s.e. (2)

2
 6th  year C.S.E.,2014 Time :-2 Hours F. M. :-15 *As!er ay three Su" :- S.E. 1.(a) Softwar e Crisis and symptoms of the present softwa re crisi s. Sugg est at least two possible solutions to the present software crisis. (2.5 marks)  (b).Define CPM. (2.5 marks) 2. (a ) !pl ain "ate rf all mo de l wit h th e co nd it ion when to use wat er fa ll mod el (2.5 marks)  (b) Define spiral Model and under which condition manager uses spiral model.  (2.5 marks) #.(a) Consider a pro$ect with the following functional units% &umber of user inputs ' &umber of user outputs ' * &umber of user en+uiries ' # &umber of user files ' , &umber of e!ternal interfaces ' *  -ssume all comple!ity ad$ustment factors and weighting factors are aerage. Compute the function points for the pro$ect. (2.5 marks)  (b)"hat do you mean by /0Cwrite down the disadantages of /0C. (2.5 marks) 4.Define COCOMO Model. #5 Mar$s%  5. Define any two :- #2.5*2&5 mar$s%  (a) Cohesion  (b) Coupling  (c) Alpha !eta And Acceptance "e sting  (d) #!$ Acti% ity &etwo' e't 'CE, 'HA(A)+ 

Upload: mukul-soni

Post on 05-Nov-2015

214 views

Category:

Documents


0 download

DESCRIPTION

softwqre engineering

TRANSCRIPT

6th year C.S.E.,2014Time :-2 Hours

F.M. :-15

*Answer any three Sub :- S.E.1.(a) Software Crisis and symptoms of the present software crisis. Suggest at least two possible solutions to the present software crisis.

(2.5 marks) (b).Define CPM.

(2.5 marks)2.(a)Explain Waterfall model with the condition when to use waterfall model (2.5 marks) (b) Define spiral Model and under which condition manager uses spiral model. (2.5 marks)3.(a) Consider a project with the following functional units:

Number of user inputs = 50

Number of user outputs = 40

Number of user enquiries = 35

Number of user files = 06

Number of external interfaces = 04

Assume all complexity adjustment factors and weighting factors are average. Compute the function points for the project. (2.5 marks) (b)What do you mean by LOC?write down the disadvantages of LOC.

(2.5 marks)4.Define COCOMO Model.

(5 Marks)5. Define any two :- (2.5*2=5 marks) (a) Cohesion (b) Coupling (c) Alpha , Beta And Acceptance Testing (d) WBS, Activity Network, PertBCE, BHAGALPUR

6th Sem, C.S.E.,2014Time :-2 Hours

F.M. :-15

*Answer any three Sub :- S.E.1.(a) Software Crisis and symptoms of the present software crisis. Suggest at least two possible solutions to the present software crisis.

(2.5 marks) (b). What do you understand by the term Software Development Life Cycle (SDLC)? Why is it important to adhere to a life cycle model while developing a large software product?

(2.5 marks)2.(a) What do you mean by prototype? Explain prototype SDLC with condition of use.

(2.5 marks) (b) Draw SDLC of waterfall model and V-model.

(2.5 marks)

3.(a) Identify salient features of an object-oriented design Approach and function-oriented design approach

(2.5 marks) (b)What do you mean by Function Point ?write down the disadvantages of LOC.

(2.5 marks)4.Define COCOMO Model.

(5 Marks)

5. Define any two :- (2.5*2=5 marks) (a) Cohesion (b) Coupling (c) Alpha , Beta And Acceptance Testing (d) CPM