smartplant3dmathandl_taylorcole

Upload: flor-de-maria-suclupe

Post on 03-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 smartplant3dmathandl_taylorcole

    1/16

    SmartPlant3D

    Materials Handling

    Taylor D. ColeTaylor D. ColeVice President, IntergraphVice President, Intergraph

    Global Metals & Mining IndustryGlobal Metals & Mining Industry

  • 7/29/2019 smartplant3dmathandl_taylorcole

    2/16

    676

    872

    2007 2015

    35

    44

    5466

    2007 2012 2017 2022

    19

    26

    33 38

    2007 2012 2017 2022

    844

    1136

    1421 1624

    2007 2012 2017 2022

    Global Outlook - Commodities

    Source: Rio Tinto May and July 2008. Million MT per annum demand forecast.

    Global Seaborne Iron Ore Global Copper

    Global Aluminum Global Seaborne Coal

    2 X 2 X

    2 X 1.3X

  • 7/29/2019 smartplant3dmathandl_taylorcole

    3/16

    Materials Handling Problem

    Time to Market Solution: Work-sharing Skilled Resources

    Higher Productivity and Qualityfor Same Hours

    Re-use of Design

    Reduce Interfaces and Re-work

    Supply Chain Efficiency

    Vendor Integrated

    Problem

    2008 2015

    Produ

    ction

    Time to

    Market

    Demand

    Supply

    Enablers:

    Technology: Intergraph SmartPlant Enterprise

    Workflow: Front-end Loaded and Rule Based

    Standardisation: Intelligent Re-usable Catalogue Leverage: Synergies with Other Industries

    Accuracy: Total Installed Schedule and Cost

    Optimise: Layout, Pre-assembly, Design Stds Safety: Reviews: Hazop, Constructability, O&M

    Knowledge: Asset Lifecycle and Re-use

    Benefits:

  • 7/29/2019 smartplant3dmathandl_taylorcole

    4/16

    4

    Business Values for Change

    over 80% of a projectover 80% of a projects total cost are committed withins total cost are committed withinthe first 20% of the total projectthe first 20% of the total projects design times design time

    Profit

    Time

    FasterStartup

    TraditionalStartup

    CapitalCostSavings

    Faster

    Profitability

    Increased

    Profit

    TraditionalProjectCost/BreakevenCurve

    DigitalPlantProjectCost/BreakevenCurve

    Co

    st

    Reduced

    CapitalSpend

    CapitalCostSavings

    ConceptualDesign

    DetailedDesign

    Fabrication &Construction

    Commission& Test

    Plant Operations & Maintenance

    According to a Construction Industry Institute studyof 53 major projects, projects which included the most efforton conceptual plant studies averaged:

    20% Lower Engineering costs39% Schedule reduction15% Plant Utilization/ Capacity increase

    compared to projects that spent the least effort on conceptual

    plant design studies as part of pre-project planning.

    Plant Hand-over

    Plant Lifecycle

  • 7/29/2019 smartplant3dmathandl_taylorcole

    5/16

    Intelligent DesignReduce Time on Task

    Comparison

    Microstation

    Old technology [1980s]

    Fantastic change for the time

    PDS

    Newer technology Faster design time improvement over Microstation

    SmartPlant3D

    Latest technological advance

    Data base engineering

    Significant improvement over PDS in design time

    Improved integration between disciplines

    http://../MicroStation-PDS-SP3D.avi
  • 7/29/2019 smartplant3dmathandl_taylorcole

    6/16

    Proof of Concept ProjectBackground / Purpose / Status

    Problem industry demand andresource supply needs a stepchange solution

    Document centric (2D) projectdelivery compared to ProcessIndustries

    Proof of Concept initiates thestep change

    Industry requirements specified

    Solution concepts established and tested

    Initiated solution configuration anddevelopment

    Concept proved - confidence to continue Pilot project for project readiness

    objective

  • 7/29/2019 smartplant3dmathandl_taylorcole

    7/16

    SmartPlant 3D Materials HandlingBenefits for Projects and Assets

    Schedule

    Standardisation

    Workflow

    Interfaces

    Productivity

    Cost

    Optimisation

    Re-use

    Wastage

    Rework

    Risk

    Work-share

    Tracking

    Forecasting

    Integration

    Safety

    Reviews

    Pre-assembly

    Simulation

    Education

    Knowledge Management and Re-use

    Handover and Asset Lifecycle

  • 7/29/2019 smartplant3dmathandl_taylorcole

    8/16

    SmartPlant 3D Materials HandlingConveyor Design Workflow

    Curre

    ntScenari

    oPro

    file&Dat

    aShee

    tDrawing

    Solu

    tion

    Conveyor

    &Pa

    rtsCatalo

    gueS

    pecificatio

    n

  • 7/29/2019 smartplant3dmathandl_taylorcole

    9/16

    SmartPlant 3D Materials HandlingChute Catalogue Workflow

    Curre

    ntScenari

    oCh

    uteArran

    gement

    Drawing

    Solut

    ion3D

    iDesi

    gntoCat

    alogu

    eandRe-u

    se

  • 7/29/2019 smartplant3dmathandl_taylorcole

    10/16

    SmartPlant 3D Materials HandlingBenefits for Projects and Assets

    Schedule

    Standardisation

    Workflow

    Interfaces

    Productivity

    Cost

    Optimisation

    Re-use

    Wastage

    Rework

    Risk

    Work-share

    Tracking

    Forecasting

    Integration

    Safety

    Reviews

    Pre-assembly

    Simulation

    Education

    Knowledge Management and Re-use

    Handover and Asset Lifecycle

    http://../Final%201024%20x%20768%2030fps%20Take%20IV.m2v
  • 7/29/2019 smartplant3dmathandl_taylorcole

    11/16

    SmartPlant 3D Materials HandlingKnowledge Management & Re-use

    Critical Information Transfer

    Design

    Operate

    Commission

    Build

    Critical Feedback Loop

    Critical Feedback Loop

    Critical Information Transfer

    Critical Information Transfer

  • 7/29/2019 smartplant3dmathandl_taylorcole

    12/16

    SmartPlant 3D Materials HandlingKnowledge Management & Re-use

    Design

    Operate

    Commission

    Build

    SmartPlant Foundation

    Application Integration

    Engineering Data Handover

    Engineering InformationManagement

  • 7/29/2019 smartplant3dmathandl_taylorcole

    13/16

    SmartPlant 3D Materials HandlingHandover & Asset Lifecycle

    By establishing a holisticstrategy for plant assetlifecycle management,Owner Operators can

    manage their assets forshort and long termprofitability rather than

    the traditional sweat theassets strategies

    Measurable Value

    Expedited Commissioning & Startup (2-3% of TIC) - through expedited commissioning & start-upresulting from as-built data validation, transformation & loading into operating systems

    Minimized Plant As-Built Verification (1-2% of TIC annually) - through auditable plant assetinformation management of change

    Reduced Production Loss (0.2-0.5% of revenue annually) through elimination of unplannedoutages as a result of decisions based upon inadequate / incomplete plant data

    Increased Turnaround Intervals (20% annually) Through application of reliability in design andasset performance management principals

  • 7/29/2019 smartplant3dmathandl_taylorcole

    14/16

    SmartPlant EnterpriseFinancial Benefits

    Base W/ SPE ChangeSales (Revenue) 1,000 1,020 +2.0%

    Less:

    Operating Cost

    Depreciation

    - 500

    - 100

    - 494.7

    - 85

    -3.0%

    -15%Operating Profit 400 440.3 +10.1%

    Base Scenario Savings / Revenue Improvement w/ SPE

    CAPEX Savings: -15% - Initial and Depreciation

    OPEX Savings: -3% annually

    Revenue Increase: +2.0% annually and 7 to 10% earlierproject completion (approximately +20% revenue increase in Y1

    on a three year CAPEX project life).

  • 7/29/2019 smartplant3dmathandl_taylorcole

    15/16

    SmartPlant 3D Materials HandlingNext Steps

    Pilot Project Australia

    Q4 2008

    BETA Version

    Q1 / Q2 2009

    Commercial Version SmartPlant3D v9 Release

  • 7/29/2019 smartplant3dmathandl_taylorcole

    16/16

    Materials Handling Solution

    Questions?

    Taylor D. Cole

    Vice President, Intergraph Global Metals and Mining

    [email protected]

    mailto:[email protected]:[email protected]