VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director Orange County Public Works 601 North Ross Street Santa Ana, CA 92701 [email protected] Brendon Biggs, Interim Director San Bernardino County Public Works 825 East Third Street San Bernardino, CA 92415 [email protected] Jason Uhley, General Manager-Chief Engineer Riverside County Flood Control and Water Conservation District 1995 Market Street Riverside, CA 92501 [email protected] Margaret Everson, Principal Deputy Director U.S. Fish and Wildlife Service 1849 C Street NW, ROOM 3331 Washington, D.C. 20240-0001 [email protected] Scott Sobiech, Field Supervisor U.S. Fish and Wildlife Service Carlsbad Fish and Palm Springs Wildlife Office 2177 Salk Avenue, Suite 250 Carlsbad, California 92008 [email protected] Colonel Aaron Barta District Commander United States Army Corps of Engineers Los Angeles District

Upload: others

Post on 13-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED

December 11, 2019

Shane Silsby, Director

Orange County Public Works

601 North Ross Street

Santa Ana, CA 92701

[email protected]

Brendon Biggs, Interim Director

San Bernardino County Public Works

825 East Third Street

San Bernardino, CA 92415

[email protected]

Jason Uhley, General Manager-Chief Engineer

Riverside County Flood Control and Water Conservation District

1995 Market Street

Riverside, CA 92501

[email protected]

Margaret Everson, Principal Deputy Director

U.S. Fish and Wildlife Service

1849 C Street NW, ROOM 3331

Washington, D.C. 20240-0001

[email protected]

Scott Sobiech, Field Supervisor

U.S. Fish and Wildlife Service

Carlsbad Fish and Palm Springs Wildlife Office

2177 Salk Avenue, Suite 250

Carlsbad, California 92008

[email protected]

Colonel Aaron Barta

District Commander

United States Army Corps of Engineers

Los Angeles District

Page 2: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 2 of 13

915 Wilshire Blvd.

Los Angeles, CA 90017

[email protected]

Lieutenant General Todd T. Semonite

Chief of Engineers and Commanding General

United States Army Corps of Engineers

Headquarters

441 G Street NW

Washington, DC 20314-1000

[email protected]

David Bernhardt, Secretary of the Interior

Department of the Interior

1849 C Street, N.W.

Washington, D.C. 20240

[email protected]

RE: Notice of Intent to Sue for Violations of the Endangered Species Act Regarding

Seven Oaks Dam Releases to the Santa Ana River Causing the Take of Santa Ana

Suckers

This letter serves as official notice by the Center for Biological Diversity and Endangered

Habitats League (collectively the “Noticing Parties”) of their intent to sue the United States

Army Corps of Engineers (“Corps”), Orange County Flood Control District, San Bernardino

County Flood Control District, and Riverside County Flood Control and Water Conservation

District (collectively, “Local Sponsors”), for violations of section 9 of the Endangered Species

Act (“ESA”)1 in connection with water release events on the Santa Ana River that have caused

and are reasonably certain to continue to cause the take of the federally threatened Santa Ana

sucker (Catostomus santaanae). This letter is being provided to you pursuant to the notice

requirement of the ESA citizen suit provision.2

As described more fully below, the actions taken by the Corps and Local Sponsors caused

unlawful “take,” including harm and harassment, of the threatened Santa Ana sucker by releasing

water from the Seven Oaks Dam (“SOD”) that caused surface flows containing high levels of

sediment to reach Santa Ana sucker spawning and foraging habitat downstream of the SOD.

These actions have resulted and are reasonably certain to continue to result in the documented

take of large numbers of Santa Ana suckers due to increased sedimentation that smothers eggs in

active spawning beds, and damages foraging habitat by decreasing water quality.3 These actions

constitute unlawful “takes” in violation of ESA Section 9.

1 16 U.S.C. § 1538.

2 16 U.S.C. § 1540(g).

3 16 U.S.C. §§ 1532(19), 1538(a)(1)(G); 50 C.F.R. § 17.84(k).

Page 3: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 3 of 13

The Center for Biological Diversity (the “Center”) is a California non-profit public interest

corporation with approximately 70,000 members, including members living near the Santa Ana

River and its tributaries in San Bernardino and Riverside Counties. The Center and its members

are dedicated to protecting diverse native species and habitats through science, policy, education,

and environmental law.

Endangered Habitats League (“EHL”) is a California non-profit corporation dedicated to the

protection of the diverse ecosystems of Southern California and to sensitive and sustainable land

use for the benefit of all the region's inhabitants. EHL advocates for the preservation of natural

habitats in San Diego, Orange, Riverside, Los Angeles, and San Bernardino Counties, and

related ecological regions. As Southern California’s only regional conservation organization,

EHL has led the way in establishing an unprecedented, interconnected system of nature reserves.

EHL has members living in Western Riverside County and the Inland Empire, and EHL’s

members use and enjoy the resources of Riverside and San Bernardino Counties. EHL and its

members are particularly concerned with protecting the regions threatened plant and animal

species, including the Santa Ana sucker, and in protecting the Santa Ana River watershed.

I. BACKGROUND

A. The ESA Statutory Framework

Congress enacted the ESA in 1973 to provide “a program for the conservation of … endangered

species and threatened species” and “a means whereby the ecosystems upon which endangered

species and threatened species depend may be conserved.”4 As the first step in the protection of

these species, section 4 of the ESA5 requires the Secretary of the Interior to list species as

“endangered” or “threatened” when they meet the statutory listing criteria.6

Once a species is listed as threatened or endangered, the ESA provides a variety of procedural

and substantive protections to ensure not only the species’ continued survival, but also its

ultimate recovery. “Congress has spoken in the plainest words, making it clear that endangered

species are to be accorded the highest priorities.”7

The ESA’s legislative history supports “the broadest possible” reading of the prohibition against

take.8 Section 9 of the ESA prohibits any “person,” including state, county or municipal

agencies and/or officials in their official capacity,9 from “taking” or causing the take of any

member of an endangered species.10

This take prohibition also applies to threatened species such

as the Santa Ana sucker.11

The term “take” is defined broadly, and includes to “harass, harm,

4 16 U.S.C. § 1531(b).

5 Id. § 1533.

6 Id. §§ 1532(6) & (20); 1533(a)(1)(A)-(E).

7 TVA v. Hill, 437 U.S. 153, 155 (1978).

8 Babbitt v. Sweet Home Chapter of Communities for a Great Oregon, 515 U.S. 687, 704-05 (1995).

9 16 U.S.C. § 1532(13).

10 16 U.S.C. § 1538(a).

11 Id. § 1533(d); 50 C.F.R. § 17.31(applying blanket take prohibition to threatened species by default); 65 Fed. Reg.

19,686 (April 12, 2000).

Page 4: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 4 of 13

pursue, hunt, shoot, wound, kill, trap, capture, or collect” or cause another to do so.12

“Take”

includes direct as well as indirect harm and need not be purposeful.13

The ESA further makes it

unlawful for any person, including agencies and officials, to cause the take of a listed species to

be committed.14

The term “person” includes “any officer, employee, agent, department, or

instrumentality…of any State, municipality, or political subdivision of a State … [or] any State,

municipality, or political subdivision of a State … .” 16 U.S.C. § 1532(13). The ESA “not only

prohibits the acts of those parties that directly exact the taking, but also bans those acts of a third

party that bring about the acts exacting a taking. [A] governmental third party pursuant to whose

authority an actor directly exacts a taking … may be deemed to have violated the provisions of

the ESA.”15

The U.S. Fish and Wildlife Service (“FWS”) has further defined “harass” to include “an

intentional or negligent act or omission which creates the likelihood of injury to wildlife by

annoying it to such an extent as to significantly disrupt normal behavioral patterns, including

breeding, feeding, or sheltering.”16

In addition, “harm” is defined to “include significant habitat

modification or degradation where it actually kills or injures wildlife by significantly impairing

essential behavioral patterns, including breeding, feeding or sheltering.”17

Altering habitat

conditions in a manner “reasonably certain” to harm listed species by impairing essential

behavioral patterns, including breeding, spawning, rearing, migrating, feeding or sheltering,

constitutes take.18

The ESA authorizes private enforcement of the take prohibition through a broad citizen suit

provision. “[A]ny person may commence a civil suit on his own behalf to enjoin any person,

including . . . any . . . governmental instrumentality or agency . . . who is alleged to be in

12

Id. § 1532(19). 13

Sweet Home Chapter of Communities for a Great Oregon, 515 U.S. at 704; see also Murrelet v. Pacific Lumber

Co., 83 F.3d 1060, 1067-68 (9th Cir. 1996) (finding take without direct observations of harm to protected murrelets

when birds nested in trees targeted by logging which “would likely harm murrelets by impairing their breeding and

increasing the likelihood of attack by predators”); National Wildlife Federation v. Burlington Northern Railroad, 23

F.3d 1508, 1512 (9th Cir. 1994). 14

Id. § 1538(g). 15

Strahan v. Coxe, 127 F.3d 155, 163 (1st Cir.1997) (holding that by issuing licenses and permits authorizing

gillnet and lobster pot fishing, activities known to incidentally injury Northern right whales, Massachusetts officials

had exacted a taking). See also Animal Protection Inst. v. Holsten, 541 F. Supp. 2d 1073 (holding state agency liable

for take based on its licensing and regulation of trapping); Defenders of Wildlife v. Administrator, EPA, 688 F. Supp.

1334 (D. Minn. 1988), aff’d by Defenders of Wildlife v. Administrator, EPA, 882 F.3d 1294 (8th Cir.1989) (holding

the U.S. Environmental Protection Agency (EPA) liable for take associated with the registration of strychnine even

though the administration of the pesticide, which was known to poison endangered species, was actually carried out

by third parties); Loggerhead Turtle v. County Council of Volusia Co., 148 F.3d 1231 (11th Cir.1998) (holding that

plaintiff had standing to proceed against Volusia County for take of threatened and endangered sea turtles, which

were harmed by the private, artificial light sources permitted by the County’s regulations); Sierra Club v. Lyng, 694

F.Supp. 1260 (E.D.Tex. 1988), aff’d by Sierra Club v. Yeutter, 926 F.2d 429 (5th Cir.1991) (holding the U.S. Forest

Service liable for take because its even-aged management plan allowed private companies to harvest timber in a way

that degraded the habitat of the endangered red-cockaded woodpecker); U.S. v. Town of Plymouth, Mass., 6

F.Supp.2d 81 (D.Mass. 1998) (holding the Town of Plymouth liable for the take of endangered piping plovers that

had either been run over or isolated from their food source by off-road vehicles, which were allowed on the beach

under the Town’s policies). 16

50 C.F.R. § 17.3. 17

Id. 18

Forest Conservation Council v. Rosboro Lumber Co., 50 F.3d 781, 784, 787-88 (9th Cir. 1995).

Page 5: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 5 of 13

violation of any provision of [the ESA] . . . .”19

Citizens may seek to enjoin both present

activities that constitute an ongoing take and future activities that are reasonably likely to result

in a take.20

The ESA’s citizen suit provision also provides for the award of costs of litigation,

including reasonable attorney and expert witness fees.21

Section 10 and section 7 of the ESA provide the only means for permitting the taking of listed

species in compliance with the prohibitions in section 9 of the Act. Section 10 is applicable to

the activities of non-federal entities such as cities and agencies, including the Local Sponsors.

The primary mechanism for avoiding liability under section 9 is to apply for and receive an

incidental take permit (“ITP”).22

In exchange for permission to “take” a listed species pursuant

to an ITP, the permit applicant must commit to implement a “habitat conservation plan” (“HCP”)

that “conserv[es]” – i.e., facilitates the recovery of – the species.23

The HCP must delineate “the

impact which will likely result from such taking” and the “steps the applicant will take to

minimize and mitigate such impacts . . . .”24

Section 7 applies to the activities of federal

agencies and requires them to consult with the USFWS to ensure listed species will not be

jeopardized by the activity and their critical habitat will not be adversely modified.25

Take of

listed species may be authorized through an Incidental Take Statement issued at the conclusion

of the consultation.26

B. The Santa Ana Sucker

The Santa Ana sucker is a small freshwater species of fish native to the larger stream systems of

Southern California, including the San Gabriel and Santa Ana river systems.27

The sucker

prefers cool, clear streams, with temperatures below 72 degrees.28

The sucker utilizes different

portions of the watercourse during different life stages.29

Spawning occurs from mid-March

until early July, with the peak of breeding activity occurring in April.30

Spawning beds consist

of gravel substrate in moderate depth, flowing, water.31

Although the sucker can survive in

streams with a variety of currents, it requires a constant stream flow both to keep stream

temperatures habitable and to flush the streambed and water column of sediments.32

Increased

water turbidity can negatively impact multiple sucker life stages, as fine sediment can smother

spawning nests, while decreasing the availability of algae, a primary food source.33

19

16 U.S.C. § 1540(g). 20

National Wildlife Fed’n v. Burlington Northern Railroad, 23 F.3d 1508, 1511 (9th Cir. 1994). 21

16 U.S.C. § 1540(g)(4). 22

Id. § 1539(a)(1)(B). 23

Id. §§ 1539(a)(1)(B), (a)(2)(A); see also Sierra Club v. U.S. Fish and Wildlife Serv., 245 F.3d 434, 441-42 (5th

Cir. 2001) (“‘[c]onservation’ is a much broader concept than mere survival” because the “ESA’s definition of

‘conservation’ speaks to the recovery of a threatened or endangered species” (emphasis added)). 24

16 U.S.C. § 1539(a)(2)(A). 25

Id. § 1536(a)(2). 26

Id. § 1536(b)(4)(C). 27

71 Fed. Reg. 19686, 19686 (Apr. 12, 2000). 28

USFWS, Recovery Plan for the Santa Ana Sucker (2017) at I-12. 29

Id. 30

Id at I-11. 31

Id at I-11. 32

USFWS, Recovery Plan for the Santa Ana Sucker (2017) at I-13; 71 Fed. Reg. 19686, 19686 (Apr. 12, 2000). 33

75 Fed. Reg. 77962, 77968 (Dec. 14, 2010).

Page 6: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 6 of 13

By 2000, the Santa Ana sucker had been eliminated from at least 75 percent of its historic range.

The remaining sucker habitat has been heavily fragmented and degraded. Today, sucker

populations are primarily restricted to the East, West, and North forks of the San Gabriel River;

the middle and lower Santa Ana River; and the lower Big Tujunga Creek. In the Santa Ana

River, the Santa Ana sucker currently occupies only four to ten kilometers of habitat, and this

“available suitable habitat is declining.” 34

FWS listed the Santa Ana sucker as threatened under the ESA on April 12, 2000, due primarily

to the threats of “habitat destruction, natural and human-induced changes in streamflows … and

demographics associated with small populations.”35

FWS has determined the Santa Ana River

habitat that runs through the cities of San Bernardino, Riverside and Colton to be essential for

the continued existence of the sucker. FWS first established critical habitat for the Santa Ana

sucker on February 26, 2004 and has since amended its critical habitat designation, most recently

on December 14, 2010. Critical habitat for the sucker extends roughly 60 miles along the Santa

Ana River from the San Bernardino National Forest to the city of Anaheim, protecting the river,

as well as some of its upland features and important aspects of its watershed.36

In its revised critical habitat rule, FWS stated that stream flows sufficient to transport coarse

sediments from upstream areas and tributaries to occupied habitat downstream is critical to

maintaining spawning substrate, and thus essential to conservation efforts.37

Under unaltered

conditions, streams experience high flow events that deliver course sediments to downstream

areas, while removing fine sediments that have covered up spawning habitats.38

These high flow

events have historically coincided with seasonal precipitations events, but the flood control

activities have altered the timing and intensity of such flows. The Seven Oaks Reservoir marks

the upstream limit of the critical habitat. Operation of the SOD traps coarse sediment behind the

dam, while failing to reduce the movement of fine sediment to downstream areas, doubling its

negative impact on sucker critical habitat.39

The transport of fine sediment and silt downstream

following releases from SOD was previously documented and referenced in the 2011 FWS five

year review.40

C. The Seven Oaks Dam

SOD is located on the upper Santa Ana River, about 8 miles northeast of the city of Redlands in

San Bernardino County.41

SOD was built by the Corps; construction was completed in 1999,

and serves the primary purpose of flood control for San Bernardino, Riverside and Orange

Counties.42

The Corps’ Water Control Manual for Seven Oaks Dam indicates that ownership,

operation and maintenance of SOD were turned over to the Local Sponsors, on October 1,

34

USFWS 2011 http://ecos.fws.gov/docs/five_year_review/doc3616.pdf 35

71 Fed. Reg. 19686, 19686 (Apr. 12, 2000). 36

See 75 Fed. Reg. 77962 (Dec. 14, 2010). 37

75 Fed. Reg. 77962, 77968 (Dec. 14, 2010). 38

75 Fed. Reg. 77962, 77968 (Dec. 14, 2010). 39

75 Fed. Reg. 77962, 77968 (Dec. 14, 2010). 40

USFWS 2011 http://ecos.fws.gov/docs/five_year_review/doc3616.pdf at p. 13, see figures 3 & 4. 41

U.S. Army Corps of Engineers, Water Control Manual Seven Oaks Dam & Reservoir, September 2003, at 2-1

http://resreg.spl.usace.army.mil/library/WCM%20AND%20REFERENCES/SEVEN%20OAKS/SOAK_WCM.pdf. 42

U.S. Army Corps of Engineers, Water Control Manual Seven Oaks Dam & Reservoir, September 2003, at 2-1

http://resreg.spl.usace.army.mil/library/WCM%20AND%20REFERENCES/SEVEN%20OAKS/SOAK_WCM.pdf.

Page 7: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 7 of 13

2002.43

The Water Control Manual further states that the Local Sponsors are required to operate

the SOD in accordance with the Corps’ currently approved water control plan, which is included

in the Water Control Manual.44

The specific duties of the Local Sponsors are listed below:45

1. Orange County Flood Control District (“OCFCD”) is responsible for water control

management, in accordance with the water control plan, at SOD. OCFCD is required to

coordinate with all other entities, public and private, affected by dam operations.

2. San Bernardino County Flood Control District (“SBCFCD”) controls physical operation

of SOD, implementing the directives it receives from OCFCD.

3. Riverside County Flood Control and Water Conservation District (“RCFCWCD”) is not

directly charged with any specific task necessary for operation or regulation of SOD.

The Water Control Manual directs dam operations and contains the protocols to which the Local

Sponsors must adhere when making releases, such as the release at issue here. The Water

Control Manual provides the rates at which impounded water can be released, given the physical

limitations of SOD infrastructure.

II. INCIDENTS OF TAKE

The construction and operation of the SOD has negatively impacted the Santa Ana sucker

population and its critical habitat in the Santa Ana River, as outlined in the FWS Recovery Plan

and analysis supporting the designation of critical habitat. The Local Sponsors’ operation of the

SOD, in particular the timing and quantity of surface flow releases, can harm downstream

suckers and their critical habitat if done without sufficient ecological consideration. One such

incident of harm occurred following a May 11, 2019 surface flow release from SOD. The

release of murky, fine sediment-laden water from behind SOD, nearly three months after the last

natural storm event of the season, moved through downstream spawning beds, causing harm to

active nest sites.

The need for the release in question arose because the Corps was allegedly “stockpiling” water

behind the dam; this caused water quality to diminish such that water agencies were complaining

of the impacts to drinking water quality.46

The release, planned and ordered by OCFCD under

the direction of the Corps’ Water Control Manual, was initially set to occur on May 9, 2019.47

After outreach from FWS, raising concerns over the potential impact of such a release on Santa

Ana suckers in the absence of a naturally occurring storm event, the release plan was revised and

43

U.S. Army Corps of Engineers, Water Control Manual Seven Oaks Dam & Reservoir, September 2003, at 9-2

http://resreg.spl.usace.army.mil/library/WCM%20AND%20REFERENCES/SEVEN%20OAKS/SOAK_WCM.pdf.;

Orange County Flood Control District, Seven Oaks Dam (last visited 7/29/2019),

http://www.ocflood.com/sarp/7oaks 44

U.S. Army Corps of Engineers, Water Control Manual Seven Oaks Dam & Reservoir, September 2003, at 9-2

http://resreg.spl.usace.army.mil/library/WCM%20AND%20REFERENCES/SEVEN%20OAKS/SOAK_WCM.pdf. 45

U.S. Army Corps of Engineers, Water Control Manual Seven Oaks Dam & Reservoir, September 2003, at 9-3

http://resreg.spl.usace.army.mil/library/WCM%20AND%20REFERENCES/SEVEN%20OAKS/SOAK_WCM.pdf. 46

Exhibit 1 at 1. 47

Exhibit 2 at 8-9.

Page 8: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 8 of 13

scheduled for May 11, 2019, when a storm event was expected to result in surface flow from the

upper San Bernardino Basin.48

FWS advised that planning the SOD release for the tail end of a

significant natural storm event would partially mask the negative impact of the SOD release on

river resources.49

Since the natural storm runoff would lead to some increase in mainstem

turbidity, a portion of the total turbidity increase, from rain and SOD release, would be attributed

to the natural storm event.50

As originally planned, the release would be begin at 9:00 a.m. and would ramp up from 120 to

700 cubic feet per second, and sustain that level of flow until May 14, 2019, before decreasing to

250 cubic feet per second by May 20, 2019.51

It was anticipated that this level of flow would

move significant amounts of sediment downstream, since the mainstem channel was considered

saturated after a wet winter and spring.52

The maximum release rate from the debris pool is 500

cubic feet per second, a release rate that is deemed to avoid significant impacts on Santa Ana

sucker habitat downstream of the SOD.53

Email exchanges between the Corps and OCFCD

estimate that a release of 700 cubic feet per second would generate flows that would reach the

Riverside Avenue Bridge in approximately 8 hours, and that the velocity of the release-generated

flows would be sufficient to move coarse sands and fine gravels long distances, while potentially

moving larger gravel particles locally.54

On May 11, 2019, prior to the scheduled 9:00 a.m. SOD release, FWS contacted representatives

from the Corps and OCFCD, warning that the weather forecast had changed such that chances of

a natural precipitation event sufficient to impact surface flows was unlikely, and therefore the

planned release would likely harm suckers downstream.55

In its communication with OCFCD

engineers, FWS outlined the potential harm of the planned release under current conditions:

“… a release of flow from Seven Oaks Dam that results in surface flow reaching

the perennial stream is likely to cause harm to sucker. This harm will be in the

form of smothering viable eggs in spawning beds (gravel beds), reduced water

quality (high sediment load and low oxygen levels), transport of young fish

downstream (increased potential for predation and exposure to high velocity flow),

and reducing in foraging habitat for juvenile and adult fish (gravel beds covered

by influx of deposited sand).”56

FWS recommended that formal consultation for such activities (moderate to high flow

releases) should be conducted to cover incidental take of federally-listed species, and that

the release should be “delayed until favorable conditions reduce the potential for impacts

48

Exhibit 2 at 1-2. 49

Id. 50

Exhibit 2 at 1-2. 51

Exhibit 3 52

Exhibit 2 at 7. 53

U.S. Army Corps of Engineers. Draft Supplemental Environmental Assessment/Negative Declaration, Seven

Oaks Dam Updated Water Control Manual. May 2014. p. 69. Available at:

https://www.spl.usace.army.mil/Portals/17/docs/publicnotices/Draft%20Public%20Review%20WQS%20SEA%20w

%20IS_MAY%202014.pdf. 54

Exhibit 4 at 1 55

Exhibit 2 at 1. 56

Id.

Page 9: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 9 of 13

to Santa Ana sucker.”57

Despite these plain warnings, and the lack of a natural storm

event, flows from SOD were released May 11, 2019.58

On May 13, 2019, a FWS biologist observed the flows generated by the May 11, 2019

release (“SOD flows”) moving into fish-inhabited portions of the stream. The FWS

biologist photographed the SOD flows mixing with clear, tertiary treated waste water

discharged from the Rialto and RIX waste water treatment plants, just upstream from

fish-occupied portions of the Santa Ana River mainstem. The photographs, included

below, were taken approximately 0.60 miles upstream of the S. Riverside Ave. bridge, in

the city of Colton.

The photo shows sediment-laden SOD flows entering the mainstem and mixing with clear water released

from adjacent water treatment. Taken 5/13/19 by FWS staff, obtained in response to a 7/2/2019 FOIA

request.

57

Exhibit 2 at 1. The Noticing Parties have previously provided the Corps with notice that the Corps is in violation

of section 7 of the ESA, 16 U.S.C. § 1536 due to its failure to consult and/or reinitiate consultation with the U.S.

Fish and Wildlife Service based on, among other things, the effects of dam operations and releases on the Santa Ana

sucker and designated Santa Ana sucker critical habitat. The Corps’ failure to initiate or reinitiate formal

consultation here despite the reasonable certainty of Santa Ana sucker take evidences and is an outgrowth of this

previously-noticed ESA violation. 58

Exhibit 3

Page 10: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 10 of 13

Photo shows sediment-laden SOD flows entering the native fish-occupied stream portion of the mainstem.

Photo taken 5/13/19 by FWS staff and obtained as part of a FOIA request submitted 7/2/2019.

The FWS biologist observed larval and young-of-year Santa Ana sucker at, and

downstream of, the point at which SOD flows mixed with the tertiary treated waste water

discharges. Additionally, the portion of the river depicted above is known to be utilized

by Santa Ana sucker for spawning beds due to the presence of ideal substrate in the

streambed.59

59

Santa Ana Riverwalk 2018, Quality of Substrate for Spawning.

Page 11: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 11 of 13

The SOD flows caused demonstrable harm to Santa Ana sucker individuals, active

spawning nests eggs as well as occupied habitat.60

Neither the Local Sponsors nor the

Corps had authorization for the take of Santa Ana sucker that resulted from the

intentional release of SOD flows. The 2002 Biological Opinion associated with

construction and operation of the Seven Oaks Dam did not provide authorization for the

incidental take of Santa Ana sucker, as it concluded that operation of the dam was not

likely to adversely affect Santa Ana suckers.61

OCFCD, the other Local Sponsors and the Corps made no apparent attempt to avoid or

mitigate the potential impacts of releasing water impounded behind SOD outside of a

natural storm event, despite warnings and proposed mitigation actions issued by FWS.62

The Local Sponsors nevertheless undertook extensive coordinating efforts in anticipation

60

50 C.F.R. § 17.3 [Harm includes adverse habitat modification that injures wildlife by significantly impairing an

essential behavior, such as breeding.] 61

U.S. Army Corps of Engineers, Water Control Manual Seven Oaks Dam & Reservoir, September 2003, Exh. J,

Seven Oaks Dam Biological Opinion, 2002 at 1,

http://resreg.spl.usace.army.mil/library/WCM%20AND%20REFERENCES/SEVEN%20OAKS/SOAK_WCM.pdf 62

Exhibit 2 at 4, 6. FWS proposed measures such as creating dikes and/or berms that would direct flows away from

occupied stream sections, particularly near the Rapid Infiltration and Extraction Treatment Facility (“RIX”), where

spawning beds are located.

Page 12: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 12 of 13

of the release, including closing trail access near the Santa Ana River below SOD, as well

as working with local law enforcement to notify and evacuate homeless encampments

along the River.63

Meanwhile, the Corps failed to ensure that the release was consistent

with the Water Control Manual and water control plan, asserting that the releases would

occur “in a manner that is compliant with the Water Control Manual … .”64

Inquiring as

to whether the release had been made, a Corps staff person noted, “we had agreement on

a particular course of action and I didn’t see anything in earlier emails that said if the rain

did not occur as predicted, then the release should not occur.”65

The Local Sponsors, in planning the May 2019 release, ignored vital information concerning the

hydrologic needs of the suckers during spawning, as contained in the 2017 FWS Recovery Plan

for Santa Ana suckers as well as the 2010 critical habitat revision. The Local Sponsors also

ignored FWS’s multiple warnings concerning the impacts of the planned release. Despite

receiving a specific recommendation that consultation should be initiated because the activity

was not covered under an existing incidental take permit, the Local Sponsors carried out the May

11, 2019 release that resulted in harm to Santa Ana sucker.

The harm caused by this SOD release is reasonably certain to occur again, since the Local

Sponsors and the Corps believe that such releases are compliant with Water Control Manual and

2011 Interim Environmental Guidelines.66

This foreseeable harm to Santa Ana suckers may be

minimized or avoided entirely through, for example, the adoption of protocols governing the

timing and mode of the releases, but on the Noticing Parties’ information and belief, there are no

legal or regulatory mechanisms in place that will ensure the harm is minimized or avoided. The

Local Sponsors’ refusal to implement mitigating actions on a voluntary basis indicates that future

SOD releases that harm Santa Ana suckers are reasonably certain to recur. This was not a one-

off incident, nor was it an accident. This was an intentional action, carried out by the Local

Sponsors, with the support of the Corps, in spite of FWS objections.

III. CONCLUSION

The Local Sponsors’ release of outflows from the SOD to the Santa Ana River on May 11, 2019,

with support of the Corps, led to sediment-laden surface flows moving through occupied habitat

where active spawning nests were located, causing the take of the threatened Santa Ana sucker.

Because the Local Sponsors and Corps have failed to obtain take authorization that may have

allowed for limited take of Santa Ana suckers under certain conditions, the past and continuing

actions of the Local Sponsors and Corps that are harming Santa Ana suckers is an illegal take in

violation of the ESA. If the Local Sponsors and Corps do not remedy this violation within the

next 60 days, the Noticing Parties may initiate legal proceedings against all responsible agencies

to prevent any further illegal take of the Santa Ana sucker. If you have any questions, wish to

meet to discuss this matter, or feel this notice is in error, please contact us.

63

San Bernardino Sun, “Seven Oaks Dam release postponed due to rain threat, has been rescheduled for Saturday,”

5/9/19, https://www.sbsun.com/2019/05/09/water-to-be-released-from-seven-oaks-dam-dangerous-flows-possible/ 64

Exhibit 5 at 1. 65

Exhibit 2 at 1. 66

Exhibit 5 at 2, 8.

Page 13: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

December 11, 2019

Page 13 of 13

Sincerely,

Ross Middlemiss

John Buse

Center for Biological Diversity

1212 Broadway, Ste. 800

Oakland, CA 94612

Tel: (510) 844-7125

[email protected]

[email protected]

Page 14: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Exhibit 1

Page 15: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

From: Palenscar, KaiTo: Karin Cleary-RoseCc: Ken CoreySubject: SOD High Flow ReleaseDate: Wednesday, April 24, 2019 7:48:02 AM

Hi Karin,

I have a call with the Corps (Hayley's group) at 9 am to discuss the potential for a high flowrelease from SOD to occur sometime soon. The Corps has been stockpiling water behind thedam for months without our knowledge and now the water quality has become poor (fordrinking) and the water agencies are complaining. The longer it is held the worse the situationwill become for humans and wildlife.

A release of any significance (>500 cfs) will flow the length of the dry channel and mergewith the perennial stream and sucker occupied habitat.

Potential for HarmIf conducted now (anytime before mid-June) would likely negative impact spawning beds andlarval/juvenile sucker (harm/death from suffocation/displacement). For adult fish (harm fromdisplacement/temporary reduction in habitat quality) the loss of forage habitat would occurany time of year. Fine sediment moved into the inset channel would remain for several monthsand reduce the amount of exposed gravels during that time.

Potential for BenefitThe benefit would be on the receding limb of the flow where some new areas would bescoured (open up new foraging habitat but likely less than the amount covered by finesediment). If conducted in the middle of the spawning season those fish that are not spawnedout would search for appropriate spawning sites on the receding limb of the hydrograph(similar to a late season storm event and a natural process). This may trigger or renewspawning. The displacement of fish downstream is not a bad thing. Summer warming likelycauses massive die-offs of young-of-the-year fish between Riverside Avenue and theRiverside landfill. Cool upwelling upstream of the Riverside narrows provides thermal refugefor fish during the hot summer months.

Discussion topics will include what flow releases are possible from the dam, what monitoringthe Corps can provide, what data and where it should be collected, etc. These data will be usedto vet recent flow models with empirical data to see if they are providing accurate information.It will also be used to see where modification in the channel may be made to encourage flowto enter the '69 breakout channel.

Formal consultation will likely be necessary and I will encourage the Corps to find/placesediment below SOD and test a technique I recently learned about at my last NCTC trainingwhich is designed to remove fine sediment from a stream (vortex pipe) and place it off-channel.

Kai

Kai Palenscar, Ph. D.Fish and Wildlife Biologist

Page 16: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

U.S. Fish and Wildlife Service - Palm Springs Office777 E. Tahquitz Canyon Way, Suite 208Palm Springs, California 92262T: 760-322-2070 x 408 E: [email protected]

Page 17: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Exhibit 2

Page 18: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

1

From: Spencer, JohnSent: Sunday, May 12, 2019 8:03 AMTo: Lovan, Hayley J CIV (US)Cc: Camara, Alison; Wong, Megan T CIV CESPL CESPD (US)Subject: Re: [Non-DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release

The release was and is being made. No actions were made to divert water. San Bernardino County stated they were going to have a biologist monitoring. There was no discussion as to what was to occur if the rain didn’t come.  John Spencer 

Sent from my iPhone  On May 12, 2019, at 4:35 AM, Lovan, Hayley J CIV (US) <[email protected]> wrote: 

Did you see this message?  Was the release made, and were any actions taken to keep the water away from spawning areas, or monitor?  We had agreement on a particular course of action and I didn’t see anything in earlier emails that said if the rain did not occur as predicted, then the release should not occur.    Sent with BlackBerry Work (www.blackberry.com) 

From: Palenscar, Kai <[email protected]> Date: Saturday, May 11, 2019, 10:57 AM To: Lovan, Hayley J CIV (US) <[email protected]> Cc: Karin Cleary‐Rose <karin_cleary‐[email protected]>, Spencer, John <[email protected]>, Ken Corey <[email protected]>, Wong, Megan T CIV CESPL CESPD (US) <[email protected]>, Camara, Alison <[email protected]> Subject: Re: [Non‐DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release 

 Dear Hayley,  The proposal to release flow from Seven Oaks Dam was delayed from Thursday, May 9 to Saturday, May 11 (8 am) based on the prediction for moderate precipitation to occur on May 11 resulting in surface flow in the Santa Ana River. The current weather prediction for Mentone, CA is for 30% chance of 0.03 inches of rain, starting at 1 pm (source: Weather Underground). This magnitude of precipitation is not likely to result in significant surface flow in the Santa Ana River. Based on the current conditions and unlikely chance for natural storm flow to interact with the perennial lowland stream (occupied by Santa Ana sucker), a release of flow from Seven Oaks Dam that results in surface flow reaching the perennial stream is likely to cause harm to sucker. This harm will be in the form of smothering viable eggs in spawning beds (gravel beds), reduced water quality (high sediment load and low oxygen levels), transport of young fish downstream (increased potential for predation and exposure to high velocity flow), and reducing in foraging habitat for juvenile and adult fish (gravel beds covered by influx of deposited sand).   

Page 19: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

2

Due to the high probability that a moderate to high flow release from Seven Oaks Dam will negatively affect Santa Ana sucker today (May 11, 2019), and potentially additional federally listed species, formal consultation should be initiated to cover incidental take for this type of activity. The pending release of flow from Seven Oaks Dam should be delayed until favorable conditions reduce the potential for impacts to Santa Ana sucker, or additional avoidance and minimization measures are provided to reduce impacts to native aquatic species. In addition to reducing impacts to listed species it is highly recommended that this type of activity is monitored to collect data (flow, sediment transport, etc.) that will be useful for future releases from Seven Oaks Dam.   Below is the current flow from the USGS E Street Gauge in San Bernardino, CA. No increase in surface flow is noted for Saturday, May 11, 2019.   Thank you, Kai  

   Kai Palenscar, Ph. D. Fish and Wildlife Biologist  U.S. Fish and Wildlife Service ‐ Palm Springs Office 777 E. Tahquitz Canyon Way, Suite 208 Palm Springs, California 92262 T: 760‐322‐2070 x 408  E: [email protected]   On Thu, May 9, 2019 at 10:11 AM Spencer, John <[email protected]> wrote: 

Kai, 

  

Page 20: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

3

Attached is the release plan that we discussed. 

  

Thank you, 

  

John Spencer, M.S., P.E.  Civil Engineer  Flood Programs  Federal Projects  OC Public Works  Office: (714) 647‐3965 

Mobile: (   [email protected] 

  

From: Palenscar, Kai <[email protected]>  Sent: Thursday, May 09, 2019 9:14 AM To: Lovan, Hayley J CIV (US) <[email protected]> Cc: Karin Cleary‐Rose <karin_cleary‐[email protected]>; Ken Corey <[email protected]>; Wong, Megan T CIV CESPL CESPD (US) <[email protected]>; Camara, Alison <[email protected]>; Spencer, John <[email protected]> Subject: Re: [Non‐DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release 

  

Good Morning, 

  

I had a lengthy discussion with John Spencer regarding the planned release from Seven Oaks Dam. He will be providing a revised release schedule soon.  

  

The plan that we discussed is delaying the release until this weekend and initiate the release on the tail of the storm event that is predicted for Saturday. This storm will likely provide surface flow from the upper San Bernardino Basin to the perennial stream. If the release from Seven Oaks Dam is conducted after the natural storm flow, it will have minimal additional impact on native fishes, including Santa Ana sucker.  

  

If any of this is inaccurate Spencer, please revise.  

  

Thank you, 

Page 21: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

4

Kai 

  

Kai Palenscar, Ph. D. 

Fish and Wildlife Biologist 

  

U.S. Fish and Wildlife Service ‐ Palm Springs Office 

777 E. Tahquitz Canyon Way, Suite 208 

Palm Springs, California 92262 

T: 760‐322‐2070 x 408  

E: [email protected] 

  

  

On Wed, May 8, 2019 at 6:05 PM Palenscar, Kai <[email protected]> wrote: 

Hi Hayley, 

  

As far as I can tell these interim recommendations were based upon a storm event originating proximal to the time period of the dam release. If the proposed dam release was proximal to a storm event the impact to downstream resources would be minimal as the natural storm flow would have caused the initial impact to river resources. At this point in the season we are well into the Santa Ana sucker spawning season and the last significant storm event was in February, approximately 3 months ago. Any release from Seven Oaks Dam that causes surface flow to reach the sucker‐occupied stream (downstream of La Cadena) is likely to cause negative impacts to both spawning beds and larval/small juvenile fish occupying the shallow stream margin.  

  

Is it possible to move sediment (create berms/dikes) to direct flows away from the occupied stream near the RIX facility? This would avoid some of the impact to spawning beds.  

  

Will anyone be monitoring conditions in the stream? If so, who is monitoring what and where?  

  

Page 22: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

5

Thank you, 

Kai 

  

Kai Palenscar, Ph. D. 

Fish and Wildlife Biologist 

  

U.S. Fish and Wildlife Service ‐ Palm Springs Office 

777 E. Tahquitz Canyon Way, Suite 208 

Palm Springs, California 92262 

T: 760‐322‐2070 x 408  

E: [email protected] 

  

  

On Wed, May 8, 2019 at 12:13 PM Lovan, Hayley J CIV (US) <[email protected]> wrote: 

My understanding from the dam operators is that the release will commence tomorrow in a manner that is compliant with the Water Control Manual, and that an environmental release is not feasible at this time.  However, they will implement the Interim Environmental Guidelines agreed upon between Orange County Public Works and USFWS (Heather Dyer) after the 2011 High Flow Release ‐ attached.  Please contact the Reservoir Regulation Team (John Spencer or Alison Camara) directly with any questions or to discuss plans during future storm events.  Orange County asked me to also forward the attached email from Heather Dyer (from 2011).  She had drafted an internal briefing paper on the Environmental Guidelines.    Alison's phone number is 714‐647‐3961 and her email is [email protected].  John's phone number is (714) 647‐3965 and his email is [email protected].   Hayley J. Lovan Chief, Ecosystem Planning Section Los Angeles District, U.S. Army Corps of Engineers [email protected]  Office: 213‐452‐3863 Cell:     ‐‐‐‐‐Original Message‐‐‐‐‐ 

Page 23: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

6

From: Palenscar, Kai [mailto:[email protected]]  Sent: Wednesday, May 8, 2019 8:56 AM To: Lovan, Hayley J CIV (US) <[email protected]> Cc: Karin Cleary‐Rose <karin_cleary‐[email protected]>; Ken Corey <[email protected]>; Wong, Megan T CIV CESPL CESPD (US) <[email protected]> Subject: Re: [Non‐DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release  Dear Hayley,  If this is really going to occur tomorrow can we discuss measures to reduce impacts to sucker spawning habitat?   One measure I have thought of to avoid smothering some of the best spawning habitat would be to place sediment berms (dikes) at strategic locations to maintain flow along the southern portion of the floodplain downstream of the RIX discharge location and upstream of Riverside Avenue Bridge. The perennial stream is currently confined to the northern portion of the floodplain until just downstream of Riverside Avenue Bridge where it run near the southern levee. There are two or three braids of the river that connect to the wetted stream upstream of Riverside Ave. If these were blocked to divert flow back to near the southern levee this would maintain approximately 1 mile of sucker spawning habitat, of a total of approximately two miles of spawning habitat (amount of spawning habitat is highly variable).   Thank you, Kai  Kai Palenscar, Ph. D. Fish and Wildlife Biologist   U.S. Fish and Wildlife Service ‐ Palm Springs Office 777 E. Tahquitz Canyon Way, Suite 208 Palm Springs, California 92262 T: 760‐322‐2070 x 408   E: [email protected] <mailto:[email protected]>    On Tue, May 7, 2019 at 5:36 PM Lovan, Hayley J CIV (US) <[email protected] <mailto:[email protected]> > wrote:           Yes, I was made aware of this today.  I'm coordinating further with the Counties to get more information.          Hayley J. Lovan         Chief, Ecosystem Planning Section         Los Angeles District, U.S. Army Corps of Engineers         [email protected] <mailto:[email protected]>           Office: 213‐452‐3863         Cell:   

Page 24: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

7

         ‐‐‐‐‐Original Message‐‐‐‐‐         From: Palenscar, Kai [mailto:[email protected] <mailto:[email protected]> ]          Sent: Tuesday, May 7, 2019 4:57 PM         To: Lovan, Hayley J CIV (US) <[email protected] <mailto:[email protected]> >         Cc: Karin Cleary‐Rose <karin_cleary‐[email protected] <mailto:karin_cleary‐[email protected]> >; Ken Corey <[email protected] <mailto:[email protected]> >         Subject: [Non‐DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release          Hi Hayley,          Have you heard about this pending release from Seven Oaks Dam? See forwarded message that originated from San Bernardino County Department of Public Works.           Kai          Kai Palenscar, Ph. D.         Fish and Wildlife Biologist           U.S. Fish and Wildlife Service ‐ Palm Springs Office         777 E. Tahquitz Canyon Way, Suite 208         Palm Springs, California 92262         T: 760‐322‐2070 x 408           E: [email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> >            ‐‐‐‐‐‐‐‐‐‐ Forwarded message ‐‐‐‐‐‐‐‐‐         From: Jeff Beehler <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >         Date: Tue, May 7, 2019 at 1:41 PM         Subject: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release         To: Palenscar, Kai <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >         Cc: Heather Dyer ([email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > ) <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >             FYI. See below. The ground is saturated up here and we only have the capacity to take about 130 cfs under current conditions.  Based on what we’ve seen in the channel this year, it’s also saturated.  I’d expect these SOD flows will continue downstream.  The higher of the releases (1,000 and 750) will likely move significant sediment downstream.  

Page 25: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

8

          From: Daniel Cozad          Sent: Tuesday, May 07, 2019 8:19 AM         To: Jeff Beehler; Manuel Colunga; Katelyn Scholte; Heather Dyer; 'Doug Headrick'         Subject: Fwd: Seven Oaks Dam (SOD) Release              Daniel B. Cozad          Please excuse typo's and autocorrect errors as this was sent from my iPad           Begin forwarded message:                  From: "McKenzie, Jr., James" <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >                 Date: May 7, 2019 at 8:05:59 AM PDT                 To: Bob Tincher <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >, "[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > " <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >, "Lillian Hernandez ([email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > )" <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >                 Cc: "Eke, Ken" <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >, "Doublet, David" <[email protected] <mailto:[email protected]>  <mailto:[email protected] <mailto:[email protected]> > >                 Subject: Seven Oaks Dam (SOD) Release                  All,                    Here's the draft release for SOD starting on May 9th:                    1,000 cfs release starting 5‐9‐19                          ‐ Ramp up to 1,000 cfs and sustain it for 4 hours                          ‐ Ramp down to 750 cfs for the weekend  

Page 26: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

9

                        ‐ Gate changes occur on normal business days                          ‐ Reach Debris Pool on 6‐7‐19                          ‐ Reach Sediment Pool on 6‐12‐19                          ‐ Assumed release of 250 cfs can be diverted by the water districts                    Lillian,                  Please forward this to the BTAC.                    I will provide an update if this changes.                    Thanks,                      James McKenzie, Jr.                  Groundwater Recharge Coordinator                 Department Of Public Works                 Flood Control Planning Division                  Phone: 909‐387‐7831                 Fax: 909‐387‐7801                    <Blockedhttp://BlockedBlockedwww.sbcounty.gov/ <Blockedhttp://Blockedwww.sbcounty.gov/> >                     Our job is to create a county in which those who reside and invest can prosper and achieve well‐being.                  BlockedBlockedBlockedwww.SBCounty.gov <Blockedhttp://BlockedBlockedwww.SBCounty.gov>  <Blockedhttp://BlockedBlockedwww.sbcounty.gov/ <Blockedhttp://Blockedwww.sbcounty.gov/> >                    <Blockedhttps://BlockedBlockedwww.facebook.com/SBCDPW/ <Blockedhttp://Blockedwww.facebook.com/SBCDPW/> >    

Page 27: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

10

                 County of San Bernardino Confidentiality Notice: This communication contains confidential information sent solely for the use of the intended recipient. If you are not the intended recipient of this communication, you are not authorized to use it in any manner, except to immediately destroy it and notify the sender.    

Page 28: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Exhibit 3

Page 29: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

1

Ross Middlemiss

From: Doublet, DavidSent: Thursday, May 9, 2019 11:12 AMTo: Biggs, Brendon; Eke, Ken; Walker, Melissa; Meeka, DarrenSubject: FW: Seven Oaks Dam Status Update - Draw Down Schedule 2019

FYI, see below for update from Orange County.   David R. Doublet  (909) 387‐7918  

From: SODResReg <[email protected]>  Sent: Thursday, May 9, 2019 11:03 AM To: Silsby, Shane <[email protected]>; Bazmi, Khalid <[email protected]>; Khan, Nardy <[email protected]>; Onuma, Kevin <[email protected]>; Tyler, James <[email protected]>; '[email protected]' <[email protected]>; 'Moon Kim Gilbert SPL ([email protected])' <[email protected]>; 'Sweeten, Jon SPL <[email protected]> ([email protected])' <[email protected]>; Blakeslee, Kevin <[email protected]>; Doublet, David <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; Luckham, Theodore <[email protected]>; Prado, Jessie <[email protected]>; Waugh, Clinton <[email protected]>; Ryan, Scott <[email protected]>; Fristrom, Tyson <[email protected]>; '[email protected]' <[email protected]>; Widor, Shannon <[email protected]>; Stockton, Carey ‐ DPW <[email protected]> Cc: Corpuz, Ariel <[email protected]>; Nguyen, Joe <[email protected]>; Camara, Alison <[email protected]> Subject: RE: Seven Oaks Dam Status Update ‐ Draw Down Schedule 2019  Current Conditions: (As of 1100 hr, Thursday May 9, 2019) Reservoir Level: 2304’ (Main Flood Control Pool) Sediment Elevation: 2131’ Depth of water: 173’ Reservoir Volume: 17,772 AF Release: 120 cfs Draw Down Schedule:

May 11, 2019 - Start Ramp Up at 0900 hr From 120 cfs to 700 cfs by 1100 hr

Maintain Approximately 700 cfs Until May 14, 2019

May 14, 2019 to May 20, 2019 – Start Ramp Down to Approximately 250 cfs

Maintain Approximately 250 cfs Until Debris Pool Elevation 2200’ is Reached

Page 30: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

2

Note: The National Weather Service is predicting approximately 1.4 inches of rain within the SOD watershed between Thursday, May 9, 2019 and Tuesday, May 14, 2019. Concerns raised by USFWS have been resolved, which resulted in the draw down to begin May 11, 2019.     

Page 31: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Exhibit 4

Page 32: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

1

From: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]>Sent: Wednesday, May 8, 2019 5:03 PMTo: Camara, AlisonCc: Tyler, James; Spencer, John; Eom, Moosub CIV USARMY CESPL (US); Crisostomo, Vangil C CIV

USARMY CESPL (US); Gilbert, Moon K CIV USARMY CESPL (US)Subject: RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam

(view in html)  For 700 cfs it’s approx. 19 miles to the bridge with an average of 3.3 fps. You can check my math but that comes out to a crude estimate of about 8 hours. I would assume a large buffer on this estimate but hopefully it helps for rough order of magnitude planning purposes.   

distance    avg velocity 

ft  mi  fps  sec  min  hr 

100445.4  19.0  3.345665 30022.55  500.3758 8.339597

       For particle movement, it looks like shear stress will be high enough in the area (avg ~0.30 lbs/sq ft) near Riverside drive to cause incipient motion of some gravel particles (~10‐15 mm). Keep in mind this is only initiation of movement for freely available particles. Particles traveling longer distances will be smaller—we might see some good movement of coarse sands and fine gravels at this flow rate.   Is this the kind of ballpark estimate you were looking for?    Regards,  Erica D. Kemp Weitzman, P.E.  Lead Planner Planning Division, Plan Formulation, Coastal Studies  Los Angeles District, U.S. Army Corps of Engineers  [email protected]   Office: 213.452.3571 Cell:    ‐‐‐‐‐Original Message‐‐‐‐‐ From: Camara, Alison [mailto:[email protected]]  Sent: Wednesday, May 8, 2019 16:08 To: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]>; Gilbert, Moon K CIV USARMY CESPL (US) <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]>; Crisostomo, Vangil C CIV USARMY CESPL (US) <[email protected]>; Walsh, Amanda Rachel CIV USARMY CESPL (US) 

Page 33: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

2

<[email protected]> Subject: [Non‐DoD Source] RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Hi Erica,  Perhaps if you can provide us a ballpark average velocity of the river for 700 cfs, we can approximate travel time solely on distance?  Just a thought.  Thanks, Alison  ‐‐‐‐‐Original Message‐‐‐‐‐ From: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]>  Sent: Wednesday, May 08, 2019 4:03 PM To: Gilbert, Moon K CIV USARMY CESPL (US) <[email protected]>; Camara, Alison <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]>; Crisostomo, Vangil C CIV USARMY CESPL (US) <[email protected]>; Walsh, Amanda Rachel CIV USARMY CESPL (US) <[email protected]> Subject: RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Thank you Kim.   Alison, I will look into other items later today.   Regards,  Erica D. Kemp Weitzman, P.E.  Lead Planner Planning Division, Plan Formulation, Coastal Studies Los Angeles District, U.S. Army Corps of Engineers [email protected]   Office: 213.452.3571 Cell:    ‐‐‐‐‐Original Message‐‐‐‐‐ From: Gilbert, Moon K CIV USARMY CESPL (US) Sent: Wednesday, May 8, 2019 16:01 To: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]>; Camara, Alison <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]>; Crisostomo, Vangil C CIV USARMY CESPL (US) <[email protected]>; Walsh, Amanda Rachel CIV USARMY CESPL (US) <[email protected]> Subject: RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Our CWMS models are set up as "real‐time" operational guidance tool, and not as an analysis tool.  We also currently don't have a CWMS model specific to Seven Oaks Dam.  

Page 34: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

3

As I have told Alison over the phone, ResReg is real‐time operations and we do not develop models for studies.  Our CWMS models are comprised of several model inputs, starting with a rainfall model, HMS, ResSim, and RAS, all of which are developed and provided by our H&H Sections for our use.  We generally don't need RAS outputs for making real‐time operation decisions.    In conclusion, ResReg doesn't have the hydrograph showing the data you're looking for.  Kim  Kim Gilbert Senior Hydraulic Engineer Reservoir Regulation Section Hydrology and Hydraulics Branch, Engineering Division U.S. Army Corps of Engineers Los Angeles District 213‐452‐3533   ‐‐‐‐‐Original Message‐‐‐‐‐ From: Kemp Weitzman, Erica D CIV USARMY CESPL (US) Sent: Wednesday, May 8, 2019 3:44 PM To: Camara, Alison <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]>; Gilbert, Moon K CIV USARMY CESPL (US) <[email protected]> Subject: RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Questions about timing require an unsteady‐state model with a hydrograph. ResReg may be able to provide this but it is unlikely this would have a quick turnaround time‐‐Kim please chime in if you have anything to add here, I'm not familiar with all of the inner workings of the CWMS unsteady set‐up. Sediment inquiries also require a different model configuration. We have models that do these things but I don't believe we would be able to give you answers today. However, I'll look into both of these items.   Regards,  Erica D. Kemp Weitzman, P.E.  Lead Planner Planning Division, Plan Formulation, Coastal Studies Los Angeles District, U.S. Army Corps of Engineers [email protected]   Office: 213.452.3571 Cell:     ‐‐‐‐‐Original Message‐‐‐‐‐ From: Camara, Alison [mailto:[email protected]] Sent: Wednesday, May 8, 2019 15:04 To: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]> Subject: [Non‐DoD Source] RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Hi Erica,  

Page 35: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

4

Thank you for running the hydraulic models.  This gives us a general idea of the velocities in the river with either a 750 or 1000 cfs release.  Would your hydraulic model be able to provide travel times along the river from Seven Oaks Dam to the area below Rialto Channel for a 750 cfs release?  Also, does the model provide information on what type of sediment would be moving for velocities between 2.5‐5 fps?    Thanks, Alison  ‐‐‐‐‐Original Message‐‐‐‐‐ From: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]> Sent: Wednesday, May 08, 2019 12:35 PM To: Camara, Alison <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]> Subject: RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Alison,  Moosub and I checked a 2014 final model and an 2017 draft model with updated terrain data. Both models yield results between ~2.5 and 5 fps at the bridge (difference between 750cfs and 1000 cfs is about 0.3 fps ) and this is consistent in the area below Rialto Channel. I would be happy to provide the screen‐shot print outs of these two models if you would like more specific data.    Keep in mind these are channel‐average velocities. Actual numbers will be higher at the thalweg and much lower near the margins. This also doesn't consider any infiltration that may occur prior to flows reaching this area of the channel.   Please let me know if you have additional questions.   Regards,  Erica D. Kemp Weitzman, P.E.  Lead Planner Planning Division, Plan Formulation, Coastal Studies Los Angeles District, U.S. Army Corps of Engineers [email protected]   Office: 213.452.3571 Cell:   ‐‐‐‐‐Original Message‐‐‐‐‐ From: Kemp Weitzman, Erica D CIV USARMY CESPL (US) Sent: Wednesday, May 8, 2019 10:43 To: Camara, Alison <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]>; Eom, Moosub CIV USARMY CESPL (US) <[email protected]> Subject: RE: Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam  Alison,  Received. Working on it.   Regards,  

Page 36: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

5

Erica D. Kemp Weitzman, P.E.  Lead Planner Planning Division, Plan Formulation, Coastal Studies Los Angeles District, U.S. Army Corps of Engineers [email protected]   Office: 213.452.3571 Cell:     ‐‐‐‐‐Original Message‐‐‐‐‐ From: Camara, Alison [mailto:[email protected]] Sent: Wednesday, May 8, 2019 10:37 To: Kemp Weitzman, Erica D CIV USARMY CESPL (US) <[email protected]> Cc: Tyler, James <[email protected]>; Spencer, John <[email protected]> Subject: [Non‐DoD Source] Hydraulic Analysis of the Santa Ana River D/S of Seven Oaks Dam Importance: High  Hi Erica,   Can you run a hydraulic analysis of the Santa Ana River from Seven Oaks Dam to Prado Basin with a 1000 cfs and 750 cfs?  Can you provide me a velocity of the river at Riverside Avenue Bridge?  This will help us determine if there is a concern regarding Santa Ana Sucker habitat.  Please, if you can do this as soon as possible, as we would like to begin releasing water from Seven Oaks Dam tomorrow.  Please feel to call me if you have any questions.    Thanks so much!    Alison Camara, P.E.  OC Public Works ‐ OC Infrastructure Programs  Flood Programs Division  Santa Ana River Project    300 N. Flower Street  Santa Ana, CA 92703  (714) 647‐3961 (Work)  

 (Cell)  [email protected] <mailto:[email protected]>    

Page 37: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

6

   

Page 38: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Exhibit 5

Page 39: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

From: Lovan, Hayley J CIV (US)To: Palenscar, Kai; Cleary-Rose, KarinCc: Wong, Megan T CIV (USA)Subject: FW: [Non-DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) ReleaseDate: Friday, July 19, 2019 4:09:52 PMAttachments: Re Revised Interim Water Control Plan (35.5 KB).msg

SOD Interim Water Control Environmental Guidelines-Rev 8-15-11.pdf

Hi Kai and Karin,

Re-sending the guidelines we referred to in our call today.

Thanks for your time today. Have a good weekend!

Hayley J. LovanChief, Ecosystem Planning SectionLos Angeles District, U.S. Army Corps of [email protected]

Office: 213-452-3863Cell: 213-453-3163

-----Original Message-----From: Lovan, Hayley J CIV (US)Sent: Wednesday, May 8, 2019 12:12 PMTo: Palenscar, Kai <[email protected]>Cc: Karin Cleary-Rose <[email protected]>; Ken Corey <[email protected]>; Wong, Megan T CIVCESPL CESPD (US) <[email protected]>; Camara, Alison [OCPW]<[email protected]>; Spencer, John [OCPW] <[email protected]>Subject: RE: [Non-DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release

My understanding from the dam operators is that the release will commence tomorrow in a manner that is compliantwith the Water Control Manual, and that an environmental release is not feasible at this time. However, they willimplement the Interim Environmental Guidelines agreed upon between Orange County Public Works and USFWS(Heather Dyer) after the 2011 High Flow Release - attached. Please contact the Reservoir Regulation Team (JohnSpencer or Alison Camara) directly with any questions or to discuss plans during future storm events.

Orange County asked me to also forward the attached email from Heather Dyer (from 2011). She had drafted aninternal briefing paper on the Environmental Guidelines.

Alison's phone number is 714-647-3961 and her email is [email protected]. John's phone number is(714) 647-3965 and his email is [email protected].

Hayley J. LovanChief, Ecosystem Planning SectionLos Angeles District, U.S. Army Corps of Engineers [email protected]

Office: 213-452-3863Cell: 213-453-3163

-----Original Message-----From: Palenscar, Kai [mailto:[email protected]]Sent: Wednesday, May 8, 2019 8:56 AMTo: Lovan, Hayley J CIV (US) <[email protected]>

Page 40: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Cc: Karin Cleary-Rose <[email protected]>; Ken Corey <[email protected]>; Wong, Megan T CIVCESPL CESPD (US) <[email protected]>Subject: Re: [Non-DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release

Dear Hayley,

If this is really going to occur tomorrow can we discuss measures to reduce impacts to sucker spawning habitat?

One measure I have thought of to avoid smothering some of the best spawning habitat would be to place sedimentberms (dikes) at strategic locations to maintain flow along the southern portion of the floodplain downstream of theRIX discharge location and upstream of Riverside Avenue Bridge. The perennial stream is currently confined to thenorthern portion of the floodplain until just downstream of Riverside Avenue Bridge where it run near the southernlevee. There are two or three braids of the river that connect to the wetted stream upstream of Riverside Ave. Ifthese were blocked to divert flow back to near the southern levee this would maintain approximately 1 mile ofsucker spawning habitat, of a total of approximately two miles of spawning habitat (amount of spawning habitat ishighly variable).

Thank you,Kai

Kai Palenscar, Ph. D.Fish and Wildlife Biologist

U.S. Fish and Wildlife Service - Palm Springs Office777 E. Tahquitz Canyon Way, Suite 208Palm Springs, California 92262T: 760-322-2070 x 408

E: [email protected] <mailto:[email protected]>

On Tue, May 7, 2019 at 5:36 PM Lovan, Hayley J CIV (US) <[email protected]<mailto:[email protected]> > wrote:

Yes, I was made aware of this today. I'm coordinating further with the Counties to get more information. Hayley J. Lovan Chief, Ecosystem Planning Section Los Angeles District, U.S. Army Corps of Engineers [email protected] <mailto:[email protected]> Office: 213-452-3863 Cell: 213-453-3163 -----Original Message----- From: Palenscar, Kai [mailto:[email protected] <mailto:[email protected]> ] Sent: Tuesday, May 7, 2019 4:57 PM To: Lovan, Hayley J CIV (US) <[email protected] <mailto:[email protected]>> Cc: Karin Cleary-Rose <[email protected] <mailto:[email protected]> >; Ken Corey<[email protected] <mailto:[email protected]> > Subject: [Non-DoD Source] Fwd: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release Hi Hayley,

Page 41: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Have you heard about this pending release from Seven Oaks Dam? See forwarded message that originated fromSan Bernardino County Department of Public Works. Kai Kai Palenscar, Ph. D. Fish and Wildlife Biologist U.S. Fish and Wildlife Service - Palm Springs Office 777 E. Tahquitz Canyon Way, Suite 208 Palm Springs, California 92262 T: 760-322-2070 x 408 E: [email protected] <mailto:[email protected]> <mailto:[email protected] > > ---------- Forwarded message --------- From: Jeff Beehler <[email protected] <mailto:[email protected]> <mailto:[email protected] >> > Date: Tue, May 7, 2019 at 1:41 PM Subject: [EXTERNAL] FW: Seven Oaks Dam (SOD) Release To: Palenscar, Kai <[email protected] <mailto:[email protected]> <mailto:[email protected] > > > Cc: Heather Dyer ([email protected] <mailto:[email protected]> <mailto:[email protected] > > ) <[email protected] <mailto:[email protected]> <mailto:[email protected] > > > FYI. See below. The ground is saturated up here and we only have the capacity to take about 130 cfs undercurrent conditions. Based on what we’ve seen in the channel this year, it’s also saturated. I’d expect these SODflows will continue downstream. The higher of the releases (1,000 and 750) will likely move significant sedimentdownstream. From: Daniel Cozad Sent: Tuesday, May 07, 2019 8:19 AM To: Jeff Beehler; Manuel Colunga; Katelyn Scholte; Heather Dyer; 'Doug Headrick' Subject: Fwd: Seven Oaks Dam (SOD) Release Daniel B. Cozad Please excuse typo's and autocorrect errors as this was sent from my iPad Begin forwarded message: From: "McKenzie, Jr., James" <[email protected] <mailto:[email protected]> <mailto:[email protected] > > >

Page 42: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Date: May 7, 2019 at 8:05:59 AM PDT To: Bob Tincher <[email protected] <mailto:[email protected]> <mailto:[email protected] > > >,"[email protected] <mailto:[email protected]> <mailto:[email protected] > > "<[email protected] <mailto:[email protected]> <mailto:[email protected] > > >, "LillianHernandez ([email protected] <mailto:[email protected]> <mailto:[email protected] > > )"<[email protected] <mailto:[email protected]> <mailto:[email protected] > > > Cc: "Eke, Ken" <[email protected] <mailto:[email protected]> <mailto:[email protected] > > >, "Doublet, David" <[email protected]<mailto:[email protected]> <mailto:[email protected] > > > Subject: Seven Oaks Dam (SOD) Release All, Here's the draft release for SOD starting on May 9th: 1,000 cfs release starting 5-9-19 - Ramp up to 1,000 cfs and sustain it for 4 hours - Ramp down to 750 cfs for the weekend - Gate changes occur on normal business days - Reach Debris Pool on 6-7-19 - Reach Sediment Pool on 6-12-19 - Assumed release of 250 cfs can be diverted by the water districts Lillian, Please forward this to the BTAC. I will provide an update if this changes. Thanks, James McKenzie, Jr. Groundwater Recharge Coordinator Department Of Public Works Flood Control Planning Division

Page 43: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Phone: 909-387-7831 Fax: 909-387-7801 <Blockedhttp://Blockedwww.sbcounty.gov/ <Blockedhttp://www.sbcounty.gov/> > Our job is to create a county in which those who reside and invest can prosper and achieve well-being. BlockedBlockedwww.SBCounty.gov <Blockedhttp://Blockedwww.SBCounty.gov> <Blockedhttp://Blockedwww.sbcounty.gov/ <Blockedhttp://www.sbcounty.gov/> > <Blockedhttps://Blockedwww.facebook.com/SBCDPW/<Blockedhttp://www.facebook.com/SBCDPW/> > County of San Bernardino Confidentiality Notice: This communication contains confidential informationsent solely for the use of the intended recipient. If you are not the intended recipient of this communication, you arenot authorized to use it in any manner, except to immediately destroy it and notify the sender.

Page 44: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

From: [email protected] [[email protected]] To: Camara, Alison [[email protected]] Subject: Re: Revised Interim Water Control Plan Date: Wednesday, April 20, 2011 12:08:11 Attachment 1: 7 Oaks Release.doc ____________________________________________________________________________________________________ Alison, Please find attached my summary of the spreadsheet and just give it a quick look to make sure I didn't misinterpret or misunderstand something. This will only be for internal briefing purposes when other biologists have questions about the release plan. We don't have any further comments on the draft plan. Let's plan on touching base once the Corps engineers give you some feedback. Thanks, Heather P. Dyer Fish & Wildlife Biologist U.S. Fish and Wildlife Service Carlsbad Field Office Phone: 760/431-9440 x 246 "Lee, Alison" <[email protected]> 04/19/2011 04:31 PM To "Heather Dyer" <[email protected]>, "Jenness McBride" <[email protected]> cc "Natsuhara, Lance" <[email protected]>, "Ernst, Jeff" <[email protected]> Subject Revised Interim Water Control Plan Heather and Jenness, Thank you for meeting with us today. I’ve made some minor revisions to the plan from our discussions and I’ve highlighted them in red. Please let me know if you have any questions. Thank you, Alison Lee, P.E. OC Public Works - Flood Control Section Santa Ana River Project

Page 45: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

300 N. Flower Street, Room 716 Santa Ana, CA 92703 (714) 834-6061 [email protected]<mailto:[email protected]> [attachment "Proposed Interim Water Control Plan 4-19-11.pdf" deleted by Heather Dyer/R8/FWS/DOI]

Page 46: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Winter Storm Season (Oct. 1-March 15)

• Release water as needed based on input in order to keep levels as close to the debris pool elevations as possible. Debris pool and intermediate pool release flows will range from 3 to 500cfs, dependent upon conditions.

• If water is up to Main Trash Rack Pool and 7 Oaks is rising (and assumedly Prado as well) water will be released at 50cfs, per the Water Control Manual. If 7 Oaks is falling, releases will range from 500 – 2000cfs.

• If a large event occurs and water reaches the Main Flood Control Pool, releases will be influenced by the conditions at Prado and range from 500-7000cfs in order to release the excess water quickly and restore flood control capacity.

Late Storm Season (March 15 – April 15)

• Release water from the debris pool and intermediate pool from 3 – 250cfs, as needed. Attempts will be made to reduce the likelihood of temporary, high volumes of water being released that will reach La Cadena but subsequently stop after the debris pool is reached. Volumes will be kept low and steady if conditions allow.

• If water is up to Main Trash Rack Pool and 7 Oaks is rising (and assumedly Prado as well) water will be released at 50cfs, per the Water Control Manual. If 7 Oaks is falling, releases will be 1000cfs in order to empty the reservoir quickly and attempt to mimic a late season storm event. In an effort to limit possible stranding of SAS moving upstream during spawning season, ramp down will be accomplished gradually, with decreases no more than 33% lower than the previous day.

• If a large event occurs and water reaches the Main Flood Control Pool, releases will be influenced by the conditions at Prado. In order to empty the reservoir as quickly as possible and mimic a late season storm, releases will range from 500-6200cfs. Complete draw down to the Main Trash Rack Pool will be accomplished in 3-5 days. However, once this is achieved, further releases will be done gradually, with decreases no more than 33% lower than the previous day.

Spawning Season (April 15 – May 31)

• Operational goal is for levels to be at the Debris Pool by June 1. If levels are at the Debris Pool or Intermediate Pool, releases will match inflow, up to 250cfs.

• If water is up to Main Trash Rack Pool and 7 Oaks is rising (and assumedly Prado as well) water will be released at 50cfs, per the Water Control Manual. If 7 Oaks is falling, releases will be 1000cfs in order to empty the reservoir quickly and attempt to mimic a late season storm event. In an effort to limit possible stranding of SAS moving upstream during spawning season, ramp down will be accomplished gradually, with decreases no more than 33% lower than the previous day.

• If a large event occurs and water reaches the Main Flood Control Pool, releases will be influenced by the conditions at Prado. In order to empty the reservoir as quickly as possible and mimic a late season storm, releases will range from 500-6200cfs. However, once this is achieved, further releases will be done gradually, with decreases no more than 33% lower than the previous day.

Spawning Season (June 1-July 15)

• Operational goal is to have water levels at the Debris Pool by June 1. By July 15 water levels should be at the Sediment Pool for maintenance activities. Minimal releases will occur over the summer. Releases will range from Inflow+20cfs to 250cfs, dependent upon conditions. At 250cfs, it is estimated no water would reach La Cadena as it would have infiltrated the dry riverbed. Keeping water releases low and steady is a measure meant to help prevent SAS from heading upstream late in the spawning season due to high flows and then becoming stranded after the release stops.

Summer (July 16-September 30)

• Releases will be according to Water Control Manual.

Page 47: Shane Silsby, Director Orange County Public Works 601 ......Dec 11, 2019  · VIA ELECTRONIC MAIL and CERTIFIED MAIL; RETURN RECEIPT REQUESTED December 11, 2019 Shane Silsby, Director

Seven Oaks DamDraft Interim Water Control Environmental Guidelines8/15/2011

* Note: Discharges can be modified based on unforseen and unique hydrologic conditions to meet public safety concerns, environmental mitigation, and/or maintenance deadlines.

Debris Pool Intermediate Pool

2149.72 to 2200' 2200' to 2265' 2299 ft to 2400 ft 2400 ft to 2500 ft 2500 ft to 2580 ftSeven Oaks Rising 50 cfs Prado Rising 500 500 500

Seven Oaks Falling 500 - 2000 cfs Prado Falling 2000 - 4340 4340 - 6560 6560 - 7000

Seven Oaks Rising 50 cfs Prado Rising 500 500 500

Seven Oaks Falling 1000 cfs Prado Falling 2000 4340 6560

Min = 3 cfs Min = 3 cfs Seven Oaks Rising 50 cfs Prado Rising 500 500 500

Max = Inflow, Max = 250 cfs Seven Oaks Falling 1000 cfs Prado Falling 2000 4340 6560

up to 250 cfs

Min = 3 cfs Min = Inflow + 10

Max = Inflow + 10 cfs Max = 250 cfs

Min = 3 cfs Min = Inflow + 20

Max = Inflow + 20 cfs Max = 250 cfs

Min = 3 cfs Seven Oaks Rising 50 cfs Prado Rising 500 500 500

Max = Inflow + 20 cfs Seven Oaks Falling 500 - 2000 cfs Prado Falling 2000 - 4340 4340 - 6560 6560 - 7000

Min = 3 cfs Seven Oaks Rising 50 cfs Prado Rising 500 500 500

Max = Inflow + 20 cfs Seven Oaks Falling 500 - 2000 cfs Prado Falling 2000 - 4340 4340 - 6560 6560 - 7000

Normal OperationsEnvironmental Guidelines *

Santa Ana Sucker AssumptionsMarch 15 is the beginning of the spawning seasonJuly 15 is the end of the spawning seasonHatching takes place in about 15 days

October 1 to March 14

March 15 to April 15

2265' to 2299'

3 cfs 3 to 500 cfs

Ramp down no more than 33% from prior day

June 1 to June 30Min = Inflow + 10

Max = 250 cfs

Min = Inflow + 10

Max = 250 cfs

April 16 to May 31

Ramp down no more than 33% from prior day

Operational goal: Empty the reservoir as quickly as possible by mimicking a late storm event, so that water will be released early in the spawning season.

September 1 to September 30 3 to 500 cfs

July 16 to August 31 3 to 500 cfs

July 1 to July 15Min = Inflow + 20

Max = 250 cfs

Min = Inflow + 20

Max = 250 cfs

Operational goal: Releases would be according to the Water Control Manual. Prepare for the upcoming storm season.

Flow Rate (cfs)

Ramp down no more than 33% from prior day Ramp down no more than 33% from prior day

3 to 250 cfs3 cfs

Main Flood Control PoolMain Trash Rack Pool Comments

Operational goal: Be down to debris pool by March 15. If needed, flooding of the WSPA would occur in the storm season to mimic a natural storm event.

Operational goal: Releases would be according to the Water Control Manual. Draw down to Sediment Pool for maintenance activities.

Operational goal: Be down to debris pool or lower by June 1.

Operational goal: Minimal releases. Maximum is no more than what may infiltrate into the river plus diversion (approx. 250 cfs).Operational goal: Minimal releases. Maximum is no more than what may infiltrate into the river plus diversion (approx. 250 cfs). Draw down to Sediment Pool for maintenance activities.