Samkuristskali 1 HPP
www.energy.gov.ge
www.energy.gov.ge
Samkuristskali 1 HPP is located in Kakheti region, Akhmeta district, village
Khadori on river Samkuristkali
Installed Capacity - 4.88 MW
Average Annual Generation – 25.70 GW/h
Regulation Type – Run-off-the-river
Capacity Usage Ratio – 60.12%
www.energy.gov.ge
Construction Cost – 8.54 million USD
Construction Period – 2 years
Domestic Tariff – 4.8 USc/kWh
Export Tariff – 8 USc/kWh
Project IRR – 16%
Project NPV – 3.44 million USD
Equity IRR – 25%
Equity NPV – 3.71 million USD
Payback Period – 9 years
Note: All the calculations are based on preliminary
assumptions. Therefore any clarifications will
cause appropriate changes in the final results.
www.energy.gov.ge
Site Location: - Kakheti region, Akhmeta district, village Khadori
- Name of the River: Samkuristskali
- GPS Coordinates: X=529825 Y=4683156
HPP Type: Diversion, Run-off-the-river
Site Description: Head unit, diversion pressure pipeline, surge tank, turbine conduit, power house, tailrace channel. Head unit conveys Tyrolean weir, height - 3.0m, which ensures maximum water discharge, reinforced concrete water intake and silt basin with sluice. Diversion is represented by pressure metal pipeline, diameter - 1.6m, length - 2.8km. Metal surge tank is located at the end of the diversion, diameter - 1.6m. Turbine conduit is 1.0m diameter metal pipe. Power house dimensions are - 12.0x24.0m, height - 18.0m. Tailrace covered channel is reinforced concrete trapezoidal construction, dimensions - 2.0x2.0m, length 60.0m.
www.energy.gov.ge
Technical Parameters
Installed Capacity MW 4.88
Average Annual output GWh 25.70
Autumn-winter (Oct-March) generation GWh 5.90
Capacity usage ratio/Efficiency % 60.12
Type of regulation Run-off-the-river
Scheme of energetic usage potential Full
Hydrology
Hydrological Data (number of years) Year 29
Year of the average multi annual discharge Year 1964
Catchment area km2 90.30
High water flow m3/sec 5.17
Average water flow m3/sec 4.20
Low water flow m3/sec 3.37
PMF (1%) m3/sec 295.00
Rated water discharge m3/sec 5.10
Maximum gross head m 116.50
Minimum gross head m 110.00
Reservoir
Full supply level (FSL) masl 1759.00
Minimum Operation level (MOL) masl Unnecessary
Total volume at FSL mln. m3 Unnecessary
Active reservoir level mln. m3 Unnecessary
Dam
Type Tyrol
Crest Elevation masl 1758.60
www.energy.gov.ge
Spillway
Type Unnecessary
Crest Elevation masl Unnecessary
Length of spillway crest m Unnecessary
Reservoir elevation during PMF masl 1760.50
Spillway capacity at reservoir level PMF m3/sec 295.00
Water intake
Sill elevation masl 1756.00
Stop log type and number Flat surface
Quantity unit 1
Sluice or bottom spillway
Type and number Unnecessary
Quantity unit Unnecessary
Dimensions (w x h) or (d) m Unnecessary
Diversion
Type of diversion Conduit
Dimensions (w; l) or (d; l) m 1.6; 2800
Stilling basin or shaft
Dimensions (w x l) or (d ) m 1.6
Powerhouse
Type Above-ground
Dimensions (w x h x l) m 12x18x24
Elevation of tailrace outlet sill masl 1644.00
Tailrace
Type Covered channel
Dimensions (w x h) m 2.0x2.0
Elevation of outlet sill masl 1641.00
www.energy.gov.ge
Turbines/Generators
Turbine Type and number F. HLA 253-WJ-60; 2
Rated discharge m3/sec 2.55
Rated output MW 2.53
Maximum output MW 2.81
Generator Type SFW 2500-6/1430
Generator nominal output MW 2.44
Generator nominal output rpm 1000/2015
Transformers
Type Three-phase
Number unit 2
Nominal power MVA 2.7
Transformer dimensions (l x w x h) m 4,5x3,15x4,8
Seismic background of the construction site
Richter scale Magnitude 7.0
Economic and Financial Parameters
Costing mln. USD 8.54
Duration of the construction Year 2.00
Investment per 1 kV Thousand USD 1.75
Investment per 1 kV/h USD 0.33
Revenue per USD spent (Average price new HPP - 4,8 cents) USD 0.16
Estimated carbon credit generation T. 9.0
Social and Environmental Parameters
Special environmental requirements
Social Impact Additional workplace; Development of infrastructure
Ecological risks Low
Transmission lines
Parameters kV 35
Distance to inter connection point km 3.30
Infrastructure
Existing roads Earth
Roads to be constructed km 3.00
www.energy.gov.ge
Number of Observed Years - 29
Chosen Year - 1964