[P [P ROJECT ROJECT N N AME AME ] ] R R ISK ISK A A SSESSMENT SSESSMENT R R EPORT EPORT (RAR) (RAR) EXECUTIVE XECUTIVE S SPONSOR PONSOR : [N : [N AME AME] PROJECT ROJECT M MANAGER ANAGER : [N : [N AME AME] PROGRAM ROGRAM M M ANAGEMENT ANAGEMENT C CONSULTANT ONSULTANT : [N : [NAME AME] REVISION EVISION D DATE ATE : : [I [I NSERT NSERT D DATE ATE] REVISION EVISION N NUMBER UMBER : : [2.0] [2.0] DELIVERABLE ELIVERABLE [GTA-PMO-TEM-010] [GTA-PMO-TEM-010]

Upload: ngohanh

Post on 08-Feb-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

[P[PROJECTROJECT N NAMEAME]]

RRISKISK A ASSESSMENTSSESSMENT R REPORTEPORT(RAR)(RAR)

EEXECUTIVEXECUTIVE S SPONSORPONSOR: [N: [NAMEAME]]

PPROJECTROJECT M MANAGERANAGER: [N: [NAMEAME]]

PPROGRAMROGRAM M MANAGEMENTANAGEMENT C CONSULTANTONSULTANT: [N: [NAMEAME]]

RREVISIONEVISION D DATEATE: : [I[INSERTNSERT D DATEATE]]RREVISIONEVISION N NUMBERUMBER: : [2.0][2.0]

DDELIVERABLEELIVERABLE [GTA-PMO-TEM-010][GTA-PMO-TEM-010]

Page 2: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

TTABLEABLE OFOF C CONTENTSONTENTS

1.0 I1.0 INTRODUCTIONNTRODUCTION....................................................................................................................................................................111.1 P1.1 PURPOSEURPOSE....................................................................................................................................................................................................................111.2 R1.2 REPORTINGEPORTING............................................................................................................................................................................................................111.3 R1.3 REPORTINGEPORTING K KEYSEYS......................................................................................................................................................................................11

2.0 T2.0 TOPOP T TENEN R RISKSISKS....................................................................................................................................................................22

3.0 R3.0 RISKISK B BAROMETRICAROMETRIC C CHARTHART..............................................................................................................................33

4.0 R4.0 RISKSISKS BYBY C CATEGORYATEGORY..................................................................................................................................................44

5.0 D5.0 DETAILEDETAILED R RISKISK A ASSESSMENTSSESSMENT......................................................................................................................555.1 C5.1 CURRENTURRENT O OVERALLVERALL P PROJECTROJECT S STATUSTATUS..................................................................................................................555.2 R5.2 RISKSISKS BYBY C CATEGORYATEGORY............................................................................................................................................................................55

5.2.X Risk Category X.............................................................................................................5

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 1 of 1

Page 3: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

TTABLEABLE OFOF F FIGURESIGURES

Figure 1: Risk Barometric Chart......................................................................................................3

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 2 of 1

Page 4: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

LLISTIST OFOF A APPENDICESPPENDICES

Appendix A – Risk Analysis Profile...............................................................................................1

Appendix B – Risk Reports.............................................................................................................1

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 3 of 1

Page 5: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

RREVISIONEVISION H HISTORYISTORY

RREVISIONEVISION N NUMBERUMBER DDATEATE CCOMMENTOMMENT

1.0 February 23, 2001 Original Scope1 and Initial Baseline

2.0 January 31, 2002 PMO Refinement

1

? This document is a reference from the Georgia Technology Authority (GTA) Project Management Office (PMO) created as part of the strategic continuous process improvement initiative. Questions or recommendations for improvement to this document may be forwarded to any GTA PMO member.

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 4 of 1

Page 6: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

1.0 I1.0 INTRODUCTIONNTRODUCTION

1.1 P1.1 PURPOSEURPOSE

A. The purposes of this report are:

1. To mitigate problems as quickly as possible,

2. To provide formal tracking for problems that have no immediate mitigation, and

3. To provide senior management with monthly briefings on the documented risks.

B. Note that the report is not limited to project risks alone but also reflects risks in the supporting infrastructure, including risks in Project Manager / Program Manager relationships, and “team” risks, such as the availability, skills, and capabilities of the team members.

C. Both the Project Manager and the Program Manager are responsible for identifying and mitigating risks.

1.2 R1.2 REPORTINGEPORTING

A. The Project Manager will update this report and will include notes in the Project Status Report (PSR) on any significant new risks or any significant changes in the status of risks.

B. The Project Manager will prepare this report as a formal deliverable to the Program Manager/Business Owner.

C. Upon approval of the deliverable version of this report, the Program Manager will deliver the approved version to management at the Division level.

1.3 R1.3 REPORTINGEPORTING K KEYSEYS

A. Definition of Status

1. Green. No risk or the risk is completely mitigated

2. Yellow. Significant risk exists; action plans must be developed and reviewed frequently

3. Red. Risk is serious enough to impact the project’s ability to meet commitments; immediate intervention is required

B. Definition of Item Labels

1. Up arrow: Item affects this risk classification in a positive manner.

2. Down arrow: Item affects this risk classification in a negative manner.

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 5 of 1

Page 7: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

2.0 T2.0 TOPOP T TENEN R RISKSISKS

A. The following table summarizes the top ten risks for the project. It is a copy of the Top Ten Risk form (GTA-PMO-FOR-005).

RRISKSISKS

PPROGRAMROGRAM MMANAGERANAGER AASSESSMENTSSESSMENT

PPROJECTROJECTTTEAMEAM AASSESSMENTSSESSMENT

LLASTAST MMONTHONTH’’SS RRANKINGANKING

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Comments:

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 6 of 1

Page 8: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

3.0 R3.0 RISKISK B BAROMETRICAROMETRIC C CHARTHARTPr

obab

ility

Prob

abili

ty

ImpactImpact

High

LowSmall Large

Prob

abili

tyPr

obab

ility

ImpactImpact

High

LowSmall Large

Figure 1: Risk Barometric Chart

LLETTERETTER RRISKISK ID ID DDESCRIPTIONESCRIPTION

A

B

C

D

E

F

G

H

I

J

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 7 of 1

Page 9: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

4.0 R4.0 RISKISK C CLASSIFICATIONLASSIFICATION S SUMMARYUMMARY

CCLASSIFICATIONLASSIFICATION OOPENPEN R RISKSISKS ININ CCLASSIFICATIONLASSIFICATION

SSTATUSTATUS

Project Expectation Risks

Plan and Schedule Risks

Budget Risks

Capital Investment Risks

Contract Risks

Business Domain Knowledge Risks

Client Decision Makers and Key Influencers Risks

Competitor Risks

Vendor Partnership Risks

Project Staffing Risks

Technology Risks

Multiple Location Risks

Project Funding Risks

Conversion Risks

Training Risks

Product Engineering Risks

Development Environment Risks

Program Constraint Risks

Facilities Risks

External Risks

Overall Count for Project

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 8 of 1

Page 10: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

5.0 D5.0 DETAILEDETAILED R RISKISK A ASSESSMENTSSESSMENT

5.1 C5.1 CURRENTURRENT O OVERALLVERALL P PROJECTROJECT S STATUSTATUS

A. [State the overall status of the project as a whole.]

5.2 R5.2 RISKSISKS BYBY C CLASSIFICATIONLASSIFICATION

5.2.X R5.2.X RISKISK C CLASSIFICATIONLASSIFICATION X X

A. [Summarize each risk in this classification, including mitigation plans.]

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.1 GTA-PMO-TEM-010 PAGE 9 of 1

Page 11: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

AAPPENDIXPPENDIX A – R A – RISKISK A ANALYSISNALYSIS P PROFILEROFILE

A.0 IA.0 INTRODUCTIONNTRODUCTION

The following pages contain the current Risk Analysis Profile for this project.

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.0 GTA-PMO-TEM-010 PAGE A.1 of 1

Page 12: Risk Assessment Report (RAR) - Georgiagta.georgia.gov/sites/gta.georgia.gov/files/imported/vgn/images...  · Web viewThis document is a reference from the Georgia Technology Authority

AAPPENDIXPPENDIX B – R B – RISKISK R REPORTSEPORTS

B.0 IB.0 INTRODUCTIONNTRODUCTION

The following pages are the individual risk reports submitted to date.

THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION

REVISION: 2.0 GTA-PMO-TEM-010 PAGE B.1 of 1