  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    1/12

    BusinessWhitePaper

    Process Risk Simulation

    Analyzing the effects of risks and controlsin business processes

    Ralf Angeli, Martin Kling

    May 2011

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    2/12WHITE PAPER | PROCESS RISK S IMULATION2

    The first decade of the 21st century showed that, while we cannot see

    into the future, no industry can afford to ignore potential what-if

    scenarios in their planning. Testament to this is the recent oil disaster in

    the US, global financial crisis, and nuclear meltdown following the

    earthquake and tsunami in Japan. While it is impossible to plan fully for

    the unexpected, some of the subsequent damage which occurred might

    have been reduced or prevented through using scenario management

    and simulation techniques.

    Ralf Angeli is business analyst

    and software designer for ARIS

    products at Software AG.

    Among other things he is

    responsible for the functional

    specification of ARIS Business

    Simulator.

    Martin Kling is responsible on

    corporate level for the ARIS

    Solution for Governance, Risk

    and Compliance at Software

    AG. Besides driving the future

    development of features and

    capabilities to ensure custom-

    ers increase their GRC maturity

    he is strongly involved in the

    supervision of customer

    projects during setup and

    delivery and a known author

    on various GRC topics in books,

    articles and blogs.

    CONTENTSINTRODUCTION 3

    RISKS 3

    MODELING RISKS IN BUSINESS PROCESSES 4

    SIMULATION OF RISK EFFECTS 5

    ANALYSIS OF RISK EFFECTS 6

    CONTROLS 6

    MODELING CONTROLS IN BUSINESS PROCESSES 7

    SIMULATION OF CONTROL EFFECTS 9

    ANALYSIS OF CONTROL EFFECTS 9

    CONCLUSION 11

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    3/12WHITE PAPER | PROCESS RISK S IMULATION 3

    INTRODUCTION

    Despite its growing maturity, simulation is still regarded by some as being complicated and

    impractical from a management perspective, even through the downfalls in static analysis of risk

    positions pertaining to business processes, projects, insurances or trading are well documented.

    Simulation is still perceived by some as an approach which involves too much data, too much

    expertise, and specialist skill sets to implement.

    However the reality is somewhat different and this mindset is in stark contrast to the results

    reported by those who have leveraged simulation. Simulation usage has grown from below 10%

    of process-related projects to over 35% according to Gartner1. And simulation based on real data

    has grown from one or two percent to over 10%. In a world where business models and

    constraints are changing faster than ever and investments become higher and higher, simulation

    can provide a means of mitigating against disaster and achieving high-margin objectives.

    In fact simulation is now available as part of business process management software and is easy

    to use by anyone in a business context. Investment in the technology is very low compared with

    the savings which can be achieved. Generally speaking, it is fairly easy to save 1 million by

    reducing risk event occurrences and optimizing process performance in parallel. ROI on simula-tion projects is a given in most cases.

    RISKS

    A significant part of business process management is the analysis and improvement of

    processes. The analysis may involve many aspects, such as media breaks, added value,

    throughput times, bottlenecks, resource utilization or cost. But often, operational risk is ignored.

    Given that this type of risk arises from the operations of an organization, it is inherent in the

    execution of business processes. In the Basel II regulations operational risk is defined as the risk

    of loss resulting from inadequate or failed internal processes, people and systems or from

    external events.2In the context of business processes, loss is not just associated with financial

    damages but also with negative effects on process performance due to additional work or poor

    availability of resources.

    In many cases those responsible for dealing with the results of risk occurrences (e.g. damaged

    products or services) are the same ones that are responsible for the regular execution of the

    affected process itself. Any mistake (risk occurrence) which has a work activity consequence will

    automatically result in a resource bottleneck which has to be compensated for by speeding

    things up or neglecting activities that keep the product or service from being delivered as soon

    as possible. Such a reaction may lead to increasing risk probabilities and in consequence to moresevere bottlenecks should the respective risks occur. The result would be a positive feedback

    loop which increasingly disrupts the provision of products and services.

    Depending on the process these effects can be quite significant and should therefore be taken

    into consideration during the process analysis. In order to do this the risks have to be identified,

    analyzed and evaluated. With the resulting information an organization can, based on its risk

    appetite, decide which risks can be accepted and which risks have to be avoided or reduced by

    means of countermeasures such as process changes or controls.

    1 http://blogs.gartner.com/jim_sinur/2009/12/22/savoring-simulation-recent-encouragement/2 http://www.bis.org/publ/bcbs128.pdf

    This white paper is intended to

    introduce the use of business

    process simulation with special

    focus on risk events and

    control activities. With the help

    of a small sample process theauthors demonstrate how the

    effects of risk occurrence as

    well as the effects of controls

    introduced to counter the risks

    can be determined by

    conducting a simulation study

    with ARIS Business Simulator.

    In particular modeling and

    configuration of risks and

    controls in a process model,

    the simulation of the process

    model and the interpretation

    of the simulation results will

    be discussed.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    4/12WHITE PAPER | PROCESS RISK S IMULATION4

    Business process modeling is the basis for the analysis of scenarios. It helps to identify opera-

    tional risks in complex business processes, and allows discussions around where to place

    effective controls for countering the risks. Once the risks and controls are identified and

    specified, their effects can be analyzed and evaluated. This can be done with calculation or

    simulation methods.

    MODELING RISKS IN BUSINESS PROCESSES

    In the context of a business process a risk event can occur during the execution of an activity,

    regardless of whether it is caused by the activity or triggered externally. The occurrence of a risk

    event is not certain but always associated with a probability. And when a risk event occurs it has

    undesired consequences, such as the loss of money, materials or resources.

    These traits of risk can be expressed in a model. In the ARIS risk management methodology a

    risk is modeled with a risk object. Such an object is connected to a function object in order to

    convey that the risk may occur during the execution of the function. The probability of risk

    occurrence can be specified in an attribute of the risk object which accepts a value between 0

    and 1. Every time the connected function is executed during simulation, the value is used to

    determine if the risk occurs or not. The direct effect of a risk occurrence is financial loss. The

    height of this loss can be given as a fixed or distributed value. If a probability distribution is

    specified, a value is sampled from the distribution every time the risk occurs.

    Figure 1 shows how risks appear in an event-driven process chain (EPC). The model, which

    serves as an example for this article, describes (in an over-simplified way) the process of a credit

    transfer. Assuming that a paper-based credit transfer order is received by a bank, a bank

    employee enters the data into a banking system. The banking system then electronically

    transfers a message with the order data to the bank that holds the account to which the funds

    should be transferred. The sending of the message marks the end of the process.

    Figure 1: Credit transfer process with risks

    Both functions in the process have risks associated with them. The risk of incorrect details being

    transferred from the paper-based order to the banking application is related to the first function.

    In the example it is assumed that this risk has a probability of 10% and causes damages which

    are equally distributed between 10 and 30 monetary units every time it occurs. Related to the

    second function is the risk of the banking system failing during the transfer. This risk has a

    probability of 0.1% and causes damages which follow a normal distribution with a mean value of

    10,000 and a standard deviation of 1,000 monetary units every time it occurs.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    5/12WHITE PAPER | PROCESS RISK S IMULATION 5

    In order to make the model more realistic, some settings regarding the frequency of the process,

    the processing times and the available resources are made: The transfer of data from the

    paper-based order into the system takes 20 seconds and is done by one bank employee who is

    available all the time. In order to have the employee working at capacity, the process needs to

    be started every 20 seconds. Therefore the frequency of the start event is set to 4,320 occur-

    rences per day. Finally, the transfer of the order data to the receiving bank keeps the banking

    system busy for 5 seconds. (Note that the values used throughout the example are purely

    fictitious and do not claim to be overly realistic.)

    SIMULATION OF RISK EFFECTS

    With the model configured, the simulation can be started. In the example a simulation period of

    ten days is used. It is possible to have a look at the results during the simulation. This is shown

    in Figure 2 which provides an impression of the user interface of ARIS Business Simulator.

    Figure 2: ARIS Business Simulator simulating the sample process with risks

    In the right part of the toolbar the controls for the simulation (e.g. run, pause, advance stepwise

    or reset) are located. Below is a representation of the process model. Objects in the model are

    highlighted when they are active. Around the objects a few object-related simulation results, likethe activation count of a risk or function, are shown. Below the model view is a pane with

    statistics tables which contain the main output of the simulation and which will be used later for

    the analysis. In the screenshot the cumulative risk statistics are visible which provide information

    about the number of risk occurrences and the amount of damages resulting from these

    occurrences, among other things. At the bottom of the window the simulation status is

    displayed.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    6/12WHITE PAPER | PROCESS RISK S IMULATION6

    ANALYSIS OF RISK EFFECTS

    The results of the simulation run are the basis for analysis. In our example the main goal is to

    find out how often risks events occurred and how large the losses are due to these occurrences.

    These values can be interesting in their own right in order to get a better understanding of the

    cost involved in the execution of the process but they can also be used to evaluate the useful-

    ness of controls which should reduce the losses. (Controls are introduced further below.)

    Over the course of ten days the process was executed 43,199 times. The throughput time was

    always 25 seconds. The bank employee worked 240 hours at 100% capacity. (The model

    contains a person type object, so it was not necessarily one person who has been working for

    those 240 hours.) Since the process was executed 43,199 times, so were the two functions in the

    process. This means there were 43,199 opportunities for each risk to occur. The actual occurrence

    counts are much lower, though, due to the probabilities which were set. The respective numbers

    can be found in the cumulative risk statistics which are shown in Table 1.

    Table 1: Cumulative risk statistics (shortened)

    Data transfer error System failureNumber of occurrences 4,227 45

    Accumulated amount of damages 84,457.51 458,378.98

    The interpretation of the results in the table is straightforward and the outcome was somewhat

    to be expected in this simplistic example. The data transfer error occurs 4,227 times and the

    system fails 45 times throughout the 43,199 opportunities for risk occurrence. These results are in

    line with the probabilities given to the risk objects. Data transfer errors account for 84,458 and

    system failures for 458,379 monetary units of damages. So even though system failures are

    much more seldom than data transfer errors, the overall damages are much higher due to the

    high amount of damages per occurrence. Based on these results alone one would probably try

    to improve the system reliability in order to reduce the larger share of damages. However

    whether this is the right strategy obviously also depends upon the cost for a reduction of these

    damages. And for these no information is available yet.

    CONTROLS

    So far it has been demonstrated how the consequences and the amount of financial damages

    from risk occurrence can be determined with simulation. The following sections show how

    controls can be used to counter risks, either by preventing them or by mitigating their effects.

    Since controls usually come at a cost the explanations will also provide some information abouthow to decide if it is worthwhile for a control to be introduced or not.

    Controls are a tricky thing to implement. First a clear understanding how the business (process)

    works is required to make sure the control covers all major possible variations of a process in

    order to be effective most of the time. It makes no sense to implement controls solely based on

    a to-be process because quite often the as-is process is substantially different. (Techniques like

    the reconstruction feature of ARIS Process Performance Manager allow for better confidence on

    this issue.)

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    7/12WHITE PAPER | PROCESS RISK S IMULATION 7

    Secondly it has to be kept in mind that any control activity requires additional effort and is not

    directly creating value. To put it bluntly, controls are on the cost side of business. In addition to

    that they often have to be built into processes where the pain of the original risk is not

    experienced directly. For example they might be built into production or sales processes, yet it is

    only the owners of the revenue recognition processes in financial accounting who see the

    damages of an incorrect financial statement first hand. This problem leads to issues concerning

    the thoroughness and willingness of control execution.

    In addition to placing a control where it is allowed to be effective, the control must be efficient.

    However, efficiency of a control can only be determined in comparison with the effects achieved

    in this case the reduction of damages.

    MODELING CONTROLS IN BUSINESS PROCESSES

    Controls are artefacts or procedures which reduce the probability of risk occurrence (preventive

    controls) or reduce the damages resulting from a risk occurrence (detective controls). Preventive

    controls are conducted before or at the time a risk may occur. An example is the four-eye

    principle which can be applied to reduce the probability of inadequate or fraudulent actions.Detective controls are conducted after the time a risk may have occurred. They are supposed to

    discover the occurrence of a risk event and thereby open up the possibility to start corrective

    actions, but can also comprise mechanisms which directly reduce damages. Examples are

    inspections or insurances.

    In ARIS, controls are function objects with a special symbol. In order to indicate where they are

    carried out they can be placed in an EPC, either directly in the control flow or attached to a

    function which is part of the control flow. The control also has to be connected to the risk it

    affects. Such a connection can be established in a business controls diagram. (Note for users of

    ARIS Risk & Compliance Manager: Simulation also supports the risk-based modeling approach,

    where controls are not added to event-driven process chains but only connected to risks. The

    models do not have to be changed to use the simulation, though, because the controls can be

    pulled in via the risks.)

    The behavior of a control is also governed by the values of certain attributes. As mentioned

    before, controls can either be preventive or detective. Depending on which type is chosen,

    different effects have to be configured. For preventive controls the percentage by which the

    probability of a connected risk is reduced has to be specified. For detective controls it is the

    percentage by which the damages of an occurred risk are reduced. For both types it is also

    possible to specify a control effectiveness value. This is a percentage which indicates the

    probability that the control is carried out successfully and thereby able to reduce the riskoccurrence probability or the damages respectively. The effectiveness of a control is evaluated

    every time the control is carried out and the control effect is only applied if the control was

    effective.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    8/12WHITE PAPER | PROCESS RISK S IMULATION8

    Figure 3 shows how controls appear in a process model. It contains the same process which was

    used as an example in the previous sections. Compared to Figure 1 two controls have been

    added to the process. These have been connected to the functions where they are supposed to

    be carried out and to the risks they affect. (The connections to the risks were done in business

    control diagrams which are not shown in the picture.)

    Figure 3: Credit transfer process with risks and controls

    In order to counter the risk of a data transfer error an additional check of the transferred data has

    been introduced. The double check control is detective because it detects an error after its

    occurrence and consequently makes it possible to correct it. In the given example an effective-

    ness of 95% is assumed. If the control is effective it will reduce the damage by 100%. A cost of

    0.2 monetary units accrues per execution of the control. (This is the easiest way to account for

    additional effort in the case of control execution. A more complex option could be a complete

    re-work process that would be triggered when the control found an error.)

    The risk of a system failure is countered by the provision of a backup system. This has been

    modeled as a preventive control because the backup system is supposed to make the whole

    system, i.e. the combination of the primary system and the backup system, more robust. For the

    backup system control an effectiveness of 90% is assumed. If it is effective it reduces the

    probability of a system failure by 100%. Per execution of the control a cost of 0.4 monetary units

    accrues.

    The placement of the controls in the figure hints at their types. The detective control was placed

    after the risk and the preventive control before the risk it affects. However, the position in the

    graphical representation of the model has no relevance for the simulation choosing when

    exactly a control is executed. This is only controlled by the control type. The simulation alsomakes sure that controls which are attached to the same function as the controlled risk are

    executed before (preventive controls) or after (detective controls) the risk is evaluated.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    9/12WHITE PAPER | PROCESS RISK S IMULATION 9

    SIMULATION OF CONTROL EFFECTS

    With the model in place the simulation run can be started and is carried out completely before

    looking at the results. The user interface of ARIS Business Simulator with the extended model

    and the results can be seen in Figure 4.

    Figure 4: ARIS Business Simulator simulating the sample process with risks and controls

    ANALYSIS OF CONTROL EFFECTS

    The goal of the analysis on the control side is to decide if it is sensible to introduce the controls

    specified for the risks in this process. In the example there is no regulatory or contractual need

    for them, so it is possible to concentrate on the monetary consequences. The basic idea is to

    compare the loss reduction a control achieves with the cost it causes. If the loss reduction is

    higher than the cost and the risk higher than the risk appetite, then the control should be

    implemented. (Such a decision obviously depends on other factors as well, but for the sake of

    simplicity we neglect those in the example.)

    Information about the loss reduction can be found in the cumulative risk statistics and the

    cumulative function statistics. The cumulative risk statistics were already used for the previous

    analysis above. In this analysis a few more performance indicators were included, which arerelated to the effects of controls, see Table 2.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    10/12WHITE PAPER | PROCESS RISK S IMULATION10

    Table 2: Cumulative risk statistics (shortened; including effects of controls)

    Data transfer error System failure

    Number of occurrences 4,308 4

    Number of prevented occurrences 0 46

    Number of detected occurrences 4,092 0

    Accumulated amount of damages 4,218.82 40,659.62

    Accumulated amount of prevented damages 0.00 463,933.53

    Accumulated amount of damage reduction 81,898.83 0.00

    For the data transfer error risk a detective control was introduced. The results show that 4,092

    out of 4,308 occurrences were detected by the control. For each of these occurrences a 100%

    damage reduction was applied. In consequence 4,218.82 monetary units of damage accrued,

    whereas 81,898.83 monetary units of damage reduction could be achieved. Since the control has

    no preventive effect, the amount of prevented damages is zero.

    For the system failure risk, a preventive control was introduced. With the control in place the risk

    only occurred 4 times and 46 occurrences were prevented. That means without the control, the

    risk would have occurred 50 times. From a monetary point of view this means that 40,659.62monetary units of damages actually accrued but 463,933.53 units were prevented.

    The above results already look quite positive. They are related to risk, however. Regarding the

    question about the net effect of the introduced controls the cumulative function statistics (see

    Table 3) have more interesting information to offer because they provide the data per control.

    We can see that both controls were executed 43,199 times. Based on the effectiveness values

    given to the controls the double check control was effective 41,013 times and the backup system

    control 38,884 times out of the total 43,199 executions. These values represent the number of

    times a control was able to reduce a risk probability or reduce a loss. The actual number of risk

    preventions or risk reductions can be lower, though.

    Table 3: Cumulative function statistics (shortened)

    Double check Backup system

    Process folders processed 43,199 43,199

    Number of effective controls 41,013 38,884

    Number of successful effective controls 4,092 46

    Accumulated amount of prevented damages 0.00 463,933.53

    Accumulated amount of unprevented damages 0.00 40,659.62

    Accumulated amount of damage reduction 81,898.83 0.00

    Accumulated amount of failed damage reduction 4,218.82 0.00

    The detective double check control reduced damages in case of 4,092 risk occurrences. However,

    as seen above the data transfer risk occurred 4,308 times. That means in 216 cases the control

    was not effective. For these quantities the statistics also include monetary equivalents. The

    double check control could reduce 81,898.83 monetary units of damages and failed to reduce

    4,218.82 units. Since there is a one-to-one relationship between the risk and the control these

    values match those for the data transfer risk in the cumulative risk statistics.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    11/12WHITE PAPER | PROCESS RISK S IMULATION 11

    The preventive backup system control prevented the system failure risk 46 times from occurring.

    In the remaining four times the control was not effective. (Note that this conclusion is only

    possible because in this example an effective control reduces the risk probability by 100%. If the

    risk probability were not fully reduced, even an effective control might not prevent the risk from

    occurring.) This equates to prevented damages of 463,933.53 monetary units and unprevented

    damages of 40,659.62 units. Again, these numbers can also be found in the cumulative risk

    statistics for the system failure risk because in this example there is a one-to-one relationship

    between the risk and the control.

    The interesting pieces of information for the analysis goal are the amount of damage reduction

    by the double check control (81,898.83) and the amount of prevented damages by the backup

    system control (463,933.53). These need to be compared with the costs of the controls which can

    be found in the function cost statistics (not shown here). For the double check control these are

    8,639.80 monetary units and for the backup system control 17,279.60. This means the introduc-

    tion of the controls has the following net effects:

    Double check Backup system

    Savings 81,898.83 463,933.53

    Cost 8,639.80 17,279.60

    Net effect 73,259.03 446,653.93

    In both cases the amount of savings due to damage reduction or prevention is higher than the

    cost for the control, i.e. both controls should be implemented from a monetary point of view.

    CONCLUSION

    Process risk simulation is a strong means to back up business decisions concerning the risk and

    performance aspects as well as the control of business processes. Following standard modeling

    conventions risks and controls may be integrated into business processes and their behavior and

    effects simulated.

    For the sake of demonstrating the concepts the examples used above have been kept simple

    and analysis was mostly focused on the monetary aspects of risks and controls. However

    process risk simulation is not limited to those areas. The analysis could cover aspects of time and

    resources as well, for example by defining follow-up activities which are to be carried out once a

    risk is detected. Such activities can temporarily influence the process performance. In such a

    case it can be interesting to track the performance over time and how the system recovers from

    the occurrence of a risk event. This is where simulation really comes into play. Here it has a clear

    advantage over calculation methods which can hardly provide information about the dynamic

    behavior of a process.

    It should also have become apparent that the usefulness of process simulation grows with the

    size, complexity and interdependency of the business processes under scrutiny. The more

    complex business processes are, the more difficult their analysis is and the more simulation

    becomes preferable as a means to support the analysis. If risks and controls occur in different

    processes at different times, the effects cannot be determined with simpler methods anymore.

    The analysis of such complex systems can be supported further by design-of-experiment and

    optimization capabilities in order to find the most desirable among different process and risk

    scenarios.

  • 8/12/2019 SAG-AEP D a-Process Risk Simulation

    12/12

    k

    l

    T O F I N D T H E S O F T W A R E A G O F F I C E N E A R E S T Y O U ,

    P L E A S E V I S I T W W W . S O F T W A R E A G . C O M

    Take the next step to get there faster.

    ABOUT SOFTWARE AG

    Software AG is the global leader in Business ProcessExcellence. Our 40 years of innovation include theinvention of the first high-performance transac-tional database, Adabas; the first business processanalysis platform, ARIS; and the first B2B server andSOA-based integration platform, webMethods.

    We offer our customers end-to-end BusinessProcess Management (BPM) solutions deliveringlow Total-Cost-of-Ownership and high ease of use.Our industry-leading brands, ARIS, webMethods,Adabas, Natural, CentraSite and IDS Scheer Consulting,represent a unique portfolio encompassing: processstrategy, design, integration and control; SOA-basedintegration and data management; process-drivenSAP implementation; and strategic process consultingand services.

    Software AG - Get There Faster

    2011 Software AG. All rights reserved. Software AG and all Software AG

    products are either trademarks or registered trademarks of Software AG.

    Other product and company names mentioned herein may be the trade-

    marks of their respective owners.