    System Process DocumentSetting Engineering Change Order Options

    Department

    Responsibility/Role

    File Name 27762209.docRevision

    Document Generation Date 18/01/2010 09:37:00

    Date Modified 1/18/2010 09:37:00 AM

    Last Changed by

    Status

    Setting Engineering Change Order Options

    Trigger:

    Concept

    The Set ECO Options page enables you to set engineering change order options for Oracle

    Engineering only. You can enter an item whose use-up date is tied to each revised item effective

    date. The default is the use-up item associated with the plan name. This can be the revised item or

    a component of the revised item.

    Oracle Alert automatically notifies the planner for the revised item if the use-up date changes

    based on information from a new MRP plan.

    In this topic, you will set engineering change order options.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:37:00 AM Page 1

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    2/17

    System Process DocumentSetting Engineering Change Order Options

    Procedure

    Step Action

    1. Begin by navigating to the Mass Changes page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    3/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:37:00 AM Page 3

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    4/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Mass Changes link.

    Page 4 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    5/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    5. Use the Organization page to select your organization.

    Last changed on: 1/18/2010 09:37:00 AM Page 5

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    6/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    7/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    8. Use the Mass Change Bills page to set the engineering change order (ECO)

    options.

    Last changed on: 1/18/2010 09:37:00 AM Page 7

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    8/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    9. Click in the Number field.

    Step Action

    10. Press [F11].

    Page 8 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    9/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    11. Enter the desired information into the Number field. Enter "M1-100".

    Last changed on: 1/18/2010 09:37:00 AM Page 9

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    10/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    12. Press [Ctrl+F11].

    Step Action

    13. Click the Tools menu.

    orPress [Alt+T].

    Page 10 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    11/17

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    12/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    15. Use the Set ECO Options page to indicate whether you want MRP to include the

    revised item and to enter an item whose use-up date is tied to each revised item's

    effective date.

    Page 12 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    13/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    16. Enable the MRP Active check box to indicate whether you want Oracle Master

    Scheduling/MRP to include the revised item in the planning process.

    Click the MRP Active option.

    Step Action

    17. Use the Use Up option to indicate whether each revised item's effective date is

    based upon the planned item's use-up date.

    Click the Use Up option.

    Last changed on: 1/18/2010 09:37:00 AM Page 13

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    14/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    18. Click in the Item field.

    Page 14 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    15/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    19. Enter an item whose use-up date is tied to each revised item effective date. The

    default is the use-up item associated with the plan name. This can be the revised

    item or a component of the revised item.

    Enter the desired information into the Item field. Enter "CM45470".

    Step Action

    20. Click in the Item Description field.

    Last changed on: 1/18/2010 09:37:00 AM Page 15

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    16/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    21. Oracle Alert automatically notifies the planner for the revised item if the use-up

    date changes based on information from a new MRP plan.

    Click the Save button.

    Page 16 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Setting Engineering Change Order Options_SPD

    17/17

    System Process DocumentSetting Engineering Change Order Options

    Step Action

    22. You have completed the Setting Engineering Change Order Options procedure.

    End of Procedure.