ANREROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
Romanian Case Study on Interconnection Agreements
Cristian Selavărdeanu Gas Expert
Romanian Energy Regulatory Authority - ANRE
3rd Technical Workshop on Gas Market Design and Natural Gas Transmission Grid Codes
May 21-23, 2018
Vilnius, Lithuania
ANRE
DESCRIPTION OF THE ROMANIAN NATIONAL GAS TRANSMISSION SYSTEM
NETWORK TOPOLOGY
ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
Legendă - Nod Tehnologic SCADA
Zimnicea
- Debitmetru tehnologic unidirecţional
- Debitmetru tehnologic bidirecţionalxx - Conductă m
a
gi st ral ă de
tra
n
sport gaze a si temlui zero de
transport cu di amet rul nom i nal Øxx"
xx - Conductă de
tra
nspor t gaz
e
a s
i
ste
m
ul ui regional de transport cu
di
am
et r ul nomin
al Ø xx"
- Staţie d
e
re
g
l are măs
u
rare gaze
natur
a
l e
- Punct de intrare productie gaze
- Interconectare locală conducte de transport, normal închisă
- Interconectare sistem de transport gaze adiacent
- Depozit de în
m
agazi nare sub
t
erană
- Staţie Co mandă Va
n
e
- Staţie Co m primare Gaze Naturale
SISTEMUL NATIONAL DETRANSPORT GAZE NATURALE-reprezentare simplificata-
- Sensul de curgere de referinta
Foeni
8
Carani
INTERCONECTARE UNGARIA
16Turnu M
ă
gurel e
Bârlad
Huşi
Vaslui
Iaşi
16
20
Negreşti
MOŞU
Buzău
MEDIEŞU AU RI T
12
1228
3/4
Sighetu M
a
rma ţ iei
123/4
12
Satu Mare
Carei
Marghita
20
Oradea
Abrămuţ
Stei
Salonta
20
Baba Novac
16
HORIA
IMPORT RUSIA
(UCRAINA)
SĂRMAŞU
BAND
D-DEALU
FRUMOS
BOGATA III
DRĂGĂŞANI
28
28
20
20
12
12
12
28
16
28
28
28
8
Baia Mare
8
14
20
16
6
1010
CEANU MARE
24
20
1220
12
24
14
14
10
10
10
10 8
28
UNGHENI20
20
COROI
20
20 28
24 28
24
24
20
Hetiur
BĂCIA
HAŢEG
Jupa
RECAŞ
S
C
Şi
n
ca CODLEA
PALTIN
STÂLP 8
9
ŞENDRENI
SC Ş
I
LIŞTEA
URZICENI
MUNTENI
LĂZĂREŞTI
FELICENI
20
20
24
28
28
24
28
20
20
28 32
28 32
28
2014
20
Rodbav
20
14
20½
2010
16
10
10
16 20
10
20
14
10
12
28
20
20
24
20
Hideaga
Zalău
Jibou
Casei
DejBeclean
Năsăud
Enciu
Bistriţa
Ţaga S
U
Sarmas Extras20
Ulieş20
20
Cluj 1
Cluj 2
Turda
Zau10
Band
VestŞincai
28
24
24
Şăuşa
Aiud
Ocna M
u
reş
Cuci
V3
TârguMureş
Ernei Golire
Reghin
BOTORCADeleni-
Cuci
Colibi
V2
IdrifaiaGăneşti
Mediaş
Bazna
NV
Bazna-Medias
24
V3
V1
V2
SC Vinţu d
e
Jo
s
20
24
20
V3
V1
V212
Mintia Simeria
Hunedoara
20
20
V1
V2
20
20
20
16
14
Reşiţa
Dumbrăviţa
Timişoara 112
20
6
24
20
Maşloc
16
24
16
10
Arad 1
Arad 3
Paroşeni
CopşaMică Copşa -
Medias
Şoala
RuşiAlămor
Sibiu
12
3
Cisnădie
Marpod
Bârghiş
Nocrich
12
Victoria PuroliteVictoria
NitroporosFăgăraş
Brateiu
-Refulare
24
Seleuş
Ţigmandru
Sighişoara 1Sighisaora
Sonda 3
32
24
Odorhei
Miercurea Ciuc
Sovata
SfântuGheorghe
Hoghiz
Rupea
BeiaBuneşti
Ghimbav
Braşov
B-Noul
Săsesc
Tohan
Zărneşti
20
24
24
24F1
F2
Laslău
V2
20½
MarpodIlimbav
12
16
12
12
20
16
2020
20
20
12
12
20½
28 10
10 1420
20
16
28
20½
Mara (Sinaia)
Posada
16
28
12
16
12
32
CâmpulungMuscel
24
SCHITU G
O
LEŞTI
20
Govora
16
20
208
Săpunari
Păpuceşti
Piteşti
Drăgăşani
20
SÂMBOTIN
20
20
12
16
Bârseşti
Drăgoieni(Târgu J
iu)
Rovinari
ŢicleniTargu
Jiu
Strâmba
20
C2-Turburea
Bibeşti20
20
2020
20
Drobeta TurnuSeverin
TURBUREA
20
20
20
IşalniţaStatia CentralaGherceşti E
xt r
HUREZANI
Hălăngeşti
20
20
20
Grădiştea
12
20 6
Hurezani-
BustuchiniHurezani
SU Zătreni
Oveselu
16
FăureştiSud
6
Iancu
Jianu
Oveselu
6
Balş
20
2020
Mădulari
Slatina
(Doba
gr. 26)Slatina
(Doba gr.
23)
20
20
20
Slatina(+Alro+Alprom)
10
8
CORBU
20
12
Corbu
10
20
20
8
10Caracal
20
20
20
16
Alexandria
20
20
16
Câmpina
PODIŞOR
20
20
Giurgiu
20
INTERCONECTARE
BULGARIA
32
16
Gura Ş
u
ţ ii
10
10
Târgovişte(Răzvad)
20
Moreni
MĂNEŞTI
VlădeniBrăteşti
Finta-Gheboaia
SU
32
20
Urziceni Extras
Butimanu
Extras
Scăieni
TeleajenValea Călugărească
Brazi
CCC Brazi
km 65
AFUMAŢI
16 Februarie
Măgurele
Titan
BUCIUMENI
BUCUREŞTI
Balaceanca
Extras
Olteniţa
28
32
20
8
3220
12
16
20
Călăraşi
Slobozia
20
32
MOISICA
JUGUREANU
BenţuBărbunceşti20
32
24
24
Chişcani20 40
28
Mital Steel
Galaţi
32
20
ISACCEA
24
24
Petromar
Năvodari
20
Constanţa
Focşani
20
32
Homocea
ONEŞTI
RACOVA
GHERĂIEŞTI
32
28
16
20
20
16
16
16
20
20
10
12
10
20
20
16
1012
10
10
8
8
1016
14
16
16
20
20
16
16
16
16
Bacău II
Bacău
Tazlău Tazlău
Comăneşti
Bicaz Săvineşti
Roman
TârguNeamţ Târgu
Frumos
CâmpulungMoldovenesc
Suceava
Rădăuţi
SiretDorohoi
Botoşani
Todireşti
20
INTERCONECTAREMOLDOVA
1616
LEŢCANI
28
16
20
20
20
20
28
20
28
20
32
20Ileana
16
1216
Jugureanu PadinaJugureanu
3224
2024
32
IMPORT
Şimnic
Scorniceşti
PetreştiBarbatesti
Socu I
Dezbenzinare Ţi
cl eni
Tămăşeşti
Prundeni
Urleşti
PopeştiLăpusata
Băbeni
TătăraniCET Govora
Colibaşi
Dacia Mioveni
Ţiţeşti
Stâlpeni
Mihăieşti
Schitu
Tălmaciu
Boiţa
Mârşa
Avrig
Turnu Roşu
OcnaSibiului
Orlat
Blaj
12
Târnăveni
20
Nadeş - Sighisoara
Ţeline
Sighişoara 2Cesiro
10
TârguSecuiesc
Covasna
Coţofăneşti
Munteni
Secuieni
Valea
Seacă
Pocoleni
Rădăuţi
ElectroArgeş
20
16
Filiasi
Gilău
Arghirescu
Huedin
Aleşd
Bordoşiu
Brăila14
16
16
16
Tecuci
16
28
CSANADPALOTA
Nădlac Nădlac Sonda 3
2020
RUSSE
UNGHENI
TRANZIT
RUSIA (ORLOVKA)
TRANZIT
BULGARIA(KARDAM)
40
48
48
40
48
48
ISACCEA
NEGRU-VODĂNegru--Vo dă
Mangalia
10
Brădeşti
Paraieni de Jos
Piscu StejariSU
Deparati
Harlesti GlavaciocCartojani
SaintGobain-
Călăraşi
BIXAD
TASAUL - proiect
FILIPEŞTI
PM VINTU-SEBES - proiect
16
Balta Alba
gr 22
Balta AlbaGhergheasa
(Boldu)GhergheasaGalbenu
Rosioru
GârboviGârboviPetrom
Florica
Urziceni Nord
Fierbinti
Tecuci
Torcesti
Cudalbi
Frasin
Beresti Tazlau
Filitelnic-Coroi
Band Nord
Fântânele S
U
Balda SU
Ludus
Herepea
Mures SU P9
Mures Cuci
P12
Corunca P10Iernut I
IernutII III
Bogata II
Deleni-Tarnaveni
Cucerdea
Nasal
Vaideiu SU
Refulare
DanesRetis
Gura Sutii
Cristur Refulare
Postarnacu
Valea Calugareasca
Scaieni Compresoare 54
Avicola Titu
Gradinari
Scaieni Compresoare 54 GDF
Frasin - Brazi
Bordosiu
Abramut
Lunca-Refulare
Vest
Sancel-Blaj Turdas
Dinias
Hurezani-
Bulbuceni
SU
Zătreni
Socu II
Micesti
Noul Sasesc
Ciofrangeni
Lunca-Sibiu Copşa -
Combinat
Mamu
Depozit 160 Videle
Burcioaia
Padina
Nord IMerisani (Bascov)
Botorca Vest I
Peris
Afumati S-da
175 Pasarea
Agnita
Mures 12 Depo Extras
Botorca Refulare
(Cetate)
20
Socodor
Ultima actualizare: 06.02.2017
SC DEALU FRUMOS
32
SC Onesti
20V2
Posada
Sinca
Paroseni
Bățani
- Nod Tehnologic in curs de implementare SCADA
Borș
V3
V3
24
Aricesti
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
DESCRIPTION OF THE ROMANIAN NATIONAL GAS TRANSMISSION SYSTEM
The main characteristics of theNational Gas TransmissionSystem are:
• 13,303 km of maintransmission pipelines andconnections for gas supply, ofwhich 553 km of pipelines arededicated to internationaltransmission of gas;
• 1,132 gas regulating - meteringstations for domestic points;
• 6 gas metering stations forinternational transmission;
• 3 compressor stations (Sinca,Onesti, Silistea)
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
DESCRIPTION OF THE ROMANIAN NATIONAL GAS TRANSMISSI ON SYSTEM
• The system was developed during the 60’s-80’s when its main task was to connect theproduction fields located mostly in the central part of the country with the large industrialconsumers.
• Two import point where developed in order to cover the supply gap with Russian importsat GMS Isaccea import and GMS Mediesu Aurit.
Due to such system philosophy, currently the border areas of the system are faced with low pressures!
Points operated by producers/storage operators: Poin ts operated by the TSO:
• 137 physical entry points from production; - 870 physical exit pointsconnected to 39 DSs;
• 7 physical entry/exit points from/to storages; - 232 physical exit pointsconnected to direct consumers.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINTS
Interconnection points:
EU neighbours1. RO-HU: Arad-Szeged2. RO-BG: Ruse-Giurgiu3. RO-BG: Negru Vodă-Kardam (I, II, III)
Non-EU neighbours4. RO-MD: Iaşi-Ungheni5. RO-UA: Medieşu Aurit-Tekovo6. RO-UA: Isaccea import-Orlovka7. RO-UA: Isaccea-Orlovka (I,II, III)
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINT 1: RO-HU: ARAD-SZEGED (CSANADPALOTA)
- Commissioned:- July 2010 – only HU-RO flow- January 2014 – RO-HU flow
(bidirectional capacity)
- Transmission capacities:- HU-RO capacity: 1.75 bcm/y- RO-HU capacity: 0.09 bcm/y
- Planned extension of capacities inboth directions (to 4.4 bcm/y), afterimplementing the BRUA project(phases I and II)
- First Interconnection Agreement (IA)concluded between TRANSGAZ andFGSZ in 2015
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Structure of the IA (I)
1. Definitions
2. Scope of the IA, general provisions
3. Transfer of Risk of Loss
4. Flow control
5. Gas quantity and quality measurementQuantity and Quality MeasurementGas quality specificationRights of access
6. Business rulesBusiness data matchingHandling of Trade notificationsHandling of Single Sided Nomination (SSNHandling of Double Sided Nominations (DSN)Renomination of DSN
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Structure of the IA (II)
7. Allocation
8. Operational Balancing Account
9. Settlement of the Operational Balancing Account in case of termination
10. Monthly Allocation and Report
11. Technical RulesBorder pressureTemporary border pressureBorder capacityValues of capacity for publicationInterruption
12. Maintenance
13. Constraints and communication procedures in case of exceptional events
14. Communication and online data transmission
15. Process of amendment of IA
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Structure of the IA (III)
16. Entry Into Force, Duration and Termination
17. Liability
18. Governing law and dispute resolution
19. Waiver of sovereign immunity
20. Force MajeureForce MajeureNotification requirementsMitigation
21. Confidential information
22. Miscellaneous
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - I
Flow control
� FGSZ controls the gas flow in cooperation with TRANSGAZ in order to ensure that thedifference of the sum of all confirmed nominations and the total gas quantity measuredshall at all times be as close to zero as possible.
� Parties consider the latest confirmed (matched) daily quantity for the bundled and theunbundled booked capacities as delivery task for the given Gas Day.
� Parties consider the daily delivery task must be delivered equally during the Gas Dayindependently from the matched profile, unless the parties agree to use different flowprofile.
� The parties shall make their best endeavours to keep the flow rate above 20,000 m3/h(s)(at normal conditions) at any direction. If the matched daily delivery schedule results inlower flow rate, the Parties shall agree on intermittent delivery schedule, which shallkeep the nominated daily quantity unchanged.
� Parties are entitled to reduce the deliveries scheduled in the framework of interruptiblecapacity any time during the Gas-Day.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - II
Gas quantity and quality measurement (I)
� Quantity and quality measurement of custody transfer is carried out at Csanadpalotameasuring station by the equipment owned, controlled and operated by FGSZ.
� The Measuring Station at Csanadpalota is operated according to the TechnicalOperating Manual of Csanadpalota Measuring Station specified in an Annex to the IA.
� FGSZ carries out the main control and calibration operations in presence of arepresentative of TRANSGAZ. FGSZ informs TRANSGAZ about the calibration works ina prior written notice form to ensure the effectiveness of this action.
� FGSZ informs TRANSGAZ of any modifications which have an effect on energydetermination (for example, but not exclusively: modifications to the piping, primaryelements, instrumentation, calculation methodology, control procedures and frequencies)and the Operating Manual shall be updated accordingly after prior agreement betweenthe Parties.
� All equipment for the commercial measurement of the quantity and quality of natural gasshould have valid type approval certificate and certificate of calibration according toHungarian legislation.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - III
Gas quantity and quality measurement (II)
Gas Quality Specification
Chemical composition (in mol percent)Methane (C1) minimum 70.0Ethane (C2) maximum 10.0Propane (C3) maximum 3.5Butane (C4) maximum 1.5Pentane (C5) maximum 0.5Hexane (C6 +) maximum 0.2Nitrogen (N2) maximum 10.0Carbon dioxide (C02) maximum 8.0Oxygen (02) maximum 0.02
Sulphur contentHydrogen sulphide (H2S) maximum 6.8 mg/irr(n)Mercaptan sulphur (RSH) maximum 8.0 mg/m3(n)Total sulphur maximum 100.0 mg/m3(n)
Gross Calorific value Minimum 10.14 kWh/m3/(n) Maximum 12.79 kWh/m3/(n)
Hydrocarbon dew pointNo hydrocarbons shall condensate at a temperature of zero degrees Celsius (0°C) at a pressure (27.0) bar absolute.
Water dew pointNot higher than minus 8 degrees Celsius (-8°C) at a pressure of 41.0 bar absolute.
ImpuritiesContent of mechanic impurity: max. 0.05 g/m3(s)
Temperature max. plus 50°C
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - IV
Business rules (I)
� At the Csanadpalota IP, (HU>RO) or (RO>HU) bundled trade notifications are not available. Tradenotifications rules on unbundled capacity point may be determined by the parties complying with the relevantprovisions of BAL NC.
� All Single Sided Nominations (SSN) shall be submitted by Network Users to FGSZ. After receiving SSN,FGSZ shall carry out a process on each nomination to ensure that it respects all validation conditions. Allprocessed SSN shall be passed by FGSZ to the Transgaz for local processing. This shall be done as soonas technically possible and feasabie but no later than 15 minutes after the full hour of the nomination and therenomination was submitted by the Network Users. TRANSGAZ has to process all the SSN that have beenreceived from FGSZ as if it would be a nomination sent by his own Registered Network User, to ensure thatthe validation rules are respected.
� Validation conditions for SSN and Renomination of SSN:i. Only the registered network users have rights to submit SSN:ii. Submitted nomination must contain the;
a. code of the network point,b. direction of flow,c. demanded quantity in kWh/h of each gas hour of the Gas Day,d. code of Network User,e. code of counter Network User.
iii. The submitted demanded quantity must not exceed the sum of bookedbundled standard capacities and bilaterally acquired bundled capacity
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - V
Business rules (II)
� Double sided nominations shall be handled on the IP, Network User - to - counter party Network User,a flow direction and hourly basis.
� In case of delivery demand from Hungary to Romania and/or from Romania to Hungary by UTC 13:30(in winter time) and UTC 12:30 (in summer time) of the Gas Day D-1, TRANSGAZ shall communicateto FGSZ the quantities nominated on the IP by using Annex “Matching Schedule - TGN”.
� FGSZ shall check if the quantities nominated on the IP using the FGSZ System correspond with thequantities sent by TRANSGAZ System.
i. If, as a result of the above mentioned check a mismatch is noticed in the hourly data, thenthe “lesser rule” shall be applied for the respective hour(s).
ii. If there is no difference the matching shall be deemed satisfactory and FGSZ shallcommunicate to TRANSGAZ the positive outcome of the matching for Gas Day D.
� FGSZ shall communicate the outcome to TRANSGAZ no later than UTC 14:00 (in winter time) andUTC 13:00 (in summer time) of the Gas Day D-1 by using Annex “Matching Schedule – FGSZ”.
� Renomination(s) of Network Users shall be possible at latest with two (2) hours lead time prior to theintended change between UTC 15:00 in winter time and UTC 14:00 in summer time on D-1 and UTC02:00 in winter time and UTC 01:00 in summer time on D.
� Response time on renominations is 30 minutes (maximum) in case of renomination on TRANSGAZsystem and 1 hour (maximum) in case of renomination on FGSZ system.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - VI
Allocation
� The allocation of the quantities delivered and/or received by the relevant Network User(s) shall becarried out based on the matched quantities. The unit of allocation is in kWh (25°C/0°C), Dailyallocation report containing the daily quantities and related GCV (25°C/0°C) data shall be sent byFGSZ to TRANSGAZ every day until UTC 8:30 in winter time and UTC 7:30 in summer time.
� The allocated daily quantity for the Network Users is equal with the latest matched quantities inkWh(n) (25°C/ 0°C).
� By the establishment of the Operational Balancing Account, the Parties aim to ensure that in case ofi) change of the gas flow,ii) flow below the minimum capacity, oriii) steering differencesiv) gas flow agreed by parties (e.g. maintenance, pipe cleaning)v) emergency situation
the quantities of gas properly nominated and confirmed will be allocated to the Network Users withoutinterruptions or reductions.
� Any imbalance occurred by a difference between the metered quantities for a given gas day and thequantities of the matched daily delivery schedule for the same gas day shall result in an operationalimbalance to be charged or credited in kind to the Operational Balancing Account.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - VII
Communication procedures in case of exceptional events
� If during any Gas Day (D) an unforeseen emergency event occurs, which causes capacity reductions,(e.g. compressor outage, or leakage) FGSZ and TRANSGAZ shall react promptly in order to minimizethe impact of such an emergency event by using best efforts and all reasonable measures.
� Both Parties shall undertake to assure prompt exchange of all relevant information (exchange within30 minutes after occurrence of an emergency), which may affect the quantity of gas being transportedin the future and the quality parameters of the gas.
� The communication shall be performed by means of telephone call for information, followed by awritten confirmation.
� Where an exceptional event occurs on a contracting party’s network affecting the interconnectionpoint, the relevant contracting party shall without delay inform and keep informed the othercontracting party in respect of the possible impact on the quantities of gas that can be transportedover the interconnection point.
� Where a contracting party considers there is an evident danger to system security and/or stability andan exceptional event may have an impact on the confirmed quantities of its network users, as soon asreasonably practicable, each contracting party shall inform its respective affected network users thatare active at the concerned interconnection point of the consequences for the confirmed quantities.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - VIII
Process of amendment of IA
� If any essential economic, technical and/or legal conditions should change in a way to affectsignificantly the terms of this IA, then each Party shall be entitled to request by written notice that theIA be amended to the new situation.
� Following a request for amendment under this Article, the Parties shall meet to discuss in good faith[whether or not an amendment of the IA is justified and] the means of amending IA to the newsituation. Failing to reach an agreement within a period of 90 days from the request for amendment,any Party shall be entitled to terminate this IA. In this case the Parties start immediately negotiate ona new interconnection agreement between themselves in order to ensure the undisturbed cooperationin operating their systems.
� In the event that one of the provisions of this IA is or becomes ineffective, invalid or unlawful, this shallnot affect the validity of the other provisions herein.
� The Parties undertake to replace any of such ineffective, invalid or unlawful provision with a newprovision that shall have as much as possible the same effect as the ineffective, invalid or unlawfulprovision.
� Any modification or amendment of this IA shall be valid only if executed in writing and signed by dulyauthorised representatives of each Party.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND FGSZ (RO-HU IP) Compulsory terms and conditions according to the EU Regulation no. 2015/703 (INT NC) - IX
Governing law and dispute resolution
� The IA is governed by and construed in accordance with Swiss law.� Any dispute, arising out of or in relation with the IA, including the validity, invalidity, breach thereof
shall be settled by arbitration in accordance with Swiss Rules of International Arbitration of the SwissChamber of Commerce in force on the date when the notice of arbitration is submitted in accordancewith the rules set by the IA. The seat of arbitration proceedings shall be conducted in Zürich,Switzerland.
� Any arbitration shall take place before a panel of three arbitrators. Out of the three (3) arbitrators onearbitrator shall be appointed by FGSZ, one by TRANSGAZ and the third arbitrator shall be mutuallyagreed by the Parties. If the Parties are unable to agree upon the identity of such third arbitratorwithin ten (10) days from the date of referral of the Dispute to arbitration, such arbitrator shall beappointed by the previously appointed two arbitrators. In the event that one of the provisions of this IAis or becomes ineffective, invalid or unlawful, this shall not affect the validity of the other provisionsherein.
� The arbitration procedure shall be conducted in English language.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINT 2: RO-BG: GIURGIU - RUSE
- Commissioned on January 2017(bidirectional capacity)
- Transmission capacities:- BG-RO capacity: 0.46 bcm/y (all
year around)- RO-BG capacity: 0.02 bcm/y
(seasonal only – summer)
- Planned extension of capacities in bothdirections (to: 1.5 bcm/y BG-ROdirection, 0.5 bcm/y RO-BG direction, allyear around), after implementing theBRUA project (phase I)
- First IA concluded between TRANSGAZand BULGARTRANSGAZ in 2016
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND BULGARTRANSGAZ (R O-BG IP)
� The structure of the IA similar to the one of IA concluded between TRANSGAZ andFGSZ for the RO-HU IP – i.e. in line with the requirements of the EU Regulation no.703/2015
� The RO-BG flow is limited during summer due to physical constraints that exist on theRomanian NTS level. These constraints will be removed once the BRUA project – phaseI will be implemented
� Future discussions will be held by TRANSGAZ and BULGARTRANSGAZ in order tofurther improve the content of the IA and, subsequently, open the public consultationprocess in accordance with the provisions of the EU Regulation no. 703/2015
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINT 4: RO-MD: IAŞI - UNGHENI
- Commissioned on August 2014
- Transmission capacities:- RO-MD capacity only: 0.04 bcm/y
- Planned extension of capacity to 1.5bcm/y, subject to the commissioning ofUngheni-Chişinău pipeline
- No IA concluded between TRANSGAZand VESTMOLDTRANSGAZ; onlyOperational Agreement (AO), concludedin 2014
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
OA CONCLUDED BETWEEN TRANSGAZ AND VESTMOLDTRANSGAZ (RO-MD IP) Structure of the OA
1. Definitions
2. Scope of the OA
3. Transfer of Risk of Loss
4. Business rules
5. Border pressure and technical capacity
6. Duration
7. Liability
8. Governing law and dispute resolution
9. Waiver of sovereign immunity
10. Force Majeure
11. Miscellaneous
Note: RO-MD IP lies outside the scopeof EU Regulations since this is an IPwith a non-EU country
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
OA CONCLUDED BETWEEN TRANSGAZ AND VESTMOLDTRANSGAZ (RO-MD IP) Supplementary information (I)
Nevertheless, in the framework of the Energy Community, ANRE has adopted, in 2017, a Declaration stating the following:
RECOGNIZING:� the need to develop energy markets in South East and Eastern Europe in close cooperation between
Energy Community Contracting Parties and Member States of the European Union� the necessity of interconnected systems in South East and Eastern Europe to operate on common and
reciprocally binding rules for the benefit of system security, security of supply and market functioning as well as to achieve the critical liquidity
� that treating interconnections, cross-border flows or network capacities equally and irrespectively whether the border to be crossed is situated between EU Member States and/or Contracting Parties paramountly contributes to the very idea of a single regulatory space for Network Energy and abolishment of barriers to trade
� that there is no legal obstacle to treating interconnection points between Member States and third countries that are Energy Community Contracting Parties equal to interconnection points between Member States and that in certain network codes and guidelines an explicit legal basis is already provided for, namely:
• point 2.1.1.1 of Annex I to Regulation (EC) 715/2009 as amended by Commission Decision of 24 August 2012 (Guidelines for Congestion Management Procedures); and
• Article 1(2) of Commission Regulation (EU) 2015/703 of 30 April 2015 establishing a network code on interoperability and data exchange rules; and
• Article 2(1) of Commission Regulation (EU) 984/2013 of 14 October 2013 establishing a Network Code on Capacity Allocation Mechanisms in Gas Transmission Systems
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
OA CONCLUDED BETWEEN TRANSGAZ AND VESTMOLDTRANSGAZ (RO-MD IP) Supplementary information (II)
DECLARES THAT:Will apply network codes and guidelines adopted based on Article 6(11) or Article 23 of Regulation (EC)715/2009 on the points interconnecting the gas transmission system of ROMANIA with the gastransmission system of REPUBLIC OF MOLDOVA and UKRAINE equally to points interconnecting thegas transmission system of ROMANIA with the gas transmission system of other Member States of theEuropean Union, provided the Secretariat of the Energy Community has been notified by REPUBLIC OFMOLDOVA and UKRAINE of its transposition of the relevant network code(s) or guideline(s). Morespecifically this commitment relates to the interconnection points:
- Medieşu Aurit (UA)- Isaccea Import (UA)- Isaccea I (UA)- Isaccea II (UA) - Isaccea III (UA) - Ungheni (MD)
SUBJECT TO:The resolution of challenges stemming from existing legacy agreements (i.e. contracts, technicaloperation conditions).
In executing this commitment, national regulatory authorities or, where applicable, nationalauthorities should coordinate and inform each other in taking their respective decisions.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINTS 5 AND 6: RO-UA: MEDIEŞU AURIT - TEKOVO (5) AND ISACCEA IMPORT - ORLOVKA (6)
MEDIEŞU AURIT - TEKOVO:
- Commissioned in 1999- Transmission capacities:
- UA-RO capacity only: 4.00 bcm/y- Possible reverse flow to UA, subject to the
results of market consultation process started in 2017
- No IA concluded between TRANSGAZ andUKRTRANSGAZ
ISACCEA IMPORT - ORLOVKA:
- Commissioned in 1979- Transmission capacities:
- UA-RO capacity only: 8.60 bcm/y- No IA concluded between TRANSGAZ and
UKRTRANSGAZ
Note: These 2 IPs lie outside the scope of EURegulations since these are IPs with a non-EUcountry
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINTS 3 - RO-BG: NEGRU VODĂ - KARDAM I, II, III7 - RO-UA: ISACCEA - ORLOVKA I, II, III
NEGRU VODĂ – KARDAM I and ISACCEA –ORLOVKA I (so called „transit line” - T1):-Commissioned in 1974-Transmission capacities:
- RO-BG capacity only: 6.10 bcm/y- UA-RO capacity only: 6.10 bcm/y
-No third party access until 1st of October, 2016-IAs concluded between TRANSGAZ and BULGARTRANSGAZ (for Negru Vodă-Kardam I IP) and between TRANSGAZ andUKRTRANSGAZ (for Isaccea-Orlovka I IP) in 2016 (business rules for the latter not applicable )-The pipeline connecting the two IPs forms an independent system (cannot be operated as part of the Romanian National Transmission System)-Main supply for the BG market -Supplies also two municipalities in RO-Capacity allocated on Regional Booking Platform - RBP (equal bookings between RO entry and exit IPs without flow control on Romanian sides)
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
IA CONCLUDED BETWEEN TRANSGAZ AND BULGARTRANSGAZ (R O-BG IP NEGRU VODĂ I –KARDAM I – T1)
� The structure of the IA similar to the one of IA concluded between TRANSGAZ andBULGARTRANSGAZ for the RO-BG IP GIURGIU-RUSE – i.e. GENERALLY in line withthe requirements of the EU Regulation no. 703/2015, with several specificities:
� Since there is no bidirectional flow, the introduction of backhaul transmissionservices was discussed. Could not be implemented due to technical problemsencountered at RO-UA IP Isaccea I – Orlovka I
� At present, no bundled capacity is offered at this IP. Further ammendments arenecessary
� Future discussions will be held by TRANSGAZ and BULGARTRANSGAZ, in the contextof the Memorandum of Understanding signed in September 2016 in the framework ofCESEC, in order to further improve the content of the IA (especially related to theprovision of bidirectional flows) and, subsequently, open the public consultation processin accordance with the provisions of the EU Regulation no. 703/2015
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE
INTERCONNECTION POINTS 3 AND 7 - CONTINUED
NEGRU VODĂ – KARDAM III and ISACCEA –ORLOVKA III (so called „transit line” - T3):-Commissioned in 1999-Transmission capacities:
- RO-BG capacity only: 9.70 bcm/y- UA-RO capacity only: 9.70 bcm/y
-No third party access at present-No IAs concluded between TRANSGAZ andBULGARTRANSGAZ and UKRTRANSGAZ
NEGRU VODĂ – KARDAM II and ISACCEA –ORLOVKA II (so called „transit line” - T2):-Commissioned in 1987-Transmission capacities:
- RO-BG capacity only: 9.60 bcm/y- UA-RO capacity only: 9.60 bcm/y
-No third party access at present-No IAs concluded between TRANSGAZ andBULGARTRANSGAZ and between TRANSGAZ and UKRTRANSGAZ
- Historical contracts with Gazprom Export (GPE) valid until 2018(for T2) and 2023 (for T3)
- Issues in concluding IAs for all these 4 IPs in ord er to allocate the available capacity after 2018 based on CAM prov isions
ANRE
Thank you for your attention!
ROMANIAN ENERGY REGULATORY AUTHORITY – ANRE
CONTACT INFORMATION
Phone: (+ 40 21) 311 22 44
Fax : (+ 40 21) 312 43 65
Email: [email protected]; [email protected]
www.anre.ro
ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE