school code: 1458 school name: aurora central high
TRANSCRIPT
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 1
Colorado’s Unified Improvement Plan for Schools for 2014-15
Organization Code: 0180 District Name: ADAMS-ARAPAHOE 28J School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL Official 2014 SPF: 1 Year Section I: Summary Information about the School Directions: This section summarizes your school’s 2013-14 performance on the federal and state accountability measures. In the table below, CDE has pre-populated the school’s data in blue text. This data shows the school’s performance in meeting minimum federal and state accountability expectations. Most of the data are pulled from the official School Performance Framework (SPF). This summary should accompany your improvement plan. Student Performance Measures for State and Federal Accountability
Performance Indicators Measures/ Metrics 2013-14 Federal and State Expectations 2013-14 School Results Meets Expectations?
Academic Achievement (Status)
TCAP, CoAlt, Lectura, Escritura Description: % Proficient and Advanced (%P+A) in reading, writing, math and science Expectation: %P+A is above the 50th percentile (from 2009-10 baseline) by using 1-year or 3-years of data
R
Elem MS HS Elem MS HS Overall Rating for Academic Achievement: Does Not Meet * Consult your School Performance Framework for the ratings for each content area at each level.
- - 73.33% - - 39.66%
M - - 33.52% - - 11.68%
W - - 50% - - 21.47%
Academic Growth
Median Growth Percentile Description: Growth in TCAP for reading, writing and math and growth on ACCESS for English language proficiency. Expectation: If school met adequate growth, MGP is at or above 45. If school did not meet adequate growth, MGP is at or above 55.
R
Median Adequate Growth Percentile (AGP)
Median Growth Percentile (MGP) Overall Rating for Academic
Growth: Approaching * Consult your School Performance Framework for the ratings for each content area at each level.
Elem MS HS Elem MS HS
- - 66 - - 54
M - - 99 - - 55
W - - 91 - - 50 ELP - - 39 - - 48
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 2
Student Performance Measures for State and Federal Accountability (cont.)
Performance Indicators Measures/ Metrics 2013-14 Federal and State
Expectations 2013-14 School Results Meets Expectations?
Academic Growth Gaps
Median Growth Percentile Description: Growth for reading, writing and math by disaggregated groups. Expectation: If disaggregated groups met adequate growth, MGP is at or above 45. If disaggregated groups did not meet adequate growth, MGP is at or above 55.
See your School Performance Framework for listing of median adequate growth expectations for your school’s disaggregated groups, including free/reduced lunch eligible, minority students, and students with disabilities, English Language Learners (ELLs) and students below proficient.
See your School Performance Framework for listing of median growth by each disaggregated group.
Overall Rating for Growth Gaps:
Approaching
* Consult your School Performance Framework for the ratings for each student disaggregated group at each content area at each level.
Postsecondary & Workforce Readiness
Graduation Rate Expectation: At 80% or above on the best of 4-year, 5-year, 6-year or 7-year graduation rate.
At 80% or above Best of 4-year through 7- year
Grad Rate Does Not Meet
Overall Rating for
Postsecondary & Workforce Readiness:
Does Not Meet
60% using a 6 year grad rate
Disaggregated Graduation Rate Expectation: At 80% or above on the disaggregated group’s best of 4-year, 5-year, 6-year or 7-year graduation rate.
At 80% or above for each disaggregated group
See your School Performance Framework for listing of 4-year, 5-year, 6-year and 7-year graduation rates for disaggregated groups, including free/reduced lunch eligible, minority students, students with disabilities, and ELLs.
Does Not Meet
Dropout Rate Expectation: At or below state average overall (baseline of 2009-10).
3.6% 8.8% Approaching
Mean Colorado ACT Composite Score Expectation: At or above state average (baseline of 2009-10).
20.0 15.2 Does Not Meet
Accountability Status and Requirements for Improvement Plan
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 3
Summary of School Plan Timeline
October 15, 2014 An optional submission for review is available on October 15, 2014 for early feedback from CDE. For required elements in the improvement plan, go to the Quality Criteria at: http://www.cde.state.co.us/uip/UIP_TrainingAndSupport_Resources.asp.
January 15, 2015 The school UIP is due to CDE for review on January 15, 2015 and should be submitted through Tracker. For required elements in the improvement plan, go to the Quality Criteria at: http://www.cde.state.co.us/uip/UIP_TrainingAndSupport_Resources.asp.
April 15, 2015 The UIP is due to CDE for public posting on April 15, 2015 through Tracker. Some program level reviews will occur at this same time. For required elements in the improvement plan, go to the Quality Criteria at: http://www.cde.state.co.us/uip/UIP_TrainingAndSupport_Resources.asp.
Program Identification Process Identification for School Directions for Completing Improvement Plan
State Accountability
Plan Type Assignment
Plan type is assigned based on the school’s overall School Performance Framework score for the official year (achievement, growth, growth gaps, and postsecondary and workforce readiness).
Priority Improvement - Entering Year 5 as of July 1, 2015
The school has not met state expectations for attainment on the SPF performance indicators and is required to adopt and implement a Priority Improvement Plan. The plan must be submitted by January 15, 2015 for review. The updated plan must also be submitted to CDE by April 15, 2015 to be posted on SchoolView.org. Note the specialized requirements for identified schools included in the Quality Criteria document.
ESEA and Grant Accountability
Title I Focus School
Title I school with a (1) low graduation rate (regardless of plan type), and/or (2) Turnaround or Priority Improvement plan type with either (or both) a) low-achieving disaggregated student groups (i.e., minority, ELL, IEP and FRL) or b) low disaggregated graduation rate. This is a three-year designation.
Not identified as a Title I Focus School
This school is not identified as a Focus School and does not need to meet those additional requirements.
Tiered Intervention Grant (TIG)
Competitive grant (1003g) for schools identified as 5% of lowest performing Title I or Title I eligible schools, eligible to implement one of four reform models as defined by the
Awarded a TIG Grant
In addition to the general requirements, TIG schools are expected to complete the TIG addendum that corresponds to the school’s approved model - Transformation. Note the specialized requirements for grantees included in the Quality Criteria document.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 4
USDE.
Diagnostic Review Grant Title I competitive grant that includes a diagnostic review and/or improvement planning support.
Not awarded a current Diagnostic Review and Planning Grant
This school has not received a current Diagnostic Review and Planning grant and does not need to meet those additional requirements.
School Improvement Support (SIS) Grant
Title I competitive grant that support implementation of major improvement strategies and action steps identified in the school’s action plan.
Not a current SIS Grantee
This school has not received a current SIS grant and does not need to meet those additional requirements.
Colorado Graduation Pathways Program (CGP)
The program supports the development of sustainable, replicable models for dropout prevention and recovery that improve interim indicators (attendance, behavior and course completion), reduce the dropout rate and increase the graduation rate for all students participating in the program.
CGP Systems Change School
In addition to the general requirements, school plans must respond to identified quality criteria for the CGP Program.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 5
Section II: Improvement Plan Information Additional Information about the School Comprehensive Review and Selected Grant History
Related Grant Awards Has the school received a grant that supports the school’s improvement efforts? When was the grant awarded?
Tiered Intervention Grant: Awarded July 1 2013
Diagnostic Review, School Support Team or Expedited Review
Has (or will) the school participated in a Diagnostic Review, SST or Expedited Review? If so, when?
RMC Instructional Audit: May of 2013, May of 2014, Tentative May 2015
External Evaluator Has the school partnered with an external evaluator to provide comprehensive evaluation? Indicate the year and the name of the provider/tool used.
RMC Instructional Audit: May of 2013, May of 2014, Tentative May 2015
Improvement Plan Information The school is submitting this improvement plan to satisfy requirements for (check all that apply): State Accreditation Title I Focus School X Tiered Intervention Grant (TIG) Diagnostic Review Grant School Improvement Support Grant Colorado Graduation Pathways Program (CGP) Other: _________________________________________________________________________________
School Contact Information (Additional contacts may be added, if needed) 1 Name and Title Mark Roberts, Ed.D., Principal Aurora Central High School
Email [email protected]
Phone 303- 340 -1600 x27003
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 6
Section III: Narrative on Data Analysis and Root Cause Identification This section corresponds with the “Evaluate” portion of the continuous improvement cycle. The main outcome is to construct a narrative that describes the process and results of the analysis of the data for your school. The analysis should justify the performance targets and actions proposed in Section IV. Two worksheets have been provided to help organize your data analysis for your narrative. This analysis section includes: identifying where the school did not at least meet minimum state and federal accountability expectations; describing progress toward targets for the prior school year; describing what performance data were used in the analysis of trends; identifying trends and priority performance challenges (negative trends); describing how performance challenges were prioritized; identifying the root causes of performance challenges; describing how the root causes were identified and verified and what data were used; and describing stakeholder involvement in the analysis. Additional guidance on how to engage in the data analysis process is provided in Unified Improvement Planning Handbook. Data Narrative for School Directions: In the narrative, describe the process and results of the data analysis for the school, including (1) a description of the school and the process for data analysis, (2) a review of current performance, (3) trend analysis, (4) priority performance challenges and (5) root cause analysis. Descriptions of the expected narrative sections are included below. The narrative should not take more than five pages. Two worksheets (#1 Progress Monitoring of Prior Year’s Performance Targets and #2 Data Analysis) have been provided to organize the data referenced in the narrative. Data Narrative for School Description of School Setting and Process for Data Analysis: Provide a
Review Current Performance: Review the SPF and local data. Document any areas
Trend Analysis: Provide a description of the trend analysis that includes at least three years of data (state and local data).
Priority Performance Challenges: Identify notable trends (or a combination of trends) that
Root Cause Analysis: Identify at least one root cause for every priority performance challenge. Root causes should address adult
Mailing Address Aurora Central High School, 11700 East 11th Avenue Aurora, Colorado 80010
2 Name and Title
Jocelyn Stevens, P-20 Learning Community Director
Email [email protected]
Phone 303-34000859
Mailing Address Educational Services Center 2, 15751 E. 1st Ave, Suite 206, Aurora CO 80011
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 7
very brief description of the school to set the context for readers (e.g., demographics). Include the general process for developing the UIP and participants (e.g., SAC).
where the school did not at least meet state/ federal expectations. Consider the previous year’s progress toward the school’s targets. Identify the overall magnitude of the school’s performance challenges.
Trend statements should be provided in the four performance indicator areas and by disaggregated groups. Trend statements should include the direction of the trend and a comparison (e.g., state expectations, state average) to indicate why the trend is notable.
are the highest priority to address (priority performance challenges). No more than 3-5 are recommended. Provide a rationale for why these challenges have been selected and address the magnitude of the school’s overall performance challenges.
actions, be under the control of the school, and address the priority performance challenge(s). Provide evidence that the root cause was verified through the use of additional data. A description of the selection process for the corresponding major improvement strategies is encouraged.
Trend Analysis and Performance Challenges Overview Aurora Central High School (ACHS) is a comprehensive high school located in Northwest Aurora with 2,210 students. Demographics comprising the student population are:
1473 / 66.5% Hispanic, 361 / 15.9% Black or African American, 181 / 8.9% Asian, 111 / 5.0% White, 59 / 2.7% two or more races, 18 / .8% Native American, 7 / .3%
Hawaii/Pacific Island. ACHS has 140 identified gifted/talented and high potential students. ACHS also has 345 students with Individualized Educations Plans (IEPs), 17.7% of
the student population. Trend analysis points us to a large English Language Learner population of 1,534 of 2,210 students, 69.4%. Non-English Proficient and Limited English
Proficient students total 957 students / 43.3% of population. Fluent English Proficient ELL students total 577 / 26.1%. ACHS has 157 NEP1, 129 NEP2, 218 LEP3, 269 LEP 4,
1170 LEP 5, 14 LEP 6, and 583 FEP students.
ACHS has selected a transformation model for Priority School Improvement and is in its second year of receiving a Tiered Intervention Grant (TIG). In 2013-2014 a new
administrative leadership team that consisted of one new principal, three new assistant principals were placed at ACHS. In addition, and through the TIG, new personnel was
added to ACHS which now includes: Four (4) Early Warning Interventionist for 9th and 10th grade levels, a Community Liaison Teacher on Special Assignment (TOSA), one Data
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 8
TOSA in 2013-2014 and one Attendance TOSA in 2014-2015.
Process
In 2014-2015 the Aurora Central High School - School Unified Improvement Planning Team consisted of the Principal, three Assistant Principals, a Parent focus group, and the
Instructional Leadership Team. The team analyzed three years of data which included: TCAP, TCAP Growth, ACT ACCESS, and RMC audit. Additional data reviewed are
graduation rates, dropout rates and daily attendance. The team referenced the RMC reports for instructional data, school climate, and fidelity to established improvement
strategies. The UIP was presented to the board of education and to our parents of ACHS.
Performance Summary While overall aggregated achievement has increased slightly, reading, writing, and math achievement remain below district and state expectations and ACHS is in PRIORITY
IMPROVEMENT. In the four School Performance Frameworks Indicators categories on the 2014 Aurora Central High School Performance Framework in the category of
Academic Achievement ACHS has a performance rating of DOES NOT MEET. In the category of Academic Growth Gaps ACHS has a performance rating of APPROACHING.
In the category of Academic Growth ACHS has a performance rating of APPROACHING. In the category of Postsecondary and Workforce Readiness ACHS has a performance
rating of DOES NOT MEET. ACHS met the required 95% Participation rate on standardized assessments. Although ACHS as seen increases in both Academic Achievement
and Academic Growth rates for reading, writing and math the gains of the 2013-2014 school year were not enough to move the school out of Priority Improvement status.
Reading Academic Achievement for ACHS is 39.66% Proficient/Advanced; this is 9.34 percent behind the APS District Average and 27.84 percent behind the State of Colorado
average. Math Academic Achievement for ACHS is 11.68% Proficient/Advanced, this is 14.32 percent behind the APS District Average and 36.5 percent behind the State of
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 9
Colorado average. Writing Academic Achievement for ACHS is 21.47% Proficient/Advanced, this is 10.53 percent behind the APS District Average and 30.03 percent behind the
State of Colorado average. The priority improvement challenge is to significantly increase Academic Achievement in Reading, Math, and Writing and narrow the Achievement
gaps between the APS District and State of Colorado averages. While graduation rates have increased slightly over the course of the three previous years the priority
improvement challenge is to significantly increase 4 year graduation rates as well as 5, 6, and 7 year rates. All rates are currently in the category of DOES NOT MEET and the
challenge is to move graduation rates in to the category of APPROACHING in 2015. For the past 3 years the graduation rate has averaged 57.4 % using the 7 year graduation
formula. This is 22.6 percentage points below state expectations. The current 4 year graduation rate is 42.2%, which is significantly below the 80% expected graduation rate for
the state of Colorado.
Root Cause for Priority Improvement Using quantitative date and qualitative data collected from multiple sources, including the School Performance Framework, TCAP/CSAP Historical Trend Analysis, Two (2)
Instructional Audits conducted at Aurora Central High School in April, 2013 and again in April, 2014 by RMC Research Corporation of Denver, the 2011-2012, 2012-2013, and
2013-2014 ACHS Climate Survey, as well as numerous classroom observations and interviews with students, teachers, parents, and various key stakeholders, we developed the
current realities at Aurora Central:
We need to increase and refine teacher skills and implementation of reading and writing, and vocabulary development, and student discourse in all content areas.
We need to align post-secondary workforce readiness systems to include all grade levels. Implement a plan to systematically support all students with our RTI system.
We need to create support systems in math, such as tutoring or intentional inclusion models to continue to reduce academic growth gaps.
We need to develop differentiated language and instructional support based on the need of English Language learners. We need to increase culturally responsive professional development and focusing on the Affective, Behavioral and Cognitive student needs.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 10
Verification of these Root Causes was found in the quality school reviews and instructional audit conducted by the RMC Research Corporation of Denver in April, 2013 and again
in April, 2014. The instructional audit and review included classroom observations, administrator and teacher interviews/surveys, student and parent focus groups, and School
Performance Framework reviews.
The abridged executive summaries of the RMC 2012-2013, 2013-2014 Instructional Audits include:
2012-2013 Year prior to TIG
In short, the school is in urgent need for improvement. Some of the key foundational elements for improvement are in place; however, Leadership this year has been problematic.
The staff shares the mission of helping all students to become college and career ready and to raise test scores, but few understand the vision for achieving that goal. Teachers
want to do well, but feel that the assistance provided to them to improve is inadequate. They do not have a clear vision of instructional effectiveness, are not consistently
monitored for effectiveness. Instructional time is poorly planned. The professional development that was given was not valued by the teachers and not viewed as influencing
achievement. Parents are often disengaged and are very concerned about the morale and discipline policy at the school.
Strong but supportive leadership is also needed and everyone should be clear about expectations. The system of collaborative decision making should result in strategies that
should be analyzed for cohesiveness, monitored for effectiveness, and co-owned throughout the school. Teachers and students must be made aware that they have a shared
responsibility for success. Instruction should become more student-centered and far more engaging. Time for instruction should be extended, not reduced. Professional learning
community time should be provided and strictly enforced. Strategic staffing should occur. More opportunities for student leadership and bonding should be emphasized.
Strategies should be put into place to brand the school and promote pride.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 11
Upon return, April of 2014 Year 1 of TIG RMC found:
Fidelity to the [2013] UIP was very high. ACHS has implemented nearly all of the activities that were outlined in the school’s [2013-2014] UIP. A few were deferred or dropped;
other activities were added. Impacts, however, were mixed. The four areas in which activities were categorized and their impacts are:
Curriculum and Instruction. Focused professional development was provided and had positive results that included:
Increased teacher knowledge and implementation of effective instructional strategies for writing across the content areas;
Increased teacher understanding and communication of lesson plan objectives;
Increased teacher knowledge and implementation of strategies related to the Madeline Hunter approach to lesson delivery;
Increased coaching resulting in more engaging instruction and rigor for some teachers;
Increased collaboration of teachers in the same department; and
Establishment of academic goals for every classroom.
Equity and Engagement. Multiple activities were held in this area, with mixed results. Activities included:
Improving the physical appearance of the school, creating a new mission and motto, making
daily announcements, holding a pep rally, and sponsoring more student clubs and programs that led to improved appearance and better student attachment and pride in the school;
Communication and Accountability. Many activities were implemented in this domain, again with mixed and sometimes clearly unintentional results.
Six early warning interventionists (EWIs) were hired to work with failing and at-risk ninth- and tenth-grade students.
Counseling was devoted to grade levels; administrators met with at-risk students, after-school and Saturday tutoring was provided, all of which were well-received and helped students with credit accrual and increasing their motivation to learn;
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 12
Round up of displaced students and super seniors led to 55 students being graduated midyear with either a high school diploma or a general equivalency diploma (GED).
The tardy sweeps/accountability walks changed the perceived locus of control in the school, from a sense of chaos and student control, to a sense of orderliness and adult control. Communication with parents/guardians about student achievement was increased through school newsletters, an improved website, teacher postcards, and robo-calls to parents of failing students.
Campus and Community. Many activities were implemented to connect parents and community partners to the school, which resulted in low but better participation by parents than had been the case in the past. Activities included:
Parenting matters programs that sponsored educational events; parent coffees and other gatherings; parent classes; parent learning walks where parents observed classrooms and provided feedback; and classes for parents on cooking and English as a second language.
The website was improved to make it more attractive and accessible, and community breakfasts were held to engage community partners.
Additionally, the 2013-2014 RMC Instructional Audit found:
Fidelity to the TIG was very high. Nearly all of the activities identified in the TIG were implemented as planned.
Abridged RMC Conclusion:
Some of the key foundational elements for improvement are in place. The quality of the teaching staff is generally high yet efforts should be taken to provide differentiated
professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice should be
assessed through continual learning walks and instructional rounds that monitor practice challenges and to gather data to plan for and adjust targeted professional development
to meet the instructional needs of teaching staff. Professional learning community time should be provided and strictly enforced. Time for instruction should be extended, not
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 13
reduced, and instruction should become more student-centered and far more engaging. Teachers generally do care about the students and would like their school to succeed.
Many students are motivated. Both teachers and adults are hopeful about the future. However, both groups must have a voice in the future of the school is to succeed. They must
own the problem and the solution. Their voices should be considered in the plan for improvement. The system of collaborative decision making should result in strategies that
should be analyzed for cohesiveness, monitored for effectiveness, and co-owned throughout the school. Teachers, students, and all other stakeholders must be made aware that
they have a shared responsibility for increasing achievement, post-secondary work force readiness and graduation rates while working to decrease growth gaps and drop-out
rates. This will enable Aurora Central High School to foster a school culture in which all stakeholders have a shared responsibility to increase student achievement, attendance
and create opportunities for students, parents and community to participate in preparing students with workforce readiness skills. Additionally, this work will enable us to increase
student achievement and graduation rates while decreasing growth gaps and drop-out rates by continual monitoring of attendance, mentoring of students and providing targeted
content, and social interventions for students to be successful. This should include continued and new efforts to increase parental involvement and the community perception as
seeing the school as welcoming with significant outreach programs that develop a home school connection that is inviting and consistently streamlines home and school
communications.
Local and Immediate School-wide Data, as evidenced in a 3 Year Historical Comparison and Analysis of the Licensed Staff Climate Survey for the school years of 2011-2012, 2012-2013, 2013-2014 further supports the previously identified Root Causes for Priority Improvement:
School Climate Data - Licensed Staff Climate Survey: 3 Year Historical Comparison, 2011-2012, 2012-2013, 2013-2014 I am able to influence the decisions made by my school District Survey for ACHS 2011-12: [Strongly Disagree, Disagree 42.0%] [Neutral 21.0%] [Agree, Strongly Agree 37.0%]
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 14
District Survey for ACHS 2012-13: [Strongly Disagree, Disagree 45.2%] [Neutral 19.0%] [Agree, Strongly Agree 35.7%] District Survey for ACHS 2013-14: [Strongly Disagree, Disagree 29.7%] [Neutral 20.3%] [Agree, Strongly Agree 50.0%] Employees are empowered to help solve problems District Survey for ACHS 2011-12: [Strongly Disagree, Disagree 38.8%] [Neutral 25.5%] [Agree, Strongly Agree 35.7%] District Survey for ACHS 2012-13: [Strongly Disagree, Disagree 46.4%] [Neutral 15.5%] [Agree, Strongly Agree 38.1%] District Survey for ACHS 2013-14: [Strongly Disagree, Disagree 26.6%] [Neutral 21.9%] [Agree, Strongly Agree 51.6%] I trust people who make school decisions that affect me District Survey for ACHS 2011-12: [Strongly Disagree, Disagree 37.0%] [Neutral 12.0%] [Agree, Strongly Agree 51.0%] District Survey for ACHS 2012-13: [Strongly Disagree, Disagree 38.0%] [Neutral 10.5%] [Agree, Strongly Agree 44.2%] District Survey for ACHS 2013-14: [Strongly Disagree, Disagree 29.7%] [Neutral 17.2%] [Agree, Strongly Agree 53.1%] There is a an atmosphere of trust /respect between building administrators and staff in the building District Survey for ACHS 2011-12: [Strongly Disagree, Disagree 44.4%] [Neutral 14.1%] [Agree, Strongly Agree 41.4%] District Survey for ACHS 2012-13: [Strongly Disagree, Disagree 48.8%] [Neutral 12.8%] [Agree, Strongly Agree 38.4%] District Survey for ACHS 2013-14: [Strongly Disagree, Disagree 28.6%] [Neutral 17.5%] [Agree, Strongly Agree 54.0%] There is a spirit of teamwork and cooperation at my site District Survey for ACHS 2011-12: [Strongly Disagree, Disagree 29.0%] [Neutral 20.0%] [Agree, Strongly Agree 37.5%] District Survey for ACHS 2011-12: [Strongly Disagree, Disagree 38.1%] [Neutral 18.6%] [Agree, Strongly Agree 45.3%] District Survey for ACHS 2013-14: [Strongly Disagree, Disagree 23.4%] [Neutral 17.2%] [Agree, Strongly Agree 59.4%]
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 15
Priority Improvement Challenge
Reading: Over the past 3 years Academic Achievement has increased slightly to 36.22% of students being proficient on TCAP/CSAP in Reading, 33 percentage points
below state average proficiency levels, and 10 percentage points below district average proficiency levels. The priority Improvement Challenge is to increase Reading
Academic Achievement narrow the Achievement gaps between the APS District and State of Colorado averages.
Writing: Over the past 3 years Academic Achievement has increased slightly to 17.76% of students being proficient on TCAP/CSAP in Writing, 36 percentage points
below state average proficiency levels, and 16 percentage points below district average proficiency levels. The priority Improvement Challenge is to increase Writing
Academic Achievement narrow the Achievement gaps between the APS District and State of Colorado averages.
Math: Over the past 3 years Academic Achievement has increased slightly to 12.8% of students being proficient on TCAP/CSAP in Math, 44 percentage points below
state average proficiency levels, and 23 percentage points below district average proficiency levels. The priority Improvement Challenge is to increase Math Academic
Achievement narrow the Achievement gaps between the APS District and State of Colorado averages.
Graduation Rate: Over the past 3 years the Graduation Rate has increased slightly to 57.4% using the 7 year graduation formula. This is 23 percentage points below
the state expectation of an 80% graduation rate. The current 4 year graduation rate has risen slightly to 40.7%. The priority Improvement Challenge is to increase the
Graduation Rate and narrow the Achievement gaps between the APS District and State of Colorado averages.
Data Trends Academic Achievement based on TCAP/CSAP
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 16
Academic Achievement is increasing but is still below state averages and has a performance rating of DOES NOT MEET.
Academic Growth is occurring in all TCAP/CSAP assessed subjects as ACHS has a performance rating of APPROACHING
Academic Growth Gaps are closing slightly as ACHS has a performance rating of APPROACHING.
The Graduation Rate is increasing, while the Drop-Out Rate is decreasing, but both currently DOES NOT MEET Colorado Department of Education expectations for Postsecondary and Workforce Readiness.
School CSAP/ TCAP Reading Proficiency Performance (2010 – 2014)
Academic Year Subject Count %P/A 2010 Reading 9th and 10th 1000 31% 2011 Reading 9th and 10th 925 35.3% 2012 Reading 9th and 10th 900 32.25% 2013 Reading 9th and 10th 1031 34.7% 2014 Reading 9th and 10th 948 39.66%
School TCAP/CSAP Math Proficiency Performance (2010 – 2014)
School CSAP/ TCAP Writing Proficiency Performance (2010 – 2014) Academic Year Subject Count %P/A 2010 Writing 9th and 10th 1000 12% 2011 Writing 9th and 10th 925 16.1% 2012 Writing 9th and 10th 900 15.36% 2013 Writing 9th and 10th 1031 15.9% 2014 Writing 9th and 10th 948 21.47%
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 17
Academic Year Subject Count %P/A 2010 Math 9th and 10th 1000 12.% 2011 Math 9th and 10th 925 11.2% 2012 Math 9th and 10th 899 13.28% 2013 Math 9th and 10th 1031 11.9% 2014 Math 9th and 10th 950 11.68%
Academic Growth
In 2014 at ACHS the Median growth per for overall Reading is at the 54th percentile and ranked APPROACHING on CDE School Performance Framework
All academic growth gaps in Reading are ranked MEETS; ELL students, Free/Reduced Lunch eligible students, Minority Students, and Students Needing to Catch Up all ranked in the 55th percentile or higher, Students with Disabilities ranked in the 45th percentile.
In 2014 at ACHS the Median growth percentile for overall Writing is at the 50th percentile and is ranked as APPROACHING on CDE School Performance Framework. Overall, all Academic Growth Gaps in Writing are ranked APROACHING.
In 2014 at ACHS the Median growth percentile for overall Math is at the 55th percentile and is ranked as APPROACHING on CDE School Performance Framework. Overall, all Academic Growth Gaps in Math are rated APPROACHING.
Academic growth in English Language Proficiency (ACCESS) is rated MEETS for the past three years and is in the 48th percentile for median growth on CDE School Performance
Framework The School Performance Framework reports use the 4-, 5-, 6- and 7-year graduation rates for the school and disaggregated student groups (students eligible for free/reduced lunch, minority students, students with disabilities and English learners). This School's Overall Graduation Rate and Disaggregated Graduation Rate (3-year aggregate):
2010 2011 2012 2013
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 18
Graduation Rate: 4yr: 41.1% 5yr: 53% 6yr: 56.1% 7yr: 57.4% Free/Reduced Lunch: 4yr: 42.1% 5yr: 55.1% 6yr: 57.9% 7yr: 59.3% Minority Students: 4yr: 39.7% 5yr: 52.3% 6yr: 55.5% 7yr: 56.9% Students with Disabilities: 4yr: 18.2% 5yr: 33.3% 6yr: 42.3% 7yr: 46.2% English Learners: 4yr: 32.9%
Graduation Rate: 4yr: 43% 5yr: 54.8% 6yr: 60% Free/Reduced Lunch: 4yr: 44.5% 5yr: 56.1% 6yr: 51.2% Minority Students: 4yr: 41.9% 5yr: 53.6% 6yr: 59% Students with Disabilities: 4yr: 27.8% 5yr: 39.7% 6yr: 51.2% English Learners: 4yr: 34.0%
Graduation Rate: 4yr: 36.4% 5yr: 51.4% Free/Reduced Lunch: 4yr: 36.9% 5yr: 52.1% Minority Students: 4yr: 35.9% 5yr: 51.4% Students with Disabilities: 4yr: 22.4% 5yr: 41.3% English Learners: 4yr: 28.3%
Graduation Rate: 4yr: 42.2% Free/Reduced Lunch: 4yr: 36.9% Minority Students: 4yr: 41.8% Students with Disabilities: 4yr: 18.2% English Learners: 4yr: 34.4%
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 19
5yr: 45.1% 6yr: 49.4% 7yr: 50.8%
5yr: 46.9% 6yr: 55.5%
5yr: 46.4%
Worksheet #1: Progress Monitoring of Prior Year’s Performance Targets Directions: This chart supports analysis of progress made towards performance targets set for the 2013-14 school year (last year’s plan). While this worksheet should be included in your UIP, the main intent is to record your school’s reflections to help build your data narrative.
Performance Indicators Targets for 2013-14 school year (Targets set in last year’s plan)
Performance in 2013-14? Was the target met? How close was the school to meeting
the target? Brief reflection on why previous targets were
met or not met.
Academic Achievement (DOES NOT MEET)
Reading: 40.5%, Proficient or Advanced Writing: 21.5%, Proficient or Advanced Math: 17%, Proficient or Advanced
Reading: 39.66%, Proficient or Advanced. The target was missed by .84 percentage points. Writing: 21.47%, Proficient or Advanced. The target was missed by .03 percentage points. Math: 11.68%, Proficient or Advanced. The target was missed by 5.32 percentage points.
We did not obtain adequate Academic Achievement in Reading, Writing, and Math to move ACHS out of Priority Improvement status.
Academic Growth (APPROACHING)
Reading: 57 Percentile
Reading: 54th Percentile. The target was missed by 3 percentile points. Writing: 50th Percentile. The target was
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 20
Performance Indicators Targets for 2013-14 school year (Targets set in last year’s plan)
Performance in 2013-14? Was the target met? How close was the school to meeting
the target? Brief reflection on why previous targets were
met or not met.
Writing: 57 Percentile Math: 57 Percentile ELP: 60 Percentile
missed by 7 percentile points. Math: 55th Percentile. The target was missed by 2 percentile points. ELP: 48th Percentile. The target was missed by 12 percentile points.
We did not obtain adequate Academic Growth in Reading, Writing, Math, and ELP to move ACHS out of Priority Improvement status.
We did not obtain adequate growth in all disaggregated Growth Gap areas to move ACHS out of Priority Improvement status.
We did not obtain adequate growth in all disaggregated Growth Gap areas to move ACHS out of Priority Improvement status.
Academic Growth Gaps (APPROACHING)
Overall, Reading: 57 Percentile Overall, Writing: 57 Percentile
Reading: Free/Reduced Lunch: 56 Percentile. The target was missed by 1 percentile point. Minority Students: 55 Percentile. The target was missed by 2 percentile points. Students with Disabilities: 45 Percentile. The target was missed by 12 percentile points. English Learners: 57 Percentile. The target was met. Writing: Free/Reduced Lunch: 50 Percentile. The target was missed by 7 percentile points.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 21
Performance Indicators Targets for 2013-14 school year (Targets set in last year’s plan)
Performance in 2013-14? Was the target met? How close was the school to meeting
the target? Brief reflection on why previous targets were
met or not met.
Postsecondary & Workforce Readiness
Overall, Math: 57 Percentile Targets, Graduation Rates:
Minority Students: 50 Percentile. The target was missed by 7 percentile points. Students with Disabilities: 45 Percentile. The target was missed by 12 percentile points. English Learners: 51 Percentile. The target was missed by 6 percentile points. Math: Free/Reduced Lunch: 53 Percentile. The target was missed by 4 percentile points. Minority Students: 54 Percentile. The target was missed by 3 percentile points. Students with Disabilities: 50 Percentile. The target was missed by 7 percentile points. English Learners: 54 Percentile. The target was missed by 3 percentile points. Actual, Graduation Rates: The graduation rate has averaged 57.4 % using the 7 year graduation formula. This is
We did not increase graduation rates nor decrease drop-out rates through increased attendance and targeted
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 22
Performance Indicators Targets for 2013-14 school year (Targets set in last year’s plan)
Performance in 2013-14? Was the target met? How close was the school to meeting
the target? Brief reflection on why previous targets were
met or not met.
(DOES NOT MEET) Drop Out Rate: Mean ACT:
7 year Graduation Rate: 70% 4 year Graduation Rate: 50% Drop Out Rate Target: 7% Mean CO ACT Target: 16
22.6 percentage points below state expectations. This target was missed by 12.6 percentage points The current 4 year graduation rate is 42.2%, which is significantly below the 80% expected graduation rate for the state of Colorado. This target was missed by 7.8 percentage points. Drop Out Rate Target: 8.8%, missed by 1.8%. The Drop-out rate has decreased slightly over three years but remains 5.6 percentage points above the State of Colorado expectation. It is in the “Approaching” category. ACHS Mean CO ACT Target: 15.2, missed by .08%
interventions to meet the Targeted Goals.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 23
Worksheet #2: Data Analysis Directions: This chart supports planning teams in recording and organizing observations about school-level data in preparation for writing the required data narrative. Planning teams should describe positive and negative trends for all of the four performance indicators using at least three years of data and then prioritize the performance challenges (based on notable trends) that the school will focus its efforts on improving. The root cause analysis and improvement planning efforts in the remainder of the plan should be aimed at addressing the identified priority performance challenge(s). A limited number of priority performance challenges is recommended (no more than 3-5); a performance challenge may apply to multiple performance indicators. At a minimum, priority performance challenges must be identified in any of the four performance indicator areas where minimum state and federal expectations were not met for accountability purposes. Furthermore, schools are encouraged to consider observations recorded in the “last year’s targets” worksheet. Finally, provide a brief description of the root cause analysis for any priority performance challenges. Root causes may apply to multiple priority performance challenges. You may add rows, as needed.
Performance Indicators Description of Notable Trends (3 years of past state and local data) Priority Performance Challenges Root Causes
Academic Achievement (DOES NOT MEET)
Overall Academic Achievement has risen slightly over the last three years… Academic achievement in READING has increased over 3 years: 2012: 32.5% 2013: 34.5% 2014: 39.7% Academic achievement in WRITING has increased over 3 years: 2012: 15.5% 2013: 15.5%
Reading: Over the past 3 years Academic Achievement has increased slightly to 36.22% of students being proficient on TCAP/CSAP in Reading, 32 percentage points below state average proficiency levels, and 13 percentage points below APS district average proficiency levels.
Writing: Over the past 3 years Academic Achievement has increased
We need to increase and refine teacher skills and implementation of reading and writing, and vocabulary development, and student discourse in all content areas.
We need to increase and refine teacher skills and implementation of reading and writing, and
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 24
Performance Indicators Description of Notable Trends (3 years of past state and local data) Priority Performance Challenges Root Causes
2014: 21.5%
Academic Achievement in MATH overall has remained
relatively stagnant from the 2012-13 school year to the
2013-14 school after seeing a decrease from the 2011-
12 school year to the 2012-13 school year:
2012: 13.32%, 2013: 11.37 % 2014: 11.68%.
slightly to 17.76% of students being proficient on TCAP/CSAP in Writing, and hitting a high of 21.47% in 2014. However, this is 34 percentage points below state average proficiency levels, and 14 percentage points below district average proficiency levels.
Math: Over the past 3 years Academic Achievement has remained relatively stagnant with a three year SPF average 12.08% of students being proficient on TCAP/CSAP in Math, 25 percentage points below state average proficiency levels, and 8 percentage points below district average proficiency levels.
vocabulary development, and student discourse in all content areas.
We need to create support systems in math, such as tutoring or intentional inclusion models to continue to reduce academic growth gaps.
Academic Growth (APPROACHING)
Academic growth in reading has increased (42 % tile to
2014, Median growth per for overall
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 25
Performance Indicators Description of Notable Trends (3 years of past state and local data) Priority Performance Challenges Root Causes
51% tiles) over four years and three of the four years
has been APPROACHING as identified by the SPF
Academic growth in writing has increased slightly 47th
percentile to 49th percentile over three years and is
rated as APPROACHING as identified by the SPF.
Academic growth in math has decreased slightly overall
over three years, 47th percentile to 48th percentile. All
Reading is at the 52nd percentile and ranked APPROACHING on CDE School Performance Framework
Overall Academic Growth Gaps in Reading are ranked MEETS; ELL students, Free/Reduced Lunch eligible students, Minority Students, and Students Needing to Catch Up all ranked in the 55th percentile or higher, Students with Disabilities ranked in the 45th percentile.
2014, Median growth percentile for overall Writing is at the 50th percentile. Overall, all Academic Growth Gaps in Writing are ranked APROACHING.
2014, Median growth percentile for overall Math is at the 52ND percentile.
We need to create support systems in math, such as tutoring or intentional inclusion models to continue to reduce academic growth gaps.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 26
Performance Indicators Description of Notable Trends (3 years of past state and local data) Priority Performance Challenges Root Causes
math growth has been APPROACHING as identified by
the SPF.
Overall, all Academic Growth Gaps in math are rated MEETS.
Academic growth in English Language Proficiency (ACCESS) is rated MEETS for the past three years and is in the 48th percentile for median growth.
Academic Growth Gaps
(APPROACHING)
Overall the racial achievement gap has decreased and academic growth in minority students has risen and is ranked with a performance indicator of MEETS on the SPF.
Overall the socioeconomic achievement gap has decreased as academic growth has risen in students who receive free or reduced price lunch and is ranked with a performance indicator of MEETS on the SPF.
Overall, the Achievement Gap between students receiving special education services and those in the general education remains a significant challenge as students with Disabilities rank in the 45th percentile, 11 percentile points behind students in other disaggregated groups. The challenge is to close the Growth Gaps for all
We need to develop differentiated language and instructional support based on the need of English Language learners. We need to increase culturally responsive professional development and focusing on the Affective, Behavioral and Cognitive student needs.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 27
Performance Indicators Description of Notable Trends (3 years of past state and local data) Priority Performance Challenges Root Causes
Overall, the achievement gap between students receiving special education services and those in the general education setting has closed. Academic growth in special education students has risen over three years but remains an improvement challenge as the largest of the growth gaps and is ranked with a performance indicator of APPROACHING on the SPF.
Overall, academic growth in English language learners has increased and is ranked with a performance indicator of MEETS on the SPF.
disaggregated groups.
Postsecondary & Workforce Readiness (DOES NOT MEET)
Graduation rate has increased slightly each year for the last three years and increased again this year. It still remains in the “Does Not Meet” category. The 4 year graduation rate has averaged 40.7 %, the 5 year 53%, the 6 year 57.9%, and the 7 year 57.4%. The current 4 year ACHS graduation rate is 42.2%. This is 38 percentage points below state expectations.
For the past 3 years, the 4 year graduation rate has averaged 40.7 %, the 5 year 53%, the 6 year 57.9%, and the 7 year 57.4%. The current 4 year ACHS graduation rate is 42.2%. This is 38 percentage points below state expectations. The challenge is to raise
We need to align post-secondary workforce readiness systems to include all grade levels. Implement a plan to systematically support all students with our RTI system.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 28
Performance Indicators Description of Notable Trends (3 years of past state and local data) Priority Performance Challenges Root Causes
ACT scores have increased slightly but still remain in the “Do Not Meet” category. This year the score remains the same.
Drop-out rates has decreased slightly over three years. It is in the “Approaching” category on the 2014 SPF.
the 4 year, 5 year, 6 year, and 7 year graduation rates and close the gap between the ACHS graduation rate and the state expectation.
Section IV: Action Plan(s) This section addresses the “Plan” portion of the continuous improvement cycle. First, identify annual performance targets and the interim measures. This will be documented in the required School Target Setting Form on the next page. Then move into action planning, which should be captured in the Action Planning Form. School Target Setting Form Directions: Complete the worksheet below. Schools are expected to set their own annual targets for academic achievement, academic growth, academic growth gaps, and postsecondary and workforce readiness. At a minimum, schools should set targets for each of the performance indicators (i.e., Academic Achievement, Academic Growth, Academic Growth Gaps, Postsecondary & Workforce Readiness) where state expectations are not met; targets should also be connected to prioritized performance challenges identified in the data narrative (section III). Consider last year’s targets (see Worksheet #1) and whether adjustments need to be made. For each annual performance target, identify interim measures that will be used to monitor progress toward the annual targets at least quarterly during the school year. Implications of Colorado Measures of Academic Success (CMAS) on Target Setting: During the 2014-15 school year, Colorado is transitioning from reading, writing and math TCAP assessments to CMAS PARCC English language arts and math assessments. These assessments measure related, but different content standards and are expected to have different proficiency levels. As a result, setting targets based on the percent of students scoring proficient and advanced may not be appropriate. Furthermore, CDE does not yet know if student growth percentiles and median student growth percentiles will be available for accountability, planning or reporting use. It is known that adequate growth percentiles will not be available next year for 2014-15 results. Target setting is still expected to occur in the UIP process during this transition period. However, some modifications in typical practice may be needed. Refer to the UIP Handbook and guidance documents on the UIP website for options and considerations.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 29
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 30
School Target Setting Form
Performance Indicators Measures/ Metrics
Priority Performance Challenges
Annual Performance Targets Interim Measures for 2014-15 Major Improvement Strategy 2014-15 2015-16
Academic Achievement (DOES NOT
MEET)
TCAP, CoAlt/, Lectura, Escritura, K-3 literacy (READ Act), local measures
R
Academic achievement DOES NOT MEET on the SPF; the challenge is to accelerate achievement across contents areas assessed.
READING: 49.7%
READING: 59.7%
MAPS (NWEA) data Reading and Math Fall 35% Quarterly Proficiency scales
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
M
Academic achievement DOES NOT MEET on the SPF; the challenge is to accelerate achievement across contents areas assessed.
MATH: 21.7%
MATH: 31.7%
MAPS (NWEA) data Reading and Math Fall 13% Quarterly Proficiency Scales
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
W
Academic achievement DOES NOT MEET on the SPF; the challenge is to accelerate achievement across contents areas assessed.
WRITING: 31.5%
WRITING: 41.5%
MAPS (NWEA) data Reading and Math Fall 17% Quarterly Proficiency Scales
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 31
S
Academic achievement DOES NOT MEET on the SPF; the challenge is to accelerate achievement across contents areas assessed.
N/A _Science will be normed by the new 12th grade CMAS Assessment
Based on the on the results of the 2014 CMAS Assessment
12th Grade CMAS
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
Academic Growth
(APPROA-CHING)
Median Growth Percentile (TCAP & ACCESS), local measures
R
Academic Growth overall is Approaching on the SPF; however, ACHS is APPROACHING in Reading. The challenge is to accelerate growth in READING achievement.
Reading: 60th Percentile
Reading: 65th Percentile
MAPS (NWEA) data Reading and Math Fall 35%
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
M
Academic Growth overall is APPROACHING on the SPF; however, ACHS is MEETS in Math. The challenge is to accelerate growth in MATH achievement.
Math: 60th Percentile
Math: 65th Percentile
MAPS (NWEA) data Reading and Math Fall 13%
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
W
Academic Growth overall is Approaching on the SPF; however, ACHS is APPROACHING in
Writing: 55th Percentile
Writing: 60th Percentile
MAPS (NWEA) data Reading and Math
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 32
Writing. The challenge is to accelerate growth in READING achievement.
Fall 35%
all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
ELP
Academic Growth overall is Approaching on the SPF; however, ACHS MEETS growth for ELLs. The challenge is to accelerate growth for our ELLs.
ELP: 53th Percentile
ELP: 58th Percentile
MAPS (NWEA) data ACCESS WIDA data 25% increase
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
Academic Growth Gaps (APPROA-
CHING)
Median Growth Percentile, local measures
R
Academic growth gaps are all rated APPROACHING; the challenge is to accelerate growth in READING
Reading: Free/Reduced Lunch: 60 Percentile Minority Students: 65 Percentile Students with Disabilities: 55 Percentile English Learners: 67 Percentile
Reading: Free/Reduced Lunch: 70 Percentile Minority Students: 75 Percentile Students with Disabilities: 65 Percentile English Learners: 77 Percentile
MAPS (NWEA) data Fall
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
M
Academic growth gaps are all rate APPROACHING; the challenge is to
Math: Free/Reduced Lunch: 63 Percentile Minority Students: 64 Percentile
Math: Free/Reduced Lunch: 73 Percentile Minority Students: 74 Percentile Students with
MAPS (NWEA) data
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 33
accelerate growth in MATH
Students with Disabilities: 60 Percentile English Learners: 64 Percentile
Disabilities: 70 Percentile English Learners: 74 Percentile
assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
W
Academic growth gaps are all rate APPROACHING; the challenge is to accelerate growth in WRITING
Writing: Free/Reduced Lunch: 60 Percentile Minority Students: 60 Percentile Students with Disabilities: 55 Percentile English Learners: 61 Percentile
Writing: Free/Reduced Lunch: 70 Percentile Minority Students: 70 Percentile Students with Disabilities: 65 Percentile English Learners: 71 Percentile
MAPS (NWEA) data
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of teaching staff.
Postsecondary & Workforce Readiness
(DOES NOT
MEET)
Graduation Rate
Although the 4, 5, 6, and 7 year Graduation Rates are increasing, the Graduation Rate is ranked DOES NOT MEET on the SPF; the challenge is to increase student graduation to meet state expectations of
‘14-‘15 ACHS Graduation Rates: 4yr- 56.4% 5yr – 77.1% 6yr – 67.1% 7yr- 65%
‘15-‘16 ACHS Graduation Rates: 4yr- 66.4% 5yr – 87.1% 6yr – 77.1% 7yr- 75%
Monitoring daily attendance, quarterly attendance, Pass and failure rates, discipline data, truancy, credit acquisition and credit recovery reports.
Communication and Accountability: We increase achievement and graduation rates while decreasing growth gaps, and drop-out rates by continual monitoring of attendance, and targeted interventions.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 34
80%.
Disaggregated Grad Rate
Although the 4, 5, 6, and 7 year Graduation Rates are increasing across all disaggregated groups, the Graduation Rate is ranked DOES NOT MEET on the SPF; the challenge is to increase student graduation to meet state expectations of 80% for all disaggregated groups.
FRL: 4yr- 56.9% 5yr – 79.3% 6yr – 77.9% 7yr- 76.1% Minority: 4yr- 55.9% 5yr – 77% 6yr – 76.5% 7yr- 73.6% SwD: 4yr- 42.4% 5yr – 70% 6yr – 62.3% 7yr- 59.7% EL: 4yr- 48.3% 5yr – 76% 6yr – 69.4% 7yr- 66.9%
FRL: 4yr- 66.9% 5yr – 89.3% 6yr – 87.9% 7yr- 86.1% Minority: 4yr- 65.9% 5yr – 87% 6yr – 86.5% 7yr- 83.6% SwD: 4yr- 52.4% 5yr – 80% 6yr – 72.3% 7yr- 69.7% EL: 4yr- 58.3% 5yr – 86% 6yr – 79.4% 7yr- 76.9%
Monitoring daily
attendance, quarterly
attendance,
pass and failure
rates, discipline data,
truancy, credit
acquisition.
Communication and Accountability: We increase achievement and graduation rates while decreasing growth gaps, and drop-out rates by continual monitoring of attendance, and targeted interventions.
Dropout Rate
Dropout Rates are decreasing, ACHS is ranked APPROACHING on
Monitoring daily attendance, quarterly attendance,
Communication and Accountability: We increase achievement and
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 35
the SPF; the challenge is to decrease student graduation to meet state expectations of 3.6%.
5% 3.5% pass and failure rates, discipline data, truancy, credit summaries of credits completed
graduation rates while decreasing growth gaps, and drop-out rates by continual monitoring of attendance, and targeted interventions.
Mean CO ACT
The ACHS composite ACT score is 15.2 and is ranked DOES NOT MEET on the SPF; the challenge is to increase the mean ACT score to state expectations of 20
18 Mean CO ACT
20 Mean CO ACT
ACCESS, MAPS (NWEA), Classroom common assessments, Classroom scales (rubrics)
Communication and Accountability: We increase achievement and graduation rates while decreasing growth gaps, and drop-out rates by continual monitoring of attendance, and targeted interventions.
Other PWR Measures
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 36
Action Planning Form for 2014-15 and 2015-16 Directions: Identify the major improvement strategy(s) for 2014-15 and 2015-16 that will address the root causes determined in Section III. For each major improvement strategy, identify the root cause(s) that the action steps will help to dissolve. Then, indicate which accountability provision or grant opportunity it will address. In the chart below, provide details about key action steps necessary to implement the major improvement strategy. Details should include the action steps that will be taken to implement the major improvement strategy, a general timeline, resources that will be used to implement the actions, and implementation benchmarks. Additional rows for action steps may be added. While the template provides space for three major improvement strategies, additional major improvement strategies may also be added. To keep the work manageable, however, it is recommended that schools focus on no more than 3 to 5 major improvement strategies. Major Improvement Strategy #1:
Curriculum Instruction: We provide differentiated professional learning that leads to rigorous, engaging first instruction which emphasizes literacy, language and critical thinking
across all content. Instructional practice is assessed continual learning walks that will gather data and be analyzed to adjust and target the professional development needs of
teaching staff.
Root Cause(s) Addressed:
We need to increase and refine teacher skills and implementation of reading and writing, and vocabulary development, and student discourse in all content areas.
Accountability Provisions or Grant Opportunities Addressed by this Major Improvement Strategy (check all that apply): State Accreditation Title I Focus School X Tiered Intervention Grant (TIG) Diagnostic Review Grant School Improvement Support Grant X Colorado Graduation Pathways Program (CGP) Other: _________________________________________________________________________________
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 37
Description of Action Steps to Implement the Major
Improvement Strategy
Timeline Key
Personnel*
Resources (Amount and Source: federal, state, and/or
local) Implementation Benchmarks
Status of Action Step* (e.g., completed, in
progress, not begun) 2014-15 2015-16
To provide focused PD with Dr. Marzano:
Comprehensive unit planning
Proficiency scales Cumulative review Instructional rounds Common language of
instruction Depth of Knowledge Self -assessment Student learning
objectives Student discourse and
questioning sequence Instructional technology
implementation and usage Metro State College:
Culturally Responsive Education
Affective Instructional strategies
Parental involvement strategies with communication
Communication with community partners
Implementation has occurred. Tracking data of instructional progress, student achievement and participation of parent walks observing classrooms, lesson studies in PLCC’s.
Aug.-May Review data of progress from previous academic year. Continue with Marzano work and Parental observations as well as building capacity to sustain the work for the next year.
Dr. Marzano Metro State College professors Teaching Partner, ELL Teacher Leader District personnel
TIG, General Fund TCAP/PARCC, ACCESS and benchmark data from MAPS (NWEA)
Comprehensive unit planning template and teacher generated unit plans
Proficiency scales template and teacher generated proficiency scales (Monthly)
Cumulative review template and teacher generated cumulative review activities
Instructional rounds template and teacher participation schedule/observers/ And those observed(Bi-Weekly)
Teacher generated questions and student discourse/lesson plans
Adult learning tracker monthly
Student exit tickets
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 38
and Specific and Relevant Power Sessions, and Focused Instructional Design Development.
Bi-weekly Teacher schedule for
technology implementation
PD survey monkey results (Twice Quarterly)
Teacher generated strategies for Affective Instructional strategies
Articles and reflections generated from teachers
High functioning PLC’s, Literacy across content areas (W,S,R,L) and accountability refinement
Implemented across content and elective subjects. Continue for 2014-2015
Aug.-May Continue with refinement of work with Dr. Marzano and coaches for clear focus.
Teaching partner ELL teacher leader District personnel
TIG, General Fund TCAP/PARCC, ACCESS and benchmark data from MAPS (NWEA)
Lesson Plan template Lesson Plan
observation tool (Daily)
Proficiency scale template
Common PLC time (Monthly)
PD hrs. (Monthly)
In Progress
Provide professional development with Mike Schmoker to increase teacher capacity to establish culturally relevant lessons.
Book study “FOCUS” began in Spring of 2013 This laid the foundation for our work with Dr.
Aug.-May Bridge the foundational work to Dr. Marzano to build capacity
Mike Schmoker Dr. Marzano
TIG TCAP/PARCC, ACCESS and Benchmark data from MAPS (NWEA) data
Completed
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 39
Marzano of structured PD and PLC time.
Teacher’s Development Group Teacher’s Development Group professional Development will continue to build capacity among all math teachers
3 Cycles Aug.-May TDG will build capacity and ultimately provide fro increase academic achievement through best practice instruction
TDG facilitators, teacher leader, building coach, and admin.
Building funds and district support
ACCESS, TCAP/PARCC and MAPS (NWEA) data
District PD for TDG
In Progress
Support best practices for English Language Acquisition through Constructing Meaning Professional development with Ellen Levy and coaching
Implementation in the building has been completed. District coaching for continued support
Aug.-May Sustain strategies and best practices for ELL students in all content and elective courses.
District Personnel Teacher Leader Teaching partner
Building fund ACCESS, TCAP/PARCC and MAPS (NWEA) data
Continued CM training for new teachers (District Calendar)
Completed
Monitor EL students and analyze data pertaining to language development, literacy and writing in order to make placements of students.
Constructive Meaning training for all EL teachers
All day professional development with Metro State University: Affective instruction focused on
Quarterly data will be analyzed and compare progress
Aug.-May Quarterly data will be analyzed and compare progress
Teacher leader ELL teaching staff District personnel
District consultants Teacher leader
ACCESS, TCAP/PARCC, MAPS (NWEA), classroom Formative and Summative Assessments as well as pass and failure rates.
Student writing samples (Quarterly)
Teacher generated lesson plans
Proficiency scales
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 40
vocabulary and writing (Monthly)
Monitor students and analyze data pertaining to language, literacy and writing.
Quarterly data, Formative, Summative and daily feedback.
Aug.-May Quarterly data, Formative, summative and daily feedback
Classroom teachers Teacher leader Teaching Partner and District Personnel
Data/TOSA District personnel Teaching Partner Teacher Leader
TCAP/PARCC, ACCESS, MAPS (NWEA), Classroom common assessments, Classroom scales (rubrics)
Student work (Weekly) (Quarterly)
Assessment schedule Accommodations for
assessment
In progress
Establish protocols for teachers to look at instructional data based on classroom and assessment outcomes.
Teachers will create scales for accountability in the classroom, review assessment data form various assessments
Aug.-May Teachers will continue to review daily/weekly classroom data as well as assessment data in order for students to set goals
Dr. Marzano Teaching Partner Teacher Leader District Personnel DATA/TOSA
TIG Proficiency Scales (Monthly)
Classroom assessments, MAPS (NWEA), TCAP/PARCC, ACCESS
Unit planning templates (Monthly)
Implementation year
* Note: These two columns are not required to meet state or federal accountability requirements, though completion is encouraged. “Status of Action Step” may be required for certain grants.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 41
Major Improvement Strategy #2:
Equity and Engagement: We foster a school culture in which all stakeholders have a shared responsibility to increase student achievement, attendance and create opportunities for
students, parents and community to participate in preparing students with workforce readiness skills.
Root Cause(s) Addressed:
We need to develop differentiated language and instructional support based on the need of English Language Learners. We need to increase culturally responsive professional
development and focusing on Affective, Behavioral, and Cognitive student needs.
Accountability Provisions or Grant Opportunities Addressed by this Major Improvement Strategy (check all that apply): State Accreditation Title I Focus School X Tiered Intervention Grant (TIG) Diagnostic Review Grant School Improvement Support Grant X Colorado Graduation Pathways Program (CGP) Other: _________________________________________________________________________________
Description of Action Steps to Implement the Major
Improvement Strategy
Timeline Key Personnel*
Resources (Amount and Source: federal, state, and/or
local)
Implementation Benchmarks
Status of Action Step* (e.g., completed, in
progress, not begun) 2014-15 2015-16
Hire an Attendance TOSA to monitor attendance, and communicate with parents and deans.
Daily, weekly and monthly monitoring of student’s attendance
Aug.-May Daily, weekly and monthly monitoring of student’s attendance
Attendance TOSA Attendance Clerk Registrar Data TOSA 1 Dean
TIG, General Fund Monitoring daily attendance, and quarterly attendance
Daily phone calls to homes on attendance
Family meetings (Daily)
Truancy workshops (Quarterly)
Implementation
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 42
Utilize discipline data, attendance data, truancy data and credit audits to develop effective responses for planning with students and parents for next steps.
Daily, weekly, and monthly monitoring of students’ progress
Aug.-May Daily, weekly, and monthly monitoring of students’ progress
3 Deans Attendance/TOSA 6 Hall monitors Parents Counselors Administrators
TIG, General Fund Monitoring of attendance data, discipline data, truancy, credit summaries of credits completed (Daily)
In progress
Community Liaison/TOSA to establish systems for bringing parents and community partners together for student achievement and parental involvement:
Community meetings Parent coffees Phone dialers Flyers Mailers Navigators calling home
and visiting homes
Weekly, quarterly and monthly progress monitoring
Aug.-May Weekly, quarterly and monthly progress monitoring
1 Community Liaison/TOSA
TIG, CSU Parenting Matters, Community Partners, Counselors
Monitoring: number of parents
attending events community
partners working with students and parents (Monthly, Quarterly)
Goal to increase parental involvement by a 10% increase from previous year.
In progress
Parent University at ACHS: Computer, English, Spanish, Health and Exercise classes, College readiness, Financial Aid, Discipline and Truancy courses
Quarterly monitoring of parental involvement
Aug.-May Quarterly monitoring of parental involvement
Teaching Staff, Community TOSA/Administration
Community Partners, Teaching staff
Monitor of sign in sheets, for parental and community involvement (Monthly)
Implementation
Refine student’s leadership and increase student engagement in afterschool activities.
Daily, Monthly, Quarterly monitoring of student participation
Aug.-May Daily, Monthly, Quarterly monitoring of student
Club sponsors, coaches, and teachers
General Fund, club accounts
Number of students involved in activities, amount of activities available for students (Quarterly)
Goal to increase
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 43
participation student involvement by 25% than previous year.
Provide extended day learning opportunities and increase after school activities
Daily, weekly, monthly monitoring of student involvement
Aug.-May Daily, weekly, monthly monitoring of student involvement
Teaching staff, club sponsors, peer tutoring team
TIG, General Fund, Counselors, teaching staff
TCAP/PARCC Attendance sign in, credit summaries of students, and grades Tutoring sign in sheets Peer tutoring sign in sheets (Weekly)
In progress
Provide Summer ELL Academy to increase ELL student involvement in academics and extra-curricular activities.
Summer data of student participation
May-June Summer data of student participation
Teaching staff, Teacher Leader, administration
TIG, General fund, teaching staff,
ACCESS, TCAP/PARCC, credit summaries and grades Credits earned over summer (Yearly)
Implementation/In progress
Establish new clubs for students to participate in, such as Latino Heritage, Black Student Alliance, Bhutanese, and Journey Through our Heritage. Equity and Diversity, and Multi-Cultural Town Hall Meetings
Weekly, Monthly monitoring of involvement.
Aug.-May Weekly, Monthly monitoring of involvement
Teaching staff, Counseling, Administration, and Community partners.
TIG, General Fund, club funds
Student Enrollment Data Sign in sheets and registration forms from clubs (Quarterly)
Implementation/In progress
Equity and Diversity Professional Development Metro State University
Culturally Responsive Education
Affective Instructional strategies
Parental involvement strategies with communication
Implementation Monthly monitoring and staff surveys
Aug.-May Monthly monitoring and staff surveys
Metro State Professors, Administration
General Fund Staff participation, Survey by Metro
State University (quarterly)
Teacher generated strategies for Affective Instructional practices
Grouping
Implementation/Progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 44
Communication with community partners
strategies for student discourse
Springtime Middle School feeder school orientations in April to connect parents and students to ACHS
Yearly monitoring
March-April Yearly monitoring
9th grade counselors, Community TOSA Administration
TIG, General Fund Enrollment data (Yearly)
In progress
Springtime Parent Summit to assist parents with transitions for each grade level
Implementation March-April Yearly monitoring
Community TOSA, Counselors, Administration from all levels of education
TIG, General Fund Enrollment data form ACHS and feeder schools (Yearly)
Implementation
* Note: These two columns are not required to meet state or federal accountability requirements, though completion is encouraged. “Status of Action Step” may be required for certain grants.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 45
Major Improvement Strategy #3:
Communication and Accountability: We increase achievement and graduation rates while decreasing growth gaps, and drop-out rates by continual monitoring of attendance, and
targeted interventions.
Root Cause(s) Addressed: We need to align post-secondary workforce readiness systems to include all grade levels. Implement a plan to systematically to support all students with our RTI system.
Accountability Provisions or Grant Opportunities Addressed by this Major Improvement Strategy (check all that apply): State Accreditation Title I Focus School X Tiered Intervention Grant (TIG) Diagnostic Review Grant School Improvement Support Grant X Colorado Graduation Pathways Program (CGP) Other: _________________________________________________________________________________
Description of Action Steps to
Implement the Major Improvement Strategy
Timeline Key Personnel*
Resources (Amount and Source: federal,
state, and/or local) Implementation Benchmarks Status of Action Step* (e.g.,
completed, in progress, not begun) 2014-15 2015-16
Early Warning Interventionists: 9th and 10th grade intervention and instruction
Organization skills Understanding GPA Understanding Credit
acquisition Time management Study skills Test taking skills Note taking skills Student accountability for their
learning Character building Building positive relationships
Weekly, quarterly monitoring
Aug.-May Weekly, quarterly monitoring
4 Early Warning Intervention teachers GSI Counselor
TIG, EWI Teaching staff, counseling, 9th 10th and GSI counselor
Meet once a week with counselors to discuss student needs
Monitoring absences, grades, credits, behavior and discipline as well as parent communication.
EWI weekly grade reports
Weekly attendance reports
Quarterly deficiency credit letter to parents
Semester credit recovery progress letters to parents
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 46
with adults Attendance in correlation to
student achievement Understanding resources
available and how to ask for help
Non-Fiction Reading and Writing
Communicating with parents regarding grades and attendance
Self-advocacy Self- assessment Goal setting College planning Post-secondary planning
Monitor and evaluate 11th and 12th grade credit acquisition in order to provide intervention, communication to parents, and counseling to increase 4 year graduation rates.
Weekly, quarterly monitoring
Aug.-May Weekly, quarterly monitoring
Counseling, Community partners, Administration
General fund, counselors, community partners
Grades, Credit Summaries, attendance and discipline
In progress
Parent coffees, Parenting Matters, and Parent University. To give parents the tools needed to see their student to graduation. To monitor grades, attendance, and credits.
Weekly, quarterly monitoring
Aug.-May Weekly, quarterly monitoring
CSU, Teaching staff, Counseling Administration EWI team
TIG, General Fund, counselors, and community partnerships
Parent Portal, grades, credit summaries, attendance, discipline and parent attendance. Parent sign in sheets (Quarterly)
In progress
Weekly Newsletter from the Principal, with all the news and recaps of ACHS
Weekly Aug.-May Weekly
Principal Local Daily, weekly, quarterly information from in building and district news
In progress
Provide weekly D and F phone calls home for students with D’s and F’s using auto-dialer
Weekly Aug.-May Weekly
Office Assistants, teachers
Local Weekly D and F data Conference with
teachers to
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 47
implement interventions to improve grades
Establish student achievement contracts to increase achievement
Semester Contract to improve student achievement
Weekly Quarterly
Aug.-May Weekly Quarterly
Counselors, EWI team
Local Teacher recommendation and weekly D and F data
Student contract for academic improvement
In progress
Accountability walks to increase classroom time for instruction
Daily, weekly
Aug.-May Daily, weekly
Deans, Hall monitors, Administrators, Teachers
Local Tardy data (Daily, Weekly) To decrease
tardiness by 10% quarterly
In progress
Teacher/Parent contact with positive post cards “We ARE Central” to communicate positive behavior, grades and attendance.
Weekly Aug.-May Weekly
Teachers, Clerks
Local Infinite Campus documentation by staff (Quarterly)
In progress
Informational Assembly for Refugee Families
Semester Aug.-Dec Jan.-May Semester
Counselors, Deans Community TOSA Community Partners
Local Attendance, grades, credit summaries, sign in sheets from parent events (Semester)
In progress
Assessment presentations Yearly November & January Yearly
Data/TOSA Teacher Leader
Local Assessment data (Semester)
In progress
TOP 50 and TOP 100 Luncheon to celebrate student achievement
Quarterly Aug.-May Quarterly
Counselors Community TOSA
Local Grades, attendance, credit summary (Quarterly)
In progress
All phone dialer information sent in English, Spanish, Nepal , and Burmese
Weekly Aug.-May Translators, TIG, Local Building information, District information of important
Implementation/ In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 48
Quarterly Weekly Quarterly
Office staff, Community TOSA
dates, times and information (By event)
AGATE/AP/CONCURRENT ENROLLMENT information nights for parents
Weekly Quarterly Yearly
Aug.-May Weekly Quarterly Yearly
Counselors, Administration, Community TOSA
TIG, Local Grade and credit summaries, sign in sheets of parents (Quarterly)
Implementation/In progress
MTSS Plan Restorative Justice initiative RTI Creation/Implementation of an
I-CARE Team Student Engagement
Committee: Behavior, Truancy, Over age under credit, credit recovery, home visits, parent workshops/professional development
Daily Weekly Quarterly
Aug.-May Daily Weekly Quarterly
Counselors Administrators Community Partners TIG TOSA’s
TIG, Community members, administrators, Counselors, instructional staff,
Student discipline data (Weekly)
Daily average attendance
Credit acquisition Credit deficiency Reviewing
transcripts for on time graduation
ENRICH Data Weekly student re-
enrollment meetings with Principal and Assistant Principal
Implementation/In progress
* Note: These two columns are not required to meet state or federal accountability requirements, though completion is encouraged. “Status of Action Step” may be required for certain grants.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 49
Major Improvement Strategy #4: Campus and Community: We increase, parental and community involvement that creates an environment that is inviting and consistently streamlines home and school communications. Root Cause(s) Addressed: We need to develop differentiated language and instructional support based on the need of English Language Learners. We need to increase culturally
responsive professional development and focusing on the Affective, Behavioral and Cognitive student needs.
Accountability Provisions or Grant Opportunities Addressed by this Major Improvement Strategy (check all that apply): State Accreditation Title I Focus School X Tiered Intervention Grant (TIG) Diagnostic Review Grant School Improvement Support Grant X Colorado Graduation Pathways Program (CGP) Other: _________________________________________________________________________________
Description of Action Steps to Implement the Major Improvement
Strategy
Timeline Key Personnel*
Resources (Amount and Source: federal, state,
and/or local) Implementation Benchmarks Status of Action Step* (e.g.,
completed, in progress, not begun) 2014-15 2015-16
Work collaboratively with community partnerships through breakfasts, meetings, and sponsored events for
Weekly, Monthly and end of
Aug.-May Weekly, Monthly
1 Community TOSA CSU-
TIG, General fund Sign in Sheets, agendas, and student progress (Monthly)
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 50
students and parents. year survey for community partners
and end of year survey for community partners
Parenting Matters Community partners
Parenting Matters/Parent Group Weekly and Monthly parent meetings Planning sessions
Weekly and Monthly parent meetings Planning sessions
CSU Professors 1 Community TOSA Community Partners
TIG, Local Sign in sheets, agendas, data of parent participation (Monthly)
In progress
Provide Parent Coffee to increase parent involvement. Coffees are informative sessions for parents to receive information and to ask questions of counselors, admin or CSU regarding their student.
Daily, weekly, monthly
Aug.-May Daily, weekly, monthly
1Community TOSA CSU Professors Community partners, counselors, administration
TIG, Local Sign in sheets, agendas, data of parent participation (Quarterly) CSU focus group data (Yearly)
In progress
Conduct home visits to closely connect with families and students. With discussions and interventions for attendance, credits, and discipline
Weekly, quarterly
Aug.-May Weekly, quarterly
Counselors Attendance TOSA Deans Administration
TIG, Local Attendance data, credit summaries, discipline data (Monthly, and Quarterly)
In progress
Bussing for students and families for extended services and events. Tutoring, athletics, and graduation
Weekly Aug.-May Weekly
District transportation
local Attendance data for events, RSVP lists for events Sign in sheets
In progress
Website for ACHS with communication and information in English, Spanish, and Nepal. All flyers or communication for parents is in English, Spanish, and Nepal. The three largest linguistic
Weekly Quarterly
Aug.-May Weekly Quarterly
Translators, Navigators, in building staff
TIG, local Community information, school information, and district information
Flyers
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 51
groups Auto dialer
Career Day Spring 2014
March-April Spring 2015
Community TOSA Counselors Local businesses Community Partners
TIG, Local Student requests and Counseling data (Yearly)
In progress
Freshman student orientation to assist students with transition to ACHS
August 2014
August 2015
Counselors Community partners
local Freshman enrollment data (Yearly)
In progress
Freshman Parent Orientation to assist parents with transition to ACHS. Allowing parents to meet administration, counselors, and EWI team who work specifically with 9th grade.
August 2014
August 2015
Community TOSA Counselors Community partners
TIG, Local Freshman enrollment data Parent sign in sheets (Yearly)
In progress
Parent training for Infinite Campus to allow parents to check grades, attendance and credits
Monthly Aug.-May Monthly
Community TOSA Staff members
TIG, Local Parent sign in sheets and request information (Quarterly)
In progress
Community classroom observations Quarterly Aug.-May Quarterly
Community TOSA Community partners Administration
TIG, Local Community request forms and sign in sheets (Quarterly)
In progress
All phone dialer information sent in English, Spanish, Nepal , and Burmese
Weekly, monthly, quarterly
Aug.-May Weekly, monthly, quarterly
Translators, Navigators Office staff
TIG, Local Building information, District information of important dates, times and information
In progress
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 52
* Note: These two columns are not required to meet state or federal accountability requirements, though completion is encouraged. “Status of Action Step” may be required for certain grants. Section V: Appendices Required For Schools with a Tiered Intervention Grant (TIG) that Selected a Transformation Model: Schools that participate in the Tiered Intervention Grant and selected the Transformation Model must use this form to document grant requirements. As a part of the improvement planning process, schools are strongly encouraged to weave appropriate requirements into earlier sections of the UIP. This form provides a way to ensure all components of the program are met through descriptions of the requirements or a cross-walk of the grant program elements in the UIP.
Description of TIG (Transformation Model) Requirements Recommended Location in UIP
Description of Requirement or Crosswalk of Description in UIP Data Narrative or Action Plan (include page numbers)
Describe how the LEA has granted the school sufficient operational flexibility in the following areas: Staffing, Calendars/Time, and budgeting.
Required TIG Addendum
The new administration has been hired in 2013 and given the authority to determine if any changes are necessary in the administrative team. As the RMC external evaluation is complete, a detailed plan for overall staffing was developed. The TIG has allowed for site-based restructuring of the school day to maximize time for student learning and professional learning. APS already provide for site based decision making related to the master schedule and assignment of teachers. School sites are given the flexibility with assigned dollars to define essential programs and services when allocating resources
A new grant project manager was hired to oversee the grant for alignment of work to strategic plan, budget, and any changes to the TIG plan. All changes must be approved through the process of the TIG team and project manager.
LEA has granted flexibility with staffing in that ACHS is responsible for recruiting, interviewing, and
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 53
hiring of all staff whose salaries are paid from the TIG
ACHS calendar is the APS school calendar, however; ACHS has the right to schedule all professional development according to time available for ACHS.
Lea must approve all spending from the TIG budget. The grants office oversees the grant and communicates all fiscal pieces when reporting on CDE Tracker.
Describe how the school receives ongoing, intensive technical assistance and related support from the LEA, the SEA, or a designated external lead partner organization (such as a school turnaround organization or an EMO).
Section IV: Action Plan or Required TIG Addendum
The school principal is supported and supervised by the Director of Student Achievement for Community A from the Division of Instruction. They work collaboratively to ensure the proposed interventions are implemented in a timely manner. The Director is in direct communication with other leaders in the division and ensures coherence in supports offered. The Division of Accountability and Research support the school and district assessments, as well as monitoring data and providing feedback. The Division of Finance provides ongoing financial management support and will assist with directing the appropriate implementation of TIG funding dollars.
The TIG Team which consists of the TIG project manager, Director, Principal, Assistant Principals and Grants Office meet monthly to review strategic plan, data and the needs of ACHS.
Describe the process for replacing the principal who led the school prior to commencement of the transformation model (e.g., use of competencies to hire new principal).
Section IV: Action Plan
The Superintendent’s Leadership Team notified the previous principal in November 2012 that she was being replaced due to past and ongoing concerns. A comprehensive selection process was led by the Chief Personnel Officer and involved representatives for the school’s stakeholder groups, including “must-have” criteria at each level of the interview process. These were focused on the specific needs and prior experiences identified as crucial for providing leadership of the necessary change of the school. A new principal with a record of previous school improvement was identified; he began on May 15th 2013. The new principal was given the authority to have all previous assistant principals re-interview for their positions. Three of the four previous administrators were replaced.
Use rigorous, transparent, and equitable evaluation systems for teachers and principals that: (1) take into account data on student growth as a significant factor as well as other factors (e.g., multiple observation-based assessments) and (2) are designed and developed with teacher and principal involvement.
Section IV: Action Plan or Required TIG Addendum
The Aurora Public Schools Licensed Educator Evaluation System is aligned with state statutes and state licensure requirements to evaluate licensed administrative and non-administrative staff. Committees of teachers and administrators were developed to align the evaluation system with SB 191 provisions. Beginning in the 2013-14 school year, teachers will be evaluated based on quality standards. Beginning in the 2014-15 school year, multiple measures of student growth will account for 50% of licensed educator evaluating rating. Administrative evaluations are conducted at 6-month intervals and include a review of student achievement data, teacher performance reviews and achievement of goals as outlined in the UIP.
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 54
Describe the process for Identifying and rewarding school leaders, teachers, and other staff who, in implementing this model, have increased student achievement and high school graduation rates. Include how staff, who have not improved their professional practice, after ample opportunities have been provided, are identified and removed.
Section IV: Action Plan or Required TIG Addendum
The district’s new Licensed Educator Evaluation System, aligned to SB 191 that is being implemented in the 2013-14 school year will guide decisions for hiring, compensation, promotion and assignment while allow for ineffective staff to be dismissed. However, the Superintendent’s Leadership Team is currently examining the overall infrastructure of the district to ensure support of turnaround efforts.
Description of TIG (Transformation Model) Requirements
Recommended Location in UIP
Description of Requirement or Crosswalk of Description in UIP Data Narrative or Action Plan (include page numbers)
Provide staff ongoing, high-quality job-embedded professional development that is aligned with the school’s comprehensive instructional program and designed with school staff to ensure that they are equipped to facilitate effective teaching and learning and have the capacity to successfully implement school reform strategies.
Section IV: Action Plan
Instructional staff participates in professional learning that is provided in building with Dr. Robert Marzano. The instruction is focused, rigorous and is based on data and professional development that began in 2013. The Instruction is to deepen the learning and understanding that focuses on literacy across content areas building wide. The learning is by whole building and is a shared responsibility. Additional feedback is provided to instructional staff through classroom observations, in building PLC and District Level PLC. Instructional staff have opportunities to work with Dr. Marzano and his team in small mini-sessions to plan and learn during common planning time.
Implement such strategies as financial incentives, increased opportunities for promotion and career growth, and more flexible work conditions that are designed to recruit, place, and retain staff with the skills necessary to meet the needs of the students in the turnaround school.
Section IV: Action Plan
Opportunities exist for instructional staff to serve as teacher leader’s assigned half-time to the classroom and half-time as a coach of instructional practices.
Extended hours for professional development and pay for staff
Extended hours for pay for staff
No incentives are connected to the success of assessments or school band movement
Use data to identify and implement an instructional program that is research-based and vertically aligned from one grade to the next as well as aligned with State academic standards;
Section III: Data Narrative and Section IV: Action Plan
The school continues to use and follow the Aurora Public Schools planning and pacing guides aligned to state standards and board approved research-based curriculum materials. Strategies will be employed to provide access to rigorous content for all students. Assessments for analysis for increasing student achievement will be aligned to pacing guides and state standards. Processes for transition to the Common Core State standards are included in goal setting and planning for implementation into each subject
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 55
area. MAPS is our benchmark scores to drive instruction that will then be measured on TCAP 2014. The end of the year summative assessment which will be PARCC for 2015
Describe the continuous use of student data (such as from formative, interim, and summative assessments) to inform and differentiate instruction in order to meet the academic needs of individual students.
Section IV: Interim Measures on Target Setting Form and Action Plan
Teachers, coaches and administration examine data through the implementation of collaborative protocols for purposeful data-driven instructional next steps. A coherent system of formative and summative assessments, generated from subject area teachers and the district, will be implemented to provide information for both students and teachers on the acquisition of skills and knowledge. Interim measures on MAPS testing for grades 9th, 10th and 11th grades have been updated to ensure implementation is consistent with program requirements. MAPS testing will take place according to the district permissions and schedule.
Current action items for UIP, Strategic Plan, PD cycle, MAPS etc.,
Weekly D’s and F’s report
Establish schedules and implement strategies that provide increased learning time.
Section IV: Action Plan
The school has established extended learning opportunities.
ELO afterschool for tutoring and credit recovery
ELL Summer Academy
Provide ongoing mechanisms for family and community engagement.
Section IV: Action Plan
The school has established ways to improve communication and participation in support of the transformation efforts. Structures are in place to encourage family participation in understanding credits, attendance, classroom instruction, and next steps for higher education. Community partnerships have been aligned with the needs of Aurora Central High School
Community breakfasts with partners to report monthly and learn of the needs of students and families.
Parent coffees: Parents learn information of events and instruction at ACHS
Parents are given opportunities at coffees to speak and ask questions of the administrative team.
Counselors are present at Parent and Community events to answer questions in regards to credit acquisition, transitions to higher education, financial aid, and grades.
Home visits and phone calls are made to make the school to home connection about attendance, grades, and workshops
Parent University to give access to parents to community partners and courses to help
12/18/2014
School Code: 1458 School Name: AURORA CENTRAL HIGH SCHOOL
CDE Improvement Planning Template for Schools (Version 6.0 -- Last Updated: June, 17 2014) 56
parents connect with ACHS.
ELL programs for parents who are second language learners. Classes such as English, citizenship and technology.
All communication from ACHS is distributed in several languages to our families and community.
Needs assessment by CSU Parenting Matters of parents. This assists with adjusting instruction and communication at Parent Coffees and Parent University.