    AbstractBC Hydro recently developed a radial 287 kV

    Northwest Transmission system which includes a long (340 km)

    line. After the terminal station it connects to two shorter lines.

    Short time after when the system went into the service, the long

    line experienced multiple line-to-ground faults due to icing and it

    led to single-phase trip protection and auto-reclose operations.

    During open-pole condition phase duration, the floating phase on

    the short lines experienced unsafe over-voltages causing

    transformer and reactor protection trips. This paper will use

    disturbance records to explain the sequence of events and present

    the detailed waveform analysis. It was found that the sensitive

    phase-to-phase fault protection operated on the shunt reactor.

    The transformer protections operated on excessive magnetizing

    current due to the differential restraint element fifth harmonic

    currents dropping below the setting threshold (35% on three

    phases). It appeared that the harmonic restraint dropped on

    higher voltage due to excessive saturation causing flux to transfer

    from transformer core to tank. The disturbance has been

    simulated with EMTP and this helped to identify the causes of

    the over-voltage. The paper will also discuss the simulation

    results and some recommend solutions to avoid re-occurrence of

    the over-voltages problem.

    Index Terms Single-Pole Operation, Temporary Over-

    Voltage, Transformer over-excitation

    I. INTRODUCTION

    he BC Hydro transmission system, in a remote corner ofthe province, had a sizeable addition brought into service

    near the end of 2014. To spur economic activity in the region a

    series of new transmission lines were constructed to

    accommodate both non-utility generation and large industrialloads. The main 287 kV transmission line to the area is very

    long and had significantly more faults than anticipated in

    months following the first energization. The protectionsystems had been very dependable during all the faults in the

    initial months and in the time since then as well. The security

    of the relaying system has also been quite good. It was tested

    though under a severe unintended operating condition for a

    fault that occurred on January 7 th 2015. This paper outlines

    how multiple faults that day left the system in the unintendedoperating configuration. This condition resulted in

    approximately 1.7 pu voltage at multiple substations. Next the

    paper will discuss how protection relaying in the regionresponded while the system was operating in a critical state.

    Three protection relays operated while there was no fault

    Submitted September 2015

    Mukesh Nagpal e-mail BC Hydro, Burnaby, BC V3N 4X8, Canada

    [email protected]

    within their protection zones. The paper includes detailedsteady-state and high frequency analysis to re-create the

    conditions witnessed in the field. Finally, the paper will briefly

    describe potential remedies to prevent further abnormal

    conditions in the system.

    II. BCHYDRO SYSTEM

    BC Hydro, the third largest utility in Canada, possesses

    major hydro-electric generation assets. These resources,

    primarily located in the northern (Peace River) region of theprovince and in the south eastern (Columbia River) region, are

    remote from the south-west corner of the province where most

    of the demand for electricity is concentrated.

    A. Northwest Transmission System

    Figure 1 shows geographic one-line diagram of the

    Northwest Transmission System (NTL). It consists of a new

    287-kilovolt (kV), 340 km long transmission line, 2L102,connecting the existing BC Hydro Skeena (SKA) Substation

    near Terrace with a new substation Bob Quinn (BQN) near

    Bob Quinn Lake.

    The system was expanded to provide a secure

    interconnection point for clean generation projects via 39 km

    long 287 kV transmission circuit 2L379. The three connected

    non-utility generating clusters are Forrest Kerr (FKR), andVolcano Creek (VOL), all on the Iskut River near Forrest Kerr

    Creek, north of Stewart in northwestern BC. The total outputfrom these clusters would be 305 MW from run of river

    generation units. These generators supply clean electricity to

    support development in the area.

    The system is also serving the industrial and residential loadvia a three terminal 287 kV 110 km long transmission line

    2L374. The transmission system one - line diagram including

    existing BC Hydro northern region transmission network, the

    NTL, new Bob Quinn substation and IPP generation andtransmission system is shown in Figure 2. The area can now

    reduce greenhouse gas emission by enabling communities now

    relying on diesel generation to connect to the BC Hydrotransmission grid as well.

    B. Detail of a 287 kV Line in Northwest System

    Figure 3 shows a simplified one-line diagram showing

    circuit 2L102, which was involved in the incident. As shown

    in Figure 1, this line is the only transmission path betweenSkeena (SKA) Substation and Bob Quinn (BQN) switching

    stations. The line is 340 km long and is fully transposed. There

    is an optical ground wire (OPGW) cable run between the topsof high voltage electricity towers. The optical fiber within the

    Mukesh Nagpal, Terry Martinich, Ska-Hiish, Tyler Scott, Gurinder Hundal and Apollo Zhang

    BC Hydro, BC, Canada

    Single-Pole Operation Leads to Hazardous Over-

    Voltage on Adjacent Lines

    T

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    2/12

    2

    cable is used for high speed protection and SCADA functions.

    Tower construction, conductor data along with the line

    parameters determined from the construction data are listed in

    Appendix I. There is 35% series compensation at the BQN endof line and 72% positive sequence shunt compensation using

    two reactors at SKA and one at BQN. The shunt reactors at

    SKA (2RX1 & 2RX2) are fixed and the one at BQN

    (2RX231) is switchable.

    2L102 is protected by modern microprocessor-based relayswith a high speed, sub-cycle, current differential scheme. The

    line breakers are rated as having a three cycle interrupt time.Therefore overall fault clearing time is less than four cycles

    for all bolted faults. This speed is within the performance

    target specified in NTL system planning studies.

    Figure 1: BC Hydro Northwest Transmission SystemGeographical Map.

    Figure 2: Northern Region BC Hydro Transmission System

    One-Line Diagram.

    To maintain the system stability, single-shot high speed

    automatic reclose is attempted after line trips. The reclose

    scheme is designed to initiate single-pole trips for single-

    phase-to-ground faults and three-pole trips for all multi-phasefaults. The SKA bus is the lead or master end for auto-reclose

    and the associated breakers 2CB7 and 2CB8 are equipped with

    point-on-wave (POW) closing to minimize the line pickuptransients. 2CB7 is the first breaker to close followed by

    2CB8. The BQN bus is the follow end with 2CB3 closing first

    and 2CB4 closing second.

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    3/12

    3

    Figure 3: Simplified 2L102 One-Line Diagram NTL

    System.

    III. EVENT DESCRIPTION

    This section is divided into two subsections. The firstsection describes a series of incidents which includes five

    individual faults at different times and the nature of these

    faults. The events with time stamps are listed in sequence inTable 1. The second subsection focuses specifically on the

    fifth event. During this event the entire system north of BQN

    experienced significant over-voltage on one phase. Thesubsection presents detailed analyses of the waveforms

    recorded by the high speed digital fault recorders during this

    incident.

    A. Overview of the Incident

    Table 1 lists the sequence of events for this series of events.On 7th January, 2015 at 05:38:39 PST, the first Phase C-to-

    ground fault occurred on 2L102 about 2 km from BQNstation. The line protection responded correctly to trip single-

    pole (Phase C) in three cycles and executed an auto-reclose

    after the one second open pole interval. The fault was caused

    by an OPGW wire sagging under the heavy snow

    accumulation on the wire. Since the sagging wire reducedclearance between the phase conductor and ground wire, it

    took longer for the fault to self-extinguish than expected.

    Hence, the line was auto-reclosed onto a persistent fault. The

    failure of auto-reclose resulted in a three-pole trip at both line

    terminals (SKA and BQN). Referring to system one-line

    diagram in Figure 2, 2L102 protection operation keys direct

    transfer trip (DTT) to the downstream line protection relays,

    2L374 and 2L379, to isolate the remote generation andtransmission customer load upon disconnection from BC

    Hydro integrated system. On receipt of DTT, 2L374 tripped at

    BQN terminal and RDC entrance circuit breakers. Similarly,

    2L379 tripped BQN terminal as well as FKR and VOL

    entrance circuit breakers. Note that RDC load remaineddisconnected and 2L379 remained open-end at FKR and VOL

    throughout the rest of events that morning.

    A second Phase C-to-ground fault occurred at 05:44:42.732

    PST; shortly after BC Hydro control center restored 2L102.

    The control center had not yet restored 2L374 and 2L379.

    Similar to the first event, the line tripped single-pole and then

    ended up tipping three-pole trip due to the auto-reclose failure.The third and fourth events are failed attempts to energize

    2L102 from SKA station by BC Hydro control center. They

    both failed due to a persistent fault on the line.

    Before the fifth event, BC Hydro control center was in the

    process of restoring the Northwest Transmission system. It

    was restored to a point such that 2L102 was fully restored atboth ends, 2L374 energized from BQN to TAT and open

    ended at RDC, and 2L379 energized at BQN but open endedat FKR and VOL. In this system configuration, 2L102 from

    SKA is the only source in the Northwest system. A Phase C-

    to-ground fault on 2L102 reoccurred at 06:21:21.972 PST at

    the same location as the previous events - 2.8 km from BQN.Breakers associated with Phase C of 2L102 were tripped by

    the protection. Because non-utility generation was not

    reconnected after the previous fault, opening of Phase Cbreakers on 2L102 led to loss of source on that phase for all

    three circuits in the Northwest Transmission system. In

    absence of regulated source on Phase C, the voltage on that

    phase in the BQN-2L374-2L379 sub-system experienced atemporary over-voltage exceeding 1.7 pu. The high voltagecaused one shunt reactor and two transformer protections to

    operate. This event is the main subject of analysis being

    reported on this paper. The remaining paper will discussprotection response during this event, analytical simulations

    replicating the event and methods to avoid its reoccurrence.

    B. Over-Voltage Waveforms

    Figure 4 shows three phase-to-ground voltages captured by

    the digital fault recorders (DFR) at the BQN bus. Phase C-to-ground voltage exceeded 1.6 pu within two cycles after

    opening of Phase C beakers on 2L102. It is interesting to note

    that, during the temporary over-voltage (TOV), Phase B-to-ground and the C phase-to-ground voltages are nearly 180

    degrees out-of-phase. Figure 5 shows phase-to-phase voltages

    which indicate that the BQN T3 delta-connected windingbetween Phases B and C was subjected to the over-voltage and

    saturation of that winding. This over-voltage resulted in BQN

    T3 tripping in about 10 cycles after the single-phase opening.

    Since BQN T3 and 2RX22 share the tripping zone, 2RX22

    was disconnected from the system at the same time. This leadto the voltage increasing yet again, this time to more than 1.7

    pu. About 8.5 cycles after tripping of BQN T3 and reactor

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    4/12

    2

    su

    Ta

    1

    2

    3

    4

    5

    X22, TAT

    siding.

    ble 1:Sequen

    Time stamp

    05:38:39.942

    05:38:41.17

    05:38:41.21

    05:41:12.47

    05:44:42.732

    05:44:43.941

    05:47:42.54

    05:48:47.02

    06:11:33.00

    06:15:18.00

    06:15:28.00

    06:21:21.97

    06:21:22.02

    06:21:22.182

    06:21:22.32

    06:21:22.42

    T1 tripped

    e of Event on

    2L102 initSKA and

    2L102 autSKA and

    2L102 ope

    trips to 2L

    2L374 trip

    2L379 trip

    2L102 re-e

    2L102 sin

    and BQN

    2L102 aut

    SKA and

    SKA 2L10to the persi

    SKA 2L10to the persi

    2L102 suc

    BQN

    2L379 re-e

    2L374 re-e

    2L102 C-

    BQN

    2L102 sin

    and BQN

    BQN 287over-volta

    BQN T3 P

    of serviceBQN 287

    higher ove

    TAT T1 P

    service

    BQN 287

    below 1 pu

    BQN 2RX

    287 kV bu

    nd the ove

    07 January, 2

    Event

    al single-poleQN

    -reclose fail,QN

    terminal logi

    74 and 2L379

    at BQN and R

    at BQN, FKR

    nergized at bo

    le-pole trip (

    -reclose fail,

    QN

    2 energizatiostent fault

    2 energizatiostent fault

    cessful restora

    nergized at B

    nergized at B

    fault initiati

    le-pole trip (

    kV bus Ce (1.6 pu.)

    N tripped HV

    kV bus C

    -voltage (1.7

    tripped 2CB

    kV bus C ph

    .

    25 PN trippe

    de-energized

    -voltage star

    15

    trip (C phase

    three-pole tri

    c initiate tran

    DC

    and VOL

    h ends

    phase) at S

    three-pole tri

    attempt fail

    attempt fail

    tion at SKA

    N

    N and TAT

    on, 2.8 km fr

    phase) at S

    hase experie

    CBs, 2RX22

    hase experie

    u.)

    2, TAT T1 ou

    ase voltage d

    bus CBs, B

    ted

    at

    at

    fer

    A

    at

    ue

    ue

    nd

    m

    A

    ce

    out

    ce

    of

    op

    N

    Figure

    BQN 2

    Figure

    BQN 2

    4: The Phase

    7kV Bus.

    5: The Phas

    7 kV Bus.

    -Ground Volt

    e-Phase Volta

    ages Capture

    ges Captured

    4

    by DFR at

    by DFR at

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    5/12

    5

    IV. PROTECTION AND CONTROL DESCRIPTION

    In two months following Northwest Transmission system

    energization, 2L102 had several phase-to-ground faults and

    the protection performed correctly during all faults. Previous

    sections detailed how the system ended up in an undesirableoperational state on the morning of 7 thJanuary 2015.

    The following protection section will detail the protection

    operations in the NTL system that morning besides the 2L102

    operations. It will also discuss the protection operations thatdid not occur. Section V will discuss the measures taken to

    quickly take action in the protection system to reduce the

    chance of a high temporary over-voltage in the future.

    A. Duration of Over-Voltage Condition

    The 2L102 line protection had single-phase tripping (SPT)

    enabled on January 7th, which opens only the faulted phase

    for any single-phase-to-ground fault. If the fault persists whenthe open phase is closed (unsuccessful reclose), then the line

    protection would open all phases with three-phase tripping

    (3PT) logic, and send direct transfer trips to open entrance

    breakers of RDC, FKR and VOL. The single-phase openinterval of the line is approximately 60 cycles (1 second). Thefirst phase-to-ground fault occurred at 5:38 AM and it was

    persistent so, a direct transfer trip was sent to RDC, FKR, and

    VOL taking them offline for the remainder of this time period.During the 6:21 AM event 2L102 line protection detected the

    single-phase-to-ground fault. During the approximately 1

    second single-phase open (SPO) period, a number of additionprotection operations occurred, some unexpectedly.

    B. BQN Transformer T3 Protection Operation

    BQN T3 is a 10 MVA transformer with an HV delta

    winding and an LV wye winding. The transformer serves a

    fourth harmonic filter bank and the station service transformerat BQN substation.

    As shown in Figure 3, the voltage between Phase B and C

    became very high (more 1.6 pu) during open pole period. It

    saturated the delta winding of BQN T3 connected between the

    two phases. Figure 6 shows the disturbance records from thetransformer differential relay. Three analog traces on top are

    three-phase line currents processed by the 60-Hz digital filter

    embedded in the relay. Two analog traces in the middle of thefigure are fifth harmonic frequency content relative to the

    fundamental frequency in differential current measured by the

    relay for the B and C phases. In bottom part of the figure,digital traces are illustrating responses various relay elements

    to the differential currents measured when the B-to-C windingwas overexcited by over-voltage. To illustrate distorted nature,

    Figure 7 shows the unfiltered analog traces of the line currents

    into the transformer. T3 primary (287 kV side) currentsdemonstrate that, with harmonic distortion considered, these

    currents were about 3 times the 20 Arms rated primary

    current. Though not shown, negligible currents were comingout of the transformer low-voltage windings confirming that

    the high-side currents were transformer magnetizing currents.

    In Figure 6 and Figure 7, Phase B and C line currents werepractically 180 out-of-phase which confirmed the saturation

    of the B-to-C winding transformer core. There was negligible

    line current in Phase A.

    The magnetizing currents on high-side appeared as Phase B

    and C differential or operate currents. However, the relay

    operation was initially blocked for approximately three cyclesby the 2nd and 5th harmonic elements as shown by digital

    traces in Figure 6. The relay was set to restrain the trip

    operation when the 2ndharmonic component of the differential

    current exceeded 15% of the fundamental frequency current inone or more phase. Likewise, 5thharmonic restraint was set to

    35%. Once the 2nd and 5th harmonic current content droppedbeyond their individual setting threshold, the relay tripped.

    The BQN T3 tripping zone trips 287 kV circuit breakers

    2CB2 and 2CB3. This protection operation also tripped reactor

    BQN 2RX22 as collateral since they share a tripping zone. It

    is likely that BQN 2RX22 would have eventually tripped aswell if given more time.

    Figure 6: From the BQN T3 Protection Event Report,

    Showing the Filtered Primary Currents.

    Figure 7: From the BQN T3 Protection Event Report,

    Showing the Unfiltered Transformer Magnetizing

    Currents.

    C. TAT Transformer T1 Protection Operation

    TAT T1 is a 16.6 MVA transformer with an HV wye

    winding and an LV wye winding. The transformer has aburied delta tertiary winding. The transformer serves the small

    amount of distribution load in the area at 25 kV.

    TAT T1 was also exposed to high voltages well above the

    knee point voltage of the saturation characteristic. T1

    conducted a relatively high current for 8 cycles before itsprotection tripped the transformer. From the event report, the

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    6/12

    6

    filtered primary currents are shown in Figure 8 and the

    unfiltered currents appear in Figure 9. The maximum

    instantaneous currents (Phase B and C) were about 170 A

    peak, due to severe harmonic distortion. As a comparison, therated primary current is 33 Arms (47 A peak).

    Like BQN T3, a high percentage of 5th harmonic current

    blocked the transformer from operating instantaneously when

    it began to saturate from the high voltage. This event report

    also shows the 5th harmonic current dropping below 35% andtripping shortly afterwards. Compared to BQN T3, this

    transformer took nearly 8 cycles longer to saturate to the pointwhere 5th harmonic current dropped below the inrush

    threshold.

    The unfiltered event report shows that the harmonic current

    started to reduce while the fundamental current increased four

    cycles after the relays event report was triggered. This alignswith the tripping of BQN T3 and RX22 and the subsequent

    voltage rise that was recorded in the area. The even higher

    voltage drove the TAT transformer core deeper into saturationcausing the magnetizing flux to leak out of the core and setting

    up eddy currents in the non-laminated parts of transformer. As

    a result, the fifth harmonic current dropped relative to thefundamental frequency component and contributed to

    transformer tripping. Similar to other transmission anddistribution transformers in BC Hydro, the transformers in the

    new NTL system were neither equipped with over-voltage nor

    Volt-per-Hertz protection. Trips by the differential protection

    saved the transformers from possible damage.

    Figure 8: From the TAT T1 Protection Event Report,

    Showing the Filtered Primary Currents

    Figure 9: From the TAT T1 Protection Event Report,

    Showing the Filtered Primary Currents

    D. BQN Reactor 2RX25 Protection Operation

    BQN 2RX25 is a 20 MVA oil filled reactor. The primarypurpose of the reactor is to compensate line charging

    capacitance for 2L374.

    The reactor protection consists of primary high impedance

    differential protection as well as primary and standby phaseand ground over-current protection. The differential protectionis able to detect phase-to-ground faults and trip

    instantaneously. It is unable to detect turn to turn faults

    though. We deploy two sets of over-current protection toensure we have redundant protection to detect turn to turn

    faults with the reactor.

    The reactor was subject to a 1.7 pu voltage, which translates

    to a higher than 1.7 pu current due to saturation. Currentsobserved during the over-voltage were 3 pu and were

    sufficient to activate the inverse-time over-current protection.

    Unlike the transformers discussed earlier there was no

    differential current in the reactor. All current entering the

    reactor left the corresponding low voltage terminal of thereactor. This reactor has a phase over-current element set to

    pick-up at 1.2 times nominal phase current with an inverse

    time tripping element. It was initially assumed that this wasthe element that tripped 2RX25. Upon investigating the event

    reports from the protection relays it was determined that the

    phase over-current element did not actually trip the reactor.

    BC Hydro has devolved a specialized element to detect phase-to-phase faults deep within multi-phase reactors. A phase-to-

    phase fault will result in an increase in phase-to-phase current

    along with a corresponding decrease in phase-to-phase

    voltage. Our element is looking for a 25 percent increase incurrent along with and 20 percent decrease in phase-to-phase

    voltage. Figure 10 is an event report for the reactor over-

    current protection. Element 50BCS is the Phase B to C over-current and Element 27CA is the Phase A to C under-voltage

    element. Element SV5T is an 8 cycle pick-up timer required

    for the phase-to-phase fault detector to operate.

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    7/12

    7

    Figure 10: From the BQN 2RX25 Protection Event Report.

    The unfiltered event report in Figure 11 shows significantly

    less harmonic current than either of the two transformers

    experienced. More than 1.7 pu of phase-to-ground temporaryover-voltage was present at the transformer terminal at the

    time of protection operation. The slope of the flux-current

    characteristic of 2RX25 in the fully saturated region is

    significantly higher than that of the transformer (air-coreinductance). Hence, the smaller harmonic content in thereactor currents.

    Figure 11: From the BQN 2RX25 Unfiltered Event Report.

    E. Observations on Protection Operations

    The operation of the protection systems helped to reduce theseverity of the over-voltage in the area. This is especially true

    following the clearing of TAT T1. Figure 12 shows an

    immediate decrease in voltage following TAT T1 breakers

    opening.

    It is also interesting to review the breaker clearing times for

    these operations. The three protection operations were nearlyuniform in their breaker clearing times as shown in Figure 12.

    All the breakers in this system are rated at a 2.4 cycle nominal

    clearing speed. In actual operation under these conditions theclearing time recorded by the protection relays was 6 cycles

    more than double the rated time. All breakers are rated at 362

    kV, but were exposed to voltages above the voltage rating. Allcurrents were well below the breaker rated interrupting current

    of 40 kA. Higher than nominal breaker interrupting times are

    expected at the lower fault currents. It must be taken into

    account for breaker failure timer settings. An event report

    from the BQN 2L374 protection relay nearly capture the entire

    event with filtered currents and voltages. The clearing points

    of various protections are easily identified with changes in

    currents and voltages at the BQN terminal.

    Figure 12: BQN Composite Protection Operations.

    V. SYSTEM ANALYSIS

    A. Simplified Steady-State Analysis

    Simplified steady-state analysis for the unbalanced open

    phase conditions is given in this section to estimate the natural

    resonance frequency provided by the open phase condition.

    When the natural resonance frequency is near the powerfrequency (60Hz), it is highly possible [1-5] that this will lead

    to the over-voltage phenomenon during the incident reported

    in this paper.

    Figure 13 shows the three-phase circuit diagramrepresenting BQN-2L374-2L379 sub-network. For simplicity,

    there are a few assumption made to the network. They are asfollows:

    Assume the healthy phase voltages (A and B) are equal

    and 120 degree apart

    Assume both lines are fully and properly transposed

    Ignore non-linear effects, i.e. surge arrestor conduction,

    transformer or reactor magnetic saturation, or coronaeffects

    Lump phase-to-ground capacitance and interphase

    capacitance on both lines as one set of capacitance

    Ignore the TAT primary to secondary coupling since the

    load is very small

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    8/12

    8

    Figure 13: Simplified BQN-2L374-2L379 sub-system with C

    phase open.

    The symbols used on Figure 13 are self-explanatory. The

    shunt reactor 2RX25 at BQN can be represented by the shunt

    inductance (Lg). The transformer TAT T1 leakage impedance

    between Primary winding and Tertiary Winding can berepresented by the inductance LT. For each transmission line,

    the phase-to-ground capacitance (Cg) and the inter-phase

    capacitance (Cm) can be obtained from the line parameters Positive Sequence Capacitance (C1) and Zero Sequence

    Capacitance (C0):

    3

    01 CCCm

    , 0CCg

    The two transmission lines 2L374 and 2L379 are in parallel.

    Therefore, their inter-phase mutual capacitance (Cm) and

    ground capacitance (Cg) can be lumped together and berepresented by a total Cmand Cg.

    Figure 14 (a) shows the equivalent network representationfor one open phase condition in Figure 13. It can be further

    simplified by finding its Thevenin Equivalent circuit which is

    shown in Figure 14 (b). The equivalent circuit is a simple LCcircuit, and the natural resonance frequency of this circuit can

    be derived as follows:

    Hz

    LL

    CCLLf

    Tg

    mgTg

    6.62)2(

    2

    1

    The simplified circuit natural frequency is 62.6Hz which is

    very close to the power frequency of 60Hz. With the

    consideration of the transformer saturation, the leakage

    impedance will become larger and hence change the resonancefrequency still closer to 60Hz. It is highly possible that the

    resonance phenomenon could result in the open-pole voltage

    rising above the source voltage level (1p.u.). Therefore, it

    gives a general indication of how the system voltage couldpossibly behave in the open pole condition.

    Tg

    Tg

    LL

    LL

    Figure 14: Simplified Thevenin Equivalent Circuit.

    This simplified analysis is only for the purpose of

    understanding. It does not include non-linear components

    which will be considered in the following sections for moreaccurate modelling and simulation.

    B. EMTP Linear Analysis with and without TAT T1

    To establish the dominant causes of the high over-voltages

    during the 2L102 SPO period, all the nonlinear effects

    (arrestor conduction, magnetic saturation, and corona losses)

    are neglected; only the linear effects are simulation. Through aprocess of elimination, each transformer and reactor is

    removed one by one and the 2L102 SPO period is simulated.The C phase voltages are then observed. It was determined

    that TAT T1 was the dominant cause of the high C Phase

    over-voltages. See Figure 15 for simulation with TAT T1 as

    well as without TAT T1.

    Other than the opening of 2L102 Phase C at BQN 3 cyclesafter fault inception, no other switching occurs during the

    simulations. For simplicity, in the simulations the small station

    service load supplied from BQN T3 was neglected and theTAT distribution load was assumed to be only 300 kW. Since

    the instantaneous Phase C-to-ground voltage is of primary

    interest, only that phase is plotted.a) Linear Case with TAT T1

    This case assumes the same initial conditions as on 7thJanuary Phase C fault near BQN and the same SPO switching

    times. All shunt reactors and the BQN and TAT transformers

    are in service. As can be clearly seen in Figure 15 (a), as soon

    as 2L102 Phase C is disconnected at BQN, the magnitude ofthe fundamental frequency voltage in Phase C of the BQN-

    FKR-RDC system escalates dramatically, to more than 5 pu

    after six cycles. This indicates the presence of a nearfundamental frequency resonance for this open-phase

    condition. The Phase C voltage waveform is actually the first

    part of a ring-down waveform. The waveform results from the

    modulation of two frequencies, one being the power frequencyor forcing frequency and the other being the natural (orresonant) frequency of the circuit. Capacitive and magnetic

    coupling to two phases energized from the grid provides the

    sustained source at power frequency. The transient resonantresponse of Phase C will be shown to be close to 60 Hz.

    Increasing the EMTP simulation time shows a beating effect

    in the waveform where the modulation would have eventuallyreached a minimum voltage (less than 1 pu) and then repeated

    but with reduced magnitudes.

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    9/12

    b)

    gr

    se

    Fipr

    fre

    wi

    inTha

    th

    Fi

    C.

    lin

    re

    k

    dias

    necy

    W

    int

    ar

    20

    boT

    T1

    Linear Case

    For this EMTunded-star a

    vice. The Ph

    ure 15 (b) sceding case,

    quency of th

    h TAT T1 a

    tantaneous ois case clearlyominant role i

    t occurred for

    ure 15: EMT

    EMTP Non-

    Figure 16 coear effects t

    order (DFR)

    instantaneo

    played in solidotted lines.

    r BQN at T =les later and

    thin 1.5 cycl

    o a high TOV

    und 1.67 pu

    0 ms BQN T

    th T3 as wellV on Phase

    trips off.

    without TAT

    simulation,d delta terti

    se C phase-to

    ow a dramatof the over-v

    modulated

    d BQN T3 o

    er-voltage ondemonstratesn producing t

    the January 7,

    P Linear Anal

    inear Analysi

    pares the E the recorde

    t the BQN e

    s C Phase

    d lines whilePhase C-to-

    0 and the Pha SKA Phase

    s, Phase C-to

    , with an initia

    ollowed by a

    protection o

    as 2RX22. Th to about 1.7

    1

    AT T1 (HVry) is assum

    -ground volta

    ic reduction,oltages durin

    aveform is si

    t of service

    ly marginallythat TAT T1e high tempor

    06:21:21 SP

    sis with and

    with TAT T1

    TP simulati data from

    d of the 2L3

    voltage (phas

    he simulatedround fault o

    se C of the linC opens one

    -ground volta

    l 2 cycles of a

    TOV of abo

    ens 2CB2 an

    ere is an imm1 pu, which p

    rounded-stared to be out

    e waveforms

    compared toSPO. The b

    ilar to the c

    ut the maxim

    exceeds 1.0ust have pla

    ary over-volta

    event.

    ithout TAT T

    n with the nthe digital f

    9. The DFR

    e-to-ground)

    alues are shocurred on 2L

    at BQN openhalf cycle la

    e at BQN g

    n over-voltag

    t 1.6 pu. At

    2CB3 and tr

    diate increasersists until T

    Vof

    of

    theeat

    ase

    um

    pu.edes

    1.

    on-ult

    87

    are

    wn02

    s 3er.

    oes

    of

    =

    ips

    inT

    The

    correspdots su

    287 k

    voltagewavefo

    the Rel

    of the

    RMSEphase

    conside

    offsets.

    field re0.9673

    Theref

    kV syinvesti

    Figure

    The

    metal

    absorptfor this

    simulat

    instantacurrent

    energy

    the tim

    voltage

    capabili

    EMTP simul

    onding to theperimposed o

    voltages. A

    waveforms arms. The goo

    tive Mean Sq

    rror divided

    for phase A iis 7.39%. Th

    ration the err

    In addition, t

    cording and sifor A phase

    re, the EMT

    tem has beeations.

    16: EMTP No

    228kV rated

    xide arrester

    ion capabilityarrester is the

    ion of the 2S

    neous voltagduring the S

    accumulation

    e that TAT T

    , the arrester h

    ty. Once a m

    ation of the

    equence of ev the three pl

    s can be see

    re in good agness of fit of t

    uared Error (

    by the RMS

    s 2.10%, fore RMSE is us

    r magnitude

    e Pearson cor

    mulation valu, B phase, a

    model of th

    n verified an

    n-linear Anal

    urge arresters

    s rated IEC

    of around 10efore about 2.

    A25 Phase C

    e across thePO. As can b

    occurs after

    1 trips off, e

    as absorbed 1.

    tal oxide arre

    phase-to-gro

    ents is shownots of the me

    n, the simula

    eement withhe model is d

    MSE), which

    f the field re

    hase B is 1.2ed because it

    hile consideri

    elation coeffi

    es are 0.9899,d C Phase,

    linear and n

    d is suitable

    sis with TAT

    2SA25 on B

    Class 4 wit

    kJ/kVr. The3 MJ. Figure

    energy accu

    arrester, ande seen, the hi

    3 and 2RX22

    ding the tem

    94 MJ, or 84

    ster is subject

    9

    nd voltages

    as a series ofsured BQN

    ted Phase C

    the recordedtermined by

    is the square

    ording. The

    4%, and foran take into

    ng the phase

    ients for the

    0.9944, andrespectively.

    onlinear 287

    for further

    T1.

    QN 2B5 are

    an energy

    rated energy17 shows the

    ulation, the

    the arresterhest rate of

    trip off. By

    orary over-

    ercent of its

    ed to energy

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    10/12

    ab

    loco

    Fi

    En

    ter

    A.

    Imph

    soltri

    A

    Di

    sorption abov

    ses may responents and

    ure 17: EMT

    ergy Absorpti

    V

    This sectionm over-voltag

    Immediate A

    mediately aftase trip and

    utions couldand auto-recl

    vantages:

    This solutio

    temporary

    investment isadvantages:

    Any single-l

    of the Nortloss of rev

    Chris Mine,

    of service to

    its rating, th

    lt in thermathe arrester fai

    P Simulation

    n.

    . MITIGATIO

    escribes thee mitigation al

    tion

    r 7th January

    reclose mod

    be developed.ose three-pole

    prevented a

    over-voltage

    hardware an

    ine to ground

    hwest Transnue for the

    loss of station

    distribution c

    internal heati

    runaway ofls.

    of BQN Surg

    ALTERNATIV

    short-term, internatives.

    2015 incidee was disabl

    The 2L102 rfor all detecte

    repeat of the

    event wit

    communicati

    ault causes a

    ission systemnon-utility ge

    service at BQ

    stomers.

    ng due to ene

    the zinc ox

    Arrestor 2S

    ES

    terim, and lo

    t, 2L102 sined until furt

    lays were setd faults.

    January 7th h

    out additio

    ons.

    omplete brea

    , disruptionnerator and

    N, as well as l

    gy

    ide

    25

    g-

    le-her

    to

    igh

    nal

    up

    nded

    oss

    B. Lo

    Analyti

    generat

    of a se2L102.

    to prov

    It wa

    dynamiloadingtesting

    MW in

    chosenNUG a

    connec

    single-

    EMP18. A

    possibl

    enable/

    This m

    relay b

    Advant

    Disadv

    g Term Soluti

    cal studies

    ion and/or loa

    ere over-voltFaults betwee

    e these results.

    s decided that

    cally controllat BQN subsit was decide

    low into BQ

    as this guarare operating a

    ion from the

    ole tripping o

    T studies anaurther long t

    use rem

    isable single-

    ay achieve m

    sed solution.

    ages:

    This solutio

    additional

    operational i

    ntages:

    This soluti

    resonant circ

    n

    identified tha

    in the BQN

    ge during sinn October 201

    single-pole tr

    ed by moniation. To simd to focus so

    substation.

    tees at least tt their full ou

    L379 to 2L10

    n and off.

    yzing this solrm solution i

    dial action

    pole tripping

    re dependabil

    n does not r

    ajor equip

    n the least tim

    n does not

    uit.

    t if there i

    ystem then th

    gle-pole open4 and January

    ipping of 2L1

    toring real tlify protectioely on monit

    threshold of

    wo generatingtput. A simpl

    2 protection r

    ution are shos being explo

    scheme co

    ased on area

    ity than a pu

    equire the in

    ent, is expe

    and at the le

    detune the

    10

    s sufficient

    ere is no risk

    intervals on2015 helped

    02 would be

    ime systemsetting and

    oring 2L379

    23 MW was

    units at thehard wired

    lays toggles

    n in Figureed that will

    trollers to

    ower flows.

    e protection

    vestment in

    cted to be

    st cost.

    fundamental

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    11/12

    Fi

    2L

    C.

    de

    dein

    A

    Di

    ure 18: EM

    379 and Singl

    Equipment R

    For this optio

    ta-grounded

    signed, single-SPO and all ot

    vantages:

    This option

    During SP

    system wou

    temporary o

    A STATC

    problem inperiod of th

    sadvantages:

    There couldBQN 25 k

    two of the p

    SPO conditi

    pumps, sewby the oscill

    The over-vo

    installs a n

    connect the

    will have a

    create a sim

    P Simulation

    e-Phase Trip.

    eplacement

    , the existing

    tar transform

    line to grounher faults wou

    etunes the re

    , the voltag

    ld be similar

    er-voltage.

    M that wou

    the distributiSPO

    be a power qsystems ther

    ase-to-groun

    on. Rotating

    ge treatmentting electrom

    ltage problem

    ew 287/69 k

    future McLy

    delta-connec

    lar problem a

    of 23 MW

    AT T1 woul

    er, the same

    faults on 2Lld result in 3P

    onance and sh

    waveforms

    to Case 6,

    ld reduce th

    n voltages at

    ality concern.e will be seve

    voltages duri

    achinery (e.g

    umps, etc.) cagnetic torque.

    may re-emerg

    autotransfo

    ont project.

    ted tertiary

    s found for T

    f Generation

    be replaced b

    as BQN T3.

    102 would reO.

    ifts it to 53 Hz

    on the 287

    aving negligi

    power qua

    TAT during

    On the TATre modulation

    g the 1.1 sec

    . water treatm

    ould be impac

    e when the N

    mer at FKR

    This transfor

    inding and

    T T1. Howe

    on

    y a

    As

    ult

    .

    kV

    ble

    ity

    the

    ndin

    nd

    ent

    ted

    G

    to

    er

    ill

    er,

    if

    traCo

    an

    aut

    A.

    Eff

    Over

    priority

    in a r

    plannervariety

    configu

    reactor

    B. Eff

    Trippin

    The

    This p

    couplin

    the prisystem.

    networ

    studiesespecia

    subsyst

    C. Pr

    Damag

    Withthe 1.7

    cycles.

    voltage

    was ex

    area woperati

    arrestor

    effectethe hig

    D. Qu

    Proble

    Mod

    in a mOnce t

    identifi

    modific

    when stime fo

    conduc

    the 2L379 te

    sformer wilnsequently, a

    problem

    otransformer,

    cts of Single-

    -voltage miti

    when consid

    mote or radi

    s to considerof intent

    rations when

    and transfor

    cts of Magnet

    g Schemes

    effects of L-

    per highlight

    g of a transfo

    ary cause oThis effect is

    analysis and

    when desiglly in a radi

    ems.

    tection Syst

    e

    out the threepu over-volt

    The protectio

    to 20 cycles.

    eriencing an

    s experiencinns helped to

    s from prolo

    equipmentlighted incide

    ick Protection

    s

    ern multi-func

    nner beyonde source of t

    ed BC Hydr

    ations to rest

    stem configur further studi

    ed without im

    minal breake

    not be c operating o

    created by

    if Alternative

    II. CONCLU

    ole Tripping

    ation should

    ring using a s

    al system. It

    the system reional and

    specifying eq

    ers

    ic Coupling of

    circuit reson

    d that a prev

    rmers buried

    f the over-vnot easily de

    highlights th

    ning single-pal system th

    em Operatio

    perations in tge condition

    n relays reduc

    Although non

    nternal fault,

    g a severe ovave the transf

    ged over-volt

    as shown lasnt.

    Solutions to P

    tion relays ha

    he original inhe January 7t

    was able to

    re single-pol

    ation will safes such as eq

    mediate time

    s at FKR ar

    nnected toder can prob

    the additio

    is implemen

    SIONS

    n Radial Syst

    be a prima

    ingle-pole trip

    is important

    onance frequunintentional

    ipment such

    Equipment in

    ance are well

    iously unkno

    delta tertiary

    ltage experieonstrated by

    e need for det

    ole trippingt supplies o

    n Prevented

    e BQN protewould have l

    ed the length

    e of the trippe

    all of the equi

    er-voltage. Tormers, reacto

    age. To date,

    ing negative

    revent System

    e the versatili

    tention of relover-voltage

    quickly mak

    tripping to t

    ly allow. Thisipment repla

    onstraints.

    11

    e open, this

    the system.bly prevent

    n of this

    ed.

    ms

    ry planning

    ping scheme

    for system

    ncy under aoperating

    s line shunt

    Single-Pole

    understood.

    n magnetic

    inding was

    ced by theonventional

    ailed EMPT

    schemes ne or more

    Equipment

    ction systemasted for 60

    of the over-

    d equipment

    pment in the

    e protections, and surge

    none of the

    effects from

    Operation

    y to be used

    y engineers.was clearly

    e protection

    e area only

    has allowedement to be

  • 7/26/2019 Single-Pole Operation Leads to Hazardous

    12/12

    12

    VIII. APPENDIX I

    A. 2L102 Construction

    Figure I-1 shows a typical steel-Y type monopole tower for

    this flat-configuration circuit. The average height of the

    conductor above ground at the tower is 15.0 m. Each phasecomprises a bundle of two 2B-1590 KCMIL ASCR Lapwing

    conductors in a 45.7 cm arrangement.

    Figure I-1: 2L102 Tower Configuration

    IX. REFERENCES

    1. F. Iliceto, E. Cinieri and A. Di Vita, Overvoltages Due to

    Open-Phase Occurrence in Reactor Compensated EHV

    Lines, IEEE Transactions on Power Apparatus and

    Systems, Vol. PAS-103, No. 3, March 1984, pp. 474-482.2. Marta Val Escudero and Miles Refern, Effects of

    Transmission Line Construction on Resonance in Shunt

    Compensated EHV Lines, Presented at the InternationalConference on Power Systems Transients (IPST05),

    Montreal, Canada, June 19-23, 2005, Paper No. IPST05-

    09.

    3.

    M. Nagpal, Terry Martinich, Amitpal Bimbhra and Dave

    Sydor, Damaging Open-Phase Overvoltage Disturbanceon a Shunt-Compensated 500 kV Line Initiated by

    Unintended Trip, IEEE Transactions on Power Delivery,

    Vol. 30, No. 1, February 2015.4. M. Nagpal, Terry Martinich, Amitpal Bimbhra, Dave

    Sydor and Jerry Wen, Damaging Open Pole Over-

    Voltage Disturbance Initiated by Personnel Incident,Western Protective Relaying Conference in October 2013,

    Spokane, WA, USA.

    5. Terry Martinich, M. Nagpal and S. Manuel, Analysis of

    Damaging Open-Phase Event on a Healthy Shunt

    Compensated 500 kV Line Initiated by Unintended Trip,

    Presented at the International Conference on Power

    Systems Transients (IPST2015), Cavtat, Croatia June 15-18, 2015, Paper No. 15IPST200