Page 1: Slide dredging

Training  on  Dredging  and  Reclama0on  Work  

•  METHOD  DREDGING  •  Hotel  Grand  Mercure    16-­‐21  Juni  2014  •  by  :  CAPT.  BENI  HERMAWAN  M.  MAR  

Page 2: Slide dredging

METHODE DREDGING

METHODE  DREDGING  CLAMSHELL  METHODE  DREDGING  CUTTER  SUCTION  METHODE   DREDGING   TRAILLING   SUCTION   HOPPER  DREDGER  

Page 3: Slide dredging

METHODE DREDGING CLAMSHELL

1.  PENGENALAN  ALAT  –    ALAT  PADA  KAPAL  CLAMSHELL    

2.  PERSIAPAN  PEKERJAAN  PENGERUKAN  PADA  KAPAL  CLAMSHELL  

3.  PELAKSANAAN  PENGERUKAN  PADA  KAPAL  CLAMSHELL  

4.  PELAKSANAAN  PEMBUANGAN  DI  DUMPING  AREA  

Page 4: Slide dredging

1.  PENGENALAN  ALAT  –  ALAT  PADA  KAPAL  CLAMSHELL  

•  CRANE  YANG  DIGUNAKAN  UNTUK  MENAIK  TURUNKAN  GRAB   DAN   MENGGERAKAN   GRAB   KE   KANAN   DAN   KE  KIRI  

•  WIRE   ROPE   PADA   CRANE   YANG   DIGUNAKAN   UNTUK  MENGANGKAT  GRAB  

•  RUANG   OPERATOR   UNTUK   MENGONTROL   DAN  MENGENDALIKAN  JALANNYA  PENGERUKAN  

•  MESIN  DREDGER  SEBAGAI  POWER  UNTUK  CRANE  •  MESIN   GENERATOR   UNTUK   KELISTRIKAN   DAN  

PENERANGAN  DI  KAPAL  •  GRAB   YANG   DIGUNAKAN   UNTUK   MENGAMBIL  

MATERIAL  KERUK  •  SPUD   DI   GUNAKAN   UNTUK   MENAHAN   KAPAL  

CLAMSHEL  AGAR  TIDAK  BERGERAK  KARENA  ARUS  DAN  GELOMBANG  

Page 5: Slide dredging

•  KAPAL  SPLIT  BARGE  YANG  MERUPAKAN  ALAT  BANTU  DARI  KAPAL  CLAMSHELL    

 •  KAPAL   SPLIT   BARGE   MEMPUNYAI   HOPPER  

YANG   FUNGSINYA   UNTUK   MENAMPUNG  MATERIAL  KERUK  

•  KAPAL   SPLIT   BARGE   DILENGKAPI   DENGAN  HYDRAULIC   UNTUK   MEMBUKA   PINTU  HOPPER   DAN   DAPAT   BERGERAK   SENDIRI  (SELF  PROPELLER)  

Page 6: Slide dredging

2.  PERSIPAN  PEKERJAAN  PENGERUKAN  PADA  KAPAL  CLAMSHELL  

•  PENGECEKAN  DAN  LAIK  OPERASI  APARAT  KERUK  SEBELUM  DI  GUNAKAN  

•  PETA  BATIMETRY  PREDREDGE  SURVEY  

•  SARANA  KOMUNIKASI  DAN  TRANSPORTASI  LAUT  

•  PEMBUATAN  TANDA  KERUK  DI  DARAT    

•  SETTING  HYDRO  PRO  DI  KAPAL  UNTUK  LOKASI  KERUK  

•  SURAT  –  SURAT  IZIN  KERJA  KERUK  DAN  IZIN  OLAH  GERAK  KAPAL  

 

Page 7: Slide dredging

PERSIPAN  PEKERJAAN  PENGERUKAN  PADA  KAPAL  SPLIT  BARGE  (  SB  )  

•  CEK  ENGINE  DAN  HYDRAULIC  LAKUKAN  TEST  ENGINE  DAN  RUDDER  

•  TEST  BUKA  TUTUP  HOPPER    

•  BUAT   HEADING   COURSE   MENUJU   DUMPING   AREA   DAN   PLOT   POSISI  DUMPING  AREA  DI  PETA  LAUT  

•  SETTING  PADA  GPS  UNTUK  HEADING  DAN  LOKASI  DUMPING  

•  PETA  LOKASI  KERJA  

Page 8: Slide dredging

3.  PELAKSANAAN  PENGERUKAN  PADA  KAPAL  CLAMSHELL  

•  KAPAL   DIPOSISIKAN   PADA   LOKASI   KERUK  DENGAN  BANTUAN  TUGBOAT  DAN  SURVEYOR  

•  SPUD  DITURUNKAN  UNTUK  MEMPERTAHANKAN  POSISI  KAPAL  

•  KAPAL   SPLIT   BARGE   MERAPAT   DI   LAMBUNG  KAPAL  CLAMSHELL  DAN  DIIKAT  KUAT  

 

 

   

Page 9: Slide dredging

•  GRAB   DITURUNKAN   KE   LAUT   DENGAN   CRANE  UNTUK  MENGAMBIL  MATERIAL  KERUK  

•  MATERIAL  KERUK  DITAMPUNG  DI  HOPPER  SPLIT  BARGE  SAMPAI  PENUH  

•  MATERIAL   YANG   DAPAT   DIKERUK   BERUPA  TANAH,  TANAH  LIAT,  LUMPUR  DAN  PASIR  

 •  KADAR  LUMPUR  DAN  SITUSOIL    

Page 10: Slide dredging

•  HYDRO   PRO   YANG   DIGUNAKAN  PADA   KAPAL   CLAMSHELL   UNTUK  KEAKURATAN  LOKASI  PENGERUKAN  

•  GPS   PADA   KAPAL   SPLIT   BARGE  UNTUK   MEMUDAHKAN   MENUJU  DUMPING   AREA   DAN   KOORDINAT  LOKASI  DUMPING  AREA  

   

Page 11: Slide dredging

3.  PELAKSANAAN  PEMBUANGAN  DI  DUMPING  AREA  

•  KAPAL  SPLIT  BARGE  MELAKUKAN  MANOUVER  LEPAS  SANDAR  DARI  KAPAL  CLAMSHELL  

•  KAPAL  SPLIT  BARGE  BERLAYAR  MENUJU  KOORDINAT  LOKASI   DUMPING   AREA   YANG   TELAH   DITENTUKAN  SESUAI  DENGAN  SIKK  

•  DALAM   BERLAYAR   HARUS  MEMPERHATIKAN   ASPEK  KESELAMATAN  PELAYARAN  

Page 12: Slide dredging

•  PADA  SAAT  MELAKSANAKAN  DUMPING  MATERIAL  KERUK,   HARUS   DIPERHATIKAN   ARAH   ARUS   DAN  GELOMBANG  

•  MATERIAL   DIBUANG   MELALUI   HOPPER   DOOR  YANG  DIGERAKAN  DENGAN  HYDRAULIC  

•  MATERIAL   JATUH   DENGAN   SENDIR INYA  DISEBABKAN  GAYA  GRAVITASI  

Page 13: Slide dredging

SCHEDULE PELAKSANAAN

SCHEDULE  PELAKSANAAN  PEKERJAAN

NO URAIAN VOLUME  (M³) HKK/HAL

TENTATIVE  SCHEDULE

KETERANGAN TAHUN  2013 MEI JUNI JULI AGUSTUS

1 2 3 4 5 1 2 3 4 1 2 3 4 5 1 2 3 4 5                                                                                                I Pelaksanaan    :                                             1 Penandatangan  SPK  -­‐  II                                           Dilaksanakan  OWNER                                                 2 Mobilisasi  KKC  Ranau  &                                           Dilaksanakan  Team  Proyek   SB  Mela0                                                                                             3 Pasang  tanda  keruk                                           Dilaksanakan  Team  Survey                                                 4 Pelaksanaan  pengerukan                                               KKC  Ranau  &  SB  Mela0 117.328,59 74  /  89                                       Dilaksanakn  Team  Proyek  &                                               Team  Kapal 5 Bunker  BBM                                           Dilaksanakn  Team  Proyek  &                                               Team  Kapal 6 Check  Sounding                                           Dilaksanakan  Team  Survey                                                 7 Progress  Sounding  I                                           Dilaksanakan  Team  Survey                                               Independent 8 Pinal  Sounding                                           Dilaksanakan  Team  Survey                                               Independent II Penyelesaian  Akhir                                             1 Demobilisasi  KKC  Ranau                                           Dilaksanakan  Team  Proyek  &                                               Team  Kapal 2 Administrasi                                           Dilaksanakan  Team  Proyek                                                  

Page 14: Slide dredging

CYCLE TIME Perhitungan Cycle Time

Ranau  dan  SB  Mela0 Volume :  117.328,59   m3 Jarak  Buang :                        6,00   Mile Kecepatan  Layar  Kosong :                        4,00   Knot/jam Kecepatan  Layar  Isi :                        3,50   Knot/jam Kapasitas  muatan   :                500,00   m3 Konsentrasi :                    80,00   %

1 Waktu    Hisap  /  Mengeruk = 164   Menit 500 / 5,5 x 1,8 menit 2 Waktu  olah  gerak = 10   Menit 3 Layar  Isi = 103   Menit 6 / 3,5 x 60 menit 4 Buang = 5   Menit 5 Layar  Kosong = 90   Menit 6 / 4 x 60 menit

372   Menit

6 Jam  Kerja  Efek0f = 1.440   Menit 7 Produksi  Trip  /  Hari = 1.440   x 1 Trip = 3,87   Trip  = 4   Trip

372

8 Target  Volume =  117.328,59   m3

9 Produksi  /hari =                          4   x            80   % x 500   m3  =            1.612   m3

10 Waktu  Pelaksanaan =                            117.328,59    = 74 HKK                                    1.612,00   89 HAL

Page 15: Slide dredging

PETA PREDREDGE

Page 16: Slide dredging

AREA KERAREAUK AREA  KERUK  

Page 17: Slide dredging

MENUJU DUMPING AREA

Page 18: Slide dredging

MENUJU LOKASI KERUK

Page 19: Slide dredging

LOKASI KERUK

Page 20: Slide dredging

METHODE DREDGING CUTTER SUCTION

1.  PENGENALAN  ALAT  –    ALAT  PADA  KAPAL  CUTTER  SUCTION  

2.  PERSIAPAN  PEKERJAAN  PENGERUKAN  PADA  KAPAL  CUTTER  SUCTION  

3.  PELAKSANAAN  PENGERUKAN  PADA  KAPAL  CUTTER  SUCTION  

4.  PELAKSANAAN  PEMBUANGAN  DI  DUMPING  AREA  

Page 21: Slide dredging

1.  PENGENALAN  ALAT  –  ALAT  PADA  KAPAL  CUTTER  SUCTION  

•  CUTTER  SUCTION  DREDGER  TERDIRI  DARI  2  (DUA)  JENIS  YAITU  :  

         1.  CUTTER  SUCTION  SELF  PROFELLER            2.  CUTTER  SUCTION  NON  SELF  PROFELLER    •  LADDER   YANG   DILENGKAPI   DENGAN   BOR   YANG  

DIGUNAKAN  UNTUK  MENGERUK  

•  DREDGE  PUMP  YANG  DIGUNAKAN  UNTUK  MENGHISAP  MATERIAL   DAN   MEMBUANGNYA   LEWAT   PIPA   KE  DARAT  

•  PADA  CUTTER  SUCTION  SELF  PROPELLER  MEMPUNYAI  MAIN  ENGINE  UNTUK  MENGGERAKAN  PROPELLER  

 

Page 22: Slide dredging

•  MEJA  OPERATOR  YANG  DIGUNAKAN  UNTUK  MENGONTROL  JALANNYA  PENGERUKAN  

•  INDIKATOR  KEDALAMAN  LADDER  

•  DGPS   HYDRO   PRO   UNTUK   MENGARAHKAN  LADDER  SESUAI  DENGAN  LOKASI  KERUK  

•  PRODUCTION  METER  UNTUK  MENGHITUNG  BERAPA   BANYAK   MATERIAL   YANG   SUDAH  DIBUANG  KE  DAMPING  AREA  

 

Page 23: Slide dredging

2.  PERSIPAN  PEKERJAAN  PENGERUKAN  PADA  KAPAL  CUTTER  SUCTION  

•  PENGECEKAN  DAN  LAIK  OPERASI  APARAT  KERUK  SEBELUM  DI  GUNAKAN  

•  PETA  BATIMETRY  PREDREDGE  SURVEY  

•  SARANA  KOMUNIKASI  DAN  TRANSPORTASI  LAUT  

•  ALAT  BANTU  UNTUK  MANOUVERING  KAPAL  DAN  PEMASANGAN  PIPA  DI  LAUT    

•  PEMBUATAN  TANDA  KERUK  DI  DARAT  DAN  LAUT  

•  SETTING  HYDRO  PRO  DI  KAPAL  UNTUK  LOKASI  KERUK  

•  SURAT  –  SURAT  IZIN  KERJA  KERUK  DAN  IZIN  OLAH  GERAK  KAPAL  

 

Page 24: Slide dredging

•  INSTAL  PIPA  –  PIPA  BAIK  DI  LAUT  MAUPUN  DI  DARAT  

•  PASANG   PIPA   SUB   MARINE   UNTUK   LOKASI   YANG   MELEWATI   ALUR  PELAYARAN  

•  ALAT  BERAT  BERUPA  EXAVATOR  DAN  DOZER  UNTUK  PERATAAN  DI  LOKASI  DUMPING  AREA  

Page 25: Slide dredging

3.  PELAKSANAAN  PENGERUKAN  PADA  KAPAL  CUTTER  SUCTION  

•  KAPAL   DIPOSISIKAN   PADA   LOKASI   KERUK  DENGAN   BANTUAN   TUGBOAT   DAN   SURVEYOR  UNTUK  SELF  PROPELLER  MANOUVER  SENDIRI  

•  SPUD  DITURUNKAN  UNTUK  MEMPERTAHANKAN  POSISI  KAPAL  

•  LADDER  DITURUNKAN   SESUAI   DENGAN  DESAIN  YANG  DIINGINKAN  

 

 

   

Page 26: Slide dredging

•  DREDGE   PUMP   D I   JALANKAN   UNTUK  MENGHISAP   MATERIAL   DAN   MENDORONG  MATERIAL  KE  LOKASI  DUMPING  

•  BOR   YANG   TERLETAK   PADA   UJUNG   LADDER  BERPUTAR   MENGEBOR   MENGHANCURKAN  MATERIAL  SAMPAI  DESAIN  YANG  DI  TENTUKAN  

•  MATERIAL   YANG   DAPAT   DIKERUK   BERUPA  TANAH,  TANAH  LIAT,  LUMPUR  ,  PASIR,  CADAS  

 •  KADAR  LUMPUR  DAN  SITUSOIL    

Page 27: Slide dredging

•  HYDRO   PRO   YANG   DIGUNAKAN  PADA   KAPAL   CUTTER   SUCTION  UNTUK   KEAKURATAN   LOKASI  PENGERUKAN   DAN   ARAH   DARI  CUTTING  HEAD  (  BOR  )  

Page 28: Slide dredging

3.  PELAKSANAAN  PEMBUANGAN  DI  DUMPING  AREA  

•  PEMBUANGAN   DILAKSANAKAN   DENGAN  MENGGUNAKAN   PIPA   YANG   DISAMBUNG   KE  DISCHARGE  PIPE  DI  KAPAL  

•  PADA   ALUR   PELAYARAN   MENGGUNAKAN   PIPA  SUB   MARINE   YANG   DI   PASANG   DI   DASAR   LAUT  AGAR  TIDAK  MENGGANGGU  ALUR  PELAYARAN  

•  JARAK   PIPA   YANG   DIGUNAKAN   DARI   KAPAL  SAMPAI   LOKASI   BUANG   SEKITAR   1   KM   KALAU  LEBIH  DI  SARANKAN  MENGGUNAKAN  BOOSTER  

Page 29: Slide dredging

•  UNTUK   PIPA   HARUS   DIPERHATIKAN   AGAR   TIDAK  TERTEKUK  UNTUK  MENGHINDARI  PENYUMBATAN  MATERIAL  PADA  PIPA    

•  PADA   UJUNG   BUANG   SLALU   DILAKUKAN  PENGAMATAN   MATERIAL   ARTINYA   CAMPURAN  ANTARA   MATERIAL   DENGAN   AIR   HARUS  SEIMBANG  UNTUK  MENGHINDARI  PENYUMBATAN  

 •  DI  UJUNG  BUANG  DI   BUATKAN  TANGGUL  UNTUK  

PENUMPUKAN  MATERIAL  DAN  PEMBUANGAN  AIR,  SETELAH   MENUMPUK   DIRATAKAN   DENGAN  MENGGUNAKAN  DOZER  

Page 30: Slide dredging

METHODE DREDGING TRAILLING SUCTION HOPPER DREDGER

1.  PENGENALAN  ALAT  –    ALAT  PADA  KAPAL  TRAILLING  SUCTION  HOPPER  DREDGER  

2.  PERSIAPAN   PEKERJAAN   PENGERUKAN   PADA   KAPAL   TRAILLING   SUCTION  HOPPER  DREDGER  

3.  PELAKSANAAN  PENGERUKAN  PADA  KAPAL  TRAILLING  SUCTION  HOPPER  DREDGER  

4.  PELAKSANAAN  PEMBUANGAN  DI  DUMPING  AREA  

Page 31: Slide dredging

1.  PENGENALAN  ALAT  –ALAT  PADA  KAPAL  TRAILLING  SUCTION  HOPPER  DREDGER  

•  DREDGE  PUMP  DAN    ENGINE  DREDGE  PUMP  

•  MAIN  ENGINE    DAN  GENERATOR  

•  HYDRAULIC  EQUIPMENT  

•  BOTTOM  DOOR  PADA  HOPPER  

•  GANTRY   ,   LADDER   DAN   DRAGHEAD   DAN   SWELL  COMPENSATOR  

•  CHARGE  BOOM  DAN  BOW  RAISER  

•  SUCTION  VALVE,  GATE  VALVE,  OVER  FLOW  

Page 32: Slide dredging

•  MEJA  OPERATOR      •  MEJA  APARAT  KERUK  DAN  KONTROL  ENGINE  

•  INDIKATOR  LADDER    

•  PRODUCTION  METER  

•  ALAT  NAVIGASI  DAN  KEMUDI  

•  INDICATOR  DRAFT  

•  HYDRO  PRO  DAN  ALAT  KOMUNIKASI  

Page 33: Slide dredging

2.  PERSIAPAN  PEKERJAAN  PENGERUKAN  PADA  KAPAL  TRAILLING  SUCTION  HOPPER  DREDGER  

•  PENGECEKAN  DAN  LAIK  OPERASI  APARAT  KERUK  SEBELUM  DI  GUNAKAN  

•  PETA  BATIMETRY  PREDREDGE  SURVEY  

•  SARANA  KOMUNIKASI  DAN  TRANSPORTASI  LAUT  

•  PEMBUATAN  TANDA  KERUK  DI  DARAT  DAN  DI  LAUT    

•  SETTING  HYDRO  PRO  DI  KAPAL  UNTUK  LOKASI  KERUK  

•  SURAT  –  SURAT  IZIN  KERJA  KERUK  DAN  IZIN  OLAH  GERAK  KAPAL  

 

Page 34: Slide dredging

•  PLOT  POSISI  DUMPING  AREA  PADA  PETA  LAUT  

•  PASANG  RAMBU  –  RAMBU  NAVIGASI  DI  LOKASI  DUMPING  AREA  

•  PADA  PEKERJAAN  REKLAMASI  CEK  CONECTION  BOW  RAISER  

•  POSISI   TAMBAT   KAPAL   HARUS   AMAN   BAGI   KAPAL   DALAM  MELAKUKAN  MANUVER  

•  PONTON  DAN  PIPA  –  PIPA  APUNG  

•  ALAT  BANTU  UNTUK  CONECTION  BOW  RAISER  

•  PETA  LAUT  LOKASI  KERJA  

Page 35: Slide dredging

3.  PELAKSANAAN  PENGERUKAN  PADA  KAPAL  TRAILLING  HOPPER  DREDGER  

•  KAPAL  BERGERAK  DARI  POSISI  BERLABUH  JANGKAR  MENUJU   LOKASI   KERJA   SESUAI   DENGAN   PETA  SURVEY  

•  GANTRY  DI  GERAKAN  UNTUK  MENURUNKAN  PIPA  LADDER  KE  DASAR  LAUT  

•  POMPA   KERUK   DI   JALANKAN   SAMPAI   DENGAN  RPM  MAKSIMAL  

•  LUMPUR  AKAN  TERHISAP  MELALUI  DRAGHEAD  KE  PIPA   LADDER   SELANJUTNYA  MASUK   KE   HOUSING  PUMP   DAN   DITEKAN  MENUJU   KE   LOADING   GATE  UNTUK  DI  TAMPUNG  DI  BAK  LUMPUR  (  HOPPER  )  

 

 

   

Page 36: Slide dredging

 •  KAPAL   BERGERAK   SECARA   PELAN   –   PELAN  

SESUAI  DENGAN  PETA  LOKASI  KERJA  KERUK  

•  MENGERUK   DILAKUKAN   SECARA   TERUS  MENERUS   SAMPAI  DENGAN  HOPPER  PENUH  DENGAN  MATERIAL  KERUK  

•  UNTUK   MEMISAHKAN   AIR   DAN   LUMPUR   DI  DALAM   HOPPER   TERDAPAT   OVERFLOW  DIMANA   AIR   AKAN   KELUAR   LEWAT  OVERFLOW   DAN   MATERIALNYA   AKAN  MENGENDAP  DI  DALAM  HOPPER  

•  LAMA  MENGERUK  SAMPAI  DENGAN  HOPPER  PENUH   SEKITAR   60   MENIT   DAN   INDIKATOR  DRAFT  SUDAH  MENUNJUKAN  MAKSIMAL  

Page 37: Slide dredging

•  SETELAH  SELESAI  MENGERUK  LADDER  DIANGKAT  DARI  DASAR  LAUT  DAN  DIDUDUKAN  KEMBALI  DI  TEMPATNYA  

•  SELANJUTNYA  KAPAL  BERLAYAR  MENUJU  LOKASI  DUMPING  AREA  YANG  TELAH  DI  TENTUKAN.  

•  DALAM  MENGERUK  KITA  DAPAT  BAGI  MENJADI  4  BAGIAN  LOKASI  YAITU  :                1.  MENGERUK  ALUR  PELAYARAN                2.  MENGERUK  KOLAM  DAN  DERMAGA                3.  MENGERUK  TRUNNING  BASIN                4.  MENGERUK  REKLAMASI    1.  MENGERUK  ALUR  PELAYARAN                    HAL  –  HAL  YANG  HARUS  DIPERHATIKAN  SEBAGAI  BERIKUT                -­‐    KECEPATAN  KAPAL  MAKSIMAL  2,5  S/D  3,0    KNOTS                              -­‐    POSISI  WIRE  ROPE  LADDER  HARUS  TEGAK  AGAR  LADDER  TIDAK                            TERJEPIT  DI  BAWAH  LUNAS  KAPAL                  

Page 38: Slide dredging

           -­‐  PERHATIKAN  HASIL  MATERIAL  KERUK                        -­‐    PERHATIKAN  INDIKATOR  LADDER  DAN  SWELL  COMPENSATOR                      -­‐    PERHATIKAN  LALU  LINTAS  KAPAL                      -­‐    PASTIKAN  POSISI  KAPAL  TETAP  BERADA  DALAM  LOKASI  KERUK  DI  ALUR                                PELAYARAN  AGAR  TIDAK  KANDAS                      -­‐    PASANG  PERAMBUAN  DI  KAPAL  YAITU  PADA  SIANG  HARI  MEMASANG                                    BELAH  KETUPAT-­‐  BOLA  BOLA  –  BELAH  KETUPAT  DAN  PADA  MALAM                              HARI  MENYALAKAN  LAMPU  MERAH  –  PUTIH  -­‐  MERAH                              -­‐    PEMBAGIAN  ORDER  KERJA  MENGERUK  YAITU  PADA  SISI  CENTER  ,  SISI                                KANAN,  SISI  KIRI                      -­‐    SELALU  WASPADA  TERHADAP  ASPEK  KESELAMATAN  PELAYARAN,                                MEMATUHI  ATURAN  COLREG,  MENJAGA  TERJADINYA  PENCEMARAN  

 

Page 39: Slide dredging

2.  MENGERUK  KOLAM  DAN  DERMAGA                    HAL  –  HAL  YANG  HARUS  DIPERHATIKAN  SEBAGAI  BERIKUT                  -­‐    KECEPATAN  MENGERUK  0,5  S/D  1,0  KNOTS                  -­‐    JARAK  MENGERUK  DENGAN  DERMAGA  SEKITAR  25  METER                  -­‐    PERHATIKAN  ARAH  ARUS  DAN  KECEPATAN  ANGIN                  -­‐    LAKUKAN  MANOUVER  KAPAL  DENGAN  BAIK  DAN  BENAR  UNTUK                              KESELAMATAN  KAPAL  DAN  DI  SEKITAR  DERMAGA                    -­‐    MENGERUK  MAJU  MUNDUR                  -­‐    PEMBAGIAN  ORDER  KERJA  BERDASARKAN  LINE      

Page 40: Slide dredging

3.  MENGERUK  TRUNNING  BASIN                    HAL  –  HAL  YANG  HARUS  DIPERHATIKAN  SEBAGAI  BERIKUT  :                    -­‐    KECEPATAN  MENGERUK  1,0  S/D  2,0  KNOTS                  -­‐    PERHATIKAN  ARAH  ARUS  DAN  KECEPATAN  ANGIN                  -­‐    PADA  SAAT  MENGERUK  MEMUTAR  PERHATIKAN  LADDER  DALAM                              KONDISI  YANG  AMAN                   -­‐     PERHATIKAN   SEKELILING   LOKASI   KERUK   TERHADAP   NELAYAN   -­‐  NELAYAN                  -­‐    PEMBAGIAN  ORDER  KERJA  BERDASARKAN  LINE    

Page 41: Slide dredging

4.          MENGERUK  REKLAMASI              -­‐    MENGERUK  REKLAMASI  YAITU  MENGERUK  UNTUK  MENDAPATKAN                      MATERIAL  PASIR  YANG  LOKASINYA  MERUPAKAN  DAERAH  PASIR  YANG                    KOORDINATNYA  SUDAH  DI  TENTUKAN.              -­‐    PELAKSANAAN  MENGERUKNYA  SEPERTI  HALNYA  MENGERUK  ALUR                    PELAYARAN,  DAN  TARGETNYA  HOPPER  HARUS  PENUH  DENGAN                    MATERIAL  PASIR                -­‐  DALAM  MENGERUK  REKLAMASI  TARGET  KEDALAMAN  TIDAK                    DITENTUKAN  YANG  DI  TENTUKAN  ADALAH  BANYAKNYA  JUMLAH  PASIR                    DI  DALAM  HOPPER        

Page 42: Slide dredging

3.  PELAKSANAAN  PEMBUANGAN  DI  DUMPING  AREA  

•  SETELAH   PELAKSANAAN   PENGERUKAN   SELESAI,  KAPAL   AKAN   BERLAYAR   MENUJU   DUMPING   AREA  YANG  TELAH  DI  TENTUKAN  TITIK  KOORDINATNYA  

•  SETELAH  TIBA  DI  LOKASI  DUMPING  KAPAL  BERHENTI  DAN   MELAKUKAN   PERSIAPAN   PELAKSANAAN  DUMPING  

•  PELAKSANAAN   DUMPING   AREA   DAPAT   DI   BAGI  SEBAGAI  BERIKUT  :  

           1.  DUMPING  LUMPUR  DAN  TANAH              2.  DUMPING  DENGAN  RAINBOW              3.  DUMPING  DENGAN  REKLAMASI    

Page 43: Slide dredging

1.      DUMPING    LUMPUR  DAN  TANAH  

§  DUMPING  DILAKUKAN  DENGAN  MENGGUNAKAN                  PINTU  BAK  LUMPUR  (  HOPPER  DOOR  )  YANG                JUMLAHNYA  16  PINTU  YANG  TERLETAK  DI  LUNAS                    KAPAL  §  POMPA   KERUK   DI   JALANKAN   AGAR   MATERIAL  

BERCAMPUR   AIR   UNTUK   MEMUDAHKAN   DALAM  PROSES  DUMPING  

§  PINTU   BAK   L IMPUR   D I   BUKA   DENGAN  MENGGUNAKAN   HYDRAULIC   DAN   LUMPUR  TERBUANG   SECARA   GRAVITASI   MELALUI   PINTU  BAK  LUMPUR  SAMPAI  MATERIAL  HABIS  

§  WAKTU  YANG  DIPERLUKAN  UNTUK  PELAKSANAAN  DUMPING  5  –  10  MENIT  

       

Page 44: Slide dredging

2.      DUMPING    DENGAN  RAINBOW  

§  DUMPING   DILAKUKAN   DENGAN   MENGGUNAKAN  PIPA   RAINBOW   YANG   POSISINYA   DI   HALUAN  KAPAL  

§  MATERIAL  PASIR  DI  SEMPROTKAN  KE  BIBIR  PANTAI  MELALUI  PIPA  RAINBOW  

§  CARA   INI   DI   GUNAKAN  UNTUK  MENIMBUN   BIBIR  PANTAI    

§  WAKTU  YANG  DIPERLUKAN  UNTUK  PELAKSANAAN  DUMPING  DENGAN  SISTEM  RAINBOW  1  –  1,5  JAM  

       

Page 45: Slide dredging

3.      DUMPING    DENGAN  REKLAMASI  

§  DUMPING   DILAKUKAN   DENGAN   MENGGUNAKAN  BOW  RAISER  YANG  LETAKNYA  DI  HALUAN  KAPAL  

§  SETELAH   KAPAL   PADA   POSISI   DUMPING,  DILAKUKAN  PENYAMBUNGAN  BOW  RAISER   YANG  TERLETAK  DI  KAPAL  DAN  DI  PONTON  

§  SETELAH  TERSAMBUNG  POMPA  DI  JALANKAN  DAN  MATERIAL  PASIR  DI  POMPA  DARI  KAPAL  KE  DARAT  MELALUI  PIPA    

§  WAKTU  YANG  DIPERLUKAN  UNTUK  PELAKSANAAN  DUMPING  DENGAN  SISTEM  REKLMASI  3  –  4    JAM  

       

Page 46: Slide dredging