Document Format Revision (10/26/12) SCOPE OF WORK Boundary Survey for Land Acquisition Various Parcels Winslow Township, Camden County, N.J. PROJECT NO. P1096-00 STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor DEPARTMENT OF THE TREASURY Andrew P. Sidamon-Eristoff, Treasurer DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION Steven Sutkin, Director Date: March 8, 2013

Upload: duonghanh

Post on 27-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Document Format Revision (10/26/12)

SCOPE OF WORK

Boundary Survey for Land Acquisition

Various Parcels Winslow Township, Camden County, N.J.

PROJECT NO. P1096-00

STATE OF NEW JERSEY

Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt. Governor

DEPARTMENT OF THE TREASURY

Andrew P. Sidamon-Eristoff, Treasurer

DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION

Steven Sutkin, Director

Date: March 8, 2013

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 2

TABLE OF CONTENTS SECTION PAGE

I. OBJECTIVE .......................................................................................... 4

II. CONSULTANT QUALIFICATIONS ................................................ 4

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS .......................................... 4

III. PROJECT BUDGET ............................................................................ 4

A. CURRENT WORKING ESTIMATE (CWE) ................................................................................ 4 B. CONSULTANT’S FEES ................................................................................................................ 4

IV. PROJECT SCHEDULE ....................................................................... 5

A. SCOPE OF WORK SCHEDULE ................................................................................................... 5 B. CONSULTANT’S PROPOSED SCHEDULE ............................................................................... 5

V. PROJECT SITE LOCATION & TEAM MEMBERS ...................... 6

A. PROJECT SITE ADDRESS ........................................................................................................... 6 B. PROJECT TEAM MEMBER DIRECTORY ................................................................................. 6

1. Department of Environmental Protection Project Manager: ...................................................... 6

VI. PROJECT DEFINITION ..................................................................... 7

A. BACKGROUND ............................................................................................................................ 7

VII. CONSULTANT RESPONSIBILITIES .............................................. 7

A. SURVEY REQUIREMENTS ......................................................................................................... 7 B. PROJECT COMMENCEMENT .................................................................................................... 8

1. Project Directory: ........................................................................................................................ 8 2. Site Access: ................................................................................................................................. 8 3. Scope of Work: ........................................................................................................................... 8 4. Project Schedule: ........................................................................................................................ 9

C. MEETINGS & PRESENTATIONS ............................................................................................... 9

VIII. GENERAL REQUIREMENTS ......................................................... 10

A. SCOPE CHANGES ...................................................................................................................... 10

IX. SUBMITTAL REQUIREMENTS ..................................................... 10

A. CONTRACT DELIVERABLES .................................................................................................. 10

X. SOW SIGNATURE APPROVAL SHEET ....................................... 11

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 3

XI. EXHIBITS ............................................................................................ 12

A. SAMPLE PROJECT SCHEDULE FORMAT B. TAX MAPS

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 4

I. OBJECTIVE

The objective of this project is to complete a boundary survey of 15 parcels with a total area of approximately 459 acres of land located in Winslow Township, Camden County, New Jersey using NJ Green Acres Program survey standards.

II. CONSULTANT QUALIFICATIONS

A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS

The Consultant shall be a firm pre-qualified with the Division of Property Management & Construction (DPMC) in the P015 Land Surveying Professional Discipline and have in-house capabilities or Sub-Consultants pre-qualified with DPMC in all other disciplines necessary to complete the project as described in this Scope of Work (SOW).

III. PROJECT BUDGET

A. CURRENT WORKING ESTIMATE (CWE) The Current Working Estimate (CWE) for this study is $75,600. The CWE includes all consulting and administrative fees. The CWE is the Client Agency’s financial budget based on this Scope of Work.

B. CONSULTANT’S FEES The Consultant’s fees shall be based on the information contained in this Scope of Work document and additional information received during the pre-proposal meeting.

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 5

IV. PROJECT SCHEDULE

A. SCOPE OF WORK SCHEDULE The survey must be complete and delivered within 60 days of the authorization to proceed.

B. CONSULTANT’S PROPOSED SCHEDULE The Consultant shall submit a project schedule with their technical proposal similar in format and detail to the schedule depicted in Exhibit ‘A’. The bar chart schedule developed by the Consultant shall reflect their recommended project activities, activity durations and activity relationships. A written narrative shall also be included with the technical proposal explaining the schedule submitted and how it can be completed in the time frame allowed. This schedule and narrative will be reviewed by the Consultant Selection Committee as part of the evaluation process and will be assigned a score commensurate with clarity and comprehensiveness of the submission.

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 6

V. PROJECT SITE LOCATION & TEAM MEMBERS

A. PROJECT SITE ADDRESS The location of the project is the following blocks and lots in Winslow Township.

Block 1801, Lots 1 and 4 Block 9103, Lots 1 and 3 Block 5302, Lot 1 Block 9104, Lot 1 Block 7004, Lot 1 Block 9105, Lot 1 Block 7502, Lots 1 and 2 Block 9106, Lot 1 Block 8601, Lot 3 Block 9107, Lot 1 Blo ck 9002, Lot 1.01 Block 9108, Lot 1

See Exhibit ‘B’ for the project location tax maps with parcels highlighted.

B. PROJECT TEAM MEMBER DIRECTORY The following are the names, addresses, and phone numbers of the Project Team members. 1. Department of Environmental Protection Project Manager: Name: Edward Mulvan, Project Manager Address: DEP, NHRG – Office of Resource Development 501 East State Street, 4th Floor Trenton, NJ 08625 Phone No: (609) 984-3819 E-Mail No: [email protected]

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 7

VI. PROJECT DEFINITION

A. BACKGROUND The State of New Jersey, through funding provided by the Green Acres Program, closed title to the 15 parcels identified in this Scope of Work on February 28, 2013. Two parcels, Lots 1 and 4 in Block 1801, will become part of the Long-A-Coming Preserve and will be managed by the Office of Natural Lands Management. The remaining parcels will become part of the Winslow Wildlife Management Area and will be managed by the Division of Fish and Wildlife under the Department of Environmental Protection.

VII.CONSULTANT RESPONSIBILITIES

A. SURVEY REQUIREMENTS The properties to be surveyed are located in 5 areas of Winslow Township and can be grouped into three areas so that three survey plans will show all 15 parcels. The parcels are identified by the following tax Block and Lot numbers: Block 1801, Lots 1 and 4; Block 5302, Lot 1; Block 7004, Lot 1; Block 7502, Lots 1 and 2; Block 8601, Lot 3; Block 9002, Lot 1.01, Block 9103, Lots 1 and 3; Block 9104, Lot 1, Block 9105, Lot 1; Block 9106, Lot 1; Block 9107, Lot 1 and Block 9108, Lot 1. Surveys must be prepared using the specifications and format identified in the STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION; GREEN ACRES PROGRAM; SCOPE OF SURVEY SERVICES AND STANDARD DETAIL REQUIREMENTS- July 1, 2011, a copy of which is found at: http://www.state.nj.us/dep/greenacres/survey/pdf/2011_survey_scope.pdf

Guidance in using the Green Acres Scope of Survey Services can be found at the following link:

http://www.state.nj.us/dep/greenacres/survey/index.html

Describe the Lots in a group, indicating the individual area per each individual lot on the plan and in the description. Supply and set corner markers and line markers per Green Acres contract guidelines. You may omit sending notifications to the adjoiners unless you need to have access through private lands in which case you must notify the adjoiner. Be mindful that lands owned

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 8

by Natural Lands Trust are not the same as NJDEP and therefore corner markers and line markers MAY NOT BE OMITTED BETWEEN LOTS IN THESE OWNERSHIPS.

In addition to performing all tasks outlined in the scope to provide surveying services, plans descriptions, mylars, hard and digital copies, the following two items must also be added:

1. To facilitate the recovery of State Land Corners using GPS technology, provide a “Table of Ground Coordinates for Corner Markers” on the plan indicating the number of each corner or corner offset marker (being the owner ID#; with the POB being corner one and numbered clockwise there from), the type of mark (conc. mon., point or capped pin), the NJSPCS Northing and Easting values of the GROUND COORDINATE, the NJSPCS Northing and Easting values of the GRID COORDINATE (only in those regions of NJ where there is significant variations in the values due to higher elevations) and the GEOGRAPHIC COORDINATE (in dd mm ss.s format).

2. The description point of beginning will be labeled with the NJSPCS Grid Coordinate value on the plan and in the deed description. The description shall not provide the NJSPCS coordinate values of corners other than the POB.

Also provide full sized plans in PDF format on CD. A current title report will be provided to the successful bidder but you are responsible to obtain all adjoining deeds and reference surveys, and surveys must be complete and delivered within 60 days of the authorization to proceed. NO extensions will be granted for any reason and in no case will there be any justification for additional costs above the bid amount.

There will be no payments made above the original bid amount to complete this survey.

B. PROJECT COMMENCEMENT 1. Project Directory: Develop a project directory that identifies the name and phone number of key designated representatives who may be contacted during the survey phases of this project. 2. Site Access: Develop plans to access the project sites and provide the names and phone numbers of approved escorts if applicable. 3. Scope of Work: Review the administration responsibilities and the submission requirements identified in this Scope of Work with the Project Team members. Items such as: contract deliverables, special

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 9

sequencing requirements, special hours for site visits, safety and security needs and weather restrictions shall be addressed. 4. Project Schedule: Review and update the project schedule as necessary with the Project Team members.

C. MEETINGS & PRESENTATIONS Conduct the appropriate number of review meetings with the Project Team members, if necessary, during the project so they may determine if the project meets their requirements, question any aspect of the contract deliverables, and make changes where appropriate. The Consultant shall describe the philosophy and process used in the development of the survey criteria and the various alternatives considered to meet the project objectives. Selected surveys, cost estimates, schedules, and other relevant information shall be presented to support the solutions proposed. Special considerations shall also be addressed such as: Contractor site access limitations, survey schedule requirements, safety and security restrictions, etc. It shall also be the responsibility of the Consultant to arrange and require all critical Sub-Consultants to be in attendance at the study review meetings, as applicable. Record the minutes of each meeting and distribute within seven (7) calendar days to all attendees and those persons specified to be on the distribution list by the Project Manager.

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 10

VIII.GENERAL REQUIREMENTS

A. SCOPE CHANGES The Consultant must request any changes to this Scope of Work in writing. An approved DPMC 9d Consultant Amendment Request form reflecting authorized scope changes must be received by the Consultant prior to undertaking any additional work. The DPMC 9d form must be approved and signed by the Director of DPMC and written authorization issued from the Project Manager prior to any work being performed by the Consultant. Any work performed without the executed DPMC 9d form is done at the Consultant’s own financial risk.

IX. SUBMITTAL REQUIREMENTS

A. CONTRACT DELIVERABLES Contract Deliverables are identified in STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION; GREEN ACRES PROGRAM; SCOPE OF SURVEY SERVICES AND STANDARD DETAIL REQUIREMENTS- July 1, 2011.

A copy can be found at: http://www.state.nj.us/dep/greenacres/survey/pdf/2011_survey_scope.pdf

PROJECT NAME: Boundary Survey for Land Acquisition PROJECT LOCATION: Winslow Township, Camden County PROJECT NO: P1096-00 DATE: March 8, 2013

PAGE 12

XI. EXHIBITS The attached exhibits in this section will include a sample project schedule, and any supporting documentation to assist the Consultant in the design of the project such as maps, drawings, photographs, floor plans, studies, reports, etc.

END OF SCOPE OF WORK

February 7, 1997Rev.: January 29, 2002

Responsible Group Code Table

The codes below are used in the schedule field “GRP” that identifies the group responsible for theactivity. The table consists of groups in the Division of Property Management & Construction(DPMC), as well as groups outside of the DPMC that have responsibility for specific activities ona project that could delay the project if not completed in the time specified. For reportingpurposes, the groups within the DPMC have been defined to the supervisory level ofmanagement (Le., third level of management, the level below the Associate Director) to identifythe “functional group” responsible for the activity.

CODE DESCRIPTION REPORTS TO ASSOCIATE DIRECTOR OF:

CM Contract Management Group Contract Management

CA Client Agency N/A

CSP Consultant Selection and Technical ServicesPrequalification Group

NE Architect/Engineer N/A

PR Plan Review Group Technical Services

CP Construction Procurement Planning & Administration

CON Construction Contractor N/A

FM Financial Management Group Planning & Administration

OEU Office of Energy and N/AUtility Management

PD Project Development Group Planning & Administration

EXHIBIT ‘A’

Act

ivity

Ix

tesc

ar.p

ti.n

ii,,

ni

,,,,u.in,,,,,

i,a

it,i

pi.

agn.

;..

itu.n

.ii

i.

iiii

,i

in

.m

iii.

...

.ii

.Iquin

tn

inim

iI

Hti

ii.,.u

i.p..

.ini

,nni,

nrn

ii,.

in.n

iii

h Des

CV

3)l

Sche

dule

/Con

duct

Predesign/P

roject

Kic

kO

ffM

tgC

M

CV

3020

Prep

are

Pro

gram

Phas

eSu

bmitt

alA

E

CV

3021

Dis

trib

ute

Prog

ram

Subm

ittal

fo

rR

evie

wC

M

CV

3OZI

Prep

are

&Su

bmit

Prbj

ect

Cos

t An

aly

sis

(DPM

C38

)C

M

CV

3022

Rev

iew

&A

pp

ro

ve

Pro

gram

Subm

ittal

CA

CV

3023

Rev

iew

&A

pp

ro

ve

Pro

gram

Subm

ittal

PR

CVSO

24R

evie

w&

Approve

Pro

gram

Subm

ittal

CM

CV

3025

Con

solid

ate

&R

etur

nPr

ogra

mSu

bmitt

alC

omm

ents

CM

CV

3030

Prep

are

Sche

mat

icPh

ase

Subm

ittal

AE

CV

3031

Dis

trib

ute

Sche

mat

icSu

bmitt

alfo

rR

evie

wC

M

CV

3037

Prep

are

&Su

bmit

Proj

ect

Cos

tAna

lysi

s(D

PMC

38)

CM

CVSO

3ZR

evie

w&

App

rove

Sche

mat

icSu

bmitt

alC

A

CV

3033

Rev

iew

&A

ppro

veSc

hem

atic

Subm

ittal

PR

Rev

iew

&A

ppro

veSc

hem

atic

Subm

ittal

CM

CV

3035

Con

solid

ate

&R

etur

nSc

hem

atic

Subm

ittal

Com

men

tC

M

CV

3040

Pre

pare

Des

ignD

evel

opm

entP

hase

Sub

mit

tal

AE

CV3O

S1D

istr

ibut

eD

DSu

bmitt

alfo

rR

evie

wC

M

C’O

47Pr

epar

e&

Subm

itPr

ojec

tCos

t Ana

lysi

s(D

PMC

38)

CM

CV

3042

Rev

iew

&A

ppro

veD

esig

nD

evel

opm

ent S

ubm

ittal

CA

CV

3043

Rev

iew

&A

ppro

veD

esig

nD

evel

opm

ent S

ubm

ittal

PRC

’130

44R

evie

w&

App

rove

Des

ign

Dev

elop

men

tSu

bmitt

alC

MCV

SO45

Con

solj

date

&R

etum

DD

.Sub

mit

talC

omm

ents

CM

Prep

are

Fina

lD

esig

nPh

ase

Subm

ittal

AE

CV3O

SID

istr

ibut

eFi

nal

Des

ign

Subm

ittal

for

Rev

iew

CM

CV

3052

Rev

iew

&A

ppro

veFi

nal

Des

ign

Subm

ittal

CA

CV

3053

Rev

iew

&A

ppro

veFi

nal

Des

ign

Subm

ittal

PRC

V30

54R

evie

wFi

nal

Des

ign

Subm

itifo

rC

onst

ruct

abili

tyO

CS

:N

OT

E:

DB

cA.T

FS

TS

heti

of3

Ref

erto

sect

ion

“IV

Pro

ject

Sch

edul

e”of

the

Bur

eau

ofD

esig

n&

Con

stru

ctio

nS

ervi

ces

Sco

peof

Work

for

contr

act

phas

edu

rati

ons.

Rou

tine

Pro

ject

IX

h1b

it‘

iS0

Prl

mav

era

Sys

tem

s,In

c.

Act

ivit

y.

II)

L)e

seri

pti

on

‘R

evie

w&

App

rove

Fina

lD

esig

nSu

bmitt

alC

M

‘30

Con

solid

ate

&R

etur

nFi

nalD

esig

nC

omm

ents

CM

Prep

are

&Su

bmit

Perm

itA

pplic

atio

nD

ocum

ents

AE

CV

3068

Prep

are

&Su

bmit

Bid

ding

Cos

tAna

lysi

s(D

PMC

38)

CM

Pla

nR

evie

w-P

ernz

ztA

cgw

stho

nC

V40

0iR

evie

wC

onst

rD

ocum

ents

&Se

cure

UC

CPe

rmit

PR

CV4O

1OPr

ovid

eFu

ndin

gfo

rC

onst

ruct

ion

Con

trac

tsC

A

CV

4020

Secu

reB

idC

lear

ance

CM

Adv

ertis

e-B

id-A

war

dC

V50

0IA

dver

tise

Proj

ect&

Bid

Con

stru

ctio

nC

ontr

acts

CP

CV5O

IOO

pen

Con

stru

ctio

nB

ids

CP

CVSO

II

Eva

luat

eB

ids

&Pr

epR

ecom

men

datio

nfo

rA

war

dC

M

CV

5Oi2

Eva

luat

eB

ids

&Pr

epR

ecom

men

datio

nfo

rA

war

dA

E

CV

5Oi4

Com

plet

eR

ecom

men

datio

nfo

rAw

ard

CP

CV

5020

Aw

ardC

onst

ruct

ionC

ontr

acts

/lss

ueN

TP

CP

:

Con

sfru

ctio

nC

’P

roje

ctC

onst

ruct

ion

Slar

tfls

sue

NT

PC

M

CV

6mi

Con

trac

tSta

rtlC

ontr

actW

ork

(25%

)C

ompl

ete

CO

N

CV

tOO

2Pr

econ

stru

cuon

Mee

ting

CM

CV

t()03

Beg

inPr

econ

stru

ctio

nSu

bmitt

als

CO

N

CVI5

004

Lon

gest

Lea

dPr

ocur

emen

tIte

mO

rder

edC

ON

CVtO

OS

Lea

dT

ime

for

Lon

gest

Lea

dPr

ocur

emen

tIt

emC

ON

Prep

are

&Su

bmit

Shop

Dra

win

gsC

ON

CV

6007

Com

plet

eC

onst

ruct

ion

Subm

ittal

sC

ON

CVSO

I IR

ough

ing

Wor

kSt

art

CO

N

CV

eoia

Perf

orm

Rou

ghin

gW

ork

CO

N

CVSO

IOC

ontr

actW

ork

(50%

+)C

ompl

ete

CO

N

CV

tOt3

Lon

gest

Lea

dPr

ocur

emen

tIte

mD

eliv

ered

CO

N

“°

Con

trac

tW

ork

(75%

)C

ompl

ete

CO

N

NO

TE

:D

BC

AT

ES

TSl

ieet

2or3

Ref

erto

sect

ion

“IV

Pro

ject

Sche

dule

”of

the

Bur

eau

ofD

esig

n&

Con

stru

ctio

nSe

rvic

esSc

ope

ofW

ork

for

cont

ract

phas

edu

rati

ons.

Rou

tine

Pro

ject

1xli

i I)i

t@

Pil

mav

era

Syst

ems,

Inc.

Act

ivity

11)

-

t)es

crip

tion

si)r

.C

VO

14R

ough

ing

Wor

kC

ompl

ete

CO

N

CV

6021

Inte

rior

Fini

shes

Star

tC

ON

CV

)22

Inst

all

Inte

rior

Fini

shes

CO

N

CV

O3O

Con

trac

tWor

kto

Subs

tant

ialC

ompl

etio

nC

ON

(DV

O3l

Subs

tant

ialC

ompl

etio

nD

ecla

red

CM

CVC’

075

Com

plet

eD

efer

red

Punc

hL

ist)

Seas

onal

Act

iviti

esC

OI4

CV

6079

Proj

ectC

onst

ruct

ion

Com

plet

eC

M:

CV60

84)

Clo

seO

utC

onst

ruct

ion

Con

trac

tsC

M

CV

6O&

Con

stru

ctio

nC

ontr

acts

Com

plet

eC

M

CV6O

SOC

lose

Out

A/E

Con

trac

tC

M

CV

6092

Proj

ectC

ompl

etio

nD

ecla

red

CM

NO

TE

:D

BC

AT

ES

TS

hee

t3o

f3

Ref

erto

sect

ion

“IV

Pro

ject

Sche

dule

”of

the

Bu

reau

of

Des

ign

&C

on

stru

ctio

nS

ervic

esSc

ope

ofW

ork

for

cont

ract

phas

edu

ratio

ns.

Routi

ne

Pro

ject

Ixli

i bit

©P

rim

aver

aS

yste

ms,

Inc.