On November 17 th 2010, Engensa, a leading British installer o PV systems, installed a 3.3 kWp PV installation on the roo o a property in Oxord, UK. The owner o the property, Mr. Bakewell, is already amiliar with solar technology. As the owner o a swimming pool business and a supporter o green technology, he promotes the use o solar heating installations to keep the pool water warm. His beautiul old estate , bathed by the scent o the surrounding pine trees, serves as an exhibition space or his pools. To improve his carbon ootprint even urther Mr. Bakewell wanted to install a grid-connected PV system on his house. “When I frst consulted a PV proessional about installing a grid-connected PV installation, I explained to them that I had two houses at about 10 meter distance rom each other, both o which have a  south acing roo acet. The proessional recommended that I install two PV installations using two inverters, one or each roosays Mr. Bakewell. The problem was that the roos o the two houses have two dierent slopes: one has a 25˚ slope and the other has a 40˚ slope. “They also said that my pine trees could pose a problem because they cast shades on my home in the mornings.” Traditional installation habits recommend avoiding shaded areas on the roo and stick to rather rigid design rules: strings connected to the same inverter need to be identical in length, orientation and slope, as do modules in a serial connection. Hence, in their eorts to avoid mismatch between modules, installers are limited in their reedom to design PV systems the way they would ideally like to. The surprise came when Mr. Bakewell called Engensa or a second opinion. He ound it was actually possible to install one PV system that would spread across the two roos using a SolarEdge inverter and SolarEdge power optimisers. The installed system consists o one SolarEdge SE3300 inverter, 18 185W ET Solar modules, and 18 SolarEdge PB250-AOB power optimisers connected together in one string spanning the two dierent roos. Power optimisers are attached to each module separately and track their individual Maximum Power Point. The MPPT is optimal at all times regardless o the mismatch between the modules. OVERVIEW Special focus: Dierent slopes Installer: Engensa Installation date: 17 Nov. 2010 Location: Oxord, UK Average Irradiance: 1120 kWh/m 2  /year Installed Capacity: 3.3kWp Modules: 18 x 185W ET Solar Power optimisers: 18 x PB250-AOB Inverters: 1 x SE3300 Multi-facet Installation Oxford, UNITED KINGDOM www.SolarEdge.com in [email protected] CASE ST UDY Highlighted Project To sum up: installers who work with traditional inverter systems are limited in their ability to design tailor-made PV systems and have to use complicated, and oten costly, installation strategies. Engensa has been working with SolarEdge or a while now and oers its technological advancements to break through existing boundaries. SolarEdge enables the installation o PV systems with optimal energy output regardless o the amount o partial shade. The SolarEdge power optimisers also maintain a fxed string voltage that extends the maximum string length. These advantages are o particular importance in the UK, where it is very common to install on a group o neighbouring row house rootops. “SolarEdge’s product is the breakthrough that we have been waiting for. Providing our customers with the best innovations on the market whilst maintaining reliability and value are central to Engensa’s company strategy . SolarEdge is the only product of its type that we trust, due to their unparalleled track record and longer warranty conditions.” Dr Toby Ferenczi CTO Engensa architects of energy    A 3.3 kWp installation consisting o one string with 18 modules that spreads across two roos with two dierent slopes: 25° and 40°. The string is connected to a SolarEdge SE3300 inverter.

Upload: xasan13

Post on 05-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solaredge Case Study Oxford Uk

8/2/2019 Solaredge Case Study Oxford Uk

http://slidepdf.com/reader/full/solaredge-case-study-oxford-uk 1/1

On November 17 th 2010, Engensa, aleading British installer o PV systems,installed a 3.3 kWp PV installation onthe roo o a property in Ox ord, UK. Theowner o the property, Mr. Bakewell, isalready amiliar with solar technology. Asthe owner o a swimming pool businessand a supporter o green technology,he promotes the use o solar heatinginstallations to keep the pool waterwarm. His beauti ul old estate, bathed bythe scent o the surrounding pine trees,serves as an exhibition space or hispools. To improve his carbon ootprinteven urther Mr. Bakewell wanted toinstall a grid-connected PV system onhis house.

“When I frst consulted a PV pro essional

about installing a grid-connected PV installation, I explained to them that I hadtwo houses at about 10 meter distancerom each other, both o which have a

south acing roo acet. The pro essionalrecommended that I install two PV installations using two inverters, oneor each roo ” says Mr. Bakewell. Theproblem was that the roo s o the twohouses have two di erent slopes: onehas a 25˚ slope and the other has a 40˚slope.

“They also said that my pine trees couldpose a problem because they cast shadeson my home in the mornings.”

Traditional installation habitsrecommend avoiding shaded areas onthe roo and stick to rather rigid designrules: strings connected to the same

inverter need to be identical in length,orientation and slope, as do modulesin a serial connection. Hence, in theire orts to avoid mismatch betweenmodules, installers are limited in theirreedom to design PV systems the waythey would ideally like to.

The surprise came when Mr. Bakewellcalled Engensa or a second opinion.He ound it was actually possible

to install one PV system that wouldspread across the two roo s usinga SolarEdge inverter and SolarEdgepower optimisers. The installed systemconsists o one SolarEdge SE3300inverter, 18 185W ET Solar modules,and 18 SolarEdge PB250-AOB poweroptimisers connected together in onestring spanning the two di erent roo s.Power optimisers are attached to eachmodule separately and track their

individual Maximum Power Point. TheMPPT is optimal at all times regardlesso the mismatch between the modules.

OVERVIEWSpecial focus: Di erent slopes

Installer: EngensaInstallation date: 17 Nov. 2010

Location: Ox ord, UK

Average Irradiance:

1120 kWh/m 2 /year

Installed Capacity: 3.3kWp

Modules: 18 x 185W ET Solar

Power optimisers:

18 x PB250-AOBInverters: 1 x SE3300

Multi-facet InstallationOxford, UNITED KINGDOM

www.SolarEdge.com in [email protected]

CASE STUDYHighl igh ted Pro jec t

To sum up: installers who work withtraditional inverter systems are limitedin their ability to design tailor-made PVsystems and have to use complicated,and o ten costly, installation strategies.Engensa has been working withSolarEdge or a while now and o ersits technological advancements tobreak through existing boundaries.SolarEdge enables the installationo PV systems with optimal energyoutput regardless o the amount o partial shade. The SolarEdge poweroptimisers also maintain a fxed stringvoltage that extends the maximumstring length. These advantages are o particular importance in the UK, where itis very common to install on a group o

neighbouring row house roo tops.“SolarEdge’s product is thebreakthrough that we have beenwaiting for. Providing our customerswith the best innovations on the marketwhilst maintaining reliability and valueare central to Engensa’s companystrategy. SolarEdge is the only productof its type that we trust, due to theirunparalleled track record and longerwarranty conditions.”

Dr Toby Ferenczi CTO Engensa

architects of energy ™

A 3.3 kWp installation consisting o one string with 18 modules that spreads across two roo s with twodi erent slopes: 25° and 40°. The string is connected to a SolarEdge SE3300 inverter.