s.no. reference to the original document context queries/amendments (details) comments · 2010. 11....
TRANSCRIPT
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
1 Vol2; Section 5.6, a
Page No 43 &
Annexure XVI Format for
Commercial bid Form I Financial Bid,
page 73
Performance Warranty Page No 43 mention Warranty period of 24 months.
Form I of financial bid and page no 13, Payment schedule
table mentions warranty period of One year (12 months).
Please specify the exact period of warranty support to
consider for software part.
We understand from the RFP that the total engagement
period with IA is 5 yrs. If the warranty support for the
software part of 2 yrs then the AMC should be for the
remaining 3 yrs.
In the same form I of commercial bid, the table 3 asks
AMC charges from 1st yr to 5th yr. If the warranty is of 2
yrs then why the charges of 1st yr to 5th yr has been
asked.
Please clearly define the warranty and AMC requirement
of Software part in the price schedule.
Warranty period is one year from the
date of Go Live. AMC will be
applicable post the Warranty period
till end of 5th year from the date of
Go Live.
2 Vol 2, Annexure XVI Format for
commercial bid, page 73
Hardware Cost There is no place holder to put hardware price required
for development phase. Where should it be included?
The cost for the hardware can be put
in the BoM.
3 Vol 2, Annexure XVII Format of Bill of
Material for software components
(page No 75)
Software Licenses AMC cost There is no place holder to put AMC price of the software
licenses for the period of 5 yrs.
The table provided for Annual
Maintenance Charges should contain
the AMC price of Software licensing.
4 Vol2, Annexure XVII Format of Bill of
Material for Services (page No 75)
Software Licenses Purchase Software licenses will be procured on whose name?
Whether IDRA wants IA to buy licenses on IDRA’s name
on the first day of the purchase OR does it want licenses
to be transferred on IRDA’s name after 5 yrs.
The licenses should be procured in
the name of IRDA.
1 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
5 Vol2, Annexure XVII Format of Bill of
Material for Services (page No 75)
Bill of Material for services: Please give an example for the software services in this
table. Or elaborate the object of this table
This table should be used for
providing cost elements required for
the managed services.
6 Vol 2, Annexure XVI Format for
Commercial bid Form II Financial Bid,
page 74
Man Month Rate Please verify our understanding. This table will be only
utilized for additional scope scenario. At the time of bid
submission, IA need not to fill this table and can be
submitted as blank.
This table would be used for
providing the manpower cost for the
entire implementation of the project
including post go live support
7 Vol2, Clause 4.6, page no. 40. Price comparison Please specify the tables which will be considered for
arriving on the total cost of ownership (TCO) in the price
schedule. There are also man month’s rates asked in the
bid. So please clarify the price component table wise for
finalization of TCO.
Costs for SW development should be
mentioned in the first table of the
annexure XVI. Hosting charges should
be mentioned in the second table
and the third table should contain
the costs for AMC. Costs from all
these three tables combined
together will provide the TCO for the
project.
8 Annexure III It is envisaged that a bandwidth
requirement of approximately 8.325
MBPS.
Please indicate whether IRDA will maintain the
connectivity of the users with the datacenter or does the
IA need to provision for the same and charge IRDA
accordingly.
Is it expected that AI should provision for internet
bandwidth? And for how many years AI should provision
for bandwidth.
IA will maintain the connectivity of
the users with the datacenter and
will charge IRDA accordingly.
9 Annexure III Bandwidth Can you please detail the processing and storage
capacity of DR with respect to DC?
The DR should be running at 80%
processing capacity of the DC but
there should be 100% data
replication in the DR.
10 Annexure III Bandwidth Is it possible to provide bandwidth requirement year on
year for entire contract period for primary and secondary
link?
Bandwidth has been specified in RFP.
2 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
11 Annexure III Users Please indicate the rise in the number of users of this
solution over the next 8 years for which this solution has
to be supported
The approximate per year growth in
the no. of users will be 8-12%.
12 IRDA_RFP_Vol1_V15.5/Section 305/
Page 15
Dashboard Please provide a list of all types of KPI's/ performance
metrics required on Dashboard & calculation logic for
each.
The detailed report and dashboard
formats would be provided to the
selected IA.
13 IRDA_RFP_Vol1_V15.5/Section 8.2/
Page 45
Balanced Scorecard Please elaborate on business logic for Balanced
Scorecard generation.
The reports or dashboards may have
similar representations as of a
scorecard. But no scorecard
requirements have been envisaged
as of now.
14 IRDA_RFP_Vol1_V15.5/Section 1.2/
Page 4
Report Security Please provide details of security requirements for
reports (when uploaded by external parties/ when
displayed on public domain)
The IA will have to assess this during
the design phase.
15 BAP_Requirements
Specifications_v25/ Section IV (i)/
Page 209
Analysis by IRDA Please list some scenarios (& corresponding logic) that
are required to be covered for performing “What-if
Analysis”
The detailed logic for the same would
be provided to the selected IA.
16 IRDA_RFP_Vol1_V15.5/Section 3.6/
Page 18
Data reconciliation How is reconciliation of data in Finance & other
departments done? Please elaborate on what data are
reconciled & provide the reconciliation process & logic.
Also, provide a list of non-compliance deviations w.r.t
IRDA regulations & also mention at what point validation
for each is fired in the business process.
The detailed report formats on
exceptions, non compliance and
reconciliations would be provided to
the selected IA along with the
business logic for the same.
17 IRDA_RFP_Vol1_V15.5/Section 3.6/
Page 18
IRDA Inter-departmental communication Is Inter-departmental communication a part of the
proposed system? If yes, please elaborate
No
18 IRDA_RFP_Vol1_V15.5/Section 2.2/
Page 9
Insurer advertisements What are Insurer advertisements? How are they to be
handled?
The detailed input formats and
reports on advertisements would be
provided to the selected IA.
3 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
19 IRDA_RFP_Vol1_V15.5/Section 3.4/
Page 14
Access Control Please provide all details on access control i.e. role-based
definitions for sub-modules/reports etc. Also provide
access control matrix.
Please refer to the sections on
authorization and access
management in the requirements
specifications document for further
details. The access control matrix will
be defined by IA, in consultation with
IRDA, during the design phase of the
implementation.
20 IRDA_RFP_Vol1_V15.5/Section 3.2/
Page 13
Document Template Will IRDA be using standard templates for all parties
during data upload? In any case, please provide format
for standard/ non-standard templates used by various
stakeholders.
The detailed input formats for data
submission and uploading would be
provided to the selected IA. As an
example please refer to the sample
forms and reports provided along
with the RFP document.
21 BAP_Requirements
Specifications_v25/ Section III
Appendix/Page 92
Intermediaries-Brokers-Reports
Management-Status on Registration-
Granted but cancelled
Applications where in-principal approval
issued but license not granted.
Please elaborate on what is meant by Granted but
cancelled
How do we track this? Do we have any particular status
for such cases
By this it is meant that the license to
a broker has been granted initially
but cancelled at a later point in time
due to some violations with respect
to the regulations. The detailed
report format and logic for tracking
this information to the selected IA.
22 IRDA_RFP_Vol1_V15.5.pdf/1.2 (g)/
Page 5.
Benchmarking the existing financial
reporting framework with the
international best practices
Benchmark details to be provided or not ? The detailed report/study on
international best practices study will
be provided to IA if required.
23 IRDA_RFP_Vol1_V15.5.pdf/4 ii/ Page
21
On the basis of the application design
signed off by IRDA or its representative,
the individual applications shall be
modeled and designed using relevant
modeling and design languages like UML.
Does first reference to application design refer to
solution architecting and does the rest of the statement
signify that the solution architecting should be signed of
before individual application designing? Or is it the SRS
which is actually referenced?
The sign off on SDD or the software
design document has been referred
here.
4 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
24 IRDA_RFP_Vol1_V15.5.pdf/4 ii/ Page
22
IA shall provide all necessary support,
including setting up the required test
environment, making seating
arrangements and providing suitable
computer systems & peripherals, to the
agency for conducting acceptance testing
IRDA shall provide the number of testers who will be
involved in the UAT, and hence IA can make the
necessary seating arrangements?
Yes
25 IRDA_RFP_Vol1_V15.5.pdf/4 iii/
Page 22 & Section 6 of Page 25
Migration of legacy data Is migration of legacy data is a part of requirement study
and will be part of SRS document or it will be separate? If
yes, does it falls within the project execution timeline of
12 months? Project Timeline does not explicitly states
anything on the same.
Data migration will be a part of
requirements study and the 12
months timeline for the
implementation of the project will be
inclusive of the same.
26 IRDA_RFP_Vol1_V15.5.pdf/4 v/ Page
31
Procurement of testing tool Since the tool will be decided later, how will it be priced
in the bid?
Pricing information of testing tools
are not necessary.
27 IRDA_RFP_Vol1_V15.5.pdf/4 v/ Page
53
Payment gateway Will it be an IRDA provided payment gateway or part of
the infrastructure provided by the IA?
IRDA as of now hasn't got any
payment gateway in place. The
payment gateway including the
interface requirements needs to be
developed by the IA. Please refer to
page 53 of the volume I of the RFP
document for further details.
28 IRDA_RFP_Vol1_V15.5.pdf/4 v/ Page
59
Active passive mode between DC and
DRC
Is IRDA mandating processing from the DRC even in
normal time?
Only when the DC is down, the
processing from DRC would start.
29 IRDA_RFP_Vol1_V15.5.pdf/Section
10.2- BCP/Page60
Two similar sites (one DC and one DR site)
have been proposed which should always
be up and running for normal operation.
In case of higher recovery normal
expectations a near site is also proposed
which will get replicated at almost at a
near real time.
We would like to understand the requirement for a "near
site", considering that high availability can be achieved
using a DC-DR setup.
Near site has been cited as an option
in the RFP document. Suggestions are
open from the bidder in this regard
5 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
30 IRDA_RFP_Vol1_V15.5.pdf/Section
10.2- BCP/Page59
Minimal data loss should be envisaged
during failure and that too only to the
extent of data being in the transmission
lines. Also, all such incidents should be
suitably notified to the clients/users.
What is the acceptable amount of data loss applicable for
BAP solution?
Zero data loss is applicable for BAP
solution.
31 BAP_Requirement
Specifications_v25.pdf/Section
6/Page 49
Content Publishing and Authoring:
upload/download documents by both the
internal and external users of the system
How many external users are expected to use the
system?
The content management system is
going to be used by both internal
users and external entities i.e.
insurers and intermediaries.
Approximately 1000 external users
will use this module.
32 BAP_Requirement
Specifications_v25.pdf/Section
1.3/Page 31
1.3: File and Use Workflow for new
product launches
The status of the product is updated in
the database and UIN is assigned to the
product
Our assumption is that application /system to generate
UIN is already in place. It is expected that the proposed
system workflow will integrate with the UIN generation
application. Please confirm
As of UIN related data is maintained
in spreadsheets which needs to be
loaded in the Business Analytics
Solution
33 BAP_Requirement
Specifications_v25.pdf/Section
1.3/Page 33+B41
1.4: Licensing of Brokers/ Surveyors, TPAs
and ATIs
System should generate a License
certificate with the unique license
number, put digital certificate on the
certificate and email it to the applicant
Our assumption is that as of today also, IRDA issues
license certificates to brokers and other entities. Will the
same application/ system be used to generate this
certificate in the future?
The functionalities for licensing of
intermediaries needs to be built
inside the BAP solution.
34 BAP_Requirement
Specifications_v25.pdf
Use of digital certificates as part of
workflows
Does IRDA use digital certificate as of today? Do you
need the vendor to also provide digital certificates and
system to verify the same?
No. As of now there is no facility to
generate digital certificate by IRDA.
The issuance of digital certificate is
in the scope of work for the bidder.
35 BAP Requirement Spec Is there a need for real time reporting? What would be
the frequency of data update in each of these reports
No
6 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
36 BAP Requirement Spec/Page 160 Any approximate complexity distribution to the list of
forms provided?
Sample formats, shared with the RFP,
is representative of the complexity
distribution. The complete set of
forms will be shared with the
selected IA.
37 BAP Requirement
specification/Section 2.1/Page 40
2.1.14. The system should support
reporting over both thin client and rich
client i.e. over web interface and client
desktop interface
Please explain the expectation in detail. Who will use the
desktop interface of BAP system
IRDA users.
38 BAP Requirement
specification/Section 2.6/Page 62
The system should have flexibility to
regenerate the programs and features
without starting the development process
from very beginning. The system should
have an user interface to support the
same so that the entire development
activity can be replicated to a new set up
without much of problems
Please explain in detail By this it is meant that the
application should have in built back
up and replication mechanism
through which the status of the
system can be restored at any point
in time without replicating the
development efforts from the scratch
7 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
39 IRDA_RFP_Vol1_V15.5.pdf IRDA Portal: The portal will provide a
platform for the extended enterprise to
be managed. It will therefore expose both
enterprise applications and a number of
functional applications to the extended
enterprise. The portal should therefore
operate through an appropriate parser
that is able to render a broad number of
services while connected to the portal.
Each response request in the portal
should be well integrated with the
parsing application. The parser
application and infrastructure is expected
to form a key component of solution
design.
Please clarify what is meant by "parser"? Parser is a generic term used here as
an intermediate layer to handle
response and requests within the
modules/services within and outside
the portal application.
8 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
40 IRDA_RFP_Vol1_V15.5.pdf Digitization We understand that as part of process reengineering,
Documents will be electronically uploaded on the IRDA
site. As part of digitization, scanning and data capture is
required to be performed for data migration.
1) Would IRDA be purchasing the scanners and
infrastructure required for Digitization?
2) If no, would you require the IA to provide the
infrastructure for digitization process?
3) Do you also want the IA vendor to provide services like
scanning, data entry, quality check etc?
4) What is the volume of documents in pages required to
be digitized? What is the expected time-frame?
5) What is the percentage distribution of historical data
across Hard copy documents, RDBMS, excel sheets,
unstructured content?
The entire data migration activity
starting from the infrastructure
requirement to the
digitization/scanning is in the scope
for the selected IA. The IA can
leverage their existing infrastructure
for the digitization activity. The
bidder needs to propose the timeline
for these activities.
41 IRDA_RFP_Vol1_V15.5.pdf Present IT System Infrastructure Will the proposed portal replace any of the existing
portals /website of IRDA?
No. But the portal for online filing for
brokers may get decommissioned in
future since online filing
functionalities for brokers would be
covered in the BAP solution,
42 IRDA_RFP_Vol1_V15.5.pdf, Section
4, Page 23
XII. IA shall set up an appropriately
staffed and centralized helpdesk for
providing helpdesk support to various
users of the BAP application. The
helpdesk team should comprise of at
least four members for support on a
continuous basis in the onsite support
phase
Understand that the onsite support will constitute the L1
team. This team will log the tickets and pass on the
incident to the technical team for resolution. Pls confirm
Yes
9 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
43 IRDA_RFP_Vol1_V15.5.pdf, Section
7.1.1, Page 26
Solution Sizing
Consumers - what is the profile of consumers? Are they
internal or external users of the system?
Consumers are the policyholders.
They are external users.
44 IRDA_RFP_Vol1_V15.5.pdf, Section
7.1.12 Page 32, Section 11.2 Page 64
Section 7.1.12
A detailed Training Plan shall be
submitted by the Implementer for which
the logistics and supportive arrangements
will be borne by IRDA.
Section 11.2
IX. IA shall provide comfortable training
space with sufficient arrangements (e.g.
air conditioning, printed course material,
workstations, refreshments etc.) for
trainees at the training location
It is mentioned that logistics and supporting arrangement
for end user training will be provided by IRDA in Section
7.1.12, where as Section 11.2 Point IX mentions that
these have to be provided by IA.
Request clarification
A detailed Training Plan shall be
submitted by the IA for which the
logistics and supportive
arrangements will be borne by IRDA.
45 IRDA_RFP_Vol1_V15.5.pdf/Section
7.1.1 -Solution Sizing/Page26
1 Insurers 200 Users
2 Internal Users 80 Users
3 Brokers and TPAs 350 Users
4 Surveyors 220 Users
5 Peer Regulators, Govt. bodies and
others 50 Users
6 Consumers 100 Users
Is the user data mentioned are for 1st Year ? .Please
provide year wise projections for next 5 years
The approximate per year growth in
the no. of users will be 8-12%.
46 IRDA_RFP_Vol1_V15.5.pdf/Section1
0.1 RPO/Page 57
There should not be any data loss under
any circumstances
Pls specify RPO requirements if any The detailed RTO and RPO
requirements will be provided to the
selected IA.
10 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
47 IRDA_RFP_Vol1_V15.5.pdf/Section
7.1.1 and 8.1.2 /Page no 26 and 44
1.Ref. Page 26-IRDA Internal Users =80
2.Ref Page 44-Intranet
Are there any WAN/Intranet requirement? Is IRDA
looking for connectivity between existing IRDA offices
and proposed hosted solution?
Please specify the number of IRDA offices need to be
connect to the proposed hosted DC and DRC over WAN?
Please provide the all office addresses which has to
connect to the proposed hosted DC and DRC location?
The Hyderabad office for IRDA shall
be connected by dedicated VPN or
MPLS to the proposed hosted DC
48 IRDA_RFP_Vol3_ v23.5.pdf/ SLA
Table-sr no-4/Page No 71
System support for Concurrent users.
Expected SLA-Support 500 Concurrent
Users for Internet Portal
Number of Concurrent Users mentioned in Volume-
1/page no 104 is 150. In the SLA table Vol-3, concurrent
users = 500 . Can you pls confirm which data can be used
for sizing estimation.
No. of concurrent users should be
150.
49 IRDA_RFP_Vol1_V15.5.pdf , Section
11.3.5
Helpdesk Please let us know the coverage window required for the
help desk
24X7 for 5 years post go live of the
BAP solution.
50 RFP VOL I3, Pg 70, SLAs, Availability, Scalability Should the solution support scalability (both vertical &
horizontal) with no downtime and without repartitioning
or changes to the database objects or 3rd party
transaction routing mechanisms
Suggestions are open from the
bidders in this regard
51 RFP VOL I. pg 59, Sec 10.2 During normal operations, both the DC
and DRC should be running in the
―Active-Passive mode with an automatic
load balancer between them, sharing 80
per cent of the full envisaged load.
Kindly clarify whether the servers in DC and DR will be in
the active-passive mode or whether they will be
synchronized by the changes happening in the DC
Servers in DC and DR will be active-
passive mode with zero data loss.
52 RFP VOL I, 97, Annexure I: Strategic
Control Requirements
Audit of DBA Actions Apart from auditing DBA actions, is it also required to
prevent the DBAs to access confidential application data
Yes
53 RFP VOL I, 97, Annexure I: Strategic
Control Requirements
Protection of Confidentiality and Integrity
of data
Kindly clarify the following:
“the data which must not be modified shall be hashed
and digitally signed by the application at the time of
original data population itself”
Data which is non modifiable in
nature at a future reference time
should have to be signed digitally.
54 RFP VOL I, 103, Anx III Solution sizing Does the data sizing estimate “include” data generated
during “data migration/digitization”.
Yes
11 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
55 RFP VOL I,9, Sec 2.2 Kindly clarify about the capabilities of the
existing Content management system
Does IRDA has a full fledged content management
system or is it a custom build one?
A content management system
needs to be built from scratch for the
BAP solution.
56 BAP_Requirements
Specifications_v25, Pg 67, Section 6
User Interface Requirement Clarification on do third parties also require access to
static reports or online reports? will it be Read-only or
interactive ?
The reports accessed by external
entities would be of read only and
static nature
57 Clarification on master data
management requirement? Is it a full
fledged MDM solution required or is
it management of some master
tables that contain reference data ?
The system should have the ability to
create/update the Master data as per the
need of the implementation.
Clarification on master data management requirement?
Is it a full-fledged MDM solution required or is it
management of some master tables that contain
reference data ?
Master Data Management is limited
to only BAP solution not across all the
applications within the organization
58 BAP_Requirements
Specifications_v25, pg 39, Section 6
Is the reporting solution required to run
on Active-Active clustering?
Reporting Active - Passive Clustering is also
applicable for the reporting solution
59 BAP_Requirements
Specifications_v25, pg 62, Section 2
Metadata management tool Could you clarify on Metadata management tool – What
context are we planning to use this for? Is metadata
management only at DW layer?
Metadata management is only
applicable to the DW and reporting
layer.
60 BAP_Requirements
Specifications_v25, section 1.1/Page
56
1.1.4 The system should support
ASP.NET, JDBC and other open standards
options.
ASP.NET is not open standards based, it is Microsoft
proprietary.
The system should support ASP.NET,
JDBC and open standards options.
12 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
61 BAP_Requirements
Specifications_v25, Section 11:
Master Data Management
Master Data Management Please let us know the rough estimate of number of
records need to be maintained under each of the
following category:
IRDA Organization structure
Channels(Agents, Brokers, Corporate agents, etc)
Rider master
Segment master
Geography master
Rural / Urban Master
Account Master
Asset Master
Complaints Master
Currency Master
Surveyor Master
ATI Master
Master list of category of Investment
Fund Type
An overall data sizing estimation has
been provided in the RFP. Further
detailing needs to be assessed during
implementation.
62 BAP_Requirements
Specifications_v25
Section 2.7: Metadata Management
Metadata Management 1. List the metadata from different sources that you want
to store in metadata
repository(For example, Two Oracle 9.2 sources, four
Cognos reporting source, etc)
2. Estimate the total anticipated number of Metadata
users that will be operating
3. Concurrent Metadata Management users
An overall data sizing estimation has
been provided in the RFP. Further
detailing needs to be assessed during
implementation.
13 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
63 BAP_Requirements
Specifications_v25
Section 2.9: Data Migration and
Integration
Data Migration and Integration Please provide a short high level description of your
current environment, such as applications, database
systems, servers, end user clients, ETL tools, etc..
Number of Data Sources:
Type of each source (mainframe, relational, flat files):
Initial/current total data(from all the above sources) that
needs to be migrated to Business Analytics database
Time kept for initial data migration
Daily data volume from all the above sources
Daily batch time to load the daily volume from the above
mentioned data sources
How frequently will each source need to be processed
(daily, weekly, monthly)
What are the estimates of growth in data volume for
each source over the sizing time period?
Estimate what could be the maximum number of Jobs
that need to execute concurrently.
Estimated complexity of these jobs: (Very
Complex/Complex/Medium/Simple).
How many jobs will need to run at peak times?
Users for Client software
Number of environments that you would like to have (for
example, 1 production, 2 development, 2 QA,etc)
Average number of concurrent web service request
made through SOAP. And total number of web service
requests to be made daily
Relevant information for the existing
applications have been provided in
the RFP. Further detailing needs to
be assessed during implementation.
14 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
64 BAP_Requirements
Specifications_v25
Section 2.9: Data Migration and
Integration
2.9.6.6 Incremental loading
2.9.6.7 Refresh with ability to Change
1. What are all the data sources(databases) from where
incremental data needs to be taken. Also, lists the
hardware configuration of each of these source systems
where database server is running. For example, DB2 9.1
running on IBM P6 570 server with 8 cores and 16 GB
RAM
2. Do you intend to capture incremental or change data
on a real-time or near real-time
3. Is Archive logging enabled on all the source system
where incremental/change data needs to be captured
Data needs to be fetched from the
system both on an incremental and
near real/real time basis.
65 IRDA_RFP_Vol1_V15.5 / 7.1.2 Data Migration What is the volume of data to be migrated/digitized?
Please provide the inputs split by the source application/
subject area.
The size of historical data has been
mentioned in annexure III of the
volume I of the RFP document.
Approximately 40% of the data
available in hardcopies.
66 IRDA_RFP_Vol1_V15.5.pdf /
Annexure III
Detailed Data Sizing The data volumes & growth rates mentioned in this
section, are these past metrics or estimated future
metrics?
- If future, what is the volume of historical information to
be considered.
- If past, what is the future data growth rate.
Also the data volumes shown here need to be considered
for the central data repository. Is this correct?
Data sizing estimation has been
provided taking into account the
history data for the past 8 years till
the present time period and has been
projected for the next 8 years. For
growth rates of data please refer to
annexure III of the volume I of the
RFP document.
15 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
67 Generic questions What is the maximum number of documents published
into the content repository per day ?
What is the maximum number of documents retrieved
from the content repository per day ?
What is the average size of a document stored in the
content repository?
How many pages approximately constitute a document?
How many pages to be scanned per day?
How many document related workflow processes are
launched per day?
What should be the total data backup duration?
We request IRDA to provide us the compliance in the
form of an excel sheet
At present there is no content
management solution is present in
IRDA, standard assumptions needs to
be considered
68 BAP_Requirements Specifications -
Page 112 -
File Management/ Correspondence
management
As mentioned in the RFP there is a high priority
requirement for Correspondence Management, File
movement tracking & management.
We understand that the proposed solution should
preferably be based on Manual of office Procedure MOP
from DARPG- Department of Administrative Reforms And
Public Grievances), which is the file movement and
record management standard of Government of India
and features like Whitehall based file movement ,
Supports for Green Note sheet, Secure notes and
annotations, Support for Hindi are important. Kindly
confirm our understanding.
Yes
69 Volume I IRDA RFP - Page 39 -
Section 8
Solution Architecture As it is mentioned in RFP that the scalability and
performance of solution is one of the key objectives, so
are you looking for an architecture in which
images/documents are stored in a file server while only
the metadata is stored in databases so as to increase the
scalability of the application
Yes
16 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
70 Volume I – IRDA RFP - Page 48 -
Section 8.3
Business Process Management As this RFP aims to replace existing manual
systems of paper based working in the IRDA departments
by automating the multiple workflows involved in the
day to day business activities of the departments of the
IRDA, our understanding is that you need a Business
Process Management (BPM) platform which has the
capabilities of graphically modeling the processes, in built
Form designer, process simulator, rule engine,
configurable Business Activity Monitoring tool and
integrated Document Management System for storing
documents. Please confirm our understanding is correct.
Yes
71 Volume I – IRDA RFP - Page 49-
Section 8.3
Content Management We understand that less paper initiative is key
requirement of project and so there will be requirement
of capture solution for scanning backlog as well as
ongoing paper documents with support for following :
page separator, barcode separator and fix page
Please confirm our understanding is correct.
Bidder needs to propose the same.
72 Volume I – IRDA RFP - Page 194 -
Section 8.3
Content Management System/Document
management system
Since the Enterprise Content Management System will
be storing critical documents of IRDA which needs to be
archived for long term, so is the department looking at
archiving documents in PDF/A format which is an open
ISO standard for long term archival and is now becoming
de-facto standard in most government projects
As per the prevalent industry
standards.
17 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
73 Volume I – IRDA RFP - Page 75 -
Section 12.1
Data Digitization As digitization is one of the key requirement of the
project so our understanding is that the proposed
solution for digitization/ scanning should take care of
automatic correction of parameters like improper
resolution, format/ compression not proper, skew,
wrong orientation, error in automatic cropping, punch
hole marks etc so that the quality of digitized data is
ensured.
Yes
74 Volume I – IRDA RFP - Page 75 -
Section 12.1
Data Digitization As there is requirement of ICR solution in the RFP so are
you looking at data capturing solution for extracting
business-critical information from Forms for further use
in Applications, Workflow, and other Information
Management Systems
Yes
75 Volume II – IRDA RFP - Page 79 - Ann
XIX
Checklist of the documents
Checklist of the documents to be
submitted along with commercial
proposal.
Performance Guarantee with the
covering letter as per the format specified
(Only applicable after award of contract)
Stage for submission for this commercial proposal.
Need clarification as EMD indemnify till contract signing
and PBG to come post to that. Hence what should be
submission date?
Technical and commercial proposal
would be submitted together along
with the EMD.
76 Volume III – IRDA RFP - Page 6 Draft MSA Please confirm on the understanding that MSA to be
reviewed for during contract signing. Comments
regarding MSA to be provided, only after technical
presentation i.e. at the time of contract signing.
Yes
77 Back Up How many Windows / Linux /Unix Servers Participating in
the Environment
The exact technical specifications
would be shared with the selected IA.
78 Back Up Any Virtualization in the environment ? Like Xen , Hyper-
v or ESX
The exact technical specifications
would be shared with the selected IA.
79 Back Up How many tape drives / Library in the environment ? The exact technical specifications
would be shared with the selected IA.
18 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
80 Back Up Is the Environment on SAN ? The exact technical specifications
would be shared with the selected IA.
81 Back Up What are the databases associated in this environment
and in which platform?
The exact technical specifications
would be shared with the selected IA.
82 Availability What are the databases and Servers needs to be
replicated and needs High Availability?
The exact technical specifications
would be shared with the selected IA.
83 Availability Does the customer requires SAN based replication or
Host based replication?
The exact technical specifications
would be shared with the selected IA.
84 IRDA_RFP_Vol1_V15.5/Section
2.3/Pg: 10
Existing Application and its status IA understands that in the table provided in the ‘Existing
Application section’, the grievance management system
and agency portal system will continue as it is. Can you
let us know how other systems are getting transformed
in the new system?
As far as the BAP solution is
concerned it is going to be loosely
integrated with agency licensing
portal, integrated grievance
management systems, Health
Database and broker return
submission application only. The
status of other systems has no
relevance with BAP.
85 IRDA_RFP_Vol1_V15.5/Section
3.5/Pg: 16
Report Administrators Are ‘Report Administrators’ referred here business
users/technical team/developers?
Report administrators are persons
from the technical team of both IRDA
and IA
86 IRDA_RFP_Vol1_V15.5/Section
12/Pg: 73
Pre Migration Activities: Clean up source
data in current system
Our understanding is that IRDA currently has a database,
which holds data from all the stakeholders. IA
understands that they have to clean up this data before
loading it into the new system. Please confirm.
At present data is captured in the
form of spreadsheets, word
document, PDFs, e-mails and
hardcopies in unstructured formats.
By cleaning up it is meant that these
data needs to be first converted into
a structured format and then
migrated into an RDBMS.
19 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
87 What are the various source systems holding the data
each of the below groups? What is the total number of
files from each source system?
i. Insurance Companies
ii. Standalone health Insurance Companies
iii. Brokers
iv. ATI
v. TPA
Also, please provide details of "other" databases that
need to be integrated into ODS and DW.
As per the present scope, the BAP
solution is not going to be integrated
with applications / systems of
external stakeholders. This is a future
requirement. However, the BAP
system should have the flexibility to
have seamless integration with these
external systems in future if required.
Hence understanding of the external
applications / systems belonging to
external stakeholders in not required
at present.
88 How will data be available for IA to extract? Will IA be
pulling data connecting to each source system or will it
be provided to IRDA using push mechanism? Please
clarify.
The external entities
(insurers/intermediaries etc.) will
either key in data in online forms or
will upload the data through a batch
process. Data will be provided to the
IA for loading. The IA will not be
responsible for pulling data from the
source systems of these external
entities.
IRDA_RFP_Vol1_V15.5/Section
3.1/Pg: 12
Proposed Business Analytics Solution:
In the proposed system, both statistical
and regulatory data coming from the
external entities will be stored in a
centralized data store which will be
transformed, cleaned and structured to
make them available in form of reports
and analysis to both IRDA internal
stakeholders and external entities.
20 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
89 IA assumes that they will implement BAP reporting
solution while considering the reporting requirements
for the departments given below:
a) Actuarial
b) F&A
c) Investments
d) Re-insurance
e) Life
f) Non life
g) Health
h) Intermediaries
Please confirm the same.
Apart from these departments, there
is an inspection department which
uses data from the other
departments for reporting purpose.
Each department can be further split
into different analysis areas or
subject areas on which final reporting
and analysis will be performed.
However, since in present scenario,
new regulations are coming few
more departments can get
introduced in future.
90 IA understands that unstructured format is hard
copy/unformatted files.
How many source systems and total number of hard
copy/files in each system will be received in unstructured
format?
Other than hard copy, In which format the unstructured
data will be (.xls, .doc, .csv etc) received. If any other
format, please specify.
Apart from the hardcopies, data is
maintained in form of spreadsheets,
word documents , PDFs and picture
formats (JPD,JPEG,BMP)
91 What is the total number of unstructured data files (pdf,
doc, xls etc) which needs to be migrated to the new
system?
Mentioned in the RFP
IRDA_RFP_Vol1_V15.5/Section
3.1/Pg: 12
Proposed Business Analytics Solution:
In the proposed system, both statistical
and regulatory data coming from the
external entities will be stored in a
centralized data store which will be
transformed, cleaned and structured to
make them available in form of reports
and analysis to both IRDA internal
stakeholders and external entities.
IRDA_RFP_Vol1_V15.5/Section
12/Pg: 73
Pre-Migration Activities:
Format unstructured data in other
systems
21 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
92 IRDA_RFP_Vol1_V15.5/Section
12/Pg: 73
Key Activities during Data Migration: Run
data extracts from current system(s)
Are the hard copies provided by the Insurers all in the
same format? If no, Please specify the formats.
The hardcopies provided by the
entities (insurers/intermediaries) are
in different formats. As of now for
most of the departments, data is
collected in dissimilar formats. As a
part of form reengineering activity in
new forms have been designed for all
the departments which will be used
for data collection from the entities.
Some sample forms have been
shared along with the RFP document.
Post selection of the IA, the final set
of reengineered forms will be
provided to the IA.
93 Can IRDA get hard copies of all historical data in an
electronic format from the Insurance companies and the
other stakeholders like brokers, TPA etc?
No
94 IRDA_RFP_Vol1_V15.5/Section
12/Pg: 73
Pre Migration Activities: Create metrics to
capture data volume, peak hours and off-
peak hours.
What kind of metrics is expected out of IA? Please clarify
and provide all the metrics required.
Metrics here refer to average data
volume migrated/converted per day,
data volume migrated/converted at
peak hours and data volume
migrated/converted at off peak
hours.
95 IRDA_RFP_Vol1_V15.5/Section
12/Pg: 73
Data Migration and Digitization
Requirements
IA assumes that Data Migration means extracting the
history data from various unstructured sources into ODS
and DW for reporting requirements. Please confirm.
Data migration is not only meant for
DW or reporting perspective but also
from a document management and
archival perspective.
22 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
96 IA understanding is that IA has to identify the data
quality issues based on the sample data and business
rules which will be provided by IRDA. Please confirm.
Yes
97 The Data Stewards from each system will fix the data
quality issues identified by IA and re-send the data for
migration.
Yes
98 IRDA_RFP_Vol1_V15.5/Section 4/Pg:
21
Please clarify the role of IA in performing acceptance
testing.
IA shall provide all necessary support,
including setting up the required test
environment, making seating
arrangements and providing suitable
computer systems & peripherals, to
the agency for conducting
acceptance testing.
99 Please provide the number of: Following are the possible no. of
members for dimensions mentioned
below. However, these are subject to
change with respect to future
regulations
100 1. Product categories? 2
101 2. Divisions? 4
102 3. Groups? 2
103 4. Channels? 10
104 5. Premium types? 2
105 IA assumes that all data from various external entities is
at summary level and not at individual policy/claims
transactional level. Please confirm.
The bidder's assumption is in order
IRDA_RFP_Vol1_V15.5/Annexure
III/Pg: 103
Annexure III: Detailed Data Sizing Estimate for IRDA BAP
IRDA_RFP_Vol1_V15.5/Section
12/Pg: 73
Data Cleansing: A ‗semantic‘ data quality
issue in which data does not comply with
‗As Is‘ business rules
IRDA_RFP_Vol1_V15.5 Delivery channel Architecture
23 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
106 If ‘Yes’ to the previous question, then please clarify the
number of files that are summary files, which will be
available for BAP reporting from each external interfaces
and what is the expected granularity of data in each
source files?
If ‘No’, then please clarify the number of daily
transactional files and the granularity of data in source
files.
Please refer to annexure III of the
requirements specification document
for details. Once, the IA has been
selected the exact report formats
will be provided to the IA which will
help the IA in understanding the
exact granularity of the data.
107 IRDA_RFP_Vol1_V15.5 Data Archival Please provide the frequency and the period of archival. Data is to be archived for 8 years of
history data and all the data including
history needs to be archived for
future reference. The frequency of
the data archival should be yearly.
108 IRDA_RFP_Vol1_V15.5 Go Live and Final Acceptance IA understands that Maintenance and Support starts
from Go-Live and not from Final Acceptance Date. Please
clarify.
Maintenance and Support starts from
successful Go-Live of the solution
109 IRDA_RFP_Vol1_V15.5/Section
11.3.1.2/Pg: 65
Application Management: 24/7 Support IA assumes that the requirement for 24/7 availability is
only applicable for online applications and not for
reporting applications. As data load for reporting will
happen during the night time and hence reporting
applications may not be available.
This is applicable for both reporting
and the online portal.
110 IRDA_RFP_Vol1_V15.5 BI Reports What is the latency period in BI reports? IA assumes that
it is one day. Please clarify.
Minimum one day period of latency
on an usual basis. However in some
cases, extraction frequency can be
real time also.
111 IRDA_RFP_Vol1_V15.5 BI Testing Can you specify the non-functional requirements for
performance testing (like peak load, concurrent users,
the minimum response time at that load etc)?
The IA need to propose this in testing
methodology proposed for BAP.
IRDA_RFP_Vol1_V15.5 Delivery channel Architecture
24 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
112 IRDA_RFP_Vol1_V15.5 BI Testing Is there need for data masking required in SIT,
Performance testing and UAT. What % of tables or fields
are required data masking?
Data security aspect has been
specified in RFP
113 IRDA_RFP_Vol1_V15.5 BI Testing Is Downstream Extracts/Report Testing in scope, if so
what are the downstream systems and complexity of
data extracts?
Testing has been specified in RFP
114 IRDA_RFP_Vol1_V15.5 BI Testing What is the current defect logging system and defect
triage (include the defect status)
There is no defect logging system
present with IRDA. IRDA would like to
best leverage this based on the
capabilities of the IA in this area.
115 IRDA_RFP_Vol1_V15.5 BI Testing Can you please share the QA certification process for
reports and Analytics data (on what parameters
certification is done)?
The detailed quality certification
process will be shared only after final
selection of the IA.
116 IRDA_RFP_Vol1_V15.5/Annexure
III/Pg: 104
Daily Server Load Estimate: Based on the
above observations, it is envisaged that a
bandwidth requirement of approximately
8.325 MBPS.
IA assumes that Bandwidth requirement expected is
8.325 Mbps. Please confirm.
Yes
117 IRDA_RFP_Vol1_V15.5./Section
4/Pg: 22/Point IV
It should be noted that IRDA will not
make any investment for hardware and
network equipments and related
platform/ system software. IA should be
able to offer managed services for the
above. This infrastructure has to be
dedicated for the proposed solution of
IRDA.
Hosting partner would like to offer its shared backup &
SAN storage services. These are pay per use in model and
offers cost benefits to the customers. Please confirm if
Shared Backup and SAN can be deployed at the DC & DR.
The infrastructure has to be
dedicated for the proposed solution
of IRDA as mentioned in the RFP.
118 IRDA_RFP_Vol1_V15.5 DC & DR Location IRDA is requested to provide if they have any preference
in location of DC & DR.
There are no location preferences in
the DC and DR selection leaving the
condition that the DC and DR
shouldn't be in the same seismic
zone.
119 IRDA_RFP_Vol1_V15.5 Anti Virus Licensing Does IRDA have an enterprise wide anti-virus license? Yes. IRDA is having an enterprise
wide anti-virus license.
25 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
120 IRDA_RFP_Vol1_V15.5/Section
3.1/Pg: 12
Proposed Business Analytics Solution As per the new architecture, will all end users access the
platform over Internet or any Private VPN solution needs
to be deployed.
If Private VPN solution has to be deployed, can IRDA
specify the requirement, locations, addresses,
bandwidths required?
All the functionalities mentioned in
the functional specifications
mentioned in the functional
requirements specifications
document should be accessible by
VPN for IRDA internal users
irrespective of any locations.
121 IA assumes that the strategy should be holistic in
addressing both Technical Metadata and functional /
business Meta data. Please confirm.
Yes
122 Please indicate if the business metadata is currently
maintained in any format?
At present no business metadata is
maintained in structure formats in
IRDA.
123 What is the frequency at which BI metadata undergoes
significant changes with respect to metadata?
As per Industry benchmark.
Selected IA should assess the same.
124 What is the frequency at which ETL metadata undergoes
significant changes with respect to metadata?
As per Industry benchmark.
Selected IA should assess the same.
125 What is the frequency at which Source System metadata
undergoes significant changes with respect to metadata?
Not very frequently as all the data
captured are used for regulatory
purpose. Highest frequency may be
daily but in rare cases.
126 What are the metadata elements you would like to
capture and manage in the metadata management tool?
(for e.g.: Business Metadata, Technical Metadata about
the Data warehouse / Data Marts, Technical Metadata
from BI / ETL / Source DB’s repository, etc)
Business Metadata
Technical Metadata from DW/Data
marts
Technical Metadata of the source
systems.
127 What are the categories of users for Metadata
management tool? Is it going to be only Report
Administrators (or) Business Analysts, Data Architects,
Developers, etc
Report administrators for reporting
metadata, data administrators for
technical metadata
IRDA_RFP_Vol1_V15.5/ Section
8.1/Pg: 39
Metadata Management
26 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
128 Please indicate the type of reports that will have to be
generated from the metadata tool. (For e.g.: Ad hoc
query and analysis, dashboards, scheduled reporting, etc)
Please refer to section 2.0 of the
functional requirements
specifications for the details
129 IRDA_RFP_Vol3__v23.5/Section
1.3/Pg: 5
The aforementioned SLA parameters shall
be measured on a daily/weekly/monthly/
quarterly basis as per the individual SLA
parameter requirements, through
appropriate SLA Measurement tools to be
designed by the IA for the purpose and
audited by a 3rd party audit agency for
accuracy, reliability and completeness.
Can you please let us know whether the cost of
conducting the 3rd party audit like CAG, Security Audit
etc will be borne by IRDA?
3rd party on testing, performance
and security will be borne by IRDA.
130 IRDA_RFP_Vol3__v23.5/Section
2.2.2/Pg: 13
Period Of Contract: IRDA may choose to
extend the term for a further period of
one year, with all the terms and
conditions being the same as for the
original term
If the contract gets extended by 1 year then IA assumes
that the value of that contract will be paid separately,
Can you please clarify?
Value for the extended year shall be
paid separately with all the terms
and conditions being the same as for
the original term
131 IRDA_RFP_Vol3__v23.5/Section
2.2.6/Pg: 14
The Parties will cooperate reasonably to
obtain, maintain and observe all relevant
and customary regulatory and
governmental licenses, clearances and
applicable approvals (hereinafter the
“Approvals”) necessary for the
Implementation Agency to provide the
Services. The costs of such Approvals shall
be borne by the Implementation Agency
Can you please give more information on this
requirement?
This not mandatory. Only relevant if
applicable.
132 Is High Availability required on the Firewalls? Please
confirm.
Yes.
133 Do you require IDPS? If yes please specify is that a
separate dedicated IPS box or IPS built within the
Firewall?
Firewall requirement has been
specified in RFP.
IRDA_RFP_Vol1_V15.5/ Section
8.1/Pg: 39
Metadata Management
IRDA_RFP_Vol3__v23.5/IRDA_RFP_V
ol1_V15.5
Firewall Security
27 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
134 Please confirm the type of Gateway Multi-Threat
protection required along with Firewall/VPN (i.e.
Gateway Antivirus, Web URL Filtering, and Anti-Spam)
Firewall requirement has been
specified in RFP.
135 Please specify the number of physical interfaces required
on the firewall & use / requirement for each interface
(including internet / WAN links & physical DMZs for LAN
connectivity)
The detailed specifications will be
provided to the IA after final
selection.
136 Please provide the number of Internal LAN Users with
concurrent traffic statistics, if any. Please mention along
with future growth perspective.
User related information has been
provided in the RFP.
137 Please provide the throughput required on the LAN
segments of the firewall e.g. 10/100/1000 Mbps
The IA needs to assess this as per
SLA specified.
138 Please provide the total number of Internet users for this
application with concurrent numbers if any.
User related information has been
provided in the RFP.
139 Please provide the concurrent VPN connections expected
over the Public Internet (Site-to-Site IPSec VPN with
other office location, Client-to-Site IPSec/SSL VPN for
employee access to Corporate Network from Internet).
The IA needs to assess this as per
SLA specified.
140 Please provide more information on the following:
Future expansion (Number of Users, Number of ISP/WAN
links, Bandwidth increase of ISP/WAN links, increase in
VPN tunnels, introducing any real time Application like
Voice/Video in the network etc
The IA needs to assess this during
the implementation.
141 IRDA_RFP_Vol3__v23.5/IRDA_RFP_V
ol1_V15.5
Backup Do the servers require file level backup too apart from
the regular OS backup that we support by default?
Yes.
IRDA_RFP_Vol3__v23.5/IRDA_RFP_V
ol1_V15.5
Firewall Security
28 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
142 IRDA_RFP_Vol3__v23.5/IRDA_RFP_V
ol1_V15.5
DC – DR Replication IA understands that DC has to be provided with a fail
over strategy. Please confirm if DR needs a fail over
strategy as well.
Since zero data loss is expected, it is
expected from the bidder to provide
all kinds of suggestions and technical
options to prevent any data loss.
143 BAP_Requirements
Specifications_v25/ Pg: 18/
Technical specifications What is the security data stored used currently? Does
IRDA plan to reuse the same store for the BAS
application?
The BAP solution will preferably have
to be integrated with the default
authentication provider in IRDA. The
user log in credentials will be reused
in such a case. The access for the
different modules, functionalities,
data will have to be defined
separately.
144 BAP_Requirements
Specifications_v25/ Section
1.1.4,1.1.5/ Pg: 27
Capability of reconciling the data across
departments. So any data which is
captured in one department as well as in
others, the figures should match with
each other, Capability of automatically
reconciling the data from one form with
different forms.
Should these checks happen at the time user is entering
the data (online) and show him appropriate messages or
Should it happen as an offline process which generates
reports (either on screen or mail) for internal IRDA users?
These reconciliation checks should
happen at both the data submission
and the reporting end.
145 BAP_Requirements
Specifications_v25/ Section 1.1.9/Pg:
27
It should be possible to define rules for
populating the content dynamically on
the web portal based on the usage,
contact type, online behavior, alerts (e.g.
pending document from insurer), etc
Could you please provide more clarity on these
requirements with additional examples (like a specific
online behavior and how it impacts the contents on the
screen)?IA assumes that these rules would be
maintained by the technical team not directly by the
business users.
For example, the system should auto
calculate the calculated the fields in
an online form or if any data to be
submitted by the entities is pending
for submission, in such as case, the
system should throw alerts
reminding the pending submission.
29 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
146 BAP_Requirements
Specifications_v25/ Section 1.2.2/Pg:
30
On successful completion of online
submission / fling the system should send
certificates to the filing entity as an
acknowledgement of the completion of
the process
IA assumes that this will be done through email or online
receipt and not a printed certificate generated through a
batch process and sent through conventional mail. Please
confirm.
Yes
147 Do any of IRDA's current applications maintain the
ratings of RI’s? Else, how does IRDA expect get this
information?
At present, this data is maintained is
offline in spreadsheets. These data
can be maintained in the system by
loading external files (such as CSVs,
TXTs) at a monthly internal.
148 Does IRDA propose to restrict the number of user ids per
insurer / intermediary organization?
Yes.
149 BAP_Requirements
Specifications_v25/ Section 1.3.2/Pg:
32
Automatic verification and validation of
data submitted by insurers for
consistency checking. If relevant product
documents are not uploaded, other
errors and omissions by insurer (with
product application) then the system
should generate an alert to IRDA about
the discrepancy.
IA assumes that the documents uploaded by the insurer
would be in standard templates issued by IRDA and
hence automated validations on these are possible.
Please confirm.
Yes
150 BAP_Requirements
Specifications_v25/ Section
1.4.4.1.2/Pg: 35
Should be configurable to enable
automated payments to the respective
departments based on a pre-defined
schedule
Please explain what is meant by “pre-defined schedule”
and what parameters are expected to be configurable?
Pre Defined Schedule here refer to
the time period when a payment has
to flow from the external entities to
IRDA. For example, renewal of
surveyor licenses.
151 BAP_Requirements
Specifications_v25/ Section
1.4.4.1.3/Pg: 35
Should have the ability to process and
display status updates in the entire
payment and collection process
Who are the intended audience for this report and what
information will it contain?
IRDA administration will be the users
of this report. The objective of this
report is to track and monitor the
defaults in payment by the external
entities.
BAP_Requirements
Specifications_v25/ Section 1.2.8/Pg:
30
Ability to cross-verify whether Insurers
are placing risk with an RI with at least
BBB rating.
30 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
152 BAP_Requirements
Specifications_v25/ Section
1.4.4.1.3/Pg: 35
Should have the ability to process and
display status updates in the entire
payment and collection process
By ‘Collection process” please confirm if the reference is
to tracking the credit of payments done online only and
not tracking of any manual payments received through
check or other offline means.
Deals with online payments only.
153 BAP_Requirements
Specifications_v25/ Section 1.5/Pg:
36
Inspections Planning and Management –
Detailed Workflow
IA assumes that this application would be used by the
Inspection department only – insurers and non-IRDA
personnel will not have access / roles in this system.
Please confirm.
Yes
154 BAP_Requirements
Specifications_v25/ Section
Business Process Reengineering –
Key objectives/Pg: 70
To automate the data transfer from
Insurers, Intermediaries and TPAs
Can IA assume that based on this objective, that ALL data
being fed into the BAP system will be automated? That
is, we will have digitization of paper records at the time
of implementation only as a onetime activity? Please
confirm.
The automation of data transfer from
the external entities system is a
future state of requirement.
However, the digitization activity is a
one time activity.
155 The major components of the BPR
exercise are:
156 1. Reengineering the forms (includes
modifying the existing forms and creating
new forms)
157 2. Reengineering the reports (includes
modifying the existing reports and
creating new reports)
158 3. Reengineering the processes of data
capture, storage and reporting
159 Among the three components, the first
two has been done during the detailed
TO BE exercise.
160 BAP_Requirements
Specifications_v25/ Section 3.9/Pg:
44
The system should monitor claim
Settlement in terms of Turnaround Time
(TAT) (Monthly) for each insurer so that
IRDA can take action on the claims
unsettled for long time.
IA understands that insurance companies provide
summary level data to IRDA. Would Insurance company
share policy holder level details as well?
Policyholders wise data needn't be
captured in Business Analytics
Solution. Hence not relevant.
BAP_Requirements
Specifications_v25/ Section
Business Process Reengineering –
Major components/ Pg: 70
Can IA assume that this is by far the final set of forms and
reports that need to be developed as part of this project
or does IA expect significant number of additional forms
and reports at the time of requirements detailing?
So far these are the final sets of
reports and forms. However, since
forms are subject to regulation also
are the reports, a few new forms may
be added or some changes may be
performed on these forms at a later
point in time during the
implementation.
31 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
161 BAP_Requirements
Specifications_v25/ Section 5.10/Pg:
48
Provision for digital signatures so that the
data security is maintained properly and
the insurers can only view the data but
will not be able to edit it.
Has IRDA digital signature already? Or IA has to procure
the same for IRDA?
IA has to procure digital signature for
IRDA.IRDA as of now is not having
digital signature technology.
162 BAP_Requirements
Specifications_v25/ Section 6.1/Pg:
49
All relevant documents need to be
uploaded and digitally signed by insurer
before upload.
'IA assumes that it is the responsibility of insurers to
ensure that all relevant digital documents are digitally
signed before uploading'. Please confirm
Yes
163 BAP_Requirements
Specifications_v25/ Section 7.2/Pg:
49
The system should also have a search
facility that should enable searching of
contents over the internet through a
standard search engine like Google
search.
Is it mandatory that IA use ‘Google search engine’ or can
IA use other industry standard engine like ‘Bing’ or
‘Yahoo search’?
There is no mandatory requirements
of searching facility through any
particular search engine. "Google"
has been mentioned as an example.
The objective is to have searching
facility through the most robust
search engine possible.
164 BAP_Requirements_Specifications_v
25/Section 1.1.2.4/Pg: 56
Tokens (RSA SecurID, SafeWord, etc.) Does IRDA expect RSA Secure token support for VPN
connections for employees or for even form based
authentication by end users as well?
Bidders needs to recommend as per
the security requirements specified
165 BAP_Requirements_Specifications_v
25/Section 2.6.1/Pg: 62
The system should have flexibility to
regenerate the programs and features
without starting the development process
from very beginning. The system should
have an user interface to support the
same so that the entire development
activity can be replicated to a new set up
without much of problems
Can you please provide more information on this
requirement?
By this it is meant that the
application should have in built back
up and replication mechanism
through which the status of the
system can be restored at any point
in time without replicating the
development efforts from the scratch
32 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
166 BAP_Requirements
Specifications_v25/Section 2.1.9/Pg:
40
Producing different reports in different
formats as per the requirements
displaying the characteristics of two or
more products in a comparative tabular
form so that if there is any duplication or
almost duplication of products, IRDA can
take suitable action against such
products.
What could be the maximum number of Products to be
compared at a time?
Number will change over time. The
max limit need to be finalized during
preparation of SRS.
167 What are the various formats of the financial statements
(Excel, PDF etc)?
PDFs and MS word
168 How many financial statements to be considered for
generating financial reports?
Detailed list of forms and reports
have been provided in the FRS
document alongwith a fair sample of
the complete set of forms and
reports have been shared with the
bidders.
169 Is there any calculation logic to be applied over the
uploaded data or data to be put together for
consolidated view?
Same as above.
170 BAP_Requirements
Specifications_v25/Section
2.1.11/Pg: 40
The system should show summarized
reports consolidating / integrating data
from different departments.
Is there any data granularity difference in data across
departments?
The data collected by the different
departments can be of different
granularity. For this purpose, the
detailed set of reports will be
provided to the selected IA only after
finalization of IA.
171 Is there any Ad-hoc reporting facility required over web? Yes.
172 How many concurrent users expected over web? Please refer to annexure III of the
volume I of the RFP document for
detailed specifications of the user
173 Is generated Ad-hoc report to be saved in server for
feature access?
Yes.
BAP_Requirements
Specifications_v25/Section
2.1.10/Pg: 40
Generating financial reports out of the
different kinds of financial statements
uploaded by the external stakeholders
BAP_Requirements
Specifications_v25/Section
2.1.11/Pg: 40
The system should support reporting
over both thin client and rich client i.e.
over web interface and client desktop
interface
33 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
174 Are reports scheduled to run at periodic intervals? Yes.
175 What is the least granularity of data to be expected in
the reports hierarchy?
For this purpose, the detailed set of
reports will be provided to the
selected IA only after finalization of
IA.
176 How many level of Drill through reports required from
main reports (for e.g.: 2, 3 etc)?
For this purpose, the detailed set of
reports will be provided to the
selected IA only after finalization of
IA.
177 Is there any dynamic hierarchy required in drill-down? Same as above.
178 IA assumes that the security considerations for IRDA
reports will be Role based. Please confirm.
As of now, role based access is
proposed, however this may be
subject to change.
179 BAP_Requirements
Specifications_v25/ Pg: 40
Section 2.3, General Analytics Section 2.3 refers to the system having the capability to
perform mentioned analysis. Does IA have to perform
the statistical analysis or build statistical models for IRDA
as a part of this requirement? Please confirm.
The solution must have capabilities
so that the business users can define
their own statistical models based on
the requirements. IA won't need to
perform statistical analysis. In some
cases for canned reports, the IA may
be required to build statistical models
proposed by the business users.
180 BAP_Requirements
Specifications_v25/ Section 2.6/Pg:
42
Advanced Analytics: The system should
have early warning management
flexibility, i.e. system should be able to
perform analyses on some leading
indicators (KPIs) and should show
indications of a particular KPI to be going
down and the reasons for it.
Will IA be required to build the statistical model to
analyze leading KPIs and trigger early warnings for KPIs to
be going down? Please confirm. If yes, is an indicative
number of KPIs to be tracked and analyzed, available?
The solution must have capabilities
so that the business users can define
their own statistical models based on
the requirements. IA won't need to
perform statistical analysis. In some
cases for canned reports, the IA may
be required to build statistical models
proposed by the business users.
BAP_Requirements
Specifications_v25/Section
2.1.11/Pg: 40
The system should support reporting
over both thin client and rich client i.e.
over web interface and client desktop
interface
34 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
181 BAP_Requirements
Specifications_v25/ Pg: 53
Other Requirements: The system should
have a suitable ALM module which will
have cash flow management
functionalities and other financial
analytics capabilities.
Please elaborate on the requirements for ALM module. There are predefined formats for the
ALM module. For this purpose, the
detailed set of reports will be
provided to the selected IA only after
finalization of IA.
182 BAP_Requirements
Specifications_v25/ Pg: 78/Point 18
183 BAP_Requirements
Specifications_v25/ Pg: 141/Point
17
184 BAP_Requirements
Specifications_v25/ Pg: 150/Point 1
185 1.please provide example of Breach as defined; Self Explanatory
186 2.Pleasee confirm if Project definition can be modified as- The definition of the terms shall
remain as it is mentioned in the
volume III of the RFP document.
187 “Project” means BAP Project involving the Design,
Development, Implementation, Operations, and
Maintenance of BAP system as per the requirements,
terms and conditions laid down in the Statement of Work
(SOW) and provision of related services in conformance
to the SLA;
The definition of the terms shall
remain as it is mentioned in the
volume III of the RFP document.
188 3. Please confirm if Deliverables definition can be
modified as–
The definition of the terms shall
remain as it is mentioned in the
volume III of the RFP document.
189 “Deliverables mean deliverables under this Agreement as
specifically set forth under the statement of work (SOW)
that Bidder is agreed to furnish and is obligated to
provide to IRDA”
The definition of the terms shall
remain as it is mentioned in the
volume III of the RFP document.
Appendix I Is there a requirement for a Solution to execute
Insurance specific Risk calculations such as - Solvency
Ratio, IBNR Reserve Estimation (Chain Ladder,
Bornhuetter-Ferguson etc,.) using various
methodologies?
Yes. There are predefined formats for
these reports. The formats and
calculation logic will be provided to
IA after finalization of IA.
IRDA_RFP_Vol3_ v23.5/Section
2.1.1/Pg: 7
Definitions
35 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
190 IRDA_RFP_Vol3_ v23.5/Section
2.2.4/Pg: 13
Scope and Provision of the Services Please clarify who are the stakeholders referred in
clause2.2.4 (a) here and such reference can be deleted.
Refer to the volume I of the RFP
document for details on the
stakeholders
191 IRDA_RFP_Vol3_ v23.5/Section
2.2.6/Pg: 14
Approvals and required consents Any cost increase due to change in applicable laws and
related approvals need to be borne by IRDA.
The costs of such Approvals shall be
borne by the Implementation Agency
as per clause 2.2.6 in the page 14 on
the volume III of the RFP document.
192 Safety and security of assets purchased by Bidder for
IRDA shall rests with IRDA when such assets are on IRDA
premises.
The terms specified in the clause
2.2.6 in the volume III of the RFP
would remain the same.
193 Will IRDA bear the cost of insurance policies required to
be taken out?
The terms specified in the clause
2.2.6 on insurance in the volume III of
the RFP would remain the same.
194 Are insurance provisions subject to negotiations? The terms specified in the clause
2.2.6 on insurance in the volume III of
the RFP would remain the same.
195
196
197
198 IRDA_RFP_Vol3_ v23.5/Section
2.3.4/Pg: 18
Security and Safety Will IRDA provide safety and security policies to Bidder in
advance and in writing for its confirmation and review?
RFP provides relevant details.
IRDA_RFP_Vol3_ v23.5/Section
2.2.6/Pg: 15
Use and Acquisition of Assets
IRDA_RFP_Vol3_ v23.5/Section
2.3.3/Pg: 18
Changes Please confirm if it is acceptable that – Bidder can
propose provisions to be added to allow each party to
propose changes to the applicable work order/statement
of work shall be added. Also, that neither party should
have any obligation respecting any change until an
appropriate change order or amendment to the
applicable work schedule/ statement of work is executed
by both parties.
Provisions to be added to allow the
IA to propose changes to the
applicable work order/statement of
work is NOT ACCEPTABLE
36 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
199 IRDA_RFP_Vol3_ v23.5/Section
2.4/Pg: 19
Financial Issues Bidder believes that Financial terms are subject to
negotiations between the parties. Please confirm.
Article IV on Financial Issues in the
volume III of the RFP document shall
remain as it is.
200 IRDA_RFP_Vol3_ v23.5/Section
2.4.3/Pg: 21
Tax Please confirm if it is acceptable that – IRDA shall be
responsible for payment of any sales, service, value-
added, use, excise, consumption, or other taxes assessed
with respect to Bidder’s provision of the Services. Tax
provisions are subject to negotiations.
Section 2.3 on the Tax in the Article
IV on Financial Issues in the volume
III of the RFP document shall remain
as it is.
201 Please confirm –
202 whether the length of the cure period in Section 2.5.1
can be increased?
If there is Breach which translates
into default in providing Services by
the Implementation agency as per
this Agreement or the SLA,
continuously for more than one
week, then the Project Director,
IRDA, will serve a FIFTEEN days notice
for curing such Breach.
203 Bidder proposes that both parties should be able, with an
appropriate notice period, to terminate only for a
material breach of respective parties’ obligations under
the Agreement. In addition, Bidder feels that, regardless
of the reason for termination, Bidder should be paid for
all services rendered through the effective date of
termination at mutually agreed rates and, in the case of
termination of the Agreement by IRDA without cause or
by Bidder for cause for all costs reasonably incurred in
anticipation of the performance of services to the extent
that they cannot reasonably be eliminated.
No. It should retain as mentioned in
the section 2.5 of the volume III of
the RFP document.
204 Please provide clarifications if clause 2.5.5 can be
removed? Or any modifications be suggested to the
wordings?
No. It should retain as mentioned.
IRDA_RFP_Vol3_ v23.5/Section
2.5/Pg: 22
Breach, Rectification and Termination
37 of 76
-
S.No. Reference to the original document Context Queries/Amendments (Details) Comments
205 Will following modifications be accepted by IRDA:
206 Certain of the warranties (including Section 2.6.1 (a) and
(b)) should be subject to a mutually agreeable time
period. Also, reference to 3.2.4 of Article II seems
incorrect. In addition, Bidder would request the inclusion
of certain industry standard requirements for warranty
claims (e.g., notice before expiration of warranty period,
confirmation of defects, absence of alterations or
modifications by parties other than Bidder). Bidder
would like to suggest modifications that Bidder believes
would make certain of the provisions more consistent
with industry standards. Additionally, guarantee under