sintropher meeting 2012, kassel ticket to kyoto (t2k) 6 th september 2012 annekathrin bode, mobiel
TRANSCRIPT
SINTROPHERMeeting 2012, Kassel
Ticket to Kyoto (T2K)
6th September 2012Annekathrin Bode, moBiel
Agenda
Project partners, budget, time frame
Intentions
Structure of the project
Organisation / accessory parts
Investments
Experiences
Project partners
5 public transport companies/organisations:
STIB/MIVB Brussels (BE) (as Lead Partner)
RET Rotterdam (NL)RATP Paris (FR)TfGM Manchester (GB)moBiel Bielefeld (DE)
Project budget is about 12,7 Mio Euro
Time frame: from 2010 to 2014
For moBiel the share is about 2,47 Mio Euro
investment part is 61,8%
(1,5 Mio Euro)
Budget and time frame
The project idea is local action in public transport on the Kyoto Protocol objectives
Central point is the reduction of CO2 emissions in public transport sector through
reduction of energy consumption
higher efficiency
investments in technologies and renewable energy production
Intentions
Structure of the project
WP1: Quick Wins – moBiel, DE
WP2: Investments – RET, NLWP2 A Energy Efficiency
WP2 B Energy Recovery
WP2 C Energy Production
WP3: Carbon footprint – RATP, FR
WP4: Influencing Context – TfGM, GB
WP5: Communication – STIB, BE
WP6: Coordination – STIB, BE
Organisation / accessory parts
MeetingsAnnual events
with a public/open part
Special focus (e.g. recovery)
Half-annual meetingsonly T2K partners
WebexInternet telephone conferences on a regular basis
Organisation / accessory parts
DrupalExchange platform on internet
Organisation / accessory parts
Peer reviews
Organisation / accessory parts
Communication agency for all partners (prophets, BE)
Significant communication budget from all partners
2 large public campaigns, 2011 and 2013
Organisation / accessory parts
Organisation / accessory parts
Energy weekJanuary 2012
At the same time at all partners
For internal staff
To raise awareness of energy consumption
Collection of ideas from staff
Concrete investments of partners (examples)
CO2 footprint / example moBiel excel sheet « Eingabe » (Wuppertal Institute)
Lfd. Nr.
Erforderliche Daten
Einheit EingabeZusatzangaben / Anmerkungen
Einheit EingabeDefault
Quelle
Verbrauch des Fuhrparks im Rahmen des ÖPNV-Angebotes (Busse, Stadtbahnen) [Traction energy]
1Dieselverbrauch
Liter 2.447.889 Anteil Biodiesel %4,40%
2Benzinverbrauch
Liter Anteil Bioethanol
%2,80%
3Verbrauch Autogas (LPG)
kg
4Verbrauch Erdgas (CNG)
kg
5Verbrauch Bioethanol
Liter
Nur bei Verbrauch reinen Bioethanols
Concrete investments of partners (examples)
RATP:
Adiabatic coolingThermo-dynamic change
underground station with its technical rooms for IT equipment. Those rooms need to be refreshed. The adiabatic cooling system is not a new technology but not so used and the use in those conditions is very innovative.
STIB:
Cogeneration(also called combined heat and power, CHP) is the use of a heat engine or a power station to simultaneously generate both electricity and useful heat. The cogeneration plant will replace the heating boiler in the Delta depot.
Concrete investments of partners (examples)
TfGM
Water power
Hydro power used in Rochdale (Manchester region) to provide a bus station: Implementation of an archemidean screw: 86.000 kWh/a expected.
Concrete investments of partners (examples)
TfGM
Wind power
was erected on 26th June 2012 and is already generating electricity.
They have generated just under 1000kWh already.
Concrete investments of partners (examples)
moBiel
Fast closing doors in depot
folding gates driven by compressed air
Budget: circa. 23,000 Euro
17 sec 5 sec
Concrete investments of partners (examples)moBiel
Relighting in tunnel stations
Reduction of lamps: 5 =>2
160 Watt power => 78 Watt
Savings: 5.300 Euro/year
Concrete investments of partners (examples)moBiel
55 lamps at 464 Euro = 25.500 Euro
Material: approx. 500 Euro every other year
Maintenance: approx. 400 Euro (could in fact be reduced in ombining the usual changing dates with the implementation of the new lamps).
moBielSpecific and weather-depending control of point heating installationsProject as example for comparable weather conditions in Northwest EuropeSignificant reductionpotential (2/3 of energie consumption)
Concrete investments of partners (examples)
Concrete investments of partners (examples)
moBiel
Recovery and Storage of braking energy
Budget: 850.000 EuroCommon discussions withsuppliers and common appearance as T2K-groupSeparate tendering with reference to T2K, exchange between partners about results and suppliers attitude
Concrete investments of partners (examples)
inverter
inverter
storage system
Concrete investments of partners (examples)
Energy storage in Rabenhof approx. 230.000 kWh
effective energy 4,6kWh
Piller, GE
Inverter 1MW in Oetkerhalle approx. 346.000 kWh
IGBT technic
Ingeteam, Bilbao, Spain
2. Inverter 1 MW in Rosenhöhe approx. 290.000 kWh
IGBT technic
Ingeteam, Bilbao, Spain
in total approx. 866.000 kWh
Source: net calculation by Elbas
Public transport network information
Pulse frequency on working days (7 a.m. – 7 p.m.) every 10 minutes
4 main routes
4 additional lines
Length of lines in total 71,6 km (main lines 36,9 km, additional lines 34,7 km)
Average distance of stations: 450m
Number of stations: 62
Average speed: 22,2 km/h
Number of carriages: 80
Number of trailer vehicle: 5
Concrete investments of partners (examples)
moBielGreen Station
Budget: 235.000 Euro
P+R station already existing
Station for e-bikes
Station for electric car-sharing
Public charging station for electrical cars
Public charging station for GPL-cars (gaz de pétrole liquéfié)
PV pannels for the generation of local energy
Concrete investments of partners (examples)
moBiel: Green Station
Area
available
Concrete investments of partners (examples)
moBiel: Green Station
Concrete investments of partners (examples)
Partners:
moBiel
Stadtwerke Bielefeld
E-Motion
Experiences
Fruitful discussions with the T2K partners
Close cooperation and working together
Not sticking tight to the planned schedule; sometimes delay in implementation
Good output (peer reviews, reports, campaigns, actions, investments,…)
Thank you for your attention!
Think global - act local