l The ROOF SLAB that is to be treated should be minimum 7 days old.
l The pipe penetrations through the horizontal brick walls should be packed and plastered to a
minimum thickness of 25 mm with the ratio of 1:3 cement mortar.
l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio
of 1:3 cement mortar to a height of minimum 6" above the gradient level.
SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY
Provide, mix and brush apply two coats of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating
Capillary (DPC) waterproofing system that generates a non-soluble crystalline formation of dendritic fibers within
the pores and capillary tracts of the concrete @ 1.5 Kg/m² for two coats on the roof slab and the adjacent curb wall
that are of concrete to the height of 6" above the filling level.
Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms seamless
flexible membrane @ 1 .2 Kg/m² on the side walls to height of 6" above the filling level. The coating should
overlap a minimum 1” over the crystalline coating at the junction.
Concrete Substrate
Non Concrete Substrate with Plastering
TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m²
ROOF SLAB - 101 Page 1 of 3
SUPERSHIELD CRYSTALGUARDFIRST COATING
SUPERSHIELD CRYSTALGUARD SECOND COATING
ROOF SLAB
SUPERSHIELD FLEXI FIRST COAT
SUPERSHIELD FLEXISECOND COAT
COVING
Application Methodology
Curing
Watch Points
Performance Criteria
1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD CRYSTALGUARD must
be free from foreign materials and to be micro cleaned by mechanical means like wire brushing or vacuum
cleaning.
2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to ensure
moisture presence inside the pores and capillaries and remove any excess water and ensure surface is touch dry
while coating.
3) Mixing of CRYSTALGUARD - Mix SUPERSHIELD CRYSTALGUARD powder with clean water to form a slurry
consistency with 5 parts of powder and 2 parts of water.
4) Application of CRYSTALGUARD - Apply the first coat of SUPERSHIELD CRYSTALGUARD as a slurry
consistency on the concrete surface.
5) Second coat of CRYSTALGUARD - Apply the second coat of SUPERSHIELD CRYSTALGUARD as a slurry
consistency on the first coat after a minimum of 4 hours gap.
Continue with the SUPERSHIELD FLEXI membrane coating on the non-concrete substrate after 8 hours of
crystalline coating.
6) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B
Component (Liquid) as per the pre-measured packaging.
7) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on the non-concrete
plastered side walls, overlapping the crystalline coating for 2" at the junction.
8) Second coat FLEXI – Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on the first coat
after a minimum of 4 hours gap.
l The SUPERSHIELD CRYSTALGUARD coating should be cured with a misty fog spray of clean water, 24 hours
after the application and to be kept moist for minimum 3 days.
l The SUPERSHIELD FLEXI should be air cured for minimum 3 days and protected from water/ rain for
minimum 18 hours.
Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and
other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification
and application methodology.
Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.
l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by
www.supershieldglobal.com ROOF SLAB - 101 Page 2 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 101
Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology
TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m²
independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like
crystal formation deep within concrete.
l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army
Corps of Engineers CRD-C48-73 "Permeability of Concrete".
l Testing on the effectiveness of coating from negative side of concrete : Independent testing that
demonstrates the capability of the coating to seal the leakage/dampness from negative side.
l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03
should exhibit a resistance of 100% better than that of the untreated specimen.
l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and
approval for use of waterproofing material on structures holding potable water shall be evidenced.
A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified
body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the
harmonized standard EN to prove that the facility from where the material is produced for the project has
undergone the required testing and extensive inspection and is under continuous surveillance by a notified body
appointed by the European Union as per the European norms for the system. Manufacturers who cannot provide
the performance test data specified herein and FPC certificate shall not be considered for the project.
B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline
waterproofing materials and shall be approved by the manufacturer in writing.
A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised
company official.
B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by
faulty workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The
warranty will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks
through the treated surfaces which are not due to structural weaknesses or other causes beyond applicator's
control such as fire, earthquake and cyclone.
Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.
Quality Assurance
Warranty
Submittals
www.supershieldglobal.com ROOF SLAB - 101 Page 3 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 101
Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology
TWO COATS OF CRYSTALGUARD @ 1.5 Kg/m²
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 102
www.supershieldglobal.com
ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT
l The ROOF SLAB that is to be treated should be minimum 7 days old.
l The pipe penetrations through the horizontal brick walls should be packed and plastered to a minimum
thickness of 25 mm with the ratio of 1:3 cement mortar.
l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio
of 1:3 cement mortar to a height of minimum 6" above the gradient level.
Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms
seamless flexible membrane @ 1.2 Kg/m² on the side walls to height of 6" above the filling level. The
coating should overlap a minimum 1” over the crystalline coating at the junction.
SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY
Provide, mix and brush apply one coat of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating
Capillary (DPC) waterproofing system @ 0.75 Kg/m² and one coat of SUPERSHIELD CRYSTALGUARD ULTIMA,
single compound highly concentrated crystalline coating as a top coat that generates a non-soluble crystalline
formation of dendritic fibers within the pores and capillary tracts of the concrete with hard surface finish @ 0.75
Kg/m² on the roof slab and the adjacent curb wall that are of concrete to the height of 6" above the filling level.
Concrete Substrate
Non Concrete Substrate with Plastering
ONE COAT OF CRYSTALGUARD AND ONE COAT OF CRYSTALGUARD ULTIMA @ 1.5 Kg/m²
ROOF SLAB - 102 Page 1 of 3
SUPERSHIELD CRYSTALGUARDCOATING
SUPERSHIELD CRYSTALGUARDULTIMA COATING
ROOF SLAB
COVING
SUPERSHIELD FLEXI FIRST COAT
SUPERSHIELD FLEXI SECOND COAT
Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology
Application Methodology
Curing
Watch Points
1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD
CRYSTALGUARD /ULTIMA must be free from foreign materials and to be micro cleaned by mechanical
means like wire brushing or vacuum cleaning.
2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to
ensure moisture presence inside the pores and capillaries and remove any excess water to ensure
surface is touch dry while coating.
3) Mixing of CRYSTALGUARD - Mix SUPERSHIELD CRYSTALGUARD powder with clean water to form a
slurry consistency with 5 parts of powder and 2 parts of water.
4) Application of CRYSTALGUARD - Apply one coat of SUPERSHIELD CRYSTALGUARD as a slurry
consistency on the concrete surface.
5) Mixing of CRYSTALGUARD ULTIMA - Mix SUPERSHIELD CRYSTALGUARD ULTIMA powder with
clean water to form a slurry consistency with 5 parts of powder and 2 parts of water.
6) Application of CRYSTALGUARD ULTIMA - Apply one coat of SUPERSHIELD CRYSTALGUARD
ULTIMA as a slurry consistency on the CRYSTALGUARD coating minimum after 4 hours gap as a top
coating.
Continue with the SUPERSHIELD FLEXI membrane coating on the non-concrete substrate after 8
hours of crystalline coating.
7) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B
Component (Liquid) as per the pre-measured packaging.
8) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on to the
non-concrete plastered side walls, overlapping the crystalline coating for 2" at the junction.
9) Second coat FLEXI - Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on to the
first coat after a minimum of 4 hours gap.
Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and
other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification
and application methodology.
l The SUPERSHIELD CRYSTALGUARD/ ULTIMA coating should be cured with a misty fog spray of clean water,
24 hours after the application and to be kept moist for minimum 3 days.
l The SUPERSHIELD FLEXI should be air cured for minimum 3 days and protected from water/ rain for
minimum 18 hours.
www.supershieldglobal.com ROOF SLAB - 102 Page 2 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 102
ONE COAT OF CRYSTALGUARD AND ONE COAT OF CRYSTALGUARD ULTIMA @ 1.5 Kg/m²
Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology
Performance Criteria
Quality Assurance
Warranty
Submittals
Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.
l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by
independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like
crystal formation deep within concrete.
l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army
Corps of Engineers CRD-C48-73 "Permeability of Concrete".
l Testing on the effectiveness of coating from negative side of concrete : Independent testing that
demonstrates the capability of the coating to seal the leakage/dampness from negative side.
l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03
should exhibit a resistance of 100% better than that of the untreated specimen.
l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and
approval for the use of waterproofing material on structures holding potable water shall be evidenced.
A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified
body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the
harmonized standard EN to prove that the facility from where the material is produced for the project has
undergone the required testing and extensive inspection and is under continuous surveillance by a notified body
appointed by the European Union as per the European norms for the system. Manufacturers who cannot provide
the performance test data specified herein and FPC certificate shall not be considered for the project.
B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline
waterproofing materials and shall be approved by the manufacturer in writing.
A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised
company official.
B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by faulty
workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The warranty
will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks through the
treated surfaces which are not due to structural weaknesses or other causes beyond applicator's control such as
fire, earthquake and cyclone.
Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.
www.supershieldglobal.com ROOF SLAB - 102 Page 3 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 102
ONE COAT OF CRYSTALGUARD AND ONE COAT OF CRYSTALGUARD ULTIMA @ 1.5 Kg/m²
Concrete Waterproofing and Durability Enhancement Using Supershield DPC Crystalline Technology
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 103
Concrete Waterproofing And Durability Enhancement Using Supershield DPC Crystalline & Multiseal Technology
www.supershieldglobal.com
ROOF SLAB PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT
l The ROOF SLAB that is to be treated should be minimum 7 days old.
l The pipe penetrations through the horizontal brick walls should be packed and plastered to a
minimum thickness of 25 mm with the ratio of 1:3 cement mortar.
l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio
of 1:3 cement mortar to a height of minimum 6" above the gradient level.
Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms
seamless flexible membrane @ 1.2 Kg/m² on the side walls to height of 6" above the filling level. The
coating should overlap a minimum 1” over the crystalline coating at the junction.
SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY
Provide, mix and brush apply one coat of SUPERSHIELD CRYSTALGUARD, single compound Deep Penetrating
Capillary (DPC) waterproofing system @ 0.75 Kg/m² and one coat of SUPERSHIELD MULTIGUARD, single
compound dual protection system enhanced with SUPERSHIELD MULTISEAL TECHNOLOGY that forms 2
hydrated & hygroscopic crystals and also a repellant barrier on the surface @ 0.8 Kg/m on the roof slab and to the
adjacent curb wall that are of concrete to the height of 6" above the filling level.
Concrete Substrate
Non Concrete Substrate with Plastering
ONE COAT OF CRYSTALGUARD AND ONE COAT OF MULTIGUARD @ 1.5 Kg/m²
ROOF SLAB - 103 Page 1 of 3
SUPERSHIELD CRYSTALGUARDCOATING
SUPERSHIELD MULTIGUARDCOATING
ROOF SLAB
SUPERSHIELD FLEXI FIRST COAT
SUPERSHIELD FLEXI SECOND COAT
COVING
Application Methodology
Curing
Watch Points
1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD
CRYSTALGUARD /MULTIGUARD must be free from foreign materials and to be micro cleaned by
mechanical means like wire brushing or vacuum cleaning.
2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to
ensure moisture presence inside the pores and capillaries and remove any excess water to ensure
surface is touch dry while coating.
3) Mixing of CRYSTALGUARD - Mix SUPERSHIELD CRYSTALGUARD powder with clean water to form a
slurry consistency with 5 parts of powder and 2 parts of water.
4) Application of CRYSTALGUARD - Apply one coat of SUPERSHIELD CRYSTALGUARD as a slurry
consistency on the concrete surface.
5) Mixing of MULTIGUARD - Mix SUPERSHIELD MULTIGUARD powder with clean water to form a
slurry consistency with 5 parts of powder and 2 parts of water.
6) Application of MULTIGUARD - Apply one coat of SUPERSHIELD MULTIGUARD as a slurry
consistency on the concrete surface as a top coat after 3 days gap.
Continue with the SUPERSHIELD FLEXI membrane coating on to the non-concrete substrate after 8
hours of crystalline coating.
7) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B
Component (Liquid) as per the pre-measured packaging.
8) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on the
non-concrete plastered side walls, overlapping the crystalline coating for 2" at the junction.
9) Second coat FLEXI - Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on the
first coat after a minimum of 4 hours gap.
Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and
other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification
and application methodology.
l The SUPERSHIELD CRYSTALGUARD coating should be cured with a misty fog spray of clean water, 24 hours
after the application and to be kept moist for minimum 3 days.
l The SUPERSHIELD MULTIGUARD coating should be air cured for minimum 3 days and protected from
water/ rain for minimum 18 hours.
www.supershieldglobal.com ROOF SLAB - 103 Page 2 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 103
Concrete Waterproofing And Durability Enhancement Using Supershield DPC Crystalline & Multiseal Technology
ONE COAT OF CRYSTALGUARD AND ONE COAT OF MULTIGUARD @ 1.5 Kg/m²
Performance Criteria
Quality Assurance
Warranty
Submittals
Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.
l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by
independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like
crystal formation deep within concrete.
l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army
Corps of Engineers CRD-C48-73 "Permeability of Concrete".
l Testing on the effectiveness of coating from negative side of concrete : Independent testing that
demonstrates the capability of the coating to seal the leakage/dampness from negative side.
l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03
should exhibit a resistance of 100% better than that of the untreated specimen.
l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and
approval for the use of waterproofing material on structures holding potable water shall be evidenced.
A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified
body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the
harmonized standard EN to prove that the facility from where the material is produced for the project has
undergone the required testing and extensive inspection and is under continuous surveillance by a notified body
appointed by the European union as per the European norms for the system. Manufacturers who cannot provide
the performance test data specified herein and FPC certificate shall not be considered for the project.
B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline
waterproofing materials and shall be approved by the manufacturer in writing.
A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised
company official.
B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by faulty
workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The warranty
will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks through the
treated surfaces which are not due to structural weaknesses or other causes beyond applicator's control such as
fire, earthquake and cyclone.
Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.
www.supershieldglobal.com ROOF SLAB - 103 Page 3 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 103
Concrete Waterproofing And Durability Enhancement Using Supershield DPC Crystalline & Multiseal Technology
ONE COAT OF CRYSTALGUARD AND ONE COAT OF MULTIGUARD @ 1.5 Kg/m²
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 104
Concrete Waterproofing And Durability Enhancement Using Multiseal Technology
www.supershieldglobal.com
ROOF SLAB - PREREQUISITE FOR SUPERSHIELD WATERPROOFING TREATMENT
l The ROOF SLAB that is to be treated should be minimum 7 days old.
l The pipe penetrations through the horizontal brick walls should be packed and plastered to a
minimum thickness of 25 mm with the ratio of 1:3 cement mortar.
l The side walls that are of non-concrete should be plastered to a minimum thickness of 25 mm with the ratio
of 1:3 cement mortar to a height of minimum 6" above the gradient level.
Provide, mix and brush apply two coats of SUPERSHIELD FLEXI, two component material that forms
seamless flexible membrane @ 1.2 Kg/m² on the side walls to height of 6" above the filling level. The
coating should overlap a minimum 1” over the crystalline coating at the junction.
SUPERSHIELD SPECIFICATION AND APPLICATION METHODOLOGY
Provide, mix and spray apply one coat of SUPERSHIELD MULTISEAL 100, water based colorless liquid
enhanced with Multiseal technology that forms hydrated and hygroscopic crystals in the pores and capillary tracts
of the concrete with a repellant barrier finish on the surface @ 200 Ml/m² on the roof slab and to the adjacent
curb wall that are of concrete to the height of 6" above the filling level.
Concrete Substrate
Non Concrete Substrate with Plastering
ONE COAT OF MULTISEAL 100 @ 200 Ml/m²
ROOF SLAB - 104 Page 1 of 3
SUPERSHIELD MULTISEAL 100 COATING
ROOF SLAB
COVING
SUPERSHIELD FLEXI FIRST COAT
SUPERSHIELD FLEXI SECOND COAT
Application Methodology
Curing
Watch Points
Performance Criteria
1) Surface preparation - The concrete substrate that is to be applied with SUPERSHIELD MULTISEAL
100 must be free from foreign materials and to be micro cleaned by mechanical means like wire
brushing or vacuum cleaning.
2) Pre-wetting - Concrete surface must be thoroughly saturated with clean water prior to the coating to
ensure moisture presence inside the pores and capillaries and remove any excess water and ensure
surface is predominantly dry while coating to enhance SUPERSHIELD MULTISEAL 100 impregnation.
3) Mixing of MULTISEAL 100 - No mixing is required and should not be diluted with water or by any
other means.
4) Application of MULTISEAL 100 - Apply one coat of SUPERSHIELD MULTISEAL 100 evenly by
means of spraying and ensure the surface is completely impregnated with SUPERSHIELD MULTISEAL
100.
Continue with the SUPERSHIELD FLEXI membrane coating on the non-concrete substrate after 8 hours
of crystalline coating.
5) Mixing of FLEXI - Mix SUPERSHIELD FLEXI A component (Powder) with SUPERSHIELD FLEXI B
Component (Liquid) as per the pre-measured packaging.
6) Application of FLEXI - Apply the first coat of SUPERSHIELD FLEXI as a slurry consistency on the
non-concrete plastered side walls, overlapping the crystalline coating for 2" at the junction.
7) Second coat FLEXI - Apply the second coat of SUPERSHIELD FLEXI as a slurry consistency on the
first coat after a minimum of 4 hours gap.
Cracks, horizontal, vertical joint sealing, tie hole, pipe penetrations, construction joints, expansion joints and
other defects in the concrete that is to be waterproofed should be treated as per the SUPERSHIELD specification
and application methodology.
Crystalline waterproofing system should meet or exceed the performance requirements as specified herein.
l The SUPERSHIELD MULTISEAL 100 coating should be air cured and protected from water/ rain for at least
4 hours.
l The SUPERSHIELD FLEXI should be air cured for minimum 3 days and protected from water/ rain for
minimum 18 hours.
www.supershieldglobal.com ROOF SLAB - 104 Page 2 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 104
Concrete Waterproofing And Durability Enhancement Using Multiseal Technology
ONE COAT OF MULTISEAL 100 @ 200 Ml/m²
l Crystalline Penetration : Crystallizing capability of waterproofing material shall be evidenced by
independent SEM (Scanning Electron Microscope) photographs documenting penetration of needle like
crystal formation deep within concrete.
l Self-healing capability and permeability resistance : Independent testing performed according to U.S. Army
Corps of Engineers CRD-C48-73 "Permeability of Concrete".
l Testing on the effectiveness of coating from negative side of concrete : Independent testing that
demonstrates the capability of the coating to seal the leakage/dampness from negative side.
l Resistance to chloride ion penetration : Independent testing performed according to ASTM C 1202-03
should exhibit a resistance of 100% better than that of the untreated specimen.
l Potable Water Approval : Independent testing shall be performed according to EN or NSF Standard 61, and
approval for the use of waterproofing material on structures holding potable water shall be evidenced.
A) Manufacturer : Manufacturer should publish a third party product quality assurance certificate from a notified
body with continuous surveillance audit or CE certificate with FPC (Factory Production Control) as per the
harmonized standard EN to prove that the facility from where the material is produced for the project has
undergone the required testing and extensive inspection and is under continuous surveillance by a notified body
appointed by the European Union as per the European norms for the system. Manufacturers who cannot provide
the performance test data specified herein and FPC certificate shall not be considered for the project.
B) Applicator : Waterproofing applicator shall be experienced in the installation of cementitious crystalline
waterproofing materials and shall be approved by the manufacturer in writing.
A) Manufacturer's Warranty : Manufacturer shall provide standard product warranty executed by authorised
company official.
B) Applicator's Warranty : Applicator shall warrant the waterproofing installation against defects caused by faulty
workmanship or materials for a period of (specify term) years from Date of Substantial Completion. The warranty
will cover the surfaces treated and will bind the applicator to repair, at his expense, any and all leaks through the
treated surfaces which are not due to structural weaknesses or other causes beyond applicator's control such as
fire, earthquake and cyclone.
Product data sheets, Application guidelines, Material safety data sheet, CE certificate, Summary of test reports.
Quality Assurance
Warranty
Submittals
www.supershieldglobal.com ROOF SLAB - 104 Page 3 of 3
WATERPROOFING SPECIFICATIONS AND METHODOLOGIES
ROOF SLAB 104
Concrete Waterproofing And Durability Enhancement Using Multiseal Technology
ONE COAT OF MULTISEAL 100 @ 200 Ml/m²