Grand River Dam Removal and Toewood Bench Construction Above the Dam Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 1 Sequence of Work & Narrative Lyons Dam Removal & Toewood Bench Construction at Lyons, MI for the Village of Lyons & the Ionia County Conservation District Situation Figure 1. Face of Lyons Dam about 8 years apart. 2016 06 01

Upload: others

Post on 01-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 1

Sequence of Work & NarrativeLyons Dam Removal & Toewood Bench Construction at Lyons, MI

for the

Village of Lyons & the Ionia County Conservation District

Situation

Figure 1. Face of Lyons Dam about 8 years apart.

2016 06 01

Page 2: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 2

This sequence of work directly follows the Emergency West Bank Stabilization at the West end of theDam and Bridge at Lyons, MI (written June 1, 2016). It is the same as the original Sequence of Workwritten in January of 2016 with two exceptions. First, there is no work in the East Channel or on HazelDevore Island and second, Vane 3 included with the original “west end” work is now included here alongwith removal of the Lyons Dam and construction of the Toewood Bench upstream of the dam.

Figure 1 shows the dam face in 2008 and 2016. While the surface of the dam is now more pitted and some splayed off holes on the face of the dam have enlarged, the end run of water around the west end and subsequent bank erosion there has forced a speed up in the awarding of bids. This sequence is funded with federal funds from the US Fish and Wildlife Service, and it is anticipated these funds will be available for spending at the completion of the Emergency Work at the West End which is funded by state funds that are currently available for spending.

There may be a gap between completion of the Emergency Work and the Dam Removal and Toewood Construction Work. If so, appropriate demobilization and mobilization costs apply. The Bid Items accompanying this Sequence of Work will have two options; one with no gap and one with a gap in time between operations. The same Michigan DEQ Permit 15-34-0014P applies for the original, Emergency and this Sequence of Work (Figure 2).

Figure 2. Michigan DEQ Permit for all stream work at Lyons, MI.

Page 3: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 3

Existing Conditions

Figure 3 (page 4) identifies existing conditions in the Lyons Grand River Project Area. Figures containinglayout sheets can be printed in sharp detail as pdf files (included in a digital folder) at any paper sizedesired. The dam at (A) has several holes in the face concrete and a large hole below the dam at thewest end. During floods, water makes an end run around the west end abutment of the dam (B) erodingthe high bank there just below residences and undermining the west abutment of the Bridge StreetBridge. Emergency dumping of rip rap at (C) has temporarily stalled the erosion. Further bank erosionoccurs downstream of the bridge on the high bank at (D). Large cobble and small boulders were used inthe past in large amounts to form in channel roads along the base of the dam and along the bridge piers(it is dug out between piers now) and to shield sewage lines under the river downstream of the bridge.Over the years, floodwaters have moved the cobble and gravel downstream where it was deposited onthe riffle north of Hazel Devore Island (E). The riffle expanded and grew in height so that bankfull andfloodwater are forced against the sand bank of Hazel Devore Island. The island has lost 30 to 50 feet ofits width over a distance of ~500 feet (F).

Page 4: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 4

Figure 3. See text on the previous and the following pages for a description of the large capital letters.Cross sections (a-a’ and b-b’) at J, the existing stone block, are shown in Figures 4 and 5.

Page 5: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 5

Bank erosion at G came within a few feet of the sewage lift station, so, in 2012, a stone bankfull benchand a straight vane were installed under an emergency permit to protect the sewage lift station. An old,smaller dam at G (Hale Mill Dam) also forced an end run of water to the north cutting into the HazelDevore Island on the south side ~375-feet and causing current high rates of erosion at (I). Emergencyconditions were declared at the raceway gates (J) where erosion under and through the gates sent highvelocity water through the raceway pond, under Bridge Street (K) to the North and began eroding thesand access road along the north side of the Raceway Channel (L). Flow from the raceway (M) iscombined with flow in the East Channel and backed-up against the causeway (N) between Hazel DevoreIsland and the town of Lyons. The backup is caused by undersized culverts in the causeway (N) (the citywill replace the causeway with a bottomless arch culvert in the future when funds allow). High velocitiesthrough the undersized culverts in the causeway are threatening home decks and foundationsdownstream of the causeway (O). Blocking stone was placed just upstream of the raceway gates (J) byDNR Fisheries in 2011 to minimize the eroding flow pattern set up in the raceway, but high velocities stillexit the causeway culverts.

Figure 4. Cross section a-a’ at J on layout sheet 1/16 and Figure 3.

630632634636638640642644646648650652654656658660662664666668670672674676678680682684686688690

0 10 20 30 40 50 60 70 80

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

10-ft

Ave Volume below OHWm isrectangle 19' x 1.7' high x 60' long = 1,938 cubic fttriangle (5.2' x 1.7' x 60')/ 2 = 265.2 cubic ftTotal Cubic Feet above OHWM = 2,203Total Cubic Yards above OHWM = 81.6

Ave Volume above OHWM istriangle (19' x 8.3' high x 60' long)/2 = 4,731 cubic feet

Total Cubic Yards above OHWM = 174.5

Total Cut Cubic Yards = 256This is available for use as Fill on Access Road #3 Fill Area A

ave width is 24.2ft

Existing Block of1-ft to 3-ft stone

Catwalk

Gates

a a'

Existing Stone Block in front of Raceway Gates

OHWMwith dam gone636.7'

Page 6: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 6

Figure 5. Longitudinal section b-b’ at J on layout sheet 1/16 and Figure 2

Survey Work and Control Points

A survey of the Grand River and its islands was conducted by Ellen River Partners in July 2009. Qualitycontrol for the survey was provided by Mulder Associates, State of Michigan, Registered Surveyors whoprovided GPS, State Plane Coordinates and NADV88 elevations for Ellen River Partners’ control points.Ellen River subsequently added several other control points. The locations, coordinate and elevationdata for control points are shown in Figure 6 (page 7).

Survey work was conducted from just south of the Grand River Dam (south to the north protrudingpeninsula on river right) to the river bend just north of Hazel Devore Island. Adjusted elevations from theUSGS topo map were added to ground survey work particularly on the high bank west and south of thedam. A 1-foot contour map was constructed using professional surveying software (Traverse PC) and isshown in Figure 7 (page 8). This contour map is the basis for a large number of project cross sections.The plan view area of various fill and rip rap areas is sometimes used from the software program andmultiplied by the average depth to yield volumes; otherwise the length, width and thickness of fill areasare multiplied together for volume calculations.

The sequence of work outlined here is likely, but may vary depending on water levels and the timingavailable to different contractors working in the Project Area.

600

620

640

660

680

700

720

740

760

780

0 50 100 150 200 250

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

Earth BankCatwalk Gates

Existing Bottom

Fishway &Attacting-waterTunnel

Dam

Existing Stone Block

b b'

Page 7: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 7

Figure 6. Control point locations with State Plane coordinates and NAVD88 elevations.

Page 8: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 8

Figure 7. Surveyed, 1-foot, contour map of the Lyons, MI Project Area.

Page 9: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 9

Proposed Access Roads

Originally, there were six access roads into the river. They are all on existing sand surfaces. Some utilizeexisting roads and all have steep segments where the road enters the river or enters the raceway pondwhere spoil from the dam will be kept. Access Road #1 has been completed under the EmergencySequence of Work for the West End. Only Access Road #3 and the existing sand Access Road #6 areneeded for the Dam Removal and Toewood Construction detailed in this Sequence of Work. Figure 8shows the location of the access roads and their steeper segments.

Page 10: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 10

Figure 8. Proposed access roads #1 through #6. Black segments show steep portions where asurfacing of stone is needed to provide stability. Note also the sand cover at the east concrete walkway,the designated Machine Storage & Re-Fueling Area and the Storage Areas (1-5) above the 100-yr flood.

Page 11: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 11

Access roads are typically 12-feet wide and a foot deep where they are surfaced with a 50/50 mixture ofcobble (3” to 8”diameter) and MDOT Plain rip rap (8” to 16” stone) on steep sections where a stablefooting is required (H-H’ typical cross section) see Figure 9. Some segments are wider at 25-feet widewhere off road trucks must pass and will be shown separately.

Figure 9. A typical cross section of sand roads on steep segments where a stable footing is required.

A longitudinal section for the steep segments of access roads show their extent and surfacing volumecalculations (Figure 15). Note that Access Road #6 is an existing sand road on level ground andrequires no surfacing.

630635640645650655660665670675680685690695700705710715720725730735740

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

H-H' Typical

Surface with a 50/50 mixture ofCobble (3' to 8" stone) andMDOT Plain Rip Rap (8" to 16") stone.Length is variable.Depth 1-ftPush mixture into surface.

H H'

Native sand base (soil)

Page 12: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 12

Figure 15. Access Road #1 longitudinal section (COMPLETED UNDER THE EMERGENCY WEST ENDWORK).

BE MINDFUL OF OVERHEAD POWERLINES AT THE BEGINNING OF ACCESS ROAD #1 NEAR THESUBSTATION AND POWERHOUSE (FIG. 8) AND MAKE SURE OFFROAD TRUCKS ANDEXCAVATORS WILL CLEAR THESE LINES. IF NOT PROVIDE SUPPORT FOR THE LINES SO THEYDO CLEAR.

Access Road #3 cannot be built until the dam is removed and will be shown after that sequence of work.

630

640

650

660

670

680

690

700

710

720

730

740

750

760

770

780

790

800

810

820

830

840

0 50 100 150 200 250 300

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

C-C' Access Road #1 Steep Longitudinal Section

Surface Access Road #1 steep segment with a 50/50 mixture of Cobble (3" to 8" stone)and MDOT Plain Rip Rap (8" to 16" stone).Length is 245 feet x 12 feet wide x 1-foot deep = 2,940, = 109 cubic yards(see H-H' for a typical 12-ft wide cross section)54 cubic yards of cobble (3" to 8" stone)55 cubic yards of MDOT Plain Rip Rap (8" to 16" stone

C C'

Page 13: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 13

Dam Removal

Dam removal will require a very heavy breaker bar attached to a large excavator. The dam will bebreached at low water (less than 650 cfs) when water depths on the downstream side of the dam shouldbe 3-feet or less allowing operation of the excavator in the channel with the water level below the cabfloor. The dam should be breached at the existing hole in the dam face (Figure 16). A second largeexcavator will be needed to remove and temporarily place the dam spoil.

A cross section of the dam and its construction sequence is shown in Figure 17.

The volume of dam spoil removed is summarized in Table 1. The measurements in the table were takenfrom a 1994 survey of the dam incorporating construction details by Ayers, Lewis, Norris and May, Inc. indrawings by Fleis and Vandenbrink Engineering, Inc.

Table 1. Dam spoil volume and possible available cobble under the dam shed roof and within its cribs.

DAM SPOIL & AVAILABLE COBLE VOLUMERectangle Expanded Expanded

or Cross Section Dam Volume Volumehalf rect. Height Thickness Area Length Volume Volume x1.25 x1.30

Dam Concrete ft ft sq ft ft cubic ft cubic yards cubic yards cubic yardsDam Downstream Face (1910) 1 20.3 1 20.3 280 5,684 211 263 274Dam Upstream Face (1906) 1 13.7 2 27.4 280 7,672 284 355 369Dam Upstream Rectangle (1932) 1 13.4 1.3 17.42 280 4,878 181 226 235Dam Upstream Triangle (1932) 0.5 10 10 50 280 14,000 519 648 674

Rectangle Expanded Expandedor Dam Volume Volume

half rect. Height Width Area Length Volume Volume x1.25 x1.30ft ft sq ft ft cubic ft cubic yards cubic yards cubic yards

Dam Bolster Downstream Rectangle (1932) 1 1.4 11.2 15.68 280 4,390 163 203 211Dam Bolster Downstream Triangle (1932) 0.5 2.7 8.7 11.745 280 3,289 122 152 158Dam Bolster added by DNR (19??) east end 1 0.5 6.7 3.35 100 335 12 16 16West Abutment 1 16 2 32 30 960 36 44 46Total Dam Concrete to Remove 1,526 1,908 1,984

Gross Crib Volume above 634'Downstream Crib & Shed Triangle Volume 0.5 9.7 19 92.15 280 25,802 956 1,195 1,242Upstream Crib & Shed Triangle Volume 0.5 9.7 9 43.65 280 12,222 453 566 588Total Gross Crib & Shed Volume 1,408 1,760 1,831

Interior Crib & Shed Wood VolumeInterior Posts 1 4 3 12 280 3,360 124 156 162Interior Beams & Boards 1 10 2 20 280 5,600 207 259 270Interior Wood Volume estimate 332 415 431

Total Spoil Vol. (Concrete + Wood) 1,858 2,323 2,415

Net Interior Cobble Volume down to 634' * 1,076Uses for Interior CobbleCobble Needed For New Riffle 634'-635.5' 1 1.5 36 54 280 15,120 560Cobble Needed For Access Road #3 1 1.5 25 37.5 280 10,500 389Splash Apron Volume For Vane # 3 0.5 2 34 78 2,652 98

1,047Left over cobble ? (can be used in Area W) 29* The true amount of cobble available within the dam is unknown because of holes eroded under the dam. There has probably been some substitution of patching conrete for cobble over the years.

Cross Section

Page 14: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 14

About 1,900 cubic yards of spoil will be removed, but this will expand to about 2,500 cubic yards (30%increase as it is loaded, transported and placed in the raceway pond. There may be as much as 1,076cubic yards of cobble under the dam shed roof and within its cribs.

The possible amount of cobble available can be used for the new riffle (about 1.5 feet of cobble) placedabove the 634-foot cut elevation to reach a riffle elevation of 635.5 feet, the base of Access Road #3 justupstream and parallel to the dam and the splash apron for vane #2. The true amount of cobble availableis unknown because there has probably been some substitution of patching concrete for cobble over theyears.

Page 15: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 15

Figure 16. Begin dam breach at hole on downstream face with a 50-foot wide hole at the top of the damthat is two-feet deep, enlarge to 80-feet as the water level recedes.

Page 16: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 16

Figure 17. Cross section of the Lyons Dam showing the year of construction (1857) and the years whenconcrete was added to reinforce the dam.

Page 17: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 17

Begin by removing the top two feet of the dam above the downstream hole. Enlarge this two-foot deepsection by about 50 feet in the horizontal. Keep the breaker bar excavator on the west side of the holeand keep the bucket and thumb excavator on the fishway side to pull spoil back toward the fishway whereit will be stored temporarily until the pool behind the dam is reduced to an elevation of about 367 feet.

Wait for the pool elevation to drop two feet (half or perhaps all of a day) then enlarge the breach width to80-feet by removing the top two feet of the dam 30 feet to the west. The breach should be approximatelyin the middle of the dam at this point.

Working first from the middle of the breach remove another two-foot depth and place debris back towardthe fishway. Work slowly both east and west until the 80-foot breach is now 4-feet deep.

Repeat this procedure for a third two-foot drop after the pool elevation has rescinded to 4-feet below thedam crest. At any time during this dam removal, spoil can also be pushed or lifted over to theupstream side of the dam, but it should be on either side of the breach hole. When the water levelhas reached 367 feet or less, Access Road #3 can be constructed on the upstream side of thedam. Part of this construction will be moving any upstream spoil into the raceway pond storagearea.

When the pool elevation has rescinded 6-feet below the dam crest, repeat the procedure by a fourth two-foot drop in the 80-foot wide breach. Wait for the water level to rescind to an elevation 637 feet or less.Now construction of Access Road #3 can begin upstream of the dam.

Build Access Road #3 and Raceway Pond Fill

Enter the river upstream of the raceway pond gates and pull the existing stone block there away from theraceway gates to form the base of Access Road # 3 upstream of the gates (Figure 18).

Page 18: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 18

Figure 18. Build Access road #3 from the west end of the parking lot on John Street into the riverupstream of the raceway pond gates. When the raceway pond is low enough build it into the pond.

Page 19: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 19

Cross section g-g’ through the existing stone block upstream of the raceway gates is shown in Figure 19.Cross section a-a’ was shown previously on page 4. The longitudinal section A-A’ combined with crosssection h-h’ are shown in Figure 20. Cross section g-g’ is shown in Figure 20 and cross section B-B’ inFigure 21.

Figure 19. Cross section g-g’ showing the stone block used as a base for Access Road #3.

630632634636638640642644646648650652654656658660662664666668670672674676678680682684686688690

0 10 20 30 40 50 60 70 80

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

10-ft

Ave Volume below OHWm isrectangle 19' x 1.7' high x 60' long = 1,938 cubic fttriangle (5.2' x 1.7' x 60')/ 2 = 265.2 cubic ftTotal Cubic Feet above OHWM = 2,203Total Cubic Yards above OHWM = 81.6

Ave Volume above OHWM istriangle (19' x 8.3' high x 60' long)/2 = 4,731 cubic feet

Total Cubic Yards above OHWM = 174.5

Total Cut Cubic Yards = 256This is available for use as Fill on Access Road #3 Fill Area A

ave width is 24.2ft

Existing Block of1-ft to 3-ft stone

Catwalk

Gates

a a'

Existing Stone Block in front of Raceway Gates

Fill Area AAccess Road #3

g g'

OHWMwith dam gone636.7'

Page 20: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 20

Longitudinal section A-A’ shows the entire length of the steeper portion of Access Road #3 (Figure 25).

Longitudinal section h-h’ shows the raceway gates exposed after the existing stone block is pulled awayfrom the gates and used for part of Fill Area A on the steeper portion of Access Road #3 (Figure 25).

Figure 20. Access Road #3 Fill Area A after the stone block material has been incorporated into theroad. Note the roadway is 25-feet wide to accommodate two way off-road truck traffic in the Grand Riverchannel proper.

600

620

640

660

680

700

720

740

760

780

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

Earth BankCatwalk Gates

Existing Bottom

Access Road #3 Stone SurfaceAdd 42 CY of Road Mixture

Fishway &AttactingwaterTunnel

Dam

Pull Existing Stone Block stone downand out 18-ft from the gates andform the surface of the new Access Road #3

Fill Area ASegment25-70-ft 45' long x 25' wide x 2.5' effect. depth = 2,812 cubic feet = 104 cubic yards

70-100-ft 30' long x 25' wide x 5' effect, depth = 3,750 cubic feet = 139 cubic yards100-125-ft 25' long x 25' wide x 3' effect. depth = 1,875 cubic feet = 69 cubic yards

312 cubic yards needed in total- 270 cubic yards salvaged from block

42 CY additional needed

Fill Area A Access Road #3 Steep SectionSurface with a 50/50 mixture of Cobble (3" to 8" stone)and MDOT Plain Rip Rap (8" to 16" stone).Additional needed: 42 CY21 cubic yards of Cobble 3" to 8" in diamter21 cubic yards of MDOT Plain Rip Rap 8" to 16" stone

A A'

h h'

636.7' OHWMA

Page 21: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 21

Longitudinal section B-B’ shows the steep portion of Access Road #3 entering the raceway pond (Figure21).

Figure 21. Access Road #3 steep segment entering the raceway pond. This is longitudinal section B-B’.

Raceway Gate, Fishway and Raceway Culvert Clay Seals

After the water level behind the partial dam and in the raceway pond has receded to about 636 feetelevation, the raceway gates are sealed with a clay block on the upstream side that is protected with asurface of 3-foot stone. The pond side of the gates is protected with a wedge of MDOT Heavy Rip Rap.(Figure 22).

A clay seal is also constructed over the south end of the large culvert that leaves the north end of theraceway pond. It will be covered with dam spoil, a clay cover for the spoil and finished with topsoil.

The north end of the large culvert under Bridge Street is sealed with MDOT Heavy Rip Rap.

Clay is also used to fill the fishway proper, its entry ways, its exit and the square manhole access on theeast side of the fishway. The clay fill is finished with top soil while the clay blocks at the entrance and exitare protected with a surface of 3-foot stone to withstand ice movement. Figure 22 identifies the variousfills in plan-view, a closer view is shown in Figure 23..

630631632633634635636637638639640641642643644645646647648649650651652653654655656657658659660661662663664665666667668669670671672673674675676677678679680

0 20 40 60 80 100 120

Elev

aatio

n NA

VD88

fee

t

Horizontal Distance feet

Access Road #3 Steeep Pond Section

Surface with a 50/50 mixture of Cobble (3" to 8" stone)and MDOT Plain Rip Rap (8" to 16" stone).Length is 90 feet x 12 feet wide x 1-foot deep = 1,080, = 40 cubic yards

20 cubic yards of Cobble (3" to 8" ) stone20 cubic yards of MDOT Plain Rip Rap (8" to 16") stone.

636.7' OHWM

B B'

Page 22: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 22

Figure 22. Clay seals (K) are placed in front of the raceway gates and the fishway entrance. They arealso placed at the fishway exit (N) and over the exit culvert from the raceway pond (O). Caps of 3-footstone cover K and N. The exit of the culvert from the pond at P is blocked with MDOT Heavy rip rap. Fill

Page 23: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 23

in the pond is shown with spoil exposed (Q), the edge of the 2-foot clay cap (R) and the edge of finishedtopsoil (S). Cross section G-G’ (in Figure 28) shows layer thickness.

Page 24: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 24

Figure 23. Figure 22 zoomed-in, note removal of grates before filling the fishway and manhole with clay.

Page 25: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 25

Construct the K, L, O, and P fills first. Cross sections i-i’, j-j’ are shown in Figures 24 and 25.

Figure 24. Cross section i-i’ of the clay and stone block upstream of the raceway gates and the fishwayentrances (K) and the MDOT Heavy rip rap downstream of the raceway gates (L).

630631632633634635636637638639640641642643644645646647648649650651652653654655656657658659660661662663664665666667668669670671672673674675676677678679680681682683684685686687688689690

0 10 20 30 40 50 60 70 80

Elev

atio

n N

AVD8

8 fee

t

Horizontal Distance feet

10-ft

19-ft12-ft

MDOT Heavy Rip Rap16" to 24" stone

Compacted Clay

Catwalk

Gates

Exis ting Surface

Fill Area LThe stone block on theupstream side of theraceway gates is10-ft high x 12 feet wide (base)x 65 feet long = 7,800 cubic feet.= 289 cubic yards of MDOTHeavy Rip Rap (16"to24"stone)~2/3 Above OHWM = 193 CY~1/3 Below OHWM = 96 CY

Fill Area KstoneThe stone block on thedownstream side of theraceway gates is 2-foot stoneover a slope width of 22 feet xa slope length of 90 feet =5,940 cubic feet= 147 cubic yards of MDOT Heavy

~3/4 Above OHWM = 147 CY~1/4 Below OHWM = 73 CY

Fill Area KclayThe clay block is 10' high x19' at the base x 90 feet long =8,550 cubic feet of compacted clay.= 317 cubic yards.Expansion coefficient for dug claycombined with compaction of thefinished clay is ~1.3 which yeilds412 cubic yards of dug clay purchasedand delivered.

Add clay in 1' to 2' lifts and compact

~2/3 Above OHWM = 211 CY~1/3 Below OHWM = 106 CY

i i'

Dig in bottom two footer stones

Kstone

KclayL

Access Road #3

Compact loose clay ~ 30%

MDOT Heavy Rip Rap16" to 24" stone

Page 26: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 26

Figure 25. Longitudinal section j-j’ clay block in front of the raceway gates and the fishway entrances.The longitudinal section is shown without the 3-foot stone facing on the clay for ice protection (Fig. 29).

Figures 26 and 27 show the cross sections o-o’ and p-p’, respectively, for the clay and stone blocks (O &P) at the ends of the large culvert under Bridge Street.

600

620

640

660

680

700

720

740

760

780

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

Earth BankCatwalk Gates

Existing Bottom

Fishway &AttactingwaterTunnel

Dam

j j'

636.7' OHWMKclay

Clay block is ~ 10' high at the structures, ~4' wide at the top against the structures 19' wide at the base.The upstream face of the clay is surfaced with 3-ft stone. see cross section i-i')

Page 27: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 27

Figure 26. Cross section o-o’ showing the clay block at the entrance to the culvert under Bridge Street.

630

635

640

645

650

655

0 5 10 15 20 25 30 35 40

Elev

atio

n NA

VD88

fee

t

Horizontal Distance feet

Existing

Proposed

Proposed Nominal Rectangle

Nominal rectangle is 22-feet wide x 6.5-feet high x 23-feet long=3,289 cubic feet of compacted clay = 4,276 cubic feet of loose clay= 158 cubic yards of loose clay compacted to 111 cubic yards in place

158 cubic yards of loose clay deliveredo o'

Page 28: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 28

Figure 27. Cross section p-p’ showing the stone block at exit of the culvert under Bridge Street.

Now dam spoil material can be moved from its temporary storage into the raceway pond and compactedwith machinery as best possible. The remainder of the dam can now be removed with the breaker barand trucked into the raceway pond for burial.

Figure 28 shows the arrangement of spoil, 2-foot clay cover and top soil in the raceway pond.

635

640

645

650

655

660

0 5 10 15 20 25 30

Elev

atio

n NA

DP88

fee

t

Horizontal Distance feet

Chart Title

Stone block is 20-feet long x 7-feet high x 13-feet wide = 1,820 cubic feet= 67 cubic yards of MDOT Heavy Rip Rap= 111 Tons of MDOT Heavy Rip rap

p p'

Page 29: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 29

Figure 28. Raceway pond fills Q, R and S, the gateway blocks (K & L) and the culvert blocks O & P.

It is optional at this point to fill the raceway pond (Q, R & S) or to complete the clay fills within (M) and atthe ends of the fishway (K and N). The cross sections m-m’, k-k’ and l-l’ are shown next in Figures 29 -31. There are multiple M fills as the fishway depth varies from its entrance to its exit.

630631632633634635636637638639640641642643644645646647648649650651652653654655656657658659660661662663664665666667668669670671672673674675676677678679680

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440 460 480

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

Dam Spoil2-ft thick Clay Seal

3-inches Top Soil

Clay Block

Stone Block

Stone Block

AccessRoad #3

Gates

Stone Block

MainStreet

Raceway Pond Cross Section South to North

Culvert

Catwalk

US OHWM 643.0

DS OHWM 636.7

Dam Xsec

~ 100-yr Flood Elevation 650'

Vertical Exaggeration ~ 7:1

ClayBlock

G G'

Fill Area P Culvert Stone Blockave. 15' wide x 8' high x 24' long= 2,880 cubic feet= 107 cubic yardsMDOT Heavy Rip Rap (16" to 24" stone)96 CY Above OHWM11 CY Below OHQWM

OP

Q

R

S

L

Fill AreaO Clay Blockave. 19' wide x 7' high x ave 19' long= 2,527 cubic feet= 94 cubic yards Compacted Clay= 122 cubic yards loose clay~80% Above OHWM = 98 CY comp. clay~20% Below OHWM = 24 CY comp. clay

Fill Area S Soil CapArea is 37,968 x 0.3'-ft deep = 11,390= 11,390 cubic feet= 422 cubic yards of loose top soil

Fill Area R Clay SealArea is 36,799 sq ft x 2-ft deep== 73,598 cubic feet= 2,726 cubic yards Compacted Clay= 3,434 cubic yards of loose clay

Fill AreaQ Dam SpoilArea is 28,800 x 2.5 ft = 72,000 cubic feet= 2,667 cubic yards of loose dam spoil- 1,280 cubic yards below DS OHWM

= 1,387 cubic yards above DS OHWM

K

Areas are taken from surveyed dimensionsof shapes in the plan view for Q R & S.Areas calculated by the professionalsurveying program Traverse PC

635.5'

638.0'

640.3'

Page 30: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 30

Figure 29. Fishway blocks (K & N) and the clay fill within the fishway (M1 through M5). Not shown isthe clay fill in the square manhole on the east side of the fishway near the last bend, nor is the auxiliarywater run entrance (see two of the grate covers in Figure 23). The manhole (2/3rds of the way down thewater run) is 21-feet x 4-feet x 4-feet. This holds a volume of 336 cubic feet = 12 cubic yards ofcompacted clay or 15.6 cubic yards of loose clay. It is topped with 0.2 cubic yards of top soil. Theentrance is 10-feet deep x 9-feet long x 4-feet wide = 360 cubic feet. This holds a volume of 13 cubicyards of compacted clay or 17 cubic yards of loose clay topped with 0.4 cubic yards of top soil.

BE SURE TO INCLUDE THE AUXILIARY WATER RUN ENTRANCE AND MANHOLE IN THE CLAYSEAL REQUIREMENTS. SEE CAPTION TO FIGURE 34 FOR QUANTITIES AND THE SUMMARYTABLE.

Figures 30 and 31 show cross section k-k’ at the middle of the fishway and cross section l-l’ at the exit ofthe fishway.

620

630

640

650

660

670

680

690

700

0 10 20 30 40 50 60 70 80 90 100 110 120 130

Elev

atio

n NA

VD88

fee

t

Horizontal Distance feet

Chart Title

KclayM1 M2 M3 M4

K3-ft stones

M5

M6

N clay

N 2-ft stones

Fill Area M1 Clay Blockave. 8' wide x 10' high x ave 7' long= 560 cubic feet= 21 cubic yards Compacted Clay= 27 cubic yards loose clay

Fill Area M2 Clay Blockave. 8' wide x 11' high x ave 25' long= 2,200 cubic feet= 82 cubic yards Compacted Clay= 106 cubic yards loose clay

Fill Area M3 Clay Blockave. 8' wide x 14' high x ave 31' long= 3,472 cubic feet= 129 cubic yards Compacted Clay

9 CY comp. clay Below OHWM= 167 cubic yards loose clay

Fill Area M4 Clay Blockave. 8' wide x 16' high x ave 9' long= 1,152 cubic feet= 43 cubic yards Compacted Clay

(9 CY Below OHWM)= 56 cubic yards loose clay

Fill Area M5 Clay Blockave. 8' wide x 17' high x ave 14' long= 1,904 cubic feet= 71 cubic yards Compacted Clay

(14 CY comp. clay Below OHWM)= 92 cubic yards loose clay

Fill Area N clay Clay Blockave. 12' wide x 15' high x ave 20' long= 3,600 cubic feet= 133 cubic yards Compacted Clay

(66 CY comp. clay Below OHWM)= 173 cubic yards loose clay

Fill Area N stonesave. 2' wide x 30' high x ave 20' long= 1,200 cubic feet= 44 cubic yards MDOT Heavy

(19 CY Below OHWM)See K sectionsfor K volume

Fill Area M6 Top Soilave. 8' wide x 0.3' high x ave 85' long= 204 cubic feet= 8 cubic yards Top Soil

Bury bottom 2 stones

m m'

636.7'OHWM

Page 31: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 31

Figure 30. Cross section k-k’ in the middle of the fishway ladder.

635

640

645

650

655

660

0 5 10 15 20 25 30

Elev

atio

n NA

DP88

fee

t

Horizontal Distance feet

k k'

Compacted Clay

Top Soil

FishwayLadder

Page 32: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 32

Figure 31. Cross section l-l’ at the exit of the fishway ladder.

Complete the removal of the dam including pieces of the west end abutment down to an elevation of 634-feet. The dam concrete at the fishway wall may be cut with a saw about 5-feet west of the wall to ensurethe dam can be broken off near the fishway wall without damaging the fishway wall itself. Successivecuts deeper down may be necessary as the surface concrete is removed.

Complete moving all dam spoil into the raceway pond, cap the spoil with two feet of clay and finish with0.3-feet of top soil (Figure 28).

The dam is completely removed down to an elevation of 634-feet and a riffle is built of cobble that wasonce inside the dam to an elevation of 635.5-feet.

Figure 32 shows the transition between the Toewood Bench and the stone, bankfull bench constructed atthe west end of the dam. The figure shows the transition before the Emergency Work was done, but thetransition is the same.

630

635

640

645

650

0 5 10 15 20 25 30

Elev

atio

n N

AVD8

8 fe

et

Horizontal Distance feet

ll'

Page 33: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 33

Bank Protection and Transition Bankfull Bench at the West End of the Dam

Figure 32. Plan view of bank rip rap and transition bankfull bench at west end of the previous dam.

Page 34: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 34

A longitudinal section parallel to the river (t-t’) for the transition bankfull bench is shown in Figure 33.

Figure 33. The transition bench elevation joins the toewood bench at an elevation of 643 feet thenslopes downward to an elevation 640 feet near the west bridge abutment.

Vane 3 will be left undone until the toewood bench and vanes 4-9 are constructed along the high banksouth of the previous dam in order to allow for off-road truck passage along the toe of the high bank.

610

620

630

640

650

660

670

680

690

700

710

720

730

740

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170

Elev

atio

n NA

VD88

fee

t

Horizontal Distance feet

t t'

Existing

Transition Bench 642' to 640'3-ft Stone

Toe WoodStructureWood-Willow Mat

Page 35: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 35

The Toe Wood Bench, Vanes and Bank Rip Rap South of the Dam

Figure 34 shows the extent of the toe wood bench, the location of vanes 3 through 5 on the toe woodbench, 9, the location of vane 6 through 9 on an existing bank flat and two vane cross sections typical ofeach condition.

Page 36: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 36

Figure 34. Location of toe wood structure (Y) and vanes 3 through 9. Note rip rap (X) above the toewood bench and rip rap (Z) below the existing bank flat.

Page 37: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 37

Figures 35 through 36 detail the toe wood bench in plan-view and cross section and the detail of vanesusing cross sections u-u’ and v-v’.

Figure 35. Plan view of the toe wood structure showing progressive layers (left to right). Note, width oftoewood bench landward of the root wad is 10- feet.

-10

-5

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

Dist

ance

from

Ban

k fe

et

Bank Distance feet

Existing Bank

NewBankNew Bank

Existing Bank

Foundation Logs20-ft longsharpened two sides on one end

Root Wad Log, Bole 20-feet long, sharpened one end, plus root wad

All Logs 12-inch to 18" diameter, 4.5-feet from large endAverage of 15-inch diameter, can be larger than 18-inchesAny species

3-ft diameter stone

4-foot long stakes

TOE WOOD STRUCTURE 8-ft pulpwood & branches

cobble layer - 1.5-ft thick

Willow Mat

gravel - 0.5-ft thick

Existing BankExisting Bank

Page 38: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 38

Figure 36. Toe wood structure in (an unlabeled) cross section.

Figures 37 and 38 show cross sections u-u’ and v-v’ for vanes 4 and 6 at Lyons. Figures 39 and 40show typical construction parameters for horizontal and vertical angles for all vanes on river left.

Page 39: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 39

Figure 37. Cross section u-u’ showing vane 4 attached to the toe wood structure. This is typical forvanes 4 and 5.

Page 40: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 40

Figure 38. Cross section u-u’ showing vane 6 attached to an existing bank flat. This is typical for vanes6 through 9.

630

635

640

645

650

655

660

665

670

675

680

685

690

695

700

705

0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 1 0 0 1 1 0 1 2 0 1 3 0 1 4 0 1 5 0 1 6 0 1 7 0 1 8 0 1 9 0 2 0 0 2 1 0 2 2 0 2 3 0

ELEV

ATIO

N F

T

HORIZONTAL DISTANCE FT

VA N E S & R IP R A P IN T H E UP S TR EAM 1 , 4 0 0 FE E TW H E R E A N AT URA L FL AT E X ISTS

VA N E S 6 , 7 , 8 & 9

Vane Header 3-ft, median diameter

Vane Footer 3-ft,median diameter

Looking Downstream

ExistingFlat

The vane is 160 feet long and rises 9.5 feet. A 6% slopeIt will use 140 3-ft stones counting both header and footer stonestie-in row and second footer row.

Vertical exaggeration ~2:1

Existing Bankfull Flatis at ~ 644.8-ft

Tie-in row of header stones : 3-ft, median diameter, dug inperpendiculare to bank across flat

Fill Area Z MDOT Heavy Rip Rap is:10-ft high x 2-ft x 700 feet along the bank= 14,000 cubic feet= 519 cubic yards of MDOT Heavy Rip Rap

(212 CY Below OHWM, ~ 40%)

v v'

Z

est. 637.4' OHWM

Page 41: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 41

Figure 39. Plan view showing construction angle of all vanes on river left. See cross section A-A’ inFigure 40.

Page 42: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 42

Figure 40. Cross section A-A’ showing vertical construction angle range for all vanes on river left.

Cut and Fill quantities are summarized in Table 3. Disregard items pertaining to Hazel Devore Island andthe East Channel.

Buried Stones

Page 43: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 43

Table 3a. Cut and Fill Quantities for the Access Roads, Raceway Pond Fill and Fishway Fill.Pg

#/F

ig#

Fill

Fill

Cut

Cut

orXs

ecAb

ove

Belo

wAb

ove

Belo

wCu

t or F

illTa

ble

#Xs

ecLo

ngSe

cLe

ngth

Wid

thDe

pth

Aea

OHW

MO

HWM

OHW

MO

HWM

Desc

ript

ion

Labe

lLa

bel

Labe

lft

ftft

sq ft

Cubi

c Ft

CYCY

CYCY

Note

sCu

t J E

xist

. Sto

ne a

t Rac

eway

Gat

es3,

4/3,

4a-

a'b-

b'60

2710

122

7,29

025

617

581

Fill

AreaC

stee

p pa

rt o

f Acc

ess R

oad

#117

,18,

19/5

,11,

12H-

H'C-

C'24

512

12,

940

109

109

Esse

ntia

lly p

acke

d to

exi

stin

g su

rfac

eFi

ll Ar

eaF

stee

p pa

rt o

f Acc

ess R

oad

#217

,20/

5,13

H-H'

F-F'

6512

178

029

29Es

sent

ially

pac

ked

to e

xist

ing

surf

ace

Fill

AreaG

stee

p pa

rt o

f Acc

ess R

oad

#217

,20/

5,13

H-H'

F-F'

3012

2.5

900

3333

25Es

sent

ially

pac

ked

to e

xist

ing

surf

ace

Fill

AreaD

stee

p pa

rt o

f Acc

ess R

oad

#417

,21/

5,14

H-H'

D-D'

130

121

1,56

058

58Es

sent

ially

pac

ked

to e

xist

ing

surf

ace

Fill

AreaE

stee

p pa

rt o

f Acc

ess R

oad

#517

,22/

5,15

H-H'

E-E'

7012

184

031

31Sa

nd o

ver s

idew

alk

& se

wer

17/5

sht 4

/16

4512

154

020

20Re

mov

ed w

hen

job

is c

ompl

eted

Som

e (?

)MDO

T He

avy

alon

g da

m b

ase

23/1

6NA

35

Filli

ng a

hol

e in

cha

nnel

bot

tom

no

effe

ct o

n flo

odin

g

Fill

AreaH

deep

hol

e at

wes

t end

of d

am23

,25,

25/1

6,17

,18

c-c'

d-d'

4020

520

04,

000

148

148

Belo

w O

HWM

Fill

AreaI R

ip R

ap N

orth

of W

Brig

e Ab

ut.

23,2

6/16

,19

e-e'

f-f'

200

252

10,0

0037

055

5La

ndw

ard

of th

e ch

anne

l pro

per o

n ex

istin

g sl

ope

Fill

AreaJ

Vane

2 S

plas

h Ap

ron

23,2

6/16

,19

e-e'

f-f'

8526

36,

630

246

246

Fill

AreaA

stee

p pa

rt o

f Acc

ess R

oad

#332

-34/

23-2

6g-

g'h-

h'10

025

3.4

8,50

031

545

315

- exi

stin

g 27

0 =

45Fi

ll Ar

eaB

stee

p pa

rt o

f Acc

ess R

oad

#333

,36,

37/2

3,26

,27

H-H'

B-B'

9012

11,

080

4040

Esse

ntia

lly p

acke

d to

exi

stin

g su

rfac

e0

0Fi

ll Ar

eaK

Clay

i-i'

j-j'

9019

108,

550

317

211

106

Less

por

tion

belo

w O

HWM

636

.7' s

ubtr

acte

dFi

ll Ar

eaK

Ston

e Bl

ock

i-i'

j-j'

9022

23,

960

147

147

73Le

ss p

ortio

n be

low

OHW

M 6

36.7

' sub

trac

ted

Fill

AreaL

Ston

e Bl

ock

i-i'

j-j'

6512

107,

800

289

193

96In

side

isol

ated

race

way

pon

d

Fill

AreaO

Cla

y ra

cew

ay cu

lv. E

ntr.

o-o'

2322

6.5

3,28

912

298

24In

side

isol

ated

race

way

pon

d

Fill

AreaP

Ston

e ra

cew

ay cu

lver

t exi

tp-

p'20

137

1,82

010

796

11In

side

isol

ated

race

way

Cut -

Dam

spoi

l rem

oved

28/T

able

374

31,

115

Dam

spoi

l exp

ande

d in

race

way

pon

d28

/Tab

le 3

G-G'

2,41

51,

135

Less

por

tion

belo

w O

HWM

(2,4

15)-1

,280

=1,1

35 C

Y

Fill

AreaR

Clay

cap

over

race

way

spoi

l37

,38,

43/2

7,28

,33

G-G'

236

,799

73,5

982,

726

2,72

6In

side

isol

ated

race

way

pon

dFi

ll Ar

eaS

Top

Soil

over

race

way

clay

cap

37,3

8,43

/27,

28,3

3G-

G'0.

336

,968

11,0

9041

141

1In

side

isol

ated

race

way

pon

d

Fill

Are

aM

1 Cl

ay B

lock

44/3

4m

-m'

108

756

560

2121

Insi

de is

olat

ed fi

shw

ayFi

ll A

rea

M2

Clay

Blo

ck44

/34

m-m

'11

825

200

2,20

081

81In

side

isol

ated

fish

way

Fill

Are

a M

3 Cl

ay B

lock

44,4

5/34

,35

k-k'

m-m

'14

831

248

3,47

212

912

9In

side

isol

ated

fish

way

Fill

Are

aM

4 Cl

ay B

lock

44/3

4m

-m'

168

972

1,15

243

349

Insi

de is

olat

ed fi

shw

ayFi

ll A

rea

M5

Clay

Blo

ck44

/34

m-m

'17

814

112

1,90

471

5714

Insi

de is

olat

ed fi

shw

ayFi

ll A

rea

M6

Top

SoilC

lay

Bloc

k44

,45/

34,3

5m

-m'

858

0.3

220

48

8In

side

isol

ated

fish

way

Fill

- Aux

iliar

y W

ater

Run

Ent

ranc

e38

/28

109

436

360

1313

Insi

de is

olat

ed fi

shw

ayFi

ll - A

uxili

ary

Wat

er R

un M

naho

le38

/28

214

416

336

1210

2In

side

isol

ated

fish

way

Fill

Are

aN

Cla

y B

lock

44,4

6/34

,36

m-m

'l-l

'20

1512

180

3,60

013

367

66Fi

ll A

rea

N S

tone

s44

,46/

34,3

6m

-m'

l-l'

2030

260

1,20

044

2024

Page 44: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 44

Table 3b. Fill Quantities for West End Rip Rap, Toe Wood Structure, Main & East Channel Rip Rap.Pg

#/F

ig#

Fill

Fill

Cut

Cut

orXs

ecAb

ove

Belo

wAb

ove

Belo

wCu

t or F

illTa

ble

#Xs

ecLo

ngSe

cLe

ngth

Wid

thDe

pth

Aea

OHW

MO

HWM

OHW

MO

HWM

Desc

ript

ion

Labe

lLa

bel

Labe

lft

ftft

sq ft

Cubi

c Ft

CYCY

CYCY

Note

sFi

ll Ar

eaT1

47-5

1/37

,38

q-q'

1540

280

1,20

044

44La

ndw

ard

of th

e ch

anne

l pro

per o

n ex

istin

g sl

ope

Fill

Area

T247

,49/

37,3

9r-

r'75

2110

210

15,7

5058

358

3La

ndw

ard

of th

e ch

anne

l pro

per o

n ex

istin

g sl

ope

Fill

Area

T347

,49/

37,3

9r-

r'75

217

147

11,0

2540

840

8La

ndw

ard

of th

e ch

anne

l pro

per o

n ex

istin

g sl

ope

Fill

Area

T447

,49/

37,3

9r-

r'75

132

261,

950

7272

Land

war

d of

the

chan

nel p

rope

r on

exis

ting

slop

eFi

ll Ar

eaT5

47,5

0/37

,40

s-s'

1028

256

560

2121

Land

war

d of

the

chan

nel p

rope

r on

exis

ting

slop

e

Fill

Area

U1

47,4

8/37

,38

q-q'

1510

660

900

3332

1Re

stor

ed B

ankf

ull B

ench

Fill

Area

U2

47,4

9/37

,39

r-r'

7523

613

810

,350

383

383

Rest

ored

Ban

kful

l Ben

chFi

ll Ar

eaU

347

,50/

37,4

0s-

s'50

122

241,

200

4444

Rest

ored

Ban

kful

l Ben

ch

Fill

Area

V47

/48/

37,3

8q-

q'22

510

4.5

4510

,125

375

187

188

Fill

Area

W47

/48/

37,3

8q-

q'16

829

258

9,74

436

136

1Be

low

636

.7' O

HWM

Fill

Area

Y T

oe W

ood

Will

ow M

at B

ench

53-5

5/42

-44

v-v'

1600

157

105

168,

000

6,22

24,

144

2,07

8La

ndw

ard

of th

e ch

anne

l pro

per

Fill

Area

Z Ri

p Ra

p Be

low

Exi

stin

g Fl

at53

,57/

42,4

6v-

v'70

011

222

15,4

0057

036

821

2Pu

shed

into

exi

stin

g so

il

Fill

Area

AA

Fin

ish

Vol

ume

60,6

1/49

,50

w-w

'4,

753

Rest

ores

Ori

gina

l Isl

and

Mas

sFi

ll Ar

eaA

A E

ast C

hann

el T

op S

oil

60,6

1/49

,50

w-w

'23

095

0.3

296,

555

243

243

Rest

ores

Ori

gina

l Isl

and

Mas

sVo

lum

e of

BB

Exp

ande

d &

Com

pact

ed60

,61/

49,5

0w

-w'

1,48

7Re

stor

es O

rigi

nal I

slan

d M

ass

Fill

Area

AA

MD

OT

Hea

vy R

ip R

ap60

,61/

49,5

0w

-w'

3,02

31,

122

1,90

1Re

stor

es O

rigi

nal I

slan

d M

ass

Cut A

rea

BB

Res

tore

d Ea

st C

hann

el60

,61/

49,5

0w

-w'

100

365

36,5

001,

352

676

676

Rest

ores

cha

nnel

to n

orm

al w

idth

and

dep

thFi

ll Ar

eaC

CEa

st C

hann

el R

ip R

ap60

,62/

49,5

1x-

x'17

52

7.5

152,

625

9777

20Fi

ll Ar

eaD

D E

ast C

hann

el R

ip R

ap64

,65/

53,5

4y-

y'40

142

281,

120

4129

123

Fill

Area

EE

Mai

n Ch

anne

l Rip

Rap

66-6

8/55

-57

z-z'

& a

a-aa

'49

536

353

,460

2,36

71,

420

947

Ove

rwid

e se

ctio

n of

rive

r, do

es n

ot a

ffect

floo

ding

Page 45: Sequence of Work & Narrative Lyons Dam Removal & Toewood

Grand River Dam Removal and Toewood Bench Construction Above the Dam

Ellen River Partners, Inc. © Elon S. Verry, Hydrologist June 14, 2016 Page 45

Table 3c. Fill quantities for the vanes.Pg

#/F

ig#

Fill

Fill

Cut

Cut

orXs

ecAb

ove

Belo

wAb

ove

Belo

wCu

t or F

illTa

ble

#Xs

ecLo

ngSe

cLe

ngth

Wid

thDe

pth

Aea

OHW

MO

HWM

OHW

MO

HWM

Desc

ript

ion

Labe

lLa

bel

Labe

lft

ftft

sq ft

Cubi

c Ft

CYCY

CYCY

Note

sVa

ne 2

Hea

der R

ow23

,26,

27/1

6,19

,20

e-e'

160

33

1,44

053

2132

ds o

f Dam

~60

% o

f van

e is

abo

ve O

HWM

see

Fig

20

Vane

2 F

oote

r Row

23,2

6,27

/16,

19,2

1e-

e'16

03

31,

440

5321

32ds

of D

am ~

60%

of v

ane

is a

bove

OHW

M s

ee F

ig 2

0

Vane

3 H

eade

r Row

47/3

720

03

31,

800

6734

33us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

3 F

oote

r Row

47/3

720

03

31,

800

6734

33us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

4 H

eade

r Row

53,5

6/42

,45

u-u'

160

33

1,44

053

2627

us o

f Dam

~ 5

0% o

f van

e is

abo

ve O

HWM

se

Fig

45Va

ne 4

Foo

ter R

ow53

,56/

42,4

5u-

u'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

5 H

eade

r Row

53,5

6/42

,45

u-u'

160

33

1,44

053

2627

us o

f Dam

~ 5

0% o

f van

e is

abo

ve O

HWM

se

Fig

45Va

ne 5

Foo

ter R

ow53

,56/

42,4

5u-

u'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

6 H

eade

r Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

6 F

oote

r Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

7 H

eade

r Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

7Fo

oter

Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

8 H

eade

r Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

8 F

oote

r Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

9 H

eade

r Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

9 Fo

oter

Row

53,5

7/42

,46-

48v-

v'16

03

31,

440

5326

27us

of D

am ~

50%

of v

ane

is a

bove

OHW

M s

e Fi

g 45

Vane

10

Head

er R

ow64

/53

typi

cal

100

33

900

3313

20ds

of D

am ~

60%

of v

ane

is a

bove

OHW

M s

ee F

ig 2

0Va

ne 1

0 Fo

oter

Row

64/5

3ty

pica

l10

03

390

033

1320

ds o

f Dam

~60

% o

f van

e is

abo

ve O

HWM

see

Fig

20

Vane

11

Head

er R

ow58

,59,

66/4

7,48

,55

typi

cal

126

33

1,13

442

1725

ds o

f Dam

~60

% o

f van

e is

abo

ve O

HWM

see

Fig

20

Vane

11

Foot

er R

ow58

,59,

66/4

7,48

,55

typi

cal

126

33

1,13

442

1725

ds o

f Dam

~60

% o

f van

e is

abo

ve O

HWM

see

Fig

20

TOTA

L17

,263

7,52

31,

594

757