CPENG 

INEOS

S5-TGT

INEOS Manufacturing France SAS - Lavéra

*****

Project Procedure

48-AU6430-00-EXE/3D.02b/0003

Page 2: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 2/20

Jacobs France 

Type de document : Project Procedure Page n° : 2/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

TABLE DES MATIERES

Pages

1.  PURPOSE ...................................................................................................................................... 3 

2.  ELECTRONIC 3D MODEL TRANSFER ....................................................................................... 3 

2.1. 

GENERAL ...................................................................................................................................... 3 

2.2. 

SDNF FILE ..................................................................................................................................... 3 

2.3.  MODEL CONTENTS ...................................................................................................................... 4 

2.3.1. 

Main Structural Steel ...................................................................................................................... 4 

2.3.2. 

Stairs .............................................................................................................................................. 4 2.3.3. Moment Connections ..................................................................................................................... 4 

2.3.4. Ladders .......................................................................................................................................... 5 

2.3.5. 

Handrail .......................................................................................................................................... 5 

2.3.6. Pipe supporting .............................................................................................................................. 5 

2.3.7. Fireproofing .................................................................................................................................... 5 

2.3.8. 

Information issued by Jacobs (see also Attachment III) ................................................................ 5 

2.3.9. Mapping Table ............................................................................................................................... 6 

3 GENERAL ARRANGEMENT DRAWINGS BY CONTRACTOR 7

Page 3: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 3/20

Jacobs France 

Type de document : Project Procedure Page n° : 3/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

1. PURPOSE

This document describes the procedure for electronic model transfer of 3D steel models between Jacobsand Contractor and the requirements pertaining to the necessary drawings to be created by Contractor.The intention of this specification is to achieve improved work quality through a more efficient workingmethodology.

2. ELECTRONIC 3D MODEL TRANSFER

2.1. GENERAL

Jacobs shall design all steel structures as three dimensional steel models. Each steel structure identifiedon the overall 3D isometric view will be - at least - one model.The three-dimensional steel models form a part of Jacobs’s electronic Plant Design Management System

(PDMS) which also includes designs of other disciplines such as piping equipment civil electrical and

Page 4: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 4/20

Jacobs France 

Type de document : Project Procedure Page n° : 4/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

Contractor shall ensure that the steel models generated are fully compliant with Jacobs’s steel models byimplementing a fit for purpose Quality Control system.

 All connections shall be detailed and calculated by Contractor.

The electronic model information flow is as follows, the original 3D model will be transferred from Jacobsto Contractor, Contractor shall transfer the converted and edited model ‘for Approval’ to Jacobs. Nochanges to steel models other than for producing fabrication details are permitted without prior writtenapproval of Jacobs. Working point location, orientation and section sizes of steel members includinghorizontal and vertical bracings must be maintained.

Electronic mail (or CD-ROMs) will be used for file transfer. After written approval from Jacobs on Contractors deliverables, Contractor can start the fabrication of thesteel structure.

2.3. MODEL CONTENTS

Jacobs’s steel model may detail columns, beams and braces, moment connections, base-plates, stairand ladder locations as well as fireproofing. Furthermore, Jacobs will issue drawings with additionaldetailed information, if required. All models are defined in millimeters, and are located at client’s plantcoordinates. Each model has a unique location.Contractor shall not combine Jacobs’ models to one or more detailed models without prior writtenapproval of Jacobs.

Page 5: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 5/20

Jacobs France 

Type de document : Project Procedure Page n° : 5/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

2.3.4. LaddersLadders are also modeled for information only. The location of centerline of rungs is correct, but rungwidth; center-to-center distance; ladder stringers and cages shall be detailed by Contractor in accordancewith the applicable specifications and standards.For ladders located on sloped surfaces Jacobs shall issue additional information for a correct detailing ofthe ladder base plates

2.3.5. HandrailWithin PDMS handrail is modeled as reference only.Contractor will design the handrail according the applicable specifications and standards. Finalinformation for required cut-outs in the handrail will be given to Contractor by means of marked up 3-disometric view on which the handrail of Contractors model and the required action is clearly indicated.This information will be issued together with the AFC-approval on Contractors model.

2.3.6. Pipe supportingThe OSDE-interface gives the possibility to release several models belonging to the same structure.Structural steel for pipe supports for example will be released to the Contractor separately from the mainstructure, but in the same period. It’s Contractor’s responsibility to line-up both models to transfer therequired connection details.For checking purpose it’s essential that Contractor return detailed models in the same configuration asreceived.

Page 6: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 6/20

Jacobs France 

Type de document : Project Procedure Page n° : 6/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

8. Handrail (3d-isometric view indicating required cut outs in handrail).9. Equipment supporting details.10. Location and member sizes of existing steel.11. Location and sizing of adjacent concrete structures.12. Location and details of insert plates in concrete structures.13. Special details

Note:Holes for e.g. holding down bolts for equipment will be modeled within PDMS by making use of a dummy,which represent the diameter and the location of the bolt.These dummies are indicating in Purchaser’s naming convention by using the abbreviation ‘AB’ It’s Contractor’s responsibility to define holes sizes and location in his detailed model.

2.3.9. Mapping TableIn the export-file you receive from Jacobs the following “profile” naming can occur: 

LaddersFrontstep (Through Step) Ladder - LADDER_TSLadder with Left out Step - LADDER_LSLadder with Right out Step - LADDER_RS

Cages (related to the ladders):Width 500 mm CAGEF500

Page 7: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 7/20

Jacobs France 

Type de document : Project Procedure Page n° : 7/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

Earthing bosses:Diameter 40 - Earthing-Boss-Dia-40Diameter 45 - Earthing-Boss-Dia-45Diameter 50 - Earthing-Boss-Dia-50

By mapping the above mentioned profiles with for you good recognizable names/ reference profile, youare enabled to import our lay-out information into your 3-d detailing package and to detail those itemsconform the applicable project standards.

3. GENERAL ARRANGEMENT DRAWINGS BY CONTRACTOR

See also attachment II.

3.1. GENERAL

For a selected number of steel items, mainly equipment supporting structures, pipe racks and buildings, itis the purpose for Contractor to create General Arrangement drawings for Authority Approval asdeliverables, using STRUCAD, TEKLA STRUCTURES or BOCAD as a modeling tool and AUTOCAD asdrafting tool.

The General Arrangement drawings for Authority Approval shall represent the plans and elevations of the

Page 8: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 8/20

Jacobs France 

Type de document : Project Procedure Page n° : 8/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

- Showing extent of fireproofing graphically (preferably 3D pictures of fireproofed members only)and by marking members with FP-3 for three sided fireproofing or FP-4 for four sided fireproofing.- Showing typical details, such as sliding points.- For welded structures type and size of welds to be indicated on separate drawing(s). Thesedrawings shall be submitted ‘for Approval’. - Outlines of concrete frames and concrete structures.- Cross references to other drawings (e.g. base plate details, equipment connections).- Client’s or Jacobs’s drawing border, including a correct filled in title block, Contractor’sidentifications- General notes (e.g. instructions and / or restrictions for erection).- Material qualities and surface treatment.

For graphical explanation of General Arrangement drawing layout see Attachment II.

3.3. DOCUMENT REVIEW

Jacobs’s shall issue the SDNF file and drawings, sketches with ‘Released For Design’ status. 

Jacobs’s intention is to issue complete design information, however, Contractor shall accept changesand/or additions to these documents required for, design developments during the course of the work.

 Above indicated changes and/or additions may involve the following items:

Additi d / l ti f fl b

Page 9: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 9/20

Jacobs France 

Type de document : Project Procedure Page n° : 9/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

4. GENERAL ARRANGEMENT DRAWING LAYOUT

 Attachment II gives a graphical explanation of the general arrangement drawing lay-out, which ispresented in example drawings “A”, “B” and “C”. On these drawings annotation numbers are shown,which are defined underneath.

 Annotation numbers definition:

1. A complete 3D picture of the entire structure, including grid labels, grid distances and mainelevations.2. A 3D picture of fireproofed members (if applicable), including grid labels, grid distances and mainelevations.3. North arrow.4. Correct filled in title block (dictated by Jacobs) and Contractor’s identification5. General notes for the “A” drawing including reference drawings, key plan and account code,dictated by Jacobs.

6. Material qualities and surface treatment.7. Base plate plan with grid labels and north & east coordinates as references.8. All structural plans shall be shown.9. Cross-references to other drawings, in principle dictated by Jacobs.10. All member sizes shall be shown.11. All members shall be dimensioned from reference point (grids) in millimeters.12. Elevation deviations of members in comparison with plan title elevation (in millimeters).13. Fireproofed members shall be shown.14. Special notes, in principle dictated by Jacobs.

15 Main eq ipment centerlines and dimensions dictated b Jacobs

Page 10: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 10/20

Jacobs France 

Type de document : Project Procedure Page n° : 10/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC  – GSI

5. ATTACHMENT 1 – FIREPROOFING NAME CONVENTION

Page 11: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 11/20

Jacobs France 

Type de document : Project Procedure Page n° : 11/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC  – GSI

6. ATTACHMENT 2 – EXAMPLE DRAWINGS

Page 12: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 12/20

Jacobs France 

Type de document : Project Procedure Page n° : 12/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC  – GSI

Base plateslocation and

details ARE NOT

APPLICABLE onthis project

Page 13: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 13/20

Jacobs France 

Type de document : Project Procedure Page n° : 13/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC  – GSI

Page 14: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 14/20

Jacobs France 

Type de document : Project Procedure Page n° : 14/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

7. ATTACHMENT 3 – DELIVERABLES BY PARTIES USING THE INTERFACE

Jacobs remarks Vendor remarks

PDMS-model * to be issued SDNF file

Overall 3d- isometric view * including general notes

3d -isometric views * to be issued for info onlyNote: detailed calculation of connections in scope ofstructural steel contractor, including all welds (i.e. column/ base plate)

 Applicable standards *Steel detailing standards (stairs, ladders,

earthing lugs etc.) to be issued as hardcopy

Steel calculation *to be issued as hardcopy(STAAD Pro V8 – main structure only)

It is the scope of the structural steel contractor todevelop further the model in order to include thesecondary steel members.

“For Purchase Order” -drawings *

Blanc drawing sheet (electronic)with clients logo

* Sheet will be issued in .dxf-format *Contractor to use this format for the General

 Arrangement drawings

General Arrangement drawingsfor authority approval

*General Arrangement drawings for Authority Approval tobe issued to Jacobs within 5 working days after receivingof the model. Hardcopies and .dxf format to be issued

Steel detailing model *

to be issued 'for approval' by means of interface

NOTE: original PDMS – reference numbers of membersto be maintained in the detailed model!!!NOTE: in case the original PDMS-member has to besplit into 2 or more parts. 1 member shall have theoriginal PDMS-reference number and all othermembers shall have typical member numbering.PDMS grating panels, issued as grating areareference to be returned by means of the 3D-detailedmodel 

Page 15: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 15/20

Jacobs France 

Type de document : Project Procedure Page n° : 15/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

Jacobs remarks Vendor remarks

calculation of connections *calculations of all connections related to the structuralintegrity and of all special connections (sliding

connections etc)

General Arrangement drawings(marking plans)

*

Updated General Arrangement drawings and 3d overallisometric view to be issued to Jacobs 'for approval' notlater than issuing the steel detailing model; Hardcopiesand .dxf format to be issued

2d grating penetration drawings(per elevation)

*

to be issued in .dxf-format indicating flooringplan and table with applicable penetrationinfo.( table with dia, insulation, clearance,north-, east coordinate )

grating layout drawings * hardcopy to be issued 'for approval'

3d handrailing penetration views(per elevation)

to be issued in .dxf-format indicatingobstructions for handrailing lay-out.( table withdia, insulation, clearance, north-, eastcoordinate ). If complexity of handrailingpenetrations are asking for this approach.Otherwise additional info will be issued afterreceiving of the ‘for approval’ model. 

Note: steel contractor to model handrailing lay-outconform Applicable standards

handrailing layout * to be issued 'for approval' as part of the model

baseplate drawings * Standard drawings *

During clarification stage, JACOBS applicable standarddrawings shall be analyzed and discussed. Steelcontractor shall determine a limited number of columnbase plates to be designed based on the reactionenvelope and to apply in fabrication.

hardcopy to be issued 'for approval'

holding down bolts (forequipment, additionalconnections)

* issuing by means of 'dummies' in the model

fire-proofing *Identification of members to be fireproofedtransferred in model. typicals as indicated instandards (hardcopies)

Page 16: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 16/20

Jacobs France 

Type de document : Project Procedure Page n° : 16/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

Jacobs remarks Vendor remarks

stairs / ladders *working points handed over by using interface/ for sloped areas additional info to be issued /

typicals as indicated in standards (hardcopies)

*to be issued 'for approval' as part of the model / anchors

in scope of steel contractor (drilled anchors)

MTO * for internal use * to be issued to Jacobs, together

3D detailed model *Complete model including all drawings to be transferredby means of CD-rom at end of project

General Arrangement drawings * All GA. drawings (as built) in . dxf or .dwg format (withoutpos.nr.) to be transferred by means of (separate) CD-rom at end of project

Page 17: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 17/20

Jacobs France 

Type de document : Project Procedure Page n° : 17/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

8. ATTACHMENT 4 - INFORMATION FLOW-SCHEME

Information Flow-scheme

action

issue

in progress

Jacobs Contractor

Phase 0

initiate mapping table initiate mapping table

send test model

est model received / checked

adapt test model

return adapted model

adapted model received / checked

Phase 1

PDMS model in progress

ransfer supports to structural database

interdisciplinary check drawings (ADP)  (internal issue)

Page 18: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 18/20

Jacobs France 

Type de document : Project Procedure Page n° : 18/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

check connectivity

clash check

material take off (internal issue)

3D - overall isometric view (incl. general notes) only with first model

applicable standards only with first model

structural model per structure or part of structure

3D - isometric view structural model

structural calculation

send notice indicating deliverables and names

Phase 2

model received / receival confirmed to Jacobs by mail

detailed model in progress

penetrations (grating, walls) in progress

detailed calculation in progress

handrail penetrations in progress

additional supports in progress

grade elevations for stairs, ladders detailed model ' for approval '

Page 19: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 19/20

Jacobs France 

Type de document : Project Procedure Page n° : 19/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

material take-off per model

detailed calculation ' for approval '

baseplate drawing ' for approval '

general arrangements drawings

Phase 3

detailed model received / receive confirmed to Contractor by mail

inform engineer

  w   i   t   h   i  n

   1   0  w  o  r   k   i  n  g   d  a  y  s

 

clash check detailed model

compare detailed model / PDMS model

merge both models / data detailed model

change info (clashes, orientations etc.)

penetration (grating, walls, handrail) information

additional model info

 AFC conformation on detailed model

Phase 4

additional info incorporated

Page 20: SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

7/24/2019 SDNF TEKLA - PDMS IMPORT 003D02B0003.pdf

http://slidepdf.com/reader/full/sdnf-tekla-pdms-import-003d02b0003pdf 20/20

Jacobs France 

Type de document : Project Procedure Page n° : 20/20

Nom du projet : S5-TGT  Date : 19/01/2010N° du document : 48-AU6430-00-EXE/3D.02b/0003 Rév. .: 1

SDNF TEKLA - PDMS IMPORT 003D02B0003.DOC – GSI

detailed model released for production

production model issued to Jacobs

End of

project complete models / all drawings incl. MTO's / on CD-rom

all G.A-drawings (as built) / on CD-rom

final MTO's of all models

END OF THIS PROCEDURE*********************