s13_rehabilitation design and construction for the us 190 mississippi river bridge cleaning,...
TRANSCRIPT
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
1/25
Rehabilitation Design and Construction for the US 190 MississippiRiver Bridge Cleaning, Painting, and Repair Project
2013 Louisiana Transportation Conference Session 13
Durk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
2/25
Results you can rely on
AGENDA
2
Design Team Organization
Site Location Bridge Specifics
History of Rehabilitation Projects
Rehabilitation Project Phases 1 and 2
Key Areas of Deterioration
Procedures for Development of Repair Plans
Non-Standard (NS) Items
Constructability and Coordination
Maintenance of Traffic During Construction
Cleaning, Painting, and Containment Specifics Accelerated Schedule
Bid Opening Phase 1
Construction
Conclusions & Questions
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
3/25
Results you can rely on
DESIGN TEAM ORGANIZATION
3
Louisiana DOTD Baton Rouge, LA
o Chris Guidry, P.E. Bridge Design Project Manager TRC Engineers, Inc.
o Durk Krone, P.E. Principalo John Dallas Richard, P.E. Project Managero Mike Paul, P.E. Project Engineero Sage Liu, P.E. Project Engineer
o Don Clayton, P.E. Maintenance of Traffic
Rahman & Associateso Rahman Bhatti, P.E. President
GPI Southeasto Paul Forte, P.E.o
Frank Rea Project Manager ENCON / CMS
o Al Fletrich, P.E. Principalo Kyle Fetrich, P.E.
Kansas City Southern (KCS) Railroad - Srikanth Honnur, P.E. Union Pacific Railroad (UPRR) Michael Freeman, P.E.
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
4/25
Results you can rely on
SITE LOCATION
4
Between Intersections ofLA 1 and US190 (west)US 61/US190/I-110 (east)
River Mile 233.9 AHP
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
5/25
Results you can rely on
BUILT 1940 4 Highway Lanes, 2 each way STRUCTURE LENGTH = 12,226 LF ADT = 28,400 (2011)
MAIN TRUSS: 3,326 FT
WEST APPROACH5,300 FT
West HighwayApproach: 1,728 FT
East HighwayApproach: 843 FT
EAST APPROACH3,600 FT
5,897 LF
BRIDGE SPECIFICS
5
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
6/25
Results you can rely on
BRIDGE SPECIFICS
6
TRUSSSPANS
RAILROAD APPROACH SPANS
Lower LateralBracing
Floorbeam
HighwayStringer
RailroadGirders
LowerChord
TRUSS SPAN FLOOR SYSTEM
HIGHWAY APPROACH SPANS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
7/25Results you can rely on
HISTORY OF REHABILITATION PROJECTS
7
Bridge opened August 1940
Huey P. Long Bridge
Old Mississippi River Bridge
Previous Rehabilitation Projects
Painted in mid-1960s
Major Rehabilitation in 1986
Widened from 19-9 to 24-0
Deck & bridge rail repairs
Structural strengthening
2005 In-depth Inspection by TRC
2010-2011 Special Inspections by TRC 2010-2013 Rehabilitation Project by TRC
Phase 1 (Highway & Railroad)
Phase 2 (Railroad Approaches)
Accelerated Schedule (2011)
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
8/25Results you can rely on
REHABILITATION PROJECT PHASES 1 & 2
8
MAIN TRUSS: 3,326 FT
SHARED 50% RR 50% DOTD
WEST APPROACH: 5,300 FT
100 % Railroad
West Highway Approach: 1,720 FT
SHARED PER STRUCTURAL ELEMENT
East Highway Approach: 835 FT
SHARED PER STRUCTURAL ELEMENT
EAST APPROACH: 3,600 FT
100% Railroad
PHASE 1 = 5,897 LFPHASE 2 = 3,572 PHASE 2 = 2,757 LF
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
9/25Results you can rely on
KEY AREAS OF DETERIORATION
9
VERTICAL TRUSS MEMBERS
LATERAL & DIAGONAL MEMBERS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
10/25Results you can rely on
KEY AREAS OF DETERIORATION
10
TOWER ANCHOR BOLT MEMBERS
GUSSET PLATES
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
11/25Results you can rely on
KEY AREAS OF DETERIORATION
11
STIRRUP BEARINGS
TRUSS LATERALS
ROCKER BEARINGS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
12/25Results you can rely on
KEY AREAS OF DETERIORATION
12
TOWER MEMBERS
TRUSS TERTIARY MEMBERS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
13/25Results you can rely on
KEY AREAS OF DETERIORATION
13
PIERS
HANDRAILS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
14/25Results you can rely on
EXAMPLE: DESIGN OF TRUSS VERTICAL MEMBER REPAIR
PROCEDURES FOR DEVELOPMENT OF REPAIR PLANS
Identify the repair locations through inspection and coordinationwith DOTD
Truss Member forces are obtained through truss analysis
Develop repair scheme:
o For members with dominating dead load
the dead load stress should be minimize thru jacking or post-tension before new steel for repair is integrated into the member
o For members with significant live loadslive loads need to be restricted during the repair
Repairs are grouped into a Type based upon similar repair
details
Each repair type is then assigned a Non-standard (NS) itemnumber and given a unique item name for bidding purposes
Example:
TEMPORARY JACKING SCHEMATIC FORVERTICAL REPAIRS TYPE I, II, III-A AND III-B
SUMMARY OF ESTIMATED QUANTITIES
ITEM NO. ITEM UNIT QUANTITY
NS-805-00016 NS BRIDGE SUPERSTRUCTURE REPAIR (TRUSS VERTICAL MEMBER REPAIR, TYPE I) EACH 9
NS-805-00016 NS BRIDGE SUPERSTRUCTURE REPAIR (TRUSS VERTICAL MEMBER REPAIR, TYPE II) EACH 1
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
15/25Results you can rely on
PROCEDURES FOR DEVELOPMENT OF REPAIR PLANS
Key Plan of
RepairLocations
Detailsfor EachRepair
Location
TemporaryJackingScheme
Notes toClarify
Intent ofRepairs
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
16/25Results you can rely on
Temporary Post-Tension scheme
PROCEDURES FOR DEVELOPMENT OF REPAIR PLANS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
17/25Results you can rely on
NON-STANDARD (NS) ITEMS
17
Phase 1: 127 Non-standard Items Used for Needed Repairs Phase 2: 57 Non-standard Items Used for Needed Repairs
Pay Unit = Each
Total Number of Repairs = 4175 (2480 Phase 1,1695 Phase - 2)
Reasoning/Benefits- Provides a unit bid price for each repair type
- Provides a unit price for additional similar repairs
found during construction
Bridge Superstructure/Substructure Non-standard Item includes alllabor, equipment, materials, and incidentals required to completethe work.
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
18/25Results you can rely on
CONSTRUCTABILITY AND COORDINATION
JACKING FRAME SYSTEM FOR STIRRUP BEARING REPAIRS
18
COORDINATION REQUIRED ENCON (internal to design team) DOTD RAILROADS
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
19/25Results you can rely on
MAINTENANCE OF TRAFFIC DURING CONSTRUCTION
Phased
Construction Highway Traffic
Commuter andTrucks
Detour route for
evacuations Lane Closures
Railroad Traffic(KCS & UPRR)
Track Fouling
19
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
20/25Results you can rely on
CLEANING, PAINTING, & CONTAINMENT SPECIFICS
20
Total Surface Area 4,266,000 SF
Pressure Wash and Solvent Clean to SSPC-SP1/SP12 NV2 Abrasive Blast to SSPC-SP10
Documents Specified an Organic Zinc, Epoxy Urethane
Paint System
Environmental Requirements
- SSPC Guide 6, Level 1A Containment- Pre- and Post-Project Soil and Water Sampling- Air Quality Monitoring- Visible Emissions Assessment - EPA Method 22- Waste Management SSPC Guide 7, 40 CFR
(Collection, Storage, Transportation, Disposal)
Red Lead in Existing Paint Cleaning must be fullycontained
OSHA (29 CFR 1926.62, Lead in Construction PPE)
- Respirators, Tyvex Suits, Fall Protection, Safety Glasses
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
21/25Results you can rely on
ACCELERATED SCHEDULE
May 2011 TRC met with DOTD and set a date for submission of finalplans for late March 2012
DOTD contacted TRC on June 15, 2011 Surplus Federal Funds
TRC submitted accelerated fee proposal to DOTD June 17, 2011 DOTD Issued Advanced Notice-to-Proceed June 20, 2011
August 31, 2011 TRC submitted 158 stamped and signed drawings (297total sheets Phase 1)
21
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
22/25Results you can rely on
BID OPENING PHASE 1
22
BID OPENING DATE January 11, 2012 ENGINEER ESTIMATE = $ 85,460,813.70
HIGH BID = $ 118,288,888.88
LOW BID = $ 74,849,999.48
AWARDED TO - LIBERTY / ALPHA
RANKBidder
NumberBidder Name
Construction Bid
(Items Total)
1 28182050 Liberty Main.-Alpha Paint. A Jt Vt. $74,849,999.48
2 00271000 Massman Construction Co. $82,258,373.20
3 54683000 Conti Enterprises, Inc. $91,377,777.00
4 HER01000 Hercules Painting Co., Inc $92,345,632.31
5 47347000 Kiewit Louisiana Co $111,446,919.80
6 24429000 Abhe & Svoboda, Inc. $118,288,888.88
DOTD Project No.: H.000343.6
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
23/25Results you can rely on
CONSTRUCTION
23
CONTAINMENT SYSTEM
INSIDE CONTAINMENT
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
24/25Results you can rely on
CONSTRUCTION
24
RESULTS FROM BLASTING
BLASTING
-
7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013
25/25
QUESTIONS