Solar Probe Plus A NASA Mission to Touch the Sun
16-19 March 2015
Instrument Suite Name
Presenter's Name
2Solar Probe Plus Mission CDR
Instrument/Suite NameScience Overview
1 page Introduce instrument and science contribution to the mission
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
3Solar Probe Plus Mission CDR
Instrument/Suite Name Team
1 page Organization chart of the instrument/suite team members
Include team member roles Include any key partners, subcontractors or major suppliers If appropriate, list suite chart and then chart for each team in each
team section
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
4Solar Probe Plus Mission CDR
Instrument/Suite Name Instrument Overview
1 page General description of the instrument to the level of the major
subsystems. Block diagram of the total instrument Serves as an introduction to the detailed presentations to follow
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
5Solar Probe Plus Mission CDR
Instrument/Suite NameTechnical Changes since PDR
1 page Give each change (recommend table below).
Give reason for change and provide impact, as appropriate, on resources of mass, power, size, telemetry, cost and schedule.
Include any science requirement changes or add statement at bottom that there were no science requirement changes.
Change since PDR Reason for Change Impact on Resources
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
6Solar Probe Plus Mission CDR
Instrument/Suite Name Summary of Engineering Design
5 pages Design description
Electrical and thermal instrument and components performance requirements Software architecture and design Mechanical design and analyses
Descriptions of any engineering or technology developments Summarize resource requirements
Table of mass and power for the components, including maturity of the estimates (EM measurement, Pro/E estimate, etc)
Commanding and housekeeping telemetry requirements Power services required Margins Other
Summarize drawing status (with definition of that status) Instrument Performance
Describe any known shortcomings in instrument performance relative to known science requirements
Identify any Long-Lead Time procurements
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
7Solar Probe Plus Mission CDR
Instrument/Suite Name CDR Summary
1 page Summarize I-CDR results
Review board membership, dates Action item summary Liens (if any)
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
8Solar Probe Plus Mission CDR
Instrument/Suite Name Engineering Model
2-3 pages List items completed since I-CDR
Link any new progress to action items where possible Include any peer reviews help between I-CDR and Mission CDR
If Lien at CDR was established and work not completed, address detailed schedule to complete lien
Fidelity of EM design (differences to FM) EM Test plan EM Test results Remaining work to FM build (example: remaining testing, drawing
updates)
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
9Solar Probe Plus Mission CDR
Instrument/Suite Name Verification and Validation Plans
3-4 pages Describe the process for verifying all instrument interfaces
(hardware & software), resources, form factor, performance and operations, environmental worthiness, and science performance requirements
List documentation (V&V plans, TE-001, requirements verification matrix)
Show a portion of your V&V matrix
Explain how tools are used (DOORS, etc) Walkthrough an example flow from requirement to verification
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
10Solar Probe Plus Mission CDR
Instrument/Suite Name Assembly, I&T Description
3-4 pages Assembly, I&T description, including
Flow chart(s) showing plans for the assembly, integration, functional and environmental testing (EMI, sniff, vibration, thermal balance, thermal vacuum, etc.), and calibration
Major milestones in the I&T flow with dates Description of any cleanliness requirements imposed on the
mission by the instrument as well as any special facilities needed Instrument alignment requirements and plans for verification of
alignment Purge requirements and plans for maintaining purge Expected number of operating hours on the instrument at launch Identify any special facilities Discuss any risks including mitigation plans Test-as-you-fly exceptions (i.e., what does not get tested)
Address Refurbishment plan if applicable16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
11Solar Probe Plus Mission CDR
Instrument/Suite Name Calibration
2 pages Detailed discussion of plans for instrument calibration
facilities planned for calibration range of parameters over which the instrument will be calibrated any shortcomings to the calibration that bring into question the
ability of the instrument to meet its mission science requirements
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
12Solar Probe Plus Mission CDR
Instrument/Suite Name Systems Assurance
1-2 pages Describe Performance Assurance Matrix Status
Identify any exceptions and status of exceptions
Identify any submitted waiver requests and status of approval (could be in back-up)
Identify any expected waivers that will be submitted (could be in back-up) System Safety
Discuss status of inputs to the Missile System Prelaunch Safety Package (MSPSP)
Identify any safety hazards along with methods for controlling them
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
13Solar Probe Plus Mission CDR
Instrument/Suite Name Science Operations Center
1 page Top-level Science Operations Center description including:
SOC/SDC driving requirements SOC/SDC design description SOC/SDC operating approach
Changes since PDR Review date for the SOC CDR
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
14Solar Probe Plus Mission CDR
Instrument/Suite Name Flight Operations Description
2 pages Status of Command and Telemetry definitions Describe the flight operations including
key elements of the instrument ground system that allows the operation of the instrument
command definitions and critical housekeeping telemetry definitions commanding path and telemetry data concept of operations for command and data handling of your
instrument during the commissioning phase of the mission as well as normal operations shall be presented.
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
15Solar Probe Plus Mission CDR
Instrument/Suite Name Risk Status
1 page Describe risk status, including
5x5 risk matrix Top 10 summary stop light chart showing instrument risks,
consequences and likelihood
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
16Solar Probe Plus Mission CDR
Instrument/Suite Name Development Status
1 page Describe development status, including
Project schedule showing critical path, schedule reserves and margins
List of threats to the schedule and schedule risk mitigation plans Trends in the schedule performance of the team such as the gain or
loss of float along the critical path
16 - 19 March 2015
General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
Include a take-away statement that describes the Instrument Suite’s readiness to move onto flight build. Example:
“Instrument Name is ready to move to flight build”
17Solar Probe Plus Mission CDR
Instrument/Suite Name
16 - 19 March 2015
Backup
18Solar Probe Plus Mission CDR
Instrument/Suite NamePhase C Peer Reviews
Review # A/I # Open # Close # Concurred
I-PDR
Peer Review A
Peer Review B
I-CDR
16 - 19 March 2015
19Solar Probe Plus Mission CDR
Instrument/Suite Name Summary of Documentation Status
1 page Give a list of your documents and their release status
Include requirements docs Specs Limited life item list Other matrix required documents CDRL status
16 - 19 March 2015
20Solar Probe Plus Mission CDR
Instrument/Suite Name Parts and Materials Status
Summarize MIL and PIL approval status and procurement status
16 - 19 March 2015
21Solar Probe Plus Mission CDR
Instrument/Suite Name Red and Green Tag Items
List red and green tag items
16 - 19 March 2015
22Solar Probe Plus Mission CDR
Instrument/Suite Name GSE
1 page - top-level summary only GSE design description, including
EGSE and MGSE requirements and implementation associated with the GSE
EGSE software including requirements, design and verification of EGSE software
Instrument purge equipment Instrument shipping container Slings or other special fixtures needed to mount and align the
instrument
16 - 19 March 2015