Site Management Plan
Stanton Ironworks, Erewash, Derbyshire
On behalf of
Saint-Gobain PAM UK LTD
November 2012
Alliance Planning No part of this document may be copied or reproduced without the express written permission of Alliance Planning Offices at: Wharf House, Wharf Road 3
rd Floor 35 Old Queen Street
Guildford 54 Hagley Road London Surrey Edgbaston, Birmingham SW1H 9JA GU1 4RP B16 8PE Tel: 01483 579098 Tel: 0121 456 7444 Tel: 0207 222 8345 Report Template – Version 6 – Updated Sept 2010
REFERENCE SG3173
SITE MANAGEMENT PLAN FOR:
A MIXED USE NEIGHBOURHOOD DEVELOPMENT CONSISTING OF RESIDENTIAL, EMPLOYMENT USES, COMMUNITY AND HEALTH CARE FACILITIES, NEW PRIMARY SCHOOL, AND ASSOCIATED INFRASTRUCTURE LANDSCAPING AND PUBLIC OPEN SPACE
AT
STANTON IRONWORKS, EREWASH, DERBYSHIRE
ON BEHALF OF: SAINT-GOBAIN PAM UK LTD
PREPARED BY: ___________________
KAMALDEEP SAINI
REVIEWED BY: _ ___
KEITH FENWICK
DATE: NOVEMBER 2012
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 1 November 2012
CONTENTS
Foreword - Introduction to New Stanton
1.0 Objectives of The Site Management Plan 7
2.0 Funding of Site Management and On Site Management 8
3.0 Security, CCTV and Lighting 11
4.0 Cleaning , Waste Disposal and Deliveries 13
5.0 Public Realm Maintenance 14
6.0 Conclusion 15
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 2 November 2012
FOREWORD – INTRODUCTION TO THE NEW STANTON
i. This report forms part of a series of documents which have been prepared on behalf
of Saint-Gobain PAM UK Ltd (the Applicant) in support of an outline planning
application, with all matters (except for access) reserved. The proposal is for a
comprehensive redevelopment of approximately 185ha of land at the former Stanton
Ironworks.
ii. This Report should be read in conjunction with the drawings and other documents
submitted as part of this application, which comprise the following:
• Development Specification
• Design and Access Statement
• Planning Statement
• Parameter Plan 1: Land Uses
• Parameter Plan 2: Scale
• Parameter Plan 3: Residential Density
• Parameter Plan 4: Access and Movement
• Parameter Plan 5: Green Infrastructure
• Parameter Plan 6: Phasing Plan
• Indicative Masterplan
• Statement of Community Involvement
• Sustainability Strategy
• Employment Land Supply Review
• Site Management Plan
• Environmental Statement
iii. The areas covered by the Environmental Statement include:
• Landscape and Visual
• Contaminated Land, Soils and Ground Conditions
• Water Resources and Flood Risk
• Ecology and Biodiversity
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 3 November 2012
• Air Quality
• Noise and Vibration
• Transport
• Archaeology and Cultural Heritage
• Socio Economic (including Retail Impact)
• Waste Management
• Interactions and Cumulative Effects
iv. Technical Appendices to the Environmental Statement include:
Appendix 1.1
Appendix 1.2
Appendix 1.3
Copy of Scoping Opinion Request and formal response from
Erewash Council
Summary of Grove Farm Tip Application
Energy Statement
Appendix 3.1 Phasing Strategy
Appendix 4.1 Copy of Schedule 4 of EIA 2011 Regulations
Appendix 5.1
Appendix 5.2
Appendix 5.3
Appendix 5.4
Appendix 5.5
Appendix 5.6
Landscape & Visual Figures
Site Application
Visual Appraisal Methodology
Countryside Character Details
Visual Effects Table
Tree Survey
Appendix 6.1
Appendix 6.2
Appendix 6.3
Appendix 6.4
Flood Risk Assessment
Preliminary Risk Assessment (April 2012)
Preliminary Geo-Environmental Assessment Summary (June
2012)
Outline Remediation Strategy (June 2012)
• April 2010, ‘Preliminary Risk Assessment – Stanton-by-
Dale, Ilkeston’, report ref: 131027-5(01). Prepared by
RSK STATS Geoconsult Ltd on behalf Saint-Gobain
PAM UK Ltd.
• January 2011, ‘Preliminary Geo-environmental Site
Assessment – Zone F – Stanton-by-Dale, Ilkeston’,
report ref: 300268-1(02). Prepare by RSK STATS
Geoconsult Ltd on behalf of Saint-Gobain PAM UK Ltd.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 4 November 2012
• February 2011, ‘Preliminary Geo-environmental Site
Assessment – Zone E – Stanton-by-Dale, Ilkeston’,
report ref: 300268-2(01). Prepare by RSK STATS
Geoconsult Ltd on behalf of Saint-Gobain PAM UK Ltd.
• February 2011, ‘Preliminary Geo-environmental Site
Assessment – Zone D – Stanton-by-Dale, Ilkeston’,
report ref: 300268-3(01). Prepare by RSK STATS
Geoconsult Ltd on behalf of Saint-Gobain PAM UK Ltd.
• February 2011, ‘Preliminary Geo-environmental Site
Assessment – Zone C – Stanton-by-Dale, Ilkeston’,
report ref: 300268-4(01). Prepare by RSK STATS
Geoconsult Ltd on behalf of Saint-Gobain PAM UK Ltd.
• February 2011, ‘Preliminary Geo-environmental Site
Assessment – Zone A and B – Stanton-by-Dale,
Ilkeston’, report ref: 300268-5(01). Prepare by RSK
STATS Geoconsult Ltd on behalf of Saint-Gobain PAM
UK Ltd.
• February 2011, ‘Controlled Waters Site Assessment –
Stanton-by-Dale, Ilkeston’, report ref: 300268-6(01).
Prepared by RSK STATS Geoconsult Ltd on behalf of
Saint-Gobain PAM UK Ltd
Appendix 7.1
Appendix 7.2
Flood Risk Assessment
Supplementary Flooding Report
Appendix 8.1
Appendix 8.2
Appendix 8.3
Appendix 8.4
Appendix 8.5
Appendix 8.6
Appendix 8.7
Appendix 8.8
Desk Based Study
Phase 1 Survey
Bats Survey
Badger Survey and Assessment – (Confidential)
Breeding Bird Survey
Great Crested Newt Survey
Reptile Surveys
Invertebrates Survey
Appendix 9.1
Appendix 9.2
Appendix 9.3
Appendix 9.4
Appendix 9.5
Air Quality Assessment
Location of Noise Receptor
Background Noise Levels
Noise Model
Construction Phasing Works
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 5 November 2012
Appendix 10.1
Appendix 10.2
Transport Assessment
Travel Plan
Appendix 11.1
Appendix 11.2
Archaeology Desk Based Assessment
Appraisal of Standing Buildings
Appendix 12.1
Appendix 12.2
Socio Economic/ Regeneration Statement
Retail Impact Assessment
The Application Site (the site)
v. The site comprises approximately 185 hectares of previously developed land at the
former Stanton Ironworks. The area is dominated by industrial uses including
manufacturing buildings. The two largest buildings on site were the Hallam Plant
(now demolished) and the existing Stanhope Plant. Storage and stockpiling areas
associated with Saint-Gobain PAM UK Ltd’s pipeline business have co-existed with
manufacturing. Additional uses on the site consist of a range of general industry,
manufacturing and ancillary uses. Significant areas of the site now lay unused.
vi. The site is located within the Erewash Valley between Nottingham and Derby and is
situated approximately 1km to the south of Ilkeston and 0.5km to the north of
Stanton-by-Dale. It is accessed by a number of roads, which provide linkages to the
strategic highway, namely the A50, A52 and M1. The M1 motorway is located to the
east of the Site. There is no direct access between the site and the motorway.
Proposed Development
vii. The opportunity to redevelop the Site has arisen following Saint-Gobain PAM UK
Ltd’s decision to cease their manufacturing business in this location. They will be
retaining their administration headquarters. In conjunction with Erewash Borough
Council, statutory and non-statutory stakeholder and local communities, they have
worked together for the past five years to prepare a new mixed use neighbourhood
development – ‘New Stanton’.
viii. Built development comprises the following:
• Mixed use neighbourhood centre – including retail, restaurants, cafe/bar/hotel
uses, and community facilities;
• Provision of 1,950 residential units;
• 150 bed accommodation for the elderly within a care village environment;
• Employment uses (Class B1, B2 and B8):
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 6 November 2012
o Up to 20,000m2 of B1 employment uses;
o Up to 50,000m2 of B2 and B8 employment uses; and
• A new primary school;
• GP/Health Centre;
• Areas of formal sports pitches and open space;
• Infrastructure;
• Allotments; and
• Community Plaza.
ix. This is an outline application with all matters reserved for subsequent approval,
except for access. However, in order to enable a proper consideration of the issues
the application raises, the parameter plans are submitted to clearly define the
limitations to the extent of development proposed and to enable Erewash Borough
Council to exercise control over any planning permissions granted. The masterplan
submitted is an indicative illustration of how the parameter plans might be
interpreted, its purpose is to guide an understanding in this respect.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 7 November 2012
1.0 OBJECTIVES OF THE SITE MANAGEMENT PLAN
1.1 This Site Management Plan sets out a general framework for the future management
of the proposed development, comprising the creation of a new mixed used
neighbourhood, New Stanton. The objective of this plan is to ensure that adequate
consideration has been given to aspects of the future operation of the development
with a view to ensuring that the development is a safe and secure place for residents
and visitors.
1.2 The key operational aspects such as security, cleaning, waste management, energy
efficiency and general maintenance within any large scale development are
significant, and a development of this scale requires early consideration to be given
to all of these aspects.
1.3 The development will function and be managed as a high quality mixed use
development. The proposed architectural and landscape treatment of the
development are of a high standard and the overall approach to management will
ensure this quality living and working environment is maintained in to the future. This
extends to the physical aspects of the development which will be maintained by
dedicated maintenance of the environment.
1.4 The overall approach to the Management Strategy will be constantly updated and
amended during the life of the development, and this Strategy should be used as a
general statement of intent at this time.
1.5 The detail of the Management Strategy is anticipated to be controlled via way of a
suitably worded planning condition and any monies to secure its on-going and future
maintenance, delivered through a S106 Agreement.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 8 November 2012
2.0 FUNDING OF SITE MANAGEMENT AND ON SITE MANAGEMENT
2.1 The delivery of the management service on an estate wide basis will be via the
appointment of a professional managing agent. The intention is to provide a holistic
approach to the estate wide management set up that integrates the different
management aspects within the responsibility of a single managing agent.
2.2 The Managing Agent will report to a Managing Board. The structure of the Board will
include members selected from the landowner, principal developers, the new
resident community, employers on site, the Local Planning Authority, the police and
others as deemed appropriate. The initial structure, funding and application of the
New Stanton Management Company will be established and put in place prior to the
first occupation of any residential properties on site.
2.3 Because of the nature of the development, it is likely that the constituent parts will at
some point in the future be split into separate ownerships and be subject to
management by various agents appointed on behalf of the individual owners. This
should not create a problem in practical terms, provided adequate legal and
operational frameworks are in place at the outset. It is the intention of the Applicant to
obtain the appropriate professional advice to ensure this is the case. The legal
framework for the development will be key to ensuring that arrangements are in place
for the maintenance of a high quality integrated approach to management in the
event of the future changes in ownership within the development.
2.4 We have set out below out intentions in relation to key areas of operational
management.
Funding of Site Management
2.5 It is the intention to bring forward a service charge regime for the future operation of
the development. The use of such a funding mechanism is normal practice for a
development of this kind and it is intended that obligations on future occupiers to
contribute towards the cost of operating the service charge will be protected within an
appropriate legal framework.
2.6 The implementation of an overall site wide service charge strategy will result in
distinctive cost centres being established, including an estate wide charge that will
relate to external areas/public realm of the proposal, common plant and equipment
and any other common facilities that are provided for the benefit of all occupiers
within the development. It is expected that separate cost centres will apply to the
residential, parking, commercial employment and leisure/retail/community elements
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 9 November 2012
of the development. The establishment of separate cost centres will ensure that
charges are appointed equally and fairly between the occupiers and flexibility can be
maintained.
2.7 At the onset of development the landowner/developer will create the structure for
future site management with the appointment of the Site Facilities Manager. The
landowner/site developer will fund that part until can become sell sustaining through
the revenue collated from the site wide service charge.
2.8 A Site of this size can benefit from considerable economies of scale and an
appropriate management regime will ensure cost effective and high quality service
delivery. The Applicant recognises the need to ensure that the estate wide services
are of a high standard, and appropriate to the disparate range of occupiers at this
location. It is the Applicant’s intention to ensure that measures are in place to achieve
an estate wide management service which delivers on these key principles and
which is affordable and equitable, particular for those occupying the affordable
housing element of the scheme.
2.9 The proposed service charge regime will allow for the distribution of adequate
resources during the lifetime of the scheme and also ensuring that the scheme is
operated and maintained at the highest standards, and self-funding into the future.
On Site Management
2.10 It is proposed that a central control room will be established to coordinate all aspects
of the management within the estate, inducing public realm. This office will also
provide an interface with common facilities within the residential, employment and
retail/leisure and community elements of the development, which are likely to be
subject to independent management control.
2.11 The intention is for the central control room to be staffed by a full time Site Facilities
Manager who will be responsible for all aspects of the day to day management of the
development, including coordination of on-site security, cleaning, health and safety,
and general maintenance.
2.12 This control room will be manned 24/7, with adequate ventilation and air-conditioning
facilities, secure entry door system to only allow authorised persons with access, in
compliance with the Data Protection Act (DTA). The control room will provide a work
base for security staff and also be capable of housing the various components of
security systems and provide a secure facility for monitoring and recording CCTV
images. It is intended that all security systems will be integrated and centralised to
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 10 November 2012
the control room and that it will provide monitoring of alarms, CCTV and access
control systems. It will also house facilities for visitors and contractor log books, and
general administration. Staff located within the control room will be suitably qualified
in the operations of access control, CCTV and emergency alarm systems and
procedures.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 11 November 2012
3.0 SECURITY, CCTV AND LIGHTING
Security
3.1 The objective of the Site Management Plan is to provide and maintain an accessible,
attractive, safe and welcoming development for all residents, workers and visitors.
The proposed security features of the development will be implemented and
managed in such a way that they will have minimal intrusion and provide a
welcoming environment.
3.2 The Site Facilities Manager will be responsible for overseeing the day to day function
of the security within the estate wide common parts and it is anticipated that security
personnel will be employed by a licenced security company. Although the scheme
will incorporate appropriate design principles which will limit the necessity for the
employment of security personnel, security staff will be required with regards to the
common areas, to patrol the residential element and provide security within the
neighbourhood centre.
3.3 The security officers who are employed to cover the public and private areas will
complement and coordinate with the concierge staff employed within the commercial
employment, retail/leisure and residential elements of the development. The wider
estate security staff will undertake safety checks in and around the development and
also secure vulnerable areas.
3.4 The Site Facilities Manager will seek to develop a relationship with a local police
partnership, which will help to establish a close working relationship and contribute
towards overall security within the development. The proposed control room will be
equipped with a two-way radio system and also have the facility to establish a radio-
link with the local community police and/or liaison officer.
CCTV
3.5 A sophisticated CCTV system will be installed and this will form a key strand in the
overall security strategy. This system will provide for picture perfect images, day-or-
night. The system shall be equipped with a DM Hard-Drive that can be accessed
remotely. The digital hard-drive will be adequate enough to record in virtual real-time
and also allow playback whilst recording.
3.6 Where possible, cameras will be hidden amongst trees or camouflaged in such a
manner that they will not be intrusive but will cover the main areas of pedestrian
movement within the public realm of the development. The natural channelling of
pedestrians to and within the development, created by the building footprints, will be
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 12 November 2012
exploited with strategically positioned CCTV cameras. In particular, the main access
points into the development will be capable of effective monitoring.
3.7 Detailed proposals for the CCTV installation have yet to but will be subject to review
by security experts.
Lighting
3.8 Lighting at the entrances of all public buildings, car parking areas, bicycles and
refuses storage points and delivery bays will be maintained at a level consistent with
the policy objectives to ensure that people, vehicles and passengers are visible to
CCTV cameras and also to provide a feeling of security.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 13 November 2012
4.0 CLEANING,WASTE DISPOSAL AND DELIVERIES
4.1 The maintenance and cleaning of the public ream will be undertaken by a contract
cleaning company and high standards of cleanliness will be maintained. The cleaning
contractor will report directly to the Site Facilities Manager.
4.2 The Site Facilities Manager will also be responsible for coordinating the removal of
waste and recycling material safely and effectively, whilst at the same time minimise
potential disruption while these operations are undertaken.
4.3 The access to all delivery points shall be operated by a controlled access basis and
consideration will be given to ‘delivery time’ allocation to ensure that congestion is
minimised.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 14 November 2012
5.0 PUBLIC REALM MAINTENANCE
5.1 The proposed landscaping of the public realm areas within the development will be of
high specification and also require a full maintenance strategy to ensure that these
spaces are kept to a high standard for use by residents and visitors. In order to
undertake such work, it is anticipated that a professional landscape maintenance
company will be appointed to maintain the landscaping area and that the
maintenance company will work within a maintained framework that has been
coordinated with the landscape architect.
5.2 The maintenance strategy would relate to both hard and soft landscaping within the
development, including roadside tree planting (except in the case of landscaping that
forms part of any local authority adoption), street maintenance, plazas, playgrounds,
canal side, sports facilities, bridges and wetlands etc. the range of tasks to be
implemented under this regime will include: regular and specific cleans, inspections,
repair and replacement and remediation works. This would all be delivered under the
direction of an overall planned preventative maintenance strategy.
5.3 A Management Company will coordinate with the design team to ensure that
adequate storage and preparation facilities are available on-site to allow for efficient
servicing of the maintenance function.
Stanton Ironworks, Erewash, Derbyshire Saint-Gobain PAM UK LTD SG 3173
Alliance Planning 15 November 2012
6.0 CONCLUSION
6.1 The completed development will be managed by a dedicated on Site Facilities
Manager, who will be employed by a professional management agent. The primary
responsibility of the Site Manager will be for the common estate elements of the
scheme but will also provide an interface and coordination point with the managers of
the individual residential/commercial elements of the development. This will ensure a
safe and secure environment that is maintained to the same standard for the lifetime
of the development. The following mechanisms to deliver the strategy are proposed:
• This Strategy is to be funded through the imposition of a site wide service
charge.
• Onsite security staff 24/7 with full CCTV coverage of the site including all
parts of public gardens.
• A professional landscape contractor will be employed to maintain the public
gardens and provide the seasonal rotation of plant species.
• On-going building management and maintenance to ensure the appearance
of the development is maintained.
• A full programme of cleaning of the public areas on a daily basis.
• Central management of the communal energy system and coordinated
management of the deliveries and servicing to ensure sustainable objectives
are delivered and local resident’s amenity is protected.
6.2 The Strategy is intended to be flexible so that it can adapt to and incorporate
changed circumstances going forward.