WATERPROOFING SPECIFICATIONS AND METHODOLOGIES ROOF SLAB 101 Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology www.supershieldglobal.com ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT l The ROOF SLAB that is to be treated should be minimum 7 days old. l The pipe penetrations through the horizontal brick walls should be packed and plastered to a minimum thickness of 25 mm with the ratio of 1:3 cement mortar. l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio of 1:3 cement mortar to a height of minimum 6" above the gradient level. SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY Provide, mix and brush apply two coats of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating Capillary (DPC) waterproofing system that generates a non-soluble crystalline formation of dendritic fibers within the pores and capillary tracts of the concrete @ 1.5 Kg/m² for two coats on the roof slab and the adjacent curb wall that are of concrete to the height of 6" above the filling level. Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms seamless flexible membrane @ 1 .2 Kg/m² on the side walls to height of 6" above the filling level. The coating should overlap a minimum 1” over the crystalline coating at the junction. Concrete Substrate Non Concrete Substrate with Plastering TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m² ROOF SLAB - 101 Page 1 of 3 SUPERSHIELD CRYSTALGUARD FIRST COATING SUPERSHIELD CRYSTALGUARD SECOND COATING ROOF SLAB SUPERSHIELD FLEXI FIRST COAT SUPERSHIELD FLEXI SECOND COAT COVING

Upload: others

Post on 26-Jul-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 101

Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology

www.supershieldglobal.com

ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT

l The ROOF SLAB that is to be treated should be minimum 7 days old.

l The pipe penetrations through the horizontal brick walls should be packed and plastered to a

minimum thickness of 25 mm with the ratio of 1:3 cement mortar.

l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio

of 1:3 cement mortar to a height of minimum 6" above the gradient level.

SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY

Provide, mix and brush apply two coats of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating

Capillary (DPC) waterproofing system that generates a non-soluble crystalline formation of dendritic fibers within

the pores and capillary tracts of the concrete @ 1.5 Kg/m² for two coats on the roof slab and the adjacent curb wall

that are of concrete to the height of 6" above the filling level.

Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms seamless

flexible membrane @ 1 .2 Kg/m² on the side walls to height of 6" above the filling level. The coating should

overlap a minimum 1” over the crystalline coating at the junction.

Concrete Substrate

Non Concrete Substrate with Plastering

TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m²

ROOF SLAB - 101 Page 1 of 3

SUPERSHIELD CRYSTALGUARDFIRST COATING

SUPERSHIELD CRYSTALGUARD SECOND COATING

ROOF SLAB

SUPERSHIELD FLEXI FIRST COAT

SUPERSHIELD FLEXISECOND COAT

COVING

Page 2: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

Application Methodology

Curing

Watch Points

Performance Criteria

1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD CRYSTALGUARD must

be free from foreign materials and to be micro cleaned by mechanical means like wire brushing or vacuum

cleaning.

2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to ensure

moisture presence inside the pores and capillaries and remove any excess water and ensure surface is touch dry

while coating.

3) Mixing of CRYSTALGUARD - Mix SUPERSHIELD CRYSTALGUARD powder with clean water to form a slurry

consistency with 5 parts of powder and 2 parts of water.

4) Application of CRYSTALGUARD - Apply the first coat of SUPERSHIELD CRYSTALGUARD as a slurry

consistency on the concrete surface.

5) Second coat of CRYSTALGUARD - Apply the second coat of SUPERSHIELD CRYSTALGUARD as a slurry

consistency on the first coat after a minimum of 4 hours gap.

Continue with the SUPERSHIELD FLEXI membrane coating on the non-concrete substrate after 8 hours of

crystalline coating.

6) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B

Component (Liquid) as per the pre-measured packaging.

7) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on the non-concrete

plastered side walls, overlapping the crystalline coating for 2" at the junction.

8) Second coat FLEXI – Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on the first coat

after a minimum of 4 hours gap.

l The SUPERSHIELD CRYSTALGUARD coating should be cured with a misty fog spray of clean water, 24 hours

after the application and to be kept moist for minimum 3 days.

l The SUPERSHIELD FLEXI should be air cured for minimum 3 days and protected from water/ rain for

minimum 18 hours.

Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and

other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification

and application methodology.

Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.

l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by

www.supershieldglobal.com ROOF SLAB - 101 Page 2 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 101

Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology

TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m²

Page 3: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like

crystal formation deep within concrete.

l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army

Corps of Engineers CRD-C48-73 "Permeability of Concrete".

l Testing on the effectiveness of coating from negative side of concrete : Independent testing that

demonstrates the capability of the coating to seal the leakage/dampness from negative side.

l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03

should exhibit a resistance of 100% better than that of the untreated specimen.

l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and

approval for use of waterproofing material on structures holding potable water shall be evidenced.

A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified

body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the

harmonized standard EN to prove that the facility from where the material is produced for the project has

undergone the required testing and extensive inspection and is under continuous surveillance by a notified body

appointed by the European Union as per the European norms for the system. Manufacturers who cannot provide

the performance test data specified herein and FPC certificate shall not be considered for the project.

B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline

waterproofing materials and shall be approved by the manufacturer in writing.

A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised

company official.

B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by

faulty workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The

warranty will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks

through the treated surfaces which are not due to structural weaknesses or other causes beyond applicator's

control such as fire, earthquake and cyclone.

Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.

Quality Assurance

Warranty

Submittals

www.supershieldglobal.com ROOF SLAB - 101 Page 3 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 101

Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology

TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m²

Page 4: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 102

www.supershieldglobal.com

ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT

l The ROOF SLAB that is to be treated should be minimum 7 days old.

l The pipe penetrations through the horizontal brick walls should be packed and plastered to a minimum

thickness of 25 mm with the ratio of 1:3 cement mortar.

l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio

of 1:3 cement mortar to a height of minimum 6" above the gradient level.

Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms

seamless flexible membrane @ 1.2 Kg/m² on the side walls to height of 6" above the filling level. The

coating should overlap a minimum 1” over the crystalline coating at the junction.

SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY

Provide, mix and brush apply one coat of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating

Capillary (DPC) waterproofing system @ 0.75 Kg/m² and one coat of SUPERSHIELD CRYSTALGUARD ULTIMA,

single compound highly concentrated crystalline coating as a top coat that generates a non-soluble crystalline

formation of dendritic fibers within the pores and capillary tracts of the concrete with hard surface finish @ 0.75

Kg/m² on the roof slab and the adjacent curb wall that are of concrete to the height of 6" above the filling level.

Concrete Substrate

Non Concrete Substrate with Plastering

ONE COAT OF CRYSTALGUARD AND ONE COAT OF CRYSTALGUARD ULTIMA @ 1.5 Kg/m²

ROOF SLAB - 102 Page 1 of 3

SUPERSHIELD CRYSTALGUARDCOATING

SUPERSHIELD CRYSTALGUARDULTIMA COATING

ROOF SLAB

COVING

SUPERSHIELD FLEXI FIRST COAT

SUPERSHIELD FLEXI SECOND COAT

Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology

Page 5: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

Application Methodology

Curing

Watch Points

1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD

CRYSTALGUARD /ULTIMA must be free from foreign materials and to be micro cleaned by mechanical

means like wire brushing or vacuum cleaning.

2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to

ensure moisture presence inside the pores and capillaries and remove any excess water to ensure

surface is touch dry while coating.

3) Mixing of CRYSTALGUARD - Mix SUPERSHIELD CRYSTALGUARD powder with clean water to form a

slurry consistency with 5 parts of powder and 2 parts of water.

4) Application of CRYSTALGUARD - Apply one coat of SUPERSHIELD CRYSTALGUARD as a slurry

consistency on the concrete surface.

5) Mixing of CRYSTALGUARD ULTIMA - Mix SUPERSHIELD CRYSTALGUARD ULTIMA powder with

clean water to form a slurry consistency with 5 parts of powder and 2 parts of water.

6) Application of CRYSTALGUARD ULTIMA - Apply one coat of SUPERSHIELD CRYSTALGUARD

ULTIMA as a slurry consistency on the CRYSTALGUARD coating minimum after 4 hours gap as a top

coating.

Continue with the SUPERSHIELD FLEXI membrane coating on the non-concrete substrate after 8

hours of crystalline coating.

7) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B

Component (Liquid) as per the pre-measured packaging.

8) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on to the

non-concrete plastered side walls, overlapping the crystalline coating for 2" at the junction.

9) Second coat FLEXI - Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on to the

first coat after a minimum of 4 hours gap.

Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and

other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification

and application methodology.

l The SUPERSHIELD CRYSTALGUARD/ ULTIMA coating should be cured with a misty fog spray of clean water,

24 hours after the application and to be kept moist for minimum 3 days.

l The SUPERSHIELD FLEXI should be air cured for minimum 3 days and protected from water/ rain for

minimum 18 hours.

www.supershieldglobal.com ROOF SLAB - 102 Page 2 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 102

ONE COAT OF CRYSTALGUARD AND ONE COAT OF CRYSTALGUARD ULTIMA @ 1.5 Kg/m²

Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology

Page 6: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

Performance Criteria

Quality Assurance

Warranty

Submittals

Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.

l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by

independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like

crystal formation deep within concrete.

l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army

Corps of Engineers CRD-C48-73 "Permeability of Concrete".

l Testing on the effectiveness of coating from negative side of concrete : Independent testing that

demonstrates the capability of the coating to seal the leakage/dampness from negative side.

l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03

should exhibit a resistance of 100% better than that of the untreated specimen.

l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and

approval for the use of waterproofing material on structures holding potable water shall be evidenced.

A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified

body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the

harmonized standard EN to prove that the facility from where the material is produced for the project has

undergone the required testing and extensive inspection and is under continuous surveillance by a notified body

appointed by the European Union as per the European norms for the system. Manufacturers who cannot provide

the performance test data specified herein and FPC certificate shall not be considered for the project.

B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline

waterproofing materials and shall be approved by the manufacturer in writing.

A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised

company official.

B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by faulty

workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The warranty

will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks through the

treated surfaces which are not due to structural weaknesses or other causes beyond applicator's control such as

fire, earthquake and cyclone.

Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.

www.supershieldglobal.com ROOF SLAB - 102 Page 3 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 102

ONE COAT OF CRYSTALGUARD AND ONE COAT OF CRYSTALGUARD ULTIMA @ 1.5 Kg/m²

Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology

Page 7: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 103

Concrete Waterproofing And Durability Enhancement Using Supershield DPC Crystalline & Multiseal Technology

www.supershieldglobal.com

ROOF SLAB PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT

l The ROOF SLAB that is to be treated should be minimum 7 days old.

l The pipe penetrations through the horizontal brick walls should be packed and plastered to a

minimum thickness of 25 mm with the ratio of 1:3 cement mortar.

l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio

of 1:3 cement mortar to a height of minimum 6" above the gradient level.

Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms

seamless flexible membrane @ 1.2 Kg/m² on the side walls to height of 6" above the filling level. The

coating should overlap a minimum 1” over the crystalline coating at the junction.

SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY

Provide, mix and brush apply one coat of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating

Capillary (DPC) waterproofing system @ 0.75 Kg/m² and one coat of SUPERSHIELD MULTIGUARD, single

compound dual protection system enhanced with SUPERSHIELD MULTISEAL TECHNOLOGY that forms 2

hydrated & hygroscopic crystals and also a repellant barrier on the surface @ 0.8 Kg/m on the roof slab and to the

adjacent curb wall that are of concrete to the height of 6" above the filling level.

Concrete Substrate

Non Concrete Substrate with Plastering

ONE COAT OF CRYSTALGUARD AND ONE COAT OF MULTIGUARD @ 1.5 Kg/m²

ROOF SLAB - 103 Page 1 of 3

SUPERSHIELD CRYSTALGUARDCOATING

SUPERSHIELD MULTIGUARDCOATING

ROOF SLAB

SUPERSHIELD FLEXI FIRST COAT

SUPERSHIELD FLEXI SECOND COAT

COVING

Page 8: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

Application Methodology

Curing

Watch Points

1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD

CRYSTALGUARD /MULTIGUARD must be free from foreign materials and to be micro cleaned by

mechanical means like wire brushing or vacuum cleaning.

2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to

ensure moisture presence inside the pores and capillaries and remove any excess water to ensure

surface is touch dry while coating.

3) Mixing of CRYSTALGUARD - Mix SUPERSHIELD CRYSTALGUARD powder with clean water to form a

slurry consistency with 5 parts of powder and 2 parts of water.

4) Application of CRYSTALGUARD - Apply one coat of SUPERSHIELD CRYSTALGUARD as a slurry

consistency on the concrete surface.

5) Mixing of MULTIGUARD - Mix SUPERSHIELD MULTIGUARD powder with clean water to form a

slurry consistency with 5 parts of powder and 2 parts of water.

6) Application of MULTIGUARD - Apply one coat of SUPERSHIELD MULTIGUARD as a slurry

consistency on the concrete surface as a top coat after 3 days gap.

Continue with the SUPERSHIELD FLEXI membrane coating on to the non-concrete substrate after 8

hours of crystalline coating.

7) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B

Component (Liquid) as per the pre-measured packaging.

8) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on the

non-concrete plastered side walls, overlapping the crystalline coating for 2" at the junction.

9) Second coat FLEXI - Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on the

first coat after a minimum of 4 hours gap.

Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and

other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification

and application methodology.

l The SUPERSHIELD CRYSTALGUARD coating should be cured with a misty fog spray of clean water, 24 hours

after the application and to be kept moist for minimum 3 days.

l The SUPERSHIELD MULTIGUARD coating should be air cured for minimum 3 days and protected from

water/ rain for minimum 18 hours.

www.supershieldglobal.com ROOF SLAB - 103 Page 2 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 103

Concrete Waterproofing And Durability Enhancement Using Supershield DPC Crystalline & Multiseal Technology

ONE COAT OF CRYSTALGUARD AND ONE COAT OF MULTIGUARD @ 1.5 Kg/m²

Page 9: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

Performance Criteria

Quality Assurance

Warranty

Submittals

Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.

l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by

independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like

crystal formation deep within concrete.

l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army

Corps of Engineers CRD-C48-73 "Permeability of Concrete".

l Testing on the effectiveness of coating from negative side of concrete : Independent testing that

demonstrates the capability of the coating to seal the leakage/dampness from negative side.

l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03

should exhibit a resistance of 100% better than that of the untreated specimen.

l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and

approval for the use of waterproofing material on structures holding potable water shall be evidenced.

A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified

body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the

harmonized standard EN to prove that the facility from where the material is produced for the project has

undergone the required testing and extensive inspection and is under continuous surveillance by a notified body

appointed by the European union as per the European norms for the system. Manufacturers who cannot provide

the performance test data specified herein and FPC certificate shall not be considered for the project.

B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline

waterproofing materials and shall be approved by the manufacturer in writing.

A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised

company official.

B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by faulty

workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The warranty

will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks through the

treated surfaces which are not due to structural weaknesses or other causes beyond applicator's control such as

fire, earthquake and cyclone.

Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.

www.supershieldglobal.com ROOF SLAB - 103 Page 3 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 103

Concrete Waterproofing And Durability Enhancement Using Supershield DPC Crystalline & Multiseal Technology

ONE COAT OF CRYSTALGUARD AND ONE COAT OF MULTIGUARD @ 1.5 Kg/m²

Page 10: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 104

Concrete Waterproofing And Durability Enhancement Using Multiseal Technology

www.supershieldglobal.com

ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT

l The ROOF SLAB that is to be treated should be minimum 7 days old.

l The pipe penetrations through the horizontal brick walls should be packed and plastered to a

minimum thickness of 25 mm with the ratio of 1:3 cement mortar.

l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio

of 1:3 cement mortar to a height of minimum 6" above the gradient level.

Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms

seamless flexible membrane @ 1.2 Kg/m² on the side walls to height of 6" above the filling level. The

coating should overlap a minimum 1” over the crystalline coating at the junction.

SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY

Provide, mix and spray apply one coat of SUPERSHIELD MULTISEAL 100, water based colorless liquid

enhanced with Multiseal technology that forms hydrated and hygroscopic crystals in the pores and capillary tracts

of the concrete with a repellant barrier finish on the surface @ 200 Ml/m² on the roof slab and to the adjacent

curb wall that are of concrete to the height of 6" above the filling level.

Concrete Substrate

Non Concrete Substrate with Plastering

ONE COAT OF MULTISEAL 100 @ 200 Ml/m²

ROOF SLAB - 104 Page 1 of 3

SUPERSHIELD MULTISEAL 100 COATING

ROOF SLAB

COVING

SUPERSHIELD FLEXI FIRST COAT

SUPERSHIELD FLEXI SECOND COAT

Page 11: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

Application Methodology

Curing

Watch Points

Performance Criteria

1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD MULTISEAL

100 must be free from foreign materials and to be micro cleaned by mechanical means like wire

brushing or vacuum cleaning.

2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to

ensure moisture presence inside the pores and capillaries and remove any excess water and ensure

surface is predominantly dry while coating to enhance SUPERSHIELD MULTISEAL 100 impregnation.

3) Mixing of MULTISEAL 100 - No mixing is required and should not be diluted with water or by any

other means.

4) Application of MULTISEAL 100 - Apply one coat of SUPERSHIELD MULTISEAL 100 evenly by

means of spraying and ensure the surface is completely impregnated with SUPERSHIELD MULTISEAL

100.

Continue with the SUPERSHIELD FLEXI membrane coating on the non-concrete substrate after 8 hours

of crystalline coating.

5) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B

Component (Liquid) as per the pre-measured packaging.

6) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on the

non-concrete plastered side walls, overlapping the crystalline coating for 2" at the junction.

7) Second coat FLEXI - Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on the

first coat after a minimum of 4 hours gap.

Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and

other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification

and application methodology.

Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.

l The SUPERSHIELD MULTISEAL 100 coating should be air cured and protected from water/ rain for at least

4 hours.

l The SUPERSHIELD FLEXI should be air cured for minimum 3 days and protected from water/ rain for

minimum 18 hours.

www.supershieldglobal.com ROOF SLAB - 104 Page 2 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 104

Concrete Waterproofing And Durability Enhancement Using Multiseal Technology

ONE COAT OF MULTISEAL 100 @ 200 Ml/m²

Page 12: ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING ... · ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT lThe ROOF SLAB that is to be treated should be minimum

l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by

independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like

crystal formation deep within concrete.

l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army

Corps of Engineers CRD-C48-73 "Permeability of Concrete".

l Testing on the effectiveness of coating from negative side of concrete : Independent testing that

demonstrates the capability of the coating to seal the leakage/dampness from negative side.

l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03

should exhibit a resistance of 100% better than that of the untreated specimen.

l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and

approval for the use of waterproofing material on structures holding potable water shall be evidenced.

A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified

body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the

harmonized standard EN to prove that the facility from where the material is produced for the project has

undergone the required testing and extensive inspection and is under continuous surveillance by a notified body

appointed by the European Union as per the European norms for the system. Manufacturers who cannot provide

the performance test data specified herein and FPC certificate shall not be considered for the project.

B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline

waterproofing materials and shall be approved by the manufacturer in writing.

A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised

company official.

B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by faulty

workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The warranty

will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks through the

treated surfaces which are not due to structural weaknesses or other causes beyond applicator's control such as

fire, earthquake and cyclone.

Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.

Quality Assurance

Warranty

Submittals

www.supershieldglobal.com ROOF SLAB - 104 Page 3 of 3

WATERPROOFING SPECIFICATIONS AND METHODOLOGIES

ROOF SLAB 104

Concrete Waterproofing And Durability Enhancement Using Multiseal Technology

ONE COAT OF MULTISEAL 100 @ 200 Ml/m²