frequency (/yr) 1.e -9 1.e -5 1.e -3 1.e -2 1.e -6 1.e -7 1.e -8 1.e -4 1 10 100 1000 0.1 Consequences Risks that one cannot afford to take too often Risks that one cannot afford to take at all Limit of tolerability Risk profile RISK MANAGEMENT OF DAMS SUBJECTED TO EXTREME NATURAL HAZARDS analytical, policy and quality assurance considerations Des Hartford

Upload: dinhhanh

Post on 15-Apr-2018

225 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

freq

uenc

y (/y

r)

1.e-9

1.e-5

1.e-3

1.e-2

1.e-6

1.e-7

1.e-8

1.e-4

1 10 100 10000.1Consequences

Risks that onecannot afford totake too often

Risks that onecannot afford to

take at all

Limit oftolerability

Riskprofile

RISK MANAGEMENT OF DAMS SUBJECTED TO EXTREME NATURAL

HAZARDS

analytical, policy and quality assurance considerations

Des Hartford

Page 2: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 2

Uncertain!

• The domain of dam safety involves much uncertainty> Uncertainty in:

• loads– natural hazards– design loads

• dam performance• dam failure consequences

• All of which should be characterised probabilistically> But are generally dealt with deterministically

Page 3: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 3

Dimensions of Dam Safety

• Safety Policy> the job of government

• through regulators

• Safety Analysis> the job of engineers and scientists

• existing methods and new approaches derived from research

• Safety Assessment> Traditionally the job of owners - to convince the

regulator that the dam is “safe”• more realistically that the dam is safe enough

– but few want to admit to this!

Page 4: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 4

Owner–regulator–engineer challenge

• To state precisely what the endeavour of dam safety assurance entails> Is it the avoidance of dam failure at all costs?

• “Absolute Safety”> Is it the avoidance of dam failure at “reasonable” cost

• “Safe Enough”– What constitutes “reasonable” cost?

» The answer to this question is a policy/political matter.

• How do we measure “safety”?> The ability to “measure” being fundamental to

engineering science and engineering practice

Page 5: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

freq

uenc

y (/y

r)

1.e-9

1.e-5

1.e-3

1.e-2

1.e-6

1.e-7

1.e-8

1.e-4

1 10 100 10000.1Consequences

Risks that onecannot afford totake too often

Risks that onecannot afford to

take at all

Limit oftolerability

Riskprofile

Safety policy

A matter for owners and regulators

Page 6: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 6

Safe enough or absolutely safe?

• Dam owners who are liable for the consequences of dam failure, and

• Dam regulators who are responsible for safeguarding the interests of the public> should have a rational and transparent means of

explaining what is meant by a “safe dam”• definitions of what constitute a “safe dam” are difficult to

find– perhaps look outside the dams community

» where the myth of absolute safety dominates– and see that safety is defined in terms of risk

> Conclusion is that Safe Enough is the goal to be striven for

• absolute safety is unachievable

Page 7: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 7

Societal safety in general

Maximum safety possible

“Safety at any cost”

“Societal” accepted

relationship between “equity” and “efficiency”

Page 8: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 8

Dams in the context of societal safety

Leve

l of S

afet

y Pr

ovid

ed

Page 9: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 9

Safety parameters

c

m

1

A

“x = A”

“y = mA + c”

“y = mx + c”

1

Page 10: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 10

Alternative policy parameters

Leve

l of S

afet

y Pr

ovid

ed

1

max

min

Page 11: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 11

Generalised safety framework for dams

Leve

l of S

afet

y Pr

ovid

ed

Page 12: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 12

Policy reality

• Risk assessment provides the most complete characterisation of the safety issue> It is also the most complex way to characterise

safety

• Designing for the “hazard” with no “factors of safety” on the response is an option> Generally not done

• Designing to the “hazard” with “factors of safety” on the response is another option> Traditional practice

Page 13: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 13

Policy challenge

• Decide whether safety of dams should be assessed in terms of:> Deterministic standards (PMF, MCE, design rules)

• Possibly linked to the consequences of dam failure– Linear or non-linear way?

> Probability of hazard• e.g. 100 year flood or the 10-4/yr natural hazard event

– Consider the design parameters for levees post Hurricane Katrina

> Probability of failure• Integrated over the full ranges of hazard loads and dam

responses> Risk

• Full probabilistic characterisation of the combinations of hazards, dam responses and failure consequences

Page 14: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 14

PMF and MCE• The PMF is simply a large flood• The MCE is simply a large earthquake

> May be very conservative in the local context• May not be very large by global standards

> Are not the physical maxima> Are not invariant instruments of public safety policy with

respect to• Location• The state of scientific knowledge or, the people developing

them> Are not strictly “deterministic” constructs

• The extent of probabilistic characterisation varies with the extent of the scientific knowledge available

> Do not necessarily provide the upper bound of “achievable safety”

> Do not necessarily lead to consistently high levels of safety indifferent parts of the same jurisdiction

Page 15: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 15

ALARP considerations

• PMF and MCE do not necessarily maximise safety by reducing risk “As Low As Reasonably Practicable”> If it is reasonably practicable to provide performance

capacity that exceeds the PMF and/or MCE performance than the additional capacity should be provided.

• e.g. concrete dam with PMF spillway designed to withstand overtopping

• e.g. earthfill dam with liquefaction failure mode eliminated– Such a dam could well withstand earthquakes larger than

the site specific MCE

• The ALARP demonstration requires joint consideration of all “hazards”, and the associated “dam response”

Page 16: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 16

“Hazard” and “Dam Response”

Mea

n lo

ad

Mea

n re

sist

ance

Des

ign

load

Des

ign

resi

stan

ce

Nominalsafetymargin

Mean safety margin

Pro

babi

lity

dens

ity

Denotes"Probabilityof Failure"

Page 17: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 17

Prob

abili

ty o

f fai

lure

0

1

Distributions ofprobability of failure

Probability of Hazard Probability of Failure given Hazard

Probability of Failure

Ann

ual E

xcee

danc

e Fr

eque

ncy

Page 18: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 18

Natural hazards, dam response and risk

Page 19: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 19

Towards a rational approach….

• Risk analysis> Provides the most comprehensive means of characterising

the safety of dams• Explicit treatment of all uncertainties

– Transparent and founded in sound science– Necessarily embodies all attributes of traditional analysis

• Goes beyond traditional analysis– Traditional analysis practice is embodied in the risk analysis

approach» As a subset

> A comprehensive risk analysis will include loads and responses outside the range of traditional practice

• Risk analysis demands more comprehensive analysis

Page 20: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 20

The problem of the “unknowable”!

• Impossible to know if an estimate of risk is a good estimate> If probability of event is very low and nothing happens

• then one might be tempted to assume that it is a good estimate– this is not the case– similarly for events that occur when previously two very different

estimates of the probability of the event (0.1 and 0.00001) wereestimated independently

» impossible to determine if the event that occurred was the 0.1 or 0.00001 event!

• This problem is not unique to risk analysis> same problem with traditional practice,

• How does one assure quality of engineering judgement?

Page 21: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 21

Dangers of judgements of probability

• Sound judgement: a vital part of good engineering> safety assessment is arguably not engineering because

nothing is being “engineered”> safety assessment is arguably “engineering science”

• “engineering science”:- the development of reliable knowledge concerning matters of engineering.

» safety assessment involves inferences from incomplete and uncertain data:- the domain of scientific inference

• Judging probability is notoriously difficult> rigorous qualification of experts and adherence to the rules

of scientific inference is the only safeguard against inadequate judgements

• deterministic or probabilistic

Page 22: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

freq

uenc

y (/y

r)

1.e-9

1.e-5

1.e-3

1.e-2

1.e-6

1.e-7

1.e-8

1.e-4

1 10 100 10000.1Consequences

Risks that onecannot afford totake too often

Risks that onecannot afford to

take at all

Limit oftolerability

Riskprofile

Going straight to the point: –safety assessment in terms of “risk”

The integrated form of the policy and analytical considerations

Page 23: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 23

PAR AND LOSS OF LIFE

SUMMERSPRING

FALLWINTERPAR (Spring/

Summer

PAR (Fall)

PAR (Winter)

NEAR DAMLOCATION

ENTIRE INUNDATED AREA

DISTANT LOCATION

PAR AND LOSS OF LIFE

Probability of Failure Consequences of Failure

(PAR) = Population at Risk

UNACCEPTABLEREGION

TOLERABLEREGION

Tolerable risk toan "Individual"

Safety Management ObjectiveRisks are "Tolerable"Risks have been reduced AsLow As ReasonablyPracticable "ALARP"Risks are being effectivelycontrolledActions are "Precautionary" inproportion to: "Uncertainty"and "Consequences ofFailure"

Unacceptable riskto an "Individual"

Risks to Individuals

F-N

1.0000E-09

1.0000E-08

1.0000E-07

1.0000E-06

1.0000E-05

1.0000E-04

1.0000E-03

1.0000E-02

1 10 100 1000

N

F>=N

Societal Risk

Page 24: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 24

“Established” criteria

F-N

1.0000E-09

1.0000E-08

1.0000E-07

1.0000E-06

1.0000E-05

1.0000E-04

1.0000E-03

1.0000E-02

1 10 100 1000

N

F>=N

Netherlands intolerability line

Hong Kong intolerability line

UK local intolerability line

UK negligible line - major hazards of transport

Hong Kong negligible line

Det

aile

dan

alys

is -

UK

Proposed limit of tolerabilityfor loss of life above bank full

Extrapolation of R2P2intolerability point

Damage

Page 25: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

freq

uenc

y (/y

r)

1.e-9

1.e-5

1.e-3

1.e-2

1.e-6

1.e-7

1.e-8

1.e-4

1 10 100 10000.1Consequences

Risks that onecannot afford totake too often

Risks that onecannot afford to

take at all

Limit oftolerability

Riskprofile

Two examples

Page 26: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 26

Ruskin Dam

58 m high

130 m long

Page 27: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 27

Tolerability of Risk Framework

SIMPLIFIED MATRIX APPROACH

1.0E-09

1.0E-08

1.0E-07

1.0E-06

1.0E-05

1.0E-04

1.0E-03

1.0E-02

1 10 100 1000

N

f

Extrapolation of R2P2 intolerability point

UK Broadly Acceptable

FERC (West USA)

USBR (broadly acceptable)

Dam crest (now)

Dam crest (fix)Dam body (now)

Dam body (fix)

Recreational Risk

CDA Guidelines

Page 28: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 28

Hugh Keenleyside Dam

Page 29: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 29

Detailed quantitative risk analysis

10.0 M DisplacementDispl. Exaggeration : 2.0

Reservoir Level : 440.0 ; (sr)2 = 500. psf ; γlim = 15. %

3PGA

2WATERLEVEL

4MAG.

5DYN. RESP.

AND LIQ.

6sr

8CREST

SLUMPING

9RAPID

RELEASE

440 m

435 m

430 m

0.50 G

0.42 G

0.34 G

0.26 G

0.18 G

0.10 G

M 7.5

M 7.0

M 6.5

M 6.0

M 5.5

M 5.0

P=0.85

P=0.50

P=0.15

CRRFOR

900

700

500

330

205

(psf)

15%

30%

45%

0 to 1/8

1/8 to 1/2

1/2 to 1.5

1.5 to 3.0

3.0 to 5.0

> 5.0

No RapidRelease

7γlim

(N1)60=6

(N1)60=8

(N1)60=10

1N -

VALUE

RapidRelease

Page 30: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 30

Probabilities of earth dam failure M=6.5, all PGA’s

Bounded Estimate of Probability of Failure (M = 6.5)

0.000.20

0.400.60

0.801.00

.10g .18g .26g .34g .42g .50g

PGA

Pf

Page 31: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 31

Loss of life scenarios

SIMPLIFIED MATRIX APPROACH

1.0000E-09

1.0000E-08

1.0000E-07

1.0000E-06

1.0000E-05

1.0000E-04

1.0000E-03

1.0000E-02

1 10 100 1000

N

f

Extrapolation of R2P2 intolerability point

UK Broadly Acceptable

UK Tolerable Det

aile

dan

alys

is

Minimum (FERC) forwest US damsCanadian Dam Safety Guidelines

Keenleyside Earthfill Dam

Concrete dam

Acceptable “traditional practice”

Unacceptable “traditional practice”

Page 32: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 32

Some comments on “ALARP”• It is not sufficient for the estimated probability of

failure meet one or several numerical Risk Tolerability criteria> Nor is it sufficient to meet numerical risk tolerability criteria

and some Cost:Benefit criterion• These considerations are only the starting point.

• The remainder of the ALARP demonstration involves explaining:> what level of safety is physically achievable i.e. what is

practicable> why the safest of the physically achievable options was not

selected• why other options that provide more safety than the option that

was selected were not chosen> justifying the selection to the regulator and the affected public

• Demonstrating reasonableness – a “societal value” judgement, not an “engineering judgement”

Page 33: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 33

Some conclusions

• Dam safety assessment is not an “exact science”> Dam safety assessment can be a “rigorous science”

• if dam owners, dam safety regulators and the engineering profession want it to be!

– Given the consequences of dam failure, why is rigorous engineering science not a requirement of dam safety assessment?

» why are dam owners and regulators not demanding it?

• Risk analysis provides the framework for scientific rigour and transparency in dam safety assessment> risk assessment provides a means of compensating for the

weaknesses in traditional practice• why not use it?

Page 34: RISK MANAGEMENT OF DAMS SUBJECTED TO … Hydro Seismic Safet… · • Full probabilistic characterisation of the combinations of ... Mean load Design load Design resistance Mean

14-02-2006 34

ReferencesRisk and Uncertainty in Dam Safety

By D.N.D. Hartford and G.B. Baecher on behalf of:

BC Hydro, Bureau of Reclamation, Corps of Engineers, Hydro Quebec, Manitoba Hydro, Ontario Power Generation, Scottish & Southern Energy and Vattenfall

Published by Thomas Telford, available through ASCE

ICOLD Bulletin 130: Risk Assessment in Dam Safety Management ,