Project document
The
“Energy Management System in the Cities and
Counties in Croatia“
Project activities
(SGE Project)
Fifth project year – 2012/2013
Zagreb, October 2012
1
CONTENT
1. Project background ..................................................................... 3
2. Planed activities of SEM project for fifth project year ................ 10109
2.1. Technical assistance in cities and counties for registry
establishment, introduction of SEM, education and promotion . 111110
2.1.1. Consulting services (professional associates) for
implementation of continuous and systematic energy management ................................................................ 111110
2.1.2. Consulting services (professional associates) for implementation of "Green Office" .................................... 121211
2.1.3. Consulting services (professional associates) for
implementation of Energy planning ................................. 131312
2.1.4. Consulting services (professional associates) for establishment
and support of EE INFO POINTS ..................................... 131312
2.1.5. Implementation of SEM project on site and active work with
local and regional governments throughout Croatia ........... 141413
2.2. Energy Management Information System (EMIS) in cities and
counties ........................................................................... 141413
2.2.1. Consulting services (professional associates) for the national
EMIS application ........................................................... 141413
2.3. Info-educational events ...................................................... 151514
2.3.1. Organisation of Info-edu activities ................................... 151514
2.4. Preparation and production of informative, educational, promotional
and other materials for implementation of SEM project, educational activities and other events .................................................. 161615
2.4.1. Production of content and expert preparation and production of
informative, educational, promotional and other project materials ..................................................................... 161615
2.5. Improvement of the Systematic Energy Management model .... 161615
2.6. Management of SEM project ................................................ 161615
2.6.1. Expert service for leading and managing of project and project resources ..................................................................... 161615
2.6.2. Communication, IT and office equipment ......................... 171715
2.6.3. Use of office space for implementation of project activities . 171716
2
3. Transfer of knowledge and experience .................................. 171716
4. Financial structure ............................................................. 191918
Appendix: Status of the implementation of the SEM project activities until
September 2012 ............................................................................. 202019
3
1. PROJECT BACKGROUND
The main goals of the project “Systematic Energy management in the
Cities and Counties in Croatia“(hereinafter the SEM project) are:
introduction of continuous and systematic energy management practice
and energy efficiency improvements in buildings primarily owned by local
(city) and regional (county) self-government units,
establishment of appropriate organizational structure, and professional
offices in charge of energy management,
initiating a process of strategic planning for energy consumption and
systematic management of energy resources at local level,
improvement of systematic energy management model and expansion to
all energy consumption sectors,
resulting with a decrease in consumption and costs of energy and water as well
as a decrease in emissions of harmful greenhouse gasses to the atmosphere.
The SEM project was initiated as a part of a comprehensive project “Croatia -
Removing Barriers to improving Energy Efficiency of the Residential
and Service sectors“ (short name: “Promoting Energy efficiency in
Croatia”) which was jointly managed by the Ministry of Economy, Labour and
Entrepreneurship (hereafter MELE) and the United Nation Development
Programme (hereafter UNDP) in the period from July 2005 to July 2011, under
the financial support of the Global Environmental Facility (hereafter GEF) and
the Environmental Protection and Energy Efficiency Fund (hereafter EPEEF).
The project implementation funded by GEF (4,39 million USD) started in July
2005. In 2006 the EPEEF gave the financial support to the project implementation by
financing its marketing strategy programme as well as the national informative and educational campaign for years 2006, 2007, 2008 and 2009 (9,35 million
HRK).
Following the positive results of the pilot project for the introduction of
systematic energy management in cities and counties, in April 2008 EPEEF
gave financial support for the implementation of the SEM project at national
level for four project years (2008/09, 2009/10, 2010/11 and 2011/12) in the
total amount of 28 million HRK. Paralel to the implementation of SEM project,
EPEEF has financed implementation of HIO Programme in the amount of almost
38 million HRK.
Since May 2008 the Croatian Government has implemented a complementary
national project called “House in Order” (the HIO programme) which includes
4
buildings owned by the Government. This enables a complete approach to the
promotion of energy efficiency in the large amount of public sector buildings of
the Republic of Croatia.
In accordance with the regulation of internal organisation of the Ministry of
Construction and physical Planning (hereafter MCPP) (Official gazette 27/12)
and regulation of internal organisation of the of the Ministry of Economy
(hereafter MOE) (official gazette 28/2012), and due to changes in the
jurisdictions and scope of work of several ministries, in year 2012 the
governance of the SEM Project and HIO programme has been transferred from
MOE to MCPP.
The SEM project activities implemented within the four project years
demonstrate success and efficiency of the systematic energy management
methodology especially through the:
Establishment of Energy Management Offices (EE office) and
Energy teams (EE team) in 76 cities and 16 counties with more
than a hundred employees. Ličko-senjska County is in the process of
estabilishing EE office. City of Zagreb, Krapina-zagorje, Karlovac and
Zagreb counties are not counted as energy management for their part is
done by North-west Croatia Regional Energy Agency.
Establishment of the Building Register containing approximately 7000
buildings owned and used by local or regional self-government units in
Croatia: a total of 6690 buildings have been identified in 19 counties and
81 cities.
Establishment of the Central Energy Management Information System
(hereinafter EMIS) - an internet application for supervision and analysis
of energy and water consumption in the public sector buildings. Data for
approximately half of all buildings – over 3500 of them – have been
entered into EMIS; More than 2400 buildings owned or used by the cities
and counties have established a practice of regular energy cost control
through bill auditing.
A national network of 112 EE information spots has been established with
the purpose of informing and educating citizens and encouraging a
transformation and development of energy efficiency products and
services within the Republic of Croatia.
Various educational modules for the public sector have been developed
that include the following target groups:
- Mayors, district prefects, heads of economy, finance, planning, energetics, environment and utility services departments
5
- Expert staff in various city and county institutions (engineers,
technical staff) - Technical staff in buildings (administrators, superintendents)
- EE teams and future EE teams - All employees
The part of the SEM project activities are being successfully implemented
by the Environmental Protection and Energy Efficiency Fund (EPEEF)
since 2010., which are: energy audits of the buildings and public display
of certificates on energy properties of the buildings, education of
employees of energy management offices in cities and counties for
implementation of ZUKE, as well as cooperation with local and regional
energy agencies in the SGE Project and ZUKE implementation. EPEEF
expanded educational activity on the municipalities as a part of the public
sector.
Implementation of these activities EPEEF has been transferred to the
EPEEF according to the Letter of Intent signed by the Ministry of
Economy, Labour and Entrepreneurship of the Republic of Croatia,
Environmental Protection, EPEEF and UNDP.
The educational modules in the public sector include:
1. Systematic energy management
- Introduction to SEM, goals, activities, purpose and obligations
for authorized persons of all levels of responsibility - Introduction to SEM, steps, goals, activities, purpose and
obligations of the users and the UNDP for technical personnel with an emphasis on the Building registry including the module
on the Building registry establishment and the introduction to
EMIS intended for all beneficiaries at technical level. 2. EMIS training aims to enable beneficiaries at building level in the
public sector (like technical staff in hospitals, administration personnel
required for data entering etc.) to use the EMIS, enter data and
monitor energy consumption which ensures early detection of
problems and irregularities.
3. A one-day course for technical personnel at building level intended for
building administrators and technical staff (superintendents) aiming to
increase technical capacities for quality building maintenance and
recommending investments for EE measures to authorized persons.
The course consists of 4 technical units covering these topics: building
envelopes, renewable energy sources, electricity and HVAC system.
4. Energy advisor course aims to ensure quality advising to citizens. It is
intended for future advisors in the EE centres as well as public
6
administration employees, technical personnel who will propose
investments or other measures for improving energy efficiency in their
institutions. The course includes following topics:
- Thermal building protection
- Heating, ventilation and cooling
- Renewable energy sources in buildings
- Building energy audits
- Economics in energetic
- Communication skills
5. The Green Office workshop is intended for all employees and Green
Office managers. It aims to raise awareness and motivation for
responsible behaviour in the office.
6. The Green Office Public Procurement workshop aims to educate
personnel in public procurement (cities, counties, departments for
procurement and finance) on how to discover ways and fields in which
green and sustainable criteria can be introduced.
Achieving these results has shown that due to the complex implementation of
systematic energy management process, it is still necessary to actively support
and encourage cities and counties to start or to continue independently with
the implementation of the systematic energy management activities in the 5th
year of the SEM project implementation.
Table 1. Achieved results of the SEM project until September 2012
Cities Counties Total
Signed Letter of Intent 93 of 127 20 of 20 113 of 147
EE Offices Established 75 15 90
Number of persons in EE teams 356 42 398
Number of buildings 3.777 2.913 6.690
Number of buildings in EMIS 1476 2100 3576
Total amount of investment in EE measures (HRK) 141.501.283
Year 2006 7.854.402
Year 2007 10.113.947
Year 2008 17.448.000
Year 2009 25.155.399
Year 2010 23.731.865
Year 2011 728.525
7
Year 2012 13.404.398
CO2 (kton) emission saving as a result of implemented EE measures till the end of 2010
8,8 kton1
CO2 (kton) emission saving as a result of establishment of systematic energy management and „soft“ measures2
Approx. 38 kton3
The process of establishing the system demands time not only because it
includes a large number of cities and counties (each of the 20 counties and 92
cities have signed a Letter of Intent and are implementing the project
activities), but also because of the evident insufficiency of expert capacities at
the local level, building of which is one of this project's objectives. Previous
experience indicate that in order to improve the system’s effectiveness and
achieve optimal results the scope should be extended to other energy
consumption sectors in cities and counties as well. Also, the process of
initiating investment cycles in the energy efficiency measures has shown to be
difficult and slow. According to previous experience it takes up to two years for
the realization and implementation of energy efficiency measures to
commence.
In spite of that, by mid-2012, a total of 159 projects of energy efficiency
measures implementation have been documented out of which 64 projects
have been realized subsequent to energy audits implemented as a part of SEM
project. The projects have been realised through direct investments by cities
and counties.
In chapter 5 of this document a list of cities and counties with which
cooperation has been established with statuses of implementation of the
project activities, list of established EE info points in RH and a review of info-
educational activities are provided.
Despite these successful indicators, the newly established energy management
offices in the local and regional self-government units (LRSGUs) are still not
ready to work independently.
1 Data according to calculations from the document „TERMINAL EVALUATION REPORT of the
UNDP-GEF Full Size Project“, Jiří Zeman, International Evaluator, May 2011 2 "Soft" measures are simple EE measures also known as "active" EE measures, where the
change in user behaviour in buildings generates certain energy savings 3 Data according to calculations from the document „TERMINAL EVALUATION REPORT of the
UNDP-GEF Full Size Project“, Jiří Zeman, International Evaluator, May 2011
8
The problem partly lies in the lack of capacities needed to establish an
organizational structure and independent mechanisms for implementation of
the systematic energy management in the LRSGUs.
Furthermore, a lack of experts with technical knowledge and skills required for
the implementation of systematic energy management activities is still evident.
This is reflected in the fact that a very limited number of LRSGUs are capable of
working independently and meeting the obligations under the Act on Efficient
End Use of Energy (ZUKE, NN 152/08).
In the fifth project year, further implementation of the SEM project
aims to ensure continuity of expert and technical support to cities and
counties, with the main objective to establish necessary organizational
structure for systematic energy management in as many cities as
possible and in all counties in the Republic of Croatia. This includes
transferring all commenced activities and established procedures to
the Croatian national institutions what will be defined by the Appendix
C.
Because of the lack of capacities needed to establish an organizational
structure and independent mechanisms for implementation of the systematic
energy management in the LRSGUs, UNDP will support employment of
educated staff in the LRSGUs in addition to tehnical, expert, and consulting
services.
Main goal of fifth year of SEM project implementation is continuation of
technical support for establishment of EE offices and implementation of
active EMIS application in all 93 cities and 20 counties that have signed
letter of intent.
The technical support for the SEM project implementation during the fifth year
will focus on the continuation of data input as well as the complete
commencement of work and further improvement of analytical abilities and
functionality of the EMIS. The basic version of the EMIS was developed in 2008.
Due to a large number of buildings and increased requirements this version
was upgraded in 2011. Full integration of EMIS requires time because basic
information about buildings as well as all data on energy consumption has to be
entered for each monitored building while the beneficiaries have to be educated
for independent use of the application. Complete analytic function of the EMIS
will be applicable when all necessary input data about the buildings have been
entered.
9
The implementation of the SEM project activities produces expert
capacities at the local level, establishes the systematic energy
management process, enters basic information on the condition and
energy consumption of public buildings in the EMIS thus enabling the
cities and counties to successfully implement activities and obligations
under ZUKE and independently plan, prepare and implement energy
efficiency projects as well as verify realized savings.
This creates a systematic basis for monitoring and achieving of strategic
objectives of the Republic of Croatia: energy efficiency improvement by 20%
and greenhouse emission reduced by 20% until 2020, as well as reaching the
demands of new EU Directive on end use energy efficiency that was adopted by
the EU parliament on 11th of September 2012, that will from January 2014
oblige public sector to lead by example in use of EE services and products and
yearly implementation of EE improvements in public building as well as in
reduction of overall energy consumption by implementation of the EE measures
in at least 3% of area of all buildings in ownership of public sector. This
obligation includes the buildings larger than 500 m2 and from 9th of July 2015
the buildings larger than 250 m2.
By realizing these goals the Republic of Croatia will be placed as a leading
country, not only in the region, but also in Europe, and a good example of
country that systematically implements energy management and energy
efficiency in the public building sector. The establishment of the systematic
energy management, the application of advanced tools and methodologies
(EMIS, energy audits and feasibility studies) and the education of a large
number of people from different disciplines enable a significant reduction of
energy consumption as well as the launching of the investment cycle in the
public building sector.
10
2. PLANED ACTIVITIES OF SEM PROJECT FOR FIFTH
PROJECT YEAR
The fifth project year lasts from November 1st 2012 till October 31st 2013. Main
activities that will be performed in cities and counties as a part of the SEM
project in this period are described below.
Execution of planned activities includes the costs of experts and companies
engaged on project activities, purchase of necessary equipment and materials
needed for successful operation, ensuring appropriate working conditions,
communication costs, travel costs, organisational costs (expenses), expenses
for maintenance of working tools, systems and workspace that are necessary
for smooth project operation and other expenses for implementation of project
activities.
In the following implementation period the goals are:
Results
Planned results in
4th year
Achived results in
4th year
(September 2012.)
Planned results in 5th year
Total results in five years of SEM project
implementation
Cities Counties Cities Counties Cities Counties Cities Counties
Signed Letter of
Intent 0 0 13 0 0 0 93 20
Adopted EE policy 5 5 5 5 13 0 93 20
Established EE
office (Officially
appointed
responsible person)
5 2 5 2 23 0 93 20
Established EE info
points 0 0 33 113
EE counsellor
course 0 5 5 10
Active EMIS 0 0 10 0 18 2 93 20
Workshops, round
tables, technical
assistance ( EMIS,
data analysis, green
office, EMS)
0 0 60 120
Independent EE
office 10 10 0 0 73 10 93 20
11
2.1. Technical assistance in cities and counties for registry
establishment, introduction of SEM, education and promotion
2.1.1. Consulting services (professional associates) for implementation
of continuous and systematic energy management
Acquisition and check-up of all necessary input data on public buildings
owned by the cities and counties through the EMIS for the purposes of
establishing a verified energy data base of all buildings in the system.
Technical assistance for establishment of new and operation of existing
EE Offices in cities and counties. Establishment of new EE offices includes
establishment of appropriate organisational structure and educated
experts that will support and perform SEM project activities and all other
activities needed for achieving strategic goals to increase energy
efficiency and environmental protection in counties / cities.
Technical assistance for establishment of practice of weekly and daily
energy consumption analysis and interpretation of energy consumption
data, identification of EE measures, energy planning and verification of
achieved savings, subsequent to the verified building registry in EMIS,
establishment of EE offices and corresponding organisational structure as
well as education of the EE team.
Technical assistance for establishment of practice of active utilisation of
the EMIS for energy consumption data collection, analysis and reporting,
energy planning and decision making.
Technical assistance for implementation of practice of local energy
planning, preparation of energy efficiency plans and programs as defined
by ZUKE and identification and implementation of EE measures.
Technical assistance for techno-economic analysis of EE measures,
verification of achieved savings (analysis and definition of base and
target consumption, verification of savings and identification of corrective
measures for energy efficiency improvement).
Providing expert support and transferring activities to the national
institutions of the Republic of Croatia
Planned goals of these activities are:
Establishment of the verified building registry with all data necessary for
analysis implementation and training of as many as possible independent
EE teams responsible for energy management in local and regional self-
government.
12
In the last 4 years of the project implementation, EE offices and teams
were established in 90 local and regional self-government units. In
established EE offices and EE teams, the lack of technical knowledge,
capacity and resources needed for independent work and functioning
of EE offices is significant, and due to this systematic energy
management and the fulfilment of all obligations under ZUKE is not
possible.
Cities and counties were completely relied on the work of UNDP staff
instead of employing their own educated staff.
In the fifth project year the objective is to offer support to local and
regional self-governments to increase the level of technical knowledge,
capacity and resource availability for unobstructed independent work as
well as to start and implement the transfer of activities to the national
institutions of the Republic of Croatia according to Appendix C.
In the fifth year the plan is to strengthen 113 offices for independent
work (all 20 counties and 93 cities that have signed letter of intent).
2.1.2. Consulting services (professional associates) for implementation
of "Green Office"
Education of employees in local and regional government in the field of
implementation of the process of centralized and green public
procurement, use of The Public Procurement Act, introduction of
economic and technical criteria of energy efficiency in tender
documentations, use of available norms during technical specification
preparation, production of detailed analysis and Life Cycle Cost
Assessment (LCCA) of products and services in the process of public
procurement.
Motivation workshops for change in behaviour and habits of employees in
relation to the concept of Green Office.
Planned goals of these activities are:
Organization and implementation of regional workshops about Green and
centralized public procurement for procurement departments in local and
regional government
Joining of local offices in local and regional government to Procura+4
campaign to perform green and centralized public procurement, and
4 ICLEI Europe – Local Governments for Sustainability - http://www.iclei-europe.org/
13
preparation of tender documentation with included eco and energy
criteria.
Awareness raising and change of behaviour of public servants with a goal
of office energy consumption rationalisation.
2.1.3. Consulting services (professional associates) for implementation
of Energy planning
The assistance includes technical support for:
Establishment of practice of local energy, planning and reporting.
Defining of action plans and strategic steps for implementation of EE
measures.
Defining critical energy complexes in local and regional government and
establishment of implementation plan for implementation of corrective EE
measures.
Educational and interactive workshops focused on systematic energy
management, energy and water usage analysis, and interpretation of
results and verification of achieved savings.
Interactive workshop focused on connecting the methodology of energy
analysis, data interpretation, energy management and EMIS, with a goal
of facilitation of usage of EMIS as a tool for systematic energy
management and energy analysis.
Planned goals of these activities are:
Continuation of implementation of educative workshops in
counties and big cities with the aim of training of all groups that
are directly or indirectly involved in systematic energy
management (like EE offices, development agencies, responsible
persons in cities and counties) to facilitate the process of
implementation of obligations imposed by ZUKE, increase capacity
for implementation of Energy Audits and Energy Certification, preparation
and execution of measures to improve energy efficiency. Plan is to
promote production of energy plans for energy efficiency improvement in
all 20 counties and 93 cities that have signed letter of intent.
2.1.4. Consulting services (professional associates) for establishment
and support of EE INFO POINTS
The assistance includes technical support for:
Local promotional and public info activities for different target groups and
general public: EE info days, thematic workshops, educative lectures.
14
Info-educational activities, establishment, coordination and supporting of
local EE Info points and partners. To date 112 EE info points in 47 cities
and 12 counties have been established.
Technical support for preparation and realisation of different EE events.
Planned goals of these activities are:
To organize 30 different info-educational events aiming to raise
awareness, inform and educate citizens.
To hold approximately 20 EE school lectures „think of tomorrow“ in
primary schools in Croatia.
To implement regular studies on the citizens’ awareness of energy
efficiency and the availability of energy efficient products on the market.
Encouragement of establishment of new EE info points in the remaining 8
counties and 46 cities that have signed letter of intent. The goal is that
all 20 counties and 93 cities that have signed letter of intent have
established EE info points run by local and regional governments.
2.1.5. Implementation of SEM project on site and active work with local
and regional governments throughout Croatia
Including costs of:
Travel to meetings with relevant clients and building owners.
Visiting and collecting data on spot that takes one or more days
according to the complexity and the scope of work.
Travel to educational-motivational meetings with responsible persons in
local and regional self-governments.
Other activities of expert and technical assistance on implementation of
project activities.
2.2. Energy Management Information System (EMIS) in cities and
counties
2.2.1. Consulting services (professional associates) for the national
EMIS application
National management and use of application (data analysis through the
application and preparation of different reports).
Analysis of national, regional, local and individual energy efficiency
indicators using EMIS.
Technical support to local administrators and users of EMIS.
EMIS Software and Hardware maintenance support.
Database maintenance and regular safety data backup.
Upgrade of application regarding new needs and requirements.
15
Adjustment of application according to changes in legislation.
Adjustment of application to work with other related IT systems.
Planned goals of these activities are:
Full integration of the EMIS as a central information system for
gathering and analysis of data about energy consumption in
public buildings. Continuation of data input of new buildings in EMIS and further input of
data about energy consumption. Objective is to have approximately
7.000 buildings from all 20 counties and 93 cities that have signed letter
of intent in EMIS.
Advanced education of the EE teams for local and regional self-
government units so that they would be able to manage and
update data in EMIS independently, as also to perform analysis
and educate end users in buildings for data input.
Transfer of knowledge and obligation of the EMIS administration to a
national institution
Enabling the EMIS to connect with other existing information systems in
order to coordinate activities.
2.3. Info-educational events
2.3.1. Organisation of Info-edu activities
Broadcasting of video materials and other thematic Info-educational
shows on TV.
Broadcasting of thematic Info-educational shows on radio stations.
Publishing thematic Info-educational articles and materials in electronic,
press and other media.
Organizing workshops, seminars, round-tables, Info days and other Info-
educational and promotional events in cooperation with local self-
government units.
Planned implementation goals of these activities are:
Implementation of at least 2 courses for EE advisers.
Implementation of 5 to 10 EMIS basic workshops for EE team.
Implementation of 10 to 15 EMIS basic workshops for beneficiaries.
Implementation of up to 30 advanced EMIS workshops,
Implementation of up to 10 workshops about the methodology of analysis
and interpretation of energy consumption and key laws and regulations
Supporting EE teams in organizing Motivation and Awareness workshops
for Green Offices.
16
(Activities include renting of rooms and equipment, catering etc.)
2.4. Preparation and production of informative, educational,
promotional and other materials for implementation of SEM
project, educational activities and other events
2.4.1. Production of content and expert preparation and production of informative,
educational, promotional and other project materials
Brochures and other publications
Educational posters, green office boards, “penguins”.
EE info points equipment.
Other materials (bags, writing pads, folders, USB sticks, Print and
photocopy etc.).
2.5. Improvement of the Systematic Energy Management model
Activities of improvement of the Systematic Energy Management model are
continuous, are implemented as an integral part of above mentioned activities
and include promotion of preparation of strategic development documents in
cities and counties. Besides the activities of systematic energy management
strategic plans would include development and utilisation of network
infrastructures that will improve economical, energetic and political efficiency in
managing and use of public services and resources in the city area. In this way
a foundation for integral management of all resources and public services in the
city will be established, which directly promotes installation of sophisticated
systems for collecting and processing of necessary data which finally leads to
the concept of “Smart Cities”.
2.6. Management of SEM project
2.6.1. Expert service for leading and managing of project and project resources
Project management.
Resources management.
Planning and reporting.
Organizational support.
Finance and administration.
Logistics and maintenance
Continuous transfer of knowledge and experience to MCPP, ME, EPEEF
and other institutions what will be defined by the Appendix C.
17
2.6.2. Communication, IT and office equipment
Internet access and related expenses.
Telephone connection and related expenses.
Mobile phones and related expenses.
Procurement and maintenance of IT equipment.
Procurement and maintenance of office equipment.
2.6.3. Use of office space for implementation of project activities
Procurement of office supplies.
Conditioning (heating/cooling) and lighting of workspace.
Rent, maintenance and equipping of office space.
Current operations.
3. TRANSFER OF KNOWLEDGE AND EXPERIENCE
During the project course in parallel with constant cooperation with Ministry of
Construction and Physical Planning (MCPP), Ministry of Economy (MOE) and
Environmental Protection and Energy Efficiency Fund (EPEEF) the transfer of
knowledge and experiences after finalisation of each project milestone was
continuously done.
In the 5th project year the main activity of the SEM project will be continuation
of technical support with the primary goal of introduction of systematic energy
management in 93 cities that have signed letter of intent and all 20 counties
and collection and input of data about public buildings in EMIS to complete and
establish a verified register of public buildings in Croatia. Final planned number
of buildings is approximately 7.000.
In parallel with technical support to local and regional government a key
activity at the national level will be the preparation of all necessary
prerequisites for transfer of SEM project activities, gathered experience,
knowledge and established procedures and employees of UNDP to responsible
national institutions.5. This also includes close cooperation with appointed
experts in the national institutions, on all implementation activities, as well as
provision of technical support during the certain period of time, in order to
secure final takeover of all duties.
Planned transfer of activities after insurance of all prerequisites will include:
5 expert institution that have obligations for implementation of EE mesures and achievement of
nationam goals.
18
Transfer of activities, knowledge and experience and training of experts
for coordination and technical support to all regional (local) teams that
are in charge for continuous and systematic energy management and
coordination and monitoring of local and regional execution of tasks that
are defined by goals of national energy policies.
Physical transfer of EMIS hardware and software in cooperation national
institutions.
Transfer of all necessary knowledge for running activities of national
EMIS administrator. Due to comprehensiveness, complexity and security
of the system it is necessary to ensure positions for two employees for
running activities of national EMIS administrators who will be responsible
for system administration, coordination of regional and local
administrators, basic data analysis, preparation of reports about national
energy consumption, preparation of key results and suggestion of
activities to decrease energy consumption as well as further development
of EMIS.
Connecting with established EE offices and regional EE teams from local
and regional self-government.
Transfer of implementation activities for EMIS in cooperation with
national institutions including: coordination of local users of EMIS,
education of end users, analysis of energy consumption, monitoring and
verification of achieved savings of energy and water consumption at a
local, regional and national level, technical support for all users.
For successful transfer of activities and gained knowledge and experience
alongside with ensuring project continuality and parallel implementation of all
on-going activities, 8 to 12 months is needed, under the condition that all
needed resources on a national level are provided (space, people, equipment,
financing). MCPP, MOE and EPEEF have systemised the positions for transfer of
activities and thus have opened space for ensuring of needed technical and
organisational conditions.
The most affordable solution to the chronic lack of implementation capacities is
an establishment of the national central energy management office whose
primary task would be to continue implementing all systematic energy
management activities at the national level as well as to implement analysis
and propose further measures.
During the entire planned period the UNDP project team will continue with
implementation of the SEM project activities and establishment of the EMIS
through training of local administrators and end users, collecting and input of
19
data needed to form the verified registry of public buildings in EMIS, technical
support and training of local EE teams for implementation of systematic energy
management and energy planning that is described in chapter 2 of this
document, but also continuously implement transfer of activities through
technical support to national institutions to rise their capacity by education and
assistance for implementation of duties and active help to local and regional
government to implement regional energy management offices which will work
in coordination with national institutions.
4. FINANCIAL STRUCTURE
The implementation of all project activities in the period from November 1st
2012 till October 31st 2013 is planned to be financed with 5.050.000,00 HRK in
total, out of which the EPEEF in the amount up to 5.000.000,00 HRK and MCPP
in the amount of 50.000,00 HRK. A detailed budget is presented in attachment
B of the contract.
20
APPENDIX: Status of the implementation of the SEM project
activities until September 2012 1. Basic SEM data for Slavonia
Name Signed
LOI EE policy
announced EE Office
established6
No of persons
in EE office7
Special space for EE office
Green Office established
Požega-Slavonia county
X 2 X
Kutjevo X X 1
Lipik X X X 1
Pakrac X X X 1
Pleternica X X 1
Požega X X 1
Brod-Posavina county X X X 3 X
Nova Gradiška X X 1
Slavonski Brod X X X 1 X
Osijek-Baranja county X X 4 X
Beli Manastir X X X 1
Belišde X X X 1 X
Donji Miholjac X X X 2
Đakovo X 1
Našice X X X 1
Osijek X X X 1
Valpovo X X 1
Vukovar-Srijem county
X X 1 X
Ilok X X X 1
Vinkovci X X 1 X X
Vukovar X X 2
Otok X X 1
Županja X X X 1 X X
Virovitica-Podravina county
X X 1
Orahovica 1
Slatina X 1
Virovitica X
6 Formally established EE office by the decision of the city management 7 Number of persons in formally established EE offices and number of persons who implement
SEM activities in cities and counties in which EE Offices have not been formally established
21
2. Basic SEM data for the area of Northwest Croatia I
Name Signed
LOI EE policy
announced EE Office
established
No of persons
in EE office
Special space for EE office
Green Office established
Koprivnica-Križevci county
X X X 1 X
Đurđevac X X X 3 X X
Koprivnica X X X 2 X
Križevci X X X 2 X
Varaždin county X X X 1 X X
Ivanec X X X 1 X X
Lepoglava X X X 2 X
Ludbreg X X X 5 X
Novi Marof X X X 1
Varaždin X X X 2
Varaždinske Toplice X X X 2 X
Bjelovar Bilogorje county
X X X 2
Bjelovar X X X 1 X
Čazma X X X 2 X X
Daruvar X X X 2 X
Garešnica X X X 1
Grubišno Polje X X X 2
Međimurje county X X X 2 X X
Čakovec X X X 2 X X
Mursko Središde X X X 1 X
Prelog X X X 2 X
3. Basic SEM data for the area of the Northwest Croatia II
Name Signed LOI EE policy
announced EE Office
established
No of persons in EE office
Special space for EE office
Green Office established
Sisak-Moslavina county
X X 2
Glina X X 1
Hrvatska Kostajnica X
Kutina X X 2
Novska X
Petrinja X X 1
Sisak X X X 2 X
Zagreb holding X X X 67
22
4. Basic SEM data for the area of central and south Dalmatia
Name Signed
LOI EE policy
announced EE Office
established
No of persons
in EE office
Special space for EE office
Green Office established
Split-Dalmatia county X X X 2
Hvar X X X 1 X
Imotski
Kaštela X X X 2 X
Komiža X X X 1
Omiš X X X 1 X
Makarska
Sinj
Solin X X X 1 X
Split X X X 4
Stari Grad X X X 1
Supetar X X X 1
Trilj
Trogir X X X 1 X
Vis X X X 2
Vrgorac X
Vrlika
Dubrovnik-Neretva county
X X X 4
Dubrovnik X X X 4
Korčula
Metkovid
Opuzen
Ploče
23
5. Basic SEM data for the area of north Dalmatia and Lika
Name Signed
LOI EE policy
announced EE Office
established
No of persons
in EE office
Special space for EE office
Green Office established
Lika-Senj county X
Gospid X X X 4
Novalja X X X 3
Otočac
Senj X X X 5 X
Zadar county X X X 4 X X
Benkovac
Biograd X X X 2 X X
Nin X X X 3 X
Obrovac
Pag X X X 3
Zadar X X X 5
Šibenik-Knin county X X X 4 X
Drniš
Knin X X X 5
Skradin X X X 1
Šibenik X X X 5 X
Vodice X X X 3
24
6. Basic SEM data for the area of Istria and Kvarner
Name Signed
LOI EE policy
announced EE Office
established
No of persons
in EE office
Special space for EE office
Green Office established
Istria county X X X 5 X X
Buje X X X 1 X
Buzet X X X 2 X
Labin X X X 2 X X
Novigrad X X X 2 X
Pazin X X X 2 X X
Poreč
Pula X X X 1 X X
Rovinj X X X 5 X
Umag X X X 1 X
Vodnjan X X X 3 X
Primorje-Gorje county
X X 2 X
Bakar X X
Cres
Crikvenica
Čabar
Delnice X X X 3 X X
Kastav X X X 3 X
Kraljevica X X X 1 X
Krk X X X 1 X
Mali Lošinj
Novi Vinodolski X
Opatija X X X 1 X
Vrbovsko
Rijeka X X X 2 X
Rab
Area of North-west Croatia contains City of Zagreb, Zagreb, Karlovac and
Krapina zagorje counties. For this area energy management and coordination
of implementation of EMS project activities is done by North-west Croatia
Regional Energy Agency.
In several occasion information regarding implementation of activities was
asked and up to the date of finalisation of this document no feedback was
received.
25
7. Review of established EE info-points in the area of the Republic of Croatia
INFO POINTS IN RH
Category of IP Number of locations City IP County IP
info office 37 33 4
info gallery 39 31 8
info corner 5 3 2
info center 6 4 2
info billboard 25 23 2
TOTAL 112 In 47 cities in 12 counties
26
Category of EE info point COUNTY ADDRESS Postal code
CITY Owner
(city or county)
info office Bjelovar-Bilogorje Trg Eugena Kvaternika 6 43 000 Bjelovar grad
info office Bjelovar-Bilogorje Trg čazmanskog kaptola 13 43 240 Čazma grad
info gallery Brod-Posavina Trg pobjede bb 35 000 Slavonski Brod county
info gallery Brod-Posavina Vukovarska 1 35 000 Slavonski Brod grad
info office Brod-Posavina Vukovarska 1 35 000 Slavonski Brod grad
info gallery Dubrovnik-Neretva Galery space "Luža", Pred dvorom 1 20 000 Dubrovnik county
info gallery Dubrovnik-Neretva Development agency of the City of Dubrovnik, Branitelja Dubrovnika 15 20 000 Dubrovnik grad
info office Dubrovnik-Neretva Development agency of the City of Dubrovnik, Branitelja Dubrovnika 15 20 000 Dubrovnik grad
info office City of Zagreb Trg Stjepana Radida 1 10 000 Zagreb grad
info gallery City of Zagreb Trg Stjepana Radida 1 10 000 Zagreb grad info billboard (16 locations) City of Zagreb 10 000 Zagreb grad
info center (closed) City of Zagreb Zelinska 4 10 000 Zagreb UNDP
info gallery Istria county Titov trg 11, Labin Labin2000, Aldo Negri 20 Labin grad
info gallery Istria county Družbe sv. Dirila i Metoda 10 52 000 Pazin grad
info office Istria county Družbe sv. Dirila i Metoda 10 52 000 Pazin grad
info billboard (1 location) Istria county 52 000 Pazin grad
info gallery Istria county Flanatička 29 52 000 Pula county info office Karlovac REGEA, Trg Josipa Broza 2 47 000 Karlovac county
info gallery Karlovac Kurilovec 1 47 280 Ozalj grad
info office Karlovac Kurilovec 1 47 280 Ozalj grad
info gallery Koprivnica-Križevci Dom kulture, Vladimira Nazora 2 48 350 Đurđevac grad
info office Koprivnica-Križevci Stjepana Radida 1 48 350 Đurđevac grad
info office Koprivnica-Križevci Nemčideva 5 48 000 Koprivnica county
info office Koprivnica-Križevci Trg bana Jelačida 7 48 000 Koprivnica grad
info gallery Koprivnica-Križevci Trg bana Jelačida 7 48 000 Koprivnica grad
info gallery Koprivnica-Križevci I.Z. Dijankovečkog 12 48 260 Križevci grad
info office Koprivnica-Križevci I.Z. Dijankovečkog 12 48 260 Križevci grad
info gallery Lika-Senj Trg dr. Franje Tuđmana 1 53 291 Novalja grad
info gallery Lika-Senj Trg dr. Franje Tuđmana 1 53 270 Senj grad
info office Lika-Senj Obala dr Franje Tuđmana 1 53 270 Senj grad
info office Međimurje Josipa bana Jelačida 22 40 000 Čakovec county
27
Category of EE info point COUNTY ADDRESS Postal code
CITY Owner
(city or county)
info corner Međimurje Srednja graditeljska škola, Športska 1 40 000 Čakovec grad
info office Međimurje Trg bana Josipa Jelačida 10 40 315 Mursko središde grad
info center Međimurje Donja 37, Cirkovljan 40 323 Prelog grad
info gallery Osijek-Baranja Vukovarska ulica 1 31 540 Donji Miholjac grad
info office Osijek-Baranja Miholjački entrepreneurship center; Trg Ante Starčevida 1/I 31 540 Donji Miholjac grad
info gallery Osijek-Baranja Pejačevidev trg 7 31 500 Našice grad
info gallery Osijek-Baranja Kuhačeva 9 31 000 Osijek grad
info center Osijek-Baranja Donjodravska 49 31 000 Osijek grad i county
info gallery Osijek-Baranja Stjepana Radida 4 31 000 Osijek county
info office Požega-Slavonia Marije Terezije 27 34 551 Lipik grad
info gallery Požega-Slavonia Marije Terezije 27 34 551 Lipik grad
info gallery Primorje-Gorje Trg 138. Brigade HV br. 4 51 300 Delnice grad
info gallery Primorje-Gorje Zakona kastafskega 3, Kastav 51 215 Kastav grad
info corner Primorje-Gorje Energo d.o.o., Dolac 14 51 000 Rijeka grad
info office Primorje-Gorje Sportski center Mavrinci, Mavrinci 38 51 219 Čavle grad
info gallery Primorje-Gorje REA Kvarner, Milutina Barača 19 51 000 Rijeka county
info center Sisak-Moslavina Tržna 9 44 320 Kutina grad
info gallery Sisak-Moslavina Rimska 26 44 000 Sisak grad
info office Sisak-Moslavina Rimska 26 44 000 Sisak grad
info billboard (2 locations) Sisak-Moslavina Rimska 26 44 000 Sisak grad
info corner Sisak-Moslavina Stjepana i Antuna Radida 8 44 000 Sisak grad
info office Split-Dalmatia Fabrika bb 21 450 Hvar grad info center Split-Dalmatia Cesta dr. Franje Tuđmana 76721 216 Kaštel Novi 21 216 Kaštel Novi grad info office Split-Dalmatia Hrvatskih mučenika 9 21 485 Komiža grad
info office Split-Dalmatia Četvrt Žarka Dražojevida bb 21 310 Omiš grad
info gallery Split-Dalmatia Četvrt Žarka Dražojevida bb 21 310 Omiš grad
info office Split-Dalmatia Stjepana Radida 42 21 210 Solin grad
info office Split-Dalmatia ST-RA, Obala kneza Branimira 17 21 000 Split grad
info corner Split-Dalmatia Technical school for machine engineering and mechatronics Zrinsko – Frankopanska 23 21 000 Split grad i county
info gallery Split-Dalmatia Domovinskog rata 2 21 000 Split county
info office Split-Dalmatia Hrvatski dom – čitovnica, Novo riva 2 21 460 Stari Grad, Hvar grad
info office Split-Dalmatia Ulica Put Mulina 2 21 220 Trogir grad
info gallery Split-Dalmatia Ulica Put Mulina 2 21 220 Trogir grad
info office Split-Dalmatia Trg 30. svibnja 1992. 21 480 Vis grad
28
Category of EE info point COUNTY ADDRESS Postal code
CITY Owner
(city or county)
info office Šibenik-Knin Draga 14 22 000 Šibenik grad
info gallery Šibenik-Knin Trg palih branitelja Domovinskog rata 1 22 000 Šibenik grad
info gallery Šibenik-Knin Trg Pavla Šubida 1, br. 2 22 000 Šibenik county
Info gallery Šibenik-Knin Gradske uprave, Dr. Franje Tuđmana 2, Knin 22 000 Knin grad
info office Šibenik-Knin Komunalnog poduzeda d.o.o. Knin, Trg Oluje 9 22 000 Knin grad
info office Varaždin Trg Hrvatskih Ivanovaca 9b 42 240 Ivanec grad
info gallery Varaždin TKIC, Hrvatskih Pavlina 7 23 210 Lepoglava grad
info center Varaždin Koprivnička 19 42 230 Ludbreg grad
info corner Varaždin Meteor center, Optujska 12 42 000 Varaždin county
info office Varaždin Franjevački trg 7 42 000 Varaždin county
info office Varaždin Maršala Tita 4 42 223 Varaždinske toplice grad
info gallery Vukovar-Srijem Trg Nikole Iločkog 13 32 236 Ilok grad
info office Vukovar-Srijem Kralja Zvonimira 1 32 101 Vinkovci grad
info gallery Vukovar-Srijem Kralja Zvonimira 1 32 101 Vinkovci grad
info gallery Vukovar-Srijem Kralja Zvonimira 1 32 101 Vinkovci grad
info billboard (2 locations) Vukovar-Srijem 32 101 Vinkovci grad
info gallery Vukovar-Srijem Dr. Franje Tuđmana 1 32 000 Vukovar grad
info office Vukovar-Srijem J.J. Strossmayera 1 32 270 Županja grad
info gallery Vukovar-Srijem J.J. Strossmayera 1 32 270 Županja grad
info office Zadar Trg kralja Tomislava 5 23 210 Biograd na Moru grad
info billboard (2 locations) Zadar 23 210 Biograd na Moru grad
info gallery Zadar Trg kralja Tomislava 5 23 210 Biograd na moru grad
info gallery Zadar Trg Hrvatskih branitelja 1 23 232 Nin grad
info billboard Zadar 23 232 Nin grad
info office Zadar Trg Hrvatskih branitelja 1 23 232 Nin grad
info billboard (2 locations) Zadar In the area of the Relja settlement and in the crossing of Obala kneza Branimira and Ban Josip Jelačid street 23 000 Zadar county
info center Zadar Put Murvice bb 23 000 Zadar county
info gallery Zadar Božidara Petranovida 8 23 000 Zadar county
info office Zadar Brne Krnarutida 13 (office 20 i 21) 23 000 Zadar grad
info gallery Zadar Narodni trg 1 23 000 Zadar grad
29
8. Review of info-educational activities held in the Republic of Croatia
9 EE info-days organized Date Location
23.04.10 Split
20.07.10 Vinkovci
09.09.10 Sisak
06.04.11 Dubrovnik
01.07.11 Kutina
17.09.11 Pula
29.10.11 Split
24.03.12 Zadar
09.06.12 Rijeka
TOTAL 9
51 EE school classes “Think about tomorrow” held Date Location Audience
16.12.09 Sisak OŠ 22. Lipanj
24.03.10 Zadar OŠ Nova
22.04.10 Split OŠ Gripe
22.04.10 Split OŠ Lučac
22.04.10 Labin OŠ Ivo Lola Ribar
23.04.10 Split OŠ Mejaši
13.05.10 Bjelovar
16.09.10 Labin
23.03.11 Lovran OŠ Viktora Cara Emina
05.04.11 Dubrovnik OŠ Marina Getaldida
14.04.11 Pula OŠ Veli vrh
14.04.11 Jastrebarsko OŠ Ljubo Babid
22.04.11 Čazma 200 učenika OŠ Čazma
17.05.11 Sisak OŠ Sela
03.06.11 Rijeka OŠ Vežica
20.07.11 Vinkovci
Dubrovnik
Dubrovnik
24.11.12 Zadar OŠ Stanovi
31.01.12 Osijek OŠ Mladost
23.02.12 Bibinje OŠ Stjepana Radida
07.03.12 Šibenik OŠ Fausta Vrančida
16.04.12 Zagreb OŠ Mate Lovraka
30
51 EE school classes “Think about tomorrow” held Date Location Audience
17.04.12 - 25.04.12
Rijeka
Between April 17th
and 25th
, 2012, an EE school class was held in 20 schools in Rijeka: OŠ Belveder, OŠ Brajda, OŠ Center, OŠ Čavle, OŠ Dolac, OŠ Eugen Kumičid, OŠ Fran Frankovid, OŠ Gornja Vežica, OŠ Ivana Zajca, OŠ Kantrida, OŠ Nikola Tesla, OŠ Pehlin, OŠ Podmurvice, OŠ Sveti Matej, OŠ Škurinje, OŠ Trsat, OŠ Turnid and OŠ Zamet.
20.04.12 Zadar OŠ Krune Krstida and OŠ Šimuna Kožičida Benje
23.04.12 Šibenik OŠ Tina Ujevida i OŠ Petra Krešimira IV
26.04.12 Biograd n/M OŠ Biograd
31.05.12 Buje Croatian-Italian OŠ
12.09.12 Gospid OŠ Jure Turida and OŠ dr Franje Tuđmana