SCHOOL RENEWAL PLAN COVER PAGE SCHOOL INFORMATION AND REQUIRED SIGNATURES
Hilton Head Island Elementary School for the Creative Arts
and
Satellite School Daufuskie Island Elementary
BEAUFORT COUNTY SCHOOL DISTRICT
SCHOOL RENEWAL PLAN FOR YEARS 2014-2019 (five years)
SCHOOL RENEWAL ANNUAL UPDATE FOR (one year)
Assurances
The school renewal plan, or annual update of the school renewal plan, includes elements required
by the Early Childhood Development and Academic Assistance Act of 1993 (Act 135) and the
Education Accountability Act of 1998 (EAA) (S.C. Code Ann. §§ 59-18-1300 and 59-139-10 et
seq. (Supp. 2004)). The signatures of the chairperson of the board of trustees, the superintendent,
the principal, and the chairperson of the school improvement council are affirmation of active
participation of key stakeholders and alignment with Act 135 and EAA requirements.
CHAIRPERSON, BOARD OF TRUSTEES
William Evans
PRINTED NAME SIGNATURE DATE
SUPERINTENDENT
Dr. Jeffrey Moss
PRINTED NAME SIGNATURE DATE
CHAIRPERSON, SCHOOL IMPROVEMENT COUNCIL
Debbie Meyers, School for the Creative Arts
Laura Leigh Miles, Satellite – Daufuskie
Kristina Roberts, Satellite – Daufuskie
PRINTED NAME SIGNATURE DATE
PRINCIPAL
Gretchen Keefner
PRINTED NAME SIGNATURE DATE
SCHOOL Hilton Head Island Elementary School for the Creative Arts
ADDRESS: 10 Bus Drive
Hilton Head Island, SC 29926
SCHOOL’S TELEPHONE: 843-342-4380
PRINCIPAL’S E-MAIL ADDRESS: [email protected]
2
STAKEHOLDER INVOLVEMENT FOR SCHOOL PLAN
(Mandated Component)
List the name of persons who were involved in the development of the school renewal plan. A
participant for each numbered category is required.
POSITION NAME
1. PRINCIPAL Gretchen Keefner
2. TEACHER Sandra Courtney
3. PARENT/GUARDIAN Melissa Babcock
4. COMMUNITY MEMBER Laura McCandless
5. SCHOOL IMPROVEMENT COUNCIL Cheryl Campbell, Jane
Castellini, Stephanie Cauller, Harriett Greenberg, Karen Harrington, Liz Henry, Susan
Hughson, Caroline Johnson, Stephanie Tebrake, Kyle Wallace, Sandra Walsh
6. OTHERS* (May include school board members, administrators, School Improvement
Council members, students, PTO members, agency representatives, university partners,
etc.)
POSITION NAME
Office Manager/Classified Staff Kathy Eways
SCA PTO Co-President Chantal Horup
SCA PTO Co-President Wendy Sampson
Daufuskie PTO President Jody Smith
Daufuskie SIC Laura Leigh Miles and Kristina Roberts
Daufuskie Teacher Amy Dungan
Parent Jan Crosby
*REMINDER: If state or federal grant applications require representation by other
stakeholder groups, it is appropriate to include additional stakeholders to
meet those requirements and to ensure that the plans are aligned.
3
ASSURANCES FOR SCHOOL PLAN
(Mandated Component)
Act 135 Assurances
Assurances, checked by the principal, attest that the district complies with all applicable Act 135
requirements.
__X___ Academic Assistance, PreK–3
The school makes special efforts to assist children in PreK–3 who demonstrate a need
for extra or alternative instructional attention (e.g., after-school homework help centers,
individual tutoring, and group remediation).
__X___ Academic Assistance, Grades 4–12
The school makes special efforts to assist children in grades 4–12 who demonstrate a
need for extra or alternative instructional attention (e.g., after-school homework help
centers, individual tutoring, and group remediation).
__X___ Parent Involvement The school encourages and assists parents in becoming more involved in their
children’s education. Some examples of parent involvement initiatives include making
special efforts to meet with parents at times more convenient for them, providing
parents with their child’s individual test results and an interpretation of the results,
providing parents with information on the district’s curriculum and assessment
program, providing frequent, two-way communication between home and school,
providing parents an opportunity to participate on decision-making groups, designating
space in schools for parents to access educational resource materials, including parent
involvement expectations as part of the principal’s and superintendent’s
EVALUATION/EVIDENCEs, and providing parents with information pertaining to
expectations held for them by the school system, such as ensuring attendance and
punctuality of their children.
__X___ Staff Development The school provides staff development training for teachers and administrators in the
teaching techniques and strategies needed to implement the school/district plan for the
improvement of student academic performance. The staff development program reflects
requirements of Act 135, the EAA, and the National Staff Development Council’s
revised Standards for Staff Development.
__X___ Technology
The school integrates technology into professional development, curriculum
development, and classroom instruction to improve teaching and learning.
__X___ Innovation The school uses innovation funds for innovative activities to improve student learning
and accelerate the performance of all students. Provide a good example of the use of
innovation funds.
__X___ Recruitment
4
The district makes special and intensive efforts to recruit and give priority to serving
those parents or guardians of children, ages birth through five years, who are considered
at-risk of school failure. “At-risk children are defined as those whose school readiness
is jeopardized by any of, but no limited to, the following personal or family situation(s):
Educational level of parent below high school graduation, poverty, limited English
proficiency, significant developmental delays, instability or inadequate basic capacity
within the home and/or family, poor health (physical, mental, emotional) and/or child
abuse and neglect.
__X___ Collaboration The school (regardless of the grades served) collaborates with health and human
services agencies (e.g., county health departments, social services departments, mental
health departments, First Steps, and the family court system).
__X___ Developmental Screening The school ensures that the young child receives all services necessary for growth and
development. Instruments are used to assess physical, social, emotional, linguistic, and
cognitive developmental levels. This program normally is appropriate at primary and
elementary schools, although screening efforts could take place at any location.
__X___ Half-Day Child Development The school provides half-day child development programs for four-year-olds (some
districts fund full-day programs). The programs usually function at primary and
elementary schools, although they may be housed at locations with other grade levels or
completely separate from schools.
__X___ Developmentally Appropriate Curriculum for PreK–3 The school ensures that the scope and sequence of the curriculum for PreK–3 are
appropriate for the maturation levels of students. Instructional practices accommodate
individual differences in maturation level and take into account the student's social and
cultural context.
__X___ Parenting and Family Literacy The school provides a four component program that integrates all of the following
activities: interactive literacy activities between parents and their children (Interactive
Literacy Activities); training for parents regarding how to be the primary teachers for
their children and full partners in the education of their children (parenting skills for
adults, parent education); parent literacy training that leads to economic self-sufficiency
(adult education); and an age-appropriated education to prepare children for success in
school and life experiences (early childhood education). Family Literacy is not grade
specific, but generally is most appropriate for parents of children at the primary and
elementary school levels and below, and for secondary school students who are parents.
Family Literacy program goals are to strengthen parent involvement in the learning
process of preschool children ages birth through five years; promote school readiness of
preschool children; offer parents special opportunities to improve their literacy skills
and education, a chance to recover from dropping out of school; and identify potential
developmental delays in preschool children by offering developmental screening.
__X___ Coordination of Act 135 Initiatives with Other Federal, State, and District
Programs
5
The district ensures as much program effectiveness as possible by developing a district-
wide/school-wide coordinated effort among all programs and funding. Act 135
initiatives are coordinated with programs such as Head Start, First Steps, Title I, and
programs for students with disabilities.
6
TABLE OF CONTENTS
(Mandated Component)
Include a table of contents to ensure inclusion of all required elements.
Cover Page 1
Stakeholder Involvement 2
Table of Contents 3
Executive Summary 7
Beaufort County School District Mission, Vision 11
School for the Creative Arts Mission, Vision 11
Daufuskie Island Elementary Satellite School to Creative Arts Mission, Vision 12
Beaufort County and School for the Creative Arts Belief Statements 13
Daufuskie Island Elementary Satellite School to Creative Arts Belief Statements 14
Performance Goal 1: Purpose and Direction 15
Performance Goal 2: Resources and Support Services 23
Performance Goal 3: Teaching and Assessing for Student Learning 42
Performance Goal 4: Documenting and Using Results for Continuous Improvement 67
Performance Goal 5: Governance and Leadership 80
7
EXECUTIVE SUMMARY OF NEEDS ASSESSMENT FINDINGS
(Mandated Component)
Data referenced is from Hilton Head Island Elementary School for the Creative Arts and
Satellite Daufuskie Island Elementary School
Hilton Head Island and neighboring Daufuskie Island S.C., assumed by some to be affluent
resorts and retirement areas, are home to 1,650 public school students in grades one through five.
800 attend Hilton Head Island Elementary School for the Creative Arts. Because of their age
and the fact that Daufuskie is only accessible by a 40 minute ferry ride, eleven students in grades
prekindergarten to grade five attend Daufuskie Island Elementary School. Because of the small
number of students Daufuskie Island Elementary became a satellite school to Creative Arts
during the 2010-11 school year. Again, because of the small number of enrolled students,
enrollment, attendance and reporting of Daufuskie students is through the School for the Creative
Arts.
Elementary School – Gr. 1-5 Hilton Head Island Elementary School for Creative Arts (SCA)
and Satellite Daufuskie Island Elementary School
Enrollment (Spring, 2014) 811 students- 45% boys and 55% girls
15% African-American, 36% Hispanic, 45%White,
3% Two or more races and American Indian,1% Asian
State Poverty Index/ % Free
/Reduced Lunch (2013)
64.50% State Listed Poverty Index
54% Free/Reduced Lunch
% Minority Population 401 students/55%
2013 Report Card Rating
2012 Report Card Rating
Absolute Rating – Good, Growth Rating – Average
Absolute Rating – Good, Growth Rating – Average
PASS Writing and ELA &
Math 2012 and
2013
% Met or Exceeded 2012 2013
Writing ELA Writing ELA
G. 3 - Writing &ELA Not given 73% 69.9% 82.5%
G. 4 - Writing & ELA Not given 72.8% 77.0% 70.7%
G. 5 - Writing & ELA 76.2% 73.7% 74% 74.7%
G. 3 – Math 70.9% 71.9%
G. 4 – Math 74.2% 84.7%
G. 5 - Math 77.8% 77.9%
G. 3 – Science 63.0% 67.9%
G. 4 – Science 72.8% 75.3%
G. 5 - Science 74.4% 75.6%
G. 3 – Social Studies 74.7% 85.5%
G. 4 – Social Studies 76.2% 82.0%
G. 5 – Social Studies 72.0% 68.4%
Discipline Referrals
2013 State Report Card
1.4% Out of School Suspensions
Retention Rate- 2013 State
Report Card
.7%
8
Limited English Proficiency
2012-13 School Year
LEP Hispanic - 32%
County Data: Literacy Level
in Beaufort County-
1. High School diploma-
2. 4+ years of college
Beaufort County Literacy Level-11% of all Beaufort County adults
are illiterate (2011)
High School Diploma - 60% (2011)
2.4+ years of College - 37.81% (2011)
2013 State School Report
Card Survey
Evaluations by Teachers, Students and Parents
Teachers Students* Parents*
Number of surveys returned 61 139 79
Percent satisfied with
learning environment 95.1% 69.7% 92.4%
Percent satisfied with
social and physical environment 100% 58.7% 92.3%
Percent satisfied with school-
home relations 90.1% 74.8% 92.4%
2013 State School Report
Card Data (Students =810)
Attendance Rate 96.7%
2013 State School Report
Card Data (Students =810)-
Served by Gifted and
Talented Program
14.9% Students with Disabilities
2013 State School Report
Card Data (Students =810) –
Teachers with Advanced
Degrees
72.7%
2013 State School Report
Card Data (Students =810)-
Teachers returning from
previous year
90.0%
2013 State School Report
Card Data (Students =810)
Student Attendance Rate
96.7% down from 97.1% previous year
2013 State School Report
Card Data (Students =810)-
Teacher Attendance Rate
95.6% up from 93.8% from previous year
2013 State School Report
Card Data (Students =810)-
Principal’s Years at School
8
2013 State School Report
Card Data (Students =810)-
Opportunities in the Arts
Excellent
2013 State School Report
Card Data (Students =810)-
Character Development
Program
Excellent
2013 State School Report
Card Data (Students =810)-
SACS Accreditation
Yes - Same as last year
9
2013 State School Report
Card Data (Students =810)-
Dollars spent per pupil
$7,068 down 5.3% from previous year
2013 State School Report
Card Data (Students =810)-
Percent of expenditures for
instruction
81% up from 76.9% from previous years.
2013 State School Report
Card Data (Students =810)-
Percentage of expenditures
for teacher’s salaries
73% Down from 73.4% from previous year.
Wikipedia states, “Hilton Head Island or simply Hilton Head is a Low-country resort town located on an
island of the same name in Beaufort County, South Carolina, United States. It is 20 miles (32 km)
northeast of Savannah, Georgia, and 95 miles (153 km) southwest of Charleston. The island gets its name
from Captain William Hilton. In 1663, Hilton identified a headland near the entrance to Port Royal
Sound, which he named "Hilton's Head" after himself. The island features 12 miles (19 km) of beachfront
on the Atlantic Ocean and is a popular vacation destination. ... The year-round population was 37,099 at
the 2010 census, although during the peak of summer vacation season the population can swell to
275,000. Over the past decade, the island's population growth rate was 32%. Hilton Head Island is a
primary city within the Hilton Head Island-Bluffton-Beaufort Metropolitan Statistical Area”. (Wikipedia,
2014)
Wikipedia also states “Daufuskie Island is a residential “Sea Island” between Savannah Georgia and
Hilton Head Island, South Carolina. It is about 2.75 miles (4.43 km) offshore. The total island surface is
just 8 square miles (21 km2) within the maximum length of 5 miles (8.0 km) and maximum width of 2.5
miles (4.0 km). Daufuskie has a full-time population of around 250. There are two resorts, a private
residential community, and a large undeveloped tract of lands identified as residential property”.
(Wikipedia, 2014)
The data presents a clear, factual case that Hilton Head Island and Daufuskie Island are
dichotomous communities with one part having financial stability, traditional two-parent family
structures, access to enrichment opportunities and higher academic performing students. In
contrast, another segment of the population served by Creative Arts and Daufuskie has
predominantly single parent families or parents that have to hold multiple jobs, significant
language and communication problems, high illiteracy rates and poor academic success. Below
are selected findings from a needs assessment that support these conclusions:
20% of the children live in single-parent homes
5% of the children in single-parent homes have only the mother as the provider and
caretaker
64.50% State reported Poverty Index for 2013 for the student population, up from 51% in
2007
over 250 second-language learners from 16 Spanish-speaking countries
65% non and/or limited English-speaking parents, are unable to provide academic
support including homework help.
This year’s enrollment data indicates that where the majority, 54% (440 of the 811 students), are
from ethnic minorities. Hilton Head’s 42 square miles are home to the third largest population of
Hispanics in the state, up from tenth largest in 2008. The S.C. Department of Education lists the
10
2013 Poverty Index for Creative Arts as 64.5%, up from 58.63% in 2007. Within our school
community, 241 second- language learners from 16 Spanish speaking countries face many
challenges educationally and socially, including the fact that our 65% non and/or limited English
speaking parents are often working several jobs and unable to provide homework support.
Among these parents there is a 75% illiteracy rate in English and Spanish which makes it nearly
impossible for them to provide their children with any academic support. Another compelling
indicator of need is that 21% of these children live in single parent homes, and in 75% of those
homes the mother is the primary provider/care giver. Single-parent families experience
challenges not only in homework support, but in the need for after-school care.
PASS Trends - Analysis
Social Studies - Historically our strongest area when compared to local and state averages
at all grades. Met or exceeded local and state averages for past five years. We missed
exceeding the state average last year at grade 5.
Science 2013 Exceeded local and state averages in Grades 3, 4, 5.
Math 2013 exceeded local and state averages in math at all grades.
ELA 2013 exceeded district averages in all areas at grade 3 with 82.5% meeting or
exceeding expectations and only .4 of a point from exceeding the state average.
Historically, Creative Arts has not met or exceeded the local or state percentages.
Writing was tested for the past five years. HHSCA exceeded district percentage four of
the last five years missing if in 2011. At grades three and four positive growth is seen
from 2009 to 2013. AT grade three SCA is off the state average by .4 of a percentage
point. At grade four Creative Arts has made 12.7% points growth since 2009. On the
2013 grade four PASS writing test students at Creative Arts exceeded the state average
and missed the district average by .7 of a percentage point.
Performance by Group data indicates that achievement gap of 40 or more points exits
between white students and all minorities. It also exits for Limited English Proficient
students when compared to white students and between white students and disabled, and
students with free and reduced lunch status.
2013 State Report Card – PASS Data – Performance by Group B Group
Subgroups ELA Mean Math Mean Science Mean Soc. Stud. Mean ELA %Tested Math % TestedGrades All Students 664.2 668.7 629.9 650.4 99.2 99.4
Male 654.5 666.9 624.0 652.4 99.1 99.1
Female 673.0 670.4 635.1 648.4 99.2 99.6
White 692.3 696.7 653.2 672.1 99.1 99.6
African American 645.2* *640.8 *606.4 637.7 100.0 100.0 Asian/Pacific Islander N/A N/A N/A N/A N/A N/A Hispanic *631.0 *637.8 *604.5 *623.3 98.8 98.8
American Indian/Alaskan N/A N/A N/A N/A N/A N/A
Disabled *608.9 *608.0 *579.2 *619.4 98.0 100.0
LEP *628.5 *636.5 *606.2 *620.2 99.3 99.3
Subsidized meals *639.7 *642.6 *608.7 *629.1 98.8 98.8
*- denotes – 40 or more point Achievement Gap between tested area and white students Annual Measurable
Objective (AMO) 635.0 635.0 635.0 635.0 95.0 95.0
2012 and 2013 ESEA Waiver Ratings – Analysis
In 2012 Creative Arts received a grade of C and a score of 74.4. On the 2013 a grade of B was
received and a score of 84.8. These compared to the Districts 2012 grade of B and score of 86.4
11
and in 2013 a score of B and a score of 83.8. In 2012 the state had a grade of A and score of
90.1 and then in 2013 a grade of B and a score of 83.8.
2009 - 2013 Report Card Detail Absolute and Growth Ratings 2009 2010 2011 2012 2013
Absolute Growth Absolute Growth Absolute Growth Absolute Growth Absolute Growth
Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj. Ind. Adj.
3.16 A 97.82 G 3.28 G 97.82 G 3.29 G 96.09 A 3.29 G 95.71 A 3.37 G 100.75 A
MAP Testing Analysis – Fall to Spring On Grade Level Analysis and Fall to Spring Mean
Score Analysis
Implementation of the Everyday Math Curriculum and a laser focus on increasing the mean score
of a class’s performance on MAP seems to have a positive impact on the Math program at
Creative Arts. Analysis is difficult because of the changes made to the MAP assessment in the
past few years with the introduction of the Common Core Standards and format changes to the
MAP assessment.
Data does indicate that Creative Arts students perform better on the MAP Math test than they do
on the Reading assessment.
Documented academic and social deficiencies exist among high-risk students attending the
Creative Arts School, including the achievement gap between minority and white students,
disabled vs non-disabled and LEP vs non LEP students. The significant increase in the Hispanic
population and second-language learners, the high poverty index and percentages of free and
reduced lunch students, the low rate of family literacy, the substantial number of single- parent
homes is related to the high number of students needing assistance because of poor PASS or
MAP test performance.
These factors demonstrate the compelling need for a well thought out and developed School
Plan. With a strong academic educational program that includes intervention, support and
enrichment increases the chances of all Creative Arts and Satellite Daufuskie Island Elementary
children being able to graduate from high school and be college and/or career ready and able to
move forward for a productive life.
MISSION, VISION, VALUES, AND BELIEFS
12
MISSION
Beaufort County School District The Beaufort County School District, through a personalized learning approach, will prepare
graduates who compete and succeed in an ever-changing global society and career marketplace.
Hilton Head Island Elementary School for the Creative Arts
As an Arts Infused School of Choice, Head Island Elementary School for the Creative Arts
strives to support the mission of the Beaufort County School District in such a way that enables
all students to be competent, competitive and successful in an ever-changing global society.
Satellite School: Daufuskie Island Elementary
Our school is to be a school where: children are prepared and inquisitive; who learn with
dedication and respect; who actively participate in their own learning. Staff is well-qualified,
teach with dedication and respect; and parents and community members are informed and
involved. Curriculum is challenging, engaging, individualized, child-centered, and
developmentally appropriate while providing individual routes to our common vision. The
environment is clean, safe, and nurturing; and has the resources required for excellence.
VISION
Beaufort County School District
We will work with families and our diverse community to ensure that students perform at an
internationally competitive level in a learning environment that is safe, nurturing and engaging.
Hilton Head Island Elementary School for the Creative Arts
We envision that Hilton Head Island Elementary School for the Creative Arts, in collaboration
with an engaged community, is committed to actively ensuring that all learners will add value to
their lives developing their potential by providing excellent education in a safe, nurturing,
learning environment.
Satellite School: Daufuskie Island Elementary
We envision one school where caring, knowledgeable adults teach all children to love learning;
to become honorable and responsible citizens; where academic excellence and respect for others
are the standards; where teachers and students are positive contributors to the local and global
communities; where teachers, parents, and children have a voice and a choice in their educational
environment and curriculum.
CORE BELIEFS
Beaufort County School District
Every student can learn using his or her valuable and unique talents and skills.
13
Learning takes place when the physical, emotional, social and intellectual well-being of
all students is assured at every level and during every transition.
High expectations of the school community positively impact student success.
Early childhood learning experiences form the foundation of future school success.
Students learn best when they are engaged and provided with opportunities for problem
solving and active participation.
All students are entitled to learning experiences so that they can become competent and
confident in the skills and knowledge needed to become successful and productive
citizens.
Investment, involvement and connection of all members of the school community are
essential to a student’s success.
Frequent informal and formal assessment aligned to clearly defined learning objectives
will provide improved student achievement.
The collection, analysis and use of data from a variety of sources are critical to making
decisions.
Students should be prepared to compete and contribute in a changing global and
multilingual society.
Hilton Head Island Elementary School for the Creative Arts
CORE BELIEFS
Every child is talented and creative and can learn in a positive and collaborative learning
environment.
An infused school of choice should be provided as an option for all parents.
With high expectations and rigor, the entire community of Hilton Head Island
Elementary School for the Creative Arts impacts the growth and success of all students.
The arts are considered academic areas and taught with rigor.
An Arts Infused program creates an exemplary academic program and learning
environment using state and national standards in Visual Arts, Music, Dance Theatre,
Creative Writing and Multimedia Technology which promote meaningful connections
between the curriculum, the child and the world around them.
An Arts Infused approach to education enables students to develop critical thinking skills
and problem solving strategies.
Active partnerships in the community and with parents will help students to make real
life connections.
Assessment aligned to learning targets will improve student achievement.
Best practices found in the STEM (Science, Technology, Engineering and Math)
framework should be integrated in an Arts Infused school.
All students should actively engage in college and career readiness activities.
CORE BELIEFS
Satellite School: Daufuskie Island Elementary
Parent choice and involvement in the educational program is important.
14
All children can learn.
Multiage grouping of children encourages leadership, acceptance and academic
achievement.
Students are successful when the physical, emotional and social concerns of each child
are addressed in a safe and nurturing learning environment.
Community involvement is a critical aspect of the school and provides support to
students and their family.
.
15
SCHOOL RENEWAL PLAN FOR Hilton Head Island Elementary School for the Creative Arts
DATE: February 18, 2014 Performance Goal Area: School Climate (Parent Involvement, Safe and Healthy Schools, etc.)
PERFORMANCE
GOAL: (Statement of desired progress
or result over five years)
1. Purpose and Direction: As part of the Beaufort County School District, Hilton Head Island
Elementary School for the Creative Arts maintains and communicates at all levels of the organization a
purpose and direction for continuous improvement that commit to high expectations for learning as well as
shared values and beliefs about teaching and learning.
INTERIM
PERFORMANCE
GOAL: (One year goal)
1. Engage in a comprehensive process to review, revise and communicate that our purpose is to create student success.
2. Foster collaboration with community stakeholders and use their knowledge, skills and resources to support student learning.
3. Use system-wide strategies to listen to and communicate with stakeholders. 4. Communicate expectations and results for student learning and goals for improvement to all
stakeholders. 5. Commit to a student-centered culture based on shared values and beliefs regarding teaching and
learning. Support challenging, equitable educational programs and learning experiences for all students. Each school will develop a shared set of values and beliefs and build climate and culture to support the district’s mission and vision.
DATA SOURCE(S): (List types of data that will be
collected or examined to
measure progress.)
1. Agendas and Minutes from SIC Meetings.
2. SCA Representation and Attendance, Agendas and Minutes of District joint SIC meetings.
3. Representation, attendance, agendas and minutes from Monthly SCA and Daufuskie PTO Meetings
4. Quarterly Principal’s Coffee’s – Attendance Sheets and topics discussed. 5. List of dates, locations and person/means of recruiting volunteers and Number of Volunteers and hours
of volunteering. 6. Names of practicum students and student teachers with dates of placements and cooperation SCA staff. 7. Notes of monthly meetings with principal. 8. Dates of meetings and cost projections. 9. List of school business partners. 10. Copies of newsletters 11. State report card results.
16
17
OVERALL
MEASURES:
SOURCE: 2012-13 School
Year
* Represents projections of
improvement
AVERAGE BASELINE 2013-
14
2014-15 2015-16 2016-17 2017-18
8 SIC Meetings annually – 2 Committee Meetings
annually -
Projected
Data
Actual
Data
8*
Maintain
9*
Maintain
9*
Maintain
9*
Maintain
9*
Joint District meetings – 2 attended (December
and April) Projected
Data
Actual
Data
2 Maintain
2
Maintain
2
Maintain
2
Maintain
2
Attend Monthly PTO Meeting – attended 6 Projected
Data
Actual
Data
7*
Maintain
9*
Maintain
9*
Maintain
9*
Maintain
9*
Volunteers - 76 signed up volunteers Projected
Data
Actual
Data
150 Inc.
3%
Inc.
3%
Inc.
3%
Inc.
3%
Practicum and Student Teacher - 11 Projected
Data
Actual
Data
25 30 30 30 30
Business Partners - 10 Projected
Data
Actual
Data
12 15 20 25 30
To add a row, go to the last box and press the tab button.
18
ACTION PLAN FOR STRATEGY
#1.1: Engage in a comprehensive process to review, revise and communicate that our purpose is to create
student success.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
1.1.1. Host monthly
School Improvement
Council meetings.
March, 2014 to
June, 2019
Principal $500.00 annually Student
Activities
Account
Monthly Agendas and Minutes
with attendance.
1.1.2. Host bi-annual
Cluster School
Improvement Council
meetings.
Annually in
October and
February
Principal None n/a Agenda and minutes from meeting
dates.
1.1.3. Meet monthly with
Parent/Teacher
Organization.
Monthly –
August through
May annually.
Scheduled in
August annually
Principal or
Assistant Principal
and PTO President
None n/a Monthly agenda and minutes from
meetings.
1.1,4. Quarterly Principal
Coffees open to anyone
September,
January, March
and May
annually
Principal $50.00 Student
Activities
Sign in sheet with list of topics
discussed.
To add a row, go to the last box and press the tab button.
19
ACTION PLAN FOR STRATEGY #1.2: Foster collaboration with community stakeholders and
use their knowledge, skills and resources to support student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
1.2.1. Actively recruit
volunteers within the
community.
Ongoing Principal, Assistant
Principal, Guidance
Counselors and
coordinated by
Office Manager-
Kathy Eways.
Speakers at Rotary
and other service
organizations. -
Continue with
United Way
volunteers. -
Continue IMPACT
mentoring program
with community
member Buck
Edwards.
$250.00 for
Annual Volunteer
Bruch in April
Student
Activities
List of dates, locations and
person/means of recruiting
volunteers.
Number of Volunteers and hours of
volunteering.
1.2.2. Work with HR to
place practicum students
and student teachers
from USCB and other
colleges to build
confidence among
stakeholders that a
Ongoing Principal working
with HR
None N/A Names of practicum students and
student teachers with dates of
placements and cooperation SCA
staff.
20
ACTION PLAN FOR STRATEGY #1.2: Foster collaboration with community stakeholders and
use their knowledge, skills and resources to support student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
capable leadership team
is in place.
1.2.3. Identify a person
within the school to
serve as volunteer
coordinator.
August 2014-19 Kathy Eways,
Office Manager
None n/a Notes of monthly meetings with
principal.
1.2.4.Investigate hiring
of a part time Volunteer
Coordinator using
General Fund or grant
money in the cluster
Fall 2014
January 2015
Principal and Office
Manager
$5,000 General Fund
or Grant
obtained.
Dates of meetings and cost
projections.
1.2.5. Develop
relationships with
business partners to build
confidence among
stakeholders that a
capable leadership team
is in place.
Principal, and two
Assistant Principals
None n/a List of school business partners-
Each administrator will document 5
Business Partners Annually
To add a row, go to the last box and press the tab button.
21
ACTION PLAN FOR STRATEGY #1.3: Use system-wide strategies to listen to and
communicate with stakeholders. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
1.3.2. Host Semi -
Annual “Principal town
hall meetings” to build
confidence among
stakeholders that a
capable leadership team
is in place.
Fall and January
Annually
Principal $200.00 Student
Activities
Dates of Meeting, number of
persons in attendance, Topics
discussed
ACTION PLAN FOR STRATEGY #1.4: Communicate expectations and results for student
learning and goals for improvement to all stakeholders. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
1.4.1 Use a variety of
methods to disseminate
information to parents
and stakeholders. –
including monthly
newsletters, up to date
web page and use of
school messenger.
Monthly Principal and
Assistant Principals.
#500.00 Paper, ink for
newsletters –
School
account.
Copies of newsletters, monitoring
of web page, list of school
messengers sent.
22
ACTION PLAN FOR STRATEGY #1.5: Commit to a student-centered culture based on shared
values and beliefs regarding teaching and learning. Support challenging, equitable educational programs
and learning experiences for all students. Each school will develop a shared set of values and beliefs and
build climate and culture to support the district’s mission and vision.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
1.5.1. Student leaders
share information,
expectations, values and
beliefs regarding
teaching and learning
with their peers.
November –
May Student
Council
Meetings
Student Council
Advisor appointed
by principal
annually
$200.00 –
Notebooks and T-
shirts for
member.
Student
Activities
Date of principal attendance to
student Council meeting and notes
on discussion.
1.5.2. Include classified
and certified staff in the
sharing process through
semiannual joint staff
meetings.
Semi-annually
beginning
September 2014
Principal and Office
Manager will
schedule and
document
None N/A Dates, sign in sheets, agendas, and
topics of discussion.
1.5.3. Address students’
overall sense of well-
being – physical, social
and emotional through
Annual Grade 5 survey
conducted by guidance
for state school report
card.
Spring, 2015 -
annually
Guidance
Counselor
None Copy of school results on state
report card
23
SCHOOL RENEWAL PLAN FOR Hilton Head Island Elementary School for the Creative Arts.
DATE: February 18, 2014
Performance Goal Area: Teacher/Administrator Quality School Climate (Parent Involvement, Safe and Healthy Schools, etc.) District Priority
PERFORMANCE
GOAL: (Statement of
desired progress or result over
five years)
2. Resources and Support Systems: Hilton Head Island Elementary School for the Creative Arts as
part of Beaufort County School District has resources and provides services in all schools that support its
purpose and direction to ensure success for all students.
INTERIM
PERFORMANCE
GOAL: (One year goal)
1. Mentor qualified professional staff capable of fulfilling assigned roles and responsibilities. 2. Assign professional staff responsibilities based on their qualifications (i.e., professional preparation, ability,
knowledge and experience). 3. Ensure that all staff participates in a continuous program of professional development. 4. Assign sufficient staff to meet the vision and purpose of each school. 5. Budget sufficient resources to support educational programs and implement plans for improvement. 6. Monitor all financial transactions through a recognized, regularly audited accounting system. 7. Provide an environment that is safe and orderly for all occupants. 8. Provide technology infrastructure to supports schools’ teaching, learning and operational needs. 9. Develop and keep current a written security and crisis management plan with appropriate training for stakeholders. 10. Ensure that each student has access to guidance services that include, but are not limited to, counseling, appraisal,
mentoring, staff consulting, referral and educational and career planning. 11. Provide appropriate support for students with special needs. 12. Provide services that support the counseling, assessment, referral, educational and career planning needs of all
students.
DATA SOURCE(S): (List types of data that will be
collected or examined to
measure progress.)
1. Annual Mentoring and evaluation assurance forms.
2. Paper reports from CODE as part of Enhanced ADEPT Pilot 3. HR Documentation 4. PD Calendar, evaluation forms, agendas and sign in sheets. 5. Master schedule 6. Organizational Chart
7. Budget 8. Copies of grants 9. Copy of security plan and dates/types of drills held. 10. Dates of inspections and copies of evaluations.
24
OVERALL
MEASURES:
SOURCE: School year
2012-13 AND 2014-15
* Represents projections of
improvement
AVERAGE
BASELINE
2013-14 2014-15 2015-16 2016-17 2017-18
Mentoring and
assurance
forms
completed
2012-13
unknown
Projected
Data
Actual Data
43*
43
Unknown until
staffing is
complete*
Unknown
until staffing
is complete*
*
Unknown
until staffing
is complete*
*
Unknown
until staffing
is complete*
*
2013-14
Enhanced
ADEPT Pilot
41 GBE
Teachers
4 Induction
Teachers
7 Annual
Formal
Projected
Data
Actual Data
To be
determined
after staffing
52 STAFF
To be
determined
after staffing
To be
determined
after staffing
To be
determined
after staffing
To be
determined
after staffing
2014-15 Job
Fair
participation
3
Projected
Data
Actual Data
3
3
3 3 3 3
Grant applied
for Projected
Data
Actual Data
1
4
5 6 6 6
To add a row, go to the last box and press the tab button.
25
ACTION PLAN FOR STRATEGY #2.1: Mentor qualified professional staff capable of fulfilling
assigned roles and responsibilities. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.1.1 Implement the
district’s mentoring
program and practices to
improve the performance
and retention rates of
highly qualified staff. –
including providing all
first year staff with a
district trained mentor
and a grade level mentor.
August –
Mentors
Assigned
Principal -Cost of subs for
mentor
observations –
Will change
annually based on
number of new
teachers.
General Fund Annual Mentoring and evaluation
assurance forms
2.1.2. Implement the
districts program for
formal evaluation of
teachers providing
mentors for teachers in
the annual formal
evaluation process or
GBE teachers on
assistance plans.
-August mentors
assigned for
teachers on
annual formal
evaluation.
-Assign mentors
for GBE
teachers as they
are placed on
assistance plans.
Principal Cost of subs for
mentor
observations –
Will change
annually based on
number of annual
formal evaluation
teachers or GBE
teachers placed
on assistance
plans.
General Fund Paper reports from CODE as part
of Enhanced ADEPT Pilot
2.1.3. Participate in Spring, annually Principal, Assistant. None n/a Verification from HR of
26
ACTION PLAN FOR STRATEGY #2.1: Mentor qualified professional staff capable of fulfilling
assigned roles and responsibilities. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
annual district job
fair
Principal and
invitations extended
to coaches and
teachers of the Year
from our school
involvement
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.2: Assign professional staff responsibilities based on their
qualifications (i.e., professional preparation, ability, knowledge and experience). EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.2.1. Maintain equitable
staff experience levels
throughout the school.
Spring annually
review the staff
experience
levels at each
grade level and
in related arts
areas.
Administrative
Team.
None n/a Staff list with experience.
27
ACTION PLAN FOR STRATEGY #2.2: Assign professional staff responsibilities based on their
qualifications (i.e., professional preparation, ability, knowledge and experience). EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.2.2. Develop an annual
school organizational
chart outlining
responsibilities
August annually Principal None n/a Copy of Org. Chart
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.3: Ensure that all staff participates in a continuous
program of professional development. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.3.1 Establish an
ongoing system of
tracking, monitoring,
assessing and analyzing
the effectiveness of
professional development
programs. - After each
PD activity obtain
participant feedback on
quality of PD and its
After each PD
activity have
staff complete a
feedback sheet.
Administrative
team including
coaches
None n/a PD Plan, PD evaluation forms
28
ACTION PLAN FOR STRATEGY #2.3: Ensure that all staff participates in a continuous
program of professional development. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
impact on student
achievement.
2.3.2 Create a
supportive and fulfilling
work environment with
conditions that support
professional
development time by
developing an annual
professional
development plan
collaboratively with the
admin team, coaches
and teacher leaders
based on achievement
data and arts focused
approach.
By August
annually
Principal, coaches
and teacher leaders.
None n/a PD Calendar
To add a row, go to the last box and press the tab button.
29
ACTION PLAN FOR STRATEGY #2.4: Assign sufficient staff to meet the vision and purpose of
each school. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.4.1. Ensure that the
Master Schedule meets
the vision and purpose of
the school. – Review Arts
provided to students
based on the schools arts
focus.
Annually Admin Team, SIC Unknown at this
time
District
staffing
allocations,
general funds,
grant money
obtained.
Master Schedule
2.4.2. Investigate the
initiation of a foreign
language for
implementation during
the 2015-16 school year.
August – initiate
a focus team
September-
November
December –
January 14,
2015
By January 30,
2015
By February 15,
Focus team
develops a plan.
Observe and meet
with schools that
have implemented a
foreign language.
Develop
recommendation for
staff.
Present to staff,
SIC, PTO
Administrative
Meeting dates and agendas
30
ACTION PLAN FOR STRATEGY #2.4: Assign sufficient staff to meet the vision and purpose of
each school. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2015 team makes
recommendation to
HR.
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.5: Budget sufficient resources to support educational
programs and implement plans for improvement.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.5.1. Ensure that
funds/resources are
aligned to student
achievement needs.
Spring annually-
submit budget as
directed by
district with
SIC/PTO/Staff
input. And
review spending
for year in
March
Principal None n/a Budget review of spending.
31
ACTION PLAN FOR STRATEGY #2.5: Budget sufficient resources to support educational
programs and implement plans for improvement.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.5.2. Secure ABC
Grant funding annually
up to $7,500.00 based on
ABC funding
requirements.
Submit
application and
annual reports as
specified by the
SC Arts
Commission.
Principal/designee None n/a Copy of ABC grant
2.5.3. Apply for at least
three grants annually to
support before/after
school activities for
students.
Annually. Principal/designee None n/a Copy of grants applied for during
the school year.
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.6: Monitor all financial transactions through a recognized,
regularly audited accounting system. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
32
ACTION PLAN FOR STRATEGY #2.6: Monitor all financial transactions through a recognized,
regularly audited accounting system. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.6.1. Follow all district
guidelines for purchasing
and allocation of funds.
At all times Principal/Admin
Team
None n/a Audit report
2.6.2 Maintain
qualified employees on
staff with professional
certifications by
monitoring and
reminding staff of their
professional
responsibilities for their
certifications.
Monitor
certification
semi-annually,
and as notified in
My Learning
Plan
Principal None n/a Accredatition Report on
certification issues.
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.7: Provide an environment that is safe and orderly for all
occupants. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.7.1. Develop,
establish and maintain
Annually Copy of security plan and
33
ACTION PLAN FOR STRATEGY #2.7: Provide an environment that is safe and orderly for all
occupants. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
short- and long-term
planning processes to
provide a safe and
orderly environment for
all students.
-by annually updating
building security plan.
-review permanent
improvement plan and
make recommendations
annually with safety as
the first priority.
-by August 15th
of each school
year staff will
sign off on
revised plan.
-spring annually
and submit
recommendations
to district.
- Assistant Principal
in charge of safety
-Principal
None
TBD by district
8% committee.
n/a
-8% district
funding
dates/types of drills held.
2.7.2. Monthly
evaluations of
maintenance, grounds
and custodial services
provided.
Monthly Assistant Principal None n/a Dates of inspections and copies of
evaluations.
2.7.3. Inspection of
playground.
Monthly Assistant Principals None n/a Dates of inspections and copies of
evaluations.
34
ACTION PLAN FOR STRATEGY #2.7: Provide an environment that is safe and orderly for all
occupants. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.7.4. Review bus
reports and bus videos
as needed to increase
As submitted Assistant Principals None n/a Dates of inspections and copies of
evaluations.
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.8: Provide technology infrastructure to supports schools’
teaching, learning and operational needs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.8.1. Provide training
for teachers,
administrators and
support staff on using
available technology
equipment, software and
applications to increase
student achievement.
-monthly technology
training for all teachers
during planning.
All staff
development for
technology
integration will
be in PD plan
completed by
August 2015.
Principal and PD
Team
$10,000.00 will
be allocated to
provide speaker
fees and/or
materials needed
General Fund PD plan, agendas, sign in sheets.
35
ACTION PLAN FOR STRATEGY #2.8: Provide technology infrastructure to supports schools’
teaching, learning and operational needs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
-monthly training for
office staff based on a
needs assessment taken
prior to the 2014-15
school year.
-monthly after school
training for staff based
on individual plans
developed prior to the
2014-15 school year.
-all teachers will observe
a minimum of two
lessons that integrate the
use of technology for a
student task at a DOK
level of two or above.
2.8.2. Implement 1:1
IPad program for all
students in grades 3-5.
October 1, 2014 Admin Team and
staff grades 3-5.
None N/A PD plan, agendas, sign in sheets.
To add a row, go to the last box and press the tab button.
36
ACTION PLAN FOR STRATEGY #2.9: Develop and keep current a written security and crisis
management plan with appropriate training for stakeholders. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.9.1. Regularly review
existing plans, equipment
and security measures
with in-house staff and
independent personnel
trained in law
enforcement.
August 2014-
2019
Principal –
Assistant Principal
in charge of
Building Safety.
None n/a Copy of plan, dates and sign in
sheets of meetings.
2.9.2. Update and
maintain relationships
with local emergency
management services.
August 2014 and
monthly via fire
drills.
None n/a Date of meeting
2.9.3. Conduct ongoing
training and monitoring
of staff and students in
emergency management
procedures.
August 2014-19 Administrative
Team/Media
Specialist/Grade
Level
Chairs/Assigned
support staff.
None n/a Dates of drills
37
ACTION PLAN FOR STRATEGY #2.9: Develop and keep current a written security and crisis
management plan with appropriate training for stakeholders. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
ACTION PLAN FOR STRATEGY #2.10: Ensure that each student has access to guidance
services that include, but are not limited to, counseling, appraisal, mentoring, staff consulting, referral and
educational and career planning.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.10.1. Involve guidance
services in classroom
instruction to address
differences in culture,
values and lifestyles.
August 2014-19 Principal –
Guidance Staff
None n/a Guidance Department long range
plan and calendars of classroom
instruction.
2.10.2. Educate parents,
school staff and students
about guidance services
and outside resources.
August 2014-19 Guidance Staff None n/a Copy of Parent newsletters,
Agenda/dates of Presentation at
PTO and Principal Town Meeting
2.10.3. Monitor parent,
school staff, student and
guidance counselor
satisfaction with
guidance services and
administration.
August 2014-19 SIC Survey None n/a Annual state report card.
38
ACTION PLAN FOR STRATEGY #2.9: Develop and keep current a written security and crisis
management plan with appropriate training for stakeholders. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.10.4. Establish meeting
student needs for
guidance services as the
primary mission. Other
functions, such as
administration and
testing services, shall be
addressed only after
students’ guidance
services needs have been
met.
August 2014-19 Guidance Services
and RTI
Coordinator
None n/a Documentation that Guidance not
scheduled as Testing Coordinator.
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.11: Provide appropriate support for students with special
needs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.11.1. Improve special
needs graduation rates
with a focus on job
August 2014-19 Principal, Special
Education
Coordinator,
Staffing costs are
included in
district
District
Allocation for
staffing,
39
ACTION PLAN FOR STRATEGY #2.11: Provide appropriate support for students with special
needs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
readiness and other post-
secondary opportunities
by
-implementing
inclusion strategies,
-insuring
implementation of
appropriate IEP’s
including support
services,
-insuring regular
education teachers
assume responsibility
for implementing
instruction of grade
level standards.
Regular Education
Staff, Special
Education Staff
allocations. Costs
incurred will be
from the building
allocated General
Funds for
supplies and
materials based
on student IEP’s
and staff requests
for materials need
to make
allocations.
General Fund
for supplies
and materials.
Schedule
Special Education review of IEP’s
and documentation by Special
Education Supervisor.
Professional Development in this
area – agenda, sign in sheets
2.11.2. Support programs
to identify students with
special needs, and
expand opportunities for
special education
students including the
Early Warning System
August 2014-19 Principal and
designated RTI
coordinator.
None n/a Monitoring weekly of EWS system
by principal. Log in data.
40
ACTION PLAN FOR STRATEGY #2.11: Provide appropriate support for students with special
needs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
and full implementation
of the Response to
Intervention.
2.11.3. Educate parents,
school staff and students
about services available
for special needs
students, including gifted
and talented, and the
criteria to access those
services through annual
parent and staff
informational meetings.
August 2014-19 Special Education
Staff, GT Building
Coordinator and
staff.
$300.00 –
Refreshments for
parent and staff
meetings.
Student
Activities
Dates of meeting, agendas and sign
in sheets
2.11.4. Monitor parent,
school staff and student
satisfaction levels with
services for students with
special needs through
parent and staff surveys.
August 2014-19 Special Education
and GT Coordinator
None n/a Special education survey results
and school report card results.
2.11.5. Ensure
appropriate training for
staff who works with
special needs students,
August 2014-19 Special Education
Coordinator in
conjunction with
building Admin
$1000.00
annually allocated
for staff
General
Funds
PD dates, topics and sign in sheets
41
ACTION PLAN FOR STRATEGY #2.11: Provide appropriate support for students with special
needs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
including gifted and
talented.
Team development
To add a row, go to the last box and press the tab button.
ACTION PLAN FOR STRATEGY #2.12: Provide services that support the counseling,
assessment, referral, educational and career planning needs of all students. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
2.12.1. Annually decrease
the percentage of students
receiving in-school
suspension, out-of-school
suspension and expulsion
by collaborating with
neighboring schools and
the district to implement
an alternative school for
elementary students.
August 2014-
19
Principal and/or
designee
None to building n/a Enrollment numbers of students
placed in alternative program
instead of suspension.
To add a row, go to the last box and press the tab button.
42
SCHOOL RENEWAL PLAN FOR Hilton Head Island Elementary School for the Creative Arts
DATE: February 18, 2014
Performance Goal Area: Student Achievement Teacher/Administrator Quality School Climate (Parent Involvement, Safe and Healthy Schools, etc.)
PERFORMANCE GOAL: (Statement of desired progress or result
over five years)
3. Teaching and Assessing for Student Learning: Beaufort County School District’s curriculum,
instructional design and assessment practices guide and ensure teacher effectiveness and student learning
across all grades and courses.
INTERIM
PERFORMANCE GOAL: (One year goal)
1. Provide equitable and challenging learning experiences that ensure all students have sufficient opportunities to develop learning, thinking and life skills that lead to success at the next level.
2. Promote active engagement of students in the learning process, including opportunities for them to apply higher-order thinking skills.
3. Allocate and protect instructional time to support student learning. 4. Provide for articulation and alignment among grade levels within the school. 5. Implement interventions to help students meet expectations for learning. 6. Provide comprehensive information and media services that support curricular and instructional programs. 7. Ensure that all students and staff members have regular and ready access to instructional technology and a comprehensive
collection of materials that supports the curricular and instructional program. 8. Teachers will participate in collaborative learning communities and other professional learning to improve instruction and
student learning. 9. Teachers will implement schools’ Instructional processes in support of student learning. 10. Ensure that mentoring, coaching and induction programs support instructional improvement consistent with schools’ values
and beliefs about teaching and learning. 11. Engage families in meaningful ways in their children’s educations and keep them informed of their children’s learning
progress. 12. Gather, analyze and use data and research in making curricular and instructional choices. 13. Monitor school climate and take appropriate steps to ensure that it is conducive to student learning. 14. Monitor and adjust curriculum, instruction and assessment systematically in response to data from multiple assessments of
student learning and examinations of professional practice. 15. School leaders will monitor and support the improvement of instructional practices to ensure student success.
16. Ensure grading and reporting practices on clearly defined criteria that represent the attainment of content knowledge and skills and that are consistent across grade levels and courses.
DATA SOURCE(S): (List types of data that will be collected
or examined to measure progress.)
1. Dates of collaborative planning and meeting notes. 2. Dates of transition meeting. 3. PD dates, agendas, sign in sheets and surveys/feedback. 4. Classroom walk through forms, dated and location. 5. Dates and outcomes of Instructional walk through process. 6. Master Schedule
43
Performance Goal #3
DATA SOURCE(S): (List types of data that will be collected
or examined to measure progress.)
Continued
7. Dates of transition meeting and notes.
8. MAP, PASS, Fountas and Pinnell Reading Assessment, GT Identification data, Number of RTI Tier 3
students, number of Arts GT identified, special education data, literacy and ESOL student numbers and
testing data, including ELDA for improvement.
OVERALL MEASURES:
SOURCE:
Data from 2013-14 school year
unless otherwise noted in
baseline column
* Represents projections of
improvement
AVERAGE
BASELINE
2013-14 2014-15 2015-16 2016-17 2017-18
Collaborative
Planning – for
annual show.
1-2
Projected
Data
Actual Data
Monthly 4
times*
6*
8*
12*
14*
Staff
Development for
Arts Integration
Projected
Data
Actual Data
6 hours
10 hours*
12 hours*
14 hours*
14
hours*
STEM PD Projected
Data
Actual Data
0 times*
0
6 hours*
8 hours*
12 hours*
14
hours*
Instructional
Rounds Projected
Data
Actual Data
Problem of
Practice –
Rigor at DOK
2, 3, 4
MATH and
Reading MAP Projected
Data
Actual Data
See Appendix
A
Increase OGL
Math and Read.
2%
Increase
OGL Math
and Read.
2%
Increase OGL
Math and
Read. 2%
Increase
OGL
Math
and
Read
2%
To add a row, go to the last box and press the tab button.
44
ACTION PLAN FOR STRATEGY #3.1: Provide equitable and challenging learning experiences
that ensure all students have sufficient opportunities to develop learning, thinking and life skills that lead to
success at the next level.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.1.1. Ensure that the
curriculum in each
grade level or course
provides students with
the opportunity to
develop knowledge,
thinking and life skills
so that they may be
successful at the next
level following an arts
infused approach to
planning and
implementation of
instruction by
August 2014-19 Administrative
Team/ Coaches
$5,000.00
Annually
General Fund
providing collaborative
planning for grade level
and arts teachers in
order to develop arts
infused rigorous units
and tasks for students
using Webb’s
DOK(Depth of
Knowledge) levels and
August 2014-19 Administrative
Team/Coaches/Grade
Level Chairs
$10,000.00 General Fund Dates of Collaborative planning
45
ACTION PLAN FOR STRATEGY #3.1: Provide equitable and challenging learning experiences
that ensure all students have sufficient opportunities to develop learning, thinking and life skills that lead to
success at the next level.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
Hess’s Cognitive Rigor
Matrix.
3.1.2. Provide staff
development
opportunities for arts
and non-arts staff on art
infusion.
August 2014-19 Principal $5,000.00 ABC Grant
and General
Fund
PD dates, agendas, sign in sheets
and surveys
3.1.3 Provide staff
development activities
to integrate the STEM
(Science, Technology,
Engineering and Math)
approach into our arts
focused school to move
towards STEAM
(a=Arts) as the
foundation of our arts
focused school of
choice.
August 2014-19 Principal $5,000.00 ABC Grant
and General
Fund
PD dates, agendas, sign in sheets
and surveys
To add a row, go to the last box and press the tab button.
46
ACTION PLAN FOR STRATEGY #3.2: Promote active engagement of students in the learning
process, including opportunities for them to apply higher-order thinking skills. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.2.1.. As an Arts
Focused School of
Choice ensure the
implementation and
application of
instructional practices
that require active student
engagement and higher-
order thinking
implementing tasks for
students based on
Webb’s DOK(Depth of
Knowledge) levels and
Hess’s Cognitive Rigor
Matrix.
August 2014-19 Principal/Coaches None – Staff
Development
Days, Planning,
Staff Meetings.
N/A Classroom observations,
Instructional Walk Through.
3.2.2. Conduct internal
Instructional rounds to
monitor progress on the
implementation of
rigorous tasks as initiated
in the spring of 2014.
2x annually
2014-2019
Administrative
Team/Coaches
$2,000.00 General Fund Dates and report from Instructional
Rounds
To add a row, go to the last box and press the tab button
47
ACTION PLAN FOR STRATEGY #3.3: Allocate and protect instructional time to support
student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.31. Ensure that school-
wide procedures are in
place to maximize
instructional time
looking at the schedule
for intervention as well
as interruptions.
Interruptions will be
monitored.
August 2014-
2019
Principal None N/A Master schedule
ACTION PLAN FOR STRATEGY #3.4: Provide for articulation and alignment among all levels
of schools. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.4.1. Implement
rigorous, organized
curricula consistently
across all grade levels
August 2014-19 Admin Team/
Coaches
None N/A Observation, Instructional Rounds
data
48
ACTION PLAN FOR STRATEGY #3.4: Provide for articulation and alignment among all levels
of schools. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
and courses to meet the
needs of all learners.
Curricula will
appropriately support
personalized student
transitions across grade
levels and school sites as
monitored by teachers,
coaches, and
administrators.
3.4.2 Guidance
Counselor will
coordinate transition
activities with Principal
and Assistant Principal
for Grade 5 students
moving to Middle
School.
Spring 2015-19 Grade 5 Guidance
Counselor and
Grade 5 Assistant
Principal.
None N/A Dates of meetings
3.4.3 Grade 1 Guidance
Counselor will
coordinate transition
activities with Grade 1
Assistant Principal for
Spring 2015-19 Grade 1 Guidance
Counselor and
Grade 1 Assistant
Principal.
$500.00 for
transition
activities
General
Fund/Student
Activities.
Dates of transition meetings and
activities
49
ACTION PLAN FOR STRATEGY #3.4: Provide for articulation and alignment among all levels
of schools. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
Kindergartens students
moving to Grade 1 at
Creative Arts.
ACTION PLAN FOR STRATEGY #3.5: Implement interventions to help students meet
expectations for learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.5.1. Anticipate, design
and employ interventions
that support student
academic growth and
development and that
address the needs of
learners at all ability
levels including:
- students working below
grade level in reading
August 2014-19 - Schedule –
Principal
- EWS - Principal
- RTI – Assistant
Principal assigned
- Special Education
– Assistant
Principal assigned
- 3 Literacy
Teachers
- 3.5 ESOL
Teachers
- 2 Gifted and
Talented
Teachers
- $45,000.00
Tutors for Math
-District
allocated staff
-District
allocated staff
-District
allocated staff
-District
MAP, PASS, %of students reading
below, on and above as measured
by F&P, GT Identification
numbers, # students per grade level
in RTI Tier 3, # Arts Identified
students, #special education
students., # served in literacy, dates
of coaching visits.
50
ACTION PLAN FOR STRATEGY #3.5: Implement interventions to help students meet
expectations for learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
and math as measured by
MAP, PASS, Fontas and
Pinnell reading
assessments, classroom
formative and summative
assessments, GT testing,
RTI Tier interventions,
and the EWS system
including:
- the “At-Risk” student
- the identified academic
Gifted and Talented
students in grades 3-5
- the identified Arts
Gifted and Talented
Students in grade 3-5.
- the ESOL students
-the special education
students.
Interventions and support
include:
a. Full implementation
of the district Literacy
- Academic Gifted
and Talented –
GT Coordinator
- Arts Gifted and
Talented – GT
Coordinator
- Literacy –
Literacy Coach
- Math – Math
Coach
- Special Education
– Principal and
Special Education
Coordinator
and Reading
- After School
GT Arts
program
supported
funds
-SCA General
Fund, ABC
Grant, Other
grants.
-Literacy
Coach –
District
allocated
-Math Coach
– District
allocated
51
ACTION PLAN FOR STRATEGY #3.5: Implement interventions to help students meet
expectations for learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
plan
b.Full implementation
of the district plan for
RTI (Response to
Intervention)
c. Full implementation
of the EWS system
and plans through
Enrich.
d.Full implementation
of the district model
of Special Education
by all regular and
special education
teachers services
including inclusion.
e. Intervention model of
services to be planned
for in building
schedule.
f. In classroom coaching
including modeling by
Math and Literacy
52
ACTION PLAN FOR STRATEGY #3.5: Implement interventions to help students meet
expectations for learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
coaches.
g.Tier two and three
interventions for
students identified
with tutors or literacy
teachers.
h. District model of
grouping for ELA
and/or math for
identified academic
GT students.
53
ACTION PLAN FOR STRATEGY #3.6: Provide comprehensive information and media services
that support curricular and instructional programs. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.6.1. Integrate, align and
support information and
media services across all
grade levels, and which
support courses that
prepare 21st Century
learners for a global
society and career
marketplace. By
providing an open media
center for collaboration
and instruction at least
75% of the time.
August 2014-19 Principal – Master
Schedule
Media Specialist
None N/A Media schedule
3.6.2. Provide a project
based technology class to
all students as part of the
related arts schedule.
August 2014-19 Principal – Master
Schedule and
teacher allocation
None N/A Master schedule
54
ACTION PLAN FOR STRATEGY #3.7: Ensure that all students and staff members have regular
and ready access to instructional technology and a comprehensive collection of materials that supports the
curricular and instructional program.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.7.1 Ensure
instructional and
technological resources
are current, accessible
and replenished in
alignment with required
curricular and
instructional programs
through the building
professional
development plan and
the district technology
plan.
- Professional
Development will be
scheduled and held
monthly during
planning period with
district tech coaches
based on district tech
plan and individual
grade level needs
(IPad program,
individual teacher
Annually – as
reflected in the
building PD plan
Principal will
compile with input
from Assistant
Principals and
Coaches
Costs are
included in areas
as defined.
N/A
Dates, agendas, sign in sheets and
surveys.
55
ACTION PLAN FOR STRATEGY #3.7: Ensure that all students and staff members have regular
and ready access to instructional technology and a comprehensive collection of materials that supports the
curricular and instructional program.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
needs).
- Implementation of a
equipped state of the
art related arts
technology class for
all students including
laptops, IPads, printer,
3D printer.
- Full implementation
of district plan for all
refreshing/implementi
ng educational
technology
- Start August
2014 with full
implementation
by 2016.
- August 2014 -
19
Principal and
Technology
Teacher and Tech
Coaches.
District technology
staff with
collaboration from
SCA Principal.
To be determined
after fall 2014
needs assessment.
Determined by
District
Technology Staff
N/A
Unknown at
this time
Long range Tech plan for related
arts
Report of refresh
56
ACTION PLAN FOR STRATEGY #3.8: Teachers will participate in collaborative learning
communities and other professional learning to improve instruction and student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.8.1. Establish professional
learning communities across
grade levels and courses to
ensure teacher collaboration
to increase student
achievement.
Annually Assistant Principal -
assigned
$3,000.00
annually for
books, materials
etc.
Building
General
Fund
Groups formed and group report
with plan and meeting notes.
ACTION PLAN FOR STRATEGY #3.9: Teachers will implement schools’ Instructional
processes in support of student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.9.1. Ensure the use of
research-based teaching
and learning strategies to
engage all students in
rigorous and relevant
learning as evidenced by
Annually Assistant Principal
assigned
$3,000,00
annually for
books, speaker,
materials etc.
Building
General Fund
Dates, times, agendas and sign in
sheets of training.
57
ACTION PLAN FOR STRATEGY #3.9: Teachers will implement schools’ Instructional
processes in support of student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
all staff participating in a
minimum of 10 hours of
annual professional
growth activities for arts
infusion.
ACTION PLAN FOR STRATEGY #3.10: Ensure that mentoring, coaching and induction
programs support instructional improvement consistent with schools’ values and beliefs about teaching and
learning.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.10.1 Implement
coaching, mentoring and
induction programs that
consistently support
quality instruction that is
aligned within the school
August 2014-19 Principal/Coaches None to building
Coaches –
allocated by
district in
staffing.
N/A Coaches log, PD plan
58
ACTION PLAN FOR STRATEGY #3.10: Ensure that mentoring, coaching and induction
programs support instructional improvement consistent with schools’ values and beliefs about teaching and
learning.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
to the district values and
beliefs about teaching
and learning.
1. Implement
district model of
coaching for
literacy, math and
technology with
plan outlined in
school PD plan.
2. See 2.1.1. and
2.1.2. for
mentoring
teachers.
59
ACTION PLAN FOR STRATEGY #3.11: Engage families in meaningful ways in their children’s
educations and keep them informed of their children’s learning progress. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.11.1 Regularly
communicate with
families regarding their
children’s learning.
Provide meaningful
opportunities for families
to participate actively in
their children’s
educations.
August 2014-19
-Meet and Greet
– August
annually
-Open House –
September
Annually
-Parent program
in fall on
accessing
student grades
online.
-Progress
Reports and
Report Cards –
follow district
schedule
-Parent
Conferences –
Fall
-Grade level
parent education
program
Principal
Assistant Principals
and Grade Level
Chairs
-Technology Coach
Administrative
Staff and Teachers
Administrative
Staff and Teachers
Assistant Principal
and Grade Level
Chairs will
None
None
None
None
$1,500.00
annually
N/A
N/A
N/A
N/A
School
General Fund
Agendas/Activity logs and sign in
sheets with dates and times.
60
ACTION PLAN FOR STRATEGY #3.11: Engage families in meaningful ways in their children’s
educations and keep them informed of their children’s learning progress. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
annually
-Grade level
sharing of
integrated unit
through
performance
(grades 1,3,and
5) or exhibition
(grade 2 and 4).
-Three ESOL
parent nights-
October,
January, and
March
- Math Night
Grade 1 and 3
- Math Night
Grades 3-5
organize.
Assistant Principals
and Teachers
(regular and arts)
Literacy Coach,
Literacy Teachers
and ESOL Teachers
Math Coach –
Grade Level Chairs
Math Coach and
Grade Level Chairs.
$500.00 per grade
level annually
District Funds
$600.00 Annually
PTO
District
School
General
Funds
3.11.2 Develop and
implement a parent
compact for involvement
in school program.
Develop by 9-
15-14 with
annual
implementation
SIC Chair/designee
and Principal
None N/A % of parents that have signed
compact and % that meet criteria.
61
ACTION PLAN FOR STRATEGY #3.12: Gather, analyze and use data and research in making
curricular and instructional choices. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.12.1 Math and Reading
coaches will establish a
systematic, collaborative
process to ensure that
teachers have
opportunities to analyze
and use student MAP
and Pass assessment data
to inform instructional
and curricular decisions.
Plan developed
with goals by
8-20-2014 with
timeline
included for
collaboration,
reflection and
analysis.
Principal and Grade
Level Assistant
Principals.
None N/A Plan developed with goals by 8-
20-2014 with timeline included for
collaboration, reflection and
analysis.
3.12.2 Grade level chairs
will establish a
systematic, collaborative
process to ensure that
teachers have
opportunities to analyze
and use student
assessment data to
inform grades, as well as
instructional and
curricular decisions.
Plan developed
with goals by
8-20-2014 with
timeline
included for
collaboration,
reflection and
analysis.
Principal and Grade
Level Assistant
Principals.
None N/A Plan developed with goals by 8-
20-2014 with timeline included for
collaboration, reflection and
analysis.
62
ACTION PLAN FOR STRATEGY #3.13: Monitor school climate and take appropriate steps to
ensure that it is conducive to student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.13.1. Ensure an
environment that
supports the academic,
physical, social,
emotional and cultural
safety of all students that
allows learners to
maximize their potential
through quarterly
Teacher Forum Meetings
with building
Administrators.
Dates to be
established by
Teacher of the
Year for
Meetings by
August 30
annually
beginning 8-
2014 through
2019.
Principal and
Teacher of the Year
None N/A Dates of meetings, agenda
3.13.2 Conduct quarterly
building inspections for
custodial, maintenance
and grounds as well as
completing monthly
surveys provided by
district.
Quarterly
inspections
Monthly online
surveys.
Assistant Principal
in charge of
building and
grounds.
None N/A Dates of inspections
3.13.3 Obtain quarterly
teacher feedback through
a survey on building,
September, 2014
and then
quarterly at
Assistant Principal
for Building,
Grounds and
None N/A Teacher survey results
63
ACTION PLAN FOR STRATEGY #3.13: Monitor school climate and take appropriate steps to
ensure that it is conducive to student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
grounds and safety. progress report
time.
Safety.
3.13.4. Annual teacher
survey on building
climate.
Spring,
annually.
District supplied
and administered
online.
None N/A Teacher results.
ACTION PLAN FOR STRATEGY #3.14: Monitor and adjust curriculum, instruction and
assessment systematically in response to data from multiple assessments of student learning and
examinations of professional practice.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.14.1. Regularly review
curriculum, instruction
and assessment with the
expectation that
modifications will be
based on best practices
and multiple sources of
Quarterly Teachers with
support from
Coaches and
Administrative
Team.
None N/A
64
ACTION PLAN FOR STRATEGY #3.14: Monitor and adjust curriculum, instruction and
assessment systematically in response to data from multiple assessments of student learning and
examinations of professional practice.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
data.
ACTION PLAN FOR STRATEGY #3.15: School leaders will monitor and support the
improvement of instructional practices to ensure student success. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.15.1. Ensure best
practices in instruction to
positively impact student
achievement by
completing one in class
observations of not less
than 60 minutes each
semester with the
Enhanced ADEPT pilot
and online e recording
method.
August 2014 -
2019
Principal, Assistant
Principals
None N/A Enhanced pilot reports
65
ACTION PLAN FOR STRATEGY #3.15: School leaders will monitor and support the
improvement of instructional practices to ensure student success. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.15.2 Administrators
will complete walk
through observations as
prescribed by district
forms and plan.
Start August,
2014- Schedule
as described by
district plan.
Principal, Assistant
Principals
None N/A Documentation of dates and staff
observed.
3.15.3 Complete
Instructional Rounds
annually to monitor
current Problem of
Practice and determine
new one when criteria is
met.
Start November
2014 and then
November and
March annually.
Principal Possible sub costs
– To be
determined.
N/A Dates and reports from Process.
ACTION PLAN FOR STRATEGY #3.16: Ensure grading and reporting practices on clearly
defined criteria that represent the attainment of content knowledge and skills and that are consistent across
grade levels and courses.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
66
ACTION PLAN FOR STRATEGY #3.16: Ensure grading and reporting practices on clearly
defined criteria that represent the attainment of content knowledge and skills and that are consistent across
grade levels and courses.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
3.16.1. Establish and
maintain consistent
grading and reporting
practices across grade
levels and courses that
reflect clearly defined
criteria and the
attainment of content
knowledge and skills.
Meet with a
focus group of
teachers from
each grade level
to determine
grading policy
for the school.
Principal $1500.00 for
Summer meeting
School
General Fund.
School grading policy.
67
SCHOOL RENEWAL PLAN FOR Hilton Head Island Elementary School for the Creative Arts
DATE: February 18, 2014
Performance Goal Area: Student Achievement Teacher/Administrator Quality School Climate (Parent Involvement, Safe and Healthy Schools, etc.)
PERFORMANCE
GOAL: (Statement of desired progress
or result over five years)
4. Documenting & Using Results for Continuous Improvement: Beaufort County School District
implements a comprehensive assessment system that generates a range of data about student learning and
system effectiveness and uses the results to guide continuous improvement.
INTERIM
PERFORMANCE
GOAL: (One year goal)
1. Establish performance measures for student learning that yield information that is reliable, valid and free of bias. 2. Develop and implement a comprehensive assessment system for assessing progress toward meeting
expectations for student learning. 3. Use student assessment data to improve teaching and learning processes. Survey teachers to determine needs
to assessments and academic audits. 4. Use the district’s systematic analysis of instructional and organizational effectiveness to improve student
performance. 5. Communicate and explain the results of student performance and school effectiveness to all stakeholders in a
timely manner. 6. Use expanded comparison and trend data of student performance from comparable schools in evaluating
effectiveness. 7. Demonstrate verifiable growth in student performance using formal and informal assessments. 8. Maintain a secure, accurate and complete student records system in accordance with state and federal
regulations.
DATA SOURCE(S): (List types of data that will be
collected or examined to
measure progress.)
1. District provided data reports – PASS, MAP 2. Creative Arts Data Team analysis of district reports. 3. Survey data 4. PD Plan 5. Coaches contact report. 6. Rubicon Atlas
7. Volunteer/Community involvement report. 8. Letter to the community 9. Agenda and sign in sheets.
68
69
OVERALL
MEASURES:
SOURCE: 2012-
13 school year
* Represents
projections of
improvement
AVERAGE
BASELINE
2013-14 2014-15 2015-16 2016-17 2017-18
2013State
Report Card
Projected
Data
Absolute –G
Growth-A
Actual Data
Same
Excellent*
Excellent*
Excellent*
Excellent*
Excellent*
2013State
Report Card
Projected
Data
ESEA Waiver
B-84.8
Actual Data
B-84.8
A - 90 A-91 A-92 A-93 A-94
2013State
Report Card
Projected
Data
PASS
Actual Data
Greater than
40 point
achievement
gap in
subgroups
Less than 40
point
difference
Less Than 35
point
difference
Less Than 30
point
difference
Less Than 25
point
difference
Less Than 20
point
difference
Map Data Less than 25 %
of all grade
levels not
reading on
grade level.
Less than
25% Reading
below grade
level
Less than 23%
Reading
below grade
level
Less than
20% Reading
below grade
level
Less than
18% Reading
below grade
level
Less than
16% Reading
below grade
level
MAP Data Map Data Less than 25
% of all
grade levels
not on grade
level in
math.
Less than 25%
of all grade
levels not on
grade level in
math.
Less than
23% of all
grade levels
not on grade
level in math.
Less than
20% of all
grade levels
not on grade
level in math.
Less than
18% of all
grade levels
not on grade
level in math.
To add a row, go to the last box and press the tab button.
70
ACTION PLAN FOR STRATEGY #4.1: Establish performance measures for student learning
that yield information that is reliable, valid and free of bias. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
11.1.1 Use PASS, MAP,
Lexile Levels, ACT/SAT
and ESEA Waiver
Scores – all of which are
reliable, valid and free of
bias – to monitor student
achievement.
August 2014 -19 Coaches to
synthesize data and
present to
administrative team
quarterly or within
three weeks of
receipt of the data.
None N/A District provided data will be
reviewed and goals set to improve
academic achievement of students
by grade level data teams.
11.1.2 Data teams to
analyze data school level
to identify strengths,
weaknesses and action
plans.
August 2014 -19 Coaches/Teachers None N/A Data team reports.
11.1.3 Analyze
performance measures
and growth measures
together, with
consideration given to
the performance of
student demographic
categories within the
school.
August 2014 -19 Coaches/Teachers None N/A Demographic analysis reports of
MAP and PASS.
To add a row, go to the last box and press the tab button.
71
ACTION PLAN FOR STRATEGY #4.2: Develop and implement a comprehensive assessment
system for assessing progress toward meeting expectations for student learning. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.2.1. Continue to
administer MAP testing.
According to
District/State
Calendar
SCA Assistant
Principal assigned
as Testing
Coordinator
None N/A Testing report from Technology
Assistant.
4.2.2. Administer South
Carolina’s state standards
assessments.
According to
District/State
Calendar
SCA Assistant
Principal assigned
as Testing
Coordinator
None N/A Testing Coordinators report.
4.2.3 Continue to
administer a district-wide
technology proficiency
assessment.
According to
District/State
Calendar
SCA Assistant
Principal assigned
as Testing
Coordinator
None N/A Results of assessment.
4.2.4 Develop and
Implement school-wide
common assessments
(benchmarks) in science,
social studies and
writing.
According to
District/State
Calendar
SCA Assistant
Principal assigned
as Testing
Coordinator
None N/A Common assessments will be
loaded into Rubicon under
direction of Testing Coordinator.
To add a row, go to the last box and press the tab button.
72
ACTION PLAN FOR STRATEGY #4.3: Use student assessment data to improve teaching and
learning processes. Survey teachers to determine needs to assessments and academic audits. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.3.1 Survey teachers
to determine their needs
for professional
development related to
understanding and using
data and academic
audits.
Spring annually Coaches None N/A Survey completed and results
report
4.3.2 Use survey
results to develop a plan
and then provide
professional
development that helps
classroom teachers
understand and use
assessment data.
Summer
Annually
Principal with
recommendations
from coaches and
Assistant Principals.
$10,000.00
allocated annually
Building
General Fund
and ABC
Grant.
PD plan
4.3.3. Ensure that
instructional coaches or
other designees (i.e.,
district subject
coordinators) meet with
teachers on a regular
basis to discuss
assessment data and its
use for driving
Included on
Professional
Development
plan and updated
quarterly by
coaches during
the school year.
Principal and
coaches
None N/A Schedule of teacher/coach contact
73
ACTION PLAN FOR STRATEGY #4.3: Use student assessment data to improve teaching and
learning processes. Survey teachers to determine needs to assessments and academic audits. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
instruction.
4.3.4 Use multiple
sources of data to make
accurate and effective
decisions on instruction.
Annually based
on assessments
given.
Coaches None N/A Executive summary of SIC report
updated by April 30 annually.
ACTION PLAN FOR STRATEGY #4.4: Use the district’s systematic analysis of instructional
and organizational effectiveness to improve student performance. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.4.1. Use student
assessment data to
evaluate instructional
and organizational
effectiveness.
Annually
starting August
2014
Principal None N/A Dashboard report.
4.4.2 Document
community involvement,
Annually – Each
event and
Principal-Office
Manager
None N/A Community involvement report.
74
ACTION PLAN FOR STRATEGY #4.4: Use the district’s systematic analysis of instructional
and organizational effectiveness to improve student performance. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
including parents,
businesses, and faith-
based, charitable and
civic organizations.
starting August
2014
ACTION PLAN FOR STRATEGY #4.5: Communicate and explain the results of student
performance and school effectiveness to all stakeholders in a timely manner. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.5.1 Continue to
produce an annual SIC
“School Report” that
details academic
performance, financial
efficiencies, budgetary
challenges and student
demographics. Make
reports available in
By April 30
annually.
Principal and SIC
Chair.
None N/A Annual report card and letter of
community.
75
ACTION PLAN FOR STRATEGY #4.5: Communicate and explain the results of student
performance and school effectiveness to all stakeholders in a timely manner. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
multiple languages.
4.5.2. Continue to
disseminate current
informational brochures
for each school in the
district containing
pertinent information,
including student testing
performance, to be
available in multiple
languages.
Updated
brochures will
be distributed to
all new
prospective
parents and at
community
functions.
Principal and
designees.
Estimated cost
$500.00 annually.
District cost
in production
and cost of
printing by
School
General Fund.
Copy of brochure
4.5.2 Hold
informational meetings
for parents and other
stakeholders to discuss
the results and meaning
of student performance
on standardized tests.
-Fall
Conferences to
discuss
individual Fall
MAP Scores.
-Parent
Informational
Meeting on
MAP
Teachers
Brooke Rowe
Presenter
coordinated by
Assistant Principal
assigned Testing
Coordinator
None
$100.00
$100.00
N/A
School
General Fund
N/A
Agendas, sign in sheets
76
ACTION PLAN FOR STRATEGY #4.5: Communicate and explain the results of student
performance and school effectiveness to all stakeholders in a timely manner. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
When results are
released SIC
meeting will be
publicized
Annual Gifted
and Talented
Parent Meeting
ESOL Parent
Meeting on
ELDA results
Open SIC Parent
Meeting on PASS
scores- SIC Chair
and Principal
GT Coordinator
ESOL Teachers and
Testing
Coordinator.
$100.00
$100.00
$100.00
N/A
N/A
N/A
ACTION PLAN FOR STRATEGY #4.6: Use expanded comparison and trend data of student
performance from comparable schools in evaluating effectiveness. EVALUATION/EVIDENCE
77
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.6.1 Compare School
for the Creative Arts with
other Beaufort County
Schools using
performance and growth
measures, together with
comparison of student
demographic categories
within schools.
Annually as data
is released
Using /Data
obtained from
Daniel Fallon the
Principal, Testing
Coordinator and
Coaches will use
data to measure
school success.
None N/A District reports from Mr. Fallon for
comparison.
ACTION PLAN FOR STRATEGY #4.7: Demonstrate verifiable growth in student performance
using formal and informal assessments. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.7.1 Maintain current
formal assessments
through the use of MAP,
PASS and writing
benchmarks.
Follow district
timeline.
Assistant Principal
assigned as Testing
Coordinator
None N/A School report card and District
MSP reports.
4.7.2 Develop a school
wide database of
common formative
Develop format
in Google Apps
by November 1,
Testing Coordinator None N/A Rubicon Atlas.
78
ACTION PLAN FOR STRATEGY #4.7: Demonstrate verifiable growth in student performance
using formal and informal assessments. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
assessments by grade
level and subject area.
2014 and update
quarterly.
79
ACTION PLAN FOR STRATEGY #4.8: Maintain a secure, accurate and complete student records
system in accordance with state and federal regulations. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
4.8.1 Continue to use
the current records
management systems of
PowerSchool and
Testview.
Continue to
follow district
protocol and
timelines.
Principal and Data
Specialist
None N/A District evaluation of data
4.8.2 Establish a
process of accountability
for student data
management.
Continue to
follow district
protocol and
timelines.
Principal and Data
Specialist
None N/A District assessment of data
management
4.8.3 Ensure that data is
entered correctly and in a
timely manner.
Continue to
follow district
protocol and
timelines.
Principal and Data
Specialist
None N/A Principal and feedback reports from
district.
80
SCHOOL RENEWAL PLAN FOR Hilton Head Island Elementary School for the Creative Arts
DATE: February 18, 2014
Performance Goal Area: Student Achievement Teacher/Administrator Quality School Climate (Parent Involvement, Safe and
Healthy Schools, etc.)
PERFORMANCE
GOAL: (Statement of desired progress
or result over five years)
5.Governance and Leadership: Beaufort County School District operates under governance and
leadership that promote and support student performance and system effectiveness.
INTERIM
PERFORMANCE
GOAL: (One year goal)
1. Schools will ensure compliance with applicable local, state, and federal laws, policies, and regulations. 2. Schools will use an EVALUATION/EVIDENCE process that results in improved professional practice and student
success. 3. Schools will operate in a consistent manner with the district’s beliefs, purpose, and direction. 4. Schools will employ a system that provides accurate analysis and thorough review of student performance and
school effectiveness. 5. Schools will provide teachers and students with opportunities to lead.
DATA SOURCE(S): (List types of data that will be
collected or examined to
measure progress.)
1. District letter indicating practices meet guidelines. (Previously in principal’s evaluation.)
2. Principal’s evaluation
3. Enhanced ADEPT reports from CODE
4. Teacher Forum agendas, minutes and sign in sheet.
81
ACTION PLAN FOR STRATEGY #5.1: Schools will ensure compliance with applicable local,
state and federal laws, policies and regulations. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.1.1Perform ongoing
audits of student files
and records to ensure
compliance standards
Continue to
follow district
protocol and
timelines.
Principal and Data
Specialist
None N/A District report of compliance
OVERALL
MEASURES:
SOURCE: 2012-13 school
year
* Represents projections of
improvement
AVERAGE
BASELINE
2013-14 2014-15 2015-16 2016-17 2017-18
District audit
Projected Data
clear
Actual Data
Clear/approval
of record
keeping
practices.
clear*
clear*
clear*
clear*
clear*
District
protocol for
compliance
Projected Data
clear
Actual Data
Clear/approval
clear*
clear*
clear*
clear*
clear*
Enhanced
ADEPT
Reports
Projected Data
complete
Actual Data
Complete* Complete* Complete* Complete* Complete*
To add a row, go to the last box and press the tab button.
82
ACTION PLAN FOR STRATEGY #5.1: Schools will ensure compliance with applicable local,
state and federal laws, policies and regulations. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
and accuracy.
83
ACTION PLAN FOR STRATEGY #5.2: Schools will use an EVALUATION/EVIDENCE process that
results in improved professional practice and student success. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.2.1 Research and provide
professional development to
improve professional practice
and student success.
August 2014 -
Continue to
follow district
protocol and
timelines.
Principal and
Assistant Principals
None N/A District protocol/report of
compliance
5.2.2 Use ongoing teacher
EVALUATION/EVIDENCE
processes to measure classroom
effectiveness.
August 2014-
Continue to
follow district
protocol and
timelines.
Principal and
Assistant Principals
None N/A Complete ADEPT Enhanced
Online evaluation program
ACTION PLAN FOR STRATEGY #5.3: Schools will operate in a consistent manner with the district’s
beliefs, purpose, and direction.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.3.1 Align School for the
Creative Arts leadership and
instructional efforts to the
district’s beliefs, purpose, and
By February
2015
Principal and
district designated
staff to guide
alignment
unknown unknown Principal’s evaluation
84
ACTION PLAN FOR STRATEGY #5.3: Schools will operate in a consistent manner with the district’s
beliefs, purpose, and direction.
EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
direction with support from
district staff.
ACTION PLAN FOR STRATEGY #5.4: Schools will employ a system that provides accurate analysis
and thorough review of student performance and school effectiveness. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.4.1 Use uniform guidelines
and standards that support
student achievement goals
and ensure consistent
measurement.
Continue to
follow district
protocol and
timelines.
Principal Unknown N/A
5.4.2 Improve student
academic performance and
educator effectiveness. At
SCA this includes Enhanced
ADEPT and Instructional
Rounds until otherwise
directed.
Continue to
follow district
protocol and
timelines.
Principal Unknown N/A
85
ACTION PLAN FOR STRATEGY #5.4: Schools will employ a system that provides accurate analysis
and thorough review of student performance and school effectiveness. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.4.3 Use technology to
help students reach their
academic goals and prepare
them for a technology-rich
future.
Continue to
follow district
protocol and
timelines.
Principal Unknown N/A Principal’s evaluation
ACTION PLAN FOR STRATEGY #5.5: Leadership and staff will provide teachers and students with
opportunities to lead. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.5.1 With the Principal,
Teacher Forum
Representatives at Creative
Arts will develop
opportunities for teachers to
assume shared and distributed
leadership roles to provide
personal development and
assist with student
development.
August 2014-19 Principal and
Teacher Forum
Representatives
None N/A Teacher Forum building meeting
agendas, minutes and sign in sheet.
86
ACTION PLAN FOR STRATEGY #5.5: Leadership and staff will provide teachers and students with
opportunities to lead. EVALUATION/EVIDENCE
ACTIVITY
TIMELINE (Start and End
Dates)
PERSON
RESPONSIBLE
ESTIMATED
COST
FUNDING
SOURCE
INDICATORS OF
IMPLEMENTATION (completed, continue, modify or
terminate)
5.5.2 Using the ‘Enhanced
ADEPT Evaluation
Process teachers will
develop Growth plans
and Goals Based
projects that
encourage and foster
professional growth to
prepare staff and
students for future
roles beyond the
school district.
August 2014-19 Administrative
Team
None N/A Submission of GBE reports to HR