Page 1: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

1

Joint venture of CMS and ATLAS

Single shot test beam at PS!Simulation of a beam loss!

Joint adventure of CMS and ATLAS

Page 2: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Can we imagine a dump failure?

Some LHC numbers• Proton energy 7 TeV• Particles per bunch 1011

• Number of bunches 2835• Stored beam energy 336 MJ• Beam current 0.5 A• Failure: magnet quench; power converter fail, etc.

dipole or quadrupol failure decaying B-field need to dump

• Revolution time: 90µs• Abort gap: 3,17µs• Kicker rise time: 3µs

Can we even imagine a beam „lost“ in IP1 or IP5?

Page 3: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

!!DUMP near to IP5 (CMS)!!

Mika Huhtinen:• Single module prefire:very unlikely

Assumption only one of the 14 abort kicker fires 4*10^13 protons lost in IP 5

• Unsynchronized abort: very likelyAssumption one of the dump kickers does not hit the abort gab bunch swept out for ~3µs; some deviated bunches

continue in the machine1*10^12 protons lost in IP 5

MC: STRUCT;MARS;FLUKA

IP5

IP6

LHC layout and hint for beamloss reason

Page 4: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Improbable things are not impossible!

• Both prefire and unsynchronized accidents happend at the TEVATRON!

• BUT: Less critical at the TEVATRON!

• They are improbable at LHC!!??!!

!RA EPAC02

Page 5: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Beam conditions at the PS8cm

cut• Fast extraction => spill ~ 100 ns duration

• Up to 1011 protons per spill (109 to 1010/ cm²)

• 24 GeV protons

• Beam spot: Starting 2-3cm diameter beam spot, but we expect to be able to tweak the last

quadrapole to have cigar shaped beam spot.– We are currently investigating if a 10cm diameter spot possible?

• Dosimetry to be handled by T7 group (secondary emission counter, gold or nickel foils).

• beam available for 8 hour shift, installation 1.5 days

• beam conditions fixed: 26.7.02

Page 6: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

T7 Area

Page 7: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

THE WHY!?!

• No integral effect expected (worst case = 10 days)

• But large instantaneous ionization! 1011 MIPS

1. Will our modules survive a beamloss?– Is our design robust?– Simple YES/NO test!

2. What is the dynamic behaviour?– Possible failure analysis!

ALL PARAMETERS will be dynamically checked slow (10µs) and fast (50ns) (Scopes/FADCs)

Page 8: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Specific Questions

1. Will the hybrid survive?2. ..............sensor survive?3. ..........complete module survive?

Disentanglement of components!!

• How many beam losses are digestable?• Check for bias voltage dependencies?

• Which component of the components breaks, if any?

Page 9: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Setup

cooling box available (-10°C) (thanks to ATLAS)

2 devices per carrier devices premounted in

carrier incl. patch panel

Page 10: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Carrier

3 ready in KA

Page 11: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Scenario1. Place carrier (DUT) in cold box 2. Full characterization in situ 3. SINGLE 100ns beam spill4. Full characterization in situ5. 2.-4. with different conditions

6. Place new carrier (DUT) ...(3 boxes=times).....etc.

• Full characterization in home lab; hopefully NO failure analysis

Page 12: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

3 carriers / tests

1st carrier: HPK-sensor + hybrid (flex) Vbias ramp : one shot per ramp point (0..100V in steps of 20V and 100..400V in 50V-steps)

2nd carrier: ST-sensor + good TEC module

3rd carrier: HPK-sensor + KA prototype TEC module(some pinholes, current..)

after ~30 consecutive beam dumps: detect if the module is still alive!

Page 13: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Parameters on sensors

Readoutstrips

1. Ionisation: completely destroy field configuration/depletion!2. Sensor is short circuited! worst case 400V on CC!!3. Furtunately the power supplies will not react on that time scale!4. Still: Dynamics are complicated and we will try to measure them!

HV: voltage&current!

Voltage over CC: Pinholes?CCbreak>120V(also check for potential on APV)

Single strip current!(also check for Rpoly)

+400V

0V

HV: voltage&current!Single strip current!(also check for Rpoly)Voltage over CC: Pinholes?CCbreak>120V(also check for potential on APV)

Page 14: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Sensor parameterHV: bias voltage Ileak: global leakage currentVAC_DC: Voltage between AC and DC-pads of several groups of strips. 2 or 3 groups are planned!

IDC_biasresistor: also done for 2 or 3 groups of strips Iguard: current possibly induced in the guard ring

= 9 parameters (3 groups) sensors on PCB (circuit discussed with RH)

parameters measured with scopes or FADCs

Page 15: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Strip parametersSingle strip current measurement

Voltage over SiO2 to estimate pinhole development

Scope (measure I)

Scope (measure V)

Page 16: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Test on hybrid (bare and on module)

Parameters:V250: 2.5V hybrid supply voltageI250

V125: 1.25 supply voltageI125

= 4 parameters (measured with scopes)(voltages refer to hybrid ground level)

Readout Standard: APV: Noise, ped, calib

Page 17: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Readout in situ (APV,module)

Use own Karlsruhe CMS-like readout system (good knowledge of the software)

1. Prequalification with normal procedures: pedestal, noise, common mode, calibration, LED,

laser?2. TRIGGER: increase of sensor leakage current

• send APV reset• when APV tickmarks are found:• send software triggers and search for header• monitor baseline behaviour if header is found• Laser response?• LED response

3. Later: full qualification (noise,ped,calib,LED)!

Page 18: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Module parameters

all hybrid parameters HV + Ileak Full readout LED and perhaps laser response

= 6 parameters (measured with scopes)

Reminder: one SINGLE shot full qualification!

Carrier 2&3: Sensor+module will sum up to 30 scope channels!

Page 19: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Readout adventureReadout over 30m of cables!1. Optical readout:

Most promising and probably the only reasonable– Still parts missing– So far NO experience in KA

2. Cat. 7 network cable (needed anyhow for control) (backup 1)

3. PC in the „hot“ area, controlled via LAN (backup2)

Cables have to be installed!Power supply combined effort with ATLAS

Page 20: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Set up of One-shot beamTime required =1.5 days

Conditional on successful replacement of PS power supply and re-establishment of

slow extraction beam line

FIRST 100ns beam extraction ever done at the PS (standard ~ms)

Possible time slots

Duration =8 hours (max)

One shot schedule

Page 21: Single  shot test beam at PS ! Simulation of a beam loss!

General Tracker Meeting 07/2002Frank Hartmann

Summary• Our electronics plus detectors should be prepared

to survive fast pulses with several orders of magnitude higher particle rates than in nominal conditions.

• We „SHOOT“ a hybrid, 2 modules, 3 sensors with 1011 protons several times varying the bias voltage!

• We are aware that the existing program is very ambitious and the available time is tight, therefore help is welcome!

• Additional ideas/devices like a CCU is feasible, if additional groups join the venture!

• Scopes still needed!• The project is a joint adventure of CMS & ATLAS• The LHCC referee welcomes the project