second installation and commissioning workshop daq and ecs fmd contribution
DESCRIPTION
Second Installation and Commissioning Workshop DAQ and ECS FMD contribution. Børge S. Nielsen, Niels Bohr Institute with invaluable contributions from C. Holm, K. Gulbrandsen, G. Renault and F. Roukoutakis 11 December 2006. Status of FMD readout. Test setup at NBI. DAQ computer. RCU. - PowerPoint PPT PresentationTRANSCRIPT
11/12 December 2006 1 Borge S. Nielsen, NBI
Second Installation and Commissioning Workshop
DAQ and ECS
FMD contributionFMD contributionBørge S. Nielsen, Niels Bohr Institute
with invaluable contributions from
C. Holm, K. Gulbrandsen, G. Renault and F. Roukoutakis
11 December 2006
11/12 December 2006 2 Borge S. Nielsen, NBI
Status of FMD readout
Test setup at NBI
Inner and Outer Digitizer
RCU
DAQ computer
Chain working: 2 digitizers, RCU, DDL, DATETo be done: TTC and LTU -- hardware is available at NBI
VME crate for TTC and LTU
11/12 December 2006 3 Borge S. Nielsen, NBI
Read-out cable problem solved
Unable to read out Digitizers to RCU with 3-4 m standard cableStandard cable: flat cable, 50 connections, 1 mm pitchNew cable: flat twisted pairs, 40 pairs, 0.635 mm pitch
40 bit signal + 10 grounds
40 bit signal + 40 grounds
This works up to at least 4 m cableHave tried this with all sorts of shielding, termination etc, without success
adaptor
11/12 December 2006 4 Borge S. Nielsen, NBI
FMD specifics to remember
• DAQ readout using 3 standard RCUs Digitizer card (FMDD) is a modified TPC FEC
• DCS uses CAEN power suppliesand interface to RCU-DCS card identical to TPC
• Receive L0, L1, L2 from LTU but we do not deliver trigger signal to CTP
• Will require ped. and gain calibration runs
11/12 December 2006 5 Borge S. Nielsen, NBI
DAQ – Pre-commissioning (1)
• Installation of DAQ system for pre-commissioning• PC installed with Linux and DATE V5 in home institute ? Yes
Linux SLC3/SLC4 ? DATE Version ? SLC3, DATE 5.14
• DDL SIU, RORC, and LTU modules available in home institute ? YesActel-based SIU ? RORC Version 4 ? Don't know, RORC sw 4.4.4
•Final readout electronics data formatting • Generation of the Common Data Header (CDH) with information from the
trigger ? Presumably yes, but not tested (using RCU).
11/12 December 2006 6 Borge S. Nielsen, NBI
DAQ – Pre-commissioning (1)•Final electronics readout demonstrated via DDL + DATE
with final TRG/DAQ system• Final readout electronics ? Yes (FMDD+RCU+SIU+DIU+RORC)
• Configuration of electronics via DDL if used ?
Will use for peds. Not tested.
• Trigger with LTU + TTC system ? No.
Detector busy to LTU ? yes. Not tested
• Readout with DDL + DATE system ? Yes
• Raw data with CDH info from Trigger ? yes, not tested.
• CDH checking enabled in DATE ? No.
• Trigger busy and DDL XON/OFF have been exercised ?
don't know what this is.
• Test performed with more than 1 DDL ? No
11/12 December 2006 7 Borge S. Nielsen, NBI
DAQ – Pre-commissioning (2)
•Data Quality Monitoring (DQM)• Raw data decoding code ready ? Almost
Same code as in AliROOT ? Simplified version
• MOOD module written to display raw data ? In progress
• Metrics for automatic DQM ? Not yet
•Detector algorithm (DA)• Online calibration procedures identified and specified ?
Yes (peds. and gains).(Including information as required in the DA framework document)
No
• Implementation of the procedures using the DA framework ?
Not yet
• RAW data files ready to test them ? No
11/12 December 2006 8 Borge S. Nielsen, NBI
DAQ – Pre-commissioning (2)•Performance test in the lab
• Max bw of readout electronics over DDL ? Not measured.
• Max event rate ? ~1kHz, apparently limited by RCU event buffer
(internal limit is Digitizer->RCU serial readout : 1-3 kHz event rate)
Range of event size ? ~ 25 – 120kB
Dead-time at nominal rate ? 1ms
• Stability (Full chain used since when ? Summer 2006
Stable run during several hours? Yes, even days.)
•Start Of Data (SOD), End Of Data (EOD) handling• Readout electronics ready to receive software triggers ? ??
• Readout electronics able to generate SOD and EOD events fragments ? ??
•Definition of Equipment identification• Detector identifier has been defined by offline. We think so
• DDL index (mapping of DDL to readout partition) defined by detector ? Not sure.
11/12 December 2006 9 Borge S. Nielsen, NBI
DCS FMD
HV LV
Node
CUDU
FMD FSM
RCU
HV: A1512 [0-3][0-5] LV: A3009 RCU
6 bd x 12 ch = 72 ch 4 bd x 12 ch = 48 ch
ChannelChannel
Channel
details
ChannelChannel
Channel
11/12 December 2006 10 Borge S. Nielsen, NBI
ECS – Pre-commissioning • Detector DCS
• Top-level DCS Finite State Machines (FSM) defined and implemented ?
CAEN LV and HV: progressing well
RCU: Not yet
• Standard set of STATES and COMMANDS ? Yes
• Front-end and readout electronics integration with the Trigger • Raw data generation controlled by LTU ? ??
• Need to control detector-specific LTU sequences ? Maybe for gain calibration?
• Detector readout with DAQ system based on DDL+DATE ? Yes
• Sequences of operation (pedestal runs, calibration runs, etc) to be controlled by the ECS
• Sequences defined and communicated to the ECS team ? More or less
• Detector-dependent programs to implement the above sequences• Programs defined ? Yes
• Programs developed and tested ? No
11/12 December 2006 11 Borge S. Nielsen, NBI
Detector installation & commissioning
•Check location of DDL SIUs and optical patch panels
•Detector installation:• When ? 19 March 2007 (FMD3)
• Will the detector DAQ contact be present during commissioning ? Yes
•DAQ & ECS needed during commissioning• When ? February 2007 in clean room
• Operation from upstairs starting on ? In clean room Feb 2007
In P2 early March
11/12 December 2006 12 Borge S. Nielsen, NBI
DCS questions• DCS status today
RCU
LV
HV
Delivery dateFSMPanelsPVSSsubsystems
• DCS needs at clean room + P2 for pre- and final installation
Final installationPre-installation
…
Cables
Network
PC
whendetailswhendetails
what
Quartus needed Feb 07
Yep.
YES !!
Yes
Yes
Yes
Yes
Yes
Yes
< Feb 07
< Feb 07
No ROOT panels InterCom
Feb 07
Feb 07
ditto
11/12 December 2006 13 Borge S. Nielsen, NBI
Questions for Detectors providing Trigger Inputs
• FMD does not provide trigger inputs to CTP
11/12 December 2006 14 Borge S. Nielsen, NBI
Detector Readout I
• Does the detector respond correctly to trigger sequences with errors?
•Has this been checked using the list of sample error-sequences
Not explicitly, but we are using standard RCU
• Can the detector operate continuously with a high rate of triggers (i.e. up to a raw rate of 40 MHz, however respecting BUSY) without generating errors? Using standard RCU
• Does the detector transfer L1 and L2a messages in an appropriate way to the event header?
Using standard RCU
• Can the detector, using an LTU, maintain stable running conditions for a period of at least 12 hours. (i.e. more than the longest run.)
We haven't had an LTU running yet.
11/12 December 2006 15 Borge S. Nielsen, NBI
Detector Readout I
• Some detectors require calibration triggers. These require a message to be sent to the CTP via a DIM server giving the details of the request. The details of the exact format for the request have not yet been released. However, does the detector foresee from where (which computer) the requests will be sent? Such a computer must be able to communicate with the CTP, which implies access to the DCS network. If the calibration trigger requires a pre-pulse, does the detector delay the pulse as required, e.g. by use of the TTCvi?
We think this is not relevant…
• Some detectors have expressed an interest in using the Region-of-Interest (RoI)
We will not do RoI's
• Can the detector drive the required LVDS signals over a distance equivalent to that for the cables connecting it to the CTP and maintain an acceptable BER (say <10-11)?
Yes, but we only return BUSY, not trigger signals
11/12 December 2006 16 Borge S. Nielsen, NBI
Detector Readout 2 (Reminders)
• Can the detector make adequate individual adjustments to each final destination so as to obtain required time alignments for L0 and L1 output signals?
If we understand the question, the answer is: Yes.
• Does the detector provide its own counters for all signals coming from the trigger system (i.e. L0, L1, L2a, L2r, BUSY) and in addition for any trigger inputs sent to the CTP?
Yes
11/12 December 2006 17 Borge S. Nielsen, NBI
Conclusions• Lots of progress with FMD detector hardware (final assembly to start imminently)
• Electronics and read-out problems solved(relating to Digitizer boards and cables)
• DAQ and DCS under control - more work needed (still worried about CAEN deliveries)
• Still need to test with LTU and TTC
• Planning ~1 month testing in Silicon Facility clean room (February 2007)
• Very short installation period with testing in P2
• We need cables in P2 !!