Scandinavian Shipyard / 2011Vessel Fire whilst in Dry Dock

Major Incident Investigation

2

Slide Agenda

1. Introduction2. Sequence of Events3. Investigation Analysis4. Recommendations5. Recommendations for the Industry.

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

3

Introduction

1. IntroductionHigh level major eventsConsequences

2. Sequence of Events3. Investigation Analysis4. Recommendations5. Recommendations for the industry

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

4

High Level Major Events

• Vessel in Dry Dock

• Blasting in Forepeak tank revealed a missing seam weld

• Remedial work required hot work (not in original yard plan)

• Fire and smoke damage through 2 decks

• All crew admitted to local hospital: smoke inhalation

checks for unknown toxic gas

• Accommodation areas rebuilt: 5 days delay in yard

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

5

Consequences

Actual PotentialHuman (P) C1 (P) C5Environment - -Assets (A) C3* (A) C5#

Final Classification: Major Asset DamagePotential Multiple Fatalities

* Severity 3 = above 50 KUSD but less than 500 KUSD# Severity 5 = above 5 MUSD

6

Sequence of events

1. Introduction2. Sequence of Events

Location mapDetailed sequence

3. Investigation Analysis4. Recommendations5. Recommendations for the Industry.

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

7

Location Map

• Major Scandinavian Shipyard, Dock 4

Presenter
Presentation Notes
HW = hardware

8

Location on board

Presenter
Presentation Notes
HW = hardware

9

Location on board

Presenter
Presentation Notes
HW = hardware

10

Hot Work Task

11

Detailed Sequence of Events

Some Pictures & Diagrams first..

Followed by 2 pages of time line

12

Yard

Welders Fire Watch Carpenters

Yard’s Contractors

13

New Weld – Forepeak side

14

PPE Store : Ignited foam

15

Looking up, above Weld seam

16

Route of FireRoute of Smoke

Ceiling of PPE Store

17

Route of Fire

Route of smoke

Route of Smoke

18

19

20

Investigation analysis

1. Introduction2. Sequence of Events3. Investigation Analysis

Analysis MethodologyRelevant DiagramsMain causes

4. Recommendations5. Recommendations for the Industry.

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

21

Analysis Methodology

• Full TOPSET Incident Investigation

• Investigation Team of 2 x QHSE and VM

• Separate interviews of entire crew

• Supervised interviews of Yard Workers & Foremen

• Immediate Underlying Root Causes

• Reviewed by Ship Managers and Seismic Contractor

• Root Causes QHSE MS Weaknesses

• Report distributed across fleet(s)

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

23

Fire In PPE Store Foam Ignited

Fire Watch departed area

Hot Work on-going

Foam scrapings not totally removed

Diagrams

Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

24

Fire Watch departed

area

Left with Supervisor

F.W. Supervisor unable to contact

Welder’s Supervisor

No Radio’s & No mobile signal

Yard’s Commsprocedures not

adequate

No direct contact with Welder

F.W. did not think Hot Work was

continuing

No Activity for > 1 hour

Welder took a meal break @ 18:00

Resumed work in another part of Forepeak Tank

Other Hot Work not known about

Single PTW covered multiple

locations

Diagrams

Why? Why? Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

25

Fire In PPE Store Foam Ignited

Fire Watch departed area

Hot Work on-going

Foam scrapings not totally removed

Diagrams

Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

26

Hot Work on-going

Seal Reference Hole

Pilot/Locator hole drilled through

Bulkhead

Verification of location of plate

seam

Working opposite sides of a Bulkhead

To see how much combustibles had

to be removed

Repair Seam from Tank-side

Previously only tack-welded

Only became visible after shot-

blastingPreviously treated

with concrete wash

Diagrams

Why? Why? Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

27

Fire In PPE Store Foam Ignited

Fire Watch departed area

Hot Work on-going

Foam scrapings not totally removed

Diagrams

Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

28

Foam scrapings not totally removed

Hot Work checklist not

followed

No Hot Work checklist was

completed

Hot Work PTW not fully

completed

Yard’s own procedures not

followed

Previous lessons learned were not

remembered

Yard HSE Plan template not

updated

Diagrams

Why? Why? Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

29

Diagrams

Casualties with Smoke inhalation

Automatic Fire Alarm too late

Not Optimal setting for

unmanned Bridge

Settings not reviewed before

Yard stay

Unmanned BridgeNo Policy for 24hr

Manned Bridge whilst in Yard

Smoke Hood not properly used

Use not regularly drilled

Their use was not part of new-hire

Induction

Why? Why? Why?

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

30

Findings

• Inadequate Hot Work Procedures

o Did not address multiple HW tasks within same tank

o Ineffective communication methods/tools

o Carpenters did not clear combustibles as per procedure

• Inadequate sub-contractor communication

• Sub-Optimal Fire Alarm configuration during Yard stay

o Ship-wide alarm sounded too late (Pre-Alarm not heard)

• Use of smoke Hoods unfamiliar to some of crew

Presenter
Presentation Notes
Some definitions ICAM = Incident Cause Analysis Method, issued from Shell Delta / Tripod methodology EREngine RoomC/OChief Officer FiFiFire FightingC/EChief Engineer FRCFast Rescue CraftMDODiesel Oil WBWork BoatCO2Extinguishing agent

31

Other Observations

• Test residual main water pressure from yard

• Ensure Fire Plans are posted on gang-way

• Mobile phones useless under MSL, in metal! Use UHF

• 2 of 4 smoke hoods used were not activated

• Investigators - Download event logs immediately!

o FiFo buffer of Fire Alarm no longer held history far enough back

Presenter
Presentation Notes
OR = organisation PR = procedure CO = communication

32

Recommendations

1. Introduction2. Sequence of Events3. Investigation Analysis4. Recommendations

1. Immediate actions taken2. Recommendations

5. Recommendations for the Industry.

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

33

Immediate actions taken

• Crew tested at Hospital for possible inhalation of toxins

• All clear and back at work the next morning (Hotel-based)

• 24 hour Bridge watch

• Accommodation rebuild

• Air Quality measured before crew returned to ship

Presenter
Presentation Notes
PMS = Power management system ME = Main Engine AE = Auxiliary Engines MAK, Bergen and LMF are trade marks

34

Recommendations

• Familiarisation of Fire Alarm settings by OOW

• Familiarisation of Smoke Hoods with more realistic Drills

• 24 hour Bridge watch during all future yard stays

• Pre-Yard, 2-way presentations of recent “lessons learned”

• Hot Work Permit process more rigorous (by task, not area)

• Audit Yard’s contractor management wrt communication

Presenter
Presentation Notes
OR = organisation PR = procedure CO = communication

35

Recommendations

1. Introduction2. Sequence of Events3. Investigation Analysis4. Recommendations5. Recommendations for the Industry.

Presenter
Presentation Notes
LTI = Lost Time Injury (stress) MTC = Medical Treatment Case (whiplash) FAC = Fisrt Aid Case

36

Recommendations for the Industry

• Your Yard HSE Plans to include reference to:

o Yard’s contractor communications (our sub-contractor management!)

o HWP should be issued by task, not by area, and be risk-assessed

o Use UHF Radios – do not rely on mobile phones

o Optimise Fire Alarm settings before entering yard (e.g. pre-alarm)

o Residual water pressure for fire hoses

• Consider retaining 24 hr Bridge Watch during any Yard.

• More regular drills involving the use of smoke-hoods.

Presenter
Presentation Notes
OR = organisation PR = procedure CO = communication