school improvement planning 2014-15 a guide to the florida continuous improvement management system

47
School Improvement Planning 2014-15 A Guide to the Florida Continuous Improvement Management System

Upload: vincent-owen

Post on 22-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

School Improvement Planning2014-15

A Guide to the Florida Continuous Improvement Management System

School Improvement Plan (SIP)The purpose of the SIP is to provide guidance for implementing a process of continuous improvement.

Shifts in practice are necessary to bring about change. The SIP provides a framework for identifying areas of weakness, and allows the school to focus on the most constructive shifts and practices to strengthen teaching and learning.

Introduction to the Continuous Improvement

Management System (CIMS)

http://www.floridacims.org

[email protected]

You will need to give Level 1 access to all the users in your building who will be listed in the SIP (except EESAC members.)

The users email address becomes the username.

The password can be reset here

Getting started…

Or

Part I – What’s New?

Go Live

Early Warning Indicators

The Early Warning System (EWS) is based on extensive research that identifies key factors, called indicators, that are highly predictive of potential student failure, especially in terms of students dropping out of school.

Because the goal of schooling is to develop students who are college- and career-ready, EWS indicators help to identify struggling students in order to provide appropriate support and intervention in a timely manner

Target Area IndicatorAll Students

AttendanceStudents who miss more than 10% of instructional time

BehaviorStudents who have referrals that lead to suspension

PerformanceStudents score at FCAT (FSA) Level 1 in either ELA or Math

ElementaryPerformance

Students who are not proficient in reading by Grade 3

PerformanceStudents who are retained

Middle School (indicators must be reported by grade level)

PerformanceStudents who fail either ELA or Math

PerformanceStudents who fail 2 or more of any course

High School

AttendanceStudents who in grade 9 miss any days in the first 20 days of schools

PerformanceStudents who fail to progress to Grade 10 on time.

PerformanceStudents in high school with a grade point average less than 2.0

Along with the indicators listed above, list the additional indicators that you are using.

Along with the indicators listed above, click +Add Another until you have listed all additional indicators that you are using.

Middle School Grades must be listed separately, all others may be listed either by grade or total

In the last box, describe all intervention strategies employed by the school to improve the academic performance of students identified by the early warning system (i.e., those exhibiting two or more early warning indicators).

Go Live

Continue Part 1

Conducting a needs assessment should be a collaborative experience and will involve looking at student data and current practice.

http://www.floridacims.org

Part II – Needs AssessmentStep Zero

Part III – 8-Step Planning and Problem Solving

Based on the needs at your school, the resources available and the time allotted, develop the following goals:

• Goal 1: Core Instruction

• Goal 2: Early Warning Systems

• Goal 3: STEM/CTE

• Goal 4: Parent Involvement

Goal 1: Core InstructionThe Core instruction Goal is a strategic goal that leads to continuous improvement. The goal will:

• support targets and cross content areas. • Be measurable but not numeric. • be rigorous but attainable within the timeframe

allotted

Guiding Questions

• What can be done to increase the effectiveness of core instruction?

• How can available resources be utilized and instructional time maximized to increase student achievement?

• How are teachers supported in the delivery of effective instruction?

Goal 2: Early Warning Systems (EWS)The EWS goal will focus on providing interventions and strategies in order to address specific elements in the areas of attendance, behavior, and academic performance that will lead to greater success for students identified as at-risk.

Guiding Questions

• What specific research-based strategies can be utilized with identified students to help them become more successful?

• How can a flexible and effective plan be developed to meet the needs of at-risk student?

• How can the use of available school resources be maximized in order to provide effective interventions to at-risk students?

Goal 3: Science, Technology, Engineering, and Mathematics (STEM) & Career Technical Education (CTE)

The school’s STEM/CTE goal is a strategic goal to prepare students to be college and career ready through STEM and/or CTE initiatives and programs. All schools will develop strategies for STEM. Schools with current or future planned CTE programs will also include strategies for CTE.

Guiding Questions:

• What resources are provided by the district to engage students in STEM-related activities?

• How do STEM and CTE strategies strengthen our current instructional programs?

• How can our CTE program be improved or expanded to increase student success?

Goal 4: Parental InvolvementThe Parent Involvement Goal is focused on building strong, continuing family and community involvement in all aspects of school programs and activities in support of measurable improvement in student achievement.

*Title 1 schools will complete the Parental Involvement Plan (PIP)

Guiding Questions:

• How can we assist parents in supporting student achievement, and foster a positive attitude towards school and learning?

• How can the available technology resources be used to ensure parents take an active part in school activities?

• How can parental support be targeted to create a multi-dimensional program that meets the need of the “whole” child?

If you had a 2013-2014 School Improvement Plan, you will see all of the goals from last year in the boxes. It is recommended that you delete all the goals from last year before you enter any responses for this year.

Step 1a will describe an action that you will take, school-wide, to increase student achievement.

Step 1b will indicate the targets for the goal. Most goals will have several targets. Some targets are for all students and some are for selected groups.

Step 1 - Goals

Enter your barriers or barrier buckets one at a time. Use the +Add Barrier button to add each one. Add all the resources available to reach the goal. Be sure to “Save” before moving on.

Step 2 – Resources and Barriers

Step 3 – Selecting the Barrier

Step 4 – The Strategy

If you do not “select” a strategy, you can’t move to Step 5.Be sure to “Save” before moving on.

Step 5 – Developing the Action Plan

MonitoringAs you work through the Action Plan, you will look for evidence that the Action Steps have been completed. Steps 6-8 of the 8-Step Problem Solving Process are also monitoring steps. In Step 6, you will monitor the Action Plan for fidelity. In Step 7, you will monitor the Action Plan for effectiveness. In Step 8, you will monitor the Goal for progress. Note: For each goal, you will have only one Step 8 but you will have a Step 6 and a Step 7 for each strategy.

Step 6 – Monitoring for Fidelity

Step 7 – Monitoring for Effectiveness

Step 8 – Monitoring the Goal for Progress

Check for Completion

Each page must be marked “complete” or “NA “. Be sure to “Save”

Parts IV, V and VI populate from the action steps after they are saved:

DATE ACTIVITY LEADER PARTICIPANTS

SEPTEMBER 4- 5, 2014 CIMS overview OSI

Charter/Vocational Principals, APs

SEPTEMBER 9- 26, 2014 SIP Development Principal

Planning Team

SEPTEMBER 29- OCTOBER 3, 2014 Finalize CIMS Principal, EESAC

chair Planning Team

OCTOBER 6- 9, 2014

SIP Technical SupportPaul Bell Middle School

For all schools from 8:00am -4:30pm. Focus of support will be on completing the online

SIP.

OSI All Schools

OCTOBER 9, 2014

EESAC meeting An EESAC meeting must be held on or before October 9, 2014 to review and

approve the 2014-2015 SIP and minutes must be posted

EESAC Chair All Schools

OCTOBER 10, 2014 SIP posted to http://www.floridacims.org Principal All Schools

OCTOBER 27- NOVEMBER 14, 2014 Fall Interim Assessment (FIA) All Schools

NOVEMBER 17- 26, 2014 Review and Revise action steps based on Interim data Planning Team EESAC and Stakeholders

Here is our site with resources from the state to help you as well as guides that we develop

http://osi.dadeschools.net

Questions?Charter School Office:

Ms. Pamela Sanders-White 305-995-1403

Office of School Improvement:Ms. Pamela Wentworth

305-995-1520