    1. EXECUTIVE SUMMARY

    1.1 TITLE:

    A project on Study of Buffer allocation system and visualization of waste through Valuestream mapping in Heat Treatment Department.

    1.2 OBJECTIVE:

    Primary objective:

    Visualizing the waste caused due to buffer allocation system using VSM.

    Secondary objective:

    Revisit the current buffer allocation system and find out method to allocate buffer

    which will reduce the waste.

    Study the flow of the process and preparing dedicated flows for the concerned

    channels, which will help in implementation of kanban. Study the communication between process stations.

    1.3 SCOPE:

    Project work is limited to shared operations area as far as VSM is concerned.

    Communication, buffer allocation systems are scoped to heat treatment department.

    Components for channels T2 & T3 are under the scope of the project (Customers: Tata

    Motors Ltd, John Deere, Escort, Volvo, Swaraj Mazda, Spicer).

    1.4 RESEARCH METHODOLOGY

    Research is a process of investigation, an examination of a subject from different points ofview. In this project we will be using Value Stream mapping as our research methodology.

    Value Stream Mapping is simply mapping on paper (often in pencil) the various information

    and processing steps to get a product from idea or raw material to finished product and to the

    customer.

    Data Collection Method Used is observations. Observation involves recording the behavioral

    patterns of people, objects and events in a systematic manner.

    1.5 FINDINGS:

    After collecting Data and mapping the value stream, the non value added times and buffer

    times came in front. Reasons behind these Non Value Added Times are also digged out. After

    care full study of allocation system, two proposals for buffer allocation have been made. (i.e.channel wise & Furnace Wise)

    Study of flow of components in the department resulted into a suggestion of creating dedicated

    flow for family of products which will help in implementing kan ban & single piece flow.

    1

  • 8/8/2019 Sapan Report

    2/50

    1.6 CONCLUSION:

    Value stream mapping proved to be a power full tool in identifying and eliminating

    wastes in the current system. After drawing and building current state VSM, we have to buildFuture State VSM. It is this Future State which highlights the waste in the 'system' that can be

    eliminated or reduced. By seeing the amount of 'waste' the team can identify opportunities to

    improve. The next step is to develop the 'Future State Implementation Plan'. Designing aFuture State requires more art, engineering and strategy than Present State mapping.

    1.7 LIMITATION:

    The study is limited to components of channel T2 & T3.

    Generalization should be done to apply the flow throughout the entire range of products.

    2

  • 8/8/2019 Sapan Report

    3/50

    2. OBJECTIVE AND SCOPE

    2.1 AIM:

    To study the current system of buffer placing, communication and flow of the process in theshared operations.

    2.2 OBJECTIVE:

    Primary objective:

    Visualizing the waste caused due to buffer allocation system using VSM.

    Secondary objective:

    Revisit the current buffer allocation system and find out method to allocate buffer

    which will reduce the waste. Study the flow of the process and preparing dedicated flows for the concerned

    channels, which will help in implementation of kanban.

    Study the communication between process stations.

    2.3 SCOPE:

    Project work is limited to shared operations area as far as VSM is concerned.

    Communication, buffer allocation systems are scoped to heat treatment department.

    Components for channels T2 & T3 are under the scope of the project (Customers: Tata

    Motors Ltd, John Deere, Escort, Volvo, Swaraj Mazda, Spicer).

    3

  • 8/8/2019 Sapan Report

    4/50

    Scope of the project

    4

    Supplier1

    Supplier2

    Supplier3

    Supplier4

    Supplier5

    Receiving&

    Inspection

    Washing

    HeatTreatm

    ent

    Face&OD

    Grinding

    Channels

    Custome

    rs

    Fig1:

    scope

    oftheprojectwork

  • 8/8/2019 Sapan Report

    5/50

    3. COMPANY PROFILE

    3.1 The SKF Group

    Svenska Kullager Fabriken i.e. SKF was founded by Sven Wingquist in 1907 when he got thepatent for self aligning bearing in Sweden. This was followed by patent in 12 other countries.

    By the year 1910 company had a base in United Kingdom with employee strength of 325 andmanufacturing operations in multiple countries (around 32).By the time it when it was 1927the company began its trading operations in India at Kolkata with East India Company.

    By the dawn of the year 1965 it started a manufacturing factory at Pune. In the year 1989 a

    factory at Bangalore was established with a purpose of manufacture of SDGBB.A decade later

    SKF India decided it was time to diversify so in 1999 it entered into manufacturing seals,Half a decade later it felt a need to change its name and thus was renamed as SKF India.

    SKF Group is the leading global supplier of products, solutions and services within rolling

    bearings, seals, mechatronics, services and lubrication systems. Services include technicalsupport, maintenance services, condition monitoring and training.

    Vision:-

    To equip the world with SKF knowledgeMission:-To be the preferred company...

    For customers, distributors and suppliers:

    delivering industry-leading, high value products, services and knowledge- engineered

    solutions;

    For employees:

    creating a satisfying work environment where efforts are recognized, ideas valued, andindividual rights respected;

    For shareholders:

    delivering shareholder value through sustainable earnings growth.

    Values:-

    The values that company stresses on while achieving its vision are High Ethics, Empowermentof people and company, Openness and most important thing is teamwork.

    Five technology platforms

    SKF groups its technologies in five platforms: Bearings and units, Seals, Mechatronics,

    Services, and Lubrication Systems. By utilizing capabilities from all or some of the platforms,SKF develops tailor-made offers for each customer segment, helping customers improve

    5

  • 8/8/2019 Sapan Report

    6/50

    performance, reduce energy use and lower total costs, while bringing increased added value to

    SKF.

    Three divisions, 40 segmentsSKF does business mainly through three divisions: Industrial Division and Service Division,servicing industrial original equipment manufacturers (OEMs) and aftermarket customers

    respectively, and Automotive Division, servicing automotive OEMs and aftermarket

    customers. SKF operates in around 40 customer segments, whereof examples include cars and

    light trucks, wind energy, railway, machine tool, medical, food and beverage and paperindustries.

    Financial targets

    SKF's long-term financial targets are to have an operating margin level of 12%, annual sales

    growth in local currencies of 6-8% and a return on capital employed of 24%.

    Research and development

    Technical development, quality and marketing have been in focus at SKF since the very start.

    The Group's efforts in research and development have resulted in numerous innovations,forming bases for new standards, products and solutions in the bearing world. In 2009, the

    number of first filings of patent applications was 218.

    6

  • 8/8/2019 Sapan Report

    7/50

  • 8/8/2019 Sapan Report

    8/50

    by striving for an overall positive environmental impact. Beyond Zero influences SKF's

    development of products and solutions.

    CO2

    Carbon dioxide (CO2) is by far the most significant greenhouse gas generated as a result ofSKF's operations. Therefore, the Group has set a target to reduce CO2 emissions by a

    minimum of 5% annually, irrespective of production volume. In 2009, the reduction was 18%,

    compared with reduction of 9.1% in 2008 and 2.2% in 2007.

    3.4 Six sigma

    SKF Six Sigma is a continuous improvement program within SKF that targets waste and

    defects in all business processes. SKF Six Sigma projects are run by extensivelytrained Black Belts and Green Belts, where Black Belts are required to run two projects a year

    and Green Belts one project a year. Within the SKF Six Sigma program are a number of tools

    and methodologies ranging from traditional DMAIC and Design for Six Sigma to Lean and

    other waste reducing methodologies. The foundations for SKF Six Sigma improvements arethat they are fact based and sustainable and contribute

    to the business objectives.

    Design for Six Sigma (DfSS)

    A methodology which focuses on developing new products and services to the market

    With optimal performance levels.

    Lean Six Sigma

    A methodology which combines tools from both Lean Manufacturing and Six Sigma.

    Lean focuses on speed and waste, Six Sigma on variation and quality the resultis better quality faster.

    Six Sigma for GrowthA customer focused approach and targets improvements in the growth areas suchas marketing, sales and distribution. Transactional Six Sigma Focuses on people processes

    such as service, sales and human resources.

    8

  • 8/8/2019 Sapan Report

    9/50

    3.5 Products

    Mechatronics

    Power Transmission Products

    Seals Product

    SKF Lubrication Systems

    Bearing Housing and Accessories

    Condition Monitoring Products

    Hydraulic Seals

    Industrial Shaft Seals

    Maintenance and Lubrication Products Plain Bearings

    Rolling Bearings

    3.6 Milestones

    1961-Company was incorporated under the name 'Associated Bearing Company'.

    1965-Company commenced production of its first factory located at Chinchwad, Pune.

    1987-Company has rechristened as SKF Bearing India. Company proposed to set up a

    new manufacturing unit for manufacture of 9.0 million nos. of ball bearings at

    Bommasandra in Karnataka. SKF of Sweden was the technical collaborators of theproject.

    1989-Company set up manufacturing unit for SDGBB in Bangalore.

    1990- Companys Chinchwad unit received a license to manufacture 22.35 million

    numbers of ball and roller bearings per annum. Its Bommasandra unit was licensed tomanufacture 26.4 million numbers of ball and roller bearings per annum.

    1995-Company forayed international markets namely U.S.A., Italy, France, Singapore,

    Argentina etc.

    1997-Company commenced up gradation of Pune plant with capital outlay of Rs.130

    crore.

    1999-SKF Bearings India inked an agreement with Telco to supply hub bearings for itslatest model Tata Indica. Company installed an electronic machine reliability

    inspection system called `Marlin', to monitor the condition of bearings in industrial

    processes.

    2002- SKF became the first bearing company in India to obtain ISO/TS-16949 for the

    Automotive Business Unit. Company established SKF Center for learning.

    2004-Company acquired Vibration Engineer and Consultants-a private limited

    company. The name of the company was changed to 'SKF India'. Companyinaugurated SKF Application Development Center.

    9

  • 8/8/2019 Sapan Report

    10/50

    3.7 Awards and recognition

    SKF India was awarded CNBC Asias India Business Leader Award for TalentManagement.

    Company was honored with Lean & Six Sigma Excellence Award by Symbiosis

    Centre for Management & Human Resource Development.

    Company bagged Six Sigma Award at CII 5th National Convention on Achieving

    Business Excellence for Global Competitiveness.

    Company received Regional Quality Circle competition award held by ToyotaKirloskar Suppliers Association.

    3.8 Future plans

    In Future, SKF India plans to increase capacity of its Haridwar, Uttarkhand to manufacturebearings. The plant is expected to become operational by first the quarter of 2010. The total

    capital investment of this plant will be around Rs. 1,500 million and will have a manufacturing

    capacity of 48 million bearings. The new facility will strengthen Companys leadershipposition in the domestic bearing market.

    SKF India's associate company, SKF Technologies (India) Pvt. Ltd. a wholly ownedsubsidiary of AB SKF, Sweden, offers customers complete sealing solutions based on

    our leading edge technology

    10

  • 8/8/2019 Sapan Report

    11/50

    3.9 SNAPSHOT:

    Date of Establishment: 1961Revenue: 356.779 ( USD in Millions )

    Market Cap: 24573.362708 ( Rs. in Millions )

    Corporate Address: Mahatma Gandhi Memorial Building,Netaji Subhash Road,Mumbai 400002, Maharashtra

    Management Details Chairperson: - Kamlesh C Mehra

    Managing director:- Rakesh MakhijaDirectors :- Darius C Shroff, Giuseppe Donato, Henrik Lange, Kamlesh C Mehra, Narendra J

    Jhaveri, Phil Knights, Pradeep Bhandari, R Makhija, Rakesh Makhija,

    Shishir Joshipura, Tryggve Sthen, Vartan Vartanian

    Business Operation: BearingsBackground SKF India incorporated in 1961 is engaged in manufacturing bearings, seals,

    solutions and other related products for a wide range of industry application. The company is a

    subsidiary of SKF Group, Sweden. The group was founded in 1907 and has presence 130countries; it owns 103 factories across 24 countries and has a workforce of 40,000 employees.

    Company manufactures ball and roller bearing components

    Financials Total Income: - Rs. 15972.1 Million (year ending Dec 2009)Net Profit: - Rs. 942.5 Million ( year ending Dec 2009)

    Company Secretary: - Pradeep Bhandari

    Auditors BSR & Associates

    11

  • 8/8/2019 Sapan Report

    12/50

    3.10 Market share of SKF India Ltd:

    Company Sales

    (Rs.Million)

    Current

    Price

    Change

    (%)

    P/E

    Ratio

    Market

    Cap.(Rs.Million)

    52-Week

    High/Low

    SKF India15709.30 467.40 -1.38 19.99 24647.19 504/230

    Timken India3191.24 148.90 -1.72 26.31 9490.12 156/72

    FAG Bearings7976.90 565.45 -1.04 12.68 9396.24 680/401

    NRB Bearings2907.36 89.45 -0.11 17.76 4334.86 102/41

    ABC Bearings1338.60 123.05 0.49 6.92 1421.23 129/35

    Bimetal Bearings1190.73 265.00 -1.30 11.34 1013.63 298/146

    Austin Engg. 816.69 95.60 6.99 4.71 332.48 116/43

    Deccan Bearings46.21 29.70 4.58 196.50 64.85 30/16

    Asian Bearing142.33 1.45 0.00 0.00 21.81 0/0

    Table1Source: shine.com

    Fig2 : segment wise net sales5

    12

  • 8/8/2019 Sapan Report

    13/50

    3.11 SHARED OPERATIONS:

    For a component, shared operations are the very first step in the factory.

    It involves heat treatment and the Face & OD Grinding processes for the components.

    Factory manufactures 183 types of bearings in this plant, each containing inner & outer Rings.All this components require hardening, which is done in heat treatment dept.

    Only 8 furnaces are there to cater the requirements of the 18 channels producing bearings.

    Factory is divided into 2 sections DGBB (Deep Groove Ball Bearing) & TRB (Taper RollerBearing); which are further divided into channels to produce bearings of certain range of bore

    and strength.

    Channels contain operations like groove grinding, ball filling, washing, greasing, inspectionetc.(in some cases F&OD is also done at channels.)

    Shared operations should never be allowed to become a bottleneck; therefore shared

    operations should have more capacity than needed for serving the involved channels.

    For good visualization buffers for next operations in the involved channels shall be locatedwhere the shared operations are located.

    The analysis of the buffer status is visual (preferably in webcam mode if needed) and done by

    the persons in charge of physical flow for shared operations (forklift drivers).Shared operations sequence prioritization is based on

    Sequence list from all involved channels

    All the involved channels previous operations buffers.

    Buffer after shared operations.

    13

  • 8/8/2019 Sapan Report

    14/50

    14

    Fig

    3:Enti r

    e

    supply

    chain

    an

    d

    Shared

    operation

    s

    asa

    vita

    lpartofi t

  • 8/8/2019 Sapan Report

    15/50

    3.12 HEAT TREATMENT:

    Heat treatment is a hardening operation, which is very important considering the life

    and strength of the product.Each & every type of components has to undergo hardening before it goes through further

    steps of manufacturing. HT has 8 furnaces (Shaker, Roller, Killick, Birlec, Castlink,

    Aichelin, Shoei, and Simplicity). Each component is suitable to go to specific furnaceaccording to dimension and other technical constraints.

    Each furnace has zones like: heating zone, quenching conveyor, washing conveyor,

    tempering zone.

    Super-cooliSuper-cooliFIG 4: HARDENING PROCESS AT FURNACE.6

    15

  • 8/8/2019 Sapan Report

    16/50

    4. RESEARCH METHODOLOGY

    4.1 Research

    Research is a process of investigation, an examination of a subject from differentpoints of view. Its not just a trip to the library to pick up a stack of materials, or picking

    the first five hits from a computer search. Research is a hunt for the truth. It is getting toknow a subject by reading up on it, reflecting, playing with the ideas, choosing the areas

    that interest you and following up on them. Research is the way you educate yourself.Research can be defined as the search for knowledge or any systematic investigation to

    establish facts. The primary purpose for applied research (as opposed to basic research) isdiscovering, interpreting, and the development of methods and systems for the

    advancement of human knowledge on a wide variety of scientific matters of our world and

    the universe. Research can use the scientific method, but need not do so.

    Scientific research relies on the application of the scientific method, a harnessing ofcuriosity. This research provides scientific information and theories for the explanation ofthe nature and the properties of the world around us. It makes practical applications

    possible. Scientific research is funded by public authorities, by charitable organizations

    and by private groups, including many companies. Scientific research can be subdividedinto different classifications according to their academic and application disciplines.

    Artistic research, also seen as 'practice-based research', can take form when creative

    works are considered both the research and the object of research itself. It is the debatablebody of thought which offers an alternative to purely scientific methods in research in its

    search for knowledge and truth.

    The term research is also used to describe an entire collection of information about aparticular subject

    16

  • 8/8/2019 Sapan Report

    17/50

    Fig 5: research process.3

    As an ethnographic research method, observation seems to have no specific beginning.While some researchers found indications of its use in ancient times, others have pointed

    to the late nineteenth and early twentieth centuries, when anthropologists starting

    "collecting data firsthand.

    Describing it as the "bedrock source of human knowledge" about the "social and natural

    world," Adler and Adler (1994) stated that Aristotle used observational techniques

    botanical studies on tile Island of Lesbos and that Auguste Comte, the father of sociology,listed observation as one of the "four core research methods"

    17

  • 8/8/2019 Sapan Report

    18/50

    4.2 Data collection:

    Data collection is a term used to describe a process of preparing and collecting data - forexample as part of a process improvement or similar project. The purpose of data

    collection is to obtain information to keep on record, to make decisions about important

    issues, to pass information on to others. Primarily, data is collected to provide informationregarding a specific topic

    In primary data collection, you collect the data yourself using methods such as interviews and

    questionnaires. The key point here is that the data you collect is unique to you and your

    research and, until you publish, no one else has access to it.

    There are many methods of collecting primary data and the main methods include:

    questionnaires

    interviews

    focus group interviews

    observation

    case-studies

    diaries

    critical incidents

    Portfolios.

    In this project, we have used observation as method of data collection.

    18

  • 8/8/2019 Sapan Report

    19/50

    4.2.1 Observation

    Definitions of observation per se are difficult to find in the literature. Gorman and Clayton

    define observation studies as those that "involve the systematic recording of observablephenomena or behavior in a natural setting" .Other authors define observation within thebroader context of ethnography or the narrower one of participation observation. What is

    consistent in the definitions, however, is the need to study and understand people within

    their natural environment.

    Observation involves recording the behavioral patterns of people, objects and events ina systematic manner. Observational methods may be:

    structured or unstructured

    disguised or undisguised

    natural or contrived personal

    mechanical

    non-participant

    Participant, with the participant taking a number of different roles.

    4.4 Roles of Observer

    The role of the participant observer is not simple. There are different ways of classifying

    the role:

    Researcher as employee. Researcher as an explicit role.

    Interrupted involvement.

    Observation alone.

    Choice of roles

    The role adopted depends on the following:

    Purpose of the research: Does the research require continued longitudinal involvement

    (long period of time), or will in-depth interviews, for example, conducted over time

    give the type of insights required? Cost of the research: To what extent can the researcher afford to be committed for

    extended periods of time? Are there additional costs such as training?

    The extent to which access can be gained: Gaining access where the role of the

    researcher is either explicit or covert can be difficult, and may take time. The extent to which the researcher would be comfortable in the role: If the researcher

    intends to keep his identity concealed, will he or she also feel able to develop the type

    of trusting relationships that are important? What are the ethical issues?

    19

  • 8/8/2019 Sapan Report

    20/50

    The amount of time the researcher has at his disposal: Some methods involve a

    considerable amount of time. If time is a problem alternate approaches will have to be

    sought

    4.5 Research methodology in this project:

    In this project, value stream mapping is used as research tool. Value stream mapping is a leanmanufacturing technique used to analyze the flow of materials and information currently

    required to bring a product or service to a consumer. At Toyota, where the technique

    originated, it is known as "material and information flow mapping" .It can be used in anyprocess that needs an improvement.

    Value stream mapping is a helpful method that can be used in Lean environments to identify

    opportunities for improvement in lead time.Although value stream mapping is often associated with manufacturing, it is also used in

    logistics, supply chain, service related industries, healthcare, software development, andproduct development

    Seven value stream mapping tools are:

    Process Activity Mapping

    Supply chain responsiveness matrix

    Product Variety Funnel

    Quality filter mapping

    Forrester effect mapping

    Decision point analysis

    Overall Structure Maps

    20

  • 8/8/2019 Sapan Report

    21/50

    4.5 VALUE STREAM MAPPING

    Lean is about doing more with less: Less time, inventory, space, people, and money. Leanis about speed and getting it right the first time.

    Lean Manufacturing is "A systematic approach to identifying and eliminating waste

    through continuous improvement by flowing the product at the demand of the customer."

    Fig 6: lean manufacturing, a overview.4

    Value Stream Mapping is simply mapping on paper (often in pencil) the various

    information and processing steps to get a product from idea or raw material to finishedproduct and to the customer.

    Value Stream Maps should focus on the product itself, following it from beginning to endand including the information that needs to flow to various departments as the productsmoves through the process.

    Placing all of this on paper in front of you enables you to see where the waste is. Every

    system has some form of waste. Even system which has implemented lean manufacturingprinciples can be improved. One small example of this is documentation that takes time to

    complete but goes nowhere. Another example is more movement of product than

    necessary.

    21

  • 8/8/2019 Sapan Report

    22/50

    The Value Stream Mapping enables seeing where the long lead times come from when the

    value added time is often a few minutes or hours. For example, if the lead time to produce

    a product and deliver to the customer is 7 days, but the actual time it takes to produce the

    product is 28 minutes, VSM will enable seeing the picture of the non value time.It is important after developing the value stream map to involve many employees, both

    management and workers, to eliminate the non value added activities.

    The VSM module is one of the first in the Lean Manufacturing course as the big picturemust be seen first before attempting to develop a new Value Stream with less waste.

    The value systems domain is involved in the permanent creation of a new culture by

    creating new languages and new descriptions and prescriptions about the world through apermanent debate between carriers of different world views, traditions and cultures.

    Changes in values in the environment in which the work system in the innovation domain

    is embedded are sensed and transformed into new products, services and processes. Thework system is involved in the discovery and the creation of the added-value of the future.

    Innovation is not thought about in a vacuum. Again, the split between thinking and doing,between those who develop a concept and those who have to implement it is in general

    counterproductive. Innovation is by definition action-research.

    Fig 7: Value stream, waste elimination approach.1

    22

  • 8/8/2019 Sapan Report

    23/50

    5 . DATA PRESENTATION

    5.1 MAPPING THE CURRENT STATE:

    Whenever there is a product for a customer, there is a value stream. The challenge lies inseeing it.2

    The key to creating an excellent current state VSM is to document what you actually see with

    your own eyes. We are not interested in how the process is supposed to work, or was designedto work.

    Throughout this project, I used VSM as a research methodology. Observation andcontinuous noting of facts helped a lot to map the current state & visualise the waste in the

    shared operations area.Material movement charts is the tool used for visualising the Non Value Added Material

    Movements and the effect of it on the complexity of the process.Channel T2 & T3 components as a limited scope are observed while they are in the

    concerned area and getting processed.

    Value Stream Mapping enables a company to identify and eliminate waste, thereby

    streamlining work processes, cutting lead times, reducing costs and increasing quality.

    Through Value Stream Mapping, a team of employees can map the current state fromcustomer back to raw material including all steps, both value-added and non-value-added,

    and develop a future state vision to act as a blueprint for Lean activities. The Future State

    often represents a significant change compared to the way the company currently operates.

    The VSM team will develop an implementation strategy to make the Future State a reality.The most urgent needs will be addressed first, and can typically be accomplished in a very

    short time frame with the appropriate resources applied.

    The Value Stream Mapping Event will identify opportunities to remove waste. The ValueStream Mapping Team will develop the implementation plan, then immediately select and

    implement one or more Kaizen Events, including: 5S / Workplace Organization Quick Changeover

    Cellular / Flow Manufacturing Pull / Kanban Systems Total Productive Maintenance

    This approach maintains the momentum and excitement of the team, as well as ensures

    buy-in to the future state plan. Typically, the team members that developed the Value

    Stream Maps are utilized for the implementation of the Kaizen Event(s).

    23

  • 8/8/2019 Sapan Report

    24/50

    Benefits of Value Stream Mapping

    See the flow of your value stream and wastes in the flow View all products from a system perspective

    Understanding both material and information flows of your value stream

    Draw a blueprint for Lean transformationthe Future State Map Prioritize activities needed to achieve the Future State

    Symbols used: 2

    : Inventory accumulated

    : Process / operation

    : Transport.

    : Information Flow.

    C.T. : Cycle time.

    C/O : Change-over time.

    24

  • 8/8/2019 Sapan Report

    25/50

  • 8/8/2019 Sapan Report

    26/50

  • 8/8/2019 Sapan Report

    27/50

    27

    Fig9:CU

    RREN

    TS

    TATEFOR387-IN

    NE

    R(CH

    ANNEL-T3)

  • 8/8/2019 Sapan Report

    28/50

  • 8/8/2019 Sapan Report

    29/50

    29

    Fig11:

    CURRENT

    STATEFOR3

    020

    7-OUTER

    (CHANNE

    LT2)

  • 8/8/2019 Sapan Report

    30/50

    30

    Fig

    12:MATERIAL

    MOVEM

    ENTCHA

    RTFOR382-IN

    NE

    R(CHAN

    NEL

    T3)

  • 8/8/2019 Sapan Report

    31/50

    31

    Fig13:M

    ATER

    IALMOVEM

    ENTCHA

    RTFOR387-OUT

    ER

  • 8/8/2019 Sapan Report

    32/50

    32

    Fig14:F

    ISHBONE

    DIAGRAM

    FORL

    ONG

    LEA

    D

    TIMEI N

    SHARED

    OPERATI O

    NS

  • 8/8/2019 Sapan Report

    33/50

    6 . OBSERVATIONS

    Traceability of soft material is a problem. The entire soft buffer for the type is not

    located at same place.

    Operators dont know where the whole lot of soft buffer is placed.

    Allocation of soft and hard buffers for some channels is not sufficient.

    Heat treatment and grinding operations are not done continuously when taken; i.e.lot is broken for some reason and hence the waiting time of the material is

    increasing.

    Information does not flow operation wise; it is centrally planned and instructionsgiven to operators.

    Planning of furnaces and Face and OD machines is done daily. Buffers are taken daily in the morning; hence the buffer arrived in the day is

    realised in the next morning; waiting time of it increases.

    Frequent and large stop times for F&OD machines.(for change over and

    maintenance)

    Out put of furnaces is accumulated near the furnace till end of shift. Material ismoved to next station at end of shift hence the lot gets separated.

    No material movement in third shift; hence large material to be moved in themorning creates confusion.

    Space in F&OD is not distributed channel wise; hence material handler has to

    decide where to keep the buffer.

    Unnecessary movement of pallets happens in F&OD. i.e. same material is handledtwice to clear up the space.

    No communication channel is there to check the run time status of the furnace and

    the material arrived from the receiving inspection.

    Accountability of the material movement is problem; some body should be wholly

    responsible for the movement.

    33

  • 8/8/2019 Sapan Report

    34/50

    7 . ANALYSIS

    To analyze something is to ask what that something means. It is to ask how something

    does what it does or why it is as it is. Analysis is the kind of thinking you will most often

    be asked to do in your work life and in other parts of life; it is not the rarefied andexclusive province of scholars and intellectuals. It is in fact one of the most common of

    our mental activities.

    Analysis of data is a process of inspecting, cleaning, transforming, and modeling data withthe goal of highlighting useful information, suggesting conclusions, and supporting

    decision making. Data analysis has multiple facets and approaches, encompassing diverse

    techniques under a variety of names, in different business, science, and social sciencedomains.

    7.1 Revisit Space allocation for soft buffer and loop lot size:

    Currently the shared operations dept keeps 2 days buffer to cater the channels.As a challenge to this assumption of keeping 2 days buffer, it is suggestible to try out and

    evaluate other options of lesser loop lot size. If loop lot size reduces, the buffer

    requirements will automatically reduce and space can be easily distributed. As we caneasily determine the factors governing loop lot size and buffer requirements:

    Optimum batch size (order size).

    Lead time (process time + waiting time + stop time + queue time).

    Set up times.

    Supplier capacity. Etc.

    We will check the effect of reduced loop lot size on output.

    Consider a month of 30 days=90 shifts.Current loop lot size= 2 days= 6 shifts. (for 100% channel efficiency)

    That means, in a month, the type changes 15 times on a channel.

    For example say that, 1 setting= 4 hours.

    So, time taken for settings in a month= 60 hrs.Value added time in a month= (90x8)-60

    =660 hr.

    34

  • 8/8/2019 Sapan Report

    35/50

    Now consider following cases:

    Case no Loop lot size(shifts) No of settings

    in month

    Time for setting

    (hr)

    VA time in a

    month(hr)

    1 6 15 4 660

    2 4 22 4 632

    2 6 15 2 690

    4 4 22 2 676

    It is clear from the table that reducing loop lot size has negative impact on out put.

    On the other hand if setting time is reduced, same loop lot size gives better output.So it is not advisable to reduce loop lot size until setting time is reduced.

    7.2 Revisit of the current allocation of space to buffer:

    It has been noted in current state VSM that, the space in HT dept is not sufficient to store 2days soft buffer for all channels. Due to which the entire lot of soft buffer cant be stored

    at one place and thus creates the separation of same type leading to high lead time in

    shared operations area.

    To analyze this fact, I collected the data about output of all channels, and the currentallocation of space to the buffer. As discussed earlier, it is required to store 2 days channel

    output. The following table shows the required and currently allocated space in number ofpallets. It can be clearly seen that there is gap between the current and required spaceallocation. It calls for rearrangement of space channel wise.

    35

  • 8/8/2019 Sapan Report

    36/50

    Following table shows the required and allotted space for soft buffers of all channels .

    ChannelIR OR

    Current Required Current Required

    T1(S + R) 6 9 8 16

    T2 8 11 15 16

    T3 16 16 10 28

    T4 - 22 - 35

    T5 - 24 - 36

    T6 16 11 16 17

    T7 16 17 16 22

    HUB - 7 16 17CH1 6 4 8 7

    CH2 8 6 10 15

    CH3 10 7 16 19

    CH4 16 14 15 35

    CH5 16 12 15 36

    CH6 3 5 3 9

    CH7 3 1 3 2

    TOTAL 124 166 151 310Table 2: review of space allocation

    This is the first hand data collected about the space allocation.

    It shows that allocation of space for some channels is not sufficient. And this is the reasonwhy operator cant find all soft buffers for heat treatment; As a result the batch getsseparated and the NVA time increases increasing setting time in F&OD dept.

    Total requirement of space is 476 pallets in HT.

    36

  • 8/8/2019 Sapan Report

    37/50

    7.3 Revisit of the flow of the components through shared operations:

    30207 Outer

    30207 inner

    382 outer

    387 inner

    Fig 15: Review of flow of components

    37

    Aichelin

    Castlink

    Birlec

    Roller

    Killick

    Shoei

    Simplicity

    Shaker

    S 40

    Gard 1601

    Gard 1016

    709-1186

    DDS 544

    SLDP 166

    Cl46 1600

    Cl3BG 169

    CL3BG

    170

    OD cell 2

    OD cell 1

  • 8/8/2019 Sapan Report

    38/50

    Figure shows the flow of components through shared operations from stage to stage. It isnoted that although there are constraints to the rings for some machines and furnace, the flow

    for a type is not fixed; it is dependent upon the availability of the concerned machine at that

    time and the criticality of the requirement.Shared operations dept, on daily basis plans the furnaces and machines for the types to be

    taken in coming three shifts.

    Furnaces and machines have some technical constraints for the types to grind or heat treat.Priority of the types is affected by various factors. Daily planning gives rise to centralized

    communication and sometimes channel stoppage due to miss planning.

    Currently channel downtime is 2.8% due to short supply from shared operations.

    Planning is manual & scheduling dependent upon individual judgment.

    Communication in heat treatment dept is person dependent. When soft buffer arrived fromReceiving & Inspection, there is no signal passed from there. Material remains unnoticed until

    stack is taken physically next morning.This person dependent system adds to buffer time. It quite noticeable that there should be

    some visual communication system which will bring ease to the parties involved and any

    unavailability will be noticed very fast. The new interaction system should build a platformfor kanban and pull system. Currently production system is Push at some places and Pull at

    some places.

    So it calls for the through out Pull System which will give base for JIT and kanban.Once the flows will be fixed and dedicated; it will be a independent system and can be

    practiced for all the channels.

    7.4 Revisit of communication system:

    Currently communication takes place orally and through telephone. Furnace operators

    write daily log book but it is not used for the real-time reference.When material comes from R&I ; there is no such message passed to shared operations

    about issue of the material.

    Centralized MRP & Production planning issues monthly schedule; each dept plans thereactivities accordingly but no internal official communication about the issue of material

    happens.

    That is the reason why each morning we have to take the stock physically and preparedaily buffer status.

    38

  • 8/8/2019 Sapan Report

    39/50

    8. SUGGESTIONS AND RECOMMENDATIONS

    8.1 Allocation of soft buffer in the available space in HT Dept.

    Considering the 2 days requirements of channels and soft buffer quantity required to be

    stored in heat treatment dept, there are two proposals to store the buffer.

    8.1.1 Channel wise allocation of soft buffer:

    Requirements of buffer quantity show that it is not possible to store the pallets on

    marked space only. There is need to look for more space and locations to store the

    pallets.Channel wise allocation of soft buffer calls for the space near simplicity and shoei

    furnace to be marked for some channels. Space behind aichelin should be markedfor hard buffer. Currently these spaces are being used but they are not marked, so

    material handler has to take his own decision about where to put what.Figure shows a allocation plan of soft buffer, channel wise.

    All channels are provided with sufficient space in HT for soft buffer. The no of

    pallets are decided considering the highest output in terms of no of boxes from achannel for a type. This gives the worst case requirement for that channel. In the

    plan the space is allocated channel wise and considering the maximum

    requirements of the channels.The preferred furnaces are also considered in this plan, so that the movement of

    material will be the minimum and traffic of pallets will be smooth lined.

    39

  • 8/8/2019 Sapan Report

    40/50

    Fig 16: proposed allocation of soft buffer, channel wise.

    40

  • 8/8/2019 Sapan Report

    41/50

    8.1.2 Furnace wise allocation of soft buffer:

    Another option to store soft buffer is to allocate it furnace wise. All material which will go on

    a furnace will be stored same space. Marked space can be easily allocated furnace wise.All types were checked for the preferred furnaces and alternatives available for it.

    Preference list is decided depending upon the output of furnace for each type and the

    maximum output type from each channel is proffered to go on which furnace for heattreatment.

    Suppose 6305 from DGBB channel 2 is the type which is having maximum output in terms of

    number of boxes per day. So such types from all channels are considered for the preferredfurnaces. All the types furnaces are provided with preferred loading types and the proposal is

    prepared to store the buffer so that operator has to see to one region only for the work to be

    done. If material is available there, it s his job to get it done. And if the area is empty, it

    stimulates a signal to the supervisor to call next material.The challenge in this task is to arrange the buffer in such a way that the movement will be the

    minimum. To resolve this issue, the material is allocated near to furnace and only shoei

    furnace is provided with the space at a reasonable distance.Figure shows the detailed placing of buffers furnace wise.

    Inventory to be stored gets reduced by 100 pallets using this

    layout

    41

  • 8/8/2019 Sapan Report

    42/50

    42

  • 8/8/2019 Sapan Report

    43/50

    Fig 17: furnace wise allocation of soft buffer.

    8.2 Flow of material in shared operations:

    As we have seen that, although there are constraints for components to go on furnaces and

    machines; still the flow of material is not smooth and predefined. Daily planning and

    central controlling of shared operations gives rise to channel stoppage and disturbances.If we decide the flow of material for a channel and dedicate the furnaces and machines to

    particular types or channels; there will be ease in information flow and communication.

    Visual mapping will be easy and any shortages will be communicated very fast.

    The operator will have to look for the buffer at a certain location only and he will have tokeep the out put at certain out put only. Supplier- customer chain will be built inside the

    department and no mans land will be covered.

    Accountability of the process will increase and the flow will be smooth lined.It will be a platform to implement kanban if the dedicated flow of information In the

    reverse direction happens. Following are the charts showing the preferred components on

    each machine and furnace.

    Rings. Furnace

    Taper Inner rings OD > 42mm to 72 mm

    Roller ,

    Simplicity

    Taper & DGBB Inner rings OD < 42mm Shaker, Killick

    All HBU Outers ( Due to size & Shape ) Roller

    Taper Inner rings OD > 42mm to 72 mm

    Castlink ,

    Birlec

    Taper & DGBB Inner rings OD > 72mm Aichelin ,Shoie

    Thin wall Outer types above 80mm OD ( D/t more

    than 13 ) Aichelin

    Outer rings OD > 80mm Aichelin

    Outer rings OD < 80mm to 47 mm

    Castlink ,

    Birlec

    Outer rings OD < 47mm Shaker, Killick

    Customer Specific requirementsSpecifiedFurnace

    .

    Table 3: Furnace allocation

    43

  • 8/8/2019 Sapan Report

    44/50

    Rings Face Machine

    Channel T3,T4,T5 & T6 components DDS Cell

    Channel T1-S,T1-R,HUB1T-IR, T2 components DDS 544

    HUB1T,Ch03, Ch01 (62mm) Outers & Ch05 IR Old Gardner

    HBU, Ch05 Outers New Gardner

    T7,HBU & Specified IR of T2 & T6 S-40

    Ch01 Outer, Ch06,07 components SLDP

    Rings OD Machine

    Channel T3, T4, T5,T6 & Ch05 Outers OD Cell 1HBU, Ch03, T2 & up to 100mm OD Outers of Ch05 OD Cell 2

    HUB1T,Ch01 Outers, T2 IR CL 46 170

    T1-S, T1-R & T7 Outers CL 46 1600

    Ch06,07 all components CL3BG

    Table 4: Grinding Machine Allocation

    Depending upon this, there can be cells build and information can flow between these cells

    rather than centrally.

    Kanban cards can be implemented if such cells are implemented.

    44

    AICHELIN

    DDSC

    ELL

    OD

    CELL1

  • 8/8/2019 Sapan Report

    45/50

    Empty Boxes return.

    Boxes in

    From previousStage.

    Rack

    Example of rack system using kanban cards.

    45

    Fig18:Racksystemimp l

    ementingk a

    nbancardsandsmoot h

    flowbetw

    eendedicate d

    cells.(for382IR)

  • 8/8/2019 Sapan Report

    46/50

    In our case such racks can be implemented only when the two parties on each side of rack are

    fixed. For this, shared operations can be divided into cells and communication will happen

    only among those cells in reverse direction. This will help in streamlining the flow of materialand information. Once the flow is decided & Racks are implemented the operator of a furnace

    or machine will have to look for raw material in one particular rack only without confusion.

    Communication will be straight forward & trigger will pass if any empty spaces will be there

    in the racks.Further there are some up gradations required before going for racks as pre requisites.( i.e.

    replace tote boxes by blue containers, loading mechanisms on machines & furnaces etc)

    Ultimate aim of the production system is one piece flow; for that the flows for product

    family should be decided and followed in a dedicated way. So this will be first steptowards the single piece flow and JIT.

    46

  • 8/8/2019 Sapan Report

    47/50

    8.2.1 Color coding of boxes in racks :

    While the boxes are being interchanged through racks or any way, color codes can be usedto decide the preference of material to process. Only ends of the boxes need to be color

    coded. FIFO can be easily practiced through color coding.

    Example:

    9. CONCLUSION

    47

  • 8/8/2019 Sapan Report

    48/50

    Whenever there is a product for a customer, there is a value stream. Challenge lies in seeing it.

    VSM proves to be a powerful too to visualize the non value added activities in the system.Once the current state VSM is mapped, clear picture of the chain of activities in the stream is

    visualized. Next step is identifying the NVAs and attack them to have shorter path towards thefinal product. It proves very useful in seeing the bottleneck from perspective of waste

    elimination.

    In this era of zero defect and six sigma, no production system can afford to have NVA

    in there value stream. If not eliminate we must try to minimize the buffer states and idle runs.In our case of shared operations area, we plotted the current state VSM and identified the

    wastes. We also tried to suggest some ways to minimize those wastes. The ultimate aim of

    system is single piece flow & it can be achieved through the approach of continuousimprovement by visualizing and eliminating wastes in the systems.

    After having the picture of current system as it is now through VSM; it is important toplot the Future State VSM to have goal in our eyes. This FSVSM will play a role ofbenchmark to the planners and executers as they plan their future improvement activities and

    schedules.

    Future State Value Stream Map helps with the larger process of developing your Lean

    Manufacturing Strategy. It requires significant knowledge of Core Disciplines and otherspecific topics. Designing a Future State requires more art, engineering and strategy than

    Present State mapping. After finishing Current State Value Stream Map, a Future State Map

    looks six months or more down the road at what the organization can achieve. It is this FutureState which highlights the waste in the 'system' that can be eliminated or reduced. By seeing

    the amount of 'waste' the team can identify opportunities to improve. The next step is to

    develop the 'Future State Implementation Plan'.

    48

  • 8/8/2019 Sapan Report

    49/50

    FIG 19: Future State Value stream Map.