    Solutions

    to

    Review

    Questions

    Session

    2

    A

    four

    stage

    process

    (a)Alwayschoosingthefastermachines:minTT=9+6+5+8=28minutes

    (b)CapacityatStage1:60[min/hour]/9[min/unit]+60[min/hour]/9[min/unit]=13.33[units/hr]

    Stage2:60/6=10[units/hr]

    Stage3:

    60

    /5=12

    [units/hr]

    Stage4:60/8 +60/12 =12.5[units/hr]

    (c)Sincethestagewiththeleastcapacityisthebottleneck,itisStage2. Theprocesscapacityisthus

    10[units/hr].

    (d)Weshouldincreasethecapacityofstage2from10to12[units/hr].Beyondthis,thebottleneck

    shifts to Stage3,andoutputwillnot increase.Thus, this additionalmachineneeds toproduce2

    [units/hr]oritshouldhavethedesignCT=1/TR=30[min/unit].

    Luis

    Poisson

    1) Theprocesscapacityisdeterminedbythebottleneck. Toidentifythebottleneck orslowest

    stage youneedtocalculatetheCTorCapacityofthedifferentstations.

    Amongstations2,3,and4,station2istheslowestone,withacapacityperhourof60min/hr / 6

    min

    /

    unit

    =

    10

    units

    per

    hour.

    You

    also

    need

    the

    capacity

    of

    the

    other

    two

    stations.

    Here

    you

    have

    parallelservers,whosecapacityadds.SoforStation1:60/40+60/20=45unitsperhour,andfor

    Station5:60/12+60/6+60/4=30unitsperhour.Sincebothstationshavealargercapacitythan

    station2,station2isthebottleneckandtheoverallcapacity(orTR)is10unitsperhour.(Allother

    stationscanprocessunitsfaster,buteithertheywouldnothaveanyinput(iftheyfollowstation2)

    orincaseofstation1,producingfasterwouldjustproduceunnecessaryworkinprocessinventory.

    2)TheminimumTTisthefastesttimeyoucanproducesomethingwhenthesystemisempty,i.e.,if

    theprocessstartsup. ThefastestpartAAcanenterthebufferis2min.ThefastestpartBBcanenter

    thebufferis6+5=11min.After11minyouhavebothparts,onlythentheassemblyinStep4can

    start,whichtakes5min,so16minsofar.Finallyinstep5youchooseagainthefastestmachine

    (sincetheseareagainparallelstations,alldoingthesamething,sousedalternatively).So16+4=20

    ministhefastestyoucouldproduceaproduct.

    3)

    Station

    2

    is

    the

    process

    bottleneck

    (see

    1)

    Eric

    &

    Old

    Itwillworsenthesituation.Clearly,thesystemisconstrainedbytheupstreamworkstation,whichis

    therealbottleneck,notbythedownstreammachine.Changingthescheduleontheupstream

    machinewillnothaveanimpactontheutilizationofthedownstreammachine,becauseonaverage

    thelatterwillalwaysseethearrivalofthesamenumberofjobs(determinedbythethroughputof

    thebottleneckworkstation).

    Therefore,theonlywaytoincreasetheutilizationrateofthedownstreammachineistoincreasethe

    throughputatthebottleneck.However,thelargernumberofsetupsrequiredbythenewpolicyis

    likelytohavetooppositeeffect:itwillwastevalueaddedtimeatthebottleneckandfurther

    constraintheproductivityofthewholefactory.

    Asaresult,atbestthepolicywillhavenoeffect.Mostlikelyitwillevenmakethesituationworse.

    Asageneralremark,youshouldsuggesttoyourclientthatmaximizingutilizationatanon

    bottleneckmachineisawrongobjective.YoushouldadviseRoditomanagethesystemtoachieve

    maximalthroughput,notmaximalutilizationofmachines.