slides (set 2)

11
02/05/2018 1 Buildoffsite Buildoffsite Voice of UK Offsite Construction Business-to-business Network Membership Organisation Enabling the construction industry to deliver far greater project value

Upload: others

Post on 05-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Slides (Set 2)

02/05/2018

1

Buildoffsite

Buildoffsite

Voice of UK Offsite Construction

Business-to-business Network

Membership Organisation

Enabling the construction industry to deliver far greater project value

Page 2: Slides (Set 2)

02/05/2018

2

Buildoffsite provides opportunities

Networking

Knowledge exchange

Publications

Marketing platforms

General & sector specific advice

Events & site visits

Instigating Offsite Collaboration

Challenge the supply chain

We have shifted emphasis from: promoting offsite, to enabling offsite delivery

Supply ChainSupply Chain ClientsClients

Design- Architecture- ProductOffsite

Manufacturers

ComponentSuppliers .

Digital Capability

Lean: Manufacturing

Site Process& Logistics

GovernmentEngagement

Alignment & Steering

Across the value chain

Public Sector

Private SectorSkills &Apprenticeships

Contractors

Page 3: Slides (Set 2)

02/05/2018

3

Action SustainabilityApply Structure

ArupAtlas Industries

BLPBRE

Bryden WoodBuild InsightCoBuilder

Design Automation Systems (DASys)

Ela8Evolusion

Geraghty TaylorLloyd’s register

LucideonMEPS waterModularize

Mott MacDonaldNPS GroupTDS GroupTotal Flow

Trimble Tekla

AquathermCaledonian Modular

Construction Specialties

C-Probe SystemsConnect2 Cleanrooms

Elements EuropeElliott Group

EnegroupEurobond

HowickJ&P/Structex

KingspanLegal & General

HomesMcAvoy

NG BaileyNomencaOrmandyPolypipeProtrade

Premier ModularShay MurtaghVision Modular

Yorkon

Balfour BeattyCostain

Crest NicholsonGraham Hochtief

KierLaing O’Rourke

Sir Robert McAlpineSkanska

Willmott Dixon

Department for Business Energy & Industrial StrategyDepartment for Communities &

Local GovernmentConstruction

Leadership CouncilHealth & Safety

ExecutiveGreater London

AuthorityInvest Northern

IrelandEnterprise Ireland

Anglian WaterASDA

AstraZenecaB&Q

Cherwell D.C.Circle Health

GlaxoSmithKlineHeathrow

HS2John Lewis

KFCLegal & General

Marks & Spencer’sMet. Police

Ministry of JusticeMoat homes

Northumbrian WaterSainsbury’s

Scottish WaterTfL/London

UndergroundUK Power Networks

United UtilitiesUniversity of Cambridge

Yorkshire Water

DESIGNERS & SERVICESMANUFACTURERS

/SUPPLIERS

CONTRACTORSCLIENTS GOV & REGS

Buildoffsite membership

Three levels for delivering valueDirection Group Meetings

Thought Leadership, Networking & Ideas Exchange

Hubs: Sector / Interest Group focusedMarket led, problem solving, action driven.Collaboration across the value chain,

Client Challenges: Specific project or technical challenge. Buildoffsite connects client needs with innovators

and facilitates improvement.

Page 4: Slides (Set 2)

02/05/2018

4

Hubs are a vehicle to deliver membership value:

The voice of Clients is crucial Led by ambitious Members Facilitated by Buildoffsite

Focused on: Collaboration Innovation Delivering greater Construction Value

EnablingHubs

DevelopingMarket Hubs

Established Market Sector Hubs

Leadership Group

Executive Group

Water

Pharma

Manufacturing

DigitalBuild

Housing

Education

Rail

Refurb

Structure

Skills

Page 5: Slides (Set 2)

02/05/2018

5

Removing Obstacles to Offsite

Giving Confidence to: Clients, Investors, Lenders and Insurers.

Assured processes for: Design, Manufacturing and Site Installation

Warranty of Process and Product for 60 yearsPlans for 100 year warranty.

Owners

Approved providers

Owners Supporters

Page 6: Slides (Set 2)

02/05/2018

6

Buildoffsite’s Productivity Goals:Construction 2025

Lower costs33%

Improvement in exports 50%

Faster delivery50%

Lower emissions 50%

People

Smart

Sustainable

Growth

Leadership

What else can we do together?

Work with other industry innovators.

Get involved to shape the future for your chosen markets.

Set new standards for construction.

Our Challenge to You….

Page 7: Slides (Set 2)

02/05/2018

7

Manufacturing Productivity vs. Construction Productivity

Event Calendar 2018

NOVEMBER20&21 – OFFSITE CONSTRUCTION SHOW

DECEMBER9 - Direction Group Meeting & Lunch

UPCOMING EVENTS AND UNDER DEVELOPMENT• GLA networking event• Pharma Hub (TBC)• KPMG & McKinsey event• ShayMurtagh factory tour• RNLI manufacturing plant tour• Metsec tour• McAvoy• Hochtief• Encon• Nomenca Site visit –end to end

process • Visit to Ross-shire Engineering

JANUARYPharma Hub Priority Planning (TBC)

FEBRUARY

27 – Direction Group Dinner28 – DG Meeting, Skills, TDS Dudley

MARCH

7 – Manufacturing Hub Launch (TBC) 14 – Housing Hub Procurement Models (TBC)

APRIL

11 – Newcastle Housing Hub & Direction Dinner12 – Student Accommodation & HE DG Meeting

MAYWater Hub (TBC)Director Level Conference22 – Member to member event hosted by Arup, London

JUNE26 – L&G Modular (TBC) Dinner Leeds/Bradford27 - Direction Group Meeting NG Bailey

JUNE26 – L&G Modular (TBC) Dinner Leeds/Bradford27 - Direction Group Meeting NG Bailey

AUGUST28 - Direction Group Dinner29 - Direction Group Meeting, Polypipe

OCTOBER30 - Direction Group Dinner31 - Direction Group Meeting

Page 8: Slides (Set 2)

02/05/2018

8

Health & Safety in Construction 2015-16

48 deaths on construction sites 79,000 work related illnesses 66,000 non-fatal injuries

20% falls from height

22 million work days lost 27 deaths in manufacturing – still too many but nearly half that of a

construction site

UKCES says so too…

Page 9: Slides (Set 2)

02/05/2018

9

Examples: North West Cambridge Development

Same time onsite using offsite solutions

Using traditional building systems

Page 10: Slides (Set 2)

02/05/2018

10

Factory in a Box

Defect-free pharmaceuticals facility built by 8 ex-Gurkhas using ‘factory in a box’ – IP free

Innovation - Dalston Lane project – Ramboll Tallest CLT building & by volume the largest

CLT project globally

121 unit residential development in London

Saved 2,400 tonnes of carbon, compared to an equivalent concrete frame

Its 3,852 cubic metres of CLT will entirely make up the external, party/core walls, floors & stairs.

High Speed 1 and Crossrail pass underneath, so CLT perfect for lighter construction weight, enabled smaller foundations & added two stories on to the building.

Page 11: Slides (Set 2)

02/05/2018

11

“The only constant in the

future is change’’

Bill Gates