south - campussuite-storage.s3.amazonaws.com · date: february 6th , 2020 bid question/answer log...

27
CHSD 99 Master Facility Implementation 5274-42 Bid Group 9– Addendum #3 Page 1 DATE: February 6 th , 2020 FROM: Wight & Company 2500 N. Frontage Road Darien, IL 60561 SUBJECT: ADDENDUM #3 TO THE BIDDING DOCUMENTS FOR: BID GROUP #9 MASTER FACILITY PLAN IMPLEMENTATION COMMUNITY HIGH SCHOOL DISTRICT 99 1436 NORFOLK STREET DOWNERS GROVE, IL 60516 This addendum forms a part of the Bidding Contract Documents, dated January 15, 2020. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. Drawing revisions clouded and tagged throughout with delta 52. SOUTH Scope of Work: BG#9 Bid Package 111-Theater Rigging (attached). Questions and Answer Log (attached). I. Clarifications II. Specifications 1. REVISE Section 099100 – PAINTING III. Modified Drawings ARCHITECTURAL 1. Sheet A3.11F REFLECTED CEILING PLAN LEVEL 1 -AREA F (Full size sheet issued) a. Note C32 revised to include all catwalk components. 2. Sheet A3.13F REFLECTED CEILING PLAN LEVEL 3 -AREA F (Full size sheet issued) a. BARREL TYPE DIFFUSER PANELS ADDED TO UPPER REAR CORNER. 3. Sheet A10.00 FINISH SCHEDULE & GENERAL DETAILS (Full size sheet issued) a. Acoustical wall finish schedule revised to clarify intent. Barrel diffuser panel WP-7 added.

Upload: others

Post on 12-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

CHSD 99 Master Facility Implementation 5274-42 Bid Group 9– Addendum #3 Page 1

DATE: February 6th, 2020 FROM: Wight & Company

2500 N. Frontage Road Darien, IL 60561

SUBJECT: ADDENDUM #3 TO THE BIDDING DOCUMENTS FOR: BID GROUP #9 MASTER FACILITY PLAN IMPLEMENTATION COMMUNITY HIGH SCHOOL DISTRICT 99 1436 NORFOLK STREET DOWNERS GROVE, IL 60516 This addendum forms a part of the Bidding Contract Documents, dated January 15, 2020. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. Drawing revisions clouded and tagged throughout with delta 52.

SOUTH

Scope of Work: BG#9 Bid Package 111-Theater Rigging (attached). Questions and Answer Log (attached).

I. Clarifications

II. Specifications

1. REVISE Section 099100 – PAINTING

III. Modified Drawings

ARCHITECTURAL

1. Sheet A3.11F REFLECTED CEILING PLAN LEVEL 1 -AREA F (Full size sheet issued)

a. Note C32 revised to include all catwalk components.

2. Sheet A3.13F REFLECTED CEILING PLAN LEVEL 3 -AREA F (Full size sheet issued)

a. BARREL TYPE DIFFUSER PANELS ADDED TO UPPER REAR CORNER.

3. Sheet A10.00 FINISH SCHEDULE & GENERAL DETAILS (Full size sheet issued)

a. Acoustical wall finish schedule revised to clarify intent. Barrel diffuser panel WP-7 added.

Page 2: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

CHSD 99 Master Facility Implementation 5274-42 Bid Group 9– Addendum #3 Page 2

b. TRZ-1 and TST-1 spec section reference added. Thickness revised to 2”. Detail reference added for TST-1

profile information.

4. Sheet A10.11F FINISH PLAN – LEVEL 1 – AREA F (Full size sheet issued)

a. WP-4 added at north and south walls.

5. Sheet A10.12F FINISH PLAN – LEVEL 2 – AREA F (Full size sheet issued)

a. WP-4 added at rear walls.

b. WP-2 added at front of control room.

6. Sheet A10.13F FINISH PLAN – LEVEL 3 – AREA F (Full size sheet issued)

a. WP-4 added at north and south walls.

7. Sheet A10.14F FINISH PLAN – UPPER SEATING – AREA F (Full size sheet issued)

a. WP-4 added at rear walls. Assume vertical extents of 9’-0”.

TECHNOLOGY

8. Sheet T0.00 LEGEND AND GENERAL NOTES (Full size sheet issued)

a. Additional paging components schedule added.

9. Sheet T1.11B AREA B COMMUNICATION PLAN -LEVEL 1 (Full size sheet issued)

a. Existing IDF A41 relocated to new IDF 1-352.

10. Sheet T1.21 IDF PLANS - LEVEL 1 (Full size sheet issued)

a. Enlarged plan and details for new IDF 1-352 added.

This addendum consists of: (1) Text Pages (0) Specification Sections and (10) Drawing Sheets.

END OF ADDENDUM

Page 3: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

DIVISION 1 – GENERAL CONDITIONS SECTION 00300– Bid Package Scope Document

00300-1 Community High Schoold District 99

South High School Master Facility Plan Initials: /

BG9 BP111 PHASE C–SCOPE OF WORK FOR THEATER RIGGING AND CURTAINS -AUDITORIUM AREA – SOUTH HIGH SCHOOL (ADDENDUM 3)

Scope – This TRADE CONTRACTOR’s scope shall include but not be limited to the scope listed below. Please see entirety of bid documents for all scope requirements.

1. This TRADE CONTRACTOR shall reference ALL Drawings and Specs in this Bid Group 9 as they relate to Theater Rigging. This TRADE CONTRACTOR shall read all Specification Sections in this manual as well as Notes and General Notes included in the drawings as they pertain to this scope of work. This TRADE CONTRACTOR shall review the project SCHEDULE included in this project manual and provide sufficient manpower and equipment to complete this TRADE CONTRACTOR’s scope of work within the designated durations provided.

2. This TRADE CONTRACTOR shall be responsible for furnishing and installing all

materials, providing skilled and/or licensed labor, equipment, tools, etc... to complete all

aspects of this trade contractor’s work including but not necessarily limited to: Stage

Edge Rail System, Stage Rigging Systems, Motorized Acoustical Panels, and

Theater Curtains, Borders, Legs, and Tracks. Refer to specifications and contract

documents for more information.

Note: This TRADE CONTRACTOR shall be responsible for reviewing all drawings,

notes, details, etc. as they relate to the Theatre Rigging Systems.

3. This TRADE CONTRACTOR shall be responsible for furnishing and installing all items

associated to the Stage Edge Rail including stanchions, safety caps, receiver cups,

synthetic mesh net panels, hardware, removable floor plugs, system component storage

carts, etc.

NOTE: This TRADE CONTRACTOR shall be responsible for coordinating with the Stage

Flooring Contractor for requirements to install the Stage Edge Rail. Any modifications

required by this TRADE CONTRACTOR to the stage flooring to install its scope of work

shall be included in this TRADE CONTRACTOR’s scope at no additional cost.

4. This TRADE CONTRACTOR shall be responsible for all Theatre Rigging components

including but not limited to: Manually Operated Counterweight Rigging Linesets,

Motorized Rigging Linesets, Motorized Proscenium Fire Safety Curtain, Manually

Operated Acoustic Curtains and Panels, Motorized Acoustic Curtains, Stage Masking

Curtains and Tracks, Rigging Accessories, and Personnel Lifts and Ladders as shown in

the bid documents. Refer to specification section 116133 for additional information.

5. This TRADE CONTRACTOR shall be responsible for furnishing and installing all

Motorized Acoustical Panels, Theatre Curtains, associated borders, legs, tracks, etc.

NOTE: This TRADE CONTRACTOR shall be responsible for the motorized window

shades per keynote C23 as shown on A3.11F for the Studio Theatre. Motorized window

shades per keynote C23 as shown on A3.11F for the Studio Theatre will be

provided by others and are not responsibility of this TRADE CONTRACTOR.

(Addendum #3)

Page 4: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

DIVISION 1 – GENERAL CONDITIONS SECTION 00300– Bid Package Scope Document

00300-2 Community High Schoold District 99

South High School Master Facility Plan Initials: /

6. This TRADE CONTRACTOR shall be responsible for the delegated design of all items as

specified in the bid documents. Any supplementary steel required for a proper installation

of this TRADE CONTRACTOR’s scope of work shall be included at no additional cost.

All attachments, anchorages, connections, and miscellaneous steel additions to

accommodate pulleys, blocks, etc., shall be designed, supplied, and installed by this

TRADE CONTRACTOR.

7. This TRADE CONTRACTOR is responsible to provide all ladders, scaffolding, cranes,

hoisting, lifts, rigging etc... necessary to complete work in accordance with project

schedule. This TRADE CONTRACTOR shall be responsible for any bracing and shoring

required during installation as well.

8. This TRADE CONTRACTOR shall be responsible for all shop drawings and calculations, and submittals.

9. This TRADE CONTRACTOR shall be responsible for the installation of all supplementary structural supports as required to complete this scope of work, including all cutting, drilling, tapping, welding, ancillary hardware, shackles, turnbuckles, wire, etc..

10. This TRADE CONTRACTOR shall be responsible for all hardware associated for this

scope of work including but not limited to all pulleys, carriers, blocks, clamps, brackets, pipes, battens, rods,

11. This TRADE CONTRACTOR shall be responsible for all motors and cables as necessary

to furnish and install a functional and complete Theatre Rigging system. It is responsibility of this TRADE CONTRACTOR to coordinate electrical requirements with the ELECTRICAL CONTRACTOR in a timely manner.

12. This TRADE CONTRACTOR shall be responsible for protecting any and all rigging related materials on-site: prior to installation, during installation and/or until final acceptance by Construction Manager.

13. This TRADE CONTRACTOR shall be responsible to coordinate with electrical, structural steel, stage lighting, and theater contractors and consultants for proper installation and operation of this scope of work.

14. This TRADE CONTRACTOR shall be responsible for and compliant with all specified

requirements including but not limited to all: Performance Requirements, Submittals, QA, Testing, Training, QC, and Extra Materials specified and pertaining to this trade contractor’s work as noted in the plans and specifications.

15. This TRADE CONTRACTOR shall be responsible to provide its own project layout

according to the drawings, considering the benchmark locations and elevations that will

be given by the Construction Manager.

16. All electrical conduit, wiring, boxes, and low voltage will be by OTHERS. However, direct coordination with this TRADE CONTRACTOR will be required.

ALLOWANCES, BOND, & ALTERNATES

17. This TRADE CONTRACTOR shall include an allowance of $10,000.00 in their base

bid to account for any unforeseen conditions. Contract amounts will be adjusted by change order for amounts greater or less than the allowance. Allowance to be utilized only at the direction of Construction Manager.

Page 5: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

DIVISION 1 – GENERAL CONDITIONS SECTION 00300– Bid Package Scope Document

00300-3 Community High Schoold District 99

South High School Master Facility Plan Initials: /

18. This TRADE CONTRACTOR will be required to provide a Performance and Payment

Bond for their work in accordance with 00201 of the General Conditions.

19. This TRADE CONTRACTOR shall provide an Alternate No. 8.4 STAGE RIGGING DEDUCTIVE

ALTERNATE and fill this in the appropriate spot on the bid form.

20. Alternate 2: This TRADE CONTRACTOR shall provide an alternate price for furnishing and installing the box boom lighting positions and all associated steel for the auditorium.

21. Alternate 3: This TRADE CONTRACTOR shall provide an alternate price for furnishing

and installing the pipe grid system as shown on A3.11 for the Theatre Classroom.

ACCEPTANCE

Accepted as listed above in addition to terms and conditions of the original construction documents on which the bid was based. Company: Wight Construction Services, Inc. 2500 North Frontage Road Darien, IL 60561 Signed: Printed Name: Position: Date:

END OF SECTION 00300 –Scope

Page 6: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Downers Grove South Phase C 180030 Commons_Auditorium Bid Group #9, Q&A Log

2500 North Frontage Road

Darien, IL 60561

630.969.7000 Fax 630.737.0518

www.wightco.com

Project Name: District 99 MFP Implementation DG South Phase C

Project Number: 180030

Date: February 6th , 2020

Bid Question/Answer Log No. 1

The following clarification information is provided in response to questions received in accordance with the bid documents for the following Bid Packages:

Bid Group: 9 Bid Packages: 96, 104-114

# Questions Date Answers Date/By

1. Scope of work lists ACT-1,ACT-2,ACT-

3 as part of work scope. I do not see

ACT-2 used in phase C. Can you confirm

ACT-2 is not used.

1/31/2020 ACT-2 is not relevant for Phase C. 20-0205

BHS

2. Can you clarify which acoustical panels

are furnished and installed by rigging

contractor as noted on line item #8 in

acoustical bid scope.

1/31/2020

Line Item #8 refers only to the acoustical

panels as delineated on Sheet TR3.22.

20-0205

BHS

3. Line item # 7 lists WP-1,WP-2,WP-3 and

WP-4 as part of work scope. Finish

schedule on sheet A10.00 has WP-6 and

no WP-4. Is WP-6 to replace WP-4.

1/31/2020

Disregard WP-6. 20-0205

BHS

4. Detail 1/A7.24 shows wood veneer wall

panels. Do these wall panels fall under

the Acoustical ceiling bid package?

1/31/2020

No. These wall panels will be bid as part of a millwork package.

20-0205

BHS

5. WP-1 East Wall (no elevation shown) on

page A10.14f – what is our Height to

figure for panels? (bid package

“Acoustical Ceiling Tiles & Acoustical

Wall Panels”)

1/31/2020

WP-1 on the upper back (east) wall on

1/A10.14 to be 9’-0” tall.

20-0205

BHS

6. WP-3 Room 0-722 (No Elevation) –

What is our Height to figure for panels? 1/31/2020

Similar to 0-723. 20-0205

BHS

7. WP-4 Filzfelt is Spec’d but not shown in

drawings (09 84 15)

1/31/2020

Locations have been added to the finish

plans, included within.

20-0206

BHS

Page 7: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Downers Grove South Phase C 180030 Commons_Auditorium Bid Group #9, Q&A Log

8. Tectum Wood Fiber Sound Absorbing

Baffles is Spec’d but not shown in

drawings (09 84 43)

1/31/2020

Disregard. This information applies to a previous phase.

20-0205

BHS

11. Confirm that scope of bid package

“Acoustical Ceiling Tiles & Acoustical

Wall Panels” is just in “Area F”

1/31/2020

No, the scope includes all areas shown as phase C. Refer to the phasing exhibit issued in the project manual.

20-0206

IE

12. Provide the specification for EP-1. 2/04/2020 Assume epoxy paint for this area.

13. Clarify the extents of paint @

handrails/guardrails. Are they all to be

stainless steel or are there any painted

steel elements?

2/04/2020

Handrails, lighting pipes, etc in the

auditorium are to be painted. Monumental stair in Area ‘B’ to be stainless steel, typ.

20-0205

BHS

14. Clarify the extents of the painting @

catwalks. RCP drawings show the

underside of the catwalks to be painted. Is

the rest of the catwalk steel to be painted

as well?

2/04/2020

All of the catwalk components are to be

painted.

20-0206

BHS

15. Confirm which trade is responsible for

the precast staining. The drawings

mention this work is to be done by the

precast contractor.

2/04/2020

The staining of the precast shall be responsibility of BP 108. Refer to item 9 in the scope document. Bidders of BP 113

can include an alternate in their bid for this scope of work in the corresponding space in the bid form.

20-0206

IE

16. Areas noted on finish plan say “Phase A and B work previously completed” or “Phase A work previously completed”. Do we EXCLUDE finishes in these areas?

2/05/2020 Areas noted as phase A and phase B are not included in this bid group unless otherwise noted in the specific scope documents.

2/05/2020

IE

Page 8: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 1 \

SECTION 099100 – PAINTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes surface preparation and the application of paint systems on interior and exterior substrates.

B. Related Requirements:

1. Division 05 sections for shop priming of metal substrates.

1.3 DEFINITIONS

A. Gloss Level 4: Eggshell refers to low-sheen finish with a gloss range between 20 and 35 at 85 degrees, according to ASTM D 523.

B. Gloss Level 5: Semigloss refers to medium-sheen finish with a gloss range between 35 and 70 at 60 degrees, according to ASTM D 523.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product. Include preparation requirements and application instructions.

B. Sustainable Design Submittals:

1. Laboratory Test Reports: For paints and coatings, indicating compliance with requirements for low-emitting materials.

C. Samples for Initial Selection: For each type of topcoat product.

D. Samples for Verification: For each type of paint system and in each color and gloss of topcoat indicated.

1. Submit Samples on rigid backing, 8 inches square. 2. Step coats on Samples to show each coat required for system. 3. Label each coat of each Sample. 4. Submit stain Samples on representative samples of actual wood substrates, 8

inches square or 8 inches long.

Page 9: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 2 \

5. Label each Sample for location and application area.

E. Product List: For each product indicated, include the following:

1. Cross-reference to finish system and locations of application areas. Use same designations indicated on Drawings and in schedules.

1.5 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Paint Finishes: 5 percent, but not less than 1 gal. of each material and color applied.

2. Coating Maintenance Manual: Upon conclusion of the project, the contractor or paint manufacturer/supplier shall furnish a coating maintenance manual, such as Sherwin-Williams “Custodian Project Color and Product Information” report or equal. Manual shall include an Area Summary with finish schedule, Area Detail designating where each product/color/finish was used, product data pages, Material Safety Data Sheets, care and cleaning instructions, touch-up procedures, and color samples of each color and finish used.

1.6 QUALITY ASSURANCE

A. Mockups: Apply benchmark samples of each paint system indicated and each color and finish selected to verify preliminary selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Architect will select one surface to represent surfaces and conditions for application of each paint system specified in Part 3.

a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft. b. Other Items: Architect will designate items or areas required.

2. Final approval of color selections will be based on benchmark samples.

a. If preliminary color selections are not approved, apply additional benchmark samples of additional colors selected by Architect at no added cost to Owner.

3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

Page 10: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 3 \

1.7 DELIVERY, STORAGE, AND HANDLING

A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.

1. Maintain containers in clean condition, free of foreign materials and residue. 2. Remove rags and waste from storage areas daily.

1.8 FIELD CONDITIONS

A. Apply paints and finishes only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.

B. Do not apply paints and finishes when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.

C. Do not apply exterior finishes in snow, rain, fog, or mist.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Benjamin Moore & Co. (BM) 2. Glidden Professional Paints. (GP) 3. PPG Architectural Finishes, Inc. (PPG) 4. Pratt & Lambert. (P&L) 5. Sherwin-Williams Company (The). (S-W)

2.2 MATERIALS, GENERAL

A. Material Compatibility:

1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in finish system and on substrate indicated.

B. Low-Emitting Materials: Interior paints and coatings used inside the waterproofing system shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."

C. Colors: As indicated in color schedules on Drawings, or if not indicated, as selected by Architect from manufacturer's full range.

Page 11: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 4 \

D. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified that are factory formulated and recommended by manufacturer for application indicated. Paint-material containers not displaying manufacturer's product identification will not be acceptable.

1. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of work.

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

1. Concrete: 12 percent. 2. Masonry (Clay and CMU): 12 percent. 3. Gypsum Board: 12 percent.

C. Gypsum Board Substrates: Do not begin paint application until finishing compound is dry and sanded smooth.

D. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

E. Proceed with coating application only after unsatisfactory conditions have been corrected.

1. Application of coating indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual" and "MPI Architectural Painting Specification Manual" applicable to substrates indicated.

B. Remove plates, machined surfaces, and similar items already in place that are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.

Page 12: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 5 \

C. Clean substrates of substances that could impair bond of paints, including dirt, oil, grease, and incompatible paints and encapsulants.

1. Remove incompatible primers and reprime substrate with compatible primers as required to produce paint systems indicated.

2. Remove grade stamps and pencil marks from wood by sanding lightly. Remove loose wood fibers by brushing.

D. Masonry Substrates: Remove efflorescence and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions.

E. Non-Shop-Primed Steel Substrates: Remove rust and loose mill scale. Clean using methods recommended in writing by paint manufacturer, but not less than the following:

1. SSPC-SP 3, "Power Tool Cleaning."

F. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.

G. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal fabricated from coil stock by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied paints.

3.3 APPLICATION

A. Apply paints and finishes according to manufacturer's written instructions and to recommendations in "MPI Architectural Painting Specification Manual."

1. Use applicators and techniques suited for paint and substrate indicated. 2. Finish surfaces behind movable equipment and furniture same as similar

exposed surfaces. Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.

3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.

4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.

B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Tint undercoats to match color of topcoat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.

C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.

D. Apply paints and finishes to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

Page 13: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 6 \

E. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work:

1. Paint the following work where exposed in equipment rooms:

a. Uninsulated metal piping. b. Uninsulated plastic piping. c. Pipe hangers and supports. d. Metal conduit. e. Plastic conduit. f. Tanks that do not have factory-applied final finishes. g. Duct, equipment, and pipe insulation having cotton or canvas insulation

covering or other paintable jacket material.

2. Paint the following work where exposed in occupied spaces:

a. Equipment, including panelboards. b. Uninsulated metal piping. c. Uninsulated plastic piping. d. Pipe hangers and supports. e. Metal conduit. f. Plastic conduit. g. Duct, equipment, and pipe insulation having cotton or canvas insulation

covering or other paintable jacket material. h. Other items as directed by Architect.

3. Paint portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets that are visible from occupied spaces.

3.4 FIELD QUALITY CONTROL

A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test paint for dry film thickness.

1. Contractor shall touch up and restore painted surfaces damaged by testing. 2. If test results show that dry film thickness of applied paint does not comply with

paint manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with paint manufacturer's written recommendations.

3.5 CLEANING AND PROTECTION

A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

B. After completing paint and finish application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

Page 14: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 7 \

C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.

D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.6 EXTERIOR PAINTING SCHEDULE

A. Steel Substrates:

1. Semi-Gloss Acrylic-Enamel Finish: Two finish coats over a primer over shop primer.

a. 1st Coat: S-W Industrial Pro-Cryl Universal Primer, B66-1310 Series: Applied at a dry film thickness of not less than 4.0 mils (8.0 mils wet).

b. 2nd and 3rd Coats: S-W Metalatex Semi-Gloss, B42 Series: Applied at a dry film thickness of not less than 1.5 mils (4.0 mils wet) per coat.

c. 2nd and 3rd Coats: S-W ProIndustrial Acrylic Semi-Gloss, B66 Series: Applied at a dry film thickness of not less than 1.5 mils (4.0 mils wet) per coat.

B. Galvanized-Metal Substrates:

1. Semi-Gloss Finish: Two finish coats over a primer:

a. Additional Preparation:

1) Clean galvanized steel with Simple Green All Purpose Cleaner. 2) Wipe galvanized steel with H&C Clean and Etch, diluted 1:1 with

water. 3) Rinse with clean water.

b. 1st Coat: S-W Industrial Pro-Cryl Universal Primer, B66-1310 Series: Applied at a dry film thickness of not less than 4.0 mils (8.0 mils wet).

c. 2nd and 3rd Coats: S-W ProIndustrial Acrylic Semi-Gloss, B66 Series: Applied at a dry film thickness of not less than 1.5 mils (4.0 mils wet) per coat.

C. Metal Railings, Hollow Metal Doors and Frames Substrates:

1. Semi-Gloss Urethane Finish: One finish coats over a primer.

a. 1st Coat: S-W Macropoxy 646 - 100 Fast Cure Epoxy, B58-620 Series. Applied at a dry film thickness of not less than 3 mils (7.0 mils wet).

b. 2nd Coat: S-W Acrolon 218 Acrylic Polyurethane Semi-Gloss, B65-650 Series. Applied at a dry film thickness of not less than 3.0 mils (4.5 mils wet).

Page 15: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 8 \

D. Existing Porcelain-Enamel-Coated Fascia:

1. Gloss Finish: Two finish coats over a primer:

a. Preparation: Clean surfaces of foreign material. Dull coating by abrading surfaces. Apply a test area, allowing paint to dry one week before testing adhesion according to ASTM D3359. If adhesion is poor, remove previous coating.

b. 1st Coat: S-W DTM Bonding Primer, B66A50 Series. (5.0 mils wet, 2.0 mils dry).

c. 2nd and 3rd Coats: S-W Pro Industrial Waterbased Acrolon 100, B65-720 Series. Applied at a dry film thickness of not less than 1.8 - 3.6 mils (4.0 - 8.0 mils wet) per coat.

3.7 INTERIOR PAINTING SCHEDULE

A. CMU Substrates:

1. Semi-Gloss Finish: Two finish coats over heavy-duty block filler.

a. 1st Coat: S-W Pro Industrial Heavy Duty Block Filler B42W150: Applied at a dry film thickness of not less than 14.0 mils (26.0 mils wet).

b. 2nd and 3rd Coats: S-W ProMar 200 Zero VOC Latex Semi-Gloss, B31-2600 Series: Applied at a dry film thickness of not less than 1.7 mils (4 mils wet) per coat.

2. Semi-Gloss Urethane Finish: Two finish coats over a primer over shop primer.

a. 1st Coat: S-W Pro Industrial Heavy Duty Block Filler B42W150: Applied at a dry film thickness of not less than 14.0 mils (26.0 mils wet).

b. 2nd and 3rd Coats: S-W Pro Industrial Waterbased Alkyd Urethane, Semi Gloss, B53W1150 (Extra-White base only): Applied at a dry film thickness of not less than 1.4 to 1.7 mils dry (4.0 to 5.0 mils wet) per coat.

B. Steel Substrates:

1. Semi-Gloss Acrylic-Enamel Finish: Two finish coats over a primer over shop primer.

a. 1st Coat: S-W Pro Industrial Pro-Cryl Primer B66-1310 Series. Applied at a dry film thickness of 1.9 to 3.8 mils (5.0 to 12.0 mils wet).

b. 2nd and 3rd Coats: S-W ProMar 200 Zero VOC Latex Semi-Gloss, B31-2600 Series: Applied at a dry film thickness of not less than 1.7 mils (4 mils wet) per coat.

Page 16: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 9 \

C. Steel Railings, Hollow Metal Doors and Frames:

1. Semi-Gloss Urethane Finish: Two finish coats over a primer over shop primer.

a. 1st Coat: S-W Pro Industrial Pro-Cryl Primer B66-1310 Series. Applied at a dry film thickness of 1.9 to 3.8 mils (5.0 to 12.0 mils wet).

b. 2nd and 3rd Coats: S-W Pro Industrial Waterbased Alkyd Urethane, Semi Gloss, B53W1150 (Extra-White base only): Applied at a dry film thickness of not less than 1.4 to 1.7 mils dry (4.0 to 5.0 mils wet) per coat.

2. Fluid-Applied Insulating Coatings:

a. Primer: Tnemec Company; Tneme-Zinc Series 90E-92; Applied at a dry film thickness of not less than 2.5 mils dry.

b. 1st Coat: Tnemec Company; Tnemec Aerolon Series 971 Aerogel-Based Thermally Insulative Coating; Applied at a dry film thickness of not less than 30 to 300 mils applied in multiple applications to specified R-value.

1) R-Value: As indicated on Drawings.

c. 2nd Coat: Tnemec Company; Tnemec Series 1028 Enduratone: Applied at a dry film thickness of not less than 2.0 to 3.0 mils dry.

D. Galvanized-Metal Substrates:

1. Semi-Gloss Acrylic-Enamel Finish: Two finish coats over a primer.

a. Additional Preparation:

1) Clean galvanized steel with Simple Green All Purpose Cleaner. 2) Wipe galvanized steel with H&C Clean and Etch, diluted 1:1 with

water. 3) Rinse with clean water.

b. 1st Coat: S-W Pro Industrial Pro-Cryl Primer B66-1310 Series. Applied at a dry film thickness of 1.9 to 3.8 mils (5.0 to 12.0 mils wet).

c. 2nd and 3rd Coats: S-W ProMar 200 Zero VOC Latex Semi-Gloss, B31-2600 Series: Applied at a dry film thickness of not less than 1.7 mils per coat (4 mils wet).

E. Gypsum Board Substrates:

1. Ceilings – Low-Luster (Flat Eggshell) Acrylic-Enamel Finish: Two finish coats over a primer.

a. 1st Coat: S-W ProMar 200 Zero VOC Interior Latex Primer B28W02600 Series: Applied at a dry-film thickness of not less than 1.0 mil (4 mils wet).

b. 2nd and 3rd Coats: S-W ProMar 200 Zero VOC Latex Flat, B30-2600 Series: Applied at a dry film thickness of not less than 1.6 mils (4 mils wet) per coat. S-W ProMar 200 Zero VOC Latex Eg-Shel, B20-2600

Page 17: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

Community High School District 99 5274-42 Master Facility Plan Implementation – South Bid Group 8

PAINTING 099100 - 10 \

Series: Applied at a dry film thickness of not less than 1.7 mils (4 mils wet) per coat.

2. Toilet-Room Ceilings - Semi-Gloss Acrylic-Enamel Finish: Two finish coats over a primer.

a. 1st Coat: S-W ProMar 200 Zero VOC Interior Latex Primer B28W02600 Series: Applied at a dry-film thickness of not less than 1.0 mil (4 mils wet).

b. 2nd and 3rd Coats: S-W ProMar 200 Zero VOC Latex Semi-Gloss, B31-2600 Series: Applied at a dry film thickness of not less than 1.7 mils (4 mils wet) per coat.

3. Walls – Semi-Gloss Urethane Finish: Two finish coats over a primer.

a. 1st Coat: S-W ProMar 200 Zero VOC Interior Latex Primer B28W02600 Series: Applied at a dry-film thickness of not less than 1.0 mil (4 mils wet).

b. 2nd and 3rd Coats: S-W Pro Industrial Waterbased Alkyd Urethane, Semi Gloss, B53W1150 (Extra-White base only): Applied at a dry film thickness of not less than 1.4 to 1.7 mils dry (4.0 to 5.0 mils wet) per coat.

c. 4th Coat for Deep-Tint Colors: Same as 3rd coat.

F. Previously Coated Surfaces:

1. Ceilings: Flat acrylic finish; two finish coats over a primer.

a. 1st Coat: S-W Extreme Bond Primer B51W50. Applied at a dry film thickness of not less than 2 to 4 mils.

b. 2nd and 3rd Coats: S-W ProMar 200 Zero VOC Latex Flat, B30-2600 Series: Applied at a dry film thickness of not less than 1.6 mils (4 mils wet) per coat.

2. CMU Walls, Gypsum Board Partitions, Hollow Metal Doors and Frames, and Railings – Semi-Gloss Urethane Finish: Two finish coats over a primer.

a. 1st Coat: S-W Extreme Bond Primer B51W50. Applied at a dry film thickness of not less than 2 to 4 mils.

b. 2nd and 3rd Coats: S-W Pro Industrial Waterbased Alkyd Urethane, Semi Gloss, B53W1150 (Extra-White base only): Applied at a dry film thickness of not less than 1.4 to 1.7 mils dry (4.0 to 5.0 mils wet) per coat.

c. 4th Coat for Deep-Tint Colors: Same as 3rd coat.

END OF SECTION 099100

Page 18: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

1. TYPICAL CEILINGS SHALL BE +9'-6"AFF UNLESS NOTED OTHERWISE.2. ALL LIGHT FIXTURES CENTERED IN ROOM UNLESS NOTED OTHERWISE.3. CENTER ALL CEILING MOUNTED DEVICES WITHIN 2X2 OR 2X4 SECTION OF

SCORED 2X4 CEILING TILE,TYP.4. PAINT EXPOSED UNDERSIDE OF ROOF DESK/FLOOR STRUCTURE, EXPOSED

STRUCTURAL STEEL, BEAMS, EXPOSED UTILITY PIPING AND ALL OTHER "PAINTABLE" SURFACES - SEE SPECIFICATIONS FOR FURTHER CLARIFICATION.

5. REMOVE ALL CEILING DEVICES SUCH AS BUT NOT LIMITED TO: LIGHT FIXTURES, EXIT SIGNS, EMERGENCY DEVICES, EMERGENCY LIGHTS, AND ANY OTHER SUPPORT SYSTEMS THAT CONFLICT WITH NEW WORK.

6. AREAS NOTED AS INCIDENTAL WORK AREAS MAY INCLUDE ABOVE CEILING WORK FOR MEP/FP RELATED UPGRADES. REFER TO ASSOCIATED DISCIPLINE-SPECIFIC DRAWINGS FOR MORE INFORMATION AND SCOPE.

GENERAL NOTES

LINEAR LIGHT FIXTURE

REFLECTED CEILING PLAN SYMBOL LEGEND

2' x 4' ACOUSTICAL CEILING SYSTEM

2' x 2' ACOUSTICAL CEILING SYSTEM

GYPSUM BOARD CEILING

EXISTING RECESSED LIGHT FIXTURE

PENDANT LIGHT FIXTURE

2X4 RECESSED LIGHT FIXTURE

EXISTING 2X4 RECESSED LIGHT FIXTURE

RECESSED CAN LIGHT FIXTURE

PENDANT LIGHT FIXTURE

WALL SCONCE

ROLLER SHADES

CJ CONTROL JOINT ON GYPSUM CEILING

2

A4.25

1

A4.26

1

A4.25

1

A4.27 1

A4.28

3

A5.16

2

A4.26

2

A4.28

1

A5.15

2

A5.16

63.W63.X63.Z

63.AA

63.AA63.BB

63.10

63.11

63.12

63.13

63.15

63.17

63.21

63.Z

63.22

63.23

63.DD 63.CC 63.Y 63.V

3

A4.29

2

A5.15

4

A5.15

1

A5.17

2

A5.17

3

A5.15

THEATRE

CLASSROOM

1-623

VOC.

CLASSROOM

1-546

PRAC

1-544

PRAC

1-545

PRAC

1-541

PRAC

1-539

PRAC

1-537

PRAC

1-535

PRAC

1-534

PRAC

1-536

PRAC

1-538

PRAC

1-540

STORAGE

1-531

STORAGE

1-533

PRAC

1-532

PRAC

1-530

MUSIC

1-529

CORRIDOR

1-542

CORRIDOR

1-542

VEST

1-622

STUDIO

THEATRE

1-604

SCENE SHOP

1-613

STORAGE

1-615

DRESSING

ROOM

1-618

TOILET

1-619

TOILET

1-620

DRESSING

ROOM

1-621

CORRIDOR

1-611

TOILET

1-605 TOILET

1-607

OFFICE

1-609

VEST

1-610

VESTIBULE

1-612

VEST

1-603

VEST

1-625

VEST

1-608

STAGE

1-628AUDITORIUM

1-633

PIT STAIR

1-632

TOILETS

1-642

TOILETS

1-638

CATWALK

STAIR

1-629

VEST

1-633

VEST

1-637VOMITORIUM

1-634

VOMITORIUM

1-636

VEST

1-631

3

A5.17

1

A5.16

4

A5.17

EVENT

CORRIDOR

1-602

VEST.

1-600

CORRIDOR

xB-42

CAFE

1-641

GYP-1

8'-1"

ACT-1

8'-8"

14'-9 1/2"

ACT-1

14'-6"

GYP-1

8'-0"

GYP-1

8'-0"

GYP-1

9'-0"

GYP-1

9'-0"

ACT-1

9'-0"

ACT-1

8'-2"

ACT-1

10'-0"

14'-9 1/2"

GYP-4

15'-0"

14'-9 1/2"

E-WP-02

E-WP-02C22

C22

C22

1' - 0"

1

A7.29

GYP-1

8'-10"

ACT-1

8'-10"

ACT-1

10'-0"

CORRIDOR

1-624

ACT-1

9'-0"

ACT-1

9'-0"

ACT-1

9'-0"

GYP-1

8'-0"

TOILET

1-616

TOILET

1-617

JAN

1-606

C29

VESTIBULE

1-644

CORRIDOR

xB-42

VEST

1-639

VEST

1-643

GYP-1

8'-6"

GYP-1

8'-0"

GYP-1

8'-2"

ACT-3

9'-0"

6

A3.21

SECURITY

1-601

GYP-1

15'-6"

GYP-1

8'-0"

GYP-1

8'-0"GYP-1

8'-0"

GYP-1

8'-0"

2

A7.25

ACT-1

16'-4"

ACT-1

12'-0"

7

A3.21

2

A7.26

7

A5.13

3

A7.25

5

A7.26

6

A7.26

ACT-1

8'-10"

1

A7.25

4

A5.16

CL

N.A N.C

N.D N.G

N.H

N.I N.J

N.J

N.K N.L

N.L

N.N

N.N

N.O

N.O

N.P

N.P

N.Q

N.Q

N.R

N.R

N.S

N.S

N.1

N.2

N.2

N.3

N.3

N.5N.5

N.08

N.9

N.12

N.12

N.14

N.14

N.15

N.15

N.16

C14

C7

C28

C32

4

A5.18

GYP-1

8'-0"

ELEC

1-614

OPEN TO ABOVE

6'-0" 1'-4"

6'-0

" T

YP

.

6'-0"7'-4"

EQ

EQ

6'-0

" T

YP

.4'

-2"

4'-5

"

3'-4" 8'-0"

6'-0" 1'-4"

6'-0

" T

YP

.

6'-0" 7'-4"

2'-8

"2'

-6"

EQ

EQ

EQ

EQ

5'-6"

5'-6

"

ACT-1

10'-0"

ACT-1

9'-0"

ACT-1

8'-8"

11'-5"

B/ DECK

GYP-1

8'-2"

15'-7"

B/ DECK

15'-7"

B/ DECK

VEST

1-630

GYP-1

8'-0"

GYP-1

8'-0"

EQ 6'-0" EQ

EQ

4'-0

"E

Q

EQ

4'-0

"E

Q

EQ EQ EQ EQ

EQ

4'-0

"E

Q

EQ EQ

EQ

EQ

EQ 5'-0" EQ

EQ

EQ

EQ 6'-0" EQ

EQ

EQ

EQ

EQ

EQ 6'-0" EQ

1'-5

"E

QE

QE

QE

Q4'

-0"

2'-6

"

4'-2

1/2

"4'

-0"

4'-0

"4'

-0"

2'-6

"

EQ EQ

EQ 4'-6" EQ

EQ

EQ

EQ

EQ

EQ 6'-0" EQ

EQ

EQ

EQ

EQ

EQ EQ

1'-5

"E

QE

QE

QE

Q4'

-0"

2'-6

"

4'-2

1/2

"4'

-0"

4'-0

"4'

-0"

4

A7.25

10

A3.21

GYP-1

8'-0"EQ 4'-6" EQ

EQ 6'-0" EQ

ACT-1

9'-0"

GYP-1

8'-0"

5'-6 1/2"

STORAGE

1-640

12

A3.21

C3

C3

GYP-1

8'-2"

GYP-1

8'-2"

C3

GYP-1

8'-0"

C3

C3

84

C3

C37

C37

C37

4

A3.22

SEE 9 / A3.21

15'-7"

B/ DECK

C38

84C23

12

A7.26

4

A7.26

1"

/ 1

'-0

"

GYP-1

13'-10"

VARIES

GYP-1

C45

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

C46

C46B/ LOWER ANTE-PROACCESS FLOOR

B/ LOWER ANTE-PROACCESS FLOOR

C48

N.4N.4

N.6

N.7

N.10

N.11

C.2

AD

B

E

F

J

G H

C.1

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:16

:39

PM

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

REFLECTED CEILING

PLAN LEVEL 1 - AREA F

5274-42

B.SPOEHR

A3.11F

COMMUNITY HIGH SCHOOL

DISTRICT 99

10'-0"

ACT-1

CEILING HEIGHT

CEILING FINISH

KEY NOTESSYMBOL MANUFACTURER MATERIAL DESCRIPTION

ACT-1 ARMSTRONG 2X2 ACOUSTICAL CEILINGSYSTEM

ACT-2 ARMSTRONG 2X4 ACOUSTICAL CEILINGSYSTEM

ACT-3 ARMSTRONG 2X2 FOOD SERVICE

E-WP-2 SEE EXTERIOR FINISHLEGEND

SEE EXTERIOR FINISH LEGEND

GYP-1 AMERICAN GYPSUM GYPSUM BOARD CEILING

GYP-3 AMERICAN GYPSUM GYPSUM BOARD CEILING 1 HR

GYP-4 AMERICAN GYPSUM GYPSUM BOARD CEILING ACOUSTICALBARRIER CEILING

GYP-6 AMERICAN GYPSUM ACOUSTICAL GYPSUM BOARDCEILING

ACOUSTICALPERFORATEDGYPSUM BOARD

MTL-1 TBD FLUSH REVEAL METAL PANEL SOFFIT

WD-1

N

SCALE: 1/8" = 1'-0"1

LEVEL 1 - AREA F

REV ISSUE DATE

ISSUED FOR DESIGNDEVELOPMENT

07.12.2019

34 ISSUED FOR 75% CONSTRUCTIONDOCUMENTS - PHASE C

10.14.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

39 ISSUED FOR ADDENDUM 3 - BG8 12.11.2019

41 ISSUED FOR ADDENDUM 4 - BG8 12.16.2019

ISSUED FOR HEALTH DEPARTMENTREVIEW - PHASE C

01.24.2020

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

84 PROVIDE ACOUSTICAL BATT INSULATION ABOVE SUSPENDED CEILING.

C3 PAINT GYPSUM BOARD CEILING PT-2.

C7 SUSPENDED PROJECTOR.

C14 SUSPENDED PROJECTION SCREEN.

C22 CONTINUOUS SOFFIT VENT

C23 MOTORIZED BLACK-OUT ROLLER SHADE SUSPENDED FROM BEAM PLATE ANDINSTALLED BY RIGGING CONTRACTOR

C28 SUSPENDED PIPE GRID SYSTEM W/ CROSS CONNECTORS. PAINT UPT-3

C29 MODIFY EXISTING CEILING GRID TO ACCEPT NEW PARTITION WALLS

C32 PAINTED UNDERSIDE OF CATWALK & ALL ASSOCIATED COMPONENTS, PAINTUPT-3

C37 CEILING EXPANSION JOINT COVER CJ-1

C38 PAINT EXPOSED CEILING PT-3

C45 CURTAIN TRACK - REFER TO THEATRE RIGGING DRAWINGS

C46 PROVIDE 2" DUCT LINER UNDERNEATH METAL DECK/STEEL PLATFORMS PERSPEC SECTION 233113

C48 TECTUM PANELS MOUNTED TO UNDERSIDE OF PRECAST WALL OPENING ANDACOUSTICAL BARRIER CEILING

39

41

52

Page 19: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

1

A4.26

1

A4.28

2

A4.28

63.W63.X63.Z63.AA63.BB

63.10

63.11

63.12

63.13

63.16

63.17

63.20

63.21

63.22

63.23

63.FF

63.FF

63.EE

63.EE 63.DD 63.CC 63.Y 63.V

3

A4.29 VEST

3-607

AUDITORIUM

1-633

STAGE

1-628

TOILET

3-608

1

A7.29

LOBBY

3-605

GYP-1

8'-0"

GYP-1

8'-0"

FOLLOW SPOT ROOMBEYOND, SEE PLAN 3/A13F

ELEC

3-604

TOILET

3-603

GYP-1

8'-0"

GYP-1

8'-0"

3'-0"

8'-0

" T

YP

.

GYP-1

8'-0"

2

A7.25

ACT-1

9'-0"

4

A7.27

GYP-1

8'-0"

GYP-1

8'-0"

N.J

N.J

N.L

N.L

N.N

N.N

N.O

N.O

N.P

N.P

N.Q

N.Q

N.R

N.R

N.S

N.S

N.2

N.3

N.12

N.14

VEST

3-603

12'-0"

B/ SLAB

3

A7.29

2

A7.29

4

A7.25

C1

C1

6'-0" TYP.

C37

EQ EQ

20'-2

1/2

"

CL

TYP.

5'-0

"

C38

8'-0"

EL: 28'-1"EL: 27'-6"

8'-0"

10'-0

"

EL: 33'-9" EL: 34'-7"

EL: 42'-2"EL: 41'-0"

TY

P.

10'-0

"

8'-0"

C30

1'-0

"1'

-0"

TY

P.

2'-0

"

TECHINCAL

MEZZANINE

3-600

C46

TECHNICAL

MEZZANINE

3-601

C46

N.4

N.6

N.7

N.10

N.11

3

A5.16

63.11

63.17

63.20

3

A4.29

FOLLOW SPOT ROOM

2

A7.25

N.R N.S

N.2

N.12

N.14

15

A5.18

9'-0"

ACT-1

BARREL TYPEDIFFUSIVE PANELSSEE SPEC SECTION098413

C47

N.4

N.6

N.7

N.10

N.11

BARREL TYPEDIFFUSIVE PANELSSEE SPEC SECTION098413

1. TYPICAL CEILINGS SHALL BE +9'-6"AFF UNLESS NOTED OTHERWISE.2. ALL LIGHT FIXTURES CENTERED IN ROOM UNLESS NOTED OTHERWISE.3. CENTER ALL CEILING MOUNTED DEVICES WITHIN 2X2 OR 2X4 SECTION OF

SCORED 2X4 CEILING TILE,TYP.4. PAINT EXPOSED UNDERSIDE OF ROOF DESK/FLOOR STRUCTURE, EXPOSED

STRUCTURAL STEEL, BEAMS, EXPOSED UTILITY PIPING AND ALL OTHER "PAINTABLE" SURFACES - SEE SPECIFICATIONS FOR FURTHER CLARIFICATION.

5. REMOVE ALL CEILING DEVICES SUCH AS BUT NOT LIMITED TO: LIGHT FIXTURES, EXIT SIGNS, EMERGENCY DEVICES, EMERGENCY LIGHTS, AND ANY OTHER SUPPORT SYSTEMS THAT CONFLICT WITH NEW WORK.

6. AREAS NOTED AS INCIDENTAL WORK AREAS MAY INCLUDE ABOVE CEILING WORK FOR MEP/FP RELATED UPGRADES. REFER TO ASSOCIATED DISCIPLINE-SPECIFIC DRAWINGS FOR MORE INFORMATION AND SCOPE.

GENERAL NOTES

LINEAR LIGHT FIXTURE

REFLECTED CEILING PLAN SYMBOL LEGEND

2' x 4' ACOUSTICAL CEILING SYSTEM

2' x 2' ACOUSTICAL CEILING SYSTEM

GYPSUM BOARD CEILING

EXISTING RECESSED LIGHT FIXTURE

PENDANT LIGHT FIXTURE

2X4 RECESSED LIGHT FIXTURE

EXISTING 2X4 RECESSED LIGHT FIXTURE

RECESSED CAN LIGHT FIXTURE

PENDANT LIGHT FIXTURE

WALL SCONCE

ROLLER SHADES

CJ CONTROL JOINT ON GYPSUM CEILING

3

A5.16

63.17

63.20

3

A4.29

2

A7.25

N.P N.Q N.R N.S

N.2

N.3

N.5

N.08

N.9

N.12

N.13

N.14

15

A5.18

1" / 1'-0"

EL: 46'-6" EL: 45'-8"

VARIES

GYP-1

N.4

N.6

N.7

N.10

N.11

C.2

AD

B

E

F

J

G H

C.1

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:16

:52

PM

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

REFLECTED CEILING

PLAN LEVEL 3 - AREA F

5274-42

Author

A3.13F

COMMUNITY HIGH SCHOOL

DISTRICT 99

N

SCALE: 1/8" = 1'-0"1

LEVEL 3 - AREA F

N

SCALE: 1/8" = 1'-0"2

FOLLOW SPOT ROOM

10'-0"

ACT-1

CEILING HEIGHT

CEILING FINISH

KEY NOTESSYMBOL MANUFACTURER MATERIAL DESCRIPTION

ACT-1 ARMSTRONG 2X2 ACOUSTICAL CEILINGSYSTEM

ACT-2 ARMSTRONG 2X4 ACOUSTICAL CEILINGSYSTEM

ACT-3 ARMSTRONG 2X2 FOOD SERVICE

E-WP-2 SEE EXTERIOR FINISHLEGEND

SEE EXTERIOR FINISH LEGEND

GYP-1 AMERICAN GYPSUM GYPSUM BOARD CEILING

GYP-3 AMERICAN GYPSUM GYPSUM BOARD CEILING 1 HR

GYP-4 AMERICAN GYPSUM GYPSUM BOARD CEILING ACOUSTICALBARRIER CEILING

GYP-6 AMERICAN GYPSUM ACOUSTICAL GYPSUM BOARDCEILING

ACOUSTICALPERFORATEDGYPSUM BOARD

MTL-1 TBD FLUSH REVEAL METAL PANEL SOFFIT

WD-1

C1 PAINT GYPSUM BOARD CEILING PT-11.

C30 SUSPENDED PAINTED GYP. BD. REFLECTOR CLOUD

C37 CEILING EXPANSION JOINT COVER CJ-1

C38 PAINT EXPOSED CEILING PT-3

C46 PROVIDE 2" DUCT LINER UNDERNEATH METAL DECK/STEEL PLATFORMS PERSPEC SECTION 233113

C47 PROVIDE DARK ACOUSTICAL CEILING TILE

N

SCALE: 1/8" = 1'-0"3

UPPER SEATING

39

REV ISSUE DATE

ISSUED FOR DESIGNDEVELOPMENT

07.12.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

39 ISSUED FOR ADDENDUM 3 - BG8 12.11.2019

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

52

52

52

Page 20: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

FINISH LEGEND

NOTE:

1. SEE SHEET A10.00 FOR PROJECT MATERIALS, ADDITIONAL INFORMATION, AND DETAILS

WALL1. ALL WALLS TO RECEIVE PAINT FINISH TO FINISHED CEILING UNLESS NOTED

OTHERWISE.2. WALL TILE TO CONTINUE BEHIND TOILET ROOM ACCESSORIES.3. TOILET ROOM WALLS TO RECEIVE WALL TILE. SEE TOILET ROOM ELEVATIONS

FOR EXACT LOCATIONS AND TYPES.4. PAINT ON GYP. BD. PARTITIONS TO BE SEMI-GLOSS U.N.O. PAINT ON GYP. BD.

CEILINGS TO BE FLAT U.N.O. PAINT ON CMU PARTITIONS TO BE SEMI-GLOSS U.N.O. PAINTED WOOD DOORS AND GRAMES TO BE SEMI-GLOSS U.N.O.

5. ALL WALLS TO BE PT-1 U.N.O.6. PROVIDE EXTRUDED STAINLESS STEEL EASED 90 DEGREE PROFILE LIKE

SCHLUTER JOLLY AT ALL OUTSIDE CORNERS AND EXPOSED EDGES IN WALL TILE. PROFILE TO BE BRUSHED STAINLESS STEEL FINISH.

7. NO PAINT FINISH ON BRICK PARTITIONS/SOFFITS U.N.O.8. PROVIDE GROUTED CORNER AT ALL WALL TILE INSIDE CORNERS.

BASE1. ALL PAINTED CMU PARTITIONS TO RECEIVE 4"H RESILIENT BASE U.N.O. STRAIGHT

PROFILE BASE TO BE USED AT CARPET FLOOR SURFACES, U.N.O. COVE PROFILE BASE TO BE USED AT ALL OTHER FLOOR SURFACES, U.N.O.

2. RESILIENT BASE TO OCCUR ON CASEWORK, U.N.O.3. TB-1 AND TB-2 TO BE PRODUCED ON SITE BY FIELD CUTTING FLOOR TILE TO 3"

HEIGHTS. PROVIDE EXTRUDED STAINLESS STEEL EASED 90 DEGREE PROFILES LIKE SCHLUTER JOLLY AT EXPOSED CUT EDGE AT TOP OF TILE BASE.

4. PROVIDE GROUTED CORNER AT ALL WALL TILE TO FLOOR TILE INSIDE CORNERS.

FLOOR1. FOR FLOOR TRANSITION DETAILS REFER TO A10.002. ALL FLOORING MATERIAL CHANGES TO OCCUR AT CENTER OF DOOR SIDE STOP.

REFER TO A10.003. FLOORING EXTENDS UNDER CABINETRY U.N.O.4. CARPET TILE ORIENTATION AS NOTED ON DRAWINGS.5. PROVIDE WATER VAPOR EMISSION CONTROL SYSTEM PER SPECIFICATION

SECTION 090160 AS REQUIRED BY MOISTURE CONTENT OF CONCRETE SLAB ON GRADE, OR ELEVATED SLAB.

6. REFER TO SPECIFICATION 035416 FOR REQUIREMENTS REGARDING HYDRAULIC CEMENT UNDERLAYMENT.

MISCELLANEOUS1. INTERIOR HOLLOW METAL DOOR AND FRAME UPT-3 U.N.O.2. INTERIOR HOLLOW METAL FRAMES UPT-3 U.N.O.3. SEE CASEWORK ELEVATIONS AND DETAILS FOR FINISH MATERIALS OF

CASEWORK AND CUSTOM ARCHITECTURAL WOODWORK.4. ALL MISC. METAL TO BE PAINTED UPT-3 U.N.O.5. WALL AND CEILING CONTROL JOINTS TO BE PAINTED TO MATCH ADJACENT WALL

COLOR U.N.O.6. REVEALS IN WALLS TO BE BRUSHED ALUMINUM, NO PAINT U.N.O.7. STAIR STRINGERS, GUARDRAILS AND HANDRAILS TO BE UPT-3.8. GYPSUM BOARD CEILINGS TO BE PAINTED PT-10 U.N.O.9. PAINT EXPOSED STRUCTURAL STEEL COLUMNS UPT-5 U.N.O.10. PAINT ALL HARD SURFACE CEILINGS AND EXPOSED CEILINGS PT-10 UNO.

FINISH LEGEND

LVT-1

RBS-1

EXTENT OF FINISHES DEVIATING FROM REST OF ROOM

RBS-1

BASE TYPE WALL FINISH

FLOOR TRANSITION

MATERIAL DIRECTION

NOTE:

1. FINISH TAG ABOVE INDICATES FINISHES FOR SPACE, UNLESS NOTED OTHERWISE.

2. SEE A10.00 FINISH LEGEND FOR COMPLETE DESCRIPTION.

PT-1

FLOOR FINISH

BASE FINISH

WALL FINISH

PT-1

MODULAR CASEWORK - ALL CASEWORK CATALOG NUMBERS SHOWN U.N.O. REFLECT CASE SYSTEMS INC. PRODUCTS.

CATLOG NUMBERS AND SIZES ARE INDICATED:

XXXXL,M PRODUCT STYLEXX.XX.XX

HEIGHT DEPTH WIDTH

THE LETTER "L" FOLLOWING A PRODUCT NUMBER INDICATES LOCKABLE CABINET.

THE SYMBOL "M" FOLLOWING A PRODUCT NUMBER INDICATES MODIFIED PRODUCT AS NOTED.

1. ALL COUNTER AND CABINET WIDTHS TO BE VERIFIED IN FIELD PRIOR TO MANUFACTURE.

2. BASE CABINETS ARE TO RECEIVE RUBBER BASE, U.N.O.3. AT AREAS OF EXPOSED PANELS, PROVIDE FULL PLASTIC LAMINATE ENDS TO

MATCH FACE CABINET.4. AT WALL TO WALL CONDITIONS, PROVIDE FILLER PANELS AT VOIDS AS NEEDED.

FILLER PANELS TO BE MINIMUM 2" WIDTH, U.N.O. FILLER PANELS TO BE VERIFIED IN FIELD.

5. ALL PLASTIC LAMINATE EDGES SHALL HAVE 3MM PVC EDGEBANDING U.N.O.6. PROVIDE BLOCKING AT ALL WALL HUNG ACCESSORIES, EQUIPMENT,

CASEWORK, BOARDS, MIRRORS, MONITORS, FEC AND MISCELLANEOUS ITEMS. ALL WOOD USED FOR BLOCKING, CONSTRUCTION, AND INTERIOR WOODWORK SHALL BE FIRE RETARDANT TREATED.

7. ALL CASEWORK SHALL BE PL-1 U.N.O.8. REFER TO CASEWORK ELEVATIONS FOR LOCATIONS WHERE BACKSPLASHES

ARE REQUIRED. BACKSPLASH TO BE 4"H U.N.O.9. REFER TO CASEWORK ELEVATIONS FOR LOCKING CABINET DESIGNATIONS.

COORDINATE KEYING WITH OWNER.10. REFER TO CASEWORK SECTION DETAILS ON SHEET SERIES A9.0'S

CASEWORK GENERAL NOTES

SCHEDULED CARPET

FLOORING

TRANSITION STRIP:

JOHNSONITE CTA-63-CSCHEDULED

RESILIENT FLOORING

DOOR IF APPLICABLE

1/8" THICKNESS 1/4" THICKNESS

CONCRETE SLAB

DOOR

CONCRETE FLOOR

TRANSITION STRIP:

JOHNSONITE SLT-63-JSCHEDULED

RESILIENT FLOORING

DOORDOOR IF APPLICABLE

1/8" THICKNESS 0 THICKNESS

CERAMIC TILE

STAINLESS STEEL TERMINATION BAR / REDUCER-SCHLUTER SYSTEMS SCHIENE OR EQUAL

CARPET

SCHEDULED

PORCELAIN TILESCHEDULED RESILIENT FLOOR

SCHLUTER SYSTEMS RENO-U

100 STAINLESS STEEL TRANSITION PROFILE

DOOR IF APPLICABLE

CONCRETE SLAB

1/2" THICKNESS 1/8" THICKNESS

DOOR

RESILIENT FLOORING/CARPET

THERMALLY BROKEN ADA-COMPLIANT ALUM. THRESHOLD W/ WEATHER SEAL-REFER TO SPECIFICATIONS

CONCRETE

EXPANSION JOINT

SET THRESHOLD IN BED OF SEALANT

CARPET

REDUCER STRIP-JOHNSONITE CRS-63-A

CONCRETE FLOOR

WOOD ATHLETIC FLOOR SYSTEMFLOORING PER

SCHEDULE

MOISTURE BARRIER

1 1/2" 1 1/2"

1/4" X 5" ALUMINUM COVER PLATE

METAL SILL TRIM

WALL BASE AS SCHEDULED

METAL LOCKER

FLOOR AS SCHEDULED

SCHEDULED RESILIENT FLOORING

TRANSITION STRIP: JOHNSONITE FS-63-DW3SCHEDULED

RESILIENT FLOORING

DOOR IF APPLICABLE

1/8" THICKNESS 1/8" THICKNESS

DOOR

CONCRETE SLAB

SCHEDULED

PORCELAIN TILE

DOOR IF APPLICABLE

CONCRETE SLAB

1/2" THICKNESS 0" THICKNESS

DOOR

SCHLUTER RENO

RAMP

1/2" THICK CONT. STEEL PLATE

(ENSURE FLUSH CONDITION)

SOLID BLOCKING

SLEEPER WITH ISOLATION

PADS AND DEFLECTION BLOCKS

5/16" CONT. BENT PLATE.

ANCHOR HORIZ, LEG TO

CONC. BELOW AS REQUIRED FOR POIR STOP

STAGE FLOOR

1/2" DIA. x 6" LONG

HEADED STUD @ 12"

O.C. SPACING SHOP ATTACHED TO THE BENT

PLATE ASSEMBLY

PLATES SHOP WELDED

USING 3/16" FILLET WELD IN 4-12 PATTERN

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:17

:01

PM

MFPIMPLEMENTATION -SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

FINISH SCHEDULE &GENERAL DETAILS

5274-42

A.SASSILA

A10.00

COMMUNITY HIGH SCHOOLDISTRICT 99

# WALL FINISH

SYMBOL DESCRIPTION MANUFACTURER MATERIALCONTACT:EMAIL:PHONE:

STYLE:COLOR:SIZE:INSTALL:

CK-1 CORK TACK SURFACE SEE SPEC 1/4" NATURAL COMPOSITIONCORK, FULL ROLLS

PL-11 WHITE PLASTICLAMINATE

WILSONART FROSTY WHITE1573-60

PT-1 GENERAL PAINT SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

NEBULOUS WHITESW7063

PT-2 BLUE ACCENT PAINT SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

DYNAMIC BLUESW6958

PT-3 BLACK PAINT SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

BLACK OF NIGHTSW6993

PT-4 LIGHT GREY ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

KNITTING NEEDLESSW7672

PT-5 DK BLUE ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

BLUE CHIPSW6959

PT-6 LIGHT BLUE ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

SKYFALLSW9049

PT-7 LIGHT YELLOWACCENT PAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

LEMON CHIFFONSW6686

PT-8 YELLOW ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

DAFFODILSW6901

PT-9 DARK GREY ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

SUMMIT GRAYSW7669

PT-10 CEILING WHITE PAINT SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

HIGH REFLECTIVE WHITESW7757

PT-11 DARK BLUE ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

SALTY DOGSW9177

PT-12 CHARCOAL ACCENTPAINT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

ROYCROFT PEWTERSW2848

UPT-1 URETHANE PAINTWHITE

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

NEBULOUS WHITESW7063

UPT-2 URETHANE PAINTBLUE

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

DYNAMIC BLUESW6958

UPT-3 URETHANE H.M. PAINTBLACK

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

BLACK OF NIGHTSW6993

UPT-4 URETHANE PAINTLT. GREY

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

KNITTING NEEDLESSW7672

UPT-5 URETHANE PAINTDK BLUE ACCENT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

BLUE CHIPSW6959

UPT-6 URETHANE PAINTLIGHT BLUE ACCENT

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

SKYFALLSW9049

UPT-8 URETHANE PAINTYELLOW

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

DAFFODILSW6901

UPT-11 URETHANE PAINTDARK BLUE

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

SALTY DOGSW9177

UPT-12 URETHANE PAINTCHARCOAL

SHERWIN WILLIAMSCONTACT: SUSAN SIENKOWSKIEMAIL:[email protected]: 312-656-0622

ROYCROFT PEWTERSW2848

WC-1 WALL COVERING SEE SPEC

WC-2 WALL COVERING SEE SPEC SECTION 097300

WD-1 1/2" WOOD VENEERPANEL

SEE SPEC SPCIES: RIFT CUT WHITEOAKGRADE: AINSTALL: REFER TOELEVATION

WD-3 - SEE SPEC 2" THICK SOLID WOOD

WT-1 WHITE SUBWAYCERAMIC WALL TILE

ROCA TILE USADISTRIBUTOR: STONE SOURCECONTACT: SCOTT SEIGALEMAIL: [email protected]: 312-970-5696

STYLE: COLOR COLLECTIONCOLOR: WHITE ICE BRIGHTU081SIZE: 3" X 6"INSTALL: VERTICALRUNNING BOND

WT-2 ANGLED WALL TILE SANT'AGOSTINODISTRIBUTOR: VIRGINIA TILECONTACT: DARLENE COZZIEMAIL:[email protected]: 847-561-9582

STYLE: DIGITAL ARTCOLOR: MIXSIZE: 24"x24"INSTALL: STACK BOND

WT-3 WHITE TEXTUREDCERAMIC WALL TILE

STONE SOURCECONTACT: SCOTT SEIGALEMAIL: [email protected]: 312-970-5696

STYLE: WIGWAGCOLOR: WHITE GLOSSYSIZE: 3"x6"INSTALL: VERTICAL STACKBOND

# BASE TYPE

SYMBOL DESCRIPTION MANUFACTURER MATERIAL

RBC-1 4" COVE RUBBER WALLBASE (GENERAL)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

63 BURNT UMBER

RBC-2 4" COVE RUBBER WALLBASE (BLUE)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

70 BLUEST

RBC-3 4" COVE RUBBER WALLBASE (YELLOW)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

75 LEMON

RBC-4 4" STRAIGHT RUBBERWALL BASE (WHITE)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

COLOR TBD

RBS-1 4" STRAIGHT RUBBERWALL BASE (GENERAL)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

63 BURNT UMBER

RBS-2 4" STRAIGHT RUBBERWALL BASE(MILLWORK)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: MONUMENTMW-40-S4COLOR: 40 BLACK

RBS-3 4" STRAIGHT RUBBERWALL BASE (BLUE)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

70 BLUEST

RBS-4 4" STRAIGHT RUBBERWALL BASE (YELLOW)

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

75 LEMON

SVC-1 INTEGRAL COVESHEET VINYL WALLBASE

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: ACCZENTCONCRETECOLOR: CHALK 25002SIZE: 4"H

SVC-2 INTEGRAL COVESHEET VINYL WALLBASE

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: GRANITCOLOR: NAUTICAL MILE

SVC-3 INTEGRAL COVESHEET VINYL WALLBASE

PROTECT-ALLCONTACT: BOB LASKEYPHONE: 779.240.2780

COLOR: DARK GRAYSIDE: 6"H

TB-1 LIGHT GREYPORCELAIN TILE BASE

STONE SOURCECONTACT: SCOTT SEIGALEMAIL: [email protected]: 312-970-5696

STYLE: PROVOAKCOLOR: GRIGIOSPAZZOLATO MATTESIZE: 2" X 48"

TB-2 LIGHT GREYPORCELAIN TILE BASE

STONE SOURCECONTACT: SCOTT SEIGALEMAIL: [email protected]: 312-970-5696

STYLE: PROVOAKCOLOR: BIANCOSABBIATO NATURALSIZE: 2" X 48"

# FLOOR FINISH

SYMBOL DESCRIPTION MANUFACTURER MATERIALCPT-1 GENERAL FIELD

CARPET TILEMILLIKENCONTACT: LIZ CURTISEMAIL: [email protected]: 312-848-4039

STYLE: MORAINEPATTERN: EXPLORERCOLOR: EXR19-133-6MEASURE W/ NAVYSIZE: 50CM X 1MINSTALL: ASHLAR RANDOM

CPT-2 PRIVATE OFFICECARPET TILE

MILLIKENCONTACT: LIZ CURTISEMAIL: [email protected]: 312-848-4039

STYLE: MORAINEPATTERN: EXPLORERCOLOR: EXR231-133-6MEASURE W/ GOLDSIZE: 50CM X 1MINSTALL: ASHLAR RANDOM

CPT-3 BLUE ACCENTCARPET TILE

MILLIKENCONTACT: LIZ CURTISEMAIL: [email protected]: 312-848-4039

STYLE: MORAINEPATTERN: EXPLORERCOLOR: EXR123-9 STRATUMSIZE: 50CM X 1MINSTALL: ASHLAR RANDOM

EP-1 EPOXY COATING - SEE SPEC

LVT-1 WOOD PLANK LUXURYVINYL TILE

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: CRAFTED PLANKECFCOLOR: LOFT OAK 3732SIZE: 6" X 48"INSTALL: 1/3 RUNNING BOND

LVT-2 BLUE LUXURY VINYLTILE

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: COLOR WEAVEPCWECOLOR: CORN FLOWERC149SIZE: 6"x36"INSTALL: 1/3 RUNNING BOND

LVT-3 LT GREY LUXURYVINYL TILE

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: COLORBEAMCOLOR: SOBA C123SIZE: 9"x36"INSTALL: 1/3 RUNNING BOND

LVT-4 LUXURY VINYL TILEBLACK SPECKLE

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: COLOR POP PCOPCOLOR: SEA SALT C145SIZE: 36"x36"INSTALL: QUARTER TURNED

QTZ-1 WHITE QUARTZ TILE UPOFLOORDISTRIBUTOR: SPARTAN SURFACESCONTACT: MICHAEL BLASEKEMAIL:[email protected]: 312-731-7310

STYLE: MOSAICCOLLECTIONCOLOR: 619301SIZE: 24" x 24"INSTALL: QUARTER TURN

QTZ-2 LIGHT GREY QUARTZTILE

UPOFLOORDISTRIBUTOR: SPARTAN SURFACESCONTACT: MICHAEL BLASEKEMAIL:[email protected]: 312-731-7310

STYLE: MOSAICCOLLECTIONCOLOR: 619302SIZE: 24" x 24"INSTALL: QUARTER TURN

QTZ-3 BLUE QUARTZ TILE UPOFLOORDISTRIBUTOR: SPARTAN SURFACESCONTACT: MICHAEL BLASEKEMAIL:[email protected]: 312-731-7310

STYLE: MOSAICCOLLECTIONCOLOR: 619359SIZE: 24" x 24"INSTALL: QUARTER TURN

QTZ-4 BLACK QUARTZ TILE UPOFLOORDISTRIBUTOR: SPARTAN SURFACESCONTACT: MICHAEL BLASEKEMAIL:[email protected]: 312-731-7310

STYLE: MOSAICCOLLECTIONCOLOR: 619319SIZE: 24" x 24"INSTALL: QUARTER TURN

RST-1 RUBBER STAIR TREADWITH CONTRASTINGSTRIP AT NOSING

JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

Safe-T First Rubber Stair TreadStyle: PVIRH-63-RDColor: 63 Burnt UmberPattern: RoundNosing: Square

RST-2 RUBBER STAIR RISER JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

Color: 21 Platinum

RST-3 RUBBER STAIR RISER JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

Color: 63 Burnt UmberPattern: RoundNosing: Square

RT-1 RUBBER TILE TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

COLOR: 63 BURNT UMBERPATTERN: ROUNDSIZE: 24"x24"

SC-1 SEALED CONCRETE - SEE SPEC

SF-1 PAINTED STAGEFLOOR

- SEE SPEC

SV-1 CONCRETE-LOOKSHEET VINYL

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: ACCZENTCONCRETECOLOR: CHALK 25002

SV-2 BLUE SHEET VINYL JOHNSONITECONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: GRANITCOLOR: NAUTICAL MILE

SV-3 COMMERCIALKITCHEN SHEET VINYL

PROTECT-ALLCONTACT: BOB LASKEYPHONE: 779.240.2780

COLOR: DARK GRAYSIZE: 5' X 8' SHEETS

T-1 DARK GREYPORCELAIN TILE

STONE SOURCECONTACT: SCOTT SEIGALEMAIL: [email protected]: 312-970-5696

STYLE: PROVOAKCOLOR: GRIGIOSPAZZOLATO MATTESIZE: 8" X 48"INSTALL: 1/3 RUNNING BOND

T-2 LIGHT GREYPORCELAIN TILE

STONE SOURCECONTACT: SCOTT SEIGALEMAIL: [email protected]: 312-970-5696

STYLE: PROVOAKCOLOR: BIANCO SABBIATONATURALSIZE: 8" X 48"INSTALL: 1/3 RUNNING BOND

T-3 MESH-BACK RIVERROCK

TBD TBD

TRZ-1 PRECAST TERRAZZOLANDING

REFER TO SPEC SECTION 055100WAUSAUTILE.COMCONTACT: GARY KASTENEMAIL: GKASTEN@WAUSAUTILEPHONE: 715-241--0305

STYLE: TECTURA DESIGNSEPOXY PRECAST LANDINGCOLOR: TZ17 BLACK OFNIGHTTHICKNESS: 2"

TST-1 TERRAZZOSTAIR TREAD

REFER TO SPEC SECTION 055100WAUSAUTILE.COMCONTACT: GARY KASTENEMAIL: GKASTEN@WAUSAUTILEPHONE: 715-241--0305

STYLE: TECTURA DESIGNSEPOXY TREADSCOLOR: TZ17 BLACK OFNIGHTTHICKNESS: 2"REFER TO A6.03 FORPROFILE

VCT-1 - ARMSTRONG RESILIENT TILECOLOR: TEA GARDENGREENID: #51872

WLKF WALKOFF CARPETTILE

TARKETTCONTACT: NICOLETTE BRANDSTEDTEMAIL:[email protected]: 312-859-9821

STYLE: ABRASIVE ACTION IICOLOR: CHARCOAL 19100SIZE: 24" X 24"INSTALL: MONOLITHIC

SYMBOL DESCRIPTION MANUFACTURER MATERIALES-1 WHITE QUARTZ WILSONART ARASHI

Q4011

PL-1 WHITE PATTERNPLASTIC LAMINATE

FORMICA WHITE TWILL9285-58

PL-2 CONCRETE PATTERNPLASTIC LAMINATE

FORMICA ELEMENTAL CONCRETE8830-58

PL-3 DARK BLUE PLASTICLAMINATE

FORMICA MARINE BLUE914-58

PL-4 BLUE PLASTICLAMINATE

LAMIN-ART CAPRI - VELLUM9225-E

PL-5 BLACK WOODGRAINPLASTIC LAMINATE

FORMICA BLACK NATURAL GRAIN909-NG

PL-6 CHARCOAL PLASTICLAMINATE

FORMICA TERRIL2297-PXPLEX FINISH

PL-7 WHITECHEMICAL-RESISTANTLAMINATE

WILSONART FROSTY WHITE1573-60CHEMSURFCHEMICAL-RESISTANTLAMINATE

PL-8 WHITE MAGNETICMARKER BOARDPLASTIC LAMINATE

FORMICA CRYSTAL WHITEMAGNETICM3091-90

PL-9 METAL LAMINATE FORMICA BRUSHED STAINLESSSTEELM2178

PL-10 MEDIUM BLUECHEMICAL-RESISTANTLAMINATE

WILSONART LAPIS BLUED417-60CHEMSURFCHEMICAL-RESISTANTLAMINATE

PL-11 WHITE PLASTICLAMINATE

WILSONART FROSTY WHITE1573-60

SS-1 WHITE SOLIDSURFACE

WILSONART YUKON RIVERSTONE9196RS

SS-2 BLACK SOLIDSURFACE

CORIAN DEEP LAPIS

SS-3 1"THK EPOXY RESIN SEE SPEC SIZE: 1" THICKNESSEDGE: SQUARECOLOR: BLACK

WD-1 1/2" WOOD VENEERPANEL

- RIFT CUT WHITE OAKFINISH: CLEAR

WD-2 1/2" SOLID WHITE OAK - WHITE OAKFINISH: STAIN TO MATCHWOOD VENEER

WD-3 - SEE SPEC 2" THICK SOLID WOOD

N.T.S.1

CARPET TO RESILIENT

N.T.S.2

RESILIENT TO CONCRETE

N.T.S.3

CERAMIC TO CARPET

N.T.S.4

CERAMIC TO RESILIENT

N.T.S.5

FLOORING @ EXTERIOR THRESHOLD

N.T.S.6

CARPET TO CONCRETE

N.T.S.7

STAGE FLOORING TO RESILIENT

N.T.S.8

CMU LOCKER BASE

N.T.S.9

RESILIENT TO RESILIENT

N.T.S.10

CERAMIC TO CONCRETE

4

4

REV ISSUE DATE

ISSUED FOR OWNER REVIEW 01.18.2019

ISSUED FOR BID GROUP 2 - PHASEA

02.06.2019

4 ISSUED FOR ADDENDUM 2 - BG2 02.25.2019

ISSUED FOR DESIGNDEVELOPMENT - PHASE B

03.11.2019

ISSUED FOR CONSTRUCTION -PHASE A

05.08.2019

ISSUED FOR 75% CONSTRUCTIONDOCUMENTS

05.10.2019

ISSUED FOR BID GROUP 7 - PHASEB

06.07.2019

ISSUED FOR PLAN REVIEW - PHASEB

06.24.2019

ISSUED FOR DESIGNDEVELOPMENT

07.12.2019

31 ISSUED FOR PLAN REVIEWRESPONSE - PHASE B

08.05.2019

ISSUED FOR CONSTRUCTION -PHASE B

08.26.2019

34 ISSUED FOR 75% CONSTRUCTIONDOCUMENTS - PHASE C

10.14.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

41 ISSUED FOR ADDENDUM 4 - BG8 12.16.2019

ISSUED FOR BID GROUP 9 - PHASEC

01.15.2020

ISSUED FOR HEALTH DEPARTMENTREVIEW - PHASE C

01.24.2020

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

SCALE: 3" = 1'-0"11

STAGE FLOOR FLUSH TRANSITION

# ACOUSTICAL WALL FINISHES

SYMBOL DESCRIPTION MANUFACTURER MATERIALWP-1 1" THICK FABRIC

WRAPPED GLASSFIBER ACOUTSTICALPANEL

SEE SPEC SECTION 098413, REFERENCEW1 - FABRIC WRAPPED PANELS

WP-2 2" THICK FABRICWRAPPED GLASSFIBER ACOUTSTICALPANEL

SEE SPEC SECTION 098413, REFERENCEW2 - FABRIC WRAPPED PANELS

WP-3 1" THICK WOOD FIBERABUSE RESISTANTACOUSTIC WALLPANEL IN C40MOUNTING

SEE SPEC SECTION 098416, REFERENCEW3 - ABUSE RESISTANT WALL PANELS

WP-4 1/8" THICK FELT WALLCOVERING OVER 3/4"PLYWOOD ON Z-CLIPS

SEE SPEC SECTION 098415, REFERENCEW4 - FELT WALL COVERING

WP-6 FABRICATED SOUNDDIFFUSION PANELSATTACHED TO WALLS

SEE SPEC SECTION 098413 PART 2.02 B -DIFFUSIVE WALL & CEILING PANEL

WP-7 BARREL TYPEDIFFUSIVE WALLPANEL

SEE SPEC SECTION 098413 PART 2.02 C

41

41

52

52

52

52

52

52

Page 21: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

DNDN

UP

DN

UP

R

CONCESSIONS

mobile? or

permanent

how large?

C

D

24

x4

82

4x4

82

4x4

82

4x6

02

4x6

0

DN

UP

FINISH LEGEND

LVT-1

RBS-1

EXTENT OF FINISHES DEVIATING FROM REST OF ROOM

RBS-1

BASE TYPE WALL FINISH

FLOOR TRANSITION

MATERIAL DIRECTION

NOTE:

1. FINISH TAG ABOVE INDICATES FINISHES FOR SPACE, UNLESS NOTED OTHERWISE.

2. SEE A10.00 FINISH LEGEND FOR COMPLETE DESCRIPTION.

PT-1

FLOOR FINISH

BASE FINISH

WALL FINISH

PT-1

STUDIO

THEATRE

1-604

SCENE SHOP

1-613

STORAGE

1-615

DRESSING

ROOM

1-618

TOILET

1-619

TOILET

1-620

DRESSING

ROOM

1-621

CORRIDOR

1-611

TOILET

1-605

TOILET

1-607

STAGE

1-628AUDITORIUM

1-633

PIT STAIR

1-632

CAFE

1-641

TOILETS

1-642

CORRIDOR

xB-42

EVENT

CORRIDOR

1-602

CATWALK

STAIR

1-629

SE

E 1

/ A

2.1

1B

SEE 1 / A2.12A

OFFICE

1-609

VEST

1-610

VESTIBULE

1-612

THEATRE

CLASSROOM

1-623

VOC.

CLASSROOM

1-546

PRAC

1-544

PRAC

1-545

PRAC

1-541

PRAC

1-539

PRAC

1-537

PRAC

1-535

PRAC

1-534

PRAC

1-536

PRAC

1-538

PRAC

1-540

STORAGE

1-531

STORAGE

1-533

PRAC

1-532

PRAC

1-530

MUSIC

1-529

CORRIDOR

1-542

CORRIDOR

1-542

STORAGE

1-863

STORAGE

1-864

OFFICE

1-862

CONCESSIONS

1-861

CORRIDOR

1-835

VEST.

1-600

VEST

1-603

VEST

1-625

OPEN TOORCHESTRAPIT BELOW

-6"

0"

0"VEST

1-608

VEST

1-622

VEST

1-637VOMITORIUM

1-634

VOMITORIUM

1-636VESTIBULE

1-644

VEST

1-631

T-2

T-1

TB-1

PT-1

T-1

TB-1

WT

-2

WC

-1R

BC

-1

WC

-1

RB

C-1

F18

F18

F18

F18

F18

WC

-1

RB

C-1

QTZ-1

RBC-1

SF-1

SF-1

SF-1

JAN

1-606

EXISTING FLOORING TO REMAIN

QTZ-1

RBC-1

TOILET

1-617

TOILET

1-616ELEC

1-614

CORRIDOR

1-624

T-1T-1

T-1

T-1

T-1

TB-1

WLKF

SECURITY

1-601

LVT-4

RBC-1

QTZ-1

RBC-1

SC-1

WLKF

RBS-1

CPT-1

RBS-1

SC-1

PT-4

SF-1

SF-1

CPT-1

RBS-1

CPT-1

RBS-1

RST-1

UPT-3

WD-3

CPT-1

RBS-1

PT-4

UPT-3

UPT-3

RBC-1

UPT-1

UPT-3

UPT-4

QTZ-1

RBC-1

UPT-4

UPT-1

UPT-12

UPT-1

RBC-1

UPT-1

SC-1

RBS-1

CPT-1

UPT-1

CPT-1

RBS-1

UPT-1

UPT-1

QTZ-2

RBC-1

UPT-1

UPT-1

RBC-1

UPT-1

SC-1

RBC-1

UPT-1

UPT-3

RBC-1

SC-1

UPT-3

RBC-1

SC-1

UP

T-1

1

EP-1

EP-1

EP-1

CPT-2

CPT-2

CPT-2

UPT-3

RBC-1

SC-1

VEST

1-630

VEST

1-633

UPT-11

RBC-1

CPT-2

UPT-11

RBC-1

CPT-2

UPT-11

RBS-1

CPT-2CPT-2

CPT-2

CPT-2

CPT-2

CPT-1

CPT-1

SC-1

SC-1

SC-1

SC-1

0"

0"

0"

WD-3

WD-3

WD-3

CORRIDOR

1-627

UPT-1

UPT-11

RBS-1

CPT-2

UPT-11

RBS-1

CPT-2

T-1

TOILETS

1-638

T-1

WT-1

WT-1

WT-1

T-1

WT-1

WT-1 WT-1

WT-1

T-1

WT-1

PT

-8

RB

C-3

UP

T-2

UPT-2

UPT-2

UPT-2

UPT-2

UPT-2

WC

-1R

BC

-1

UPT-2

UP

T-2

PT-3

RBS-1

CPT-1

F36

UPT-12

PT-2

F1

F1

F1

F1F1

F40

F41

F41

UP

T-1

1

UPT-11

WC

-2

UP

T-1

1

WC

-2

UPT-11

WC

-2

UPT-11

UP

T-1

1

UPT-11

WC

-2

WC

-2

WC-2

UP

T-2

A7.34

8

A7.34

8

A7.34

8

A7.34

8

A7.34

8

A7.34

8

SIM.

SIM.

SIM.

SIM.

SIM.

SIM.

WP-3

WP

-3

WP-3

WP-2

WP-2

WP-2

WP-2

WP

-2

WP-2

WP-2WP-2

WP-2

WP-2WP-2

WD

-3

F45

F46

F46

RBC-1

UPT-1

F1

F1

F1

F1

13

A7.22

REFER TO TR DRAWINGS FOR ADJUSTABLE PANELS

WP-4

REFER TO TR DRAWINGS FOR ADJUSTABLE PANELS

WP-4

C.2

AD

B

E

F

J

G H

C.1

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:17

:08

PM

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

FINISH PLAN - LEVEL 1

AREA F

5274-42

A.SASSILA

A10.11F

COMMUNITY HIGH SCHOOL

DISTRICT 99

# KEYNOTES

F1 PROVIDE FULL HEIGHT CORNER GUARD. HOLD OFF FINISH FLOOR 4" FORWALL BASE INSTALLATION. TYPE: FLUSH MOUNT STAINLESS STEEL, 2" WING

F18 CONTINUE WC-1 ON SOFFIT VERTICAL FACE ABOVE

F36 PAINT GYP. BD PER DETAIL 5/A7.34

F40 PAINT ALL HANDRAILS, GUARDRAILS AND MISC. METAL UPT-11 U.N.O

F41 PROVIDE STAIR NOSING AT CARPET STAIR TREADS, TYP. STYLE: TBD; COLOR:TBD

F45 PAINT STAGEHOUSE BLACK FROM STAGE FLOOR TO 8'-0" ABOVE PINRAILGALLERY ELEVATION. STAGEHOUSE CAN BE UNPAINTED FOR BALANCE OFVOLUME ABOVE THAT ELEVATION.

F46 PAINT ALL AISLE RAILINGS UPT-3

SCALE: 1/8" = 1'-0"1

FINISH PLAN LEVEL 1 - AREA F

REV ISSUE DATE

ISSUED FOR DESIGNDEVELOPMENT

07.12.2019

34 ISSUED FOR 75% CONSTRUCTIONDOCUMENTS - PHASE C

10.14.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

ISSUED FOR HEALTH DEPARTMENTREVIEW - PHASE C

01.24.2020

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

52

52

Page 22: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

DN

DN

DN

UP

WRESTLING

2-817

CONTROL

ROOM

2-612

SEE 1 / A2.12A

SE

E 1

/ A

2.1

2B

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

11'-9 1/2"

OPEN TOBELOW

READING

ROOM

2-613

VEST

2-611

SCENE SHOP

1-613

STUDIO

THEATRE

1-604

STAGE

1-628

AUDITORIUM

1-633

OFFICE

2-610

PT-4OFFICE

2-616

ELEC

2-617

CORRIDOR

2-309

QTZ-1

RBC-1

VEST

2-614

CORRIDOR

2-316

UPT-11

RBS-1

CONTROL

ROOM

2-601

VEST

2-602

ELEC

2-603DIMMER

2-604

STORAGE

2-605

VEST

2-606

RBC-1

UPT-3

OPEN TOBELOW

RBS-1

CPT-1

UPT-3

SC-1

RBC-1

UPT-1

SC-1

UPT-3

UPT-3

RBC-1

UPT-1

SC-1

RBC-1

UPT-1

SC-1

RBC-1

UPT-1

SC-1

PT-11

WD-3

WD-3

WD-3

WD-3

OPEN TO BELOW

OPEN TO BELOW

SC-1

SC-1

CPT-1

UPT-11

RBS-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

SC-1

SC-1

OFFICE

2-615

UPT-1

RBC-1

SC-1

RBS-1

CPT-1

PT-4

RBS-1

CPT-1

PT-4

RBS-1

CPT-3

UPT-11

RBS-1

CPT-1

WP-2

RBS-1

CPT-1

UPT-1

QTZ-2

F15

QTZ-1

RBC-1

UPT-1

QTZ-2

QTZ-2

QTZ-2

QTZ-1

RBC-1

UPT-1

QTZ-2

F15

F15LVT-1

RBS-1

PT-4

F22

F22

F22

F1

F1

Room

2608

Room

2607 RBC-1

UPT-1

SC-1

RBC-1

UPT-1

SC-1

F1

F1

F1

PT-2

PT-2

WP

-4

F41

F41

F41

F41

WC

-2

UP

T-1

1

UPT-11

WP

-1W

P-1

WP

-1W

P-1

WP

-1W

P-1

WP

-1

WP-1WP-1WP-1WP-1WP-1

SEE ELEVATION 7/A7.19 FOR ACOUSTICAL PANEL TYPES

SE

E E

LE

V.

5/A

7.1

9

FO

R A

CO

US

TIC

AL

PA

NE

L T

YP

ES

UPT-11

WP-2

UPT-11

F46

F40

WP

-4

UPT-11

UP

T-1

1

WC

-2

WC

-2

UP

T-1

1

UPT-11

UP

T-1

1

WC

-2

OFFICE

2-613

CPT-1

RBS-1

PT-4

F46

WP-2

WP-2

FINISH LEGEND

LVT-1

RBS-1

EXTENT OF FINISHES DEVIATING FROM REST OF ROOM

RBS-1

BASE TYPE WALL FINISH

FLOOR TRANSITION

MATERIAL DIRECTION

NOTE:

1. FINISH TAG ABOVE INDICATES FINISHES FOR SPACE, UNLESS NOTED OTHERWISE.

2. SEE A10.00 FINISH LEGEND FOR COMPLETE DESCRIPTION.

PT-1

FLOOR FINISH

BASE FINISH

WALL FINISH

PT-1

C.2

AD

B

E

F

J

G H

C.1

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:17

:15

PM

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

FINISH PLAN - LEVEL 2

AREA F

5274-42

A.SASSILA

A10.12F

COMMUNITY HIGH SCHOOL

DISTRICT 99

SCALE: 1/8" = 1'-0"1

FINISH PLAN LEVEL 2 - AREA F

REV ISSUE DATE

ISSUED FOR DESIGNDEVELOPMENT

07.12.2019

34 ISSUED FOR 75% CONSTRUCTIONDOCUMENTS - PHASE C

10.14.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

# KEYNOTES

F1 PROVIDE FULL HEIGHT CORNER GUARD. HOLD OFF FINISH FLOOR 4" FORWALL BASE INSTALLATION. TYPE: FLUSH MOUNT STAINLESS STEEL, 2" WING

F15 INSTALL QTZ-1 AND QTZ-2 QUARTZ TILE 50%/50% RANDOM MIX.

F22 FLOOR JOINT FJ-1. REFER TO A7.50 FOR DETAIL.

F40 PAINT ALL HANDRAILS, GUARDRAILS AND MISC. METAL UPT-11 U.N.O

F41 PROVIDE STAIR NOSING AT CARPET STAIR TREADS, TYP. STYLE: TBD; COLOR:TBD

F46 PAINT ALL AISLE RAILINGS UPT-3

52

52

52

52

Page 23: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

DN

SEE 1 / A2.12A

16'-11"

18'-11"

23'-7"

TECHINCAL

MEZZANINE

3-600

TOILET

3-608

STAGE

1-628

AUDITORIUM

1-633

TECHNICAL

MEZZANINE

3-601

3-703

3-800

VEST

3-607

LOBBY

3-605

3-711

TOILET

3-603

WT-1

WT-1

UPT-1

UPT-11

ELEC

3-604

CORRIDOR

3-309

OPEN TO BELOW

UPT-1

PT-11

WD-3

WD-3

WD-3

WD-3

RBS-1

CPT-1

CPT-1CPT-1

CPT-1

UPT-11

RBS-1

CPT-1

SC-1

SC-1

SC-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

RBS-1

CPT-1

UPT-1

RBC-1

QTZ-2

UPT-1

RBC-1

QTZ-1

QTZ-2

F15

UPT-1

RBC-1

QTZ-1

QTZ-2

F15

RBC-1

SC-1

T-1

T-1

UP

T-2

EL: 23'-7"

EL: 23'-7"

BALCONY

3-602

CPT-1

CPT-1

VEST

3-603

F22

F40

PT-4

PT

-4

WC

-2

PT-4

UPT-4UPT-4

F41

F41

F41

F41

F41

F41

UPT-4UPT-4

UP

T-1

1

UPT-11

UP

T-1

1

UPT-11

F46

F46

WP

-2W

P-2

F1

F1

F1

F1

F1

F1

F1

WP-4

WP-4

REFER TO TR DRAWINGS FOR ADJUSTABLE PANELS

WP-4

REFER TO TR DRAWINGS FOR ADJUSTABLE PANELS

FINISH LEGEND

LVT-1

RBS-1

EXTENT OF FINISHES DEVIATING FROM REST OF ROOM

RBS-1

BASE TYPE WALL FINISH

FLOOR TRANSITION

MATERIAL DIRECTION

NOTE:

1. FINISH TAG ABOVE INDICATES FINISHES FOR SPACE, UNLESS NOTED OTHERWISE.

2. SEE A10.00 FINISH LEGEND FOR COMPLETE DESCRIPTION.

PT-1

FLOOR FINISH

BASE FINISH

WALL FINISH

PT-1

C.2

AD

B

E

F

J

G H

C.1

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:17

:24

PM

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

FINISH PLAN - LEVEL 3 -

AREA F

5274-42

A.SASSILA

A10.13F

COMMUNITY HIGH SCHOOL

DISTRICT 99

SCALE: 1/8" = 1'-0"1

FINISH PLAN LEVEL 3 - AREA F

REV ISSUE DATE

ISSUED FOR DESIGNDEVELOPMENT

07.12.2019

34 ISSUED FOR 75% CONSTRUCTIONDOCUMENTS - PHASE C

10.14.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

# KEYNOTES

F1 PROVIDE FULL HEIGHT CORNER GUARD. HOLD OFF FINISH FLOOR 4" FORWALL BASE INSTALLATION. TYPE: FLUSH MOUNT STAINLESS STEEL, 2" WING

F15 INSTALL QTZ-1 AND QTZ-2 QUARTZ TILE 50%/50% RANDOM MIX.

F22 FLOOR JOINT FJ-1. REFER TO A7.50 FOR DETAIL.

F40 PAINT ALL HANDRAILS, GUARDRAILS AND MISC. METAL UPT-11 U.N.O

F41 PROVIDE STAIR NOSING AT CARPET STAIR TREADS, TYP. STYLE: TBD; COLOR:TBD

F46 PAINT ALL AISLE RAILINGS UPT-3

52

52

Page 24: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

STAGE

1-628

AUDITORIUM

1-633OPEN TO BELOW

CPT-1

SC-1

SC-1

SC-1

SC-1

SC-1

SC-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

UP

T-1

1

UPT-11

UP

T-1

1

UPT-11

PT-4

PT

-4

PT-4

F41

F41

F41

F41

F41

F41

F41

F41

UPT-11

UPT-11

WC

-2

WC

-2

UPT-11

UPT-11

WC

-2

WC

-2

PT-11

F40

WP

-1

F46

F46

F46

F46

F46

F46

WP-2

WP-2WP-2

WP

-4W

P-4

FINISH LEGEND

LVT-1

RBS-1

EXTENT OF FINISHES DEVIATING FROM REST OF ROOM

RBS-1

BASE TYPE WALL FINISH

FLOOR TRANSITION

MATERIAL DIRECTION

NOTE:

1. FINISH TAG ABOVE INDICATES FINISHES FOR SPACE, UNLESS NOTED OTHERWISE.

2. SEE A10.00 FINISH LEGEND FOR COMPLETE DESCRIPTION.

PT-1

FLOOR FINISH

BASE FINISH

WALL FINISH

PT-1

OPENTO BELOW

CPT-1

RBS-1

PT-3

WP-7

F48

WP-7

F48

WP-7

F48

C.2

AD

B

E

F

J

G H

C.1

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

Co. ©

C

opyright 2018 A

ll rights

reserv

ed. N

o p

art

of th

ese d

ocum

ents

may b

e r

epro

duced, sto

red, or

transm

itte

d in a

ny form

or

by a

ny m

eans, ele

ctr

onic

, m

echanic

al, p

hoto

copyin

g, re

cord

ing o

r oth

erw

ise, w

ithout th

e p

rior

written c

onsent of W

ight &

Co.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .

Wight & Companywightco.com

2500 North Frontage RoadDarien, IL 60561

P 630.969.7000F 630.969.7979

C:\U

sers

\bspo

ehr\

Do

cum

ents

\02

-52

74

-42

_D

GS

_A

rch

_2

019

_C

en

tra

l_b

sp

oeh

rCS

VU

T.r

vt

2/6

/202

0 4

:17

:31

PM

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREETDOWNERS GROVE, IL 60516

FINISH PLAN - UPPER

SEATING - AREA F

5274-42

Author

A10.14F

COMMUNITY HIGH SCHOOL

DISTRICT 99

N

SCALE: 1/8" = 1'-0"1

FINISH PLAN - UPPER SEATING - AREA F

# KEYNOTES

F40 PAINT ALL HANDRAILS, GUARDRAILS AND MISC. METAL UPT-11 U.N.O

F41 PROVIDE STAIR NOSING AT CARPET STAIR TREADS, TYP. STYLE: TBD; COLOR:TBD

F46 PAINT ALL AISLE RAILINGS UPT-3

F48 BARREL TYPE DIFFUSIVE PANELS ABOVE. REFERENCE RCP 2/A3.13F

N

SCALE: 1/8" = 1'-0"2

FINISH PLAN - FOLLOW SPOT ROOM - AREA F

REV ISSUE DATE

34 ISSUED FOR 75% CONSTRUCTIONDOCUMENTS - PHASE C

10.14.2019

ISSUED FOR BID GROUP 8 - PHASEC

11.20.2019

ISSUED FOR CONSTRUCTION -PHASE C

01.28.2020

52 ISSUED FOR ADDENDUM 3 - BG9 02.06.2020

52

52

52

52

52

Page 25: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

COMMUNICATIONS LEGEND:

W

+48"

WALLPHONE LOCATION. CIC TO FURNISH AND INSTALL ONE (1) CATEGORY 6 CABLE

AND ONE (1) CATEGORY 6 8P8C (RJ45) JACK IN A FACEPLATE WITH WALLPHONE

MOUNTING LUGS. REFER TO THE SPECIFICATION FOR CABLE AND JACK

REQUIREMENTS. CIC TO COORDINATE FACEPLATE FINISH AND HEIGHT WITH

ARCHITECTS.

TWO (2) CABLE AND TWO (2) JACK LOCATION. CIC TO FURNISH AND INSTALL TWO (2)

CATEGORY 6 CABLES AND TWO (2) CATEGORY 6 8P8C (RJ45) JACKS AT THIS LOCATION.

REFER TO THE SPECIFICATION FOR CABLE AND JACK REQUIREMENTS. CIC TO

COORDINATE FACEPLATE FINISH AND HEIGHT WITH ARCHITECTS.

CEILING DATA LOCATION CONSISTING OF TWO (2) CATEGORY 6A 8P8C (RJ45) JACKS

AND TWO (2) CATEGORY 6A CABLES TO SUPPORT CUSTOMER PROVIDED AND CIC

INSTALLED WIRELESS ACCESS POINTS. CIC TO FURNISH AND INSTALL TWO (2)

CATEGORY 6A CABLES AND TWO (2) CATEGORY 6A 8P8C (RJ45) JACKS WITH A 25-FOOT

SERVICE LOOP AT THIS LOCATION. CIC SHALL FURNISH AND INSTALL A PLENUM-RATED

TWO-JACK RJ-45 (8P8C) HUBBELL ISB2WP (OR EQUIVALENT) MODULE AT END OF THE

25-FOOT SERVICE LOOP COIL. REFER TO THE SPECIFICATION FOR CABLE AND JACK

REQUIREMENTS.

WAP

CEILING DATA LOCATION CONSISTING OF ONE (1) CATEGORY 6 CABLE TO SUPPORT SIC

FURNISHED AND INSTALLED SURVEILLANCE CAMERA. CIC TO FURNISH AND INSTALL

ONE (1) CATEGORY 6 CABLE AND ONE (1) CATEGORY 6 8P8C (RJ45) JACK WITH A

25-FOOT SERVICE LOOP AT THIS LOCATION. CIC SHALL FURNISH AND INSTALL A

PLENUM-RATED TWO-JACK RJ-45 (8P8C) HUBBELL ISB2WP (OR EQUIVALENT) MODULE

AT END OF THE 25-FOOT SERVICE LOOP COIL. REFER TO THE SPECIFICATION FOR

CABLE AND JACK REQUIREMENTS.

C

TV

TELEVISION LOCATION. CIC TO FURNISH AND INSTALL TWO (2) CATEGORY 6 CABLES,

ONE (1) COAXIAL CABLE, TWO (2) CATEGORY 6 8P8C (RJ45) JACKS, AND ONE (1) F-TYPE

CONNECTOR AT THIS LOCATION. ALL COAXIAL CABLE SHALL TERMINATE IN THE

SERVER ROOM AND NOT IN THE RESPECTIVE IDF THAT THE DATA CABLING WILL

TERMINATE IN. REFER TO THE SPECIFICATION FOR CABLE AND JACK REQUIREMENTS.

CIC TO COORDINATE FACEPLATE FINISH AND HEIGHT WITH ARCHITECTS.

TWO (2) CABLE AND TWO (2) JACK LOCATION. CIC TO FURNISH AND INSTALL TWO (2)

CATEGORY 6 CABLES AND TWO (2) CATEGORY 6 8P8C (RJ45) JACKS AT THIS LOCATION

ALONG WITH APPROPRIATE INSERTS FOR FLOOR BOX, POKE-THRU DEVICE, OR TABLE

TOP BOX THAT IS PROVIDED BY THE EC. REFER TO THE SPECIFICATION FOR CABLE

AND JACK REQUIREMENTS. CIC TO COORDINATE FACEPLATE FINISH WITH

ARCHITECTS.

PS

PAGING SPEAKER LOCATION. CIC TO FURNISH A CEILING MOUNTED PAGING SPEAKER.

REFER TO THE SPECIFICATION FOR SPEAKER REQUIREMENTS. CIC TO COORDINATE

SPEAKER FINISH AND LOCATION WITH ARCHITECTS.

EXISTING WIRELESS ACCESS POINT LOCATION. PROVIDE ADD/ALTERNATE COST TO

PROVIDE A NEW CEILING DATA LOCATION CONSISTING OF TWO (2) CATEGORY 6A 8P8C

(RJ45) JACKS AND TWO (2) CATEGORY 6A CABLES TO SUPPORT CUSTOMER PROVIDED

AND CIC INSTALLED WIRELESS ACCESS POINTS. CIC TO FURNISH AND INSTALL TWO (2)

CATEGORY 6A CABLES AND TWO (2) CATEGORY 6A 8P8C (RJ45) JACKS WITH A 25-FOOT

SERVICE LOOP AT THIS LOCATION. CIC SHALL FURNISH AND INSTALL A PLENUM-RATED

TWO-JACK RJ-45 (8P8C) HUBBELL ISB2WP (OR EQUIVALENT) MODULE AT END OF THE

25-FOOT SERVICE LOOP COIL. REFER TO THE SPECIFICATION FOR CABLE AND JACK

REQUIREMENTS.

WAP

E

DIGITAL CLOCK LOCATION. CIC TO FURNISH AND INSTALL AN ANALOG WALL CLOCK AT

THIS LOCATION. REFER TO THE SPECIFICATION FOR CLOCK REQUIREMENTS. CIC TO

COORDINATE CLOCK FINISH AND LOCATION WITH ARCHITECTS.

CL

DUAL DIGITAL CLOCK LOCATION. CIC TO FURNISH AND INSTALL A DUAL SIDED DIGITAL

WALL CLOCK AT THIS LOCATION. REFER TO THE SPECIFICATION FOR CLOCK

REQUIREMENTS. CIC TO COORDINATE CLOCK FINISH AND LOCATION WITH

ARCHITECTS.

CLD

WALL MOUNTED PAGING SPEAKER AND DIGITAL CLOCK LOCATION. CIC TO FURNISH

AND INSTALL A DIGITAL WALL CLOCK AND PAGING SPEAKER AT THIS LOCATION. REFER

TO THE SPECIFICATION FOR CLOCK REQUIREMENTS. CIC TO COORDINATE CLOCK AND

SPEAKER FINISH AND LOCATION WITH ARCHITECTS.

PCL

CEILING DATA LOCATION CONSISTING OF TWO (2) CATEGORY 6 8P8C (RJ45) JACKS AND

TWO (2) CATEGORY 6 CABLES. EC TO FURNISH AND INSTALL A 4-11/16" X 4-11/16" X 2-1/8"

DEEP BOX WITH SINGLE GANG TRIM RING MOUNTED FLUSH TO THE UNDERSIDE OF THE

CEILING TILE TO SUPPORT SIC PROVIDED CCTV CAMERAS. CIC TO FURNISH AND

INSTALL TWO (2) CATEGORY 6 CABLES AND TWO (2) CATEGORY 6 8P8C (RJ45) JACKS

AT THIS LOCATION. REFER TO THE SPECIFICATION DRAWING FOR CABLE AND JACK

REQUIREMENTS. CIC TO COORDINATE FACEPLATE FINISH WITH ARCHITECTS.

COMMUNICATIONS & LOW VOLTAGE CONDUIT REQUIREMENTS:

ALL CONDUIT RUNS SHALL BE 3/4" EMT, UNLESS NOTED OTHERWISE.

ALL BOXES SHALL BE A MINIMUM OF 4-11/16" x 4-11/16" x 2-1/8" DEEP BOX WITH A SINGLE GANG

TRIM RING MOUNTED FLUSH TO THE WALL SURFACE, UNLESS NOTED OTHERWISE.

ALL MOUNTING HEIGHTS ARE TO THE CENTERLINE OF THE BACKBOX UNLESS NOTED

OTHERWISE.

ALL CONDUIT SHALL BE ROUTED ABOVE CEILINGS, BELOW FLOORS, OR STUBBED UP WITHIN

WALLS; NO CONDUIT SHALL BE EXPOSED UNLESS APPROVED BY THE ARCHITECT.

ALL CONDUITS IN WALLS SHALL STUB UP AT LEAST 6-INCHES ABOVE THE FINISHED CEILING. ALL

STUBS SHALL BE REAMED AND BUSHED AT BOTH ENDS.

ALL CONDUIT PENETRATIONS THROUGH FIRE-RATED PARTITIONS SHALL BE SEALED AS

REQUIRED BY CODE. ALL BACKBOXES MOUNTED WITHIN FIRE-RATED PARTITIONS SHALL MEET

THE FIRE RATING OF THE PARTITION AS REQUIRED BY CODE.

PROVIDE PULL STRINGS IN ALL CONDUIT RUNS LONGER THAN 10-FEET.

PROVIDE PULL BOXES EVERY 100 LINEAR FEET OR AFTER TWO SUCCESSIVE 90° BENDS.

ALL JUNCTION AND PULL BOXES SHALL BE FURNISHED WITH ACCOMPANYING BLANK COVER

PLATE.

ALL BOXES IN EXTERIOR LOCATIONS SHALL BE WEATHERPROOF AND WATERPROOF.

INSTRUCTIONS SHOWN IN DIMENSION LINES, DETAILS, ELEVATIONS, AND PLANS (IN THIS ORDER)

TAKE PRECEDENCE OVER INSTRUCTIONS SHOWN IN LEGENDS.

CONDUIT AND CABLE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO REPRESENT

INSTALLATION PATHS OR DISTANCES. ACTUAL ROUTING AND BOX LOCATIONS SHALL BE

FIELD-VERIFIED FOR FEASIBILITY AND COORDINATED WITH OTHER DISCIPLINES BY THE

INSTALLATION CONTRACTOR.

HORIZONTAL CONDUITS INTO EACH TECHNOLOGY AREA FROM THE EXTERIOR CEILING PLENUM

ARE REQUIRED FOR CABLE ACCESS INTO THE ROOM FROM ALL LOCATIONS THROUGHOUT THE

SPACE. THE ENDS OF THE CONDUITS SHALL BE REAMED AND BUSHED, AND EXTEND A MINIMUM

OF 2-INCHES INTO THE ROOM.

ONE 4-INCH

ONE 2-INCH

ONE 1-1/2-INCH

ONE 1-1/4-INCH

ONE 1-INCH 4 X 16 X 3

6 X 20 X 3

8 X 27 X 4

8 X 36 X 4

15 X 60 X 8 8 INCHES

5 INCHES

4 INCHES

3 INCHES

2 INCHES

4-INCH

2-INCH

1-1/2-INCH

1-1/4-INCH

1-INCH

40 INCHES

12 INCHES

9 INCHES

8 INCHES

4 INCHES

CONDUIT

DIAMETER

MINIMUM

BEND RADIUS

NUMBER AND

SIZE OF OF

CONDUITS

PULL BOX SIZE

(W x L x H IN

INCHES)

FOR EACH ADDITIONAL

CONDUIT ENTERING THE PULL

BOX, INCREASE THE WIDTH

CABLE

O.D. (")

19

13

11

6

6

4

4

3

2

2

1

1

1

1

1

N/A

1"

1

33

23

19

12

10

8

6

6

5

4

3

2

1

1

1

1

1-1/4"

1

46

32

25

16

14

10

8

8

7

6

5

4

3

1

1

1

1-1/2"

2

75

52

42

27

22

18

14

12

10

10

8

6

5

3

3

2

2"

4

200

139

112

71

60

48

40

36

30

28

22

16

14

10

8

7

3"

12

333

231

187

120

102

82

68

60

50

46

38

30

24

16

14

12

4"

20

CONDUIT TRADE SIZE AND MAXIMUM QUANTITIES OF CABLES OF THAT O.D.

0.16

0.18

0.20

0.25

0.27

0.30

0.33

0.35

0.38

0.40

0.45

0.50

0.55

0.67

0.70

0.75

0.60

10

8

6

4

3

2

1

1

1

1

1

1

1

N/A

N/A

N/A

3/4"

N/A

NOTE: THIS DRAWING SET INCORPORATES THREE-PART SPECIFICATIONS FOR

INTERPRETATION; THEREFORE, THESE SPECIFICATIONS AND DRAWINGS SHALL BE TREATED AS

A SINGLE ISSUANCE. IF EITHER COMPONENT IS NOT UTILIZED FOR BID, REVIEW, OR

CONSTRUCTION, THEN CRITICAL INFORMATION IS MISSING THAT MAY AFFECT SCHEDULE AND

PRICING. INSTALLATION CONTRACTORS SHALL TRANSMIT, DOWNLOAD, AND INCORPORATE

THESE SPECIFICATIONS ALONG WITH THESE DRAWINGS.

AVIC = AUDIOVISUAL CABLING CONTRACTOR

CIC = CABLING INSTALLATION CONTRACTOR

EC = ELECTRICAL INSTALLATION CONTRACTOR

PIC = PAGING INSTALLATION CONTRACTOR

SIC = SECURITY INSTALLATION CONTRACTOR

ABBREVIATIONS USED IN THESE DRAWINGS:

NOTE: THE INSTALLATION CONTRACTOR

SHALL COORDINATE WITH THE ARCHITECT

AND GENERAL CONTRACTOR FOR EXACT

MOUNTING LOCATIONS PRIOR TO

INSTALLATION OF ANY COMPONENTS.

MOUNTING INFORMATION, WHERE X =

A ABOVE CEILING

D TO THE DESK

F FLUSH-MOUNTED

H HIDDEN UNDER WORKSURFACE

M TO THE MULLION

R TO THE RACK ITSELF

S PLACED ON THE WORKSURFACE

X

MOUNTING INFORMATION, WHERE X =

A ABOVE CEILING

D TO THE DESK

F FLUSH-MOUNTED

H HIDDEN UNDER WORKSURFACE

M TO THE MULLION

P TO THE PODIUM

R TO THE RACK ITSELF

S PLACED ON THE WORKSURFACE

TX TRANSMITTER

RX RECEIVER

X

TELECOMMUNICATIONS GROUNDING NOTES:

1. REFER TO E-SERIES DRAWINGS FOR PANEL SCHEDULING INFORMATION AND GROUNDING

ELECTRODE SYSTEM DATA.

2. A SINGLE GROUND SOURCE SHALL BE PROVIDED FOR GROUNDING ALL RACKS, TRAYS AND

METAL FRAMES IN THE MAIN DISTRIBUTION FRAME. A TELECOMMUNICATIONS MAIN

GROUNDING BUSBAR (TMGB) SHALL BE PROVIDED AND INSTALLED ON THE MAIN

CROSS-CONNECT WALL AT A HEIGHT OF 8-FEET AFF. THE TMGB SHALL CONSIST AT A

MINIMUM OF A PREDRILLED COPPER BUSBAR WITH HOLES FOR USE WITH STANDARD-SIZED

LUGS, AND HAVE MINIMUM DIMENSIONS OF 1/4-INCH THICK BY 4-INCHES WIDE WITH A

MINIMUM OF FORTY-EIGHT (48) CONNECTION POINTS. THE TMGB SHALL BE DIRECTLY

BONDED TO THE ELECTRICAL SERVICE GROUND AND TO THE BUILDING STEEL.

3. A TELECOMMUNICATIONS GROUNDING BUSBAR (TGB) SHALL BE INSTALLED IN ANY/ALL

TELECOM ROOMS. THE TGB SHALL BE MOUNTED ON THE HORIZONTAL CROSS-CONNECT

WALL AT A HEIGHT OF 8-FEET AFF. THE TGB SHALL CONSIST OF A PREDRILLED COPPER

BUSBAR WITH HOLES FOR USE WITH STANDARD-SIZED LUGS, AND HAVE MINIMUM

DIMENSIONS OF 1/4-INCH THICK BY 2-INCHES WIDE WITH A MINIMUM OF TWELVE (12)

CONNECTION POINTS.

4. A GROUND CABLE FROM THE TMGB TO EACH TGB SHALL BE INSTALLED TO CREATE A

FORMAL TELECOMMUNICATIONS BONDING BACKBONE (TBB). THE TBB MAY NOT BE

DAISY-CHAINED, BUT CAN BE TAPPED-OFF USING A SHORT BONDING CONDUCTOR. BARE

COPPER CABLING IS ACCEPTABLE. THE TBB SHALL BE SIZED BASED ON THE LENGTH OF THE

CABLE RUN.

5. THE CONTRACTOR SHALL PROVIDE AND INSTALL A MINIMUM #6 AWG GROUND WIRE FROM

EACH OPEN RELAY RACK AND CABLE TRAY TO THE MAIN TELECOMMUNICATIONS

GROUNDING BUSBAR OR TELECOMMUNICATIONS GROUNDING BUSBAR.

6. ANY PENETRATION THROUGH A FIRE-RATED WALL SHALL BE PROPERLY FIRE-STOPPED BY

THE CONTRACTOR WITH THE APPROPRIATE FIRE-STOP MATERIAL PER APPLICABLE BUILDING

AND ELECTRICAL CODES.

7. THE CONTRACTOR SHALL COORDINATE GROUND CABLE INSTALLATION WITH THE

ARCHITECTS, MEP ENGINEERS AND THE OTHER TRADES ON THE PROJECT.

8. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY DAMAGE TO ANY COMPONENT

OF THE TELECOMMUNICATIONS GROUNDING SYSTEM DURNING INSTALLATION.

9. THE CONTRACTOR SHALL ENSURE THAT THE SIZE OF THE TMGB AND THE TGB ARE

ADEQUATE TO SUPPORT THE TELECOMMUNICATIONS GROUNDING REQUIREMENTS FOR THE

PROJECT.

AV

LESS THAN 13

14 - 20

LENGTH IN FEET

6

4

3

2

1

1/0

2/0

3/0

4/0

250 KCMIL

ANSI/TIA-607-B CONDUCTOR SIZES

CONDUCTOR SIZE (AWG)

21 - 26

27 - 33

34 - 41

42 - 52

53 - 66

67 - 84

85 - 105

106 - 125

300 KCMIL126 - 150

350 KCMIL151 - 175

500 KCMIL176 - 250

600 KCMIL251 - 300

750 KCMILGREATER THAN 301

COMMUNICATIONS DRAWING INDEX

T0.00 - LEGEND AND GENERAL NOTES

T1.10 - OVERALL SITE COMMUNICATION PLAN - LEVEL 1

T1.10A - AREA A COMMUNICATION PLAN - LEVEL 1

T1.10B - AREA B COMMUNICATION PLAN - LEVEL 1

T1.10C - AREA C COMMUNICATION PLAN - LEVEL 1

T1.10D - AREA D COMMUNICATION PLAN - LEVEL 1

T1.10E - AREA E COMMUNICATION PLAN - LEVEL 1

T1.21 - IDF PLANS - LEVEL 1

T2.02 - OVERALL SITE COMMUNICATION PLAN - LEVEL 2

T2.12A - AREA A COMMUNICATION PLAN - LEVEL 2

T2.12B - AREA B COMMUNICATION PLAN - LEVEL 2

T2.12E - AREA E COMMUNICATION PLAN - LEVEL 2

T3.03 - OVERALL SITE COMMUNICATION PLAN - LEVEL 3

T3.13A - AREA A COMMUNICATION PLAN - LEVEL 3

T3.13B - AREA B COMMUNICATION PLAN - LEVEL 3

T3.13E - AREA E COMMUNICATION PLAN - LEVEL 3

POSITION 1 - GREEN

IDENTIFICATION LABEL

POSITION 1 - GREEN

POSITION 2 - GREEN

IDENTIFICATION LABEL

POSITION 1 - GREEN

POSITION 2 - GREEN

POSITION 3 - COAX

IDENTIFICATION LABEL

1

2

POSITION 1 - YELLOW

POSITION 2 - YELLOW

IDENTIFICATION LABEL

1

POSITION 1 - VIOLET

IDENTIFICATION LABEL

NOTE: FOR ALL FLOOR BOX, POKE-THRU, AND TABLE TOP LOCATIONS

THE CIC, SHALL ADHERE TO THE POSITION AND COLOR SCHEME FOR

THE CORRESPONDING WALL LOCATION. IT IS THE RESPONSIBILITY OF

THE CIC TO COORDINATE WITH THE EC AND/OR THE FURNITURE

VENDOR TO DETERMINE WHAT FLOOR BOX, POKE-THRU, OR TABLE TOP

BOX IS BEING PROVIDED FOR CIC USE.

#

VECPU6

PRODUCT

BROWSER BASED SYSTEM CPU CARD

DESCRIPTION

ADDITIONAL PAGING SYSTEM COMPONENTS REQUIRED FOR INTEGRATION W/ EXISTING SYSTEM

1

2

3

4

5

6

7

8

9

10

11

12

13

14

1

QTY

2

1

3

1

1

2

1

1

76

9

9

9

9

VECPU6-EXP

VECRK

VC40R-9T

XPETCM24

VESTX

V-C6124P

VP-9202

V-6120

VE522B-2

V-D2425B

V-936400

V-CSB25

VB-S20

VECPU6 EXPANSION

9 POSITION RACK MOUNT AND POWER HARNESS

9 POSITION BACK PLANE CABLE W/ TERMINATOR

24 POINT 25V TALKBACK INTERCOM EXPANSION CARD

24 POINT ONE-WAY PAGING EXPANSION CARD

POWER SUPPLY, 6AMP, POSITIVE 24VDC

DUAL 6A/4A SWITCHING POWER SUPPLY SHELF (2U)

6-CHANNEL AMPLIFIER

2X2 LAY-IN CEILING SPEAKER 25/70V

2.5" DIGITAL CLOCK, 24VAC/VDC

25/70V 8" SPEAKER W/O GRILLE

2.5" DIGITAL CLOCK/8" SPEAKER BAFFLE

TYPE 20 SURFACE BACKBOX

NOTE: CABLING INSTALLATION CONTRACTOR TO VERIFY EXACT PART #'S AND QUANTITIES

REQUIRED WITH VALCOM PRIOR TO PURCHASE AND INSTALLATION

ER

GISTE

RED COMMUNIC

TI ONS

D IS T R I BUT I ON DE SIG

NER

A

EXPIRES 12/31/20

Regis. No. 201337R

C

A

D

B

E

N.I.C.

N.I.C.

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

C

o. ©

C

op

yrig

ht 2

01

8 A

ll rig

hts re

se

rve

d. N

o p

art o

f th

ese

d

ocu

me

nts m

ay b

e re

pro

du

ce

d, sto

re

d, o

r tra

nsm

itte

d in

a

ny fo

rm

o

r b

y a

ny m

ea

ns, e

le

ctro

nic, m

ech

an

ica

l, p

ho

to

co

pyin

g, re

co

rd

in

g o

r o

th

erw

ise

, w

ith

ou

t th

e p

rio

r w

ritte

n co

nse

nt o

f W

ig

ht &

C

o.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .Wight & Company

wightco.com

2500 North Frontage Road

Darien, IL 60561

P 630.969.7000

F 630.969.7979

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREET

DOWNERS GROVE, IL 60516

LEGEND AND GENERAL

NOTES

5274-42

A.SASSILA

T0.00

COMMUNITY HIGH SCHOOL

DISTRICT 99

REV ISSUE DATE

1

WALL PHONE LOCATION

ELEVATION VIEW

6" = 1' - 0"

2

2-PORT DATA LOCATION

ELEVATION VIEW

6" = 1' - 0"

3

TV LOCATION

ELEVATION VIEW

6" = 1' - 0"

4

WIRELESS ACCESS POINT LOCATION

ELEVATION VIEW

6" = 1' - 0"

5

SECURITY CAMERA LOCATION

ELEVATION VIEW

6" = 1' - 0"

ISSUED FOR 50% DD - PHASE C 6.14.2019

ISSUED FOR 100% DD - PHASE C 7.12.2019

ISSUED FOR 25% CD - PHASE C 8.30.2019

ISSUED FOR 75% CD - PHASE C 10.14.2019

ISSUED FOR 90% CD - PHASE C 11.01.2019

ISSUED FOR BID GROUP 8 - PHASE C 11.20.2019

ISSUED FOR PLAN REVIEW - PHASE C 1.28.2020

52

ISSUED FOR ADDENDUM 3 - BG9 - PHASE C 2.6.2020

52

Page 26: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

WD

DW

DW

F

RR

R

CONCESSIONS

mobile? orpermanenthow large?

18x4

8

18x4

8

18x24

24x60

C

D

24x4824x48

24x4824x60

24x60

24x48

UP

UP

DEMO

KITCHEN

CULINARY

LAB

CULINARY

LAB

ART

GALLERY

OFFICE

CLASSROOM

OFFICE

PHOTO

AR

EA

F

AR

EA

B

CERAMICS

STUDIO

KILN

MULTI-NEEDS

ROOM

CLASSROOM

CLASSROOM

OFFICE OFFICE

CLASSROOM

RADIO RADIO

CLASSROOM

CLASSROOM

CO

RR

ID

OR

TO

IL

ET

S

TO

IL

ET

S

CA

FE

BUILDING

SERVICES

STAIR

ENGINEERINGSTORAGE

ST

OR

AG

E

OFFICE

?

OF

FIC

E

CONFERENCEKITCHENETTE

TOILET

TOILET

STORAGE

JANITOR

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

AR

EA

F

AR

EA

B

OFFICE MAT ROOM

OFFICE

SENSORY

INCIDENTAL WORK AREA

INCIDENTAL WORK AREA

LINE OF WALL SURFACE

ABOVE

AREA B AREA B

AREA C.1 AREA C.1

AR

EA

C

.1

AR

EA

C

.2

ART OFFICE

PHASE A WORK

PREVIOUSLY

COMPLETED

PHASE A WORK

PREVIOUSLY

COMPLETED

PHASE A WORK

PREVIOUSLY

COMPLETED

OFFICE

STORAGE

IDF A51

WAP

PS PS PS PS PS PS PS PS PS

PS PS PS

PS PS PS

PS PS PS

PS PS

PS PS

PS PS

PS

PS

PS

WAP

+60" +60" +60"

+60"

WAPWAP

WAPWAP

WAPWAP

C

C

C

C

ON HEADER

C

96" AFF/LANDING

C

C

C

C

C

ABOVE WINDOWS

NEW IDF 1-352

EXISTING IDF A41 TO BE RELOCATED TO NEW IDF 1-352

ER

GISTE

RED COMMUNIC

TI ONS

D IS T R I BUT I ON DE SIG

NER

A

EXPIRES 12/31/20

Regis. No. 201337R

C

A

D

B

E

N.I.C.

N.I.C.

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

C

o. ©

C

op

yrig

ht 2

01

8 A

ll rig

hts re

se

rve

d. N

o p

art o

f th

ese

d

ocu

me

nts m

ay b

e re

pro

du

ce

d, sto

re

d, o

r tra

nsm

itte

d in

a

ny fo

rm

o

r b

y a

ny m

ea

ns, e

le

ctro

nic, m

ech

an

ica

l, p

ho

to

co

pyin

g, re

co

rd

in

g o

r o

th

erw

ise

, w

ith

ou

t th

e p

rio

r w

ritte

n co

nse

nt o

f W

ig

ht &

C

o.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .Wight & Company

wightco.com

2500 North Frontage Road

Darien, IL 60561

P 630.969.7000

F 630.969.7979

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREET

DOWNERS GROVE, IL 60516

AREA B

COMMUNICATION PLAN -

LEVEL 1

5274-42

A.SASSILA

T1.11B

COMMUNITY HIGH SCHOOL

DISTRICT 99

REV ISSUE DATE

NORTH

1

COMMUNICATION PLAN

PLAN VIEW

1/8" = 1' - 0"

ISSUED FOR 50% DD - PHASE C 6.14.2019

ISSUED FOR 100% DD - PHASE C 7.12.2019

ISSUED FOR 25% CD - PHASE C 8.30.2019

ISSUED FOR 75% CD - PHASE C 10.14.2019

ISSUED FOR 90% CD - PHASE C 11.01.2019

ISSUED FOR BID GROUP 8 - PHASE C 11.20.2019

ISSUED FOR PLAN REVIEW - PHASE C 1.28.2020

52

ISSUED FOR ADDENDUM 3 - BG9 - PHASE C 2.6.2020

52

Page 27: SOUTH - campussuite-storage.s3.amazonaws.com · Date: February 6th , 2020 Bid Question/Answer Log No. 1 The following clarification information is provided in response to questions

5

4

12

1

5

2'

2'-6"

3

T1.21

EC TO FURNISH

AND INSTALL

ONE (1) NEMA

5-20 QUAD

RECEPTACLE

ON OVERHEAD

CABLE TRAY

3

2'-3"

3/4" FIRE-RATED (OR PAINTED WITH A MINIMUM OF THREE (3) COATS FIRE RETARDANT

PAINT) A-C GRADE VOID FREE PLYWOOD SHEETING SHALL BE INSTALLED ON THE

ENTIRE LENGTH OF THIS WALL. THE PLYWOOD SHALL BE MOUNTED SO THAT SUCH

THAT THE TOP OF THE PLYWOOD IS 8' - 6" AFF AND THE BOTTOM EDGE OF THE

PLYWOOD IS 6" AFF.

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED WALL MOUNTED

ENCLOSURE - BLACKHAWK LABS PART #MRQ301S16 AND S16PROKIT.

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED 12-INCH WIDE

LADDER CABLE TRAY - CPI PART #10250-712. TRAY TO BE MOUNTED SUCH THAT THE

BOTTOM OF THE TRAY IS 7-FEET, 6-INCHES AFF.

TELCOMMUNICATIONS MAIN GROUNDING BUSBAR MOUNTED AT 8-FEET AFF.

ELECTRICAL CONTRACTOR FURNISHED AND INSTALLED EMT HORIZONTAL SLEEVES TO

ALLOW STATION AND BACKBONE CABLING TO ENTER THE ROOM. THE ENDS OF THE

SLEEVES SHALL BE REAMED AND BUSHED, AND EXTEND A MINIMUM OF 2-INCHES INTO

THE ROOM. EXACT PLACEMENT, SIZE, QUANTITY, AND ROUTING OF THE SLEEVES

SHALL BE COORDINATED WITH OTHER TRADES.

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED CATEGORY 6 1U

48-PORT PATCH PANEL TO SUPPORT TERMINATION OF HORIZONTAL STATION CABLING.

REFER TO SPECIFICATION FOR EXACT REQUIREMENTS.

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED CATEGORY 6A 1U

24-PORT PATCH PANEL TO SUPPORT WIRELESS ACCESS POINT CABLING

CONNECTIVITY REQUIREMENTS. REFER TO SPECIFICATION FOR EXACT

REQUIREMENTS.

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED WALL MOUNT FIBER

OPTIC TERMINATION ENCLOSURE TO SUPPORT TERMINATION OF FIBER BACKBONE

CABLING. REFER TO SPECIFICATION DRAWING FOR EXACT REQUIREMENTS.

1

2

3

4

5

6

7

8

DRAWING KEYNOTES:

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED QUANTITY ONE (1)

12-STRAND 50-MICRON OM4 GRADE ARMORED FIBER OPTIC CABLE. REFER TO CABLE

SPECIFICATION DRAWING FOR EXACT REQUIREMENTS.

10

ELECTRICAL INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED NEMA 5-20 QUAD

RECEPTACLE MOUNTED WITHIN THE WALL MOUNTED ENCLOSURE. REFER TO

ELECTRICAL DRAWINGS FOR EXACT REQUIREMENTS.

9

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED RACK MOUNT 1U

FIBER OPTIC TERMINATION ENCLOSURE TO SUPPORT TERMINATION OF FIBER

BACKBONE CABLING. REFER TO SPECIFICATION DRAWING FOR EXACT REQUIREMENTS.

11

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED 2-POST 19-INCH RACK

- CPI PART #48353-703.

12

CABLING INSTALLATION CONTRACTOR SUPPLIED AND INSTALLED 6-INCH VERTICAL

WIRE MANAGER - CPI PART #13912-703.

13

13 13

12

11

7

6

6

6

6

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

7

OFFICESTORAGE

5

T1.21

4

2

1 5

8

7

6

6

6

2 9

3'-10"

11"

SERVICES

BUILDING

SERVICES

13 13

12

11

6

6

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

7

10

NEW IDF IT TECH

NEW IDF 118 IDF A100L

10

10

NEW IDF 1-352

ER

GISTE

RED COMMUNIC

TI ONS

D IS T R I BUT I ON DE SIG

NER

A

EXPIRES 12/31/20

Regis. No. 201337R

C

A

D

B

E

N.I.C.

N.I.C.

NORTH

Project Number:

Drawn By:

Sheet:

Wig

ht &

C

o. ©

C

op

yrig

ht 2

01

8 A

ll rig

hts re

se

rve

d. N

o p

art o

f th

ese

d

ocu

me

nts m

ay b

e re

pro

du

ce

d, sto

re

d, o

r tra

nsm

itte

d in

a

ny fo

rm

o

r b

y a

ny m

ea

ns, e

le

ctro

nic, m

ech

an

ica

l, p

ho

to

co

pyin

g, re

co

rd

in

g o

r o

th

erw

ise

, w

ith

ou

t th

e p

rio

r w

ritte

n co

nse

nt o

f W

ig

ht &

C

o.

. . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . .Wight & Company

wightco.com

2500 North Frontage Road

Darien, IL 60561

P 630.969.7000

F 630.969.7979

MFP

IMPLEMENTATION -

SOUTH

1436 NORFOLK STREET

DOWNERS GROVE, IL 60516

IDF PLANS - LEVEL 1

5274-42

A.SASSILA

T1.21

COMMUNITY HIGH SCHOOL

DISTRICT 99

REV ISSUE DATE

NORTH

1

EQUIPMENT LAYOUT - NEW IDF 118

PLAN VIEW

1/2" = 1'-0"

ISSUED FOR 50% DD - PHASE C 6.14.2019

ISSUED FOR 100% DD - PHASE C 7.12.2019

ISSUED FOR 25% CD - PHASE C 8.30.2019

ISSUED FOR 75% CD - PHASE C 10.14.2019

ISSUED FOR 90% CD - PHASE C 11.01.2019

NORTH

2

CABLE TRAY LAYOUT - NEW IDF 118

PLAN VIEW

1/2" = 1'-0"

3

2-POST RACK LAYOUT - NEW IDF 118

ELEVATION VIEW - FRONT

1" = 1'-0"

NORTH

4

EQUIPMENT LAYOUT - NEW IDF IT TECH

PLAN VIEW

1/2" = 1'-0"

5

WALL MOUNT ENCLOSURE LAYOUT - NEW IT TECH

ELEVATION VIEW - FRONT

1" = 1'-0"

ISSUED FOR BID GROUP 8 - PHASE C 11.20.2019

ISSUED FOR PLAN REVIEW - PHASE C 1.28.2020

NORTH

6

EQUIPMENT LAYOUT - NEW IDF 1-352

PLAN VIEW

1/2" = 1'-0"

NORTH

7

CABLE TRAY LAYOUT - NEW IDF 1-352

PLAN VIEW

1/2" = 1'-0"

8

2-POST RACK LAYOUT - NEW IDF 1-352

ELEVATION VIEW - FRONT

1" = 1'-0"

9

DATA BACKBONE

SCHEMATIC VIEW

NOT TO SCALE

51

52

ISSUED FOR ADDENDUM 3 - BG9 - PHASE C 2.6.2020

52