smartplant3dmathandl_taylorcole
TRANSCRIPT
-
7/29/2019 smartplant3dmathandl_taylorcole
1/16
SmartPlant3D
Materials Handling
Taylor D. ColeTaylor D. ColeVice President, IntergraphVice President, Intergraph
Global Metals & Mining IndustryGlobal Metals & Mining Industry
-
7/29/2019 smartplant3dmathandl_taylorcole
2/16
676
872
2007 2015
35
44
5466
2007 2012 2017 2022
19
26
33 38
2007 2012 2017 2022
844
1136
1421 1624
2007 2012 2017 2022
Global Outlook - Commodities
Source: Rio Tinto May and July 2008. Million MT per annum demand forecast.
Global Seaborne Iron Ore Global Copper
Global Aluminum Global Seaborne Coal
2 X 2 X
2 X 1.3X
-
7/29/2019 smartplant3dmathandl_taylorcole
3/16
Materials Handling Problem
Time to Market Solution: Work-sharing Skilled Resources
Higher Productivity and Qualityfor Same Hours
Re-use of Design
Reduce Interfaces and Re-work
Supply Chain Efficiency
Vendor Integrated
Problem
2008 2015
Produ
ction
Time to
Market
Demand
Supply
Enablers:
Technology: Intergraph SmartPlant Enterprise
Workflow: Front-end Loaded and Rule Based
Standardisation: Intelligent Re-usable Catalogue Leverage: Synergies with Other Industries
Accuracy: Total Installed Schedule and Cost
Optimise: Layout, Pre-assembly, Design Stds Safety: Reviews: Hazop, Constructability, O&M
Knowledge: Asset Lifecycle and Re-use
Benefits:
-
7/29/2019 smartplant3dmathandl_taylorcole
4/16
4
Business Values for Change
over 80% of a projectover 80% of a projects total cost are committed withins total cost are committed withinthe first 20% of the total projectthe first 20% of the total projects design times design time
Profit
Time
FasterStartup
TraditionalStartup
CapitalCostSavings
Faster
Profitability
Increased
Profit
TraditionalProjectCost/BreakevenCurve
DigitalPlantProjectCost/BreakevenCurve
Co
st
Reduced
CapitalSpend
CapitalCostSavings
ConceptualDesign
DetailedDesign
Fabrication &Construction
Commission& Test
Plant Operations & Maintenance
According to a Construction Industry Institute studyof 53 major projects, projects which included the most efforton conceptual plant studies averaged:
20% Lower Engineering costs39% Schedule reduction15% Plant Utilization/ Capacity increase
compared to projects that spent the least effort on conceptual
plant design studies as part of pre-project planning.
Plant Hand-over
Plant Lifecycle
-
7/29/2019 smartplant3dmathandl_taylorcole
5/16
Intelligent DesignReduce Time on Task
Comparison
Microstation
Old technology [1980s]
Fantastic change for the time
PDS
Newer technology Faster design time improvement over Microstation
SmartPlant3D
Latest technological advance
Data base engineering
Significant improvement over PDS in design time
Improved integration between disciplines
http://../MicroStation-PDS-SP3D.avi -
7/29/2019 smartplant3dmathandl_taylorcole
6/16
Proof of Concept ProjectBackground / Purpose / Status
Problem industry demand andresource supply needs a stepchange solution
Document centric (2D) projectdelivery compared to ProcessIndustries
Proof of Concept initiates thestep change
Industry requirements specified
Solution concepts established and tested
Initiated solution configuration anddevelopment
Concept proved - confidence to continue Pilot project for project readiness
objective
-
7/29/2019 smartplant3dmathandl_taylorcole
7/16
SmartPlant 3D Materials HandlingBenefits for Projects and Assets
Schedule
Standardisation
Workflow
Interfaces
Productivity
Cost
Optimisation
Re-use
Wastage
Rework
Risk
Work-share
Tracking
Forecasting
Integration
Safety
Reviews
Pre-assembly
Simulation
Education
Knowledge Management and Re-use
Handover and Asset Lifecycle
-
7/29/2019 smartplant3dmathandl_taylorcole
8/16
SmartPlant 3D Materials HandlingConveyor Design Workflow
Curre
ntScenari
oPro
file&Dat
aShee
tDrawing
Solu
tion
Conveyor
&Pa
rtsCatalo
gueS
pecificatio
n
-
7/29/2019 smartplant3dmathandl_taylorcole
9/16
SmartPlant 3D Materials HandlingChute Catalogue Workflow
Curre
ntScenari
oCh
uteArran
gement
Drawing
Solut
ion3D
iDesi
gntoCat
alogu
eandRe-u
se
-
7/29/2019 smartplant3dmathandl_taylorcole
10/16
SmartPlant 3D Materials HandlingBenefits for Projects and Assets
Schedule
Standardisation
Workflow
Interfaces
Productivity
Cost
Optimisation
Re-use
Wastage
Rework
Risk
Work-share
Tracking
Forecasting
Integration
Safety
Reviews
Pre-assembly
Simulation
Education
Knowledge Management and Re-use
Handover and Asset Lifecycle
http://../Final%201024%20x%20768%2030fps%20Take%20IV.m2v -
7/29/2019 smartplant3dmathandl_taylorcole
11/16
SmartPlant 3D Materials HandlingKnowledge Management & Re-use
Critical Information Transfer
Design
Operate
Commission
Build
Critical Feedback Loop
Critical Feedback Loop
Critical Information Transfer
Critical Information Transfer
-
7/29/2019 smartplant3dmathandl_taylorcole
12/16
SmartPlant 3D Materials HandlingKnowledge Management & Re-use
Design
Operate
Commission
Build
SmartPlant Foundation
Application Integration
Engineering Data Handover
Engineering InformationManagement
-
7/29/2019 smartplant3dmathandl_taylorcole
13/16
SmartPlant 3D Materials HandlingHandover & Asset Lifecycle
By establishing a holisticstrategy for plant assetlifecycle management,Owner Operators can
manage their assets forshort and long termprofitability rather than
the traditional sweat theassets strategies
Measurable Value
Expedited Commissioning & Startup (2-3% of TIC) - through expedited commissioning & start-upresulting from as-built data validation, transformation & loading into operating systems
Minimized Plant As-Built Verification (1-2% of TIC annually) - through auditable plant assetinformation management of change
Reduced Production Loss (0.2-0.5% of revenue annually) through elimination of unplannedoutages as a result of decisions based upon inadequate / incomplete plant data
Increased Turnaround Intervals (20% annually) Through application of reliability in design andasset performance management principals
-
7/29/2019 smartplant3dmathandl_taylorcole
14/16
SmartPlant EnterpriseFinancial Benefits
Base W/ SPE ChangeSales (Revenue) 1,000 1,020 +2.0%
Less:
Operating Cost
Depreciation
- 500
- 100
- 494.7
- 85
-3.0%
-15%Operating Profit 400 440.3 +10.1%
Base Scenario Savings / Revenue Improvement w/ SPE
CAPEX Savings: -15% - Initial and Depreciation
OPEX Savings: -3% annually
Revenue Increase: +2.0% annually and 7 to 10% earlierproject completion (approximately +20% revenue increase in Y1
on a three year CAPEX project life).
-
7/29/2019 smartplant3dmathandl_taylorcole
15/16
SmartPlant 3D Materials HandlingNext Steps
Pilot Project Australia
Q4 2008
BETA Version
Q1 / Q2 2009
Commercial Version SmartPlant3D v9 Release
-
7/29/2019 smartplant3dmathandl_taylorcole
16/16
Materials Handling Solution
Questions?
Taylor D. Cole
Vice President, Intergraph Global Metals and Mining
mailto:[email protected]:[email protected]