Ørsted wind power way of working with rd&d...wind turbine rotor diameter, year of commissioning...
TRANSCRIPT
Trondheim,
17th January 2018
Jørn Scharling Holm,
Technology Partnership Manager
ØRSTED WIND POWER WAY OF WORKING WITH RD&D
Rapid technological development
Wind turbine rotor diameter, year of commissioning
Multiple levers to drive down cost in offshore wind power
2002 2005 2007 2011 2014 2016 2020
80 m90 m
107 m
120 m
154 m 164 m
180 - 200 m
Boeing 747, 76m
Scale
✓
1
▪ Turbines size
▪ Sites size
▪ Vessel size
Innovation
✓
2
▪Foundation
▪Electrical infrastructure
Industrialisation
✓
3
▪Transition from single supply
to multiple global suppliers
Ørsted’s overview of levers for CoE reduction
Internal R&D
projects
Small collaborative
R&D projects
Joint Industry
Projects
Confidentiality and IPR
Project management efficiency and
administration
Project outcome, scope and impact
Competence match
Wake models
Foundation concept
Geoscience models
R&D strategy
review
12
Internal / external funding
Large R&D
consortium
projects
R&D Programmes
Ørsted R&D strategy and types of collaboration
3
Confidentiality and IPR
Project management efficiency and
administration
Project outcome, scope and impact
Competence match
Wake models
Foundation concept
Geoscience models
R&D strategy
review
12
Internal / external funding
Ørsted R&D strategy and types of collaboration
3
Internal R&D
projects
Joint Industry
Projects
Large R&D
consortiums
Small collaborative
R&D projects
R&D Programmes
Ørsted’s R&D Programme
R&D Strategy- organised in 5 Roadmaps
ObjectivesEnable the pipeline, CoE reduction, Risk reduction, HSE performance,
Design standard improvements and competence development
Measurements: Lidar,
radar, buoys
Modelling: Lay-out,
AEP, Loads, etc.
Power curve validation
Roadmap 1
Wind & Waves
Substation design
Array and export cables
layout and installation
Grid simulations
Grid connection
Ancillary services
Roadmap 3
Electrical
Infrastructure
Component reliability
New components
New O&M inspection
and replacement
methods
Roadmap 4
WTG O&M
Logistics
modelling and
optimisation
Accomodation set-
up development
Roadmap 5
Logistics
Geotechnical survey methods
Monopile/ jacket design methods
Soil-structure interaction
Underwater noise damping
Corrosion protection
Roadmap 2
Foundations, Geoscience
and Marine
Student Projects
Programme
University PhDs
Input on research
topics
Data packages
Research projects
Guest lectures/
cases
Collaboration with universities and research institutions- building competences leading to improved R&D
List not exhaustive.
Six research areas - Focusing on everything but the turbine, representing roughly 70% of offshore wind energy costs
2%
12%
19%
22%12%
33%Development
ConstructionFinance
Installation
Foundations
Electrical
Turbine
LCOE Breakdown
Source: Navigant
Example on joint demonstration and commercialisation - Carbon Trust OWA
From basic research to commercial deployment- how, who, what…
IEA - Renewable Energy Technology Deployment, published in March 2017