sced re-runs: before and after non-spin deployment on july 13 & july 18
DESCRIPTION
SCED Re-Runs: Before And After Non-Spin Deployment on July 13 & July 18. John Dumas Director Wholesale Market Operations. Outline of Presentation. Additional Data from July 13 & 18 Non-Spin Deployment. Results of SCED Re-Run for different “floor” scenarios. Limitations of the SCED Re-Run - PowerPoint PPT PresentationTRANSCRIPT
August 8, 2011
Reliability Deployments Task Force Meeting
SCED Re-Runs: Before And After
Non-Spin Deployment on July 13 & July 18
John DumasDirector Wholesale Market Operations
2
Outline of Presentation
• Additional Data from July 13 & 18 Non-Spin Deployment.
• Results of SCED Re-Run for different “floor” scenarios.• Limitations of the SCED Re-Run
• QSE actions to submit EOC with floor for Non-Spin
• Summary of the SCED Re-Run
• Observations
August 8, 2011
3
Additional Data from July 13 Non-Spin Deployment.
July 28, 2011
@14:35 LSL Non-Spin Responsibility“ON” Non-QSGR 2247 649
“OFFNS” Non-QSGR 104 251
“ON” QSGR 433 844
“OFFNS” QSGR 219 291
“OFF” Non-QSGR that came online by 14:55
56 0
“OFF” QSGR that came online by 14:55
144 0
•Note 1: All are telemetry values at 14:35 (before Non-Spin Deployment)
•Note 2: Load increase from 14:35 to 14:55 = 540 MW
•Note 3: LSL injection from OFFNS resources from 14:35 to 14:55 =
219 (“OFFNS” QSGR) + 104 (“OFFNS” Non-QSGR) = 323 MW•Note 4: The total HSL from “OFF” Generation Resources that came online = 248 MW
4
Additional Data from July 18 Non-Spin Deployment.
July 28, 2011
@14:35 LSL Non-Spin Responsibility“ON” Non-QSGR 1636 738
“OFFNS” Non-QSGR 116 358
“ON” QSGR 258 536
“OFFNS” QSGR 288 368
“OFF” Non-QSGR that came online by 14:55
0 0
“OFF” QSGR that came online by 14:55
0 0
•Note 1: All are telemetry values at 15:20 (before Non-Spin Deployment)
•Note 2: Load increase from 15:20 to 15:55 = 507 MW
•Note 3: LSL injection from OFFNS resources from 15:20 to 15:55 =
288 (“OFFNS” QSGR) + 116 (“OFFNS” Non-QSGR) = 404 MW
5
Scenarios for SCED Re-Run with different “floors”
August 8, 2011
• For “ON” Generation Resources (QSGR and Non-QSGR), change HASL/HDL calculation to give SCED ability to ALWAYS use capacity reserved for Non-Spin.
• Re-Run SCED with modified EOC for Generation Resources having Non-Spin Responsibility as per the following:
Low FLoor Medium-1 Floor
Medium-2 Floor
High Floor
ONLINE Non-QSGR:HASL to HSL
18*FIP
July13=$79.38July 18=$80.01
$500 $1000 $3000
ONLINE QSGR:(HSL-Non-Spin) to HSL
18*FIP
July13=$79.38July 18=$80.01
$500 $1000 $3000
OFFNS (QSGR & Non-QSGR):LSL to HSL
15*FIP+$120
July13=$186.15July 18=$186.675
$500 $1000 $3000
6
Results of SCED Re-Run for different “floor” scenarios
August 8, 2011
July 13: FIP=4.41 July 18: FIP=4.445
System Lambda@14:35 Before Non-Spin Deployment
System Lambda@14:55 - After Non-Spin Deployment
System Lambda@15:20 Before Non-Spin Deployment
System Lambda@15:55 - After Non-Spin Deployment
Sum(HDL)-GTBD=459 MW (New)= -7 MW (Original)
Sum(HDL)-GTBD=505 MW (New)=505 MW (Original)
Sum(HDL)-GTBD=335 MW (New)=280 MW (Original)
Sum(HDL)-GTBD=1149 MW (New)=1149 MW(Original)
Original – No change
$2999.99 $76.79 $267.75 $63.35
Original – Only online HASL/HDL changed, NO floor
$92.88 $76.79 $62.54 $63.35
Low Floor $81.28 $83.61 $85.08 $80.92
Med Floor-1$500
$500 $500 $475.57 $80.92
Med Floor-2$1000
$1000 $1000 $968.96 $80.92
High Floor$3000
$3000 $3000 $2968.95 $80.93
7
Results of SCED Re-Run for different “floor” scenarios
• July 13 : 13:00 – 20:00
August 8, 2011
@14:35GTBD=62261 MW
orig=$2999.99HASL=$92.88low=$81.28med-1=$500med-2=$1000high=$3000
@14:55GTBD=62801 MW
orig=$76.79HASL=$76.79low=$83.61med-1=$500med-2=$1000high=$3000
8
Results of SCED Re-Run for different “floor” scenarios
• July 18 : 13:00 – 20:00
August 8, 2011
@15:55GTBD=61677 MW
orig=$63.35HASL=$63.35low=$80.92med-1=$80.92med-2=$80.92high=$80.93
9
Limitations of the SCED Re-Run
August 8, 2011
• In Production, the additional EOC available to SCED after Non-spin deployment pushed down the output of other Generation Resources not carrying any Non-Spin Responsibility.
• The SCED re-runs used the Production telemetered MW. The telemetered MW would have been different if the floor were applied ALL of the time.
10
QSE actions to submit EOC with floor for Non-Spin
• No change to QSE process of submitting EOC and AS offers to DAM
• No change to QSE process of submitting AS offers to SASM
• QSE will update EOC to incorporate floor before the end of the Adjustment Period.
– With the ability provided by NPRR 321 “Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period”,
August 8, 2011
11
Summary of the SCED Re-Run
• After Non-Spin deployment, if the “floored” EOC segments are marginal, then the LMPs will be at the floor – i.e. LMPs are administered - by the value of the floor.
• After Non-Spin deployment, if none of the “floored” EOC segments are awarded, then the Generation Resources providing Non-Spin will be at risk of being price-takers at their LDL.
• Floors over or under compensate relative to prices without Non-Spin deployment.
August 8, 2011
12
Observations
• ERCOT did not over deploy Non-Spin on July 13 and July 18.– Sum(HDL)-GTBD <200– Load growth exceeded the remaining Non-Spin deployed
• Is the impact to the Day-Ahead and Real-Time energy price convergence because of permanently allowing SCED to use Non-Spin capacity mitigated by the floor on the Non-Spin segment of the EOC?
• ERCOT procedure to deploy Non-Spin will need to be reviewed if the Non-Spin capacity is permanently made available to SCED.