  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    1/25

    Rehabilitation Design and Construction for the US 190 MississippiRiver Bridge Cleaning, Painting, and Repair Project

    2013 Louisiana Transportation Conference Session 13

    Durk Krone, P.E., TRC Engineers, Inc., Baton Rouge, LA

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    2/25

    Results you can rely on

    AGENDA

    2

    Design Team Organization

    Site Location Bridge Specifics

    History of Rehabilitation Projects

    Rehabilitation Project Phases 1 and 2

    Key Areas of Deterioration

    Procedures for Development of Repair Plans

    Non-Standard (NS) Items

    Constructability and Coordination

    Maintenance of Traffic During Construction

    Cleaning, Painting, and Containment Specifics Accelerated Schedule

    Bid Opening Phase 1

    Construction

    Conclusions & Questions

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    3/25

    Results you can rely on

    DESIGN TEAM ORGANIZATION

    3

    Louisiana DOTD Baton Rouge, LA

    o Chris Guidry, P.E. Bridge Design Project Manager TRC Engineers, Inc.

    o Durk Krone, P.E. Principalo John Dallas Richard, P.E. Project Managero Mike Paul, P.E. Project Engineero Sage Liu, P.E. Project Engineer

    o Don Clayton, P.E. Maintenance of Traffic

    Rahman & Associateso Rahman Bhatti, P.E. President

    GPI Southeasto Paul Forte, P.E.o

    Frank Rea Project Manager ENCON / CMS

    o Al Fletrich, P.E. Principalo Kyle Fetrich, P.E.

    Kansas City Southern (KCS) Railroad - Srikanth Honnur, P.E. Union Pacific Railroad (UPRR) Michael Freeman, P.E.

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    4/25

    Results you can rely on

    SITE LOCATION

    4

    Between Intersections ofLA 1 and US190 (west)US 61/US190/I-110 (east)

    River Mile 233.9 AHP

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    5/25

    Results you can rely on

    BUILT 1940 4 Highway Lanes, 2 each way STRUCTURE LENGTH = 12,226 LF ADT = 28,400 (2011)

    MAIN TRUSS: 3,326 FT

    WEST APPROACH5,300 FT

    West HighwayApproach: 1,728 FT

    East HighwayApproach: 843 FT

    EAST APPROACH3,600 FT

    5,897 LF

    BRIDGE SPECIFICS

    5

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    6/25

    Results you can rely on

    BRIDGE SPECIFICS

    6

    TRUSSSPANS

    RAILROAD APPROACH SPANS

    Lower LateralBracing

    Floorbeam

    HighwayStringer

    RailroadGirders

    LowerChord

    TRUSS SPAN FLOOR SYSTEM

    HIGHWAY APPROACH SPANS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    7/25Results you can rely on

    HISTORY OF REHABILITATION PROJECTS

    7

    Bridge opened August 1940

    Huey P. Long Bridge

    Old Mississippi River Bridge

    Previous Rehabilitation Projects

    Painted in mid-1960s

    Major Rehabilitation in 1986

    Widened from 19-9 to 24-0

    Deck & bridge rail repairs

    Structural strengthening

    2005 In-depth Inspection by TRC

    2010-2011 Special Inspections by TRC 2010-2013 Rehabilitation Project by TRC

    Phase 1 (Highway & Railroad)

    Phase 2 (Railroad Approaches)

    Accelerated Schedule (2011)

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    8/25Results you can rely on

    REHABILITATION PROJECT PHASES 1 & 2

    8

    MAIN TRUSS: 3,326 FT

    SHARED 50% RR 50% DOTD

    WEST APPROACH: 5,300 FT

    100 % Railroad

    West Highway Approach: 1,720 FT

    SHARED PER STRUCTURAL ELEMENT

    East Highway Approach: 835 FT

    SHARED PER STRUCTURAL ELEMENT

    EAST APPROACH: 3,600 FT

    100% Railroad

    PHASE 1 = 5,897 LFPHASE 2 = 3,572 PHASE 2 = 2,757 LF

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    9/25Results you can rely on

    KEY AREAS OF DETERIORATION

    9

    VERTICAL TRUSS MEMBERS

    LATERAL & DIAGONAL MEMBERS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    10/25Results you can rely on

    KEY AREAS OF DETERIORATION

    10

    TOWER ANCHOR BOLT MEMBERS

    GUSSET PLATES

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    11/25Results you can rely on

    KEY AREAS OF DETERIORATION

    11

    STIRRUP BEARINGS

    TRUSS LATERALS

    ROCKER BEARINGS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    12/25Results you can rely on

    KEY AREAS OF DETERIORATION

    12

    TOWER MEMBERS

    TRUSS TERTIARY MEMBERS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    13/25Results you can rely on

    KEY AREAS OF DETERIORATION

    13

    PIERS

    HANDRAILS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    14/25Results you can rely on

    EXAMPLE: DESIGN OF TRUSS VERTICAL MEMBER REPAIR

    PROCEDURES FOR DEVELOPMENT OF REPAIR PLANS

    Identify the repair locations through inspection and coordinationwith DOTD

    Truss Member forces are obtained through truss analysis

    Develop repair scheme:

    o For members with dominating dead load

    the dead load stress should be minimize thru jacking or post-tension before new steel for repair is integrated into the member

    o For members with significant live loadslive loads need to be restricted during the repair

    Repairs are grouped into a Type based upon similar repair

    details

    Each repair type is then assigned a Non-standard (NS) itemnumber and given a unique item name for bidding purposes

    Example:

    TEMPORARY JACKING SCHEMATIC FORVERTICAL REPAIRS TYPE I, II, III-A AND III-B

    SUMMARY OF ESTIMATED QUANTITIES

    ITEM NO. ITEM UNIT QUANTITY

    NS-805-00016 NS BRIDGE SUPERSTRUCTURE REPAIR (TRUSS VERTICAL MEMBER REPAIR, TYPE I) EACH 9

    NS-805-00016 NS BRIDGE SUPERSTRUCTURE REPAIR (TRUSS VERTICAL MEMBER REPAIR, TYPE II) EACH 1

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    15/25Results you can rely on

    PROCEDURES FOR DEVELOPMENT OF REPAIR PLANS

    Key Plan of

    RepairLocations

    Detailsfor EachRepair

    Location

    TemporaryJackingScheme

    Notes toClarify

    Intent ofRepairs

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    16/25Results you can rely on

    Temporary Post-Tension scheme

    PROCEDURES FOR DEVELOPMENT OF REPAIR PLANS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    17/25Results you can rely on

    NON-STANDARD (NS) ITEMS

    17

    Phase 1: 127 Non-standard Items Used for Needed Repairs Phase 2: 57 Non-standard Items Used for Needed Repairs

    Pay Unit = Each

    Total Number of Repairs = 4175 (2480 Phase 1,1695 Phase - 2)

    Reasoning/Benefits- Provides a unit bid price for each repair type

    - Provides a unit price for additional similar repairs

    found during construction

    Bridge Superstructure/Substructure Non-standard Item includes alllabor, equipment, materials, and incidentals required to completethe work.

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    18/25Results you can rely on

    CONSTRUCTABILITY AND COORDINATION

    JACKING FRAME SYSTEM FOR STIRRUP BEARING REPAIRS

    18

    COORDINATION REQUIRED ENCON (internal to design team) DOTD RAILROADS

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    19/25Results you can rely on

    MAINTENANCE OF TRAFFIC DURING CONSTRUCTION

    Phased

    Construction Highway Traffic

    Commuter andTrucks

    Detour route for

    evacuations Lane Closures

    Railroad Traffic(KCS & UPRR)

    Track Fouling

    19

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    20/25Results you can rely on

    CLEANING, PAINTING, & CONTAINMENT SPECIFICS

    20

    Total Surface Area 4,266,000 SF

    Pressure Wash and Solvent Clean to SSPC-SP1/SP12 NV2 Abrasive Blast to SSPC-SP10

    Documents Specified an Organic Zinc, Epoxy Urethane

    Paint System

    Environmental Requirements

    - SSPC Guide 6, Level 1A Containment- Pre- and Post-Project Soil and Water Sampling- Air Quality Monitoring- Visible Emissions Assessment - EPA Method 22- Waste Management SSPC Guide 7, 40 CFR

    (Collection, Storage, Transportation, Disposal)

    Red Lead in Existing Paint Cleaning must be fullycontained

    OSHA (29 CFR 1926.62, Lead in Construction PPE)

    - Respirators, Tyvex Suits, Fall Protection, Safety Glasses

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    21/25Results you can rely on

    ACCELERATED SCHEDULE

    May 2011 TRC met with DOTD and set a date for submission of finalplans for late March 2012

    DOTD contacted TRC on June 15, 2011 Surplus Federal Funds

    TRC submitted accelerated fee proposal to DOTD June 17, 2011 DOTD Issued Advanced Notice-to-Proceed June 20, 2011

    August 31, 2011 TRC submitted 158 stamped and signed drawings (297total sheets Phase 1)

    21

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    22/25Results you can rely on

    BID OPENING PHASE 1

    22

    BID OPENING DATE January 11, 2012 ENGINEER ESTIMATE = $ 85,460,813.70

    HIGH BID = $ 118,288,888.88

    LOW BID = $ 74,849,999.48

    AWARDED TO - LIBERTY / ALPHA

    RANKBidder

    NumberBidder Name

    Construction Bid

    (Items Total)

    1 28182050 Liberty Main.-Alpha Paint. A Jt Vt. $74,849,999.48

    2 00271000 Massman Construction Co. $82,258,373.20

    3 54683000 Conti Enterprises, Inc. $91,377,777.00

    4 HER01000 Hercules Painting Co., Inc $92,345,632.31

    5 47347000 Kiewit Louisiana Co $111,446,919.80

    6 24429000 Abhe & Svoboda, Inc. $118,288,888.88

    DOTD Project No.: H.000343.6

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    23/25Results you can rely on

    CONSTRUCTION

    23

    CONTAINMENT SYSTEM

    INSIDE CONTAINMENT

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    24/25Results you can rely on

    CONSTRUCTION

    24

    RESULTS FROM BLASTING

    BLASTING

  • 7/29/2019 S13_Rehabilitation Design and Construction for the US 190 Mississippi River Bridge Cleaning, Painting, And Repair Project_LTC2013

    25/25

    QUESTIONS