2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL 1 Tamarack Flush Mount Solar Roof Mount System Installation Manual for 8-rail kit

Upload: others

Post on 03-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

1

Tamarack Flush MountSolar Roof Mount System

Installation Manual for 8-rail kit

Page 2: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

2

Table of Contents

Table of Contents 2

Installation Features and Ratings 3

System Components 4

Tools Required and Torque Specifications 5

Attaching Roof Mounts 6

Installing Rails and Splices 7

Leveling Rails and Grounding 8

Ground Wiring Diagrams 9 - 10

Module Level Power Electronics (MLPE) Installation 11

Module Installation and Wire Management 12

End Caps 13

List of Approved Modules 14

Page 3: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

3

Tamarack Flush Mount System Features

• Designed for mounting on most residential roofs• Can be installed with most available roof attachments for composition shingle, tile and metal roofs• Only 4 tools required for installation• Top clamps and rail attachments require the use of a single standard 1/2-inch socket• One part for both mid-clamp and end-clamp use simplifies ordering and stocking parts• Module clamps are spring loaded to ease module placement• Two rail heights and one rail length• Bonding splice installs easily without tools• Built-in wire management for module and microinverter cables• Sleak low-profile design eliminates the need for an array skirt

Tamarack Product Summary

Flush mount is a visually appealing, low profile, photovoltaic (PV) module installation system that significantly lowers PV module installation cost by allowing the installation professional to stock fewer parts and to com-plete the installation in less time.

Certified to meet local and International Building Codes when installed in accordance with this manual. The design load rating meets the minimum requirements of 10 PSF downward pressure, 5 PSF upward pressure and 5 PSF down-slope load. Module orientation may be portrait or landscape. Designed for use with most third-party roof attachments including Solar Roof Hooks, Quick Mount PV, Ironridge Flashfoot, S-5 Clamps, etc.

Class A Fire Rating per UL 1703 for steep roof slope applications when using Type 1 or Type 2 Listed Photovoltaic Modules. This is per Middle-ton fire test report 103427989MID-004.

ETL Listed to UL 2307 for bonding and grounding when installed in ac-cordance with this manual.

Rails, clamps, splices and mounting devices are UL2703 Listed for mounting flat-plate Photovoltaic Modules and Panels

5014275

Page 4: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

4

Push-On End CapEight caps, for two rows give the rail system a finished look while allowing drainage.

Wire Management ClipKit includes 24 clips that can be pushed into top of rail to keep cables in place.

Tamarack Flush Mount 84-inch Rail KitInstall Eight Typical PV modules*

Ground lugUse one per module row to ground rail with bare 6 to 10 AWG copper wire. Four clamps are included.

Push-In Bonding Rail SpliceQuickly splice and bond rail sections with no tools or fas-teners. Top Clamps and Rail Mounts can be co-located with splice. Eight splices included.

Rail Mount and L-FootQuickly and securely mount the rail from either side, to any L-Foot, Tile Hook or specialty flashing with a hole or slot for a 5/16-inch bolt. 16 mounts are included.

Mill Finish RailsEight rails for attractive low-profile mounting of up to eight modules with four-foot roof attachment spacing. Certified for up to 180 MPH wind speed and 20 PSF snow load.

50-50 ClampOne clamp can be used as a mid-clamp or an end-clamp on modules with 30 mm to 40 mm frame height. Twenty clamps are included.

MLPE AdapterAttach microinverters or power optimizers to the rails under the modules. Use one adapter for each device. Eight adapters are included.

Channel End Clamp Use this end clamp for mounting modules flush with the end of the rails. This end clamps replaces 50/50 clamps at the end of the row. Eight clamps are included in the kit.

Page 5: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

5

Tools Required• Cordless Drill• Torque Wrench• Rachet and 1/2” Socket• Level

Torque Specifications

Rail Support 12 ft-lbsMLPE Rail Attachment 12 ft-lbsGround Lug 12 ft-lbs50-50 clamp 12 ft-lbsRail Ground Lug 12 ft-lbsIlsco SGB-4 Module Frame Ground lug 12 ft-lbs

Prepare for Installation

Plan the PV module layout that fits the roof and confirm that plans comply with local AHJ requirements.

The rails can be installed parallel or perpendicular to the roof rafters. Center the rails over the structural menbers as much as possible.

Leave enough room to work safely around the aray during the installation process. Some build-ing and fire codes require minimum clearances around PV module installations.

The length of the rails for each row in the installation will be equal to the total width of the modules plus 1/2-inch for each 50-50 clamp used between modules plus 2-inches total for end clamping. When using the channel end clamp, rails can be cut to the edge of the array.

Install proper roof mount flashings per the manufacturer’s instructions. The maximum allow-able spans between roof supports is 6 feet.

Page 6: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

6

Attach Rail Mounts

Each Rail-Mount consists of two parts, a 5/16 inch bolt and a clamp extrusion. The rail adapters have been designed to interface with off-the-shelf mounting products that have vertical leveling slots. Our Rail Mounts work with most products that have 5/16 inch or 3/8 inch bolt slots. We also offer our own L foot for mounting to products that have a flat mounting surface, such as seam clamps, exposed beams or Quick Mount Q Blocks.

Install Rails

Rails are sold in convenient 84-inch and 126-inch lenths. This length is enough for two or three 60 cell or 72 cell modules with a width of up to 40.5 inches. Use a Tamarack bonding splice to connect each section of rail in a row.

If a cut section of rail is required for the installation, it must not be installed at the end of a row. Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and 3 roof mounts, the splice should be located within 1/3 rail span of the middle mount.

Rail mounting is simple and easy. The Rail Adapter clamps to the two feet on the bottom of the rail. There is never any drilling, and parts can be brought on the roof fully assembled and ready to be installed. Rail Adapters may be installed anywhere on the rails, including at splices and they will not interfere with module mount-ing clamps.

Simply position the adapter into the two feet on the bottom of the rail, and tighten the bolt slightly. Leave the bolt slightly lose to allow leveling of the rails in the next step.

Page 7: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

7

Leveling Rails

Start by leveling the bottom rail of the array first. Set the Rail Adapters near the middle of the leveling range and adjust as necessary to have visually level rails. Tighten the attachment bolts to the specified torque when they are aligned. Level the top rail of the array in the same manner.

If there are multiple rows of rails in the array, use a string level or straight edge to help adjust the remaining rows to be level with the top and bottom rails. It is also possible to visually align rails in the middle of the array.

Tighten all hardware to the specified torque.

Grounding

Tamarack rails and PV modules are bonded by 50-50 Module Clamps and bonding splices.The 50-50 clamps acheive bonding to the module frames by stainless-steel pins in the clamping surface of the clamp tops, which penetrate module frame coating. The rails and channel nuts are bonded because of the conductive surface of the mill finish aluminum used in the rail con-struction.

SolarEdge Optimizers and Enphase Microinverters are bonded to the rail with the Tamarack MPLE adapters.

Bonding Method 1: Rail LugUse a Ground Clamp to bond a ground conductor to a rail.

Bonding Method 2 (Optional): Frame LugUse a module ground lug to bond a module frame to a ground conductor. The resulting system is bonded primarily through the module frames. This method may not be acceptable to all building inspectors. This lug is not included in the kit.

Page 8: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

8

Grounding DiagramsRail Grounding method

Frame Grounding Method

550

C

G

550 550 550 550 550 550

550 550 550 550 550 550

550 550

550 550C

C

C

C

C

C

C

C

50-50 Clamp

Channel Clamp

Fault Path

Minimum 10 AWG Copper Wire

Bonding Splice

Ground Lug

G

G

G

Rail

GG

G

G

550

C

G

550 550 550 550 550 550

550 550 550 550 550 550

550 550

550 550C

C

C

C

C

C

C

C

50-50 Clamp

Channel Clamp

Fault Path

Minimum 10 AWG Copper

Wire

Bonding Splice

Ground Lug

G

G

G

Rail

G

G

Page 9: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

Rail Grounding method with SolarEdge Optimizers

Frame Grounding method with SolarEdge Optimizers

550

C

G

550 550 550 550 550 550

550 550 550 550 550 550

550 550

550 550C

C

C

C

C

C

C

C

50-50 Clamp

Channel Clamp

Failt Path

Minimum 10 AWG Copper

Wire

Bonding Splice

Ground Lug

G

G

Rail

G

G

G

G

SolarEdge Optimizer

550

C

G

550 550 550 550 550 550

550 550 550 550 550 550

550 550

550 550C

C

C

C

C

C

C

C

50-50 Clamp

Channel Clamp

Failt Path

Minimum 10 AWG Copper

Wire

Bonding Splice

Ground Lug

G

G

Rail

G

G

G

G SolarEdge Optimizer

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

9

Page 10: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

10

Module Level Power Electronics

Use the Tamarack MLPE Rail Adapter to attach Enphase microin-verters or SolarEdge Optimizers to the rails.The large flat washer is installed between the mounting plate of the MLPE and the top of the rail. Tighten the bolt to 12 ft.-lb. with a torque wrench and a 1/2-inch socket.

Wire Management

Place electrical conductors and connectors at the bottom of the rail channels.

Install the wire protection clips where necessary to keep wires in the channels.

When using 1.6 inch rail, it is possible to damage connectors or large bundles of wire when 50-50 bolts are tightened. Position con-nectors and bundles appropriately to prevent risk of ground faults.

NOTE

These kits may have extra parts that will not be needed in some situations

Page 11: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

11

Module Installation

Start module installation at one end of the rails. If there are multiple rows, start on the bottom row. Install a 50-50 clamp at the end of each rail with the side of the clamp with 2 bonding pins on the module frame. Push the channel nut into the rail. The integrated spring assembly will hold the clamp in place.

Place the first module onto the rails so that it is centered over the rails. Make sure the module is touching the inside edge of the clamps and tighten the clamps with a 1/2” socket.

Install 50-50 Clamps in each rail on the other side of the first module. The springs will hold the clamps in place prior to tightening. Place the second module on the rails, align it with the first module, and push in against the clamps. Tighten the clamps to fully secure the module.

Install the remaining modules and clamps on the rails in the same manner, aligning the corners of the modules.

On the outside edge of the last module, install the clamps so that the side with the two stainless-steel pins is on the module frame. Tighten all bolts to the specified torque.

Page 12: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

12

Do a final check to be sure that all installation hardware on the array is properly tightened to 12 ft. lbs.

Channel End Clamps

Channel End Clamps may be used in place of the 50-50 clamps at the ends of rails. Channel Clamps secure the module frame from below and allow the rails to be cut flush to the edge of the array for a clean look.

Insert channel end clamp in the rail. The module must be lifted slightly to slide the clamp under the frame. Allow the module to rest on the rail again and slide the clamp back toward the end of the module until it is flush with the outside end of the module frame and tighten lightly. Feel under the array to check that the clamp is clamping the module flange securely, then tight-en to 12 ft. lbs.

End Caps

Place an end cap at the end of each rail to inprove the look of the system. Drain holes on the bottom of the end caps ensure that water does not accumulate in the rails.

Page 13: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

13

Manufacturer Modules/SeriesAuxin AXN6M610Txxx, AXN6P610Txxx, AXN6M612Txxx, AXN6P612Txxx.

Axitec AXIblackpremium 60 (35mm), AXIpower 60 (35mm), AXIpower 72 (40mm), AXIpremium 60 (35mm), AXIpremium 72 (40mm).

Canadian SolarCS6V-xxxM, CS6P-xxxP, CS6K-xxxM, CS5A-xxxM, CS6K-xxxMS CS6U-P, CS6U-M, CS6X-P, CS6K-MS, CS6K-M, CS6K-P, CS6P-P, CS6P-M, CS3U-P, CS3U-MS, CS3K-P, CS3K-MS, CS1K-MS, CS3K, CS3K, CS3U, CS3U-MB-AG, CS3K-MB-AG, CS3K-MB-AG,

CS6K, CS6U, CS3L, CS3W, CS1H-MS, and CS1U-MSCertainteed CTxxxMxx-01, CTxxxPxx-01, CTxxxMxx-02 Where “xx” denotes frame and backsheet color. CT-03 Series

G3, L-G4 and L-G2, Q.PLUS G4 xxx, Q.PLUS BFR G4.1/TAA xxx, Q.PLUS BFR,G4.1/MAX xxx, Q.PLUS BFR G4.1 xxx, Q.PRO-G4 xxx, Q.PRO [q.pro] EC-G4.4 xxx,

Q.PRO [q.pro] BFR G4 xxx, Q.PRO [q.pro] BFR G4.1 xxx, Q.PRO [q.pro] BFR G4.3 xxx, Q.PEAK-G4.1 xxxQ.PEAK- G4.1/MAX xxx, Q.PEAK BLK G4.1 xxx, Q.PEAK-G4.1/TAA xxx

Q.PEAK BLK G4.1/TAA xxx, B.LINE PRO BFR G4.1 xxx, B.LINE PLUS BFR G4.1 xxx,B.LINE PRO BFR G4.1 xxx, Q.PEAK DUO-G5-xxx, Q.PEAK DUO-G5.X-xxx and Q.PEAK DUO BLK-G5-xxx

Q.PEAK L G4.2, Q.PLUS L G4.2, Q.PLUS L G4.1 -35mm, Q.PLUS L G4 - 35mm,Q.PRO [q.pro] L G4 -35mm, Q.PRO [q.pro] L G4.1 - 35mm, Q.PRO [q.pro] L G4.2 - 35mm,B.LINE PLUS L G4.2 - 35mm, B.LINE PRO L G4.1 - 35mm, B.LINE PRO L G4.2 - 35mm,

Q.PLUS L-G4.2/TAA -35mm, Q.PEAK DUO L-G5.2, Q.PEAK DUO L-G5.3 (380-395), Q.Peak Duo L-G6 xxx, Q.Peak Duo L-G6.2 xxx, Q.Peak Duo L-G6.3 xxx, Q.Peak Duo G6 xxx, Q.Peak Duo BLK-G6 xxx

Heliene 36M, 60M, 72M, 60P, and 72PHyundai KG, MG, TG, RI, RG, TI and KI series (35mm and 40mm)

JAP6 60-xxx, JAM6-60-xxx/SI, JAM6(K)-60/xxx, JAP6(k)-72-xxx/4BB, JAP72SYY-xxx/ZZ, JAP6(k)-60-xxx/4BB, JAP60SYY-xxx/ZZ, JAM6(k)-72-xxx/ZZ, JAM72SYY-xxx/ZZ, JAM6(k)-60-xxx/ZZ, JAM60SYY-xxx/ZZ, JAM 72S09, JAM72S10, JAP72S10, JAM60S10,

JAP60S10 i. YY: 01 white backsheet, 02 black backsheet, 03 half-cell and white backsheet, 09 M4 cell, 10 M4 1/2 cell

ii. ZZ: SC standard cell, PR = perc, BP = bifacial, HiT = HIT, IB = IBC, MW = MWTJKM xxx P-60, JKM xxx PP-60, JKM xxx M-60, JKM xxx M-60B, JKMS xxx PP-60JKMS xxx P-60, JKMSxxx-72, JKMxxxP-72, JKMSxxxP-72, JKMxxxM-72, JK07A

(JKMSxxxPP-60 & JKMSxxxPP-72), JK07B (JKMSxxxPP-60), JKM xxx PP-60(Plus),JKMSxxxM-60-EP, JKM xxx P-72B, JKMxxxPP-72, JKMxxxPP-72B, JKMxxxPP-72(Plus), JKMSxxxPP-72,

JKM xxx PP-60B, JKM xxx M-60B, JKMSxxxM-60, JKMxxxM-72-V, JKMxxxPP-72-V, JKMxxx-72L-V,JKMxxx-72HL-V, JKMxxxM-60L, JKMxxxM-60BL, JKMxxxM-60HL, JKMxxxM-72HL-V, JKMxxxM-72L-V

LG xxxN2W-B3/LGxxxN2W-B3LGxxxS1C-G4

LGxxxN1C-G4, LGxxxS1C-L4, LGxxxS2W-G4Longi LR6-72HV 330-350M, LR6-60PH 290-310M, LR6-72PH 360-380MMission MSE seriesNSP NEO Solar Power D6M and D6P

N240, N330, N320K, N315K, N310KVBHNxxxSA16/VBHNxxxSA16B, VBHNxxxSA15/VBHNxxxSA15B, VBHNxxxKA01,VBHN SA17/18/KA03/04, VBHNxxxSA17G, VBHNxxxSA17E/18E, VBHNxxxZA01,

VBHNxxxZA02, VBHNxxxZA03, VBHNxxxZA04.Piemar SGXXXM (FB), SGXXXM (BF), SGXXXMPhono Solar PS-xxx-60, PS-xxx-72REC REC Alpha Series, REC Peak Energy BLK2 Series, REC Peak Energy Series, REC TwinPeak SeriesRenesola Virtus II with module ratings of 250-260 in increments of 5, 156 series with module ratings of 270-275.Silfab SLA-M and SLG-M

E20-xxx-COM, X21-xxx, X22-360-C-AC, Evaluated with both the G3 and G5 frameSPR-P17-xxx-COM, (xxx: module power rating)

TP572, TP596, TP654, TP660 (35mm/40mm), TP672, Hipor M350+ (40mm)Talesun Smart (35mm) M = Mono, P = Poly, B = Black, T = Transparent

(H) = 1500V, without (H) is 1000VTesla/Zep/Solar City SCxxx, SCxxxB, SCxxxB1, SCxxxB2

TSM-PD05, TSM-PD05.05, TSM-PD05.08, TSM-PE05A, TSM-PE05A.08 TSM-DD05A.05(II), TSM-DD05A.08(II), TSM-DD05A.08S(II), TSM-DD05A.05S(II)

TSM-PD05.08S, TSM-PD05.08C, TSM-PD05.08D, TSM-PD14, TSM-PE14ATSM-PE14A.08, TSM-DD14A(II), TSM-DD14A.05(II), TSM-DD14A.08(II), TSM-PD14.002

URE D7MxxxH8A, D7KxxxH8A, D7MxxxH7A

Vikram Eldora Grand Ultima, Eldora Grand, Eldora Prime, Eldora Ultima, Solivo, Somera Grand, Ultima, Somera Grand, Somera Half (VSMH.72), Somera Prime, Somera Ultima

Yingli YL xxx P-29b, YLM 60, YLM 72, YGE, YGE-VG, YLM, YL xxx P-35b, YL xxx D-30b, YL xxx D-36b

Manufacturer Model NumbersSolarEdge Technologies LTD P400J, P600, P700, P730, P800p, P800s

Enphase M250-72, 250-60, M215-60, C250-72, S230, S280, IQ 6, IQ 6+, IQ 7, IQ 7+, IQ 7X, Q Aggregator

Certified Power Optimizer List for UL2703 Listing Program

Tamarack Solar Products

Certified Module List for UL2703 Listing Program

JA Solar

Hanwha Q-Cells

Sun Power

Jinko

LG

Panasonic

Trina Solar

Talisun

Page 14: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

14

Disclaimer

This manual describes proper installation procedures and provides necessary standards required for product reli-ability. Warranty details are available on our website. www.tamaracksolar.comAll installers must thoroughly read this manual and have a clear understanding of the installation procedures prior to installation. Failure to follow these guidelines may result in property damage, bodily injury or even death.

Installers Responsibilities

• Follow all applicable local or national building and fire codes, including any that may super sede this manual. • Electrical installation should be conducted by a licensed and bonded electrician or solar con tractor. • Module maintenance or removal must not break the bonding path of the system. • Ensure all products used are appropriate for the installation and array under the site’s loading conditions. • Use only Tamarack parts or parts approved by Tamarack; substituting parts may void any ap plicable warranty. • Comply with all applicable fire codes including, but not limited to, keeping walkways clear. • Ensure bare copper grounding wire does not contact aluminum and zinc-plated steel compo nents, to prevent risk of galvanic corrosion. • If loose components or loose fasteners are found during periodic inspection, retighten imme diately. If corrosion is found, replace affected components immediately. • Provide an appropriate method of direct-to-earth grounding according to the latest edition of the National Electrical Code, including NEC 250: Grounding and Bonding, NEC 690: Solar Photovoltaic Systems, and CSA C22.1, Safety Standard for Electrical Installations, Canadian Electrical Code, Part 1• Disconnect AC power before servicing or removing microinverters and power optimizers. • Review module manufacturer’s documentation to ensure compatibility and compliance with warranty terms and conditions.• Maximum Series Fuse Rating of 20 Amps.

Page 15: Solar Roof Mount System - Amazon Web Services · Each section of rail at the end of a row must be supported by two mounts before being spliced. If a rail section has a splice and

2019 TAMARACK SOLAR - REVISION 2 8-Rail Kit FLUSH MOUNT MANUAL

15