soda action tracker 20131126
DESCRIPTION
Action Tracker for SODA ProjectTRANSCRIPT
Document Number Rev. A01
Name Date
14
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.1 Provide evidence that the overall SODA Projects
Audit and Review Schedule has been prepared,
encompasses all individual projects, and has been
reviewed and approved by management.
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
review
John S
HE
RID
AN
15
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.2 SODA projects to reference the adopted
Onshore/Shallow Offshore Project Quality Manual in
the SODA related quality documents
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
review
John S
HE
RID
AN
16
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.3 Provide evidence that an action tracking system
for NCRs, exists and is maintained so that proper
closeout can be achieved. Also provide evidence that
review and analysis of NCs, Corrective and
Preventive actions is carried out - Refer to Global
Project Standards and Guides PG13 – Quality
Management – Appendix 1
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
review
John S
HE
RID
AN
17
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.4 The organisation chart needs to be uniquely
identified and controlled as per the project
document control procedures
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
review
John S
HE
RID
AN
18
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.5 Management of the Team Workspace (intranet
and extranet) should be more effective. Approved
documentation shall only be loaded into the
controlled project livelink instance. Project
personnel should be trained in the proper process
for loading documents into livelink, to prevent
instances where multiple revisions of the same
document are available at point of source.
An example of this exist in the supplier
documentation area, where different revisions of
the same ITP are available - SDA-
NG01004434_DM001E-OTUG1-H02-10001-001-01
Inspection & Test Plan (OTU-MD PD # 3K862 Rev B
03-JUN-2011) and (OTU-MD PD # 3K862 Rev C 12-
AUG-2011)
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
reviewJohn S
HE
RID
AN
19
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.6 SODA Quality team to provide evidence of KPIs –
Leading and Lagging
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
review
John S
HE
RID
AN
20
13 S
epte
mber
2011
GE
N-T
00
-TP
D-Q
A0
88
0-0
00
01
-00
0
SO
DA
5.7 SODA Project quality team to develop a project
specific quality policy and objectives covering a
commitment to continually improve on the QMS. –
Refer to Global Project Standards and Guides PG13 –
Quality Management – Section 2.3 QMS
Requirements – High Risk, Item “a”.
Uju
Okw
usogu
Not
Rate
d
T/P
SQ
- T
eam
28-O
ct-
11
OP
EN
No close out - Item to be checked in 2013
review
John S
HE
RID
AN
ONSHORE / SHALLOW OFFSHORE PROJECTS
ACTION TRACKING for REVIEWS & AUDITS
Verified by
Ite
m N
o.
Da
te R
ais
ed
Finding/Recommendation
Re
spo
nsi
ble
Pa
rty
Ra
tin
g
Ori
gin
ato
r
Ta
rge
t D
ate
Sta
tus
Evidence of Close-out
Au
dit
/Re
vie
w
Re
po
rt N
o.
Pro
ject
/Fu
nct
ion
GEN-T00-000-QA6680-00001-000