sap.testking.c tplm30 66.v2015-03-13.by.kyle - …€¦ · sap certified application associate ......

24
Testking.C_TPLM30_66.80 Questions Number : C_TPLM30_66 Passing Score : 800 Time Limit : 120 min File Version : 5.1 http://www.gratisexam.com/ C_TPLM30_66 SAP Certified Application Associate - Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these questions. Guys just read this only. I have corrected few questions and now score will be 95% above Guaranteed. Best stuff I have ever used for my exam preparation. I love Exam collection guys. Added Explanations and Exhibits most of the questions. Finally, I got right questions for this exam and share with you guys. Best Wishes. I only used these questions and got 900 marks with this. Perfect Show.

Upload: vannga

Post on 01-May-2018

231 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Testking.C_TPLM30_66.80 Questions

Number: C_TPLM30_66Passing Score: 800Time Limit: 120 minFile Version: 5.1

http://www.gratisexam.com/

C_TPLM30_66

SAP Certified Application Associate - Enterprise Asset Management (Maintenance& Repair) with SAP ERP 6.0 EHP6

Excellent Questions, I pass with 90% with these questions. Guys just read this only.

I have corrected few questions and now score will be 95% above Guaranteed.

Best stuff I have ever used for my exam preparation. I love Exam collection guys.

Added Explanations and Exhibits most of the questions.

Finally, I got right questions for this exam and share with you guys. Best Wishes.

I only used these questions and got 900 marks with this. Perfect Show.

Page 2: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Exam A

QUESTION 1Which of the following are prerequisites for business completion? (Choose two)

A. The order must have actual costs.B. The order must be fully settled.C. The balance of the order must be zero.D. The order must have planned costs.

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 2What information does the value category provide in the maintenance order?

A. The costs details for individual technical objectsB. The costs by work centerC. The material costs by valuation categoryD. A summary of costs for multiple cost elements

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 3Which of the following Customizing settings is required to assign a notification to a maintenance orderoperation?

A. Assignment of operations to all object list entries activeB. Assignment of order type to notification typeC. Maintain indicator for notification data on order headerD. Create default value profiles for general order data

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 4When the user creates a maintenance plan for a call object (order), which value in the planning datadetermines the order type?

A. PriorityB. Maintenance activity typeC. Maintenance planner groupD. Main work center

Correct Answer: CSection: (none)

Page 3: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation

Explanation/Reference:correct answer.

QUESTION 5A maintenance technician replaces a defective counter with a new counter.

http://www.gratisexam.com/

Before the users can create a standard measuring document for the new counter, what step(s) must theyperform?

A. Create a new technical object to represent the new measuring point.B. Create a special measuring document and set the Counter Replacement indicator.C. Dismantle the old measuring point and create a new measuring point.D. Create a new measuring point and change the measuring point from which the measurement reading

was transferred.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 6A user has planned an operation with labor costs and material costs; however, the material cost element isnot assigned to a value category.Where do the material costs appear in the value categories for the order?

A. In the overhead value categoryB. In a new, automatically created value categoryC. In the unassigned value categoryD. In the internal activity value category

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 7Which of the following always produces up-to-the-minute costing information for maintenance orders?

A. A standard analysis from the Plant Maintenance Information System (PMIS)B. A standard query in SAP NetWeaver Business WarehouseC. A maintenance order listD. A shift report based on shift notes

Correct Answer: CSection: (none)Explanation

Page 4: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation/Reference:Explanation:

QUESTION 8Which task list can have both external and internal number assignment for the task list group number?

A. Bill of material task listB. Equipment task listC. General task listD. Functional location task list

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 9Which of the following is a function of deadline monitoring (transaction IP30)?

A. Generate a Logistics Information System (LIS) report for scheduled maintenance items within a specificperiod.

B. Convert maintenance notifications into maintenance orders within a specific period.C. Convert maintenance calls into call objects within a specific period.D. Generate a Logistics Information System (LIS) report for all overdue maintenance calls.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 10A maintenance plan has a completion requirement. The plan contains five maintenance items that producefive notifications.

Which system status must each notification have before the maintenance call is completed and the nextmaintenance call can be generated?

A. REL (Released)B. ATCO (All Tasks Completed)C. TECO (Technically Completed)D. NOCO (Notification Completed)

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 11Which of the following control characters is available in the edit mask of the structure indicator?

A. D (numeric characters)B. M (alphanumeric characters)C. Y (special characters)

Page 5: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

D. A (alpha characters)

Correct Answer: DSection: (none)Explanation

Explanation/Reference:right answer.

QUESTION 12Which of the following is a benefit of SAP Solution Manager?

A. It reduces the cost of implementation and continuous improvement.B. It enables central SAP NetWeaver Enterprise Search within all SAP systems.C. It provides common master data management within all SAP systems.D. It reduces the number of systems and operates only one central IT landscape.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 13Which account assignment category can you specify in a settlement profile?

A. Maintenance planning plantB. Functional locationC. EquipmentD. Material

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 14You have selected Confirmation Required in the control key for operations in a maintenance order. One ofthe operations is already partially confirmed.

Which system statuses can the order header display before all operations are finally confirmed? (Choosethree)

A. TECOB. PCNFC. CRTDD. CNFE. CLSD

Correct Answer: ABESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 15

Page 6: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

How many time-based cycles can you use in a multiple-counter maintenance plan?

A. ThreeB. ZeroC. TwoD. One

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 16What are the purposes of technical object structures? (Choose three)

A. To support Asset Accounting in the description of fixed assetsB. To display the total number of an asset's individual parts from a design engineering perspectiveC. To identify objects and object parts for maintenanceD. To collect historical data for maintenance objectsE. To enable detailed cost analyses

Correct Answer: CDESection: (none)Explanation

Explanation/Reference:appropriate answer.

QUESTION 17What are the prerequisites for creating a capacity requirement in a maintenance order operation? (Choosetwo)

A. The performing work center must have available capacity data.B. The performing work center must have a control key with the Determine Capacity Requirements

indicator set.C. The numeric value for Work in the order operation must be greater than 0.D. The operation must have a control key with the Determine Capacity Requirements indicator set.

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 18In order costing configuration, for what is the allocation structure used?

http://www.gratisexam.com/

A. To provide a method of consolidating costs in the Plant Maintenance Information System

Page 7: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

B. To allocate costs to a hierarchy of maintenance technical objectsC. To determine the cost elements that are allowed in the plant maintenance orderD. To determine the settlement receiving elements for costs debited to the order

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 19Your customer uses operating hours to execute a performance-based maintenance plan.

Which of the following data must you assign in the maintenance plan header?

A. A task list for performance-based maintenanceB. A cycle unit of measure with a corresponding characteristic from the measuring pointC. An order type for performance-based maintenanceD. A technical object with a measuring point

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 20Your customer wants to use the dynamic availability check for stock material.

What data must you use to create a scope for the check?

A. Checking group and material typeB. Checking rule and material typeC. Checking rule and material groupD. Checking group and checking rule

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 21What does the functional location category determine? (Choose two)

A. Whether a fixed asset from Asset Accounting can be assignedB. Whether you can create linear data for a functional locationC. The partner determination procedureD. The functional location class

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

Page 8: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

QUESTION 22Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisionsand create maintenance orders automatically.

What must you do in Customizing?

A. Define field values for PM/PS Reference ElementB. Define transfer of project or investment programC. Create a revision type and select WPS-Controlled.D. Create a revision type and select Not WPS-Controlled.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 23When a user creates a notification or an order and enters a functional location as the reference object, youwant the system to suggest the subordinate equipment automatically.

In addition to setting the reference object view in the order or the notification, what other settings must youmake? (Choose two)

A. Set View Profiles for Technical Objects in Customizing.B. Set the Single Installation indicator in the equipment master data record.C. Set the Single Installation indicator in the Functional Location master data record.D. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 24Your customer executes deadline monitoring (transaction IP30).

What happens after you insert additional call dates using the manual call function?

A. The system restarts the maintenance plan.B. The system retains the normal scheduled call dates.C. The system fixes the next scheduled call date.D. The system reschedules all previous scheduled call dates.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:well executed answer.

QUESTION 25Your customer wants to settle costs of the refurbishment process to an inventory account.

What Customizing does the process require? (Choose two)

A. Special control keys for use in refurbishment operations

Page 9: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

B. A specific order type for refurbishment processingC. A specific settlement profile for the purpose of refurbishmentD. A specific notification type for refurbishment processing

Correct Answer: BCSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 26Your customer wants the system to generate a serial number and an equipment master upon goodsreceipt of a material.

Which Customizing steps are required?

A. Create a serial number profile and assign it to an equipment master.B. Create a serial number profile and assign it to a serializing procedure.C. Create a serial number profile and assign it to a view profile for technical objects.D. Create a serializing procedure and assign it to an equipment master.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 27Which steps must you perform to activate the usage history for equipment? (Choose two)

A. Activate the usage history for the equipment category.B. Set the Usage History indicator for the maintenance plant.C. Define history-related fields for the relevant equipment reference category.D. Activate the usage history for each piece of equipment in the master record.

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 28Where do you define initial and subsequent buffers for the maintenance plan strategy?

A. In the maintenance itemB. In the maintenance plan category settingsC. In the maintenance package for the maintenance strategyD. In the maintenance plan scheduling parameters

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 29

Page 10: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Your customer wants to create a component for maintenance that does not allow physical inventory.

Which material type must you use?

A. Spare parts (ERSA)B. Maintenance assembly (IBAU)C. Non-valuated materials (UNBW)D. Operating supplies (HIBE)

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 30In a refurbishment order for external processing, where can you find information about the defective partafter the goods issue has been posted?

A. In special stock type R (refurbishment stock), after the return from the service company and a goodsreceipt posting

B. In special stock type B (batch) after the return from the service company and a goods receipt postingC. In special stock type F (customer order stock)D. In special stock type O (parts provided to vendor)

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 31Factory calendars are assigned to the maintenance plant and work center.

By default, which factory calendar is used for work order scheduling?

A. Planning plantB. Main work centerC. Maintenance plantD. Production work center linked to a technical object

Correct Answer: BSection: (none)Explanation

Explanation/Reference:given answer is right.

QUESTION 32Which scheduling parameter adjusts the cycle intervals of a maintenance strategy for each maintenanceplan?

A. The call horizonB. The early and late shift factorsC. The early and late toleranceD. The cycle modification factor

Page 11: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 33Which of the following information can the shift report display? (Choose three)

http://www.gratisexam.com/

A. Planned and actual costs for shiftsB. Digital signatures for approval of a shift reportC. Maintenance plans and task listsD. Maintenance orders and notificationsE. Measurement documents and goods movements

Correct Answer: BDESection: (none)Explanation

Explanation/Reference:good choice of options.

QUESTION 34What does the scheduling period determine in the maintenance plan scheduling parameters?

A. The duration for which the system generates maintenance orders immediatelyB. The duration for which the system generates planned or call dates during schedulingC. The duration for which the system generates maintenance notifications immediatelyD. The validity period of the maintenance plan

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 35What does the cycle set sequence in a multiple-counter maintenance plan determine?

A. The scheduling sequence of a maintenance itemB. The operation sequence of a maintenance orderC. The scheduling sequence for a group of maintenance plansD. The operation sequence of a task list

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

Page 12: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

QUESTION 36To which objects can you assign a user status profile? (Choose three)

A. An order typeB. A task list typeC. A maintenance plan categoryD. An equipment categoryE. A notification type

Correct Answer: ADESection: (none)Explanation

Explanation/Reference:truthfully.

QUESTION 37In which lifecycle scenarios can you use SAP Solution Manager? (Choose three)

A. RetirementB. OperationsC. ImplementationD. OptimizationE. Scoping

Correct Answer: BCDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 38What are the prerequisites for installing equipment at a functional location? (Choose two)

A. A cost center is assigned to the equipment.B. A fixed asset is assigned to the equipment.C. The equipment category of the equipment allows the installation.D. The functional location master record allows the installation.

Correct Answer: CDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 39Which of the following steps are required to create a measuring point for performance-based preventivemaintenance? (Choose two)

A. Specify the annual estimated usage for the measuring point.B. Activate the Measurement Reading Transfer indicator.C. Define a valuation code group.D. Create the measuring point as a counter.

Correct Answer: ADSection: (none)

Page 13: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation

Explanation/Reference:very well.

QUESTION 40When a user creates a task list using the Copy function, all the header fields transfer to the new task list,with one exception.

Which field is the exception?

A. UsageB. Work CenterC. AssemblyD. Status

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 41Your customer has several plants.How do you set up the maintenance organizational structure to implement centralized maintenanceplanning?

A. Assign all your work centers to one of your central planning plants.B. Define a plant and assign it to a company code.C. Assign all your work centers to one of your maintenance plants.D. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 42Which standard aggregation of data does the Plant Maintenance Information System (PMIS) use? (Choosethree)

A. By info sourceB. By characteristicsC. By data sourceD. By date periodE. By key figures

Correct Answer: BDESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 43How can you maintain a distribution rule? (Choose two)

Page 14: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

A. Manually, prior to the first settlementB. Automatically, according to value categories in the orderC. Manually, after the business completion for the orderD. Automatically, based on a combination of Customizing and object master data

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 44You customize an order type to release orders immediately upon creation, and you assign the order type toa maintenance item.

How can a user override the automatic release of the order without creating a new order type?

A. Select a maintenance planner group and set the Do Not Release Immediately indicator.B. Set the Do Not Release Immediately indicator in the task list header.C. Set the Do Not Release Immediately indicator in planning data for the maintenance item.D. Select a maintenance activity type and set the Do Not Release Immediately indicator.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:satisfactory answer.

QUESTION 45Your customer wants to assign personnel to order operations.

Which master data must exist in the system?

A. A requirements profileB. A personnel indicator in the control keyC. A personnel profileD. A personnel number

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 46What are consequences of activating alternative labeling for functional locations?

A. You can assign a serial number to a functional location.B. You can change the primary functional location label and keep the old label as a historical functional

location label.C. The company code is automatically included in the functional location label.D. You can change the primary functional location label and delete the old functional location label.

Correct Answer: BSection: (none)Explanation

Page 15: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation/Reference:nicely done.

QUESTION 47What does the maintenance plan category determine?

A. The type of maintenance call object the system generates for a due maintenance callB. The type of technical object for the maintenance planC. How maintenance call objects are generated for a due maintenance callD. The grouping of similar maintenance plans together for reporting

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 48What does the notification type define? (Choose three)

A. The reference object viewB. The catalog or catalog profileC. The scheduling typeD. The planner groupE. The number assignment of the notification

Correct Answer: ABESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 49What happens when you set the system status in a maintenance order to technically completed (TECO)?(Choose two)

A. The system sets a deletion indicator for outstanding reservations.B. The system sets a deletion indicator for outstanding purchase requisitions.C. The system posts costs to the target account assignment.D. The system sets a deletion indicator for purchase orders assigned to the maintenance order.

Correct Answer: ABSection: (none)Explanation

Explanation/Reference:proper answer.

QUESTION 50Which of the following can you assign to a maintenance order operation? (Choose three)

A. AssetB. EquipmentC. WBS elementD. Maintenance orderE. Measuring point

Page 16: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Correct Answer: BCESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 51Which of the following components is included in SAP Solution Manager?

A. SAP NetWeaver Business WarehouseB. Master data managementC. Service DeskD. SAP NetWeaver Enterprise Search

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 52Your customer wants to establish a maintenance work center with various activity types, each with adifferent fixed price.

How do you accomplish this?

A. Create various maintenance activity types with the fixed prices and assign them to the work center.B. Define the activity types for each maintenance planning plant.C. Create various maintenance activity types in each work center and assign a price.D. Define the activity types in Controlling and assign them to the cost center of the work center.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 53What does the structure indicator for a functional location determine? (Choose three)

A. The functional location typeB. The number of characters for each hierarchy levelC. The edit maskD. The functional location categoryE. The number of hierarchy levels for a particular structure

Correct Answer: BCESection: (none)Explanation

Explanation/Reference:good tricky answer.

QUESTION 54In Customizing, to what data must you assign digital signatures in addition to the order type?

Page 17: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

A. Maintenance plantB. Work centerC. Maintenance planner groupD. Planning plant

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 55Your customer wants to subdivide the maintenance organization by production responsibility.

What do you use to designate the contact person for coordination between production and plantmaintenance?

A. Plant sectionB. Production cost centerC. Work centerD. Controlling area

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 56To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.

To which parameter do you assign the costing sheet?

A. Version for cost estimatesB. Costing typeC. Valuation categoriesD. Valuation variant

Correct Answer: DSection: (none)Explanation

Explanation/Reference:genuine answer.

QUESTION 57Which object do you use to assign number ranges for maintenance plans in Customizing?

A. Maintenance planner groupB. Technical objectC. Maintenance itemD. Maintenance plan category

Correct Answer: DSection: (none)Explanation

Page 18: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation/Reference:Explanation:

QUESTION 58When you create a refurbishment order, which reference objects can you use? (Choose three)

A. Functional locationB. Equipment without serial numberC. Material with serial numberD. Material without serial numberE. Equipment with serial number

Correct Answer: CDESection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 59What are the prerequisites for the calculation of planned costs in an order? (Choose three)

A. The order operations must have a control key with the Costing indicator set in Customizing.B. The user must save the order or execute the Determine costs function.C. The cost elements must be assigned to the order type in Customizing.D. A costing variant for planned costs must be assigned to the order type in Customizing for order types.E. The costing indicator must be set in Customizing for order types.

Correct Answer: ABDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 60The view profile enables you to create a customized selection of tabs for use with technical objects.

Which Customizing step(s) must you perform to make a view profile available?

A. Activate customized tabs for each equipment category or functional location category.B. Create the view profile in the master record of either equipment or functional location.C. Create the view profile and assign it to an object type.D. Create the view profile for a particular screen group and then assign it to a functional location category

or equipment category.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:appropriate answer.

QUESTION 61What purpose does the maintenance planner group serve?

A. It determines which maintenance call object the system generates for a due maintenance call.B. It identifies a person or a group of persons who is responsible for planning maintenance activities for a

number of technical objects.

Page 19: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

http://www.gratisexam.com/

C. It identifies a person who is part of the main work center and who acts as the supervisor.D. It represents a person or a group of persons who is responsible for maintaining task lists.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 62Your customer uses the dynamic availability check for stock material.

Where does the system check material availability for an operation?

A. In all plants where material inventory existsB. Only in the plant where the material has been reservedC. Only in the plant where the material is flagged with the special stock indicator for maintenance stockD. In all plants where the material is managed with serial numbers

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 63A customer wants to define an order type that includes a notification when the order is created.

Which Customizing step(s) must you perform?

A. Assign the notification type to the order type according to plant assignment in Customizing.B. Set the indicator for notification data or order header and assign the notification type to the order type in

Customizing.C. Set the Notification indicator for the order type according to plant assignment in Customizing.D. Assign the notification type to the order type in Customizing.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 64Which of the following steps must you perform to customize priorities for a maintenance order?

A. Assign a priority type to an order type.B. Assign priorities to technical object master records.C. Assign a priority type to a technical object master record.

Page 20: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

D. Assign priorities to order types.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 65Your customer needs a maintenance order type for use with Test Equipment Management in amaintenance plan.

Which Customizing setting must you make for the order type?

A. Assign an inspection lot to order type only.B. Create an order type for Test Equipment Management.C. Assign an inspection type to an order type with plant assignment.D. Create a plant for inspection lots.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 66What are the prerequisites for order settlement? (Choose three)

A. The order must be technically completed.B. The order has not been settled previously.C. A settlement rule must be created for the order.D. The order must be released.E. The settlement profile used in the order type must allow settlement.

Correct Answer: CDESection: (none)Explanation

Explanation/Reference:sophisticated answer.

QUESTION 67Which of the following combinations must you use to create a single-cycle maintenance plan for anexternal service?

A. A maintenance order for settlement and an outline agreementB. A framework order and a maintenance order for settlementC. A framework order and a subcontract purchase orderD. A subcontract purchase order and an outline agreement

Correct Answer: BSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 68

Page 21: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Your customer wants to utilize estimated costs in Plant Maintenance orders.

Which condition does the customer need to be aware of?

A. Planned costs overwrite estimated costs after release of the order.B. A specific order type in which cost estimates are activated must be used.C. Planned costs must not exceed the estimated costs.D. Upon release of the order, estimated costs cannot be revised.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 69What is the purpose of the usage list for equipment history? (Choose two)

A. To display changes to history-related fields in an equipment master recordB. To display the list of previous equipment operatorsC. To document the number of breakdowns for an objectD. To track where the equipment was installed

Correct Answer: ADSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 70What step activates the Warranty subscreen as part of the equipment master data record?

A. Setting the Master Warranty indicator in the equipment master dataB. Setting the Use-in-Equipment indicator in the Master Warranty transactionC. Adding the Warranty subscreen in View Profiles for Technical ObjectsD. Adding the Warranty subscreen in the Object Information view of the equipment master data record

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 71Which of the following are maintenance work center functions? (Choose three)

A. Capacity planningB. Production resources/tools (PRT) allocationC. SchedulingD. CostingE. Material planning

Correct Answer: ACDSection: (none)Explanation

Page 22: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation/Reference:Explanation:

QUESTION 72What do you use to set up a refurbishment order for external refurbishment?

A. An external operation that contains a subcontracting indicator and a material item with a materialprovision indicator activated.

B. An external operation that contains a control key for refurbishment.C. An order type for external refurbishment and an assignment of a material with split valuation.D. An order type for external refurbishment and a material item with item category External Refurbishment.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:well answered.

QUESTION 73When is the latest possible point in time that you can create a settlement rule?

A. Before technical completionB. Before order releaseC. After order releaseD. After technical completion

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 74Your customer wants to generate costing for internal activities.

For which of the following can you define various rates in Activity Type/Price Planning transaction? (Choosethree)

A. Plan/actual versionB. Cost centerC. PeriodD. Value categoryE. Plant

Correct Answer: ABCSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 75Which steps must you perform to enable the valuation of characteristics for a piece of equipment? (Choosethree)

A. Assign characteristics to the equipment class type.B. Assign characteristics to a class.

Page 23: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

C. Create characteristics in the classification system.D. Assign a class to a piece of equipment.E. Assign a class to the equipment category.

Correct Answer: BCDSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 76A maintenance work order has external processing. The planning plant and maintenance plant havedifferent addresses. A purchase requisition is generated from a maintenance order.

With standard delivered SAP Customizing, which address is the default delivery address in the purchaserequisition?

A. Work centerB. Storage locationC. Planning plantD. Maintenance plant

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 77What options are available in the maintenance order when you analyze costs using value categories?(Choose two)

A. Display of costs by responsible work centerB. Display of costs by individual operationsC. Display of values in an alternate currencyD. Summary of actual costs across multiple cost elements

Correct Answer: BDSection: (none)Explanation

Explanation/Reference:real answer.

QUESTION 78Users need to be able to select operations and work centers from the task list when they create amaintenance order with task list selection.

In Customizing, how can you accomplish this requirement? (Choose two)

A. By setting the indicators for the order type onlyB. By setting the indicators for the planning plant onlyC. By activating the work center selection indicatorD. By activating the operation selection indicator

Correct Answer: CDSection: (none)Explanation

Page 24: SAP.Testking.C TPLM30 66.v2015-03-13.by.Kyle - …€¦ · SAP Certified Application Associate ... & Repair) with SAP ERP 6.0 EHP6 Excellent Questions, I pass with 90% with these

Explanation/Reference:Explanation:

QUESTION 79How does SAP make new functions of the SAP ERP application available to customers?

A. Via enhancement packagesB. Via best practicesC. Via add-onsD. Via Support Packages

Correct Answer: ASection: (none)Explanation

Explanation/Reference:Explanation:

QUESTION 80For which business requirements must you use serial numbers? (Choose two)

A. To uniquely identify inventory material itemsB. To have a future option to track material items as pieces of functional locationsC. To have a future option to track material items as pieces of equipmentD. To have the option to track batches

Correct Answer: ACSection: (none)Explanation

Explanation/Reference:actual answer.