risk assessment report (rar) -...
TRANSCRIPT
[P[PROJECTROJECT N NAMEAME]]
RRISKISK A ASSESSMENTSSESSMENT R REPORTEPORT(RAR)(RAR)
EEXECUTIVEXECUTIVE S SPONSORPONSOR: [N: [NAMEAME]]
PPROJECTROJECT M MANAGERANAGER: [N: [NAMEAME]]
PPROGRAMROGRAM M MANAGEMENTANAGEMENT C CONSULTANTONSULTANT: [N: [NAMEAME]]
RREVISIONEVISION D DATEATE: : [I[INSERTNSERT D DATEATE]]RREVISIONEVISION N NUMBERUMBER: : [2.0][2.0]
DDELIVERABLEELIVERABLE [GTA-PMO-TEM-010][GTA-PMO-TEM-010]
TTABLEABLE OFOF C CONTENTSONTENTS
1.0 I1.0 INTRODUCTIONNTRODUCTION....................................................................................................................................................................111.1 P1.1 PURPOSEURPOSE....................................................................................................................................................................................................................111.2 R1.2 REPORTINGEPORTING............................................................................................................................................................................................................111.3 R1.3 REPORTINGEPORTING K KEYSEYS......................................................................................................................................................................................11
2.0 T2.0 TOPOP T TENEN R RISKSISKS....................................................................................................................................................................22
3.0 R3.0 RISKISK B BAROMETRICAROMETRIC C CHARTHART..............................................................................................................................33
4.0 R4.0 RISKSISKS BYBY C CATEGORYATEGORY..................................................................................................................................................44
5.0 D5.0 DETAILEDETAILED R RISKISK A ASSESSMENTSSESSMENT......................................................................................................................555.1 C5.1 CURRENTURRENT O OVERALLVERALL P PROJECTROJECT S STATUSTATUS..................................................................................................................555.2 R5.2 RISKSISKS BYBY C CATEGORYATEGORY............................................................................................................................................................................55
5.2.X Risk Category X.............................................................................................................5
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 1 of 1
TTABLEABLE OFOF F FIGURESIGURES
Figure 1: Risk Barometric Chart......................................................................................................3
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 2 of 1
LLISTIST OFOF A APPENDICESPPENDICES
Appendix A – Risk Analysis Profile...............................................................................................1
Appendix B – Risk Reports.............................................................................................................1
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 3 of 1
RREVISIONEVISION H HISTORYISTORY
RREVISIONEVISION N NUMBERUMBER DDATEATE CCOMMENTOMMENT
1.0 February 23, 2001 Original Scope1 and Initial Baseline
2.0 January 31, 2002 PMO Refinement
1
? This document is a reference from the Georgia Technology Authority (GTA) Project Management Office (PMO) created as part of the strategic continuous process improvement initiative. Questions or recommendations for improvement to this document may be forwarded to any GTA PMO member.
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 4 of 1
1.0 I1.0 INTRODUCTIONNTRODUCTION
1.1 P1.1 PURPOSEURPOSE
A. The purposes of this report are:
1. To mitigate problems as quickly as possible,
2. To provide formal tracking for problems that have no immediate mitigation, and
3. To provide senior management with monthly briefings on the documented risks.
B. Note that the report is not limited to project risks alone but also reflects risks in the supporting infrastructure, including risks in Project Manager / Program Manager relationships, and “team” risks, such as the availability, skills, and capabilities of the team members.
C. Both the Project Manager and the Program Manager are responsible for identifying and mitigating risks.
1.2 R1.2 REPORTINGEPORTING
A. The Project Manager will update this report and will include notes in the Project Status Report (PSR) on any significant new risks or any significant changes in the status of risks.
B. The Project Manager will prepare this report as a formal deliverable to the Program Manager/Business Owner.
C. Upon approval of the deliverable version of this report, the Program Manager will deliver the approved version to management at the Division level.
1.3 R1.3 REPORTINGEPORTING K KEYSEYS
A. Definition of Status
1. Green. No risk or the risk is completely mitigated
2. Yellow. Significant risk exists; action plans must be developed and reviewed frequently
3. Red. Risk is serious enough to impact the project’s ability to meet commitments; immediate intervention is required
B. Definition of Item Labels
1. Up arrow: Item affects this risk classification in a positive manner.
2. Down arrow: Item affects this risk classification in a negative manner.
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 5 of 1
2.0 T2.0 TOPOP T TENEN R RISKSISKS
A. The following table summarizes the top ten risks for the project. It is a copy of the Top Ten Risk form (GTA-PMO-FOR-005).
RRISKSISKS
PPROGRAMROGRAM MMANAGERANAGER AASSESSMENTSSESSMENT
PPROJECTROJECTTTEAMEAM AASSESSMENTSSESSMENT
LLASTAST MMONTHONTH’’SS RRANKINGANKING
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Comments:
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 6 of 1
3.0 R3.0 RISKISK B BAROMETRICAROMETRIC C CHARTHARTPr
obab
ility
Prob
abili
ty
ImpactImpact
High
LowSmall Large
Prob
abili
tyPr
obab
ility
ImpactImpact
High
LowSmall Large
Figure 1: Risk Barometric Chart
LLETTERETTER RRISKISK ID ID DDESCRIPTIONESCRIPTION
A
B
C
D
E
F
G
H
I
J
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 7 of 1
4.0 R4.0 RISKISK C CLASSIFICATIONLASSIFICATION S SUMMARYUMMARY
CCLASSIFICATIONLASSIFICATION OOPENPEN R RISKSISKS ININ CCLASSIFICATIONLASSIFICATION
SSTATUSTATUS
Project Expectation Risks
Plan and Schedule Risks
Budget Risks
Capital Investment Risks
Contract Risks
Business Domain Knowledge Risks
Client Decision Makers and Key Influencers Risks
Competitor Risks
Vendor Partnership Risks
Project Staffing Risks
Technology Risks
Multiple Location Risks
Project Funding Risks
Conversion Risks
Training Risks
Product Engineering Risks
Development Environment Risks
Program Constraint Risks
Facilities Risks
External Risks
Overall Count for Project
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 8 of 1
5.0 D5.0 DETAILEDETAILED R RISKISK A ASSESSMENTSSESSMENT
5.1 C5.1 CURRENTURRENT O OVERALLVERALL P PROJECTROJECT S STATUSTATUS
A. [State the overall status of the project as a whole.]
5.2 R5.2 RISKSISKS BYBY C CLASSIFICATIONLASSIFICATION
5.2.X R5.2.X RISKISK C CLASSIFICATIONLASSIFICATION X X
A. [Summarize each risk in this classification, including mitigation plans.]
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.1 GTA-PMO-TEM-010 PAGE 9 of 1
AAPPENDIXPPENDIX A – R A – RISKISK A ANALYSISNALYSIS P PROFILEROFILE
A.0 IA.0 INTRODUCTIONNTRODUCTION
The following pages contain the current Risk Analysis Profile for this project.
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.0 GTA-PMO-TEM-010 PAGE A.1 of 1
AAPPENDIXPPENDIX B – R B – RISKISK R REPORTSEPORTS
B.0 IB.0 INTRODUCTIONNTRODUCTION
The following pages are the individual risk reports submitted to date.
THIS IS A CONTROLLED DOCUMENT, REFER TO THE DOCUMENT CONTROL INDEX FOR THE LATEST REVISION
REVISION: 2.0 GTA-PMO-TEM-010 PAGE B.1 of 1