    White Paper

    Best Practices for Application Configuration

    Deployment in Siebel 7.7 and Siebel 7.8

    October 2005

  • 8/8/2019 Siebel Best Practices WP Fnl

    2/32

    Table of Contents

    Introduction1

    Section One 3

    Planning & Analysis 4

    Define Changes 5

    Configure Changes 5

    Package Changes 7

    Deploy/Activate Changes 7

    Testing 8

    Section Two 10

    Deployment Details for Each Change Category 10

    Repository ObjectsGeneral 10RepositoryCompiled 11

    RepositoryNon-Compiled 12

    RepositoryAdditive and Non-Additive Schema 14

    Authored Data by Business Users or Administrator 17

    Section Three 19

    Techniques to Reduce Downtime During Deployment 19

    Repository 19

    Schema 21

    Run-time CustomizationsAdditions/Updates to Current Logic 22

    Authored Data by Business Users or Administrators 22

    Appendix One 23

    Deployment Scenarios 23

    Appendix Two 27

    Deployment/Activation Summary for Common Configuration Areas

    for Release 7.7 and 7.8 27

  • 8/8/2019 Siebel Best Practices WP Fnl

    3/32

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    This document describes the best practices for application configuration deployment in aSiebel 7.7 or Siebel 7.8 environment, and focuses on the procedures to package, deploy, and

    activate a customized Siebel application. While an overall change management process may

    be used, this document addresses the process for deploying an approved and implemented

    change request from a development environment to a test or production environment.

    The primary audience for this document includes IT leads and managers responsible for

    deploying and migrating operations against Siebel environments. Useful information is

    also included for development leads and managers to help them participate in deploy-

    ment planning and execution. Content in this document is limited to the deployment to

    a Siebel Enterprise and does not cover other deployment options such as mobile clients or

    handheld clients.

    This document details the following:

    The high-level process flow associated with managing a change request

    Deployment management details for the common change categories

    Techniques to help minimize downtime during deployment

    Appendix One offers a sample deployment scenario to help clarify the process further.

    Appendix Two includes a table that lists common configuration areas, along with

    deployment-related information.

    You should use this document in conjunction with the following books from the Siebel 7.7

    and Siebel 7.8 bookshelves:

    Going Live with Siebel Business Applications

    Configuring Siebel Business Applications

    Using Siebel Tools

    Siebel Enterprise Integration Manager Administration Guide

    Applications Administration Guide

    Siebel Reports Administration Guide

    Testing Siebel Business Applications

    Technical notes referenced in this document

    Introduction

  • 8/8/2019 Siebel Best Practices WP Fnl

    4/32

    2

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Using a Non-Standard Change Request, you should have Siebel Expert Services reviewthe following:

    New indexes

    Docking visibility changes

    Non-standard changes to the data model

    Non-standard ways to minimize the downtime from deployment

    Performance Tuning

    Architecture Review

    This document discusses changes relevant only in the Siebel environment, and it does

    not point out any external interface issues that need to be addressed.

    The following list of terms used within this document are specific to the deployment ofSiebel application changes:

    Change Request: A logical entity that represents the reason behind performing a change

    to the application functionality. It might be created using a change management system

    or created and tracked using other means.

    Categories: Within Siebel applications, customized objects are organized into different

    categories based on their physical nature, deployment behavior, and tools in use. For

    example, objects that reside within the Siebel Repository are considered a category of

    objects called Repository Objects.

    Run-time Customizations: Within Siebel applications, these are normally records in

    the Siebel run-time database that are configured or customized by developers and

    Siebel administrators to influence the applications functionality. Run-time customiza-

    tions also include values that dr ive the business execution within production for items

    like list of values and assignment rules. Run-time customizations are considered one

    change category.

    Schema Synchronization: This is a step within the Siebel Repository migration process

    that applies the customized schema objects in the repository to the database.

  • 8/8/2019 Siebel Best Practices WP Fnl

    5/32

    Figure 1. Process flow associated with managing a change request in a Siebel 7.7 or

    Siebel 7.8 environment.

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Section One

    A process flow typically associated with managing a change request in a Siebel environmentis described in Figure 1, below.

  • 8/8/2019 Siebel Best Practices WP Fnl

    6/32

    4

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    The following sections give an overview of the steps in the process flow outlined in Figure 1.

    Planning & Analysis

    First, you must clearly define and document the business requirements for the change

    request, as well as identify its business impact. For example, end users may need to make

    changes to an existing business process or adapt to changes in the user interface and business

    logic. The next step is to map the business requirements to technical requirements as follows:

    Identify the changes to the application configuration

    Identify resources required to implement the changes

    Identify the required time to implement the changes

    Define the scope of the changes

    Document the high-level design for the change request

    Be sure to analyze the impact on the data model and existing interfaces and consider the

    impact to performance from these changes to the application. Although performance-related

    configurations are not covered in this document, custom scripts (server level) are an exam-

    ple of what to consider when looking at performance impact. Consider changes to scripts

    based on frequently called events as well as logic acting on large amounts of data. Discuss

    the performance with business users and document acceptable key performance indicators

    (KPIs). KPIs are a set of metrics that can be established to define the acceptable performance

    characteristics for a given functionality.

    In this phase a Deployment Item Listshould also be created. This list contains a record for

    each item that must be packaged and deployed to capture the necessary customizations

    associated with the change request. It can also contain additional deployment-relatedinformation such as deployment technique to use, any deployment prerequisites, ownership,

    approvals, and so on. It is important to keep this list up to date and to add additional details

    as they emerge during the course of the project. The list is not only used to make sure that

    all customizations are being deployed, but it is also used to plan the deployment process and

    any automated steps. You can track the Deployment Item List with the Siebel 7.8 change

    management functionality, through a third-party change management system, or manually

    in a spreadsheet.

  • 8/8/2019 Siebel Best Practices WP Fnl

    7/32

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Define ChangesBased on the high-level design document, identify the required changes to the repository,

    run-time customizations and configuration files. For example, repository changes may

    involve creating a new join, creating a new field, or changing the property of an existing

    field for an existing business component. Subsequently, perform a dependency check in

    Siebel Tools to make sure all dependent objects also reflect the changes made to the business

    component. Identify any required changes to external system integration, detail the resource

    plan for each component of the change request, and then create a more detailed design

    document. From this, you can define a test plan based on the detailed design. Be sure to

    update the Deployment Item List as needed with any changes or additions you make.

    Configure Changes

    Before making any changes, make sure that the affected objects are backed up or thatthere is another mechanism to track the history of the changes (for example, using a

    source code control management system) to enable you to recover an object to a prior

    version if necessary.

    Using the design from the prior stage, make the configuration changes as required. Based on

    the categories of changes needed for each design, review Table 1 to identify the configuration

    tool to be used.

    The deployment management details for each change category in the following table are

    described in Section Two, Deployment Details for Each Change Category.

  • 8/8/2019 Siebel Best Practices WP Fnl

    8/32

    6

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Change Category Sub-Category Examples Configuration Tool

    Repository Objects Compiled UI Level: Applet, Application,Screen, View, Web Template,Report (New Reports, ReportName Changes)

    Bus Object Level: BusinessComponent, Business Object,Business Service, Link, PickList, Integration Object

    DB Layer: Table

    Siebel Tools

    Non-Compiled Workflow Policy Objects, Workflow

    Processes, Reports Objects (gener-

    ated into Report Object Library,

    .ROL, file)

    Siebel Tools

    Schema Additive New Table: Add new column,

    new non-unique index

    Existing Table: Add nullcolumn, not null column;Increase char/varchar/numericcolumn size

    Add non-unique index; Alter non-

    unique index

    Siebel Tools

    Non-Additive Change column default, nullto not null column, not null tonull column

    Change column type char tovarchar, varchar to char

    Decrease column size

    Siebel Tools

    Files On Siebel Server

    (webmaster and

    reports)

    Web Templates, Style Sheets,

    Images, Reports for Proposal

    Generator

    Manual, Third-Party

    Tools

    On Reports

    Server

    Report Executables (.rox), String

    Translation Files for Reports (.txt)

    Third-Party Applica-

    tion (Actuate e.Report

    Designer Professional)

    Run-time

    Customizations

    Additions of new

    logic or updates

    to current logic

    Additions of new (or updates to

    existing) Personalization Rules,

    State Model, Workflow Policies,

    SmartScripts and Assignment

    Manager Rules

    Developer Client

    (dedicated client in 7.7)

    Authored Data

    (by Business Users,

    Administrators)

    File-based

    Content

    Solutions, Literature Siebel Admin Views

    and third-party tools

    to modify file-based

    content

    Run-time Data Products, Product Catalog, Price

    Lists, Workspace Projects

    Siebel Admin Views

    Table 1: Change categories, examples, and configuration tools.

  • 8/8/2019 Siebel Best Practices WP Fnl

    9/32

    Figure 2. Change categories and the order in which they are executed.

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Package ChangesAfter the configuration of a ll the changes associated with the change request has been

    completed, the respective customized items are packaged according to the deployment

    item list. Packaging here refers to identifying and ex porting the customizations to file.

    For example, you can:

    Export the repository containing the repository changes using the Database

    Configuration Utility.

    Export the changes to the run-time data customizations using the Application

    Deployment Manager (ADM) or Enterprise Integration Manager (EIM), combined

    with export of the interface tables.

    Compile the repository objects into the run-time SRF (Siebel Repository File) and

    generate the browser scripts as needed.

    All the steps above can be executed interactively from a script or through a command line.

    See Section Two, Deployment Details for Each Change Category for details.

    It is recommended that you store and track the packaged customizations in a secure manner

    along with the deployment item listfor example, in a source code control management

    system or in a secure place in the file system with controlled access privileges.

    Deploy/Activate Changes

    Before deployment, make sure that repository objects, run-time customizations, and files in

    the target environment are backed up. Figure 2 shows the high-level steps and the order in

    which the various change categories are brought into the target environment.

  • 8/8/2019 Siebel Best Practices WP Fnl

    10/32

    8

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    There can also be dependencies between individual items that will dictate the order inwhich they must be deployed (both across change categories as well as within a category).

    For example, if a new State Model is developed for which a set of new list of values (LOV)

    has also been created, then the LOV definitions must be deployed first because the LOVs

    referenced in the state model will be validated against the LOV definitions in the database

    on import. It is important to identify these dependencies ahead of time and to test the

    deployment process of the collective changes in a test environment before moving into

    production. The deployment sequence for run-time customizations supported by ADM

    can be controlled by establishing data type relationships in the ADM Administration view.

    See the Migrating Customizations Between Applications section in Going Live with Siebel

    Business Applications for documentation on using ADM.

    It is recommended that you automate the deployment/activation process as much as pos-sible (for example, using the ADM custom scripts) to make sure that the same deployment

    process performed in the test environment is repeated in the production environment. This

    helps to achieve a high-quality deployment and also helps minimize downtime. See Alert

    2012 on how the Repository Migration task can be run unattended.

    The actual deployment and activation of each customization may require a different tool

    or mechanism. See Section Two, Deployment Details for Each Change Category and

    Appendix Two to identify the necessary deployment tools and activation steps needed.

    Testing

    In this phase all changes made as part of the change request are tested before rolling out any

    changes to the production environment. The main objectives of this phase are to make surethe functionality of the implemented customizations are verified and have not adversely

    affected prior functionality. Run the test plans you created to test the changes in a separate

    test environment. Make sure that the test plans cover testing of integration with any external

    systems. Also, be sure to validate that the key performance indicators (KPIs) are met. Note

    that for a major release it is recommended that performance testing is performed in a pro-

    duction-like environment before deploying into actual productionfor example, a scaled-

    down version of the production system.

    Be sure to follow the Deployment Item List and the associated deployment process devel-

    oped for the production system when deploying into the test environment. This ensures that

    the results will be the same when you later deploy into the production environment.

  • 8/8/2019 Siebel Best Practices WP Fnl

    11/32

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Use the test results to make any further configuration changes or corrective changes in thedevelopment environment. Hence, the development and testing phases may be iterative until

    you get the desired results from testing. Be sure to update the Deployment Item List accord-

    ingly and to use the updated list when you redeploy before the next test cycle.

    You may automate the testing of application functionality and performance using the test

    automation APIs. See Testing Siebel Business Applications for details and license require-

    ments. For customer order management objects, you can use the Scenario Tester to simulate

    a post-deployment environment.

    After deploying into the production environment, perform a limited set of testsoften

    referred to as user acceptance teststo verify the new functionality and make sure all the

    customizations were correctly deployed.

  • 8/8/2019 Siebel Best Practices WP Fnl

    12/32

    10

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Deployment Details for Each Change CategoryThe sections below describe the deployment management details for different change cat-

    egories (see Table 1). See also Appendix Two for a summary of deployment- and activation-

    related information for common configuration areas.

    Repository ObjectsGeneral

    The repository objects are divided into three main categories from a deployment

    perspective:

    Compiled objects

    Schema objects (these are also compiled, but they require an additional database

    synchronization step)

    Non-compiled objects

    Details on the three different categories are described in the following sections. However,

    for all three categories, the repository objects themselves are generally migrated together

    using one process. The compiled objects, including schema objects, are compiled into one

    file accessed by the Siebel application server at runtime, the Siebel Repository File (SRF).

    The general packaging/deployment process for the repository and SRF is described in this

    section. Exceptions are noted in the detailed sections below.

    Packaging/Deployment

    RepositoryExport the repository containing the changes to file using the Database

    Configuration Utility. Note that you perform this export only after the development team

    has acknowledged that the customizations are ready for deployment. The exported reposi-

    tory file is migrated into the test or production environment using the Repository Migrationprocess. This migration process also includes the step to apply the schema changes within

    the repository to the database and execute them as part of the migration. It is recommended

    that you perform this step whether or not the new repository contains schema changes.

    The repository deployment step is considered complete once it has been imported to the

    target database and given a name known to the Siebel Enterprise.

    For information on the Database Configuration Utility, see the Managing Repositories

    section in Using Siebel Tools. For information on the Repository Migration Utility, see

    the Migrating Repositories Between Databases section in Going Live with Siebel

    Business Applications.

    Section Two

  • 8/8/2019 Siebel Best Practices WP Fnl

    13/32

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    SRF and Browser ScriptsUse Siebel Tools to compile the SRF files from the repositorycontaining the changes. You must compile a separate SRF for each language to be supported.

    A full compile is recommended when deploying to test or production environments. Also,

    note that Siebel Tools SRF compilation requires binary sort setting in the database, so the

    SRF cannot be compiled from a database with a dictionary sort setting. The SRF files must

    be copied to the objects directory on all the Siebel application servers while the servers are

    off line. While compiling the SRF, you can generate any browser scripts. Update the scripting

    options in Siebel Tools to point to a directory of your choice where the browser scripts will

    be created (this is a one-time step). You must then copy the browser scripts to the webmaster

    directory on each Siebel Server.

    For information about compiling .SRF files and generating browser scripts, see Using Siebel

    Tools on the Siebel Bookshelf.

    ActivationThe deployment consisted of the repository, SRF file and the browser scripts.

    For the new repository and SRF to take effect, the application servers must be restarted. To

    activate the browser scripts, either restart the Web servers or issue the UpdateWebImages

    SWE command. For details, see FAQ 2104: How Do You Deploy Customized Images, Style

    Sheets, Help Files, and Scripts To Your Web Servers? and the Configuring for Security:

    Overview section in the Security Guide for Siebel Business Applications.

    RepositoryCompiled

    Changes to UI objects, business objects, business components, integration objects, and

    tables require you to recompile the .SRF file. The repository itself must also be migrated

    to the target environment along with the .SRF. See the previous section on compiling anddeploying the .SRF and migrating the repository.

    Note that changes to the compiled objects often have interdependencies with other types

    of customizations. For example, if a business service is part of one or more new workflow

    processes, remember to also deploy these workflow processes from development to test or

    production environment (see the Workflow Process subsection in Section Three).

    Changes to the integration object structure are also associated with changes in other busi-

    ness layer objects, as well as integration run-time settings relating to EAI (Enterprise Appli-

    cation Integration). As part of putting the new object structure into effect, all synchronous

    interfaces affected by the deployment are stopped and started (through the server restart),

    which may also directly affect any associated external systems.

  • 8/8/2019 Siebel Best Practices WP Fnl

    14/32

    12

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    RepositoryNon-CompiledCertain objects in the repository are not compiled into the .SRF, but are either accessed

    directly from the repository at runtime or used by other objects during the design and

    packagingfor example, reports objects exported into Report s .ROL. The noncompiled

    objects are usually deployed together as part of the overall repository migration. Alterna-

    tive deployment steps for certain ty pes are noted in the following sections.

    Workflow Policy Objects

    Changes: Changes to Workflow Policy objects, Workflow Policy columns or Workflow Policy

    programs are considered major functionality changes because they drastically change an

    existing object or add new objects for policy support. You make these changes using Siebel

    Tools and access them directly from the repository during runtime by the Siebel application.

    Packaging/Deployment:See the Repository ObjectsGeneral section.

    Activation: When rolling out changes to the Workflow Policy objects in the repository,

    you must restart the Workflow Monitor Agent (WorkMon) server component to make the

    changes take effect. However, because the configuration changes reside within the repository,

    typically the application servers themselves (not just the Workflow Monitor Agent com-

    ponent) will need to be restarted to put the new repository in effect. If the rollout includes

    changes to existing Workflow Policy objects you must make sure that the current outstand-

    ing requests have been processed through the older (current) configurations before the

    WorkMon component is shut down.

    Any changes made to the Workflow Policy conditions in the run-time customization will

    also require the database triggers to be regenerated through the Generate Triggers (GenTrig)

    server component unless the Workflow Policy has batch flag set to TRUE, or if the changes

    are limited to the Workflow Policy actions. In all cases, you must restart the workflow moni-

    tor and action agents for the affected groups. See the Workflow Policy section in Siebel

    Business Process Designer Administration Guide.

  • 8/8/2019 Siebel Best Practices WP Fnl

    15/32

    1

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Workflow Processes

    Changes to Workflow Processes: Configuration changes to Workflow Process definitions in

    the repository are made in the repository using Siebel Tools.

    Packaging/Deployment:To migrate the changes to a target environment, use the UI Work-

    flow Process export/import in Siebel Tools, the Workflow Admin Service business service,

    or the Repository Migration process as part of migrating the entire repository. After the

    Workflow Processes are imported, click Deploy in Siebel Tools to mark Workflow Process as

    completed and ready for activation. The Deploy button allows the processes to be activated

    in the following step. The Workflow Admin Service business service in Siebel 7.8 could be

    used to import, deploy, and activate Workflow Processes in bulk.

    The UI method is documented in the Siebel Business Process Designer Administration Guide.

    Summary steps are as follows:

    Copy or import the Workflow Processes into the target repository using any of the three

    methods mentioned above.

    Click Deploy for each Workflow Process within the Siebel Tools UI.

    Activation: A newly deployed Workflow Process must be activated using either the Siebel

    run-time client or the Workflow Admin Service business service (see the previous section for

    Siebel Bookshelf references). The business service provides the additional benefit of activat-

    ing all the customized processes in one step. In addition, note that the new definitions of the

    Workflow Processes will not start executing until the activation step is complete.

    Reports (Objects generated into .ROL file)

    You can make functional and structural changes to existing report objects, such as adding

    new columns or adding one or more subreports. See Siebel Reports Administration Guide

    for details.

    Changes: Make changes to reports using Siebel Tools. You need to generate an .ROL file for

    each report object that has been modified, using the Generate Actuate Report option in the

    Tools menu in Siebel Tools.

    Packaging/Deployment:No changes specific to Siebel need to be packaged. However, you

    must regenerate the report executable (.ROX) from the new .ROL file using the Actuate

    e.Report Designer Professional. This report executable (.ROX) file is then migrated to the

    Actuate Reports Server using Actuate Management Console.

    Activation: There is no actual activation step, but the new report will take effect for all new

    requests after it is deployed in the Actuate Reports Server.

  • 8/8/2019 Siebel Best Practices WP Fnl

    16/32

    14

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Assignment Manager Objects

    Changes to Assignment Manager Criteria, Attribute and Assignment Object (child-object

    to Workflow Policy Object): The Assignment Manager objects are stored in the repository and

    changes are made using Siebel Tools.

    Packaging/Deployment:Note that although these objects are accessed directly from the

    repository in the database at runtime, for most changes to Criteria and Attributes you will

    also need to recompile the SRF because it is used by the Assignment Manager Administra-

    tion views. See Siebel Assignment Manager Admininstration Guide for details.

    Activation: When rolling out changes to the Assignment Manager repository objects, you

    must restart the Assignment Manager server component to make the changes take effect.

    However, because the configuration changes reside within the repository, you must restartthe application servers themselves, and not only the Assignment Manager component, to put

    the new repository in effect.

    If any run-time customization changes have also been made to Assignment Policies in

    the run-time database, you must restart the Workflow Monitor Agent for the Assignment

    Manager and regenerate the database triggers through the Generate Triggers (GenTrig)

    server component. Also, if any changes have been made to Assignment Manager Rules in

    the run-time customization, you must refresh the Assignment Managers rules cache by

    releasing the new rules f rom the Assignment Manager Rules Administration v iew. Note

    that any currently executing Assignment Manager tasks will continue to use the old rules

    until the tasks are completed.

    See the Server Administration Requirements After Configuration section in Siebel

    Assignment Manager Administration Guide for additional deployment-related

    details for Assignment Manager.

    RepositoryAdditive and Non-Additive Schema

    Customers may make additive or non-additive changes to the database schema (see Table

    1 for detailed examples). The standard deployment process for both types of change is the

    same (see also Section Three, Techniques to Reduce Downtime during Deployment).

    Changes: Additive changes include extending the schema by adding tables, columns, or

    non-unique indexes, and mapping these extensions to the business objects layer and UI

    layer. Non-additive changes include changing the column default, changing the column

    from null to not-null, and so on. The changes to the schema definition objects are made

    using Siebel Tools.

    Packaging/Deployment:See Section Two, Repository Objects-General.

  • 8/8/2019 Siebel Best Practices WP Fnl

    17/32

    1

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Activation: After the repository has been imported during the deployment step to the targetenvironment, you must synchronize the schema changes to the physical database while the

    system is off line. You can do this synchronization as a step of the Repository Migration

    process or you can do it separately. The Repository Migration process runs from the Siebel

    Server installation directory and connects directly to the database. It does not depend on the

    actual server processes and infrastructure, but the database requires that the physical objects

    to be modified are not used by any other user processes. During the schema synchronization

    step the Repository Migration process generates a DDL file to be applied to the database that

    updates the physical schema to match the repository schema object definition. Consult with

    your DBA to review the DDL and determine the outage window. If your database platform

    is on z/OS, review the Siebel documentation carefully for additional steps that are specific to

    this platform.

    The activation of the schema customizations is considered complete once the schema

    synchronization step has completed successfully and the Siebel Server has been restarted

    to use the newly imported repository.

    More About Schema Synchronization: This is a step within the Repository Migration

    process that is also known as DDLSync. During this step any customizations done

    to the Tables object in Siebel Tools are applied to the database schema. This application

    is done through an internal Siebel utility ca lled ddlimp.exe. This utility compares the

    schema customizations (Table object) in a given repository and alters the objects in the

    database schema to match the repository by issuing SQL commands. These commands

    are usually not visible to the end user.

    Files on the Siebel Server

    As part of the application configuration you may need to customize the UI (layout/format)

    through changes to Web templates, images, or style sheets. You may also need to change or

    add report files used by the Proposal Generator.

    Changes: Changes to Web templates and style sheets provided by Siebel Systems are

    typically made using third-party tools because Siebel Systems does not provide the tools

    to modify them.

    Packaging/Deployment:Siebel Systems does not provide any specific tools to deploy the

    Web templates and style sheets modified by customers. The modified Web templates should

    be copied to the Siebel Application Server into the webtempldirectory. The modified images,

    style sheets, and other UI-related objects should be copied to subdirectories under the web-

    masterdirectory. See the Migrating Repositories Between Databases and Post-Repository

    Migration Tasks sections in Going Live with Siebel Business Applications.

  • 8/8/2019 Siebel Best Practices WP Fnl

    18/32

    16

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Note that the files under the webmasterdirectory must be deployed to all application serversbefore activation because a Web server may request the newly deployed files from any of the

    application servers.

    Copy report files used by the Proposal Generator to the Reports directory on all the

    application servers.

    Activation: For the Web templates changes to take effect, the Siebel Application Servers

    must be restarted. For the changes to style sheets and other webmasterfiles to take effect,

    you must restart the Web servers or issue the SWE command UpdateWebImages. Note

    that even though the webmasterfiles eventually reside on the Web server, they are actually

    deployed to the Siebel Application Server. More information is available on Siebel Sup-

    portWeb in FAQ 2104.

    Files on the Reports Server

    As part of the application configuration, certain report executables and translation text files

    may need to be deployed on the Reports Server. See Siebel Reports Administration Guide for

    more details on deploying reports.

    Changes: Customers may have modified an existing report or created a new report using

    the Actuate e.Report Designer Professional and would like to deploy the resulting executable

    (.ROX) on the Reports Server. For multilingual reports, you may have to create or modify a

    translation text file (.TXT file) also.

    Packaging/Deployment:The deployment tool for .ROX files is the Actuate Management

    console that is used to import the report to the Actuate Encyclopedia accessed by the Reports

    Server. The .TXT files are copied directly into specified location in the file system on the

    Reports Server host. As part of deploying the reports, make sure that the appropriate privi-

    leges are assigned.

    Activation: There is no actual activation step for either the .ROX file or the .TXT file, but

    the changed or the new report will take effect for all new requests after it is deployed to the

    Actuate Reports Server.

    Run-time CustomizationsAdditions/Updates to Current Logic

    Customers may add or change the configuration to enforce conditions or change logic for

    many run-time customization data types.

    Changes: For example, customers may add or modify required states for a state model to

    meet business requirements. One or more personalization rules may be added or modified

    to restrict the visibility of an applet or view based on position. Similarly, SmartScripts may

    be added or modified to enhance an employees usability or productivity. These changes are

    made from the corresponding Administration views in the Siebel Client.

  • 8/8/2019 Siebel Best Practices WP Fnl

    19/32

    1

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Packaging/Deployment:You can use the Application Deployment Manager (ADM), EIM,or export/import from the Siebel Client Administration views for packaging and deploying

    run-time customizations depending on the type. (See Appendix Two for deployment

    information on different types.) Note also that you can extend types supported by ADM

    by creating custom ADM Integration Objects/Content Objects. Types using file attachments

    are supported by ADM from Siebel 7.8for example, Literature, Correspondence

    Templates, and so on.

    Refer to the following documentation for additional information:

    ADMthe Migrating Customizations Between Applications section in Going Live with

    Siebel Business Applications

    Siebel Enterprise Integration Manager Administration Guide

    Applications Administration Guide for different features (workflow, Assignment Manager,and so on)

    Activation: Many of the run-time customizations require an activation step, but not all. See

    Appendix Two for activation steps for different types. Note also that the availability of some

    run-time customizations are governed also by a publish/active flag, or active/expiration date.

    See theApplications Administration Guide for details.

    Note: You might have to update the ADM Batch Import workflow process to set the file import

    directory. This is the directory from which ADM will read the XML files. Also, make sure the

    ADM workflow process is set to active in the application UI (this is a one-time step when you

    refresh the database).

    Authored Data by Business Users or Administrator

    Customers may add or change authored data to manage the content for certain business

    functions. Note that in some organizations the business users manage these changes directly

    in the production environment. In other organizations the changes are first created and

    tested in a development or test environment and then later deployed to the production

    environment by an administrator.

    Changes: For example, customers may add or modify Solutions and Literature used as sales

    tools by the sales force. Similarly, Product Catalog and Price Lists used for order manage-

    ment could be added or modified.

    Packaging/Deployment:For Customer Order Management, Workspace Projects offer a

    different level of packaging for versioned objects. Versioned objects can be grouped into a

    Workspace Project, which then can be deployed through ADM as one of its supported types.

    Other objects representing authored data are deployed in the same way as the run-time

    customizations referenced in the previous section.

  • 8/8/2019 Siebel Best Practices WP Fnl

    20/32

    18

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Activation: Versioned objects in Customer Order Management require being releasedstarting on either the current or a specific date before they can be used in production. Also,

    many of the non-versioned data in Customer Order Management requires its specific cache

    to be refreshed after deployment. Note that you can automate these operations using the

    Siebel API documented in the Product Data Service and Import/Export API Reference

    bookshelf guide.

    There is usually no actual deployment activation step for other areas, but note that the avail-

    ability of many authored data areas is controlled by a published/active flag, and so on, and

    requires coordination with external business-driven events and processes.

  • 8/8/2019 Siebel Best Practices WP Fnl

    21/32

    1

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Techniques to Reduce Downtime During DeploymentWhile the deployment of any typical set of configuration changes will require taking the

    system off line for at least a brief period, there are several techniques that can minimize the

    downtime. These techniques depend on the changes deployed, the system environment, and

    other factors. The following sections describe some techniques to reduce the downtime for

    individual change categories.

    The impact from the system downtime may be different for each deployed customization.

    By deploying the customizations of a change request in parallel you may be able to mini-

    mize the total downtime further. To illustrate the deployment of customizations related to a

    change request, an example is given in Appendix One.

    Note: Authored data and run-time customizations could be rolled out to a live system, but becareful to analyze the nature of the customizations and their dependencies. A simple case would

    involve the rollout of one object while a more complex case would involve the rollout of vari-

    ous objects that are interdependent. In the latter case, the child objects must be deployed first,

    followed by the parent objects. During the short deployment window, the system is likely to serve

    an incomplete set of customizations to end users. Such situations might result in severe run-time

    errors and, in extreme cases, data corruption.

    Repository

    (See Table 1 for detailed examples.)

    You can import the repository containing the changes into production with a different

    name using the Repository Import process as a pre-deployment stepwhile the system is

    still liveto reduce the downtime window. Then, after the system is taken off line duringthe deployment window, the pre-existing repository is renamed and archived, and the

    name of the new repository that was just deployed changes to reflect the production name.

    The Repository Import is invoked from the Database Configuration Utility.

    Similarly, you can copy the recompiled .SRF file containing the changes with a different

    name into the live production environment and then rename it later once the system is

    taken down. Be careful to make sure that the correct .SRF files are in place on all the servers

    before bringing the system back up. It is strongly recommended that you automate the

    steps to copy, rename, and then verify name and content on the target (for example, by

    diff or examining date and size) using scripts to reduce the risk of any deployment errors.

    Section Three

  • 8/8/2019 Siebel Best Practices WP Fnl

    22/32

    20

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Integration Objects-Integration Points

    Deploying changes affecting integration with external systems should be carefully con-

    sidered before deployment. Careful planning and pre-deployment preparation work both

    within Siebel Systems and within the external system may be needed to help keep the

    downtime to a minimum.

    If the change is to add only a new object that uses an existing integration point, then

    the downtime of such a change is mainly driven by the deployment of the new .srf. This

    assumes the external systems can send in the requests using the new data structure with-

    out any significant changes to these systems. If the incoming or outgoing data structure

    is changed, it is advisable to a llow the current integration operations to come to a natural

    completion point across all the involved applications before restarting the system and

    using the new data structure. Also, note that the EAI infrastructure is often closely tiedto the Siebel Business Process execution, which you may also need to consider (see the

    Workflow Processes section that follows and the Workflow Policy section in Siebel

    Business Process Designer Administration Guide).

    Workflow Processes

    The following applies if the Workflow Processes are not deployed as part of an overall

    repository migrationfor example, for a bug fix where only the Workflow Process objects

    are affected.

    Because Workflow Process definitions are versioned and have an explicit activation step,

    you can perform the deployment while the system is still online, after which the activa-

    tion is performed once the system is off line or in a quiescent state. Allow the currently

    executing logic and/or queues to finish before the newly deployed processes are activated.

    See also run-time customizations with explicit activation steps in the section for run-time

    customizations below.

  • 8/8/2019 Siebel Best Practices WP Fnl

    23/32

    2

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Schema

    Additive Schema

    (See Table 1 for detailed examples.)

    It is highly recommended that you any synchronize any schema changes during a planned

    database outage window. However, if the DBA has analyzed the changes in conjunction with

    the Siebel Development Lead/Architect and determined that they are purely additive, you

    could apply the changes as a separate deployment step before the deployment downtime

    period. Note that the pre-deployment step in this case is applying certain schema changes

    before hand. These changes are a part of the entire set of schema customizations that must

    be deployed to the target environment in its entirety so that the repository, SRF, and schema

    objects are matching. Note that the ability to apply changes to the database while it is online

    depends on the RDBMS capabilities. Check with your DBA to review the DDL and deter-mine whether they can be applied online. Assistance from Siebel Expert Services is required

    for optimizing schema deployment as described in this scenario.

    Non-Additive Schema

    (See Table 1 for detailed examples.)

    If the business requirement is to reduce downtime to an absolute minimum, additional

    tuning may be possible to optimize the schema deployment step. This may involve bypassing

    the Siebel program (ddlimp.exe) and manually running highly optimized SQL statements.

    This process requires advanced database knowledge as well as a thorough understanding of

    the Siebel schema. Assistance from Siebel Expert Services is required for optimizing schema

    deployment in this scenario.

    Note: This does not mean that the ddlimp.exe used to synchronize the schema does not run

    efficient SQL. When optimizing the SQL statements to be executed, this utility does not consider

    the size of the tables and other database settings specific to your case.

    Files on the Siebel Server

    (See Table 1 for detailed examples)

    In general, you need to restart the Siebel Application Servers for Web templates changes to

    take effect, and you must restart the Web servers or issue a SWE command for changes to

    style sheets, images, and other webmasterfiles to take effect.

    One technique to minimize downtime is to automate the deployment by performing the file

    copy from scripts. This is to make sure that the copy will happen as quickly as possible to the

    various targets, as well as to eliminate the risk of human error. It is also strongly recom-

    mended that you develop scripts to automate a post-deployment verification step to make

    sure the actual files were successfully deployed to all their destinations (through content diff,

    or comparing size/timestamp, and so on).

  • 8/8/2019 Siebel Best Practices WP Fnl

    24/32

    22

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Further, by applying normal load balancing techniques, the end user impact could beminimal. For example, the changes can be applied to the servers in a rolling fashion. This

    involves first taking a subset of the servers offline and deploying all the changed files (Web

    templates, .SRF, and so on) to these offline servers, but while the remaining servers are still

    live. Then, during a short downtime window after the remaining servers are also taken off

    line, the newly updated servers can be put back into production. Finally, once the remain-

    ing servers are updated, you can put them all back on line. This may involve a temporarily

    reduced capacity that needs to be considered as part of the deployment planning (unless

    additional hardware is available during the deployment window).

    Run-time CustomizationsAdditions/Updates to Current Logic

    (See Table 1 for detailed examples)

    A few run-time customization types have an explicit activation step (other than restartingthe component or server). You can deploy configuration changes to these types into the tar-

    get environment as a pre-deployment step before taking the system down, after which they

    are explicitly activated once the servers are online but before allowing general user access. (If

    they are activated solely by restarting the component or server, the risk is that an unplanned

    server restart may inadvertently activate the changes and leave the system in an inconsistent

    state.) Examples include:

    Workflow Processes (explicit activation in Siebel Client)

    Workflow Policies (expiration date)

    State Models (expiration date)

    iHelp (explicit activation)

    Assignment Manager Rules (explicit activation)

    As discussed in the previous Files on the Siebel Server section, another technique to mini-

    mize the deployment impact for run-time customizations is to use automation. As men-

    tioned, automating the deployment process as much as possible ensures that the deployment

    steps themselves are efficient and also reduces the risk of human error. You can use ADM or

    custom scripts to automate the deployment of run-time customization changes. See Going

    Live with Siebel Business Applications for additional information on using ADM.

    Authored Data by Business Users or Administrators

    (See Table 1 for detailed examples.)

    For C/OM objects, you can automate some of the deployment and activation steps using

    APIs to reduce manual steps and achieve an efficient deployment process. (See the Product

    Data Service and Import/Export API Reference bookshelf for details.) Also, a C/OM Work-

    space Project has an explicit activation step that can use the same pre-deployment technique

    described in the previous section for run-time customizations.

    There is usually no downtime involved when deploying most other authored data.

  • 8/8/2019 Siebel Best Practices WP Fnl

    25/32

    2

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Deployment ScenariosHere is one deployment scenario to help you understand how you can prepare a deploy-

    ment from one environment to another. The scenario is referred to as a major release and

    contains changes to run-time customizations, the Siebel Repository (compiled and non-

    compiled), and .SRF files.

    Scenario: Major Release

    In a major release, significant functionality changes are rolled out to the end users who

    might need to be trained on these changes. End users are expected to change their pro-

    cesses and their navigation within the application. This release impacts external systems

    and requires coordination with other teams for the development and rollout. It is also

    expected that the current work queue needs to run through completion before the

    deployment can start.

    Object Type Packaging Steps Deployment Steps

    List of Values Export the objects from the de-

    velopment system after confirm-

    ing functionality. Use ADM, EIM

    or UI Export to export to file.

    Deploy to target database using

    ADM, EIM or UI Import.Responsibility/Views

    State Model

    Assignment Rules only

    Smart Scripts

    Views

    Positions and Organizations

    Positions and Organizations

    WF Policies

    C/OM Workspace Projects

    20 new/updated WF Processes Export the repository using the

    Database Configuration Utility.

    Perform Repository Import

    and apply the physical schema

    changes using the Repository

    Migration process.

    2000 Repository objects

    Three SRF files (one each for the

    three languages in the deploy-

    ment) and browser scripts

    Run a script to perform the com-

    pilation for the three languages in

    a pre-production environment.

    Run a script to copy the files to

    the application servers while the

    servers are not running.

    Appendix One

  • 8/8/2019 Siebel Best Practices WP Fnl

    26/32

    24

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Testing the Deployment Process

    It is highly recommended that you test the planned deployment process itself in a test

    environment before rolling it out to a production environment. The goal of this testing is

    to correct any deployment errors, which may be due to the database, automated scripts, or

    other steps in the deployment process. Before reaching this step, it is vital to have executed

    the various deployment scripts and commands to some degree of confidence in another

    test environment.

    The following high-level steps are carried out for testing the deployment process:

    1. Refresh the test environment database from the production database, or from a scaled-

    down version of the production database.

    2. Alter any confidential data as necessary.

    3. Perform the deployment steps and run any automated scripts against the test environ-ment. The full deployment process should be tested, and the target environment startup

    and shutdown sequence needs to be the same as expected in production. Be sure to

    test any pre-deployment operations that take place before the system is put off line

    for example, turning off system monitoring agents, and so on.

    4. Identify any errors in the deployment process and make necessary changes.

    5. Repeat from Step 3 above until the operation runs without any errors end-to-end.

    6. Perform simple testing on the application to make sure the deployment did include

    the intended objects.

    Continue with the user acceptance test (UAT) and other tests. Once the testing is satisfactory,

    you are ready for the production deployment.

    Downtime and Pre-Deployment Considerations

    To minimize downtime during the production rollout, the following key points influence the

    design of the deployment script:

    1. For some of the run-time customizations, pre-deployment can occur because these objects

    require a specific activation step other than restarting a component or server. This means

    that you can import these objects to the database while the system is still up and activate

    them after the system is restarted but before users are allowed into the system. For this

    scenario, these objects are as follows:

    a. Assignment Rules

    b. C/OM Workspace Projects

    2. You can perform the repository import step using the Repository Migration process while

    the target system is online. Because this operation typically takes between one and two

    hours, you could start it one hour before the actual maintenance window. (However, you

    still need to restart the system for the new repository to be put into effect.)

  • 8/8/2019 Siebel Best Practices WP Fnl

    27/32

    2

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Based on the information above, you can see deployment of changes as two separate activi-ties. The first step is the pre-deployment step, and the second is the operations that occur

    within the downtime window. Notice that the first step is not as time-critical as the second

    and would most likely not occur within a single script, so more control is available during

    the deployment.

    The following steps are first taken against the test environment before being applied against

    the actual production environment. Note that various other pre- and post-deployment steps

    are necessary as dictated by your current IT policies. Examples include procedures for user

    notification, executive and business change approvals, and IT operational activities regarding

    to system changes. These additional steps will impact not only the Siebel environment, but

    other integrated applications as well.

    Deployment Activities in Test and Production Environments

    As mentioned earlier, the steps to follow in the test environment are very similar to the steps

    followed in the actual production environment. The steps below are the same for the pro-

    duction and test deployment except for Step 1:

    1. Prepare the staging environment with production data.

    2. Retrieve the packaged deployment customizations and deployment item list from the

    source control system or from the server on which you store these (repository dat file,

    .SRF, xml files, and so on). Review the deployment item list and verify that all changes

    are included and correct.

    3. Run the Database Configuration Utility to perform a repository import. Run the reposi-

    tory import as New Custom Repository.

    4. During the repository import, you could start the deployment of the run-time cus-

    tomizations for which a specific activation step is necessary. Note that the dedicated

    (developer) client can be used to connect directly to the server database for the purpose

    of running ADM to import run-time customizations. See also Step 11.

    5. At some point during the import, users are notified that they need to terminate their ses-

    sions. This is where the system would enter a cool-down window to allow all internally

    queued requests to complete (this applies to the workflow process and policies here).

    6. Shut down the application servers (effective downtime begins).

    7. Rename the original Siebel Repository Original Siebel Repository and the new reposi-

    tory Siebel Repository.

    8. Continue to use the Repository Migration process to synchronize the new schema

    changes to the physical database.

    9. While the schema synchronization process is running, run the script to copy the SRF files

    and browser scripts to their respective Siebel Server directories.

    10. Restart the application servers after the schema synchronization and the copy of SRF/

    browser scripts have completed.

  • 8/8/2019 Siebel Best Practices WP Fnl

    28/32

    26

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    11. Unless the run-time customizations have not already been imported using the developerclient, after the environment is up ADM can be invoked using the server manager com-

    mand line (or through ADM Admin view) to import the XML files holding the remain-

    ing run-time customization changes.

    12. After all the configuration changes are deployed, perform any required activation

    steps (not necessarily in the following order; in this scenario the activation steps

    are independent):

    a. Activate the workflow processes from the application UI or through the Workflow

    Admin Business Service.

    b. Activate C/OM Workspace Projects.

    c. Release Assignment Manager Rules.

    d. Release SmartScripts.

    e. Start the workflow policy monitor agents. These can be started automatically uponrestarting the server by setting the initial task and AutoStart to True and the Default

    Tasks to a value larger than zero. These agents are properties of the component defi-

    nition. The group name property would have to be set on the component definition

    level, which means new tasks for other policy groups would require a new compo-

    nent definition or an explicit command to start another monitor agent task.

    In this scenario, it is not necessary to restart the environment for the new run-time custom-

    izations to take effect. If you need to restart the server to activate other run-time customiza-

    tions after they have been imported to the database, then it would be best to perform the

    deployment of these objects before the first shutdown step, but after the system is effectively

    taken off linethat is, after all user sessions and processes have completed.

    1. Test and validate the system before making it available for end users.

    2. After the system has been validated, you can export, archive, and then delete the old

    repository from the production instance using Siebel Tools after confidence has been

    established in the new customizations. Also, to facilitate fixes to the new configuration,

    copy the Original Siebel Repository to the development environment for comparison

    purposes.

  • 8/8/2019 Siebel Best Practices WP Fnl

    29/32

    2

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Deployment/Activation Summary for Common Configuration Areasfor Release 7.7 and 7.8

    Configuration Area Category Deployment

    Mechanism

    Activation Step

    Access Control Admin Run-time

    Customization

    UI Export/Import

    or Create IntObj

    for ADM

    None

    Access Groups Run-time

    Customization

    ADM None

    Bundle Promotion (C/OM) Run-time

    Customization

    ADM (7.8) None

    Bundle Discount (C/OM) Run-time Custom-

    ization

    ADM (7.8) Refresh the cache using

    the UI button or restart

    the server.

    Aggregate Discount Sequences

    (C/OM)

    Run-time

    Customization

    ADM (7.8) Refresh the cache using

    the UI button or restart

    the server.

    Assignment Manager Run-time

    Customization

    ADM a. Regenerate triggers if

    changing criteria.

    b. Restart Workflow

    Monitor agent.

    c. Release Rules from

    the UI through the ap-

    plet menu item.

    Adjustment Groups (C/OM) Run-time

    Customization

    ADM (7.8) Refresh the cache using

    the UI button or restart

    the server.

    Audit Trail Admin Run-time

    Customization

    UI Export/Import

    or Create IntObj

    for ADM

    None

    Correspondence templates Run-time

    Customization

    Manually or

    through EIM

    None

    Cost List (C/OM) Run-time

    Customization

    ADM (7.8) None

    Data Map Object (C/OM) Run-time

    Customization

    ADM (7.8) None

    Data Transformation Run-time

    Customization

    UI Export/Import

    or Create IntObj

    for ADM

    Reload Maps. To use

    the maps. In case any

    existing map is updated,

    purge the cache.*

    Discount and E&C Matrix (C/OM) Run-time

    Customization

    ADM (7.8) Refresh the cache using

    the UI button or restart

    the server.

    Dispatch Rule Run-time

    Customization

    UI Export/Import

    or Create IntObjfor ADM

    Refresh the cache using

    the UI button or restartthe server.

    Correspondence Templates Run-time

    Customization

    Manually and EIM None

    Expense Type Run-time

    Customization

    ADM None

    Appendix Two

  • 8/8/2019 Siebel Best Practices WP Fnl

    30/32

    28

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Configuration Area Category DeploymentMechanism

    Activation Step

    Fund (C/OM) Run-time Customization ADM (7.8) None

    iHelp Run-time Customization UI Export/Import

    or Create IntObj

    for ADM

    Restarting the server has

    no effect. Activate each

    item from the UI using the

    Activate button.

    Workspace Projects

    (C/OM)

    Run-time Customization ADM (7.8) Objects in the workspace

    projects need to be released

    using the UI button or APIs

    with the current (=blank)

    or a specific date as the

    required start date.

    List of Values Run-time Customization ADM Refresh the cache using

    the UI button or restart the

    server.

    Message Type (C/OM) Run-time Customization ADM (7.8) Refresh the cache usingthe UI button or restart the

    server.

    Personalization Rules Run-time Customization UI Export/Import

    or Create IntObj

    for ADM

    Reload from the Applet

    menu.

    Predefine Queries Run-time Customization ADM None

    Price List (C/OM) Run-time Customization ADM (7.8) Refresh the cache using

    the UI button or restart

    the server.

    Product Cata log (C/OM) Run-time Customization ADM (7.8) Refresh the cache using

    the UI button or restart the

    server.

    Product Data (C/OM) Run-time Customization ADM (7.8) Refresh the cache using

    the UI button or restart

    the server.

    Product Feature (C/OM) Run-time Customization ADM None

    Product Line (C/OM) Run-time Customization ADM None

    Promotion (C/OM) Run-time Customization ADM (7.8) None

    Proposal Templates Run-time Customization Manually or

    through EIM

    None

    Report Files File Manually copy .txt

    files / import .rox

    files via Actuate

    MgmtConsole

    None

    Repository Objects

    (general)

    Repository Repository Migra-

    tion process

    Restart the Siebel servers.

    Additional activation is

    necessary for schema ob-

    jects: Run DDLSync or the

    entire Repository Migration

    process to synchronize the

    schema objects.

    Responsibilities Run-time Customization ADM Click the Clear Cache

    button from the UI.

    Runtime Events Run-time Customization UI Export/Import

    or Create IntObj

    for ADM

    Reload from the Applet

    menu item.

  • 8/8/2019 Siebel Best Practices WP Fnl

    31/32

    2

    W H I T E P A P E R

    B E S T P R A C T I C E S F O R A P P L I C A T I O N C O N F I G U R A T I O N

    D E P L O Y M E N T I N S I E B E L 7 . 7 A N D S I E B E L 7 . 8

    Configuration Area Category DeploymentMechanism

    Activation Step

    SmartScripts Run-time Customization UI Export/Import Activate from the UI.

    SRF File Manually copy to

    each server

    Restart the server.

    State Model Run-time Customization ADM None

    Symbolic URL Run-time Customization UI Export/Import

    or Create IntObj

    for ADM

    None

    User List Run-time Customization ADM None

    Views Run-time Customization ADM None

    Vo lume Discount (C/OM) Run-time Customization ADM (7.8) Refresh the cache using

    the UI button or restart the

    server.

    Web Templates File Manually copy toeach server

    Restart the Siebel Server.

    Webmaster files File Manually copy to

    each server

    Files are updated to each

    Web server when the Web

    server is restarted, or when

    an administrator uses the

    SWE command UpdateWe-

    bImages to manually

    refresh the files on the

    Web server.

    WebServices Run-time Customization UI Export/Import

    or Create IntObj

    for ADM

    Refresh the cache using

    the UI button or restart the

    server.

    Workflow Policies Repository, Run-time

    Customization

    EIM or Manual,

    Rep Migration

    Yes. WorkMon restart.

    Possible regeneration of

    Db triggers (GenTrig).

    Also governed by

    Expiration date.

    Workflow Process Repository Siebel Tools UI

    Export/Import or

    Workflow Admin

    Service BusSvc

    or through the Re-

    pository Migration

    process

    Yes. Siebel Tools and Siebel

    Client WF Admin, or the

    Workflow Admin Service

    business process.

    * Restarting the server will also activate the object.

  • 8/8/2019 Siebel Best Practices WP Fnl

    32/32

    www.siebel.com

    World Headquarters

    Siebel Systems, Inc.

    2207 Bridgepointe Parkway

    San Mateo, CA 94404

    United States

    Tel: 1-800-647-4300

    Tel: 1-650-295-5000

    Fax: 1-650-295-5 1 1 1

    Europe

    Siebel Systems UK Limited

    Siebel Centre

    The Glanty

    Egham, Surrey TW20 9DW

    United Kingdom

    Tel: 44-0-1784-494900

    Fax: 44-0-1784-494901

    Asia Pacific

    Siebel Systems Australia

    Level 1, 80 Pacific HighwayNorth Sydney, NSW 2060

    Australia

    Tel: 61-2-9012-3100

    Fax: 61-2-9012-3333

    Japan

    Siebel Systems Japan K.K.

    Ebisu Prime Square

    1-1-39 Hiroo, Shibuya-Ku

    Tokyo, 150-0012

    Japan

    Tel: 81-3-5464-7700

    Fax: 81-3-5464-7702

    Latin America

    Siebel Systems Brasil Ltda

    Av. Naes Unidas, 12.901

    20 andar - Torre Norte

    04578-903 - So Paulo - SP

    BrazilTel: 55-11-3444-0450

    Fax: 55-11-3444-0666

    2005 Siebel Systems, Inc. All rights reserved. Siebel, the