.06 2203.12

0.00 1094.30 0.00 0.00 0.00 0.00 5.28 1099.58

0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.06

0.00 7.86 0.00 0.00 0.00 0.00 0.04 7.90

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 260.84 0.00 0.00 0.00 0.00 1.39 262.23

0.00 79.79 0.00 0.00 0.00 0.00 0.56 80.35

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00

0.00

0.00 23.43 0.00 0.00 0.00 0.00 0.10 23.52

0.00 3.79 0.00 0.00 0.00 0.00 0.02 3.81

Page 378: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.76 0.00 0.00 0.00 0.00 0.00 0.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 373.91 0.00 0.00 0.00 0.00 2.22 376.12

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 346.38 0.00 0.00 0.00 0.00 2.41 348.79

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 13371.71 0.00 0.00 0.00 0.00 111.23 13482.95

Page 379: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7 Total Revenue at Current Tariff and Charges

2018-19

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

LT Total - (Existing Categories) 11284305 0.00 0.00 0.00 24039.87 0.00 10618.68 8699340.76

Category- Domestic (All) 8793640 0.00 0.00 0.00 9168.39 0.00 7658.13 0.00

Group A: Domestic consumers with annual

consumption < = 600 Units 5082489 0.00 0.00 0.00 2532.41 0.00 2809.65 0.00

0-50 4013993 1.45 0 0 1916.64 0.00 2138.53 0.00

51-100 979504 2.60 0 0 484.50 0.00 594.96 0.00

101-200 83159 3.60 0 0 94.45 0.00 69.90 0.00

Above 200 5833 6.90 0 0 36.82 0.00 6.25 0.00

Group B: All Domestic consumers with

consumption ( < =2400 and > 600 units) 3274126

0.000 0 4948.82 0.00 3566.20 0.00

0-50 298889 2.60 0 0 1743.26 0.00 304.47 0.00

51-100 1499549 2.60 0.00 0.00 1611.37 0.00 1402.07 0.00

101-200 1371091 3.60 0 0 1316.68 0.00 1701.00 0.00

201-300 94948 6.90 0 0 195.62 0.00 145.24 0.00

Above 300 9649 7.75 0.00 0.00 81.88 0.00 13.42 0.00

Group C: All Domestic consumers with annual

consumption >2400 units 437025

0.000 0 1687.16 0.00 1282.28 0.00

0-50 10547 2.68 0 0 238.04 0.00 24.43 0.00

51-100 17494 3.35 0 0 233.67 0.00 40.54 0.00

101-200 173822 5.42 0 0 450.41 0.00 456.31 0.00

201-300 161595 7.11 0 0 329.24 0.00 453.96 0.00

301-400 44786 8 0 0 174.27 0.00 157.96 0.00

401-500 13770 8.52 0.00 0.00 91.97 0.00 60.13 0.00

Above 500 units 15011 9.06 0.00 0.00 169.56 0.00 88.95 0

Category II - Non-domestic/Commrl (A & B) 809173 0.00 0 0 1885.02 0.00 1647.46 0.00

Lt - II (A) 432616 0.00 0 0 95.92 0.00 482.94 0.00

0-50 units 432616 5.40 660 0 95.92 0.00 482.94 0.00

LT II (B): Above 50 Units/Month 375427 0.00 0.00 0.00 1785.97 0.00 1160.85 0.00

0-50 0 6.90 900 0 231.44 0.00 0.00 0.00

51-100 142678 7.69 900 0 178.64 0.00 181.74 0.00

101-300 159023 9.06 900 0 363.94 0.00 331.89 0.00

301-500 30745 9.61 900.00 0.00 180.15 0.00 126.94 0.00

Above 500 42981 10.19 900.00 0.00 831.80 0.00 520.27 0.00

LT II (C): Advertisement Hoardings 1130 12.28 900 0 3.13 0.00 3.67 0.00

Category III (A & B) - Industrial 84388 0.00 0 0 2303.21 0.00 754.27 1199892.96

Category III (A) - Industrial 84388 0.00 0 0 2303.21 0.00 754.27 1199892.96

(i) Industrial Normal 43774 6.71 900 900 975.27 0.00 0.00 1199875.96

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Page 380: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

(ii) Industrial Optional (Seasonal) 1 7.45 900 900 0.01 0.00 0.00 17.00

(iii) Pisciculture/Prawn culture 39898 3.86 360 360 1320.36 0.00 741.74 0.00

(iv) Sugarcane crushing 65 3.86 360 360 0.67 0.00 1.68 0.00

(v) Poultry farms with above 1000 birds 3 5.91 900.00 900.00 0.07 0.00 0.03 0.00

(vi) Mushroom & Rabbit Farms 31 5.91 900 900 0.41 0.00 0.41 0.00

(vii) Floriculture in Green House 616 4.89 900 900 6.42 0.00 10.41 0.00

Category III (B) - Industrial (Optional) 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SSI Units 0 0.00 0 0 0.00 0.00 0.00 0.00

Seasonal Industries 0 0.00 0 0 0.00 0.00 0.00 0.00

Category IV- Cottage Industries, Dhobighats & Others 11990 0.00 0 0 42.63 0.00 44.35 0.00

Cottage Industries 11990 3.75 240.00 0.00 42.63 0.00 44.35 0.00

Agro Based Activities 0 4 240 0 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Category V (A,B & C) - Irrig & Agriculture 1410967 0.00 0 0 9761.55 0.00 0.00 7499447.80

Category V(A+B) - Agriculture 1410967 0.00 0 0 9761.55 0.00 0.00 7499447.80

Cat V(A)(i) - Agriculture with DSM measures 1388842 0.00 0 0 9757.98 0.00 0.00 7382595.84

Corporate Farmers & IT Assesses 1418 2.50 0 0 36.57 0.00 0.00 8096.15

Wet Land Farmers (Holdings >2.5 acre) 10133 0.50 0 525 121.92 0.00 0.00 62748.67

Dry Land Farmers (Connections > 3 nos.) 1475 0.50 0.00 525.00 45.98 0.00 0.00 7454.54

Wet Land Farmers (Holdings <= 2.5 acre) 206527 0.00 0 0 99.65 0.00 0.00 966750.10

Dry Land Farmers (Connections <= 3 nos.) 1169289 0.00 0 0 9453.85 0.00 0.00 6337546.38

Cat V(A)(ii) - Agriculture with Non-DSM measures 22125 0.00 0 0 3.57 0.00 0.00 116851.96

Corporate Farmers & IT Assesses 2864 3.50 0 0 1.01 0.00 0.00 18203.84

Wet Land Farmers (Holdings >2.5 acre) 16262 1.00 0 1050 1.96 0.00 0.00 84302.34

Dry Land Farmers (Connections > 3 nos.) 2217 1.00 0 1050 0.06 0.00 0.00 11999.78

Wet Land Farmers (Holdings <= 2.5 acre) 467 0.50 0 525 0.29 0.00 0.00 1401.00

Dry Land Farmers (Connections <= 3 nos.) 315 0.50 0 525 0.26 0.00 0.00 945.00

Category LT V(C) - Others 0 0.00 0 0 0.00 0.00 0.00 0.00

Salt farming units with Connected Load upto 15HP 0 3.70 0.00 240.00 0.00 0.00 0.00 0.00

Rural Horticulture Nurseries 0 3.70 0.00 240.00 0 0 0 0

Category V (B) - Agriculture (Tatkal) (3) 0 0.00 0 0 0.00 0.00 0.00 0.00

Category VI - Local Bodies, St. Lighting & PWS 111542 0.00 0 0 768.19 0.00 419.51 0.00

VI(A) - Street Lighting 60557 0.00 0 0 195.99 0.00 89.61 0.00

Panchayats 45665 5.98 900 0 124.85 0.00 58.16 0.00

Municipalities 7071 6.53 900 0 33.69 0.00 13.79 0.00

Muncipal Corporations 7821 7.09 900 0 37.44 0.00 17.66 0.00

VI(B) - PWS Schemes 50985 0.00 0 0 572.21 0.00 329.91 0.00

Minor/Major Panchayats 45689 0.00 0.00 0.00 475.07 0.00 287.96 0.00

Panchayats 45689 4.87 0 900 475.07 0.00 287.96 0.00

All Nagarpalikas & Municipalities 2833 0.00 0.00 0.00 55.18 0.00 22.79 0.00

Muncipalities 2833 5.98 0 900 55.18 0.00 22.79 0.00

Municipal Corporations 2463 0.00 0 0.00 41.96 0.00 19.15 0.00

Corporations 2463 6.53 0 900 41.96 0.00 19.15 0.00

Page 381: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

Category VII (A&B) 62542 0.00 0 0 109.24 0.00 94.60 0.00

Cat VII (A) - General Purpose 51676 7.28 360 0 94.82 0.00 85.26 0.00

Cat VII-B - Religious Places (CL <=1KW) 10866 0.00 0.00 0.00 14.42 0.00 9.34 0.00

(i) Religious Places (CL > 2kW) 328 5.04 360 0 4.35 0.00 2.84 0.00

(ii) Religious Places (CL <= 2kW) 10538 4.84 360 0 10.07 0.00 6.50 0.00

Category VIII-Temporary Supply 63 0.00 0.00 0.00 1.63 0.00 0.36 0.00

All units 63 10.50 360 0 1.63 0.00 0.36 0.00

New L T Categories ( Total ) 2696 0.00 0 0 24.21 0.00 40.12 0.00

LT-VI (C): NTR Sujala Padhakam 463 4.00 0 120 3.11 0.00 1.58 0.00

LT II (D) : Function Halls / Auditoriums 2233 11.77 0 0 21.09 0.00 38.54 0.00

TOTAL (LT including new categories) 11287001 0.00 0 0 24064.07 0.00 10658.81 8699340.76

HIGH TENSION 7395 0.00 0 0 10721.56 0.00 3631.85 0.00

HT Category at 11 kV 6748 0.00 0 0 3426.04 0.00 1402.20 0.00

HT I (A): General 3704 6.33 5700 0 1492.01 0.00 779.46 0.00

Lights and Fans 0 0.00 0 0 52.79 0.00 0.00 0.00

Industrial Colonies 0 6.32 0 0 4.10 0.00 0.00 0.00

Seasonal Industries 140 7.66 5700 0 45.47 0.00 33.94 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.38 0 0 277.81 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 2 5.82 0 0 0.29 0.00 0.31 0.00

HT I (C): Aquaculture and Animal Husbandry 89 3.86 360 0 40.49 0.00 26.81 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed

Mixing Plants 36

4.895700 0 25.08 0.00 8.75 0.00

HT II: Others 1555 7.66 5700 0 512.91 0.00 252.24 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.71 0 0 99.04 0.00 0.00 0.00

HT II (B): Religious Places 12 5.03 360 0 5.65 0.00 2.07 0.00

HT II (C): Function Halls/Auditoriums 95 11.77 0 0 6.95 0.00 13.59 0.00

HT III: Public Infrastructure and Tourism 69 7.30 5700 0 41.00 0.00 14.76 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.35 0 0 8.68 0.00 0.00 0.00

HT IV Government LIS 345 5.82 0 0 47.98 0.00 40.41 0.00

HT IV Private Irrigation and Agriculture 556 5.82 0 0 192.48 0.00 203.80 0.00

HT IV CPWS 113 4.89 0.00 0.00 50.58 0.00 20.25 0.00

HT VI: Townships & Residential Colonies 31 6.32 900.00 0.00 22.58 0.00 5.81 0.00

HT VII: Green Power 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0 9.50 8550.00 0.00 0.12 0.00 0.00 0.00

Category: RESCOs 1 0.32 0.00 0.00 500.03 0.00 0.00 0.00

Page 382: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT Category at 33 kV 558 0.00 0 0 3457.55 0.00 960.86 0.00

HT I (A): General 346 5.87 5700 0 2265.05 0.00 589.89 0.00

Lights and Fans 0 0.00 0 0 37.77 0.00 0.00 0.00

Industrial Colonies 0 6.32 0 0 9.40 0.00 0.00 0.00

Seasonal Industries 4 6.98 5700 0 19.19 0.00 6.05 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 6.92 0 0 485.02 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 13 5.37 0 0 249.99 0.00 48.78 0.00

HT I (C) : Aquaculture and Animal Husbandry 0 3.86 360 0 0.05 0.00 0.00 0.00

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants 4

4.895700 0 11.33 0.00 5.19 0.00

HT II: Others 40 6.98 5700 0 99.50 0.00 39.61 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 8.03 0 0 16.44 0.00 0.00 0.00

HT II (B): Religious Places 4 5.03 360 0 26.85 0.00 24.92 0.00

HT II (C) : Function Halls / Auditoriums 0 11.77 0 0 1.46 0.00 0.00 0.00

HT III: Public Infrastructure and Tourism 7 6.69 5700 0 7.26 0.00 5.61 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.74 0 0 1.59 0.00 0.00 0.00

HT IV Government LIS 0 5.82 0 0 0.00 0.00 0.00 0.00

HT IV Agriculture 88 5.82 0 0 125.54 0.00 206.86 0.00

HT IV CPWS 30 4.89 0.00 0.00 86.48 0.00 26.97 0.00

HT VI: Townships & Residential Colonies 22 6.32 900.00 0.00 14.65 0.00 6.98 0.00

HT VII: Green Power 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT VIII: Temporary 0 8.81 8550.00 0.00 0.00 0.00 0.00 0.00

HT Category at 132 kV 89 0.00 0 0 3837.97 0.00 1268.80 0.00

HT I (A): General 47 5.44 5700 0 1727.09 0.00 489.23 0.00

Lights and Fans 0 0.00 0 0 16.94 0.00 0.00 0.00

Industrial Colonies 0 6.32 0 0 13.79 0.00 0.00 0.00

Seasonal Industries 0 6.72 5700 0 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 6.49 0 0 472.51 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 4 4.95 0 0 190.56 0.00 46.73 0.00

HT I (C ): Aquaculture and Animal Husbandry 0 3.86 360 0 0.00 0.00 0.00 0.00

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants 0

4.895700 0 0.00 0.00 0.00 0.00

Page 383: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh)

or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy

Sales

(MU)

Energy

sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected Load/

Contract

Demand

(HP)

Consumer Categories No of consumers

Components of tariff Relevant sales related data

HT II: Others 1 6.72 5700 0 28.91 0.00 8.01 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.77 0 0 5.03 0.00 0.00 0.00

HT II (B): Religious Places 0 5.03 360 0 0.00 0.00 0.00 0.00

HT II (C) : Function Halls / Auditoriums 0 11.77 0 0 0.00 0.00 0.00 0.00

HT III: Public Infrastructure and Tourism 0 6.38 5700 0 0.00 0.00 0.00 0.00

Time of Day Tariffs (6 PM to 10 PM) 0 7.43 0 0 0.00 0.00 0.00 0.00

HT IV Government LIS 0 5.82 0 0 0.00 0.00 0.00 0.00

HT IV Agriculture 13 5.82 0 0 661.64 0.00 432.02 0.00

HT IV CPWS 0 5 0 0 0 0 0 0

HT V: Railway Traction 24 4 3600 0 721 0 293 0

HT VI: Townships & Residential Colonies 0 6 0 0 0 0 0 0

HT VII: Green Power 0 0 0 0 0 0 0 0

HT VIII: Temporary 0 8.16 8550.00 0.00 0.00 0.00 0.00 0.00

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL( LT + HT) 11294396 0.00 0.00 0.00 34785.63 0.00 14290.66 8699340.76

Page 384: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

2018-19

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual

consumption < = 600 Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with

consumption ( < =2400 and > 600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual

consumption >2400 units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

(i) Industrial Normal

Consumer Categories

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

6397.08 311.23 78.64 450.31 0.00 7237.26

2999.28 0.00 61.25 349.58 0.00 3410.11

463.29 0.00 56.87 159.45 0.00 679.61

277.91 0.00 56.87 120.42 0.00 455.20

125.97 0.00 0.00 35.26 0.00 161.23

34.00 0.00 0.00 3.49 0.00 37.50

25.41 0.00 0.00 0.28 0.00 25.69

1544.650.00 4.23 164.90 0.00

1713.79

453.25 0.00 4.23 12.55 0.00 470.04

418.96 0.00 0.00 71.98 0.00 490.94

474.00 0.00 0.00 74.04 0.00 548.04

134.98 0.00 0.00 5.70 0.00 140.68

63.46 0.00 0.00 0.64 0.00 64.10

991.330.00 0.15 25.22 0.00

1016.70

63.80 0.00 0.15 0.44 0.00 64.39

78.28 0.00 0.00 0.84 0.00 79.12

244.12 0.00 0.00 9.39 0.00 253.51

234.09 0.00 0.00 9.70 0.00 243.79

139.07 0.00 0.00 2.96 0.00 142.03

78.36 0.00 0.00 0.91 0.00 79.26

153.62 0.00 0.00 0.99 0.00 154.61

1703.17 136.68 16.40 35.06 0.00 1891.31

51.79 31.87 16.40 15.57 0.00 115.64

51.79 31.87 16.40 15.57 0.00 115.64

1647.53 104.48 0.00 19.42 0.00 1771.42

159.69 0.00 0.00 0.00 0.00 159.69

137.38 16.36 0.00 6.85 0.00 160.58

329.73 29.87 0.00 8.59 0.00 368.19

173.12 11.42 0.00 1.66 0.00 186.21

847.61 46.82 0.00 2.32 0.00 896.75

3.85 0.33 0.00 0.07 0.00 4.25

1167.76 108.27 0.00 6.38 0.00 1282.40

1167.76 108.27 0.00 6.38 0.00 1282.40

654.41 80.53 0.00 3.31 0.00 738.24

Full year revenue excluding external subsidy

Page 385: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category V (B) - Agriculture (Tatkal) (3)

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

0.01 0.00 0.00 0.00 0.00 0.01

509.66 26.70 0.00 3.02 0.00 539.38

0.26 0.06 0.00 0.00 0.00 0.33

0.04 0.00 0.00 0.00 0.00 0.05

0.24 0.04 0.00 0.00 0.00 0.28

3.14 0.94 0.00 0.05 0.00 4.12

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

15.99 1.06 0.00 0.43 0.00 17.48

15.99 1.06 0.00 0.43 0.00 17.48

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

18.12 13.92 0.00 50.79 0.00 82.83

18.12 13.92 0.00 50.79 0.00 82.83

17.54 3.69 0.00 50.00 0.00 71.22

9.14 0.00 0.00 0.05 0.00 9.19

6.10 3.29 0.00 0.36 0.00 9.76

2.30 0.39 0.00 0.05 0.00 2.74

0.00 0.00 0.00 7.43 0.00 7.43

0.00 0.00 0.00 42.09 0.00 42.09

0.58 10.23 0.00 0.80 0.00 11.61

0.35 0.00 0.00 0.10 0.00 0.46

0.20 8.85 0.00 0.59 0.00 9.63

0.01 1.26 0.00 0.08 0.00 1.35

0.01 0.07 0.00 0.02 0.00 0.10

0.01 0.05 0.00 0.01 0.00 0.07

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

414.96 47.88 0.00 4.68 0.00 467.53

123.21 8.06 0.00 2.54 0.00 133.82

74.66 5.23 0.00 1.92 0.00 81.81

22.00 1.24 0.00 0.30 0.00 23.54

26.55 1.59 0.00 0.33 0.00 28.46

291.75 39.82 0.00 2.14 0.00 333.71

231.36 34.75 0.00 1.92 0.00 268.03

231.36 34.75 0.00 1.92 0.00 268.03

33.00 2.75 0.00 0.12 0.00 35.87

33.00 2.75 0.00 0.12 0.00 35.87

27.40 2.31 0.00 0.10 0.00 29.81

27.40 2.31 0.00 0.10 0.00 29.81

Page 386: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

76.10 3.41 0.99 3.38 0.00 83.87

69.03 3.07 0.99 2.79 0.00 75.88

7.06 0.34 0.00 0.59 0.00 7.99

2.19 0.10 0.00 0.02 0.00 2.31

4.87 0.23 0.00 0.57 0.00 5.68

1.71 0.01 0.00 0.00 0.00 1.72

2 0 0.00 0.00 0.00 2

26 0 0.00 0.15 0.00 26

1 0 0.00 0.02 0.00 1

25 0 0.00 0.13 0.00 25

6423.15 311.26 78.64 450.46 0.00 7263.51

6004.07 1381.15 0.00 12.38 0.00 7397.61

1937.37 622.37 0.00 11.15 0.00 2570.89

944.44 444.29 0.00 6.25 0.00 1394.98

0.00 0.00 0.00 0.00 0.00 0.00

2.59 0.00 0.00 0.00 0.00 2.59

34.83 19.34 0.00 0.00 0.00 54.17

205.03 0.00 0.00 0.00 0.00 205.03

0.17 0.00 0.00 0.00 0.00 0.17

15.63 0.97 0.00 0.15 0.00 16.74

12.264.99 0.00 0.06 0.00

17.31

392.89 143.78 0.00 2.62 0.00 539.29

86.26 0.00 0.00 0.00 0.00 86.26

2.84 0.07 0.00 0.02 0.00 2.93

8.18 0.00 0.00 0.16 0.00 8.34

29.93 8.41 0.00 0.12 0.00 38.46

7.25 0.00 0.00 0.00 0.00 7.25

27.92 0.00 0.00 0.58 0.00 28.50

112.02 0.00 0.00 0.94 0.00 112.96

24.73 0.00 0.00 0.19 0.00 24.92

14.27 0.52 0.00 0.05 0.00 14.85

0.00 0.00 0.00 0.00 0.00 0.00

0.11 0.00 0.00 0.00 0.00 0.11

16.00 0.00 0.00 0.00 0.00 16.00

Page 387: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT Category at 33 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

2052.92 369.94 0.00 0.93 0.00 2423.80

1329.59 336.24 0.00 0.58 0.00 1666.41

0.00 0.00 0.00 0.00 0.00 0.00

5.94 0.00 0.00 0.00 0.00 5.94

13.39 3.45 0.00 0.00 0.00 16.84

335.63 0.00 0.00 0.00 0.00 335.63

134.25 0.00 0.00 0.02 0.00 134.27

0.02 0.00 0.00 0.00 0.00 0.02

5.542.96 0.00 0.01 0.00

8.50

69.45 22.58 0.00 0.07 0.00 92.09

13.20 0.00 0.00 0.00 0.00 13.20

13.50 0.90 0.00 0.01 0.00 14.41

1.71 0.00 0.00 0.00 0.00 1.71

4.86 3.20 0.00 0.01 0.00 8.06

1.23 0.00 0.00 0.00 0.00 1.23

0.00 0.00 0.00 0.00 0.00 0.00

73.07 0.00 0.00 0.15 0.00 73.22

42.29 0.00 0.00 0.05 0.00 42.34

9.26 0.63 0.00 0.04 0.00 9.93

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

2013.78 388.84 0.00 0.30 0.00 2402.92

939.54 278.86 0.00 0.16 0.00 1218.56

0.00 0.00 0.00 0.00 0.00 0.00

8.72 0.00 0.00 0.00 0.00 8.72

0.00 0.00 0.00 0.00 0.00 0.00

306.66 0.00 0.00 0.00 0.00 306.66

94.33 0.00 0.00 0.01 0.00 94.34

0.00 0.00 0.00 0.00 0.00 0.00

0.000.00 0.00 0.00 0.00

0.00

Page 388: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Energy

Charges

(Rs

Crores)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

19.42 4.57 0.00 0.00 0.00 23.99

3.91 0.00 0.00 0.00 0.00 3.91

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

385.08 0.00 0.00 0.04 0.00 385.12

0.00 0.00 0.00 0.00 0.00 0.00

256.13 105.41 0.00 0.08 0.00 361.62

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

12427.22 1692.41 78.64 462.84 0.00 14661.11

Page 389: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 7

2018-19

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual

consumption < = 600 Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with

consumption ( < =2400 and > 600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual

consumption >2400 units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

(i) Industrial Normal

Consumer Categories Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0.00 7237.26 0.00 0.00 0.00 0.00 107.47 7344.73

0.00 3410.11 0.00 0.00 0.00 0.00 40.95 3451.05

0.00 679.61 0.00 0.00 0.00 0.00 0.00 0.00

0.00 455.20 0.00 0.00 0.00 0.00 0.00 0.00

0.00 161.23 0.00 0.00 0.00 0.00 0.00 0.00

0.00 37.50 0.00 0.00 0.00 0.00 0.00 0.00

0.00 25.69 0.00 0.00 0.00 0.00 0.00 0.00

0.001713.79 0.00 0.00 0.00

0.00 0.000.00

0.00 470.04 0.00 0.00 0.00 0.00 0.00 0.00

0.00 490.94 0.00 0.00 0.00 0.00 0.00 0.00

0.00 548.04 0.00 0.00 0.00 0.00 0.00 0.00

0.00 140.68 0.00 0.00 0.00 0.00 0.00 0.00

0.00 64.10 0.00 0.00 0.00 0.00 0.00 0.00

0.001016.70 0.00 0.00 0.00

0.00 0.000.00

0.00 64.39 0.00 0.00 0.00 0.00 0.00 0.00

0.00 79.12 0.00 0.00 0.00 0.00 0.00 0.00

0.00 253.51 0.00 0.00 0.00 0.00 0.00 0.00

0.00 243.79 0.00 0.00 0.00 0.00 0.00 0.00

0.00 142.03 0.00 0.00 0.00 0.00 0.00 0.00

0.00 79.26 0.00 0.00 0.00 0.00 0.00 0.00

0.00 154.61 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1891.31 0.00 0.00 0.00 0.00 8.51 1899.82

0.00 115.64 0.00 0.00 0.00 0.00 0.00 115.64

0.00 115.64 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1771.42 0.00 0.00 0.00 0.00 0.00 1771.42

0.00 159.69 0.00 0.00 0.00 0.00 0.00 0.00

0.00 160.58 0.00 0.00 0.00 0.00 0.00 0.00

0.00 368.19 0.00 0.00 0.00 0.00 0.00 0.00

0.00 186.21 0.00 0.00 0.00 0.00 0.00 0.00

0.00 896.75 0.00 0.00 0.00 0.00 0.00 0.00

0.00 4.25 0.00 0.00 0.00 0.00 0.00 4.25

0.00 1282.40 0.00 0.00 0.00 0.00 10.29 1292.69

0.00 1282.40 0.00 0.00 0.00 0.00 0.00 0.00

0.00 738.24 0.00 0.00 0.00 0.00 0.00 0.00

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

Page 390: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category V (B) - Agriculture (Tatkal) (3)

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00

0.00 539.38 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.33 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.05 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.28 0.00 0.00 0.00 0.00 0.00 0.00

0.00 4.12 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 17.48 0.00 0.00 0.00 0.00 0.19 17.67

0.00 17.48 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 82.83 0.00 0.00 0.00 0.00 43.60 126.43

0.00 82.83 0.00 0.00 0.00 0.00 0.00 0.00

0.00 71.22 0.00 0.00 0.00 0.00 0.00 0.00

0.00 9.19 0.00 0.00 0.00 0.00 0.00 0.00

0.00 9.76 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2.74 0.00 0.00 0.00 0.00 0.00 0.00

0.00 7.43 0.00 0.00 0.00 0.00 0.00 0.00

0.00 42.09 0.00 0.00 0.00 0.00 0.00 0.00

0.00 11.61 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.46 0.00 0.00 0.00 0.00 0.00 0.00

0.00 9.63 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.35 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.07 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 467.53 0.00 0.00 0.00 0.00 3.44 470.98

0.00 133.82 0.00 0.00 0.00 0.00 0.00 0.00

0.00 81.81 0.00 0.00 0.00 0.00 0.00 0.00

0.00 23.54 0.00 0.00 0.00 0.00 0.00 0.00

0.00 28.46 0.00 0.00 0.00 0.00 0.00 0.00

0.00 333.71 0.00 0.00 0.00 0.00 0.00 0.00

0.00 268.03 0.00 0.00 0.00 0.00 0.00 0.00

0.00 268.03 0.00 0.00 0.00 0.00 0.00 0.00

0.00 35.87 0.00 0.00 0.00 0.00 0.00 0.00

0.00 35.87 0.00 0.00 0.00 0.00 0.00 0.00

0.00 29.81 0.00 0.00 0.00 0.00 0.00 0.00

0.00 29.81 0.00 0.00 0.00 0.00 0.00 0.00

Page 391: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums

TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 83.87 0.00 0.00 0.00 0.00 0.49 84.36

0.00 75.88 0.00 0.00 0.00 0.00 0.00 75.88

0.00 7.99 0.00 0.00 0.00 0.00 0.00 7.99

0.00 2.31 0.00 0.00 0.00 0.00 0.00 0.00

0.00 5.68 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.72 0.00 0.00 0.00 0.00 0.01 1.73

0.00 1.72 0.00 0.00 0.00 0.00 0.00 0.00

0.00 26.25 0.00 0.00 0.00 0.00 0.00 26.25

0.00 1.29 0.00 0.00 0.00 0.00 0.00 1.29

0.00 24.96 0.00 0.00 0.00 0.00 0.00 24.96

0.00 7263.51 0.00 0.00 0.00 0.00 107.47 7370.98

0.00 7397.61 0.00 0.00 0.00 0.00 47.88 7445.49

0.00 2570.89 0.00 0.00 0.00 0.00 15.30 2586.19

0.00 1394.98 0.00 0.00 0.00 0.00 6.66 1401.65

0.00 0.00 0.00 0.00 0.00 0.00 0.24 0.24

0.00 2.59 0.00 0.00 0.00 0.00 0.02 2.61

0.00 54.17 0.00 0.00 0.00 0.00 0.20 54.37

0.00 205.03 0.00 0.00 0.00 0.00 1.24 206.27

0.00 0.17 0.00 0.00 0.00 0.00 0.00 0.17

0.00 16.74 0.00 0.00 0.00 0.00 0.18 16.93

0.00 17.31 0.00 0.00 0.000.00 0.11

17.42

0.00 539.29 0.00 0.00 0.00 0.00 2.29 541.58

0.00 86.26 0.00 0.00 0.00 0.00 0.44 86.71

0.00 2.93 0.00 0.00 0.00 0.00 0.03 2.96

0.00 8.34 0.00 0.00 0.00 0.00 0.03 8.37

0.00 38.46 0.00 0.00 0.00 0.00 0.18 38.64

0.00 7.25 0.00 0.00 0.00 0.00 0.04 7.29

0.00 28.50 0.00 0.00 0.00 0.00 0.21 28.72

0.00 112.96 0.00 0.00 0.00 0.00 0.86 113.82

0.00 24.92 0.00 0.00 0.00 0.00 0.23 25.15

0.00 14.85 0.00 0.00 0.00 0.00 0.10 14.95

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.11 0.00 0.00 0.00 0.00 0.00 0.11

0.00 16.00 0.00 0.00 0.00 0.00 2.23 18.24

Page 392: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT Category at 33 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed

Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed

Mixing Plants

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 2423.80 0.00 0.00 0.00 0.00 15.44 2439.24

0.00 1666.41 0.00 0.00 0.00 0.00 10.12 1676.52

0.00 0.00 0.00 0.00 0.00 0.00 0.17 0.17

0.00 5.94 0.00 0.00 0.00 0.00 0.04 5.98

0.00 16.84 0.00 0.00 0.00 0.00 0.09 16.93

0.00 335.63 0.00 0.00 0.00 0.00 2.17 337.80

0.00 134.27 0.00 0.00 0.00 0.00 1.12 135.38

0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.02

0.00 8.50 0.00 0.00 0.000.00 0.05

8.55

0.00 92.09 0.00 0.00 0.00 0.00 0.44 92.54

0.00 13.20 0.00 0.00 0.00 0.00 0.07 13.27

0.00 14.41 0.00 0.00 0.00 0.00 0.12 14.53

0.00 1.71 0.00 0.00 0.00 0.00 0.01 1.72

0.00 8.06 0.00 0.00 0.00 0.00 0.03 8.10

0.00 1.23 0.00 0.00 0.00 0.00 0.01 1.23

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 73.22 0.00 0.00 0.00 0.00 0.56 73.78

0.00 42.34 0.00 0.00 0.00 0.00 0.39 42.72

0.00 9.93 0.00 0.00 0.00 0.00 0.07 9.99

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 2402.92 0.00 0.00 0.00 0.00 17.14 2420.06

0.00 1218.56 0.00 0.00 0.00 0.00 7.71 1226.27

0.00 0.00 0.00 0.00 0.00 0.00 0.08 0.08

0.00 8.72 0.00 0.00 0.00 0.00 0.06 8.78

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 306.66 0.00 0.00 0.00 0.00 2.11 308.77

0.00 94.34 0.00 0.00 0.00 0.00 0.85 95.19

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00

0.00

Page 393: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Surcharges

Grid

Support

Charges

(Rs. Crores)

Non - tariff Income

Total

Revenue

( Net of

incentives)

0.00 23.99 0.00 0.00 0.00 0.00 0.13 24.12

0.00 3.91 0.00 0.00 0.00 0.00 0.02 3.93

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 385.12 0.00 0.00 0.00 0.00 2.95 388.08

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 361.62 0.00 0.00 0.00 0.00 3.22 364.85

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 14661.11 0.00 0.00 0.00 0.00 155.36 14816.47

Page 394: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 8 Revenue Deficit / Surplus at Current Tariffs and Charges

Items of Revenue Deficit/Surplus (Rs. Crs.) Detail Links Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

Aggregate Revenue Requirement (Rs. Crs.) Form 1 9429.49 14556.41 17313.94 18831.47 18752.01 21429.39

Total Revenue 7325.85 10320.98 11494.32 12380.11 13482.95 14816.47

Revenue from Current Tariffs (Net of incentives) (Rs. Crs.) Form 5 7290.42 10247.49 11389.02 12308.90 13371.71 14661.11

Non - Tariff Income (Rs. Crs.) Form 6' 35.42 73.49 105.30 71.21 111.23 155.36

Revenue from Trading (Rs. Crs.) Form 1.4 b 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00Revenue Deficit (-) / Surplus(+) at Current Tariffs

(Rs. Crs.) -2103.64 -4235.43 -5819.62 -6451.36 -5269.06 -6612.92

Page 395: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 9 Revenue Deficit / Surplus and Proposed Adjustments

Items of Revenue Deficit/ Surplus (Rs. Crs.)Detail

LinksBase Year 2014-15 2015-16 2016-17 2017-18 2018-19

A Aggregate Revenue Requirement Form 1 9429.49 14556.41 17313.94 18831.47 18752.01 21429.39

B Revenue from Current Tariffs (Net of incentives) (Rs. Crs.) Form 5 7290.42 10247.49 11389.02 12308.90 13371.71 14661.11

C Non - Tariff Income (Rs. Crs.) Form 6' 35.42 73.49 105.30 71.21 111.23 155.36

D Revenue from Trading Form 1.4 b 0.00 0.00 0.00 0.00 0.00 0.00

E Revenue Deficit(-) / Surplus(+) at Current Tariff -2103.64 -4235.43 -5819.62 -6451.36 -5269.06 -6612.92

F Revenue changed through proposed tariff

G External subsidy available / contracted 1,867.94 2,169.03 2,318.45 3,153.48 3,402.90 0.00

H Any other means of adjustments 262.63 0.00 0.00 0.00 0.00 0.00

Revenue from Cross Subsidy Surcharge 255.06

Revenue from Additional Surcharge 139.23

Net Deficit / Surplus 26.92 -2066.40 -3501.17 -3297.88 -1866.16 -6218.63

Page 396: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 10 (Revenue proposed tariffs)

Gross

RevenueIncentives Net Revenue Surcharge

Additional

surcharge

LT Category 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Category I (A&B) - Domestic 0.00 0.00 0.00

Category II (A,B & C) - Non-domestic/Commercial 0.00 0.00 0.00

Category LT-II (C) Advertising Hoardings 0.00 0.00 0.00

Category III (A & B) - Industrial 0.00 0.00 0.00

Category IV (A,B &C) - Cottage Industries & Dhobighats 0.00 0.00 0.00

Category V (A, B & C) - Irrigation and Agriculture 0.00 0.00 0.00

Category VI (A & B) - Local Bodies, St. Lighting & PWS 0.00 0.00 0.00

Category VII (A & B) - General Purpose 0.00 0.00 0.00

Category VIII (A & B) -Temporary Supply 0.00 0.00 0.00

LT (new Category revenue) 0.00 0.00 0.00

0.00 0.00 0.00

HT Category at 11 KV 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industry Segregated 0.00 0.00 0.00

Lights & Fans 0.00 0.00 0.00

Colony consumption 0.00 0.00 0.00

Seasonal Industries 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-I (B) Ferro-Alloys 0.00 0.00 0.00

HT-II - Others 0.00 0.00 0.00

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-III Aviation activity at Airports 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-IV A Govt. Lift Irrigation Schemes 0.00 0.00 0.00

HT-IV B Agriculture 0.00 0.00 0.00

HT - IV (C) Composite P.W.S Schemes 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00

HT - VIII -Temporary Supply 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00

Retail Supply (Regulated Business) Surcharges (Open Access)Grid Support

ChargesTotal Revenue

2018-19

Revenue from Proposed Tariffs (Rs. Crs.)

Page 397: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Gross

RevenueIncentives Net Revenue Surcharge

Additional

surcharge

Retail Supply (Regulated Business) Surcharges (Open Access)Grid Support

ChargesTotal Revenue

2018-19

Revenue from Proposed Tariffs (Rs. Crs.)

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00

0.00 0.00 0.00

HT Category at 33 KV 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industry Segregated 0.00 0.00 0.00

Lights & Fans 0.00 0.00 0.00

Colony consumption 0.00 0.00 0.00

Seasonal Industries 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-I (B) Ferro-Alloys 0.00 0.00 0.00

HT-II - Others 0.00 0.00 0.00

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-III Aviation activity at Airports 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-IV A Govt. Lift Irrigation Schemes 0.00 0.00 0.00

HT-IV B Agriculture 0.00 0.00 0.00

HT - IV (C) Composite P.W.S Schemes 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00

HT - VIII -Temporary Supply 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00

0.00 0.00 0.00

HT Category at 132 KV 0.00 0.00 0.00 0.00 0.00 0.00 0.00

HT-I Industry Segregated 0.00 0.00 0.00

Lights & Fans 0.00 0.00 0.00

Colony consumption 0.00 0.00 0.00

Page 398: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Gross

RevenueIncentives Net Revenue Surcharge

Additional

surcharge

Retail Supply (Regulated Business) Surcharges (Open Access)Grid Support

ChargesTotal Revenue

2018-19

Revenue from Proposed Tariffs (Rs. Crs.)

Seasonal Industries 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-I (B) Ferro-Alloys 0.00 0.00 0.00

HT-II - Others 0.00 0.00 0.00

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-III Aviation activity at Airports 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00

HT-IV A Govt. Lift Irrigation Schemes 0.00 0.00 0.00

HT-IV B Agriculture 0.00 0.00 0.00

HT - IV (C) Composite P.W.S Schemes 0.00 0.00 0.00

HT-V Railway Traction 0.00 0.00 0.00

HT-VI Townships and Residential Colonies 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00

HT - VIII -Temporary Supply 0.00 0.00 0.00

HT- RESCOs 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00

0.00 0.00 0.00

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 399: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 10 a Incentives Proposed

2018-19

No. of consumersIncentive Amount

(Rs Crores)

LT Category 0 0.00

Category I (A&B) - Domestic

Category II (A,B & C) - Non-domestic/Commercial

Category LT-II (C) Advertising Hoardings

Category III (A & B) - Industrial

Category IV (A,B &C) - Cottage Industries & Dhobighats

Category V (A, B & C) - Irrigation and Agriculture

Category VI (A & B) - Local Bodies, St. Lighting & PWS

Category VII (A & B) - General Purpose

Category VIII (A & B) -Temporary Supply

L.T (New Category)

HT Category at 11 KV 0 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

HT- RESCOs

HT Category at 33 KV 0 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

Consumer Category

Total

Remarks

Page 400: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

No. of consumersIncentive Amount

(Rs Crores)

Consumer Category

Total

Remarks

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

HT- RESCOs

HT Category at 132 KV 0 0.00

HT-I Industry Segregated

Lights & Fans

Colony consumption

Seasonal Industries

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM)

HT-I (B) Ferro-Alloys

HT-II - Others

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM)

HT-III Aviation activity at Airports

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM)

HT-IV A Govt. Lift Irrigation Schemes

HT-IV B Agriculture

HT - IV (C) Composite P.W.S Schemes

HT-V Railway Traction

HT-VI Townships and Residential Colonies

HT-VII - Green Power

HT - VIII -Temporary Supply

HT- RESCOs

Total 0 0.00

Page 401: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 11

Items of Non - Tariff Income

(Rs. Crs.)Detail Links Base Year 2014-15 2015-16 2016-17 2017-18 2018-19

Rebate on Power Purchase 0.00 21.39 55.58 61.09 64.15 67.36

Cap S/c 19.68 24.85 32.49 41.59 43.67 45.85

Gain/loss (Billing) 0.02 0.01 0.03 -0.06 -0.06 -0.07

HT EPSS 0.24 1.31 0.07 0.00 0.00 0.00

IED 1.53 2.81 2.95 6.03 6.33 6.65

Int on Bank Deposits -0.16 0.15 0.19 4.16 4.37 4.59

LPF 1.18 0.32 0.67 0.49 0.52 0.54

LVSe 4.22 3.79 3.89 6.16 6.47 6.79

Malpractice 1.48 5.74 3.06 2.92 3.07 3.22

Prior Period HT 0.00 0.00 -9.95 -65.20 -32.00 0.00

Prior Period LT 0.00 0.00 0.00 -4.50 -4.73 0.00

Reactive Income 0.14 1.68 1.67 0.96 1.01 1.06

Receipt of Direct Ta 0.54 1.50 1.92 1.87 1.96 2.06

Recoveries for TP 0.28 0.51 0.50 0.00 0.00 0.00

Theft 6.28 9.43 12.22 15.69 16.47 17.30

Total Non tariff income 35.42 73.49 105.30 71.21 111.23 155.36

Non-tariff Income at Proposed Charges

This form refers to the income other than the income derived from tariffs and does not include cross subsidy surcharge, additional surcharge, etc.

Page 402: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 12 Total Revenue at Proposed Tariff and Charges

2018-19

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy Sales

(MU)

Energy sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected

Load/ Contract

Demand

(HP)

Energy

Charges

(Rs Crores)

LT Total - (Existing Categories) 11284305 0.00 0.00 0.00 24039.87 0 10619 8699341 6397

Category- Domestic (All) 8793640 0.00 0.00 0.00 9168.39 0.00 7658.13 0.00 2999.28

Group A: Domestic consumers with annual consumption < = 600

Units 5,082,489 - - - 2,532.41 - 2,809.65 - 463.29

0-50 4,013,993 1.45 - - 1,916.64 - 2,138.53 - 277.91

51-100 979,504 2.60 - - 484.50 - 594.96 - 125.97

101-200 83,159 3.60 - - 94.45 - 69.90 - 34.00

Above 200 5,833 6.90 - - 36.82 - 6.25 - 25.41

Group B: All Domestic consumers with consumption ( < =2400 and >

600 units) 3,274,126 - - - 4,948.82 - 3,566.20 - 1,544.65

0-50 298,889 2.60 - - 1,743.26 - 304.47 - 453.25

51-100 1,499,549 2.60 - - 1,611.37 - 1,402.07 - 418.96

101-200 1,371,091 3.60 - - 1,316.68 - 1,701.00 - 474.00

201-300 94,948 6.90 - - 195.62 - 145.24 - 134.98

Above 300 9,649 7.75 - - 81.88 - 13.42 - 63.46

Group C: All Domestic consumers with annual consumption >2400

units 437,025 - - - 1,687.16 - 1,282.28 - 991.33

0-50 10,547 2.68 - - 238.04 - 24.43 - 63.80

51-100 17,494 3.35 - - 233.67 - 40.54 - 78.28

101-200 173,822 5.42 - - 450.41 - 456.31 - 244.12

201-300 161,595 7.11 - - 329.24 - 453.96 - 234.09

301-400 44,786 7.98 - - 174.27 - 157.96 - 139.07

401-500 13,770 8.52 - - 91.97 - 60.13 - 78.36

Above 500 units 15,011 9.06 - - 169.56 - 88.95 - 153.62

Category II - Non-domestic/Commrl (A & B) 809173 - - - 1885.02 0.00 1647.46 0.00 1703.17

Lt - II (A) 432616 - - - 95.92 0.00 482.94 0.00 51.79

0-50 units 432,616 5.40 660.00 - 95.92 - 482.94 - 51.79

LT II (B): Above 50 Units/Month 375427 - - - 1785.97 0.00 1160.85 0.00 1647.53

0-50 - 6.90 900.00 - 231.44 - - - 159.69

51-100 142,678 7.69 900.00 - 178.64 - 181.74 - 137.38

101-300 159,023 9.06 900.00 - 363.94 - 331.89 - 329.73

301-500 30,745 9.61 900.00 - 180.15 - 126.94 - 173.12

Above 500 42,981 10.19 900.00 - 831.80 - 520.27 - 847.61

LT II (C): Advertisement Hoardings 1,130 12.28 900.00 - 3.13 - 3.67 - 3.85

Category III (A & B) - Industrial 84388 - - - 2303.21 0.00 754.27 1199892.96 1167.76

Category III (A) - Industrial 84388 - - - 2303.21 0.00 754.27 1199892.96 1167.76

(i) Industrial Normal 43,774 6.71 900.00 900.00 975.27 - - 1,199,875.96 654.41

(ii) Industrial Optional (Seasonal) 1 7.45 900.00 900.00 0.01 - - 17.00 0.01

(iii) Pisciculture/Prawn culture 39,898 3.86 360.00 360.00 1,320.36 - 741.74 - 509.66

(iv) Sugarcane crushing 65 3.86 360.00 360.00 0.67 - 1.68 - 0.26

(v) Poultry farms with above 1000 birds 3 5.91 900.00 900.00 0.07 - 0.03 - 0.04

(vi) Mushroom & Rabbit Farms 31 5.91 900.00 900.00 0.41 - 0.41 - 0.24

(vii) Floriculture in Green House 616 4.89 900.00 900.00 6.42 - 10.41 - 3.14

Category III (B) - Industrial (Optional) 0 - - - 0.00 0.00 0.00 0.00 0.00

SSI Units - - - - - - - - 0.00

Seasonal Industries - - - - - - - - 0.00

Category IV- Cottage Industries, Dhobighats & Others 11990 - - - 42.63 0.00 44.35 0.00 15.99

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data Full year revenue excluding external subsidy

Page 403: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy Sales

(MU)

Energy sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected

Load/ Contract

Demand

(HP)

Energy

Charges

(Rs Crores)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data Full year revenue excluding external subsidy

Cottage Industries 11,990 3.75 240.00 - 42.63 - 44.35 - 15.99

Agro Based Activities - 3.75 240.00 - - - - - 0.00

0 - - - 0.00 0.00 0.00 0.00 0.00

Category V (A,B & C) - Irrig & Agriculture 1410967 - - - 9761.55 0.00 0.00 7499447.80 18.12

Category V(A+B) - Agriculture 1410967 - - - 9761.55 0.00 0.00 7499447.80 18.12

Cat V(A)(i) - Agriculture with DSM measures 1388842 - - - 9757.98 0.00 0.00 7382595.84 17.54

Corporate Farmers & IT Assesses 1,418 2.50 - - 36.57 - - 8,096.15 9.14

Wet Land Farmers (Holdings >2.5 acre) 10,133 0.50 - 525.00 121.92 - - 62,748.67 6.10

Dry Land Farmers (Connections > 3 nos.) 1,475 0.50 - 525.00 45.98 - - 7,454.54 2.30

Wet Land Farmers (Holdings <= 2.5 acre) 206,527 - - - 99.65 - - 966,750.10 0.00

Dry Land Farmers (Connections <= 3 nos.) 1,169,289 - - - 9,453.85 - - 6,337,546.38 0.00

Cat V(A)(ii) - Agriculture with Non-DSM measures 22125 - - - 3.57 0.00 0.00 116851.96 0.58

Corporate Farmers & IT Assesses 2,864 3.50 - - 1.01 - - 18,203.84 0.35

Wet Land Farmers (Holdings >2.5 acre) 16,262 1.00 - 1,050.00 1.96 - - 84,302.34 0.20

Dry Land Farmers (Connections > 3 nos.) 2,217 1.00 - 1,050.00 0.06 - - 11,999.78 0.01

Wet Land Farmers (Holdings <= 2.5 acre) 467 0.50 - 525.00 0.29 - - 1,401.00 0.01

Dry Land Farmers (Connections <= 3 nos.) 315 0.50 - 525.00 0.26 - - 945.00 0.01

Category LT V(C) - Others 0.00 - - - 0.00 0.00 0.00 0.00 0.00

Salt farming units with Connected Load upto 15HP - 3.70 - 240.00 - - - - 0.00

Rural Horticulture Nurseries - 3.70 - 240.00 - - - - 0.00

Category V (B) - Agriculture (Tatkal) (3) 0 - - - 0.00 0.00 0.00 0.00 0.00

Category VI - Local Bodies, St. Lighting & PWS 111542 - - - 768.19 0.00 419.51 0.00 414.96

VI(A) - Street Lighting 60557 - - - 195.99 0.00 89.61 0.00 123.21

Panchayats 45,665 5.98 900.00 - 124.85 - 58.16 - 74.66

Municipalities 7,071 6.53 900.00 - 33.69 - 13.79 - 22.00

Muncipal Corporations 7,821 7.09 900.00 - 37.44 - 17.66 - 26.55

0 - - - 0.00 0.00 0.00 0.00 0.00

0 - - - 0.00 0.00 0.00 0.00 0.00

0 - - - 0.00 0.00 0.00 0.00 0.00

VI(B) - PWS Schemes 50985 - - - 572.21 0.00 329.91 0.00 291.75

Minor/Major Panchayats 45689 - - - 475.07 0.00 287.96 0.00 231.36

Panchayats 45,689 4.87 - 900.00 475.07 - 287.96 - 231.36

0 - - - 0.00 0.00 0.00 0.00 0.00

All Nagarpalikas & Municipalities 2833 - - - 55.18 0.00 22.79 0.00 33.00

Muncipalities 2,833 5.98 - 900.00 55.18 - 22.79 - 33.00

0 - - - 0.00 0.00 0.00 0.00 0.00

Municipal Corporations 2463 - - - 41.96 0.00 19.15 0.00 27.40

Corporations 2,463 6.53 - 900.00 41.96 - 19.15 - 27.40

0 - - - 0.00 0.00 0.00 0.00 0.00

Category VII (A&B) 62542 - - - 109.24 0.00 94.60 0.00 76.10

Cat VII (A) - General Purpose 51,676 7.28 360.00 - 94.82 - 85.26 - 69.03

Cat VII-B - Religious Places (CL <=1KW) 10866 - - - 14.42 0.00 9.34 0.00 7.06

(i) Religious Places (CL > 2kW) 328 5.04 360.00 - 4.35 - 2.84 - 2.19

(ii) Religious Places (CL <= 2kW) 10,538 4.84 360.00 - 10.07 - 6.50 - 4.87

Category VIII-Temporary Supply 63 - - - 1.63 0.00 0.36 0.00 1.71

All units 63 10.50 360.00 - 1.63 - 0.36 - 1.71

New L T Categories ( Total ) 2696 - - - 24.21 0.00 40.12 0.00 26.07

LT-VI (C): NTR Sujala Padhakam 463 4.00 - 120.00 3.11 - 1.58 - 1.25

LT II (D) : Function Halls / Auditoriums 2,233 11.77 - - 21.09 - 38.54 - 24.82

TOTAL (LT including new categories) 11287001 - - - 24064.07 0.00 10658.81 8699340.76 6423.15

HIGH TENSION 7395 - - - 10721.56 0.00 3631.85 0.00 6004.07

HT Category at 11 kV 6748 - - - 3426.04 0.00 1402.20 0.00 1937.37

HT I (A): General 3,704 6.33 5,700.00 - 1,492.01 - 779.46 - 944.44

Page 404: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy Sales

(MU)

Energy sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected

Load/ Contract

Demand

(HP)

Energy

Charges

(Rs Crores)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data Full year revenue excluding external subsidy

Lights and Fans - - - - 52.79 - - - 0.00

Industrial Colonies - 6.32 - - 4.10 - - - 2.59

Seasonal Industries 140 7.66 5,700.00 - 45.47 - 33.94 - 34.83

Time of Day Tariffs (6 PM to 10 PM) - 7.38 - - 277.81 - - - 205.03

HT I (B): Energy Intensive Industries 2 5.82 - - 0.29 - 0.31 - 0.17

HT I (C): Aquaculture and Animal Husbandry 89 3.86 360.00 - 40.49 - 26.81 - 15.63

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants 36 4.89 5,700.00 - 25.08 - 8.75 - 12.26

HT II: Others 1,555 7.66 5,700.00 - 512.91 - 252.24 - 392.89

Time of Day Tariffs (6 PM to 10 PM) - 8.71 - - 99.04 - - - 86.26

HT II (B): Religious Places 12 5.03 360.00 - 5.65 - 2.07 - 2.84

HT II (C): Function Halls/Auditoriums 95 11.77 - - 6.95 - 13.59 - 8.18

HT III: Public Infrastructure and Tourism 69 7.30 5,700.00 - 41.00 - 14.76 - 29.93

Time of Day Tariffs (6 PM to 10 PM) - 8.35 - - 8.68 - - - 7.25

HT IV Government LIS 345 5.82 - - 47.98 - 40.41 - 27.92

HT IV Private Irrigation and Agriculture 556 5.82 - - 192.48 - 203.80 - 112.02

HT IV CPWS 113 4.89 - - 50.58 - 20.25 - 24.73

HT VI: Townships & Residential Colonies 31 6.32 900.00 - 22.58 - 5.81 - 14.27

HT VII: Green Power - - - - - - - - 0.00

HT VIII: Temporary - 9.50 8,550.00 - 0.12 - - - 0.11

Category: RESCOs 1 0.32 - - 500.03 - - - 16.00

HT Category at 33 kV 558 - - - 3457.55 0.00 960.86 0.00 2052.92

HT I (A): General 346 5.87 5,700.00 - 2,265.05 - 589.89 - 1329.59

Lights and Fans - - - - 37.77 - - - 0.00

Page 405: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Energy

Charges

(Rs/kWh) or

(Rs.kVAh)

Demand

charges

(Rs/kVA/Yr)

Demand

charges

(Rs/HP/Yr)

Energy Sales

(MU)

Energy sales

(MVAh)

Connected

Load/

Contract

Demand

(MW)

Connected

Load/ Contract

Demand

(HP)

Energy

Charges

(Rs Crores)

Consumer CategoriesNo of

consumers

Components of tariff Relevant sales related data Full year revenue excluding external subsidy

Industrial Colonies - 6.32 - - 9.40 - - - 5.94

Seasonal Industries 4 6.98 5,700.00 - 19.19 - 6.05 - 13.39

Time of Day Tariffs (6 PM to 10 PM) - 6.92 - - 485.02 - - - 335.63

HT I (B): Energy Intensive Industries 13 5.37 - - 249.99 - 48.78 - 134.25

HT I (C) : Aquaculture and Animal Husbandry - 3.86 360.00 - 0.05 - - - 0.02

HT I (D) : Poultry Hatcheries and Poultry Feed Mixing Plants 4 4.89 5,700.00 - 11.33 - 5.19 - 5.54

HT II: Others 40 6.98 5,700.00 - 99.50 - 39.61 - 69.45

Time of Day Tariffs (6 PM to 10 PM) - 8.03 - - 16.44 - - - 13.20

HT II (B): Religious Places 4 5.03 360.00 - 26.85 - 24.92 - 13.50

HT II (C) : Function Halls / Auditoriums - 11.77 - - 1.46 - - - 1.71

HT III: Public Infrastructure and Tourism 7 6.69 5,700.00 - 7.26 - 5.61 - 4.86

Time of Day Tariffs (6 PM to 10 PM) - 7.74 - - 1.59 - - - 1.23

HT IV Government LIS - 5.82 - - - - - - 0.00

HT IV Agriculture 88 5.82 - - 125.54 - 206.86 - 73.07

HT IV CPWS 30 4.89 - - 86.48 - 26.97 - 42.29

HT VI: Townships & Residential Colonies 22 6.32 900.00 - 14.65 - 6.98 - 9.26

HT VII: Green Power - - - - - - - - 0.00

HT VIII: Temporary - 8.81 8,550.00 - - - - - 0.00

HT Category at 132 kV 89 - - - 3837.97 0.00 1268.80 0.00 2013.78

HT I (A): General 47 5.44 5,700.00 - 1,727.09 - 489.23 - 939.54

Lights and Fans - - - - 16.94 - - - 0.00

Industrial Colonies - 6.32 - - 13.79 - - - 8.72

Seasonal Industries - 6.72 5,700.00 - - - - - 0.00

Time of Day Tariffs (6 PM to 10 PM) - 6.49 - - 472.51 - - - 306.66

HT I (B): Energy Intensive Industries 4 4.95 - - 190.56 - 46.73 - 94.33

HT I (C ): Aquaculture and Animal Husbandry - 3.86 360.00 - - - - - 0.00

HT I (D): Poultry and Hatcheries and Poultry Feed Mixing Plants - 4.89 5,700.00 - - - - - 0.00

HT II: Others 1 6.72 5,700.00 - 28.91 - 8.01 - 19.42

Time of Day Tariffs (6 PM to 10 PM) - 7.77 - - 5.03 - - - 3.91

HT II (B): Religious Places - 5.03 360.00 - - - - - 0.00

HT II (C) : Function Halls / Auditoriums - 11.77 - - - - - - 0.00

HT III: Public Infrastructure and Tourism - 6.38 5,700.00 - - - - - 0.00

Time of Day Tariffs (6 PM to 10 PM) - 7.43 - - - - - - 0.00

HT IV Government LIS - 5.82 - - - - - - 0.00

HT IV Agriculture 13 5.82 - - 661.64 - 432.02 - 385.08

HT IV CPWS - 4.89 - - - - - - 0.00

HT V: Railway Traction 24 3.55 3,600.00 - 721.49 - 292.81 - 256.13

HT VI: Townships & Residential Colonies - 6.32 - - - - - - 0.00

HT VII: Green Power - - - - - - - - 0.00

HT VIII: Temporary - 8.16 8,550.00 - - - - - 0.00

TOTAL( LT + HT) 11294396 0.00 0.00 0.00 34785.63 0.00 14290.66 8699340.76 12427.22

Page 406: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 12

2018-19

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual consumption < = 600

Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with consumption ( < =2400 and >

600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual consumption >2400

units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

(i) Industrial Normal

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Consumer CategoriesDemand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

311 79 450 0 7237 0 7237.26

0.00 61.25 349.58 0.00 3410.11 0.00 3410.11

- 56.87 159.45 - 679.61 - 679.61

- 56.87 120.42 - 455.20 - 455.20

- - 35.26 - 161.23 - 161.23

- - 3.49 - 37.50 - 37.50

- - 0.28 - 25.69 - 25.69

- 4.23 164.90 - 1,713.79 - 1,713.79

- 4.23 12.55 - 470.04 - 470.04

- - 71.98 - 490.94 - 490.94

- - 74.04 - 548.04 - 548.04

- - 5.70 - 140.68 - 140.68

- - 0.64 - 64.10 - 64.10

- 0.15 25.22 - 1,016.70 - 1,016.70

- 0.15 0.44 - 64.39 - 64.39

- - 0.84 - 79.12 - 79.12

- - 9.39 - 253.51 - 253.51

- - 9.70 - 243.79 - 243.79

- - 2.96 - 142.03 - 142.03

- - 0.91 - 79.26 - 79.26

- - 0.99 - 154.61 - 154.61

136.68 16.40 35.06 0.00 1891.31 0.00 1891.31

31.87 16.40 15.57 0.00 115.64 0.00 115.64

31.87 16.40 15.57 - 115.64 - 115.64

104.48 0.00 19.42 0.00 1771.42 0.00 1771.42

0.00 - - - 159.69 - 159.69

16.36 - 6.85 - 160.58 - 160.58

29.87 - 8.59 - 368.19 - 368.19

11.42 - 1.66 - 186.21 - 186.21

46.82 - 2.32 - 896.75 - 896.75

0.33 - 0.07 - 4.25 0.00 4.25

108.27 0.00 6.38 0.00 1282.40 0.00 1282.40

108.27 0.00 6.38 0.00 1282.40 0.00 1282.40

80.53 - 3.31 - 738.24 - 738.24

0.00 - 0.00 - 0.01 - 0.01

26.70 - 3.02 - 539.38 - 539.38

0.06 - 0.00 - 0.33 - 0.33

0.00 - 0.00 - 0.05 - 0.05

0.04 - 0.00 - 0.28 - 0.28

0.94 - 0.05 - 4.12 - 4.12

0.00 0.00 0.00 0.00 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

1.06 0.00 0.43 0.00 17.48 0.00 17.48

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

Page 407: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category V (B) - Agriculture (Tatkal) (3)

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

1.06 - 0.43 - 17.48 0.00 17.48

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

13.92 0.00 50.79 0.00 82.83 0.00 82.83

13.92 0.00 50.79 0.00 82.83 0.00 82.83

3.69 0.00 50.00 0.00 71.22 - 71.22

0.00 - 0.05 - 9.19 - 9.19

3.29 - 0.36 - 9.76 - 9.76

0.39 - 0.05 - 2.74 - 2.74

0.00 - 7.43 - 7.43 - 7.43

0.00 - 42.09 - 42.09 - 42.09

10.23 0.00 0.80 0.00 11.61 - 11.61

0.00 - 0.10 - 0.46 - 0.46

8.85 - 0.59 - 9.63 - 9.63

1.26 - 0.08 - 1.35 - 1.35

0.07 - 0.02 - 0.10 - 0.10

0.05 - 0.01 - 0.07 - 0.07

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 0.00 0.00 0.00 0.00 - 0.00

47.88 0.00 4.68 0.00 467.53 0.00 467.53

8.06 0.00 2.54 0.00 133.82 - 133.82

5.23 - 1.92 - 81.81 - 81.81

1.24 - 0.30 - 23.54 - 23.54

1.59 - 0.33 - 28.46 - 28.46

0.00 0.00 0.00 0.00 0.00 - 0.00

0.00 0.00 0.00 0.00 0.00 - 0.00

0.00 0.00 0.00 0.00 0.00 - 0.00

39.82 0.00 2.14 0.00 333.71 - 333.71

34.75 0.00 1.92 0.00 268.03 - 268.03

34.75 - 1.92 - 268.03 - 268.03

0.00 0.00 0.00 0.00 0.00 - 0.00

2.75 0.00 0.12 0.00 35.87 - 35.87

2.75 - 0.12 - 35.87 - 35.87

0.00 0.00 0.00 0.00 0.00 - 0.00

2.31 0.00 0.10 0.00 29.81 - 29.81

2.31 - 0.10 - 29.81 - 29.81

0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.41 0.99 3.38 0.00 83.87 0.00 83.87

3.07 0.99 2.79 - 75.88 0.00 75.88

0.34 0.00 0.59 0.00 7.99 0.00 7.99

0.10 - 0.02 - 2.31 - 2.31

0.23 - 0.57 - 5.68 - 5.68

0.01 0.00 0.00 0.00 1.72 0.00 1.72

0.01 - 0.00 - 1.72 - 1.72

0.03 0.00 0.15 0.00 26.25 0.00 26.25

0.03 - 0.02 - 1.29 - 1.29

0.00 - 0.13 - 24.96 - 24.96

311.26 78.64 450.46 0.00 7263.51 0.00 7263.51

1381.15 0.00 12.38 0.00 7397.61 0.00 7397.61

622.37 0.00 11.15 0.00 2570.89 0.00 2570.89

444.29 - 6.25 - 1394.98 - 1394.98

Page 408: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

HT Category at 33 kV

HT I (A): General

Lights and Fans

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

0.00 - - - 0.00 - 0.00

0.00 - - - 2.59 - 2.59

19.34 - - - 54.17 - 54.17

0.00 - - - 205.03 - 205.03

0.00 - 0.00 - 0.17 - 0.17

0.97 - 0.15 - 16.74 - 16.74

4.99 - 0.06 - 17.31 - 17.31

143.78 - 2.62 - 539.29 - 539.29

0.00 - - - 86.26 - 86.26

0.07 - 0.02 - 2.93 - 2.93

0.00 - 0.16 - 8.34 - 8.34

8.41 - 0.12 - 38.46 - 38.46

0.00 - - - 7.25 - 7.25

0.00 - 0.58 - 28.50 - 28.50

0.00 - 0.94 - 112.96 - 112.96

0.00 - 0.19 - 24.92 - 24.92

0.52 - 0.05 - 14.85 - 14.85

0.00 - - - 0.00 - 0.00

0.00 - - - 0.11 0.00 0.11

0.00 - 0.00 - 16.00 0.00 16.00

369.94 0.00 0.93 0.00 2423.80 0.00 2423.80

336.24 - 0.58 - 1666.41 - 1666.41

0.00 - - - 0.00 - 0.00

Page 409: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Demand

/Fixed

charges

(Rs Crores)

Minimum

Charges

(Rs Crores)

Customer

Charges

(Rs crores)

Others

(Rs Crores)

Gross Tariff

Revenue

(Rs Crores)

Full year revenue excluding external subsidy

Incentives

(Rs. Crs)

Net Revenue

from Tariff

(Rs. Crores)

0.00 - - - 5.94 - 5.94

3.45 - - - 16.84 - 16.84

0.00 - - - 335.63 - 335.63

0.00 - 0.02 - 134.27 - 134.27

0.00 - - - 0.02 - 0.02

2.96 - 0.01 - 8.50 - 8.50

22.58 - 0.07 - 92.09 - 92.09

0.00 - - - 13.20 - 13.20

0.90 - 0.01 - 14.41 - 14.41

0.00 - - - 1.71 - 1.71

3.20 - 0.01 - 8.06 - 8.06

0.00 - - - 1.23 - 1.23

0.00 - - - 0.00 - 0.00

0.00 - 0.15 - 73.22 - 73.22

0.00 - 0.05 - 42.34 - 42.34

0.63 - 0.04 - 9.93 - 9.93

0.00 - - - 0.00 0.00 0.00

0.00 - - - 0.00 0.00 0.00

388.84 0.00 0.30 0.00 2402.92 0.00 2402.92

278.86 - 0.16 - 1218.56 - 1218.56

0.00 - - - 0.00 - 0.00

0.00 - - - 8.72 - 8.72

0.00 - - - 0.00 - 0.00

0.00 - - - 306.66 - 306.66

0.00 - 0.01 - 94.34 - 94.34

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00

- 0.00

4.57 - 0.00 - 23.99 - 23.99

0.00 - - - 3.91 - 3.91

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 - 0.04 - 385.12 - 385.12

0.00 - - - 0.00 - 0.00

105.41 - 0.08 - 361.62 - 361.62

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 - 0.00

0.00 - - - 0.00 0.00 0.00

1692.41 78.64 462.84 0.00 14661.11 0.00 14661.11

Page 410: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 12

2018-19

LT Total - (Existing Categories)

Category- Domestic (All)

Group A: Domestic consumers with annual consumption < = 600

Units

0-50

51-100

101-200

Above 200

Group B: All Domestic consumers with consumption ( < =2400 and >

600 units)

0-50

51-100

101-200

201-300

Above 300

Group C: All Domestic consumers with annual consumption >2400

units

0-50

51-100

101-200

201-300

301-400

401-500

Above 500 unitsCategory II - Non-domestic/Commrl (A & B)

Lt - II (A)

0-50 units

LT II (B): Above 50 Units/Month

0-50

51-100

101-300

301-500

Above 500

LT II (C): Advertisement Hoardings

Category III (A & B) - Industrial

Category III (A) - Industrial

(i) Industrial Normal

(ii) Industrial Optional (Seasonal)

(iii) Pisciculture/Prawn culture

(iv) Sugarcane crushing

(v) Poultry farms with above 1000 birds

(vi) Mushroom & Rabbit Farms

(vii) Floriculture in Green House

Category III (B) - Industrial (Optional)

SSI Units

Seasonal Industries

Category IV- Cottage Industries, Dhobighats & Others

Consumer Categories Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

0 0 0 0 107 7344.73

0.00 0.00 0.00 0.00 40.95 3451.05

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

0.00 0.00 0.00 0.00 8.51 1899.82

0.00 0.00 0.00 0.00 0.00 115.64

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0 0 1771.42

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 4.25

0.00 0.00 0.00 0.00 10.29 1292.69

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.19 17.67

Total Revenue

( Net of

incentives)

Surcharges

Grid Support

Charges

(Rs. Crores)

Non - tariff Income

Page 411: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Cottage Industries

Agro Based Activities

Category V (A,B & C) - Irrig & Agriculture

Category V(A+B) - Agriculture

Cat V(A)(i) - Agriculture with DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Cat V(A)(ii) - Agriculture with Non-DSM measures

Corporate Farmers & IT Assesses

Wet Land Farmers (Holdings >2.5 acre)

Dry Land Farmers (Connections > 3 nos.)

Wet Land Farmers (Holdings <= 2.5 acre)

Dry Land Farmers (Connections <= 3 nos.)

Category LT V(C) - Others

Salt farming units with Connected Load upto 15HP

Rural Horticulture Nurseries

Category V (B) - Agriculture (Tatkal) (3)

Category VI - Local Bodies, St. Lighting & PWS

VI(A) - Street Lighting

Panchayats

Municipalities

Muncipal Corporations

VI(B) - PWS Schemes

Minor/Major Panchayats

Panchayats

All Nagarpalikas & Municipalities

Muncipalities

Municipal Corporations

Corporations

Category VII (A&B)

Cat VII (A) - General Purpose

Cat VII-B - Religious Places (CL <=1KW)

(i) Religious Places (CL > 2kW)

(ii) Religious Places (CL <= 2kW) Category VIII-Temporary Supply

All units

New L T Categories ( Total )

LT-VI (C): NTR Sujala Padhakam

LT II (D) : Function Halls / Auditoriums TOTAL (LT including new categories)

HIGH TENSION

HT Category at 11 kV

HT I (A): General

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Total Revenue

( Net of

incentives)

Surcharges

Grid Support

Charges

(Rs. Crores)

Non - tariff Income

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 43.60 126.43

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 3.44 470.98

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.49 84.36

0.00 0.00 0.00 0.00 0.00 75.88

0.00 0.00 0.00 0.00 0.00 7.99

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.01 1.73

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 26.25

0.00 0.00 0.00 0.00 0.00 1.29

0.00 0.00 0.00 0.00 0.00 24.96

0.00 0.00 0.00 0.00 107.47 7370.98

0.00 0.00 0.00 0.00 47.88 7445.49

0.00 0.00 0.00 0.00 15.30 2586.19

0.00 0.00 0.00 0.00 6.66 1401.65

Page 412: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C): Aquaculture and Animal Husbandry

HT I (D): Poultry Hatcheries abd Poultry Feed Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C): Function Halls/Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Private Irrigation and Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

Category: RESCOs

HT Category at 33 kV

HT I (A): General

Lights and Fans

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Total Revenue

( Net of

incentives)

Surcharges

Grid Support

Charges

(Rs. Crores)

Non - tariff Income

0.00 0.00 0.00 0.00 0.24 0.24

0.00 0.00 0.00 0.00 0.02 2.61

0.00 0.00 0.00 0.00 0.20 54.37

0.00 0.00 0.00 0.00 1.24 206.27

0.00 0.00 0.00 0.00 0.00 0.17

0.00 0.00 0.00 0.00 0.18 16.93

0.00 0.00 0.00 0.00 0.11 17.42

0.00 0.00 0.00 0.00 2.29 541.58

0.00 0.00 0.00 0.00 0.44 86.71

0.00 0.00 0.00 0.00 0.03 2.96

0.00 0.00 0.00 0.00 0.03 8.37

0.00 0.00 0.00 0.00 0.18 38.64

0.00 0.00 0.00 0.00 0.04 7.29

0.00 0.00 0.00 0.00 0.21 28.72

0.00 0.00 0.00 0.00 0.86 113.82

0.00 0.00 0.00 0.00 0.23 25.15

0.00 0.00 0.00 0.00 0.10 14.95

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 2.23 18.24

0.00 0.00 0.00 0.00 15.44 2439.24

0.00 0.00 0.00 0.00 10.12 1676.52

0.00 0.00 0.00 0.00 0.17 0.17

Page 413: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

LT Total - (Existing Categories)

Consumer Categories

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C) : Aquaculture and Animal Husbandry

HT I (D) : Poultry Hatcheries and Poultry Feed Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

HT Category at 132 kV

HT I (A): General

Lights and Fans

Industrial Colonies

Seasonal Industries

Time of Day Tariffs (6 PM to 10 PM)

HT I (B): Energy Intensive Industries

HT I (C ): Aquaculture and Animal Husbandry

HT I (D): Poultry and Hatcheries and Poultry Feed Mixing Plants

HT II: Others

Time of Day Tariffs (6 PM to 10 PM)

HT II (B): Religious Places

HT II (C) : Function Halls / Auditoriums

HT III: Public Infrastructure and Tourism

Time of Day Tariffs (6 PM to 10 PM)

HT IV Government LIS

HT IV Agriculture

HT IV CPWS

HT V: Railway Traction

HT VI: Townships & Residential Colonies

HT VII: Green Power

HT VIII: Temporary

TOTAL( LT + HT)

Surcharge

(Rs.Crs)

Additional

Surcharge

(Rs.Crs)

Direct Apportioned

Total Revenue

( Net of

incentives)

Surcharges

Grid Support

Charges

(Rs. Crores)

Non - tariff Income

0.00 0.00 0.00 0.00 0.04 5.98

0.00 0.00 0.00 0.00 0.09 16.93

0.00 0.00 0.00 0.00 2.17 337.80

0.00 0.00 0.00 0.00 1.12 135.38

0.00 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.05 8.55

0.00 0.00 0.00 0.00 0.44 92.54

0.00 0.00 0.00 0.00 0.07 13.27

0.00 0.00 0.00 0.00 0.12 14.53

0.00 0.00 0.00 0.00 0.01 1.72

0.00 0.00 0.00 0.00 0.03 8.10

0.00 0.00 0.00 0.00 0.01 1.23

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.56 73.78

0.00 0.00 0.00 0.00 0.39 42.72

0.00 0.00 0.00 0.00 0.07 9.99

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 17.14 2420.06

0.00 0.00 0.00 0.00 7.71 1226.27

0.00 0.00 0.00 0.00 0.08 0.08

0.00 0.00 0.00 0.00 0.06 8.78

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 2.11 308.77

0.00 0.00 0.00 0.00 0.85 95.19

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.000.00 0.00

0.00

0.00 0.00 0.00 0.00 0.13 24.12

0.00 0.00 0.00 0.00 0.02 3.93

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 2.95 388.08

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 3.22 364.85

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 155.36 14816.47

Page 414: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Form 13 Cost and Revenue

2018-19

Consumer CategoryDetail

LinksCost of Service

Revenue from

Tariff & Charges

(Class Deficit) /

Class Surplus

(=Revenue from

Tariff & Charges -

CoS)

External

Subsidy

Cross

SubsidyRemarks

LT Category 14869.24 7263.51 -7605.73 0.00 -7605.73

Category I (A&B) - Domestic 6061.87 3410.11 -2651.76 0.00 -2651.76

Category II (A,B & C) - Non-domestic/Commercial 1294.66 1916.27 621.61 0.00 621.61

Category III (A & B) - Industrial 1569.28 1282.40 -286.87 0.00 -286.87

Category IV (A,B &C) - Cottage Industries & Dhobighats 29.38 17.48 -11.90 0.00 -11.90

Category V (A, B & C) - Irrigation and Agriculture 5295.66 82.83 -5212.83 0.00 -5212.83

Category VI (A & B) - Local Bodies, St. Lighting & PWS 539.35 468.82 -70.53 0.00 -70.53

Category VII (A & B) - General Purpose 77.90 83.87 5.97 0.00 5.97

Category VIII (A & B) -Temporary Supply 1.13 1.72 0.59 0.00 0.59

0.00 0.00 0.00 0.00 0.00

HT Category at 11 KV 2233.11 2570.89 337.78 0.00 337.78

HT-I Industry Segregated 983.95 1394.98 411.03 0.00 411.03

Lights & Fans 34.79 0.00 -34.79 0.00 -34.79

Colony consumption 2.70 2.59 -0.11 0.00 -0.11

Seasonal Industries 29.96 54.17 24.21 0.00 24.21

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 183.08 205.03 21.95 0.00 21.95

HT-I (B) Ferro-Alloys 0.19 0.17 -0.02 0.00 -0.02

HT-II - Others 325.72 539.29 213.57 0.00 213.57

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 62.89 86.26 23.37 0.00 23.37

HT-III Aviation activity at Airports 26.04 38.46 12.42 0.00 12.42

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 5.51 7.25 1.74 0.00 1.74

HT -IV A Govt Lift Irrigation 42.35 28.50 -13.84 0.00 -13.84

HT -IV A Private Irrigation & Agriculture 169.38 112.96 -56.42 0.00 -56.42

HT- IV B - CP Water Supply Schemes 44.51 24.92 -19.59 0.00 -19.59

HT-VI Townships and Residential Colonies 13.53 14.85 1.31 0.00 1.31

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00

HT - VIII -Temporary Supply 0.06 0.11 0.05 0.00 0.05

HT- RESCOs 257.23 16.00 -241.22 0.00 -241.22

HT I (B): Energy Intensive Industries 26.68 16.74 -9.94 0.00 -9.94

HT I (C): Aquaculture and Animal Husbandry 16.53 17.31 0.78 0.00 0.78

HT II (B): Religious Places 3.58 2.93 -0.65 0.00 -0.65

HT II (C): Function Halls/Auditoriums 4.41 8.34 3.93 0.00 3.93

0.00 0.00 0.00 0.00 0.00

HT Category at 33 KV 2038.62 2423.80 385.18 0.00 385.18

HT-I Industry Segregated 1280.31 1666.41 386.09 0.00 386.09

Lights & Fans 21.34 0.00 -21.34 0.00 -21.34

Colony consumption 5.31 5.94 0.63 0.00 0.63

Seasonal Industries 10.84 16.84 6.00 0.00 6.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 274.04 335.63 61.60 0.00 61.60

HT-I (B) Ferro-Alloys 141.25 134.27 -6.98 0.00 -6.98

Page 415: SOUTHERN POWER DISTRIBUTION COMPANY OF A.P · PDF fileI am competent and duly authorised by APSPDCL to affirm, swear, ... Power Distribution Company of Telangana Limited (TSSPDCL)

Consumer CategoryDetail

LinksCost of Service

Revenue from

Tariff & Charges

(Class Deficit) /

Class Surplus

(=Revenue from

Tariff & Charges -

CoS)

External

Subsidy

Cross

SubsidyRemarks

HT-II - Others 62.25 92.09 29.84 0.00 29.84

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 10.29 13.20 2.91 0.00 2.91

HT-III Aviation activity at Airports 4.54 8.06 3.52 0.00 3.52

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.99 1.23 0.23 0.00 0.23

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 114.60 73.22 -41.39 0.00 -41.39

HT- IV B - CP Water Supply Schemes 78.94 42.34 -36.60 0.00 -36.60

HT-VI Townships and Residential Colonies 9.76 9.93 0.16 0.00 0.16

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00

HT- VIII - RESCOs 0.00 0.00 0.00 0.00 0.00

HT - IX -Temporary Supply 0.00 0.00 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 0.03 0.02 -0.01 0.00 -0.01

HT I (C): Aquaculture and Animal Husbandry 6.40 8.50 2.10 0.00 2.10

HT II (B): Religious Places 16.81 14.41 -2.40 0.00 -2.40

HT II (C): Function Halls/Auditoriums 0.91 1.71 0.80 0.00 0.80

0.00 0.00 0.00 0.00 0.00

HT Category at 132 KV 2273.43 2402.92 129.49 0.00 129.49

HT-I Industry Segregated 949.46 1218.56 269.10 0.00 269.10

Lights & Fans 9.32 0.00 -9.32 0.00 -9.32

Colony consumption 7.59 8.72 1.13 0.00 1.13

Seasonal Industries 0.00 0.00 0.00 0.00 0.00

HT-I Industrial Time-of-Day Tariff (6 PM to 10 PM) 259.88 306.66 46.78 0.00 46.78

HT-I (B) Ferro-Alloys 104.81 94.34 -10.47 0.00 -10.47

HT-II - Others 15.51 23.99 8.49 0.00 8.49

HT-II - Others - Time-of-Day Tariff (6 PM to 10 PM) 2.70 3.91 1.21 0.00 1.21

HT-III Aviation activity at Airports 0.00 0.00 0.00 0.00 0.00

HT-III - Aviation Time-of-Day Tariff (6 PM to 10 PM) 0.00 0.00 0.00 0.00 0.00

HT -IV A Govt Lift Irrigation 0.00 0.00 0.00 0.00 0.00

HT -IV A Private Irrigation & Agriculture 492.45 385.12 -107.33 0.00 -107.33

HT- IV B - CP Water Supply Schemes 0.00 0.00 0.00 0.00 0.00

HT-V Railway Traction 431.72 361.62 -70.10 0.00 -70.10

HT-VI Townships and Residential Colonies 0.00 0.00 0.00 0.00 0.00

HT-VII - Green Power 0.00 0.00 0.00 0.00 0.00

HT - IX -Temporary Supply 0.00 0.00 0.00 0.00 0.00

HT- VIII - RESCOs 0.00 0.00 0.00 0.00 0.00

HT I (B): Energy Intensive Industries 0.00 0.00 0.00 0.00 0.00

HT I (C): Aquaculture and Animal Husbandry 0.00 0.00 0.00 0.00 0.00

HT II (B): Religious Places 0.00 0.00 0.00 0.00 0.00

HT II (C): Function Halls/Auditoriums 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

Total 21414.39 14661.11 -6753.28 0.00 -6753.28