south region operations metrics
TRANSCRIPT
MISO System-wide DA and RT LMPs
05
101520253035404550556065707580
40
.06
44
.49
39
.22
33
.27
33
.37
32
.39
33
.37
35
.34
30
.17
28
.48
31
.73
28
.42
25
.20
41
.13
44
.16
36
.95
32
.15
32
.12
33
.09
32
.44
34
.34
29
.38
28
.19
30
.46
29
.04
24
.64
Day-Ahead and Real-Time Average Monthly System-Wide MISO Prices
MISO DA MISO RT
$/M
Wh
Note: MISO System-Wide price is based on the monthly hourly average of the active hubs.
1
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-150.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
30
.7%
30
.1%
22
.8%
14
.0%
10
.3%
12
.3%
12
.8%
14
.0%
10
.4%
11
.1% 19
.0%
17
.9%
13
.6%
DA/RT Price Deviation
Pe
rce
nt
Pri
ce
Div
erg
en
ce
*Price Convergence: DA and RT LMP
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
12.30 13.41
8.94
4.653.44 4.00 4.27 4.93
3.13 3.176.03 5.08
3.42
-1.08
0.33 0.23 1.12 1.25
-0.70
0.93 1.00 0.78 0.29 1.27
-0.63
0.56
Average Absolute (DA-RT) difference Average (DA-RT) difference
$/M
Wh
* Monthly deviation, expressed as a percent of average DA LMP, is calculated as the average of hourly absolute (DA-RT) price differences divided by the average of hourly DA LMPs for the month.
Note: MISO System-Wide price is based on the monthly hourly average of the active trading hubs.
2
ILL IND MICH MINN ARK LOU TEX MISO
29
.68
30
.77
30
.01
24
.18
25
.88 3
2.7
9
26
.22
28
.50
28
.64
29
.93
29
.20
24
.01
25
.07
36
.81
25
.95
28
.52
22
.20
24
.64
23
.36
16
.70
20
.98
23
.85
22
.48
22
.03
19
.99 24
.78
23
.12
16
.15
19
.99
21
.35
21
.13
20
.93
Peak/Off-Peak: March 2015
DA Peak RT Peak DA OffPeak RT OffPeak
$/M
Wh
MISO DA and RT Hub LMPs
3
ILL IND MICH MINN ARK LOU TEX MISODA Peak 1.55 1.54 0.31 -2.45 -1.55 3.70 -2.10 0.14RT Peak 0.45 0.64 -0.36 -2.95 -2.18 8.03 -2.09 0.22
DA OffPeak 0.84 2.30 0.91 -3.35 0.03 1.75 0.56 0.43RT OffPeak -0.79 3.07 1.42 -3.37 -0.16 0.14 0.06 0.05
Congestion Component of LMP ($/MWh)
0
100
200
300
400
500
600
0
20 40 60 80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
$/M
Wh
Number of Hours
Price Duration Curve – Peak Hours
Note: MISO System-Wide price is based on the hourly average of the active hubs.
4
Apr-2015 MISO Real-Time Price 196.48 2(0.57%) 2(0.57%) 344(97.73%) 0(0.00%)
Apr-2015 MISO Day-Ahead Price 39.44 0(0.00%) 0(0.00%) 352(100.00%) 0(0.00%)
Mar-2015 MISO Real-Time Price 476.20 2(0.57%) 3(0.85%) 328(93.18%) 0(0.00%)
Mar-2015 MISO Day-Ahead Price 78.11 0(0.00%) 0(0.00%) 340(96.59%) 0(0.00%)
Hours w ithLMP < $0/MWh
Hours w ithLMP > $150/MWh
Hours w ithLMP > $100/MWh
Hours w ithLMP < $50/MWh
Peak Hourly LMP
Price Duration Curve – Off-Peak Hours
Source MISO Information Delivery and Market Analysis Department
Note: MISO System-Wide price is based on the hourly average of the active hubs.
5
0
10
20
30
40
50
60
70
80
90
100
0
20 40 60 80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
$/M
Wh
Number of Hours
Apr-2015 MISO Real-Time Price 55.80 0(0.00%) 0(0.00%) 367(99.73%) 0(0.00%)
Apr-2015 MISO Day-Ahead Price 38.69 0(0.00%) 0(0.00%) 368(100.00%) 0(0.00%)
Mar-2015 MISO Real-Time Price 86.65 0(0.00%) 0(0.00%) 386(98.47%) 0(0.00%)
Mar-2015 MISO Day-Ahead Price 56.99 0(0.00%) 0(0.00%) 390(99.49%) 0(0.00%)
Peak Hourly LMP
Hours w ithLMP < $0/MWh
Hours w ithLMP > $150/MWh
Hours w ithLMP > $100/MWh
Hours w ithLMP < $50/MWh
92.24131.77
108.02
52.54 49.0185.99 79.25 65.59 50.36 55.40
94.7174.04
49.21
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
DA Congestion Collections
Normalized* Day-Ahead Market Congestion Collections$/MWh
1.722.27
1.64
0.77 0.69
1.42 1.39 1.130.84 0.84
1.53 1.270.94
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Day-Ahead Market Congestion Collections$ in millions
Source: MISO Information Delivery and Market Analysis Department
* Normalized using Day-Ahead loadDate of Extraction: May 05, 2015.
6
4.7
4
4.6
1
4.6
6
4.1
5
3.9
2
3.9
6
3.8
7
4.4
9
3.6
5
3.0
9 4.4
8
4.6
2
4.6
0
4.5
9
4.0
8
3.8
6
3.9
4
3.8
0
4.0
2
3.4
3
2.9
9
2.8
8
2.8
7
2.5
8
3.0
1
2.5
8
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Chicago Citygate Hub Henry Hub
1.98 1.95 1.94 1.88 1.86 1.85 1.89 1.90 1.90 1.921.78 1.71 1.72
0.74 0.74 0.73 0.71 0.67 0.65 0.66 0.66 0.66 0.66 0.66 0.66 0.66
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Illinois Basin Powder River Basin
Nominal Fuel PricesGas ($/mmbtu)
Coal ($/mmbtu)
Chicago Citygate Trading Hub and Henry Trading Hub
Oil* ($/mmbtu)
Illinois Basin Heat Content = 11,800 btu/lb,Powder River Basin Heat Content = 8,800 btu/lb
Distillate Fuel Oil Heat Content =5.825 mmbtu/bbl
Source: Publicly Available/Government Sources-EIA and ICE
22.82 22.69 22.73 22.36 21.95 21.32 20.09 19.6816.59
14.58 15.92 14.50 14.83
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
https://www.theice.com/marketdata/reports/76
http://www.eia.doe.gov/cneaf/coal/page/coalnews/coalmar.html#spot; “SNL Energy”
http://www.eia.gov/emeu/steo/pub/cf_tables/steotables.cfm?tableNumber=8
* Monthly oil prices are estimates and subject to change upon finalization.
7
19
3.6
1
25
5.9
5
17
5.3
4
89
.85
79
.28
13
4.6
6
14
0.6
6
12
5.2
6
95
.91
10
1.2
7
16
7.5
4
13
9.7
4
92
.80
12
5.3
4
7.48
2.832.65
21.74
6.49
0.32
12.19
2.55
1.95
4.97
0.00
1.62
1.23
15.63
0
50
100
150
200
250
300
Apr2014
May Jun Jul Aug Sep Oct Nov Dec Jan2015
Feb Mar Apr YTDAvg
$ in M
illions
Hourly and Monthly Funding for Credits Net FTR Shortfall
Source: MISO Market ECF Report
Date of Extraction: May 5, 2015. Values may change due to resettlement.
FTR Rolling 12-month percentage calculations can be found in the April 2015 FTRWG meeting materials.
FTR Monthly and Rolling 12-Month FundingC
8
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15Monthly FTR Allocation% 89.9% 97.5% 99.8% 96.9% 96.8% 94.7% 90.0% 91.1% 97.4% 98.8% 99.0% 100.0% 94.9%Rolling 12-month Allocation% 97.7% 98.2% 98.6% 98.4% 98.3% 97.9% 97.6% 97.5% 97.4% 96.1% 96.1% 96.1% 96.8%
Offered Capacity and RT Peak Load ObligationOffered Capacity (Hourly Average per category)
MW
Source: MISO Information Delivery and Market Analysis Department
*Gas excludes CC and CT units. **Other includes DRR as well as oil ,pet coke and waste units.
1Real-Time ICCP Load plus Real-Time Regulation Requirement plus Real-Time Spinning Requirement at the daily Peak hour
Average Net Scheduled Interchange over all hours
Hydro
Nuclear
Gas*
CC
CT
Other**
1Real-Time peak load obligation
Coal
Wind
9
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
110,000
120,000
130,000
140,000
150,000
160,000
4/1
4/2
4/3
4/4
4/5
4/6
4/7
4/8
4/9
4/1
0
4/1
1
4/1
2
4/1
3
4/1
4
4/1
5
4/1
6
4/1
7
4/1
8
4/1
9
4/2
0
4/2
1
4/2
2
4/2
3
4/2
4
4/2
5
4/2
6
4/2
7
4/2
8
4/2
9
4/3
0
Marginal Fuel – April 2015Percentage of Time a Fuel is Marginal in the Real-Time Market% of Time
Source: MISO Information Delivery and Market Analysis Department
CC Coal Gas^^ Nuclear Oil Hydro *Wind0
20
40
60
80
100
120
42
85
30
0 0 0
66
46
82
48
0 2 1
55
44
83
39
0 1 0
61
Off-Peak On-Peak Total
Note: Binding transmission constraints can produce instances where more than one unit is marginal in the system. Consequently, more than one fuel may be on the margin; and since each marginal unit is included in the analysis, the percentage may sum to more than 100%.
^^Gas excludes Combined Cycle units
10
Generation Outages and Derates
Source: MISO CROW Outage Scheduler
* Forced Outages include Emergency, Forced, and Urgent* Planned Outages include Planned
*De-rates are based on limits observed in Real-Time and may reflect normal seasonal de-rates in addition to de-rates for maintenance or other operating conditions.
Outages extracted on May 01, 2015
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-150
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Daily Average Generation Outages and Derates - Reliability Footprint
Forced* Planned* Derates*
MW
Data includes both MISO market and reliability footprints. Outage data is “point in time” and can change. The chart reflects the data as it resided in the system on the date of extraction.
11
0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Co
un
t
Alerts* Warnings* Events*
Minimum and Maximum Generation Notifications
0 0 01
0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Co
un
t
Alerts* Warnings* Events*
Minimum Generation ActionsSupply surplus situations during light load periods when on-line resources need to operate at Emergency Minimum levels or be decommitted as to not over burden the interconnected system.
Maximum Generation ActionsSystem-wide or transmission contingency related capacity shortages that may jeopardize the reliable operation of all or part of the MISO system.
Source: MISO Real-Time Operations Department
* Alerts – forecasting specific emergency situations in a future time-frame* Warnings – experiencing initial stages of an emergency situation and taking action* Events – experiencing an emergency situation and taking action
12
100 96 98.33 98.9
Apr-15 Mar-15 2015 YTD Avg 2014 Avg
-4.2
251.5 256.6 286.2
-11.6
-3.5
-20.6
254.4
Apr-15 Mar-15 2015 YTD Avg 2014 Avg
Mean STD
45 4936
29
Apr-15 Mar-15 2015 YTD Avg 2014 Avg
6
0
0
0
0
0
Level 3 & 4
Level 5
Level 6
Apr-15 Mar-15
2.54.0
1.00.0
1.02.0
Apr-15 Mar-15 2015 YTD Avg 2014 Avg
MISO External
Reliability — Other MetricsTransmission Loading Relief (TLR) Events Area Control Error (ACE)
MW
Levels:3 – curtailing non-firm4 – curtailing non-firm and reconfiguring5 – curtailing firm6 – emergency
Manual Redispatches (Count)
23,518 MWh Non-Firm MWh Curtailed
0 MWh Firm MWh Curtailed
Source: MISO Real-Time Operations Department
April 2015 Unit Commitment EfficiencyPercentage of days with online generation held to target and sufficient to meet demand and constraints
N
Contingency Reserve Sharing# of ARS events
O
13
Generation Interconnect Queue – Overall
0
50
100
150
200
250
300
350
400
450
Apr2013
May Jun Jul Aug Sep Oct Nov Dec Jan2014
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan2015
Feb Mar Apr
# of
Req
uest
s
0
5,000
10,000
15,000
20,000
25,000
30,000
Size
of Q
ueue
(MW
)
Size of Queue (MW) Number of Requests
Generation Interconnect Queue – Overall Status
Source: MISO Transmission Planning Department
84
2
81
Requests
Wind Coal Other
14
Generator Suspension/Retirement – Overall
0
5
10
15
20
Apr2013
May Jun Jul Aug Sep Oct Nov Dec Jan2014
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan2015
Feb Mar Apr
# o
f Re
qu
est
s
0
500
1,000
1,500
2,000
2,500
3,000
3,500
Siz
e o
f Qu
eu
e (
MW
)
Size of Queue (MW) Number of Requests
Generator Suspension/Retirement Requests – Overall
Source: MISO Transmission Planning Department
2
1
0
Requests in Study -Current Month
Coal Gas Other
15
Regional DA and RT Average Hub LMP
Source: MISO Information Delivery and Market Analysis Department
16
29.6
8
30.7
7
30.0
1
24.1
8
25.8
8 32.7
9
26.2
2
28.6
4
29.9
3
29.2
0
24.0
1
25.0
7
36.8
1
25.9
5
22.2
0
24.6
4
23.3
6
16.7
0
20.9
8
23.8
5
22.4
8
19.9
9 24.7
8
23.1
2
16.1
5
19.9
9
21.3
5
21.1
3
ILL IND MICH MINN ARK LOU TEX
Central Region North Region South Region
Day-Ahead and Real-Time Average Monthly LMP for HubsPeak/Off-Peak : April 2015
DA_Peak RT_Peak DA_offPeak RT_offPeak
Source: MISO Information Delivery and Market Analysis Department
Regional & System-wide DA & RT LMP – MISO, PJM, SPP
Note: SPP price is the hourly average of LMPs at SPP’s Settlement Locations. Hourly LMP data provided by SPP.
SPP MISO PJM
21
.70
25
.20
30
.35
22
.00
24
.64
29
.81
Day-Ahead and Real-Time Average Monthly LMP for MISO, PJM and SPP: April 2015
Day-Ahead Real-Time
$/M
Wh
SPP South Hub MISO Arkansas Hub MISO Indiana Hub PJM Chicago Hub
26
.12
23
.38
27
.64
24
.77
27
.12
22
.47
27
.30
24
.75
$/M
Wh
17
6.9
2
6.8
3
6.8
3
6.8
3
6.8
3
6.8
3
7.4
5
6.8
37.4
6
6.6
4
6.6
4
6.6
4
6.6
4
6.6
4
12.
37
6.6
4
1.7
5
1.6
6
1.6
6
1.6
6
1.6
6
1.6
6
2.2
7
1.6
6
2.0
2
1.2
0
1.2
0
1.2
0
1.2
0
1.2
0
6.9
3
1.2
0
0.6
5
0.5
4
0.5
4
0.5
4
0.5
4
0.5
4 1.2
9
0.5
41.2
8
0.4
4
0.4
4
0.4
4
0.4
4
0.4
4
6.3
2
0.4
4
MISO Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7
Non-Zone Indiana Michigan Wisconsin Minnesota Louisiana Texas
$/M
Wh
Day-Ahead and Real-Time Monthly Average of Hourly MCPs by Zones: April 2015
REG_DA_MCP REG_RT_MCP SPIN_DA_MCP SPIN_RT_MCP SUPP_DA_MCP SUPP_RT_MCP
Source: MISO Information Delivery and Market Analysis Department
Note: No reserve MCP separation across zones if no reserve zone constraints bind. The definition of the Reserve Zones is updated on a quarterly basis, in conjunction with the update of the Network Model. See Zonal Regulation Map
Zonal DA and RT MCP
18
Average Load by Region
Central Region(GW)
South Region(GW)
North Region(GW)
Source: MISO Information Delivery and Market Analysis Department* Monthly data based on hourly ICCP load data.
36.57 37.9343.12 42.36 44.35
39.51 37.1840.40 41.28 43.61 45.07
39.3735.83
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
15.27 15.05 16.68 17.20 17.7015.70 15.43 17.22 17.47 17.91 18.39
16.04 14.84
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
16.81 18.1521.48 21.88 22.75 20.96
17.69 17.86 17.88 19.51 19.4816.88 16.68
Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Hourly Integrated Peak Load Hour: 04/09/2015 HE 14 Peak load: 79.00 GW
Central Region: 41.60GW North Region: 17.18GW South Region: 20.22GW
19
Source: MISO Information Delivery and Market Analysis Department
*Based on 5-minute unit level generation dispatch target
Dispatched Generation Fuel Mix by Region
20
67.6%
50.4%
15.3%
67.8%
49.0%
10.5%
13.7%
12.3%
26.4%
15.7%
9.9%
31.2%
14.7%
7.2%53.9%
11.4%
7.1%
52.5%
3.3%
28.0%
3.7%
31.4%
4.3% 5.8%
0.0%
20.0%
40.0%
60.0%
80.0%
100.0%
120.0%
Central Region North Region South Region Central Region North Region South Region
Mar-2015 Apr-2015
Coal(%) Nuclear(%) Gas(%) Wind(%) Other(%)
Generation Outages by Region
Source: MISO CROW Outage Scheduler
* Forced Outages include Emergency, Forced, and Urgent* Planned Outages include Planned
*De-rates are based on limits observed in Real-Time and may reflect normal seasonal de-rates in addition to de-rates for maintenance or other operating conditions.
Outages extracted on May 01, 2015 Data includes both MISO market and reliability footprints. Outage data is “point in time” and can change. The chart reflects the data as it resided in the system on the date of extraction.
21
0
2
4
6
8
10
12
14
16
18
Central Region North Region South Region Central Region North Region South Region
Mar-2015 Apr-2015
GW
Daily Average Generation Outages and Derates - Reliability Footprint
Forced Planned Derates
Source: The Web-based Revenue Sufficiency Guarantee Report
Revenue Sufficiency Guarantee by Regions
*DA_RSG_VLR% is the ratio of DA RSG associated with VLR commitments to the total DA RSG MWP.
*RT_RSG_Txx% is the ratio of RT RSG associated with congestion mitigation to the total RT RSG MWP.Date of Extraction: May 5, 2015. Values may change due to resettlement.
22
0%10%20%30%40%50%60%70%80%
$0.00
$2.00
$4.00
$6.00
$8.00
$10.00
Central Region North Region South Region
Apr-2015
Mill
ions
DA RSG & DA RSG Associated with VLR Total DA RSG MWP DA RSG Associated with VLR Commitments DA_RSG_VLR%*
0%5%10%15%20%25%30%35%40%
$0.00
$2.00
$4.00
$6.00
$8.00
$10.00
Central Region North Region South Region
Apr-2015
Mill
ions
RT RSG & RT RSG Associated with Congestion Mitigation RT RSG MWP RT RSG Associated with Congestion Mitigation RT_RSG_Txx%*
Reliability – Manual Re-dispatches and TLR by Region
Transmission Loading Relief (TLR) Events (Count)
Levels:3 – curtailing non-firm4 – curtailing non-firm and reconfiguring5 – curtailing firm6 – emergency
Manual Redispatches (Count)
Source: MISO Real-Time Operations Department
TLR – April 2015
Notifications – April 2015 • 04/08/15 15:38-23:00 EST: Severe
Weather Alert for areas in the Central Region, due to Tornado Warnings.
• 04/09/15 01:00-02:30 EST: System Status Level 1 YELLOW due to network issues affecting M2M, ARS, MCS and the portal.
• 04/09/15 19:30 EST to 04/10/2015 03:00 EST: Severe Weather Alert for MISO footprint due to a long line of severe thunderstorms including tornado watches and warnings.
• 04/27/15: 05:50 – 14:00 EST Severe Weather Alert issued for southern Louisiana and southern Mississippi areas due to heavy storms, tornadoes, damaging wind and hail.
• 04/27/15: 10:10 – 14:00 EST Conservative Operations issued for EES, CLEC, LAFA, LEPA, SME due to multiple forced transmission outages.
0 Firm MWh Curtailed23,518 Non-Firm MWh Curtailed
23
0 0 0
4
2
00 0 0 0 0 00 0 0 0 0 0
Central Region North Region South Region Central Region North Region South Region
Mar-2015 Apr-2015
Level 3&4 Level 5 Level 6
3
25
82
1017
49
Central Region North Region South Region Central Region North Region South Region MISO
Mar-2015 Apr-2015 2014 AVG
# Number of Manual Redispatch
Transmission Service and Generation Interconnection Request by Region
Long-term Firm Transmission Service Queue
Source: MISO Transmission Planning Department
Generation Interconnect Queue
Number of RequestsApril 2015
Note: The regions are determined based on POINT_OF_RECEIPT.
24
0
5
10
15
20
25
30
35
40
Central Region North Region South Region
Apr-2015
# of Requests in Study
0
4
8
12
Central Region North Region South Region
Apr-2015
# of Requests Processed
0
5,000
10,000
15,000
20,000
25,000
30,000
Central Region North Region South Region
Apr-2015
MW Size of Queue( MW) -Total
0
200
400
600
800
1,000
1,200
1,400
Central Region North Region South Region
Apr-2015
MW Size of Queue( MW) -New Size of Queue (MW) - Resolved
Region Total New ResolvedCentral 83 0 4North 55 2 1South 22 0 1
Transmission Service and Generation Interconnection Request by Region
Long-term Firm Transmission Service Queue
Generation Interconnect Queue
Number of RequestsFebruary 2015
Note: The regions are determined based on POINT_OF_RECEIPT.
25
0
5
10
15
20
25
30
35
Central Region North Region South Region
Feb-2015
# of Requests in Study
0
4
8
12
16
20
24
Central Region North Region South Region
Feb-2015
# of Requests Processed
0
5,000
10,000
15,000
20,000
25,000
30,000
Central Region North Region South Region
Feb-2015
MW Size of Queue( MW) -Total
0
100
200
300
400
500
600
700
Central Region North Region South Region
Feb-2015
MW Size of Queue( MW) -New Size of Queue (MW) - Resolved
Region Total New ResolvedCentral 89 0 3North 51 0 0South 25 0 1