    MBA Project work Guidelines

    Introduction:

    This program guide will provide the student with all the information they need to know for

    developing a project dissertation. As project work is a very important part of MBA coursecurriculum, it has been marked for four credits.

    The following guidelines may be adopted for MBA projects:

    1. The duration of the project is for six months starting with synopsis preparation and ending

    with evaluation.

    2. It must be a live project either done at the place of work or some other organisation.

    3. The project must be taken up under a guide at student’s Authorised Study Centre/ Program

    Centre/ Learning Centre.

    4. Students to contact Learning centre for appropriate formats for project work.

    5. The project must be completed and submitted at the Learning Centre.

    6. The project must relate to the specialisation pursued.

    Selection of Project Title:

     –   The title selected should be coherent with the stream of study or specialisation.

     –    A list of suggested topics is provided at the end of this document. However, the student

    and the guide have the freedom to identify an appropriate topic.

     –   The title should be specific and focus towards the objectives of the project.

    Project work and final submission:

    1. Submit a draft project work to the Authorised Study Centre/ Program Centre/ Learning

    Centre:

    The draft project work should be submitted 20 days after the study has been conducted.

    The draft should constitute the following:

      Title of the project

      Introduction

      Literature review/related research outcomes (a brief review of similar or related studies

    conducted elsewhere. (This should not be more than 500 words).

      Description of study methodology

      List of work done: Visits to company, list of functionaries met, documents received from

    company; registers and files seen, and observations made, field visits, number of

    samples collected/ questionnaires filled should be mentioned in proper order.

      Names of books, sites, journals, magazines referred.

    2. After receiving a feedback from the Authorised Study Centre/ Program Centre/ Learning

    Centre, make the necessary corrections and proceed to the next step.

    3. Submit the final report:

  • 8/20/2019 Smu Mba-project Guidelines

    2/13

      The final project report should be submitted 30 days after the submission of the draft

    project work. The recommended number of pages of final report should be around 100.

    4. Viva Voce/Presentation:

    Viva will be conducted as per the schedule. The power point slides for presentation should

    be submitted along with the final project report. The student should demonstrate or makea power point presentation of their project at the Study Centre/ Program Centre/ Learning

    Centre to the University approved external and internal examiners. The student must stay

    in touch with their Study Centre/ Program Centre/ Learning Centre for the actual date of

    project evaluation.

    The project work terminates with the viva voce/ presentation. A summary of the project is

    to be submitted.

    Executive Summary: Should be 500 words; besides being a part of the project report, a

    copy of the executive summary should be submitted separately also. The following are

    the constituents of the summary:o  Title

    o  Statement of the problem

    o  Methodology used

    o  Main findings /outcome of the study with respect to objectives

    o  Recommendations

    Project Report

    The final project report should consist of the following components:

      Cover page

      Title page

      Acknowledgement

      Bonafide letter (from the company where the project was undertaken)

      Table of contents

      List of Tables & List of Figures

      List of Symbols, Abbreviations and Nomenclature

      Executive Summary

      Chapters

    o  Introduction

    o  Project details

      Title of the project

      Aims and objectives of the study

      Problem statement

      Scope of the study

      Significance of the study

    o  Literature review/related research outcomes (should not be more than 500 words)

    o

      Methodology used: Data collection method, research tools used, samplingmethodology, validity of the data

  • 8/20/2019 Smu Mba-project Guidelines

    3/13

    o  Data analysis and interpretation/Research findings

    o  Recommendations and conclusions

    o  Limitations of the study and scope for further research, if any,

      References/ Bibliography

    Format for Bibliography:

    Books:

     Author’s or Editor’s Names, Title of the Book, Place of Publication, Publisher, Year of

    Publication, Page number

    Example:

    R.C. Goyal, Hospital Administration and Human Resource Management, New Delhi:

    Prentice Hall Publication, 2008, Pg. 75

    S.K. Joshi, Quality Management in Hospitals, New Delhi: Jaypee Brothers, 2009, pg 89-

    93

    Journals: Author, “Article Title”, Title of Periodical, Date of Publication, Page numbers of the article. 

    Example:

    Bronwyn Fryer, “The Layoff”, Harvard Business Review, March 2009, Pg 17-24.

    Keila Rooney, “Consumer Driven Healthcare Marketing: Using the Web to Get Up Close

    and Personal”, Journal of Healthcare Management, Chicago: July 2009, Vol. 54, Pg 241 

    Visit our website http ://edunx t.smud e.edu.in, for detailed project guid elines.

    Project Evaluation:

    Evaluation pattern for the project is as given below:

    Evaluation Criteria Internal External

    Synopsis 5 5

    Methodology 10 10

     Analysis /Findings 25 25

    Project Report 25 25Viva 35 35

    Total 100 100

    Template/Details for Preparation of Project Report for MBA course Contents

    i. Cover page and Title page

    ii. Acknowledgement

    iii. Bonafide Letteriv. Executive Summary

  • 8/20/2019 Smu Mba-project Guidelines

    4/13

    v. Table of Contents

    vi. List of Tables

    vii. List of Figures

    viii. List of Symbols, Abbreviations and Nomenclature

    ix. Chapters 

    x. References/Bibliography

    xi. Instructions 

    i) Cover Page and Title Page:

    About Cover page and Title Page:

    A PROJECT REPORT

    Under the guidance of

     ______________________________

    Submi t ted by

     ______________________________

    in partial fulfillment of the requirement

    for the award of the degree

    Of

    MBA

    IN

    [Finance/Marketing/Human Resource Management/Information Systems/Banking/Retail

    Operations/Operations Management/Project Management/Total Quality Management]

    &

    ii) Acknowledgement:

     Acknowledgment is the regard given to the people and organisations that have helped the

    student in completing the project undertaken. It must consist of acknowledgements towards

  • 8/20/2019 Smu Mba-project Guidelines

    5/13

    the organisation the student studies and to the company where the student has done the

    project followed by the people who have helped student in the process.

    iii) Bonafide Certificate

    Bonafide Certificate:  

    BONAFIDE CERTIFICATE

    Certified that this project report titled ……………………………………………..” is the bonafide

    work of “…………...…………” who carried out the project

    work under my supervision.

    SIGNATURE SIGNATURE

    HEAD OF THE DEPARTMENT FACULTY IN CHARGE

     

    iv) Executive Summary:

    Executive summary should be a one-page summary of the project report. It should consist of

    the statement of the problem, main findings, and recommendations for further use. It should

    be typed in double line spacing, font style -Times New Roman, and font size 14.

    v) Table of contents:

    It is the list of all the contents in the report. Please see the example below:

    Table of Contents

    ChapterNo.

    Title Page No.

    1 Introduction

    1.1 1

    1.2 5

    1.3 10

    2 Literature review.

    2.1 14

    2.2 21

  • 8/20/2019 Smu Mba-project Guidelines

    6/13

     

    vi) List of Tables:

    Give the same name for the table as it exactly appears above the tables in the text. The caption

    of the table must be present above the table. 1.5-line spacing should be adopted for typing

    the matter under this head.

    Table 1

    Field 1 Field 2 Field 3 Field 4 Field 5 Field 6

    List of tables

    1. Table 1:

    2. … 

    Note: 

    By the word ‘Table’, we mean tabulated numerical data in the body of the project report

    as well as in the appendices (if any). All other non-verbal materials used in the body of the

    project work and appendices such as charts, graphs, maps, photographs and diagrams may

    be designated as figures.

    vii) List of Figures:

    Give the same name for the figure as it appears exactly below the figures in the text. The

    caption of the figure must be present below the figure. 1.5-line spacing should be adopted for

    typing the matter under this head.

    Figure 1: < Caption of the Figure>

    List of Figures

    1. Figure 1:

    2. …. 

    viii) List of Symbols, Abbreviations, and Nomenclature:

    1.5 line spacing should be adopted for typing the matter under this head. Standard symbols,

    abbreviations, etc., should be used.

  • 8/20/2019 Smu Mba-project Guidelines

    7/13

     

    ix) Chapters:

    The chapters can be broadly classified into three parts:

    1. Introductory chapter

    2. Chapter(s) on the main content of the project

    3. Concluding chapter.

    The main text will be divided into several chapters and each chapter can be further divided

    into several divisions and sub-divisions.

      Each chapter should be given a relevant title.

      Tables and figures in a chapter should be placed in the position with respect to the

    reference where they are cited.

      Headers and foot notes should be used sparingly. The title of the project must be reflected

    on the left side of the header and chapter name must be on the right side of the headers.

    Page numbers are to be placed on the right side of the footer. They should be typed in

    single space and placed directly underneath in the very same page, which refers to thematerial they annotate.

    Note: The report must always end with the concluding chapter and future enhancements, if

    any. 

    x) References/Bibliography:

    The listing of references should be typed four spaces below the heading “REFERENCES” in

    alphabetical order in single spacing left - justified. The reference material should be listed in

    the alphabetical order of the first author. The name of the author/ authors should be

    immediately followed by the year and other details. Any website reference must be referred/

    preceded by the publications reference. 

    xi) Instructions:

      The text in the printed copies must be in black colour.

      1.5 line spacing should be used for typing the general text. The general text shall be typed

    in the font style ‘Times New Roman’ and font

    size 12.

  • 8/20/2019 Smu Mba-project Guidelines

    8/13

     

    LIST OF PROJECT TOPICS (SUGGESTED)

    Sl. No. Project TopicsPROJECT TOPICS FOR HUMAN RESOURCE MANAGEMENT

    1. A study of performance appraisal / performance management systemin XYZ organisation

    2. Assessment of role stress amongst the employees of XYZorganisation

    3. Job satisfaction survey at XYZ organisation

    4. Competency mapping in an organisation

    5. Training effectiveness in an organisation

    6. Study of organisational culture OCTAPACE profile.

    7. Motivational analysis of organization

    8. A comparative study of team effectives in an organisation: Teameffectiveness assessment measure.

    9. A study of Compensation Management System

    10. A detailed study of promotion and reward policy of organisations

    11. A study of quality of work life in an organisation

    12. Mapping training needs of employees: Training Need Analysis

    PROJECT TOPICS RELATED TO MARKETING

    13.Formulation of Marketing Strategies to Improve Market Share of LGMicrowave Ovens

    14.

    Improving the Effectiveness & Efficiency of Operations at Cox &

    Kings India Ltd.

    15.Demand Forecasting for Orion-ERP Package for ICICI InfoTech inBangalore, based on Small & Medium Enterprises.

    16.Developing a Service Delivery Model to Bridge the Gap betweenServices Expected & Provided by ICICI Home Loans.

    17.Strategies for Increasing the Occupancy Rate of Taj West End Hotel,Bangalore

    18. A Market Feasibility Study for New X-ray Machines from Wipro-GEMedical Systems

    19.Distribution Mapping & Dealer Satisfaction Survey for Nokia MobilePhones.

    20.  A Study of Marketing Strategies & Distribution Channels in NorthKarnataka for Cholamandalam Investment & Finance Company Ltd.

    21. A Study to Improve Awareness level of Triraksha Welfare Schemeamong Farmers for Tractors & Farm Equipment Ltd

    22. A Study to Increase Penetration Level & Brand Loyalty amongexisting consumers of Samsung India Electronics Ltd.

    PROJECT TOPICS RELATED TO FINANCE

    23. The Study of Indian Financial System: Post Liberalisation

    24.The Impact of Global Recession on Information Technology Sector InIndia

    25.The Impact of the Recent Global Economic Slump on the Indian

    Capital Market26. A Comparative Study of Bancassurance Products In Banks

  • 8/20/2019 Smu Mba-project Guidelines

    9/13

    27. A Comparative Study of Equity Linked Savings Schemes Floated byDomestic Mutual Fund Players

    28. A Comparative Study of Cost Of Capital In Automobile/ Steel/Pharma/ Finance Industry

    29. A Comparative Study of Financial Performance of Banks Using Ratio

     Analysis30. Profitability and Operational Efficiency of Public Sector Banks

    31. Profitability and Operational Efficiency of Banks in India

    32. A Study of Working Capital Management In Small Scale Industries

    33. The Scope of Microfinance in the Indian Context.

    34. Financial Inclusion- The Scope and Effect in the Indian Economy

    35. Rural Banking in India

    36. Dematerialisation – The Scope and Effect.

    37. The Future of Investment Banks in the post- Lehman Brothers Era

    PROJECT TOPICS RELATED TO INFORMATION SYSTEMS

    38. Role of software agents as a collaborative tool – E-commerce

    39.Hospital Management System - Database Approach, MangalaHospital, Hassan

    40. Automation of Banking Database, XYZ Bank.

    41. Automation of Customer Relation Database, A SAP Product

    42. A Study on Electronic Data Storage- Steel Factory, Mumbai

    43. A Webpage Design using JAVA-Google Page

    PROJECT TOPICS RELATED TO MBA - HCS

    44. A Study on the Identification of High Risk Groups Prone to SpinalDisorders /Diabetes-/Heart Attacks (or any other lifestyle condition)and Corresponding Prevention Recommendations

    45. A Study on the Wellness Practices in a Target Group (MNCEmployees, School Children and Older Adults) andRecommendations on Wellness Practices

    46. A Study on the Identification of Causes of Delays in In-patientDischarges and Recommendations to Avoid Delays and IncreasePatient Satisfaction

    47.

     A Comparative Study on Patient Satisfaction in (Executive Suites,VIP Suites, Out-patient Department, General Ward, LaboratoryServices, etc.) and Recommendations to Increase PatientSatisfaction

    48. A Study on Patient Satisfaction in Any One Department in a Multi-specialty Hospital. (Health Screening Dept, In-house Pharmacy,

    Outpatient Services, Billing, etc.)

    49. A Study on the Identification of Causes of Delays in Patient Transfer(Internal/ External) and Recommendations to Decrease Waiting Timeand Increase Patient Satisfaction

    50. A Comparative Study on Waiting Time in Various HospitalDepartments and Recommendations to Decrease Waiting Time(Outpatient Dept, Billing, etc.)

    51. A Study on Job Satisfaction of Nurses /Paramedic Staff in ICU/Operation Theatre /Wards, etc., and CorrespondingRecommendations to Improve Job Satisfaction

    52. A Study of Sickness Absenteeism Among Various Groups of Hospital

    Employees (Nurses, Housekeeping Staff, Ward Boys, CSSD

  • 8/20/2019 Smu Mba-project Guidelines

    10/13

    employees, Doctors, etc.). A comparative study of the same may alsobe done.

    53.

     A Study on Work Safety for Employees in the Radiology Department /Waste Disposal Department /Lab /Housekeeping, etc., andCorresponding Recommendations to Improve Work Safety. Acomparative study may also be undertaken between the

    departments.

    54. A Study on Waste Disposal Management in a Hospital andRecommendations for Safe Disposal

    55. A Study on Hospital Acquired Infections and PreventionRecommendations

    56. A Study on the Efficiency of CSSD (or any other department of amulti-specialty hospital)

    57. A Cost Analysis Study in General Ward (or any other department) ofa Hospital to Develop User Charges

    58. A Comparative Study on Cost Analysis of the Various Departments ina Hospital and Cost-cutting Recommendations

    59. A Study on Formulation of Marketing Strategies to Promote aHealthcare Service (e.g., ‘Women Wellness Check-up’ Promotions) 

    60. A Study on Involvement of Doctors /Nurses /Paramedics in RuralHealthcare and Suggestions to Improve Involvement

    61. A Study on Medical Representative Triumphs and TrialsRecommendation to Improve Liaison of Medical Reps and Doctors

    62. A Comparative Study of In-house Pharmacy and Retail Pharmacy

    63. A Study on the Identification of the Causes of Delays in CashlessHospitalisation and Recommendations to Reduce Time Lags

    PROJECT TOPIC RELATED TO PROJECT MANAGEMENT

    64. A study on the effectiveness of Project Management in Mining

    65. Importance of Human Resource Management in construction projects

    66. A study on controlling risks in construction projects

    67. Project Cost Estimation for software projects

    68. A study on software project management practices with specialreference to embedded systems

    69. A study on quality management/assurance for software projects

    ion

    70. Effect of project risk on project performance : A study at XYZ Inc.

    71. Validity of feasibility studies in Infrastructure Projects

    72.Comparative Study of Project Management Software- MS project andPrimavera

    73. A Study on Risk Factors Involved In Outsourcing IT Projects

    74. Role of Earned Value Analysis in Project Management

    75. Risk analysis and management in IT projects

    PROJECT TOPIC RELATED TO INTERNATIONAL BUSINESS MANAGEMENT

    76.Market entry strategies and programs for a particular sector/Company/ Product

    77. Cross cultural issues and managing cross border teams

    78. Strategies adopted by MNCs to cope with Indian brands

    79. Impact of FDI on any particular sector

  • 8/20/2019 Smu Mba-project Guidelines

    11/13

    80. Multinational mergers and acquisitions

    81. HR policies – Global and Local

    82. Transfer pricing- issues and government policies

    83. Impact of HRM practices on operational performance in MNCs

    84. Changes in banking industry after incorporation of FEMAPROJECTS TOPICS FOR MBA  – TOTAL QUALITY MANAGEMENT

    85.Implementation of 5 ‘S’ in manufacturing companies in XXXXX city/town/state

    86. Quality Management in Software Industry – A Study

    87. Process Capability Study in BPO companies

    88. A Study on Continuous Improvement Process in XXXXXXX Company

    89. Effectiveness of Six sigma Projects – A Study

    90. Application of Quality Control tools – A Study

    91. Cost reduction through Quality Approach – A study

    92. A Study on Just In Time in XXXXXXX Company

    93.Total Productive maintenance in manufacturing Companies  – AStudy

    94. Customer Satisfaction through TQM Approach – A Study

    95. Quality Management in Healthcare sector – A Study

    96. A Study on Statistical Process Control in specific manufacturingCompany

    97. Application of QFD in Service Industries

    98.Impact of Application of FMEA in Manufacturing Industries in the cityof XXXXXXX

    99. A study on quality management in XXXXXXX bank

    100.  A study on TQM implementation in hospital

    101.  A Study on TQM implementation in service industries

    102. Measuring quality in service sectors

    103. SPC and its application in service industries

    104. A study on effectiveness of TQM implementation in XXXXXXXindustry

    105. Improving quality in small and medium scale industries

    PROJECT TOPICS RELATED TO RETAIL OPERATIONSMANAGEMENT

    106.  A study on Indian organized retail sector

    107. Effectiveness of promotional schemes in Retail stores

    108. Study of retail store operations

    109. Emerging retail formats and strategies

    110. Role of FDI in Indian retail sector

    111.  A study on retail consumer behaviour-personal, social & cultural

    112. A study on Loyalty programs in organized retail sector

    113. A study on changing consumer preferences towards organizedretailing from unorganized retailing

    114.  A study on strategies for promoting retailers brand

  • 8/20/2019 Smu Mba-project Guidelines

    12/13

    115. An analysis of possible strategies for successful internet basedcustomer services in retail

    116. Measuring the effectiveness of display system in retail industry

    117. Retail outlet mapping of retail stores & shopping malls

    118. Study on private labels Vs. national brands

    119.  A study on effective Supply Chain practices in organized retail sector

    120. Impact of retail IT application on effective store operations

    121. Best HR practices in organized retail sector

    122. A study on customer relationship management practices in retailstore

    123. A study on effective retail project management

    124.  Analysis of training needs assessment of retail sales executives

    125.  A study on pricing strategies followed by successful retailers.

    126. To analyse visual merchandising and space planning in a mall

    127. To identify significance of CRM in retail sector128. A study of automotive retail management structure in an organization

    PROJECT TOPICS RELATED TO OPERATIONS MANAGEMENT

    129.  A study on Total Quality Management at XYZ Company

    130.  A study on ERP selection process in SME’s 

    131. A study on Production and inventory control

    132.  A study on the role of internet in supply chains

    133.  Analysis and design of service operations using waiting lines

    134. Computer Aided Management

    135. Impact of TPM practices on production performance

    136. Effect of six sigma on manufacturing performance

    137.  A study on Quality Measurement in Service Operations

    138. Role of Artificial Intelligence in manufacturing

    139.  Aggregate Planning and Master Production Schedule

    PROJECT TOPICS RELATED TO BANKING MANAGEMENT 

    140.  Analysis of SARFESAI Act on NPAs on banks

    141. Mergers and Acquisitions in Indian banks

    142. Securitisation in Indian banks

    143. Study of Management of NPAs in SBI Bank (any bank)- strategiesfor Recovery

    144. Risk Management in Indian Banks

    145. Project finance management services by banks

    146.  A Case study of Merchant banking services by banks

    147.Financial Performance (analysis) of banks - by Financial statementanalysis like ratio analysis, trend analysis, Balance sheet analysis forthe last five years

    148. Study of Investment and Portfolio management services

    149. A Case Study Of Selected Banks In Public & Private SectorOperating In India With reference to Products and Services

  • 8/20/2019 Smu Mba-project Guidelines

    13/13

    150. A study on Asset- Liability Management using Gap analysis(sophisticated techniques can also be used, provided if branches areusing)

    151.

    Study of Retail Banking products and services-Customer satisfactionat branch

    a. Study of retail liability products such as depositsb. Study of Retail asset products such as loans, overdrafts inbranches

    152. Study of Working capital Management in Indian banks

    153. Impact of internet banking system or Impact of Technology on Indianbanks

    154.  An appraisal of Institutional banking services to SME sector

    155. Study on Credit risk management practices in banks

    156. Ratio analysis (comparative study) of SBI & ICICI bank (any twobanks)

    157. Performance of EXIM bank –products and services

    158. Forfaiting and Factoring services by Banks

    159.  A study on Foreign exchange risk exposure in banks