SMALL THINGS IN BLASTING MAKE ALL THE DIFFERENCE Within the blasting process, the areas that can be optimised and improved are small and easy to dismiss. Brent Buffham explains why quarry operators should take extra notice of the little things. T here aren’t too many places left within the blasting process that haven’t been investigated to the nth degree. The optimisation and economics of blasting and the downstream processes directly affected by poor or uneconomic blasting practices have become areas of importance. The unsettling fact that many drilling and blasting contractors and clients of blasting services realise the main areas that can be optimised, however, generally does not enact their knowledge. In a world that has the “continuous improvement” mindset, we must ask ourselves: “How much is actually being improved?” More importantly, we should also be asking: “How is it being monitored and implemented?” Blast results are the responsibility of every process from initial resource planning to the final excavation of the blast muck pile. These can be segregated into simplified categories, including preparation, design, implementation, drilling, priming, loading, stemming, timing, firing and extraction. The above categories are areas in which Maxam endeavours to assist its clients. We can all understand that in order to achieve a professional job, eg pouring a house pad, the preparation must be excellent. This is also true in blasting. Achieving great blast results with poor preparation is difficult. Bench preparation in terms of sheeting, access for equipment and personnel must be adequate with the preference of 14 Quarry February 2011 excellence. Preparation should also consider the successive processes so that the good intentions can be realised. MAKE OR BREAK DESIGN Design plays a crucial part in blasting, as we all know. It is an essential attribute of the blasting process that can make or break the best intentions. Not paying attention to concerning conditions that present can lead to inadequacies in the distribution of explosion energy and thus poor blast results. Maxam maintains site-specific parameter sets for all total service sites, allowing its technical service team to provide clients with insight to what has been and what may result should optimisations be trailed. The key attributes of Maxam’s total service are laser profiling and bore tracking (Figures 1 and 2). These two alone can vastly improve site economics and blast results, like fragmentation, throw, toe movement, powder factor, confinement, environmental compliance and more. With all processes in our modern era, we must concern ourselves with safety and how it affects us. The implementation must be considered in terms of three aspects: 1. Necessity. 2. Adequacy. 3. Safety. If the above are unanswerable, we must ask ourselves why we are implementing it. To be confident with the expectations of results and downstream effects, our actions require reasons for their implementation. PRIMING AND LOADING Drilling and drillers are vital purveyors of information that cannot be gleaned from any other process. To underplay the importance of drilling is to expect poor results. Maxam has the ability to provide many forms of “drill log recording” tools. These tools, when utilised, can determine the further actions required to turn potential poor results into good, even excellent, results. It is the small things that make the difference in blasting, and a contributing factor for product columns being discovered in the blasted muck piles is inadequate priming. Priming practices (Figure 3) such as “pulling” the priming unit into competent product is vital with pumpable product ranges such as Maxam’s RIOFLEX 10000 bulk product. Loading practices (Figure 4) are aspects that are sometimes not focused upon; this produces an air of confusion amongst clients Basalt Quarry A - example Main Working Pit Excavation - 01/01/11 Z X Y 1 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 Figure 1. An isometric profile of bore tracks in a basalt quarry.

Upload: brent-buffham

Post on 19-Jan-2016

24 views

Category:

Documents


2 download

DESCRIPTION

Within the blasting process, the areas that can be optimised and improved are small and easy to dismiss. Brent Buffham explains why quarry operators should take extra notice of the little things.

TRANSCRIPT

Page 1: Small Things in Blasting Make All the Difference

Small thingS in blaSting make all the differenceWithin the blasting process, the areas that can be optimised and improved are small and easy to dismiss. Brent Buffham explains why quarry operators should take extra notice of the little things.

t here aren’t too many places left within the blasting process that haven’t been investigated to the nth degree.

The optimisation and economics of blasting and the downstream processes directly affected by poor or uneconomic blasting practices have become areas of importance.

The unsettling fact that many drilling and blasting contractors and clients of blasting services realise the main areas that can be optimised, however, generally does not enact their knowledge. In a world that has the “continuous improvement” mindset, we must ask ourselves: “How much is actually being improved?” More importantly, we should also be asking: “How is it being monitored and implemented?”

Blast results are the responsibility of every process from initial resource planning to the final excavation of the blast muck pile. These can be segregated into simplified categories, including preparation, design, implementation, drilling, priming, loading, stemming, timing, firing and extraction.

The above categories are areas in which Maxam endeavours to assist its clients. We can all understand that in order to achieve a professional job, eg pouring a house pad, the preparation must be excellent.

This is also true in blasting. Achieving great blast results with poor preparation is difficult. Bench preparation in terms of sheeting, access for equipment and personnel must be adequate with the preference of

14 Quarry February 2011

excellence. Preparation should also consider the successive processes so that the good intentions can be realised.

MAKE OR BREAK DESIGNDesign plays a crucial part in blasting, as we all know. It is an essential attribute of the blasting process that can make or break the best intentions. Not paying attention to concerning conditions that present can lead to inadequacies in the distribution of explosion energy and thus poor blast results.

Maxam maintains site-specific parameter sets for all total service sites, allowing its technical service team to provide clients with insight to what has been and what may result should optimisations be trailed.

The key attributes of Maxam’s total service are laser profiling and bore tracking (Figures 1 and 2). These two alone can vastly improve site economics and blast results, like fragmentation, throw, toe movement, powder factor, confinement, environmental compliance and more.

With all processes in our modern era, we must concern ourselves with safety and how it affects us. The implementation must be considered in terms of three aspects:1. Necessity.2. Adequacy.3. Safety.

If the above are unanswerable, we must ask ourselves why we are implementing it. To be confident with the expectations of results and downstream effects, our actions require reasons for their implementation.

PRIMING AND LOADINGDrilling and drillers are vital purveyors of information that cannot be gleaned from any other process. To underplay the importance of drilling is to expect poor results. Maxam has the ability to provide many forms of “drill log recording” tools. These tools, when utilised, can determine the further actions required to turn potential poor results into good, even excellent, results.

It is the small things that make the difference in blasting, and a contributing factor for product columns being discovered in the blasted muck piles is inadequate priming. Priming practices (Figure 3) such as “pulling” the priming unit into competent product is vital with pumpable product ranges such as Maxam’s RIOFLEX 10000 bulk product.

Loading practices (Figure 4) are aspects that are sometimes not focused upon; this produces an air of confusion amongst clients

Customer: Basalt Quarry A - exampleSurvey Location: Main Working Pit Exavation

Face Name:Station ID:Operator:

Survey Date:File:

F01

Basalt Quarry ST01-F01.nez

Joe BloggsST01 -East Location

01/01/10

Number of Data Points:Number of Boreholes:Pre-Drilled Boreholes:

Face Length:Left Marker Offset:

Right Marker Offset:Rock Volume:

Total Vol (incl back rows):

99219051.0 (m)0.0 (m)0.0 (m)2289.7 (m)32289.7 (m)3

Isometric View of Profiles

Basalt Quarry A - exampleMain Working Pit Excavation - 01/01/11

Z

X

Y

1

1918

1716

1514

1312

1110

98

76

54

32

Figure 1. An isometric profile of bore tracks in a basalt quarry.

Page 2: Small Things in Blasting Make All the Difference

and operators. It is not acceptable practice to just “stick it in the hole”; loading is a skill that impacts on blast results.

Maxam’s RIOFLEX range is robust and reliable in the harshest conditions but, sooner or later, poor loading will break the safeguards that Maxam’s stringent manufacturing protocols have put in place.

Stemming is often considered to be one of the least important aspects of the blasting process, more so in the mining industry where environmental concerns are often reduced. However, what type of stemming and how the practice is conducted can make the difference. Various stemming types can be used and each has its appropriate reason but the best stemming is considered to be crushed angular rock, around 10 to 14 per cent of the hole diameter. The speed of stemming practices can greatly affect the performance of containment. It is important to ensure the stemming is placed in the hole with enough time to settle without bridging. Go too fast and you can expect ejection and loss of explosion energy. Stemming can also add value to your blast; the right stemming can reduce powder factors, increase containment, reduce environmental readings and increase fragmentation, all which have flow-on economic improvements that cannot be ignored.

Timing can assist with blast performance and requires due attention. Not too much difference is made if the previous steps have been poorly implemented.

SPECIAL REPORT - DRILL AND BLAST

Quarry February 2011 15

Profile PrintoutBasalt Quarry A - example

Main Working Pit ExcavationUnedited Profile for Borehole 15

Survey Date 01/01/10

Profile Location:

Distance from LM: (m) 42.00

Offset from Ref Line: (m) -0.87

Borehole Collar:

Northing (m) 1073.05 (m)

Easting (m) 5025.98 (m)

Elevation (m) 111.53 (m)

Hole Diameter 76 mm

Hole Length 14.0 m

Stemming 3.0 m

Back Fill: 0.0 m

Subdrill 1.0 mHole Angle Varies

Profile Cross-Section 43.9 m²

Borehole Volume: 117.4 m3

Minimum Burden 2.8 m @10.0 m

Maximum Burden 3.7 m @3.0 m

Ave Burden 3.2 m

Nominal Powder Factor: 0.000 kg/m3

0.000 kg/ton

Operator: Joe Bloggs

Depth m True Burden m Offset m

1.0 3.5 0.0

2.0 3.8 0.0

3.0 3.7 0.0

4.0 3.6 0.0

5.0 3.4 -0.1

6.0 3.0 -0.1

7.0 3.1 -0.2

8.0 3.0 -0.3

9.0 2.8 -0.4

10.0 2.8 -0.4

11.0 3.3 -0.5

12.0 Undefined 0.0

12.7 Undefined 0.0

0 2m Scale 1:120.3

* The above diagram is an overlay (combination) of two seperate printouts

BA FEDC

Issues related to the loading of blast holes.

(A) Optimal hose retraction - hose 300mm in product at all times (B) Hose retraction speed too fast - deflagration to low order detonation of the decoupled product column (C) Hose retraction speed too slow - inadequate explosive amount, hose placement effectively reduces the diameter of the blast hole

(D) Result of figure “C” - foreign material is “sucked” into the product column, decoupling occurs - possible low order detonation(E) Floating primer – down line has some tension, as it is suspended in product - misleading interpretation of correct loading - deflagration to low order detonation(F) Tangled lead on hose due to slack lead on loading commencement or large diameter blast holes - deflagration to low order detonation

Figure 2. A profile printout of 15 boreholes in a basalt quarry.

BA GFEDC

Issues related to the priming of blast holes.

(A) Optimal bottom and top primed blast hole (B) Optimal bottom primed blast hole (C) Priming unit in decoupled product - possible deflagration (D) Priming unit is “pulled” into competent product - full order detonation

(E) Bottom priming unit in decoupled product with top priming unit in competent product - low to full order detonation(F) Priming unit partially embedded in silt or a “snagged” priming unit - deflagration to low order detonation(G) Inert material separating the product column - partial product column detonation and misfire

Issues related to the priming of blast holes.

(A) Optimal bottom and top primed blast hole. (B) Optimal bottom primed blast hole. (C) Priming unit in decoupled product - possible deflagration. (D) Priming unit is “pulled” into competent product - full order detonation.

(E) Bottom priming unit in decoupled product with top priming unit in competent product - low to full order detonation.(F) Priming unit partially embedded in silt or a “snagged” priming unit - deflagration to low order detonation.(G) Inert material separating the product column - partial product column detonation and misfire.

Figure 3. The priming of blast holes is integral in successful blasting.

Issues related to the loading of blast holes.

(A) Optimal hose retraction - hose 300mm in product at all times. (B) Hose retraction speed too fast - deflagration to low order detonation of the decoupled product column. (C) Hose retraction speed too slow - inadequate explosive amount, hose placement effectively reduces the diameter of the blast hole. (D) Result of figure “C” - foreign

material is “sucked” into the product column, decoupling occurs - possible low order detonation.(E) Floating primer – down line has some tension, as it is suspended in product - misleading interpretation of correct loading - deflagration to low order detonation.(F) Tangled lead on hose due to slack lead on loading commencement or large diameter blast holes - deflagration to low order detonation.

Figure 4. Clients and operators can be easily confused if loading practices are not given due attention.

Page 3: Small Things in Blasting Make All the Difference

SPECIAL REPORT - DRILL AND BLAST

Timing compliments the results when correctly applied in conjunction with the other blast-related aspects, if correctly implemented. Most importantly, timing is about relief! How much you allow the blast to utilise your design is entirely in timing’s realm of control, thus yours. Maxam utilises computer-aided simulations to provide the best advice.

SAFETY FACTORSFiring your blast is about safety. Simply put, if we conduct an effective blast but destroy or harm equipment or personnel, the result is forfeited. Maxam’s logistic service vehicles and blast utilities all have sirens to assist with pit clearance runs. Maxam can draft clearance procedures for your site with industry best practices in mind via our expert occupational health and safety team.

Quarry operators can improve their blasting in cost-effective ways, eg reduced level markers on active benches to help with “digging to grade” is just one way. Maxam

can implement RL markers specific to your site and with these in place, spot check floor levels, bench levels and crest lines.

The Maxam team can make a difference with advice on the small things, ie the areas for the greatest gains via optimisation and continuous improvement. Every small improvement or little correction to practices

and application of products and services can and will improve your operation economically, productively and safely. In conjunction with Maxam’s reliable and expert team, the big problems are almost small themselves.•

Brent Buffham is the technical liaison officer for Maxam Australia.

Maxam‘s technical service team can provide clients with insights on blast optimisation.